SlideShare une entreprise Scribd logo
1  sur  15
KOHINOOR SQUARE
ANURAG MATHUR
B.ARCH 3RD YEAR
• Location : Mumbai , India
• Type : Mixed use building
• Architect : SSAArchitects
• Height : 203 m Main building 142 m Residence
building
• Floor : 52 stories , 32 stories Count
• Selection : First Mixed use high-rise criteria in
Mumbai
KOHINOOR SQUARE
t Car Park Entry
Service Entry
Office/Retail
Entry
Public Parking
Entry
Site Area : 4.6 Acres
The first five floors of the main building is used for
a high-end shopping mall and the remaining 47
floors of the main building is utilized for a
commercial offices and five star hotel.
The main building is crowned by five star hotel on
top 5 floor.
The first 13 floors of the residential building is used
as a parking garage for both the buildings and the
remaining 19 floors is residences.
Parking provided for about 2000 cars with super
efficient driveways and personalized access
controls.
Hotel
Offices
Retail
Residences
Parking
Central core(Office tower) consist of :
• 3 Lobbies of 6 Lifts serving levels 25th to 39th
• Spaces between the lifts where a lift lobby is
not provided are used as toilets with dust at
either side: 2 lifts from this pack of 6 are
assessable to lower floors as well
• 1 lobby of 4 lifts serving levels 1st to 24th
• There is a lift bank at 24th floor .
• 2 services lifts travelling Throughout the
building
• 2 Stair cases are also placed in the core .
HVAC & Flume
Shaft
FHC Shaft
Electrical Shaft
11th to 24th Floor
24th to 37th Floor
• The Central Core is surrounded by the office spaces.
• There are segregated office space from 6th to 14
floor with toilets to each office and common toilets
also provided on all these floor.
• Refuge Floors is provided.
DCR RULE
In case of high-rise bldg. more than 30 m then first
refuge floor shall be provided at 24 m or first habitable
floor whichever is higher. Thereafter at every seventh
habitable floor.
Residential Building :
13 stories of parking in below floors.
132 residential units .
8 units on each floor.
At top few floors 4 units on each floor.
Central Core :
3 lifts and 1 service lift
2 Stairs are also placed in the core.
9.5 m
Structure system :
The structure comprises a concrete core and post-
tensioned concrete slab and spandrel beams.
The average centre to centre distance between
columns is 9.5 m.
The column is of 1.8 x 1.8 m .
The tube system concept is based on the idea that a
building can be designed to resist lateral loads.
This assembly of columns and beams forms a rigid
frame that amounts to a dense and strong structural
wall along the exterior of the building.
Foundation :
The combined pile raft foundation system is used .
It is a geotechnical composite construction that combines
the bearing effect of both foundation elements raft and piles .
The pile raft foundation system has recently been widely
used for many structures , specially in high-rise buildings.
The façade consists of faceted unitized aluminum curtain
walls with provisions for high performance double glass
façades on the tower.
Diamond edges of the building having aluminum flashing with
LED lighting are the unique feature and make it complicated
façade design.
All the Glasses are articulated glasses & can sustain design
wind pressure of 4.5 to 5.0 kPa.
The building design makes it environmentally friendly, using
technologies such as floor-to-ceiling insulated glazing to
contain heat and maximize natural light, and an automatic
daylight dimming system
15 double height landscaped Sky Gardens and
more than a dozen double height Terraces, to act
as tranquil and refreshing breakout zones.
Low flow faucets, dual flush toilets, grey water
systems and storm water & rainwater management
systems – all a part of our commitment to the
environment
SUSTAINABLE FEATURES
The Kohinoor square building is one of the first skyscraper building in india to achieve a leadership in
energy and environmental design platinum rating for environmental sustainability a gold (leed) certification
from green building council. Construction of the Kohinoor square started in early 2009, with an completion
date of march 2013.

