HOW TO BUILD 
A PLATFORM 
IN SIX STEPS 
To mark the start-up of oil production from the 
West Chirag platform in Azerbaijan, BP outlines 
the six main steps involved in building such a 
massive platform. 
1 
Long steel tubes are welded together at 
a fabrication site to make a frame (the jacket). 
This jacket framework provides the stability 
to support the topsides. Once complete, the 
jacket is maneuvered onto a barge 
and towed out to the field. 
2 
The jacket is pushed off the barge, 
positioned on the seabed, and 
fastened in place using long 
metal piles. 
Highest safety standards 
The entire construction work of West Chirag was 
performed with full commitment to the highest 
safety standards without a single day o from 
work case throughout around 20 million 
man-hours achieved. 
3 
The topsides structure is 
constructed at the fabrication 
site one deck at a time, 
incorporating the preordered 
equipment from specialist 
suppliers. 
With its completed weight of 19,500 
tonnes the West Chirag topsides is the 
heaviest structure ever installed in the 
Caspian and it was fully constructed in 
the country using local infrastructure at 
the ATA fabrication yard which was 
upgraded for this scale of activities. 
5 
4,000 people 
About 4000 people including 
sub-contractors and specialist 
vendors were involved in the 
construction works of West Chirag 
with up to 90% of the workforce 
being Azerbaijani nationals. 
The ‘sail away’ of the 19,500-tonne 
topsides structure is completed. 
19,500 tonnes 
Complete topside 
183 thousand barrels 
per day 
The design oil capacity of West Chirag is 
183 thousand barrels per day. The gas export 
capacity is 285 million standard cubic feet 
per day. 
Build jacket 
Float  secure jacket 
Build topside 
4 
Construction of the multi-decked topsides 
is completed, connecting all the pipework 
and equipment, including power 
generation, the control systems, drilling 
rig, accommodation block and helipad. 
The topsides structure is jacked up and 
prepared for load-out onto a barge. 
Transport topside 
6 
Attach topside to jacket 
The topsides structure is floated 
over the jacket and lowered into place, 
followed by commissioning and start-up.

Contenu connexe

Tendances

Oil Production Facilities
Oil Production FacilitiesOil Production Facilities
Oil Production FacilitiesInGu Lee
 
Offshore Structures Presentation
Offshore Structures PresentationOffshore Structures Presentation
Offshore Structures Presentationsurya3303
 
Introduction to offshore structures
Introduction to offshore structuresIntroduction to offshore structures
Introduction to offshore structuresNitish Anand
 
Offshore Petroleum Production Systems
Offshore Petroleum Production SystemsOffshore Petroleum Production Systems
Offshore Petroleum Production SystemsSahyog Shishodia
 
Offshore platform design
Offshore platform designOffshore platform design
Offshore platform designkmsu
 
0020 introduction to fpso design
0020 introduction to fpso design0020 introduction to fpso design
0020 introduction to fpso designChieu Nguyen
 
Offshore fixed platforms
Offshore fixed platformsOffshore fixed platforms
Offshore fixed platformsAmit Purohit
 
Basic whp presentation(1)
Basic whp presentation(1)Basic whp presentation(1)
Basic whp presentation(1)nguyen_uptorcem
 
Construction of marine and offshore structures(2007)
Construction of marine and offshore structures(2007)Construction of marine and offshore structures(2007)
Construction of marine and offshore structures(2007)calir2lune
 
An Overview of Design, Analysis, Construction and Installation of Offshore Pe...
An Overview of Design, Analysis, Construction and Installation of Offshore Pe...An Overview of Design, Analysis, Construction and Installation of Offshore Pe...
An Overview of Design, Analysis, Construction and Installation of Offshore Pe...Professor Kabir Sadeghi
 
Overview of subsea production systems
Overview of subsea production systemsOverview of subsea production systems
Overview of subsea production systemsGiuseppe Moricca
 
C3.2.1. Topside Separation_2020
C3.2.1. Topside Separation_2020C3.2.1. Topside Separation_2020
C3.2.1. Topside Separation_2020David Seow
 
