SlideShare une entreprise Scribd logo
1  sur  14
Télécharger pour lire hors ligne
Introducing
                       NEXT
ADRIAN BUSUTTIL

                  (Busuttilfamily@xtra.co.nz)
                  Mobile: 0272 245420
PRECISE

PROFESSIONAL
                DESIGN               DYNAMIC


               PORTFOLIO
               Adrian Busuttil




                                 Virtual
                                 Reality




        RAIL        ROAD         OTHER
Bridgwater Northern Distributor Road,
Client: Somerset County Council
                                                                  MORE




                                                                   BACK
                     Project Scope Included:
                      56m span bridge over a navigable channel;
                      Two new signalised junctions;
                      New access to associated housing development.
Albany Highway – Widening for Albany Senior High School

Client: North Shore City Council/ Ministry of
        Education/Arrow International
                                                           MORE                   BACK




                                      Project Scope Included:
                                       Project management and Control
                                       Widening the existing carriageway whilst future proofing
                                        for future corridor enhancement;
                                       Two new signalised intersections;
                                       3D Model of existing services for design and consent.




     EXISTING BRIDGE PIERS (SH1)
Package 1 - Phase 1 Auckland Manukau Eastern Transport Initiative (AMETI),

                      Client: Auckland Transport
Project Scope Included:
 The replacement of the existing single span bridge with a multi span
   structure to accommodate the new AMETI link road, the existing twin track
   North Island Main Trunk Railway and a future third rail track;
 3D Verification of the vertical clearance to the new structure over the
   existing rail spans to allow for future electrification of the railway;
 3D Temporary Diversion Design for Staged Construction;
 Future proofing for final phase 2 design.




                                                                               MORE   BACK
Package 1 - Phase 2 Auckland Manukau Eastern Transport Initiative (AMETI),

           Client: Auckland Transport
                                    The second phase of the AMETI Package 1 project   MORE
                                    includes the development of the following
                                    projects:
                                     RTN Busway – dedicated, urban busway on
                                       Ellerslie Panmure Highway and Lagoon Drive
                                       from Forge Way in the west across Panmure
                                       Bridge in the east;
                                     Reconstruction of Panmure Roundabout into a
                                       signalised intersection;                       BACK
                                     QTN Network – improvements for bus priority .




                                                                     Panmure’s existing
                                                                     context and proposed
                                                                     intensified urban form
Cont. Package 1 - Phase 2 Auckland Manukau Eastern Transport Initiative (AMETI),

                              Client: Auckland Transport
Phase 2 – General Layout Plan (Mount Wellington Highway Intersection Improvement)    Phase 2 – General Layout Plan (New Panmure Intersection)




                                                                          Overall Project Philosophy:
                                                                           Provide bus priority, cycle lanes and improved
                                                                            footpaths and landscaping while maintaining the      BACK
                                                                            required traffic capacity and minimising land
                                                                            take.
Link to Weymouth
     Relief Road                                                                        Link to Weymouth
 Northbound Drive                                                                           Relief Road
       Through                                                                            Northbound Fly
(youtube Real Time)                                                                           Through
                                                                                         (youtube Virtual
                                                                                              Model)


                      DESKTOP VIRTUAL REALITY TECHNOLOGY TO AID HIGHWAY VISUALISATION




             BEFORE                                   AFTER


                                                                                                BACK
MORE




BACK
Balancing pond 3D design and volumetric   BACK
calculations
Manukau Link Station Development,
          Client: Manukau City Council
                                             MORE
Concept Design Development



                                             BACK
MORE




                                                                    BACK




Third Rail Layout – Lewisham Extension, Izmir Metro and Copenhagen Metro
MORE




                      BACK




Civil Works, West Midland
Metro - Line 1 Civil Works
OLE layout, Manchester
                             Metrolink - Phase 2




                                         BACK




Civil Works, West Midland
Metro - Line 1 Civil Works

Contenu connexe

Tendances

Mechanical Design Portfolio
Mechanical Design PortfolioMechanical Design Portfolio
Mechanical Design PortfolioRajiv Ranjan
 
PORTFOLIO (Design Engineering)
PORTFOLIO (Design Engineering)PORTFOLIO (Design Engineering)
PORTFOLIO (Design Engineering)David Diaz
 
MECHANICAL DESIGN ENGINEER
MECHANICAL DESIGN ENGINEERMECHANICAL DESIGN ENGINEER
MECHANICAL DESIGN ENGINEERMohinuddin Shaan
 