Contenu connexe

Tendances

High rise building case study
High rise building case study High rise building case study
High rise building case study VISHAKA BOTHRA
 
Raj Rewal Asian games village case study
Raj Rewal Asian games village case studyRaj Rewal Asian games village case study
Raj Rewal Asian games village case studyRadhikaJadhav8
 
5.1 Mixed use building
5.1 Mixed use building5.1 Mixed use building
5.1 Mixed use buildingshabbirtg
 
PREFABRICATED CONSTRUCTION CASE STUDY: THE HEMISPHERE
PREFABRICATED CONSTRUCTION CASE STUDY: THE HEMISPHEREPREFABRICATED CONSTRUCTION CASE STUDY: THE HEMISPHERE
PREFABRICATED CONSTRUCTION CASE STUDY: THE HEMISPHEREShivangi Saini
 
architecture Case study yale university
architecture Case study yale universityarchitecture Case study yale university
architecture Case study yale universityNisarg bhavsar
 
Case Study: Sustainable Mixed-Use Development in Historic Urban Areas
Case Study: Sustainable Mixed-Use Development in Historic Urban AreasCase Study: Sustainable Mixed-Use Development in Historic Urban Areas
Case Study: Sustainable Mixed-Use Development in Historic Urban AreasSustainable Performance Institute
 
Kanchenjunga Apartments- A Case Study
Kanchenjunga Apartments- A Case StudyKanchenjunga Apartments- A Case Study
Kanchenjunga Apartments- A Case StudyShivangi Shankar
 
High Rise Building Research Document
High Rise Building Research DocumentHigh Rise Building Research Document
High Rise Building Research DocumentNicholas Socrates
 
Mix use building case Study
Mix use building case Study Mix use building case Study
Mix use building case Study Nitesh Parmar
 
Hall of nations, Pragati Maidan, Delhi.
Hall of nations, Pragati Maidan, Delhi.Hall of nations, Pragati Maidan, Delhi.
Hall of nations, Pragati Maidan, Delhi.Mayur Waghulde
 
DLF Cyber city (integrated business district)
DLF Cyber city (integrated business district)  DLF Cyber city (integrated business district)
DLF Cyber city (integrated business district) Kapil Kaushik
 
University campus literature study
University campus literature studyUniversity campus literature study
University campus literature studyKiruthika Selvi K J
 
case study of chandigarh college of architecture
case study of chandigarh college of architecturecase study of chandigarh college of architecture
case study of chandigarh college of architectureAbhishek Tiwari
 
Tall buildings case studies
Tall buildings   case studiesTall buildings   case studies
Tall buildings case studiesSoumitra Smart
 
Case study on Mixed use building
Case study on Mixed use buildingCase study on Mixed use building
Case study on Mixed use buildingTonmoy Barua
 

Tendances (20)

Case study on Apartment
Case study on ApartmentCase study on Apartment
Case study on Apartment
 
High rise building case study
High rise building case study High rise building case study
High rise building case study
 
Kohinoor Square BTECH.pptx
Kohinoor Square BTECH.pptxKohinoor Square BTECH.pptx
Kohinoor Square BTECH.pptx
 
Raj Rewal Asian games village case study
Raj Rewal Asian games village case studyRaj Rewal Asian games village case study
Raj Rewal Asian games village case study
 
5.1 Mixed use building
5.1 Mixed use building5.1 Mixed use building
5.1 Mixed use building
 
PREFABRICATED CONSTRUCTION CASE STUDY: THE HEMISPHERE
PREFABRICATED CONSTRUCTION CASE STUDY: THE HEMISPHEREPREFABRICATED CONSTRUCTION CASE STUDY: THE HEMISPHERE
PREFABRICATED CONSTRUCTION CASE STUDY: THE HEMISPHERE
 
architecture Case study yale university
architecture Case study yale universityarchitecture Case study yale university
architecture Case study yale university
 
Case Study: Sustainable Mixed-Use Development in Historic Urban Areas
Case Study: Sustainable Mixed-Use Development in Historic Urban AreasCase Study: Sustainable Mixed-Use Development in Historic Urban Areas
Case Study: Sustainable Mixed-Use Development in Historic Urban Areas
 