PD184 - TopSide Processing System
PD184 - TopSide Processing SystemPD184 - TopSide Processing System
PD184 - TopSide Processing SystempetroEDGE
 

Tendances (20)

Offshore Platforms
Offshore Platforms Offshore Platforms
Offshore Platforms
 
Oil Production Facilities
Oil Production FacilitiesOil Production Facilities
Oil Production Facilities
 
Introduction to offshore structure
Introduction to offshore structure Introduction to offshore structure
Introduction to offshore structure
 
Offshore Structures Presentation
Offshore Structures PresentationOffshore Structures Presentation
Offshore Structures Presentation
 
Introduction to offshore structures
Introduction to offshore structuresIntroduction to offshore structures
Introduction to offshore structures
 
Offshore Petroleum Production Systems
Offshore Petroleum Production SystemsOffshore Petroleum Production Systems
Offshore Petroleum Production Systems
 
Offshore platforms
Offshore platformsOffshore platforms
Offshore platforms
 
Offshore platform design
Offshore platform designOffshore platform design
Offshore platform design
 
Semi submersible
Semi submersibleSemi submersible
Semi submersible
 
0020 introduction to fpso design
0020 introduction to fpso design0020 introduction to fpso design
0020 introduction to fpso design
 
Offshore fixed platforms
Offshore fixed platformsOffshore fixed platforms
Offshore fixed platforms
 
Basic whp presentation(1)
Basic whp presentation(1)Basic whp presentation(1)
Basic whp presentation(1)
 
Construction of marine and offshore structures(2007)
Construction of marine and offshore structures(2007)Construction of marine and offshore structures(2007)
Construction of marine and offshore structures(2007)
 
An Overview of Design, Analysis, Construction and Installation of Offshore Pe...
An Overview of Design, Analysis, Construction and Installation of Offshore Pe...An Overview of Design, Analysis, Construction and Installation of Offshore Pe...
An Overview of Design, Analysis, Construction and Installation of Offshore Pe...
 
Overview of subsea production systems
Overview of subsea production systemsOverview of subsea production systems
Overview of subsea production systems
 
C3.2.1. Topside Separation_2020
C3.2.1. Topside Separation_2020C3.2.1. Topside Separation_2020
C3.2.1. Topside Separation_2020
 
PD184 - TopSide Processing System
PD184 - TopSide Processing SystemPD184 - TopSide Processing System
PD184 - TopSide Processing System
 
Offshore packages
Offshore packagesOffshore packages
Offshore packages
 
Tutorial #1 - SACS Basic
Tutorial #1 - SACS BasicTutorial #1 - SACS Basic
Tutorial #1 - SACS Basic
 
Offshore structures
Offshore structuresOffshore structures
Offshore structures
 

En vedette

Offshore pile design according to international practice
Offshore pile design according to international practiceOffshore pile design according to international practice
Offshore pile design according to international practiceWeb2Present
 
Oil & Gas Production and Surface Facilities
Oil & Gas Production and Surface FacilitiesOil & Gas Production and Surface Facilities
Oil & Gas Production and Surface FacilitiesMohamed Elnagar
 
BP 3Q 2016 results presentation
BP 3Q 2016 results presentation   BP 3Q 2016 results presentation
BP 3Q 2016 results presentation bp
 
BP Energy Outlook. 2017 Edition
BP Energy Outlook. 2017 Edition BP Energy Outlook. 2017 Edition
BP Energy Outlook. 2017 Edition bp
 
Life Cycle of Oil & Gas Wells
Life Cycle of Oil & Gas WellsLife Cycle of Oil & Gas Wells
Life Cycle of Oil & Gas WellsMohamed Elnagar
 
A day in the life of the BP Carteret fuel terminal
A day in the life of the BP Carteret fuel terminal A day in the life of the BP Carteret fuel terminal
A day in the life of the BP Carteret fuel terminal bp
 
