SlideShare une entreprise Scribd logo
1  sur  3
Télécharger pour lire hors ligne
ROK-ON™
Insulated Building Systems
For more information, contact ROK-ON™
1033 B Avenue Suite 125, Coronado, Ca. 92118 USA
Offices in Reno, NV USA, Milwaukee, WI USA, Edmonton Alberta Canada, Ensenada BC Mexico,
USA – Richard Chase -1 (262) 893-8082 Canada - Gordon Ritchie (780) 430-6300 Doug Faulkner (587) 336-3888
Mexico – David Chase (775-750-2152
Be#er	
  –	
  Faster	
  -­‐	
  Cheaper	
  
ROK-ON™
Insulated Structural Sheathing
•  Superior performance
•  Easy installation
•  Competitively priced
ROK-ON™ fiberglass reinforced ceramic cement sheathing is laminated to EPS foam
to create a thin structural panel that is attached directly to framing as the exterior
insulated sheathing. The result is a high-performance, lower cost solution for exterior
walls that exceeds the North American building codes for energy and fire performance.
Fully tested to meet all applicable
2015 IBC building codes.
NFPA 285 - exceeded criteria by 30% 0
flame/0 smoke. /ASTM E 84 – 0 flame/0
smoke / ASTM E136 – non combustible
IBC Code Compliance
Chapter 7 – Fire resistant rated
construction
Chapter 16 – Structural transverse wind
loads resistance
Chapter 26 Types I-IV (non
combustible)
Energy Standards Performance
Exceeds 2015 IECC and ASHRAE 90.1
for energy performance. Eliminates
thermal bridging. A typical panel is 2.75”
thick, and provides an R11
Dew point remains outside the wall
cavity. 9 layers of moisture protection in the
system. Superior water resistance.
	
  	
  
Tremendous architectural flexibility.
Roc-on™ can accept direct application of
finishes (stone or brick veneer, metal panels,
stucco, etc.)
	
  
Full	
  Quality Control – Issued the
Warnock Hershey stamp from Intertek
$10 million per occurrence product
liability policy in place.
Cuts and attaches like
OSB/DensGlass® without
special tools or fasteners.
Versus
Stucco/EIFS System
3 steps
•  Easily Inspected
•  R-11
•  Non combustible
•  Will Not Rot
•  Mold Resistant
•  Impact Resistant
•  Bug Proof
8 steps
•  8 Chances to Fail
•  R-5
•  Easily Damaged
•  High Maintenance
ROK-ON™
For more information, contact ROK-ON™
1033 B Avenue Suite 125, Coronado, Ca. 92118 USA
Offices in Reno, NV USA, Milwaukee, WI USA, Edmonton Alberta Canada, Ensenada BC Mexico,
USA – Richard Chase -1 (262) 893-8082 Canada - Gordon Ritchie (780) 430-6300 Doug Faulkner (587) 336-3888
Mexico – David Chase (775-750-2152
Be#er	
  –	
  Faster	
  -­‐	
  Cheaper	
  
Traditional EIFS systems require up to 5 steps before any final finish can be applied. ROK-
ON™ does this in one step. It is installed directly to framing in the same time as the first layer
of sheathing in other systems. This significantly reduces costs, increases productivity, and
reduces construction time across the entire supply chain.
VS
•  New mandated codes around energy performance have
forced architects and builders to look at new ways meet the
requirements. Continuous external insulation is now required
to meet the codes.
•  Fire and health codes continue to become more stringent
and buildings are going up and not out. Mold replaced
asbestos as the most litigated construction issue.
•  Labor is increasingly harder to find and more expensive.
All of this comes at a time when pricing pressure is at it’s
greatest.
ROK-ON™
Insulated Structural Sheathing
The Solution – ROK-ON™
ROK-ON™ can be installed
directly on a building or in a
modular environment. Either
way, less steps means it can
be installed much faster than
traditional methods. This
reduces the critical path
timeline for the GC and leads
to earlier occupancy for the
building owner. All of this with
a high performing system that
will reduce long-term energy
costs with less maintenance.
ROK-ON™ prefabricated installation after 9 days on a Holiday Inn®
Conventional EIFS Installation ROK-ON™ Installation

Contenu connexe

Tendances

Dealership Pres101209
Dealership Pres101209Dealership Pres101209
Dealership Pres101209danc752
 
Astec Project Updates
Astec Project UpdatesAstec Project Updates
Astec Project UpdatesTony Loup
 
Product Katalog Bluescope Lysaght
Product Katalog Bluescope LysaghtProduct Katalog Bluescope Lysaght
Product Katalog Bluescope LysaghtParama Steel
 