Mechanical design engineer portfolio (1.2 mb)
Mechanical design engineer portfolio (1.2 mb)Mechanical design engineer portfolio (1.2 mb)
Mechanical design engineer portfolio (1.2 mb)Nagaraja D Shenoy
 
CAD Portfolio - Karan Shah
CAD Portfolio - Karan ShahCAD Portfolio - Karan Shah
CAD Portfolio - Karan ShahKaran Shah
 
DESIGN AND COMPARATIVE ANALYSIS OF OLD & NEW MODEL CAR WHEEL RIMS WITH VARIOU...
DESIGN AND COMPARATIVE ANALYSIS OF OLD & NEW MODEL CAR WHEEL RIMS WITH VARIOU...DESIGN AND COMPARATIVE ANALYSIS OF OLD & NEW MODEL CAR WHEEL RIMS WITH VARIOU...
DESIGN AND COMPARATIVE ANALYSIS OF OLD & NEW MODEL CAR WHEEL RIMS WITH VARIOU...Journal For Research
 
Mechanical design engineer
Mechanical design engineerMechanical design engineer
Mechanical design engineerPrasanna M N
 
Resume_Design Engineer with 4.8 Years of Exp.
Resume_Design Engineer with 4.8 Years of Exp.Resume_Design Engineer with 4.8 Years of Exp.
Resume_Design Engineer with 4.8 Years of Exp.RENUKARAJU K.B.S
 
Mechanical Design Engineering Portfolio
Mechanical Design Engineering PortfolioMechanical Design Engineering Portfolio
Mechanical Design Engineering PortfolioNIKHIL KULKARNI
 
Material, design & analysis of a bicycle frame
Material, design & analysis of a bicycle frameMaterial, design & analysis of a bicycle frame
Material, design & analysis of a bicycle frameZubair Ahmed
 
DESIGN AND ANALYSIS OF COMPOSITE PROPELLER/DRIVEN SHAFT USING FEA
DESIGN AND ANALYSIS OF COMPOSITE PROPELLER/DRIVEN SHAFT USING FEADESIGN AND ANALYSIS OF COMPOSITE PROPELLER/DRIVEN SHAFT USING FEA
DESIGN AND ANALYSIS OF COMPOSITE PROPELLER/DRIVEN SHAFT USING FEAEagle .
 
CADCAM CAE Notes
CADCAM CAE NotesCADCAM CAE Notes
CADCAM CAE NotesAbhay Gore
 
Creo parametric tips and tricks
Creo parametric tips and tricksCreo parametric tips and tricks
Creo parametric tips and tricksEvan Winter
 
Structural and Thermal Analysis of a Single Plate Dry Friction Clutch Using F...
Structural and Thermal Analysis of a Single Plate Dry Friction Clutch Using F...Structural and Thermal Analysis of a Single Plate Dry Friction Clutch Using F...
Structural and Thermal Analysis of a Single Plate Dry Friction Clutch Using F...dbpublications
 
3 d printing an emerging era of future
 3 d printing an emerging era of future 3 d printing an emerging era of future
3 d printing an emerging era of futurePravin Ahirwar
 
Introduction to CAD/CAE/CAM
Introduction to CAD/CAE/CAMIntroduction to CAD/CAE/CAM
Introduction to CAD/CAE/CAMpavanRaikar3
 
Mechanical Design Portfolio
Mechanical Design Portfolio Mechanical Design Portfolio
Mechanical Design Portfolio Christian Johnson
 
Structural dynamic analysis of a Formula SAE vehicle
Structural dynamic analysis of a Formula SAE vehicleStructural dynamic analysis of a Formula SAE vehicle
Structural dynamic analysis of a Formula SAE vehicleMarco Basilici
 

Tendances (20)

Mechanical Design Portfolio
Mechanical Design PortfolioMechanical Design Portfolio
Mechanical Design Portfolio
 
PORTFOLIO (Design Engineering)
PORTFOLIO (Design Engineering)PORTFOLIO (Design Engineering)
PORTFOLIO (Design Engineering)
 
Design Portfolio
Design PortfolioDesign Portfolio
Design Portfolio
 
MECHANICAL DESIGN ENGINEER
MECHANICAL DESIGN ENGINEERMECHANICAL DESIGN ENGINEER
MECHANICAL DESIGN ENGINEER
 
Mechanical design engineer portfolio (1.2 mb)
Mechanical design engineer portfolio (1.2 mb)Mechanical design engineer portfolio (1.2 mb)
Mechanical design engineer portfolio (1.2 mb)
 