A day in the life - graduate Aisha McEvoy
A day in the life - graduate Aisha McEvoyA day in the life - graduate Aisha McEvoy
A day in the life - graduate Aisha McEvoybp
 
BP Energy Outlook 2035: 2015 Presentation
BP Energy Outlook 2035: 2015 PresentationBP Energy Outlook 2035: 2015 Presentation
BP Energy Outlook 2035: 2015 Presentationbp
 
BP second quarter 2016 results presentation slides
BP second quarter 2016 results presentation slidesBP second quarter 2016 results presentation slides
BP second quarter 2016 results presentation slidesbp
 
BP Energy Outlook 2016
BP Energy Outlook 2016BP Energy Outlook 2016
BP Energy Outlook 2016bp
 
BP Oman Social Investment Programmes
BP Oman Social Investment ProgrammesBP Oman Social Investment Programmes
BP Oman Social Investment Programmesbp
 
OIL AND GAS SURFACE WELLHEAD AND CHRISTMAS TREE
OIL AND GAS SURFACE WELLHEAD AND CHRISTMAS TREEOIL AND GAS SURFACE WELLHEAD AND CHRISTMAS TREE
OIL AND GAS SURFACE WELLHEAD AND CHRISTMAS TREEPZoneSlide
 
Well completion and stimulation
Well completion and stimulation Well completion and stimulation
Well completion and stimulation kaleem ullah
 
Petroleum production engineering
Petroleum production engineeringPetroleum production engineering
Petroleum production engineeringMaanik Gupta
 
Introduction into Oil and Gas Industry. OIL: Part 1
Introduction into Oil and Gas Industry. OIL: Part 1Introduction into Oil and Gas Industry. OIL: Part 1
Introduction into Oil and Gas Industry. OIL: Part 1Fidan Aliyeva
 
Spar platforms for power point
Spar platforms for power pointSpar platforms for power point
Spar platforms for power pointRoy Robinson
 
Chen sacs 2014 descending cases presentation compressed
Chen sacs 2014 descending cases presentation   compressedChen sacs 2014 descending cases presentation   compressed
Chen sacs 2014 descending cases presentation compressedscarlettsweb
 

En vedette (19)

Offshore pile design according to international practice
Offshore pile design according to international practiceOffshore pile design according to international practice
Offshore pile design according to international practice
 
Oil & Gas Production and Surface Facilities
Oil & Gas Production and Surface FacilitiesOil & Gas Production and Surface Facilities
Oil & Gas Production and Surface Facilities
 
BP 3Q 2016 results presentation
BP 3Q 2016 results presentation   BP 3Q 2016 results presentation
BP 3Q 2016 results presentation
 
BP Energy Outlook. 2017 Edition
BP Energy Outlook. 2017 Edition BP Energy Outlook. 2017 Edition
BP Energy Outlook. 2017 Edition
 
Life Cycle of Oil & Gas Wells
Life Cycle of Oil & Gas WellsLife Cycle of Oil & Gas Wells
Life Cycle of Oil & Gas Wells
 
A day in the life of the BP Carteret fuel terminal
A day in the life of the BP Carteret fuel terminal A day in the life of the BP Carteret fuel terminal
A day in the life of the BP Carteret fuel terminal
 
A day in the life - graduate Aisha McEvoy
A day in the life - graduate Aisha McEvoyA day in the life - graduate Aisha McEvoy
A day in the life - graduate Aisha McEvoy
 
BP Energy Outlook 2035: 2015 Presentation
BP Energy Outlook 2035: 2015 PresentationBP Energy Outlook 2035: 2015 Presentation
BP Energy Outlook 2035: 2015 Presentation
 
BP second quarter 2016 results presentation slides
BP second quarter 2016 results presentation slidesBP second quarter 2016 results presentation slides
BP second quarter 2016 results presentation slides
 
BP Energy Outlook 2016
BP Energy Outlook 2016BP Energy Outlook 2016
BP Energy Outlook 2016
 
BP Oman Social Investment Programmes
BP Oman Social Investment ProgrammesBP Oman Social Investment Programmes
BP Oman Social Investment Programmes
 