Kanchenjunga Apartments- A Case Study
Kanchenjunga Apartments- A Case StudyKanchenjunga Apartments- A Case Study
Kanchenjunga Apartments- A Case Study
 
kala-academy
kala-academykala-academy
kala-academy
 
High Rise Building Research Document
High Rise Building Research DocumentHigh Rise Building Research Document
High Rise Building Research Document
 
high rise case study
high rise case studyhigh rise case study
high rise case study
 
Mix use building case Study
Mix use building case Study Mix use building case Study
Mix use building case Study
 
Hall of nations, Pragati Maidan, Delhi.
Hall of nations, Pragati Maidan, Delhi.Hall of nations, Pragati Maidan, Delhi.
Hall of nations, Pragati Maidan, Delhi.
 
DLF Cyber city (integrated business district)
DLF Cyber city (integrated business district)  DLF Cyber city (integrated business district)
DLF Cyber city (integrated business district)
 
University campus literature study
University campus literature studyUniversity campus literature study
University campus literature study
 
case study of chandigarh college of architecture
case study of chandigarh college of architecturecase study of chandigarh college of architecture
case study of chandigarh college of architecture
 
Tall buildings case studies
Tall buildings   case studiesTall buildings   case studies
Tall buildings case studies
 
KOHINOOR SQUARE.pdf
KOHINOOR SQUARE.pdfKOHINOOR SQUARE.pdf
KOHINOOR SQUARE.pdf
 
Case study on Mixed use building
Case study on Mixed use buildingCase study on Mixed use building
Case study on Mixed use building
 

En vedette

Hearst Tower
Hearst TowerHearst Tower
Hearst Towermisschand
 
case study sustainibility indian office highrise
case study sustainibility indian office highrisecase study sustainibility indian office highrise
case study sustainibility indian office highriseAnurag Biswas
 
Sustainable Design - Mixed Residential/Commercial Use
Sustainable Design - Mixed Residential/Commercial UseSustainable Design - Mixed Residential/Commercial Use
Sustainable Design - Mixed Residential/Commercial Userajensen00
 
What's different between urban planning, urban design, architecture, AADI
What's different between urban planning, urban design, architecture, AADIWhat's different between urban planning, urban design, architecture, AADI
What's different between urban planning, urban design, architecture, AADIaalliance
 
analysis of high rise building
analysis of high rise buildinganalysis of high rise building
analysis of high rise buildingishant_kukreja
 

En vedette (6)

Hearst Tower
Hearst TowerHearst Tower
Hearst Tower
 
case study sustainibility indian office highrise
case study sustainibility indian office highrisecase study sustainibility indian office highrise
case study sustainibility indian office highrise
 
Sustainable Design - Mixed Residential/Commercial Use
Sustainable Design - Mixed Residential/Commercial UseSustainable Design - Mixed Residential/Commercial Use
Sustainable Design - Mixed Residential/Commercial Use
 
Tall buildings
Tall buildingsTall buildings
Tall buildings
 
What's different between urban planning, urban design, architecture, AADI
What's different between urban planning, urban design, architecture, AADIWhat's different between urban planning, urban design, architecture, AADI
What's different between urban planning, urban design, architecture, AADI
 
analysis of high rise building
analysis of high rise buildinganalysis of high rise building
analysis of high rise building
 

Similaire à KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag Mathur(IIT Roorkee)

F.A.R., Ground Coverage and Height Permissible as per Bye Laws
F.A.R., Ground Coverage and Height Permissible as per Bye LawsF.A.R., Ground Coverage and Height Permissible as per Bye Laws
F.A.R., Ground Coverage and Height Permissible as per Bye LawsAr. Md Shahroz Alam
 
High rise archive research
High rise archive researchHigh rise archive research
High rise archive researchdenverdieza
 
Case study on Leadenhall Building KUET BECM 2k15
Case study on Leadenhall Building KUET BECM 2k15Case study on Leadenhall Building KUET BECM 2k15
Case study on Leadenhall Building KUET BECM 2k15Arafat Akash
 
Comcast technology center and parking study
Comcast technology center  and parking study Comcast technology center  and parking study
Comcast technology center and parking study ShuvoDipDatta
 
report on high riseee
report on high riseeereport on high riseee
report on high riseeeAditya Sanyal
 