Teakwood Green Presentation 8.31.09
Teakwood Green Presentation 8.31.09Teakwood Green Presentation 8.31.09
Teakwood Green Presentation 8.31.09Newbold Contracting
 
Feasibility Report
Feasibility ReportFeasibility Report
Feasibility ReportAna Sheikh
 
A2 1300 - Janstar Homes www.janstar.com
A2 1300 - Janstar Homes  www.janstar.comA2 1300 - Janstar Homes  www.janstar.com
A2 1300 - Janstar Homes www.janstar.comLindal Cedar Homes
 
Encap systems8182010a
Encap systems8182010aEncap systems8182010a
Encap systems8182010asaclarkjr
 
Lead paint presentation 8182010
Lead paint presentation 8182010Lead paint presentation 8182010
Lead paint presentation 8182010saclarkjr
 
white_green_booklet
white_green_bookletwhite_green_booklet
white_green_bookletTim Kikot
 

Tendances (11)

Dealership Pres101209
Dealership Pres101209Dealership Pres101209
Dealership Pres101209
 
Astec Project Updates
Astec Project UpdatesAstec Project Updates
Astec Project Updates
 
Product Katalog Bluescope Lysaght
Product Katalog Bluescope LysaghtProduct Katalog Bluescope Lysaght
Product Katalog Bluescope Lysaght
 
Teakwood Green Presentation 8.31.09
Teakwood Green Presentation 8.31.09Teakwood Green Presentation 8.31.09
Teakwood Green Presentation 8.31.09
 
Feasibility Report
Feasibility ReportFeasibility Report
Feasibility Report
 
A2 1300 - Janstar Homes www.janstar.com
A2 1300 - Janstar Homes  www.janstar.comA2 1300 - Janstar Homes  www.janstar.com
A2 1300 - Janstar Homes www.janstar.com
 
Encap systems8182010a
Encap systems8182010aEncap systems8182010a
Encap systems8182010a
 
Resume update 3
Resume  update 3Resume  update 3
Resume update 3
 
Lead paint presentation 8182010
Lead paint presentation 8182010Lead paint presentation 8182010
Lead paint presentation 8182010
 
Green construction
Green constructionGreen construction
Green construction
 
white_green_booklet
white_green_bookletwhite_green_booklet
white_green_booklet
 

Similaire à Rok-on Insulated Sheathing 3 page Brochure

Insulated metal panels edc1
Insulated metal panels edc1Insulated metal panels edc1
Insulated metal panels edc1Derrick Teal
 
ABB Installation Products_Oil and Gas_Presentation_ENG_US_9AKK107992A8161.pptx
ABB Installation Products_Oil and Gas_Presentation_ENG_US_9AKK107992A8161.pptxABB Installation Products_Oil and Gas_Presentation_ENG_US_9AKK107992A8161.pptx
ABB Installation Products_Oil and Gas_Presentation_ENG_US_9AKK107992A8161.pptxPTD QUYCOCTU
 
New Commercial Presentation 2009
New Commercial Presentation 2009New Commercial Presentation 2009
New Commercial Presentation 2009MikeRussell
 
ICF Commercial Presentation
ICF Commercial PresentationICF Commercial Presentation
ICF Commercial PresentationBenKeim
 
Cable Mgr cable tray Introduction
Cable Mgr cable tray Introduction Cable Mgr cable tray Introduction
Cable Mgr cable tray Introduction Gabriel Vasquez
 
2015 Residential Construction Practices Fairfield County CT
2015 Residential Construction Practices Fairfield County CT 2015 Residential Construction Practices Fairfield County CT
2015 Residential Construction Practices Fairfield County CT tigerrealestate
 
Design for Manufacturing: Challenges & Opportunities
Design for Manufacturing: Challenges & OpportunitiesDesign for Manufacturing: Challenges & Opportunities
Design for Manufacturing: Challenges & OpportunitiesCheryl Tulkoff
 
five_e_brochure
five_e_brochurefive_e_brochure
five_e_brochureTim Kikot
 
Panel Built Information Packet
Panel Built Information PacketPanel Built Information Packet
Panel Built Information PacketPanel Built
 
Thermally broken facade by engineered assemblies cc dec 2015 final
Thermally broken facade by engineered assemblies cc dec 2015 finalThermally broken facade by engineered assemblies cc dec 2015 final
Thermally broken facade by engineered assemblies cc dec 2015 finalBlair Davies
 
High performance buildings & rating tools
High performance buildings & rating toolsHigh performance buildings & rating tools
High performance buildings & rating toolsKen Thomson
 