Tutorial #2 - SACS Basic
Tutorial #2 - SACS BasicTutorial #2 - SACS Basic
Tutorial #2 - SACS Basic
 
OIL AND GAS SURFACE WELLHEAD AND CHRISTMAS TREE
OIL AND GAS SURFACE WELLHEAD AND CHRISTMAS TREEOIL AND GAS SURFACE WELLHEAD AND CHRISTMAS TREE
OIL AND GAS SURFACE WELLHEAD AND CHRISTMAS TREE
 
Well completion and stimulation
Well completion and stimulation Well completion and stimulation
Well completion and stimulation
 
Petroleum production engineering
Petroleum production engineeringPetroleum production engineering
Petroleum production engineering
 
Introduction into Oil and Gas Industry. OIL: Part 1
Introduction into Oil and Gas Industry. OIL: Part 1Introduction into Oil and Gas Industry. OIL: Part 1
Introduction into Oil and Gas Industry. OIL: Part 1
 
Oil and gas industry ppt
Oil and gas industry pptOil and gas industry ppt
Oil and gas industry ppt
 
Spar platforms for power point
Spar platforms for power pointSpar platforms for power point
Spar platforms for power point
 
Chen sacs 2014 descending cases presentation compressed
Chen sacs 2014 descending cases presentation   compressedChen sacs 2014 descending cases presentation   compressed
Chen sacs 2014 descending cases presentation compressed
 

Similaire à How to build a platform

How to build a platform - Juniper
How to build a platform - Juniper How to build a platform - Juniper
How to build a platform - Juniper bp
 
2022 1st quarter results.pdf
2022 1st quarter results.pdf2022 1st quarter results.pdf
2022 1st quarter results.pdfssuseree822a
 
Naice 2006 full paper building local capability (case study of agbami project)
Naice 2006 full paper building local capability (case study of agbami project)Naice 2006 full paper building local capability (case study of agbami project)
Naice 2006 full paper building local capability (case study of agbami project)Luis Luis
 
Corporate Profile | Ärk Global
Corporate Profile | Ärk Global Corporate Profile | Ärk Global
Corporate Profile | Ärk Global Ärk Global
 
J Ray Firsts
J Ray FirstsJ Ray Firsts
J Ray FirstsMyLast1
 
New base 584 special 16 April 2015
New base 584 special  16 April  2015New base 584 special  16 April  2015
New base 584 special 16 April 2015Khaled Al Awadi
 
Gwadar Port: Introduction & Importance
Gwadar Port: Introduction & Importance Gwadar Port: Introduction & Importance
Gwadar Port: Introduction & Importance Salman H. Sindhoo
 
Walchandnagar Industries
Walchandnagar IndustriesWalchandnagar Industries
Walchandnagar Industriesketan.pole
 
Scroby Sands Offshore Wind Farm - Rope Access Maintenance
Scroby Sands Offshore Wind Farm - Rope Access MaintenanceScroby Sands Offshore Wind Farm - Rope Access Maintenance
Scroby Sands Offshore Wind Farm - Rope Access MaintenanceAbfad Limited
 
ABB Case Study - Lightening the Load at Peterhead Harbour - ABB Low Voltage C...
ABB Case Study - Lightening the Load at Peterhead Harbour - ABB Low Voltage C...ABB Case Study - Lightening the Load at Peterhead Harbour - ABB Low Voltage C...
ABB Case Study - Lightening the Load at Peterhead Harbour - ABB Low Voltage C...Thorne & Derrick International
 
MOQ Platform installation_Lesson learnt_Rev B
MOQ Platform installation_Lesson learnt_Rev BMOQ Platform installation_Lesson learnt_Rev B
MOQ Platform installation_Lesson learnt_Rev BVishak Gopi
 
Dragados Offshore - Industry Europe
Dragados Offshore - Industry EuropeDragados Offshore - Industry Europe
Dragados Offshore - Industry EuropeOscar Del Santo
 