MANJEERA TRINITY CORPORATE PRESENTATION
MANJEERA TRINITY CORPORATE PRESENTATIONMANJEERA TRINITY CORPORATE PRESENTATION
MANJEERA TRINITY CORPORATE PRESENTATIONManjeera Group
 
A presentation on high rise
A presentation on high riseA presentation on high rise
A presentation on high riseAnamikaAntora
 
AArone Group - Cyberwalk | Sector 8, IMT Manesar Gurgaon
AArone Group - Cyberwalk | Sector 8, IMT Manesar GurgaonAArone Group - Cyberwalk | Sector 8, IMT Manesar Gurgaon
AArone Group - Cyberwalk | Sector 8, IMT Manesar Gurgaonnisarahmad036
 
Cyberwalk launched at manesar
Cyberwalk launched at manesarCyberwalk launched at manesar
Cyberwalk launched at manesarRealMaxx
 
AArone Group - Cyberwalk | Sector 8, IMT Manesar Gurgaon
AArone Group - Cyberwalk | Sector 8, IMT Manesar GurgaonAArone Group - Cyberwalk | Sector 8, IMT Manesar Gurgaon
AArone Group - Cyberwalk | Sector 8, IMT Manesar Gurgaonnisarahmad036
 
Highrise building analysis in local context
Highrise building analysis in local contextHighrise building analysis in local context
Highrise building analysis in local contextUmme Rubaiya
 
Skyscrapers Architecture Analysis
Skyscrapers Architecture AnalysisSkyscrapers Architecture Analysis
Skyscrapers Architecture AnalysisSharathmira Sathya
 
Seminar on capital gate building
Seminar on capital gate buildingSeminar on capital gate building
Seminar on capital gate buildingNayan Rao
 
Marquette Plaza, Minneapolis, Minnesota, United States.
Marquette Plaza, Minneapolis, Minnesota, United States.Marquette Plaza, Minneapolis, Minnesota, United States.
Marquette Plaza, Minneapolis, Minnesota, United States.Mayur Waghulde
 
Advanced Design Studio 2
Advanced Design Studio 2Advanced Design Studio 2
Advanced Design Studio 2ong93
 

Similaire à KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag Mathur(IIT Roorkee) (20)

case study project.pptx
case study project.pptxcase study project.pptx
case study project.pptx
 
F.A.R., Ground Coverage and Height Permissible as per Bye Laws
F.A.R., Ground Coverage and Height Permissible as per Bye LawsF.A.R., Ground Coverage and Height Permissible as per Bye Laws
F.A.R., Ground Coverage and Height Permissible as per Bye Laws
 
High rise archive research
High rise archive researchHigh rise archive research
High rise archive research
 
Case study on Leadenhall Building KUET BECM 2k15
Case study on Leadenhall Building KUET BECM 2k15Case study on Leadenhall Building KUET BECM 2k15
Case study on Leadenhall Building KUET BECM 2k15
 
Comcast technology center and parking study
Comcast technology center  and parking study Comcast technology center  and parking study
Comcast technology center and parking study
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
 
report on high riseee
report on high riseeereport on high riseee
report on high riseee
 
MANJEERA TRINITY CORPORATE PRESENTATION
MANJEERA TRINITY CORPORATE PRESENTATIONMANJEERA TRINITY CORPORATE PRESENTATION
MANJEERA TRINITY CORPORATE PRESENTATION
 
A presentation on high rise
A presentation on high riseA presentation on high rise
A presentation on high rise
 
AArone Group - Cyberwalk | Sector 8, IMT Manesar Gurgaon
AArone Group - Cyberwalk | Sector 8, IMT Manesar GurgaonAArone Group - Cyberwalk | Sector 8, IMT Manesar Gurgaon
AArone Group - Cyberwalk | Sector 8, IMT Manesar Gurgaon
 
Cyberwalk launched at manesar
Cyberwalk launched at manesarCyberwalk launched at manesar
Cyberwalk launched at manesar
 