AL13 Architecural Systems V-Line Brock White Connect 1-22-2017
AL13 Architecural Systems V-Line Brock White Connect 1-22-2017AL13 Architecural Systems V-Line Brock White Connect 1-22-2017
AL13 Architecural Systems V-Line Brock White Connect 1-22-2017davidjthomas
 
Thermo Bond Pre-Cast Concrete Brochure
Thermo Bond Pre-Cast Concrete BrochureThermo Bond Pre-Cast Concrete Brochure
Thermo Bond Pre-Cast Concrete BrochureDoug Olson
 
Scott Thorne Resume
Scott Thorne ResumeScott Thorne Resume
Scott Thorne ResumeScott Thorne
 
2014 Glass Connections Conference Program 10-compressed
2014 Glass Connections Conference Program 10-compressed2014 Glass Connections Conference Program 10-compressed
2014 Glass Connections Conference Program 10-compressedRich Porayko
 
Insulated metal wall and roof panels for sustainability and energy efficiency...
Insulated metal wall and roof panels for sustainability and energy efficiency...Insulated metal wall and roof panels for sustainability and energy efficiency...
Insulated metal wall and roof panels for sustainability and energy efficiency...Derrick Teal
 
Ensuring and predicting the reliability of cpv
Ensuring and predicting the reliability of cpvEnsuring and predicting the reliability of cpv
Ensuring and predicting the reliability of cpvGreg Caswell
 
Heavy and Extreme Copper PCBs for Military/Aerospace Applications
Heavy and Extreme Copper PCBs for Military/Aerospace ApplicationsHeavy and Extreme Copper PCBs for Military/Aerospace Applications
Heavy and Extreme Copper PCBs for Military/Aerospace ApplicationsEpec Engineered Technologies
 

Similaire à Rok-on Insulated Sheathing 3 page Brochure (20)

Insulated metal panels edc1
Insulated metal panels edc1Insulated metal panels edc1
Insulated metal panels edc1
 
ABB Installation Products_Oil and Gas_Presentation_ENG_US_9AKK107992A8161.pptx
ABB Installation Products_Oil and Gas_Presentation_ENG_US_9AKK107992A8161.pptxABB Installation Products_Oil and Gas_Presentation_ENG_US_9AKK107992A8161.pptx
ABB Installation Products_Oil and Gas_Presentation_ENG_US_9AKK107992A8161.pptx
 
New Commercial Presentation 2009
New Commercial Presentation 2009New Commercial Presentation 2009
New Commercial Presentation 2009
 
ICF Commercial Presentation
ICF Commercial PresentationICF Commercial Presentation
ICF Commercial Presentation
 
Cable Mgr cable tray Introduction
Cable Mgr cable tray Introduction Cable Mgr cable tray Introduction
Cable Mgr cable tray Introduction
 
2015 Residential Construction Practices Fairfield County CT
2015 Residential Construction Practices Fairfield County CT 2015 Residential Construction Practices Fairfield County CT
2015 Residential Construction Practices Fairfield County CT
 
01 teck mro_en
01 teck mro_en01 teck mro_en
01 teck mro_en
 
Design for Manufacturing: Challenges & Opportunities
Design for Manufacturing: Challenges & OpportunitiesDesign for Manufacturing: Challenges & Opportunities
Design for Manufacturing: Challenges & Opportunities
 
five_e_brochure
five_e_brochurefive_e_brochure
five_e_brochure
 
Panel Built Information Packet
Panel Built Information PacketPanel Built Information Packet
Panel Built Information Packet
 
Thermally broken facade by engineered assemblies cc dec 2015 final
Thermally broken facade by engineered assemblies cc dec 2015 finalThermally broken facade by engineered assemblies cc dec 2015 final
Thermally broken facade by engineered assemblies cc dec 2015 final
 
High performance buildings & rating tools
High performance buildings & rating toolsHigh performance buildings & rating tools
High performance buildings & rating tools
 
AL13 Architecural Systems V-Line Brock White Connect 1-22-2017
AL13 Architecural Systems V-Line Brock White Connect 1-22-2017AL13 Architecural Systems V-Line Brock White Connect 1-22-2017
AL13 Architecural Systems V-Line Brock White Connect 1-22-2017
 
Thermo Bond Pre-Cast Concrete Brochure
Thermo Bond Pre-Cast Concrete BrochureThermo Bond Pre-Cast Concrete Brochure
Thermo Bond Pre-Cast Concrete Brochure
 
Jadro steel ppt
Jadro steel pptJadro steel ppt
Jadro steel ppt
 
Scott Thorne Resume
Scott Thorne ResumeScott Thorne Resume
Scott Thorne Resume
 
2014 Glass Connections Conference Program 10-compressed
2014 Glass Connections Conference Program 10-compressed2014 Glass Connections Conference Program 10-compressed
2014 Glass Connections Conference Program 10-compressed
 
Insulated metal wall and roof panels for sustainability and energy efficiency...
Insulated metal wall and roof panels for sustainability and energy efficiency...Insulated metal wall and roof panels for sustainability and energy efficiency...
Insulated metal wall and roof panels for sustainability and energy efficiency...
 