Boom Structural Design and Static Finite Element Analysis for a 1000tons Shee...
Boom Structural Design and Static Finite Element Analysis for a 1000tons Shee...Boom Structural Design and Static Finite Element Analysis for a 1000tons Shee...
Boom Structural Design and Static Finite Element Analysis for a 1000tons Shee...IRJET Journal
 

Similaire à How to build a platform (20)

How to build a platform - Juniper
How to build a platform - Juniper How to build a platform - Juniper
How to build a platform - Juniper
 
2022 1st quarter results.pdf
2022 1st quarter results.pdf2022 1st quarter results.pdf
2022 1st quarter results.pdf
 
Falcon Spirit FSO
Falcon Spirit FSOFalcon Spirit FSO
Falcon Spirit FSO
 
Naice 2006 full paper building local capability (case study of agbami project)
Naice 2006 full paper building local capability (case study of agbami project)Naice 2006 full paper building local capability (case study of agbami project)
Naice 2006 full paper building local capability (case study of agbami project)
 
Corporate Profile | Ärk Global
Corporate Profile | Ärk Global Corporate Profile | Ärk Global
Corporate Profile | Ärk Global
 
Elsayed cv updated
Elsayed cv updatedElsayed cv updated
Elsayed cv updated
 
J Ray Firsts
J Ray FirstsJ Ray Firsts
J Ray Firsts
 
New base 584 special 16 April 2015
New base 584 special  16 April  2015New base 584 special  16 April  2015
New base 584 special 16 April 2015
 
Gwadar Port: Introduction & Importance
Gwadar Port: Introduction & Importance Gwadar Port: Introduction & Importance
Gwadar Port: Introduction & Importance
 
Abou el azm CV
Abou el azm CVAbou el azm CV
Abou el azm CV
 
Walchandnagar Industries
Walchandnagar IndustriesWalchandnagar Industries
Walchandnagar Industries
 
Scroby Sands Offshore Wind Farm - Rope Access Maintenance
Scroby Sands Offshore Wind Farm - Rope Access MaintenanceScroby Sands Offshore Wind Farm - Rope Access Maintenance
Scroby Sands Offshore Wind Farm - Rope Access Maintenance
 
ABB Case Study - Lightening the Load at Peterhead Harbour - ABB Low Voltage C...
ABB Case Study - Lightening the Load at Peterhead Harbour - ABB Low Voltage C...ABB Case Study - Lightening the Load at Peterhead Harbour - ABB Low Voltage C...
ABB Case Study - Lightening the Load at Peterhead Harbour - ABB Low Voltage C...
 
MOQ Platform installation_Lesson learnt_Rev B
MOQ Platform installation_Lesson learnt_Rev BMOQ Platform installation_Lesson learnt_Rev B
MOQ Platform installation_Lesson learnt_Rev B
 
Dragados Offshore - Industry Europe
Dragados Offshore - Industry EuropeDragados Offshore - Industry Europe
Dragados Offshore - Industry Europe
 
IT port report
IT port reportIT port report
IT port report
 
Amc floating dock
Amc floating dockAmc floating dock
Amc floating dock
 
Navion Saga FSO
Navion Saga FSONavion Saga FSO
Navion Saga FSO
 
Brochure CMR Marine
Brochure CMR MarineBrochure CMR Marine
Brochure CMR Marine
 
Boom Structural Design and Static Finite Element Analysis for a 1000tons Shee...
Boom Structural Design and Static Finite Element Analysis for a 1000tons Shee...Boom Structural Design and Static Finite Element Analysis for a 1000tons Shee...
Boom Structural Design and Static Finite Element Analysis for a 1000tons Shee...
 