CAD Portfolio - Karan Shah
CAD Portfolio - Karan ShahCAD Portfolio - Karan Shah
CAD Portfolio - Karan Shah
 
DESIGN AND COMPARATIVE ANALYSIS OF OLD & NEW MODEL CAR WHEEL RIMS WITH VARIOU...
DESIGN AND COMPARATIVE ANALYSIS OF OLD & NEW MODEL CAR WHEEL RIMS WITH VARIOU...DESIGN AND COMPARATIVE ANALYSIS OF OLD & NEW MODEL CAR WHEEL RIMS WITH VARIOU...
DESIGN AND COMPARATIVE ANALYSIS OF OLD & NEW MODEL CAR WHEEL RIMS WITH VARIOU...
 
Mechanical design engineer
Mechanical design engineerMechanical design engineer
Mechanical design engineer
 
Mechanical Engineering Portfolio
Mechanical Engineering PortfolioMechanical Engineering Portfolio
Mechanical Engineering Portfolio
 
Resume_Design Engineer with 4.8 Years of Exp.
Resume_Design Engineer with 4.8 Years of Exp.Resume_Design Engineer with 4.8 Years of Exp.
Resume_Design Engineer with 4.8 Years of Exp.
 
Mechanical Design Engineering Portfolio
Mechanical Design Engineering PortfolioMechanical Design Engineering Portfolio
Mechanical Design Engineering Portfolio
 
Material, design & analysis of a bicycle frame
Material, design & analysis of a bicycle frameMaterial, design & analysis of a bicycle frame
Material, design & analysis of a bicycle frame
 
DESIGN AND ANALYSIS OF COMPOSITE PROPELLER/DRIVEN SHAFT USING FEA
DESIGN AND ANALYSIS OF COMPOSITE PROPELLER/DRIVEN SHAFT USING FEADESIGN AND ANALYSIS OF COMPOSITE PROPELLER/DRIVEN SHAFT USING FEA
DESIGN AND ANALYSIS OF COMPOSITE PROPELLER/DRIVEN SHAFT USING FEA
 
CADCAM CAE Notes
CADCAM CAE NotesCADCAM CAE Notes
CADCAM CAE Notes
 
Creo parametric tips and tricks
Creo parametric tips and tricksCreo parametric tips and tricks
Creo parametric tips and tricks
 
Structural and Thermal Analysis of a Single Plate Dry Friction Clutch Using F...
Structural and Thermal Analysis of a Single Plate Dry Friction Clutch Using F...Structural and Thermal Analysis of a Single Plate Dry Friction Clutch Using F...
Structural and Thermal Analysis of a Single Plate Dry Friction Clutch Using F...
 
3 d printing an emerging era of future
 3 d printing an emerging era of future 3 d printing an emerging era of future
3 d printing an emerging era of future
 
Introduction to CAD/CAE/CAM
Introduction to CAD/CAE/CAMIntroduction to CAD/CAE/CAM
Introduction to CAD/CAE/CAM
 
Mechanical Design Portfolio
Mechanical Design Portfolio Mechanical Design Portfolio
Mechanical Design Portfolio
 
Structural dynamic analysis of a Formula SAE vehicle
Structural dynamic analysis of a Formula SAE vehicleStructural dynamic analysis of a Formula SAE vehicle
Structural dynamic analysis of a Formula SAE vehicle
 

Similaire à Engineering Design Portfolio

Mumbai traffic scenario & mumbai metro
Mumbai traffic scenario & mumbai metroMumbai traffic scenario & mumbai metro
Mumbai traffic scenario & mumbai metrosatish choudhari
 
Analysis of Impact of East West Metro Corridor on Land Use
Analysis of Impact of East West Metro Corridor on Land UseAnalysis of Impact of East West Metro Corridor on Land Use
Analysis of Impact of East West Metro Corridor on Land UseAnirban Mahajan
 
Uemc apr 19_2011
Uemc apr 19_2011Uemc apr 19_2011
Uemc apr 19_2011Harith
 
Bandra worli sea link jay
Bandra worli sea link jayBandra worli sea link jay
Bandra worli sea link jayDhruv Seth
 
Mount Dennis Mobility Hub Study
Mount Dennis Mobility Hub StudyMount Dennis Mobility Hub Study
Mount Dennis Mobility Hub StudyCrosstown TO
 
Recent transportation studies for the kern region
Recent transportation studies for the kern regionRecent transportation studies for the kern region
Recent transportation studies for the kern regiondirectionsto2050
 
