North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
Engineering Design Portfolio
1. Introducing
NEXT
ADRIAN BUSUTTIL
(Busuttilfamily@xtra.co.nz)
Mobile: 0272 245420
2. PRECISE
PROFESSIONAL
DESIGN DYNAMIC
PORTFOLIO
Adrian Busuttil
Virtual
Reality
RAIL ROAD OTHER
3. Bridgwater Northern Distributor Road,
Client: Somerset County Council
MORE
BACK
Project Scope Included:
56m span bridge over a navigable channel;
Two new signalised junctions;
New access to associated housing development.
4. Albany Highway – Widening for Albany Senior High School
Client: North Shore City Council/ Ministry of
Education/Arrow International
MORE BACK
Project Scope Included:
Project management and Control
Widening the existing carriageway whilst future proofing
for future corridor enhancement;
Two new signalised intersections;
3D Model of existing services for design and consent.
EXISTING BRIDGE PIERS (SH1)
5. Package 1 - Phase 1 Auckland Manukau Eastern Transport Initiative (AMETI),
Client: Auckland Transport
Project Scope Included:
The replacement of the existing single span bridge with a multi span
structure to accommodate the new AMETI link road, the existing twin track
North Island Main Trunk Railway and a future third rail track;
3D Verification of the vertical clearance to the new structure over the
existing rail spans to allow for future electrification of the railway;
3D Temporary Diversion Design for Staged Construction;
Future proofing for final phase 2 design.
MORE BACK
6. Package 1 - Phase 2 Auckland Manukau Eastern Transport Initiative (AMETI),
Client: Auckland Transport
The second phase of the AMETI Package 1 project MORE
includes the development of the following
projects:
RTN Busway – dedicated, urban busway on
Ellerslie Panmure Highway and Lagoon Drive
from Forge Way in the west across Panmure
Bridge in the east;
Reconstruction of Panmure Roundabout into a
signalised intersection; BACK
QTN Network – improvements for bus priority .
Panmure’s existing
context and proposed
intensified urban form
7. Cont. Package 1 - Phase 2 Auckland Manukau Eastern Transport Initiative (AMETI),
Client: Auckland Transport
Phase 2 – General Layout Plan (Mount Wellington Highway Intersection Improvement) Phase 2 – General Layout Plan (New Panmure Intersection)
Overall Project Philosophy:
Provide bus priority, cycle lanes and improved
footpaths and landscaping while maintaining the BACK
required traffic capacity and minimising land
take.
8. Link to Weymouth
Relief Road Link to Weymouth
Northbound Drive Relief Road
Through Northbound Fly
(youtube Real Time) Through
(youtube Virtual
Model)
DESKTOP VIRTUAL REALITY TECHNOLOGY TO AID HIGHWAY VISUALISATION
BEFORE AFTER
BACK