AArone Group - Cyberwalk | Sector 8, IMT Manesar Gurgaon
AArone Group - Cyberwalk | Sector 8, IMT Manesar GurgaonAArone Group - Cyberwalk | Sector 8, IMT Manesar Gurgaon
AArone Group - Cyberwalk | Sector 8, IMT Manesar Gurgaon
 
Highrise building analysis in local context
Highrise building analysis in local contextHighrise building analysis in local context
Highrise building analysis in local context
 
Skyscrapers Architecture Analysis
Skyscrapers Architecture AnalysisSkyscrapers Architecture Analysis
Skyscrapers Architecture Analysis
 
Seminar on capital gate building
Seminar on capital gate buildingSeminar on capital gate building
Seminar on capital gate building
 
Shanghai Tower.pdf
Shanghai Tower.pdfShanghai Tower.pdf
Shanghai Tower.pdf
 
Bhurj khalifa _Net Case Study
Bhurj khalifa _Net Case StudyBhurj khalifa _Net Case Study
Bhurj khalifa _Net Case Study
 
Marquette Plaza, Minneapolis, Minnesota, United States.
Marquette Plaza, Minneapolis, Minnesota, United States.Marquette Plaza, Minneapolis, Minnesota, United States.
Marquette Plaza, Minneapolis, Minnesota, United States.
 
Advanced Design Studio 2
Advanced Design Studio 2Advanced Design Studio 2
Advanced Design Studio 2
 
AR Gunnar Birkerts
AR Gunnar BirkertsAR Gunnar Birkerts
AR Gunnar Birkerts
 

Dernier

原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档208367051
 
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档208367051
 
Call Girls Meghani Nagar 7397865700 Independent Call Girls
Call Girls Meghani Nagar 7397865700  Independent Call GirlsCall Girls Meghani Nagar 7397865700  Independent Call Girls
Call Girls Meghani Nagar 7397865700 Independent Call Girlsssuser7cb4ff
 
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024CristobalHeraud
 
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一F dds
 
How to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our SiteHow to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our Sitegalleryaagency
 
Call Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full NightCall Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full Nightssuser7cb4ff
 
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degreeyuu sss
 
西北大学毕业证学位证成绩单-怎么样办伪造
西北大学毕业证学位证成绩单-怎么样办伪造西北大学毕业证学位证成绩单-怎么样办伪造
西北大学毕业证学位证成绩单-怎么样办伪造kbdhl05e
 
Call Girls Satellite 7397865700 Ridhima Hire Me Full Night
Call Girls Satellite 7397865700 Ridhima Hire Me Full NightCall Girls Satellite 7397865700 Ridhima Hire Me Full Night
Call Girls Satellite 7397865700 Ridhima Hire Me Full Nightssuser7cb4ff
 
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一diploma 1
 
3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdfSwaraliBorhade
 
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书zdzoqco
 
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一lvtagr7
 
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services DubaiDubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubaikojalkojal131
 
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一z xss
 
Cosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable BricksCosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable Bricksabhishekparmar618
 
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10uasjlagroup
 
Design Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William VickeryDesign Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William VickeryWilliamVickery6
 

Dernier (20)

原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
 
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
 
Call Girls Meghani Nagar 7397865700 Independent Call Girls
Call Girls Meghani Nagar 7397865700  Independent Call GirlsCall Girls Meghani Nagar 7397865700  Independent Call Girls
Call Girls Meghani Nagar 7397865700 Independent Call Girls
 
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
 
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
 
How to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our SiteHow to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our Site
 
Call Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full NightCall Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full Night
 
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
 
Call Girls in Pratap Nagar, 9953056974 Escort Service
Call Girls in Pratap Nagar,  9953056974 Escort ServiceCall Girls in Pratap Nagar,  9953056974 Escort Service
Call Girls in Pratap Nagar, 9953056974 Escort Service
 
西北大学毕业证学位证成绩单-怎么样办伪造
西北大学毕业证学位证成绩单-怎么样办伪造西北大学毕业证学位证成绩单-怎么样办伪造
西北大学毕业证学位证成绩单-怎么样办伪造
 