Plus de bp

bp 3Q 2022 financial results
bp 3Q 2022 financial resultsbp 3Q 2022 financial results
bp 3Q 2022 financial resultsbp
 
bp 2Q 2022 financial results
bp 2Q 2022 financial resultsbp 2Q 2022 financial results
bp 2Q 2022 financial resultsbp
 
bp 1Q 2022 financial results
bp 1Q 2022 financial resultsbp 1Q 2022 financial results
bp 1Q 2022 financial resultsbp
 
bp 4Q 2021 financial results
bp 4Q 2021 financial resultsbp 4Q 2021 financial results
bp 4Q 2021 financial resultsbp
 
bp 3Q 2021 financial results
bp 3Q 2021 financial resultsbp 3Q 2021 financial results
bp 3Q 2021 financial resultsbp
 
bp 2Q 2021 financial results
bp 2Q 2021 financial resultsbp 2Q 2021 financial results
bp 2Q 2021 financial resultsbp
 
bp 1Q 2021 financial results
bp 1Q 2021 financial resultsbp 1Q 2021 financial results
bp 1Q 2021 financial resultsbp
 
bp 4Q 2020 financial results
bp 4Q 2020 financial resultsbp 4Q 2020 financial results
bp 4Q 2020 financial resultsbp
 
bp 3Q 2020 financial results
bp 3Q 2020 financial resultsbp 3Q 2020 financial results
bp 3Q 2020 financial resultsbp
 
bp 2Q 2020 results & strategy presentation
bp 2Q 2020 results & strategy presentationbp 2Q 2020 results & strategy presentation
bp 2Q 2020 results & strategy presentationbp
 
BP 1Q 2020 Financial results
BP 1Q 2020 Financial results BP 1Q 2020 Financial results
BP 1Q 2020 Financial results bp
 
BP 4Q and full year results presentation
BP 4Q and full year results presentationBP 4Q and full year results presentation
BP 4Q and full year results presentationbp
 
BP 3Q 2019 results presentation
 BP 3Q 2019 results presentation BP 3Q 2019 results presentation
BP 3Q 2019 results presentationbp
 
BP 2Q 2019 results presentation
BP 2Q 2019 results presentationBP 2Q 2019 results presentation
BP 2Q 2019 results presentationbp
 
BP 1Q 2019 presentation slides
BP 1Q 2019 presentation slides BP 1Q 2019 presentation slides
BP 1Q 2019 presentation slides bp
 
BP Stats Review 2018
BP Stats Review 2018BP Stats Review 2018
BP Stats Review 2018bp
 
2018 BP Energy Outlook
2018 BP Energy Outlook2018 BP Energy Outlook
2018 BP Energy Outlookbp
 
BP second quarter 2017 results
BP second quarter 2017 resultsBP second quarter 2017 results
BP second quarter 2017 resultsbp
 
BP Statistical Review of World Energy 2017
 BP Statistical Review of World Energy 2017 BP Statistical Review of World Energy 2017
BP Statistical Review of World Energy 2017bp
 
BP Around the world in 11 deals
BP Around the world in 11 dealsBP Around the world in 11 deals
BP Around the world in 11 dealsbp
 

Plus de bp (20)

bp 3Q 2022 financial results
bp 3Q 2022 financial resultsbp 3Q 2022 financial results
bp 3Q 2022 financial results
 
bp 2Q 2022 financial results
bp 2Q 2022 financial resultsbp 2Q 2022 financial results
bp 2Q 2022 financial results
 
bp 1Q 2022 financial results
bp 1Q 2022 financial resultsbp 1Q 2022 financial results
bp 1Q 2022 financial results
 
bp 4Q 2021 financial results
bp 4Q 2021 financial resultsbp 4Q 2021 financial results
bp 4Q 2021 financial results
 
bp 3Q 2021 financial results
bp 3Q 2021 financial resultsbp 3Q 2021 financial results
bp 3Q 2021 financial results
 
bp 2Q 2021 financial results
bp 2Q 2021 financial resultsbp 2Q 2021 financial results
bp 2Q 2021 financial results
 
bp 1Q 2021 financial results
bp 1Q 2021 financial resultsbp 1Q 2021 financial results
bp 1Q 2021 financial results
 
bp 4Q 2020 financial results
bp 4Q 2020 financial resultsbp 4Q 2020 financial results
bp 4Q 2020 financial results
 
bp 3Q 2020 financial results
bp 3Q 2020 financial resultsbp 3Q 2020 financial results
bp 3Q 2020 financial results
 
bp 2Q 2020 results & strategy presentation
bp 2Q 2020 results & strategy presentationbp 2Q 2020 results & strategy presentation
bp 2Q 2020 results & strategy presentation
 