Mount Dennis Mobility Hub Update and Station Design Review
Mount Dennis Mobility Hub Update and Station Design ReviewMount Dennis Mobility Hub Update and Station Design Review
Mount Dennis Mobility Hub Update and Station Design ReviewCrosstown TO
 
MEMOIR-Optimization of Tunnel reconstruction.pptx
MEMOIR-Optimization of Tunnel reconstruction.pptxMEMOIR-Optimization of Tunnel reconstruction.pptx
MEMOIR-Optimization of Tunnel reconstruction.pptxTebonLionel
 
Doubling progress report
Doubling progress reportDoubling progress report
Doubling progress reportNeha Singh
 
Functional Design Presentation At-Grade Section: Don Mills to Ionview Online ...
Functional Design Presentation At-Grade Section: Don Mills to Ionview Online ...Functional Design Presentation At-Grade Section: Don Mills to Ionview Online ...
Functional Design Presentation At-Grade Section: Don Mills to Ionview Online ...Crosstown TO
 
2015 Excellence in Infrastructure Submissions
2015 Excellence in Infrastructure Submissions2015 Excellence in Infrastructure Submissions
2015 Excellence in Infrastructure SubmissionsAutodesk AEC
 
BC Sir John A. MacDonald BC In A Pet.
BC Sir John A. MacDonald BC In A Pet.BC Sir John A. MacDonald BC In A Pet.
BC Sir John A. MacDonald BC In A Pet.P. Anna Paddon
 
HSR (Phase1 Report) Executive Summary
HSR (Phase1 Report) Executive SummaryHSR (Phase1 Report) Executive Summary
HSR (Phase1 Report) Executive SummaryTransport Planning
 
rup-20151016-part-1-item07-victoria-station-upgrade
rup-20151016-part-1-item07-victoria-station-upgraderup-20151016-part-1-item07-victoria-station-upgrade
rup-20151016-part-1-item07-victoria-station-upgradeRobert Lee - CEng, MICE, PMP
 
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinarNorth West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinarAssociation for Project Management
 
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinarNorth West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinarAssociation for Project Management
 

Similaire à Engineering Design Portfolio (20)

Mumbai traffic scenario & mumbai metro
Mumbai traffic scenario & mumbai metroMumbai traffic scenario & mumbai metro
Mumbai traffic scenario & mumbai metro
 
Analysis of Impact of East West Metro Corridor on Land Use
Analysis of Impact of East West Metro Corridor on Land UseAnalysis of Impact of East West Metro Corridor on Land Use
Analysis of Impact of East West Metro Corridor on Land Use
 
Scarborough Subway Extension Final Evaluation Criteria
Scarborough Subway Extension Final Evaluation CriteriaScarborough Subway Extension Final Evaluation Criteria
Scarborough Subway Extension Final Evaluation Criteria
 
Uemc apr 19_2011
Uemc apr 19_2011Uemc apr 19_2011
Uemc apr 19_2011
 
2016-06-06 Scarborough Subway Extension SAG
2016-06-06 Scarborough Subway Extension SAG2016-06-06 Scarborough Subway Extension SAG
2016-06-06 Scarborough Subway Extension SAG
 
Bandra worli sea link jay
Bandra worli sea link jayBandra worli sea link jay
Bandra worli sea link jay
 
Mount Dennis Mobility Hub Study
Mount Dennis Mobility Hub StudyMount Dennis Mobility Hub Study
Mount Dennis Mobility Hub Study
 
Recent transportation studies for the kern region
Recent transportation studies for the kern regionRecent transportation studies for the kern region
Recent transportation studies for the kern region
 
Mount Dennis Mobility Hub Update and Station Design Review
Mount Dennis Mobility Hub Update and Station Design ReviewMount Dennis Mobility Hub Update and Station Design Review
Mount Dennis Mobility Hub Update and Station Design Review
 
MEMOIR-Optimization of Tunnel reconstruction.pptx
MEMOIR-Optimization of Tunnel reconstruction.pptxMEMOIR-Optimization of Tunnel reconstruction.pptx
MEMOIR-Optimization of Tunnel reconstruction.pptx
 
Doubling progress report
Doubling progress reportDoubling progress report
Doubling progress report
 
Functional Design Presentation At-Grade Section: Don Mills to Ionview Online ...
Functional Design Presentation At-Grade Section: Don Mills to Ionview Online ...Functional Design Presentation At-Grade Section: Don Mills to Ionview Online ...
Functional Design Presentation At-Grade Section: Don Mills to Ionview Online ...
 