Call Girls Satellite 7397865700 Ridhima Hire Me Full Night
Call Girls Satellite 7397865700 Ridhima Hire Me Full NightCall Girls Satellite 7397865700 Ridhima Hire Me Full Night
Call Girls Satellite 7397865700 Ridhima Hire Me Full Night
 
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
 
3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf
 
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
 
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
 
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services DubaiDubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
 
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
 
Cosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable BricksCosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable Bricks
 
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
 
Design Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William VickeryDesign Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William Vickery
 

KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag Mathur(IIT Roorkee)

  • 2. • Location : Mumbai , India • Type : Mixed use building • Architect : SSAArchitects • Height : 203 m Main building 142 m Residence building • Floor : 52 stories , 32 stories Count • Selection : First Mixed use high-rise criteria in Mumbai KOHINOOR SQUARE
  • 3. t Car Park Entry Service Entry Office/Retail Entry Public Parking Entry Site Area : 4.6 Acres
  • 4. The first five floors of the main building is used for a high-end shopping mall and the remaining 47 floors of the main building is utilized for a commercial offices and five star hotel. The main building is crowned by five star hotel on top 5 floor. The first 13 floors of the residential building is used as a parking garage for both the buildings and the remaining 19 floors is residences. Parking provided for about 2000 cars with super efficient driveways and personalized access controls. Hotel Offices Retail Residences Parking
  • 5. Central core(Office tower) consist of : • 3 Lobbies of 6 Lifts serving levels 25th to 39th • Spaces between the lifts where a lift lobby is not provided are used as toilets with dust at either side: 2 lifts from this pack of 6 are assessable to lower floors as well • 1 lobby of 4 lifts serving levels 1st to 24th • There is a lift bank at 24th floor . • 2 services lifts travelling Throughout the building • 2 Stair cases are also placed in the core .
  • 6. HVAC & Flume Shaft FHC Shaft Electrical Shaft
  • 7. 11th to 24th Floor 24th to 37th Floor • The Central Core is surrounded by the office spaces. • There are segregated office space from 6th to 14 floor with toilets to each office and common toilets also provided on all these floor. • Refuge Floors is provided. DCR RULE In case of high-rise bldg. more than 30 m then first refuge floor shall be provided at 24 m or first habitable floor whichever is higher. Thereafter at every seventh habitable floor.
  • 8. Residential Building : 13 stories of parking in below floors. 132 residential units . 8 units on each floor. At top few floors 4 units on each floor. Central Core : 3 lifts and 1 service lift 2 Stairs are also placed in the core.
  • 9.
  • 10. 9.5 m Structure system : The structure comprises a concrete core and post- tensioned concrete slab and spandrel beams. The average centre to centre distance between columns is 9.5 m. The column is of 1.8 x 1.8 m . The tube system concept is based on the idea that a building can be designed to resist lateral loads. This assembly of columns and beams forms a rigid frame that amounts to a dense and strong structural wall along the exterior of the building.
  • 11. Foundation : The combined pile raft foundation system is used . It is a geotechnical composite construction that combines the bearing effect of both foundation elements raft and piles . The pile raft foundation system has recently been widely used for many structures , specially in high-rise buildings.
  • 12. The façade consists of faceted unitized aluminum curtain walls with provisions for high performance double glass façades on the tower. Diamond edges of the building having aluminum flashing with LED lighting are the unique feature and make it complicated façade design. All the Glasses are articulated glasses & can sustain design wind pressure of 4.5 to 5.0 kPa. The building design makes it environmentally friendly, using technologies such as floor-to-ceiling insulated glazing to contain heat and maximize natural light, and an automatic daylight dimming system
  • 13. 15 double height landscaped Sky Gardens and more than a dozen double height Terraces, to act as tranquil and refreshing breakout zones. Low flow faucets, dual flush toilets, grey water systems and storm water & rainwater management systems – all a part of our commitment to the environment
  • 15. The Kohinoor square building is one of the first skyscraper building in india to achieve a leadership in energy and environmental design platinum rating for environmental sustainability a gold (leed) certification from green building council. Construction of the Kohinoor square started in early 2009, with an completion date of march 2013.