Ensuring and predicting the reliability of cpv
Ensuring and predicting the reliability of cpvEnsuring and predicting the reliability of cpv
Ensuring and predicting the reliability of cpv
 
Heavy and Extreme Copper PCBs for Military/Aerospace Applications
Heavy and Extreme Copper PCBs for Military/Aerospace ApplicationsHeavy and Extreme Copper PCBs for Military/Aerospace Applications
Heavy and Extreme Copper PCBs for Military/Aerospace Applications
 

Rok-on Insulated Sheathing 3 page Brochure

  • 2. For more information, contact ROK-ON™ 1033 B Avenue Suite 125, Coronado, Ca. 92118 USA Offices in Reno, NV USA, Milwaukee, WI USA, Edmonton Alberta Canada, Ensenada BC Mexico, USA – Richard Chase -1 (262) 893-8082 Canada - Gordon Ritchie (780) 430-6300 Doug Faulkner (587) 336-3888 Mexico – David Chase (775-750-2152 Be#er  –  Faster  -­‐  Cheaper   ROK-ON™ Insulated Structural Sheathing •  Superior performance •  Easy installation •  Competitively priced ROK-ON™ fiberglass reinforced ceramic cement sheathing is laminated to EPS foam to create a thin structural panel that is attached directly to framing as the exterior insulated sheathing. The result is a high-performance, lower cost solution for exterior walls that exceeds the North American building codes for energy and fire performance. Fully tested to meet all applicable 2015 IBC building codes. NFPA 285 - exceeded criteria by 30% 0 flame/0 smoke. /ASTM E 84 – 0 flame/0 smoke / ASTM E136 – non combustible IBC Code Compliance Chapter 7 – Fire resistant rated construction Chapter 16 – Structural transverse wind loads resistance Chapter 26 Types I-IV (non combustible) Energy Standards Performance Exceeds 2015 IECC and ASHRAE 90.1 for energy performance. Eliminates thermal bridging. A typical panel is 2.75” thick, and provides an R11 Dew point remains outside the wall cavity. 9 layers of moisture protection in the system. Superior water resistance.     Tremendous architectural flexibility. Roc-on™ can accept direct application of finishes (stone or brick veneer, metal panels, stucco, etc.)   Full  Quality Control – Issued the Warnock Hershey stamp from Intertek $10 million per occurrence product liability policy in place. Cuts and attaches like OSB/DensGlass® without special tools or fasteners. Versus Stucco/EIFS System 3 steps •  Easily Inspected •  R-11 •  Non combustible •  Will Not Rot •  Mold Resistant •  Impact Resistant •  Bug Proof 8 steps •  8 Chances to Fail •  R-5 •  Easily Damaged •  High Maintenance ROK-ON™
  • 3. For more information, contact ROK-ON™ 1033 B Avenue Suite 125, Coronado, Ca. 92118 USA Offices in Reno, NV USA, Milwaukee, WI USA, Edmonton Alberta Canada, Ensenada BC Mexico, USA – Richard Chase -1 (262) 893-8082 Canada - Gordon Ritchie (780) 430-6300 Doug Faulkner (587) 336-3888 Mexico – David Chase (775-750-2152 Be#er  –  Faster  -­‐  Cheaper   Traditional EIFS systems require up to 5 steps before any final finish can be applied. ROK- ON™ does this in one step. It is installed directly to framing in the same time as the first layer of sheathing in other systems. This significantly reduces costs, increases productivity, and reduces construction time across the entire supply chain. VS •  New mandated codes around energy performance have forced architects and builders to look at new ways meet the requirements. Continuous external insulation is now required to meet the codes. •  Fire and health codes continue to become more stringent and buildings are going up and not out. Mold replaced asbestos as the most litigated construction issue. •  Labor is increasingly harder to find and more expensive. All of this comes at a time when pricing pressure is at it’s greatest. ROK-ON™ Insulated Structural Sheathing The Solution – ROK-ON™ ROK-ON™ can be installed directly on a building or in a modular environment. Either way, less steps means it can be installed much faster than traditional methods. This reduces the critical path timeline for the GC and leads to earlier occupancy for the building owner. All of this with a high performing system that will reduce long-term energy costs with less maintenance. ROK-ON™ prefabricated installation after 9 days on a Holiday Inn® Conventional EIFS Installation ROK-ON™ Installation