2015 Excellence in Infrastructure Submissions
2015 Excellence in Infrastructure Submissions2015 Excellence in Infrastructure Submissions
2015 Excellence in Infrastructure Submissions
 
Waterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display PanelsWaterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display Panels
 
BC Sir John A. MacDonald BC In A Pet.
BC Sir John A. MacDonald BC In A Pet.BC Sir John A. MacDonald BC In A Pet.
BC Sir John A. MacDonald BC In A Pet.
 
HSR (Phase1 Report) Executive Summary
HSR (Phase1 Report) Executive SummaryHSR (Phase1 Report) Executive Summary
HSR (Phase1 Report) Executive Summary
 
rup-20151016-part-1-item07-victoria-station-upgrade
rup-20151016-part-1-item07-victoria-station-upgraderup-20151016-part-1-item07-victoria-station-upgrade
rup-20151016-part-1-item07-victoria-station-upgrade
 
Coordinated Transit Planning in Toronto
Coordinated Transit Planning in TorontoCoordinated Transit Planning in Toronto
Coordinated Transit Planning in Toronto
 
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinarNorth West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
 
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinarNorth West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
 

Engineering Design Portfolio

  • 1. Introducing NEXT ADRIAN BUSUTTIL (Busuttilfamily@xtra.co.nz) Mobile: 0272 245420
  • 2. PRECISE PROFESSIONAL DESIGN DYNAMIC PORTFOLIO Adrian Busuttil Virtual Reality RAIL ROAD OTHER
  • 3. Bridgwater Northern Distributor Road, Client: Somerset County Council MORE BACK Project Scope Included:  56m span bridge over a navigable channel;  Two new signalised junctions;  New access to associated housing development.
  • 4. Albany Highway – Widening for Albany Senior High School Client: North Shore City Council/ Ministry of Education/Arrow International MORE BACK Project Scope Included:  Project management and Control  Widening the existing carriageway whilst future proofing for future corridor enhancement;  Two new signalised intersections;  3D Model of existing services for design and consent. EXISTING BRIDGE PIERS (SH1)
  • 5. Package 1 - Phase 1 Auckland Manukau Eastern Transport Initiative (AMETI), Client: Auckland Transport Project Scope Included:  The replacement of the existing single span bridge with a multi span structure to accommodate the new AMETI link road, the existing twin track North Island Main Trunk Railway and a future third rail track;  3D Verification of the vertical clearance to the new structure over the existing rail spans to allow for future electrification of the railway;  3D Temporary Diversion Design for Staged Construction;  Future proofing for final phase 2 design. MORE BACK
  • 6. Package 1 - Phase 2 Auckland Manukau Eastern Transport Initiative (AMETI), Client: Auckland Transport The second phase of the AMETI Package 1 project MORE includes the development of the following projects:  RTN Busway – dedicated, urban busway on Ellerslie Panmure Highway and Lagoon Drive from Forge Way in the west across Panmure Bridge in the east;  Reconstruction of Panmure Roundabout into a signalised intersection; BACK  QTN Network – improvements for bus priority . Panmure’s existing context and proposed intensified urban form
  • 7. Cont. Package 1 - Phase 2 Auckland Manukau Eastern Transport Initiative (AMETI), Client: Auckland Transport Phase 2 – General Layout Plan (Mount Wellington Highway Intersection Improvement) Phase 2 – General Layout Plan (New Panmure Intersection) Overall Project Philosophy:  Provide bus priority, cycle lanes and improved footpaths and landscaping while maintaining the BACK required traffic capacity and minimising land take.
  • 8. Link to Weymouth Relief Road Link to Weymouth Northbound Drive Relief Road Through Northbound Fly (youtube Real Time) Through (youtube Virtual Model) DESKTOP VIRTUAL REALITY TECHNOLOGY TO AID HIGHWAY VISUALISATION BEFORE AFTER BACK
  • 10. Balancing pond 3D design and volumetric BACK calculations
  • 11. Manukau Link Station Development, Client: Manukau City Council MORE Concept Design Development BACK
  • 12. MORE BACK Third Rail Layout – Lewisham Extension, Izmir Metro and Copenhagen Metro
  • 13. MORE BACK Civil Works, West Midland Metro - Line 1 Civil Works
  • 14. OLE layout, Manchester Metrolink - Phase 2 BACK Civil Works, West Midland Metro - Line 1 Civil Works