BP 1Q 2020 Financial results
BP 1Q 2020 Financial results BP 1Q 2020 Financial results
BP 1Q 2020 Financial results
 
BP 4Q and full year results presentation
BP 4Q and full year results presentationBP 4Q and full year results presentation
BP 4Q and full year results presentation
 
BP 3Q 2019 results presentation
 BP 3Q 2019 results presentation BP 3Q 2019 results presentation
BP 3Q 2019 results presentation
 
BP 2Q 2019 results presentation
BP 2Q 2019 results presentationBP 2Q 2019 results presentation
BP 2Q 2019 results presentation
 
BP 1Q 2019 presentation slides
BP 1Q 2019 presentation slides BP 1Q 2019 presentation slides
BP 1Q 2019 presentation slides
 
BP Stats Review 2018
BP Stats Review 2018BP Stats Review 2018
BP Stats Review 2018
 
2018 BP Energy Outlook
2018 BP Energy Outlook2018 BP Energy Outlook
2018 BP Energy Outlook
 
BP second quarter 2017 results
BP second quarter 2017 resultsBP second quarter 2017 results
BP second quarter 2017 results
 
BP Statistical Review of World Energy 2017
 BP Statistical Review of World Energy 2017 BP Statistical Review of World Energy 2017
BP Statistical Review of World Energy 2017
 
BP Around the world in 11 deals
BP Around the world in 11 dealsBP Around the world in 11 deals
BP Around the world in 11 deals
 

Dernier

Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsSachinPawar510423
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
lifi-technology with integration of IOT.pptx
lifi-technology with integration of IOT.pptxlifi-technology with integration of IOT.pptx
lifi-technology with integration of IOT.pptxsomshekarkn64
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitterShivangiSharma879191
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgsaravananr517913
 

Dernier (20)

Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documents
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
lifi-technology with integration of IOT.pptx
lifi-technology with integration of IOT.pptxlifi-technology with integration of IOT.pptx
lifi-technology with integration of IOT.pptx
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
 

How to build a platform

  • 1. HOW TO BUILD A PLATFORM IN SIX STEPS To mark the start-up of oil production from the West Chirag platform in Azerbaijan, BP outlines the six main steps involved in building such a massive platform. 1 Long steel tubes are welded together at a fabrication site to make a frame (the jacket). This jacket framework provides the stability to support the topsides. Once complete, the jacket is maneuvered onto a barge and towed out to the field. 2 The jacket is pushed off the barge, positioned on the seabed, and fastened in place using long metal piles. Highest safety standards The entire construction work of West Chirag was performed with full commitment to the highest safety standards without a single day o from work case throughout around 20 million man-hours achieved. 3 The topsides structure is constructed at the fabrication site one deck at a time, incorporating the preordered equipment from specialist suppliers. With its completed weight of 19,500 tonnes the West Chirag topsides is the heaviest structure ever installed in the Caspian and it was fully constructed in the country using local infrastructure at the ATA fabrication yard which was upgraded for this scale of activities. 5 4,000 people About 4000 people including sub-contractors and specialist vendors were involved in the construction works of West Chirag with up to 90% of the workforce being Azerbaijani nationals. The ‘sail away’ of the 19,500-tonne topsides structure is completed. 19,500 tonnes Complete topside 183 thousand barrels per day The design oil capacity of West Chirag is 183 thousand barrels per day. The gas export capacity is 285 million standard cubic feet per day. Build jacket Float secure jacket Build topside 4 Construction of the multi-decked topsides is completed, connecting all the pipework and equipment, including power generation, the control systems, drilling rig, accommodation block and helipad. The topsides structure is jacked up and prepared for load-out onto a barge. Transport topside 6 Attach topside to jacket The topsides structure is floated over the jacket and lowered into place, followed by commissioning and start-up.