Presentation Structure
- London Transport Strategy 2000
• Main components
- Buses and the London Bus Initiative
- What else happened
- Considerations for Melbourne
Background – London in 1999
“Congestion and overcrowding on London’s
transport networks is acute.”
- Urgent need for measures to reduce heavy all
day traffic congestion
- Slow and unreliable bus services
- Difficulties for business in servicing and delivery
movements
- Unreliability and gross overcrowding of National
Rail and Underground services
- Growth in the number of people using transport
- London’s population and economy growth
Background – London in 1999
Key issues for outer London include:
- Inadequate public transport options, particularly for non-radial
and off-peak trips
- Heavy and growing traffic congestion on key routes and in
town centres affecting both individuals and businesses
- Pockets of deprivation and regeneration sites which are not
well linked to the main transport networks
Background - The Mayors Transport Strategy
- Creation of ‘Transport for London’ provided a new opportunity
- “Balanced set of priorities needed to facilitate the required
changes in the transport network in the short and medium
term”
- Overcoming backlog of investment in the Underground
- Radical improvements to bus services
- Improving capacity including cross city and orbital rail, a new
Thames crossing
- Increase travel choice
Package of measures proposed
- Overground Rail – Crossrail, East London Line extension,
Thameslink 2000
- Underground – station upgrades e.g. Tottenham Court Road,
Victoria, etc (and Docklands Light Rail extensions)
- Intermediate modes (Tram/BRT) – Cross River Transit, East
London Transit,
- Smartcards and fare changes
- Congestion charging
Role of buses
- Bus system offered potential for rapid (i.e. short term)
improvements
- Could relieve overcrowding on Underground
- Offer an alternative to the car especially in outer London
- Building off the back of Red Routes (Clearways) and Pilot Route
43 project
- Key short term focus was London Bus Initiative
• Improvements on 27 key routes
• £60 million over 2 years
London Bus Initiative – The Strategy
The vision:
- To deliver a ‘step-change’ enhancement of the actual and
perceived quality of London’s bus services
Key objectives were to:
- Promote a change in travel habits to get more people onto
London’s buses
- Make buses more attractive for potential users
- Make buses the first choice mode of transport on LBI routes
- Deliver the above on a ‘whole route’ basis
- Aligned to Mayor’s strategy
London Bus Initiative
What was different?
- Corridor based – not hotspot targets on 27 routes
- Multi-agency approach
• TfL / Councils / Operators / Police
- Reviewed whole trip
- Not just infrastructure focused
London Bus Initiative – Whole route/trip approach
- Whole (Bus) Route
- Whole trip corridor approach
• Door to Door
• Total Journey Quality
- Partnership (multi-agency) approach
based on responsibilities
- NOT just bus priority i.e. bus lanes and
vehicle detection at signals, etc
Origin/Home
Walk to Bus Stop
Wait at Bus Stop
Bus Journey
Board the Bus
Alight from Bus
Walk to Destination
London Bus Initiative – package of measures
London Bus Initiative - KPIs
Targets/KPIs – Multi issue/agency examples:
- Reductions in journey time (10 – 20%)
- Improved reliability (excess wait time)
- Increased coverage of routes with bus lanes (real and virtual)
- Increased patronage
- Reductions in bus stop dwell time
- Bus stop accessibility (50 – 100%)
- Improved customer satisfaction
- Improved bus cleanliness
London Bus Initiative – Package of measures
- Route Traffic Management Strategy
• To review use of carriageway space
• Introduce real and ‘virtual’ bus lanes
- Review of kerbside parking/loading controls
- Extension of hours/days of Red Routes (clearways)
- Detailed Traffic Signal Review
- Bus stop improvements/rationalisation
- Total Route Control Strategy (flagship routes only)
• i.e. Control any aspect likely to cause delay
- Integrated Traffic Management – link and node
- Delivered via Program
Team
- Dedicated LBI
Communications Team
assisted delivery
- Consultation widened to
include bus passengers
London Bus Initiative – other features
London Bus Initiative – What was delivered?
Over LBI 1 – (2+1 years):
- 108 new sections of bus lanes
• 84 extended in length / 40 in hours
- 50 new pedestrian crossings
- Bus Priority added to 306 traffic signals
- 146 physical intersection improvements
• 200 signal timing changes
- 40% of 2,500 route stops made DDA complaint
London Bus Initiative – total spend
Spending breakdown: (2002 GBP – 2013 AUD equivalent)
- Enforcement £11m $24m AUD
- Traffic engineering £28m $60m AUD
- Bus operations £3.5m $8m AUD
- Programme support £9m $20m AUD
- Major projects £8.5m $18.5m AUD
- $130m AUD
London Bus Initiative – Benefits
- Increased bus patronage +21.9% during LBI
• Patronage increase equivalent to $12 million in benefits pa
- Mixed journey time improvements
• Big wins on contra-flow schemes
• More time spent at stops negated some journey time benefits
- Over long term improved reliability
• Reduced operating costs
• Protected buses from worsening
congestion
London Bus Initiative - legacy
- Bus Stops accepted as vital part of trip
- Increased patronage increased time at stops
- Acknowledgement of need to reduce
boarding/alighting time
- Led to:
• Cashless Operation – and Smartcards
• Articulated buses – multi-door entry/exit
London Bus Initiative – other legacy
- Enforcement seen as key to urban arterial operations
- Expansion of decriminalisation (non police enforcement) to
both Borough and Transport for London Road Network
- Transport Operational Command Unit (TOCU)
- Expansion of CCTV enforcement (211 new cameras)
• Bus Lanes
• Parking / Loading / Stopping
• On bus cameras on 600 buses
- Enforcement Strategies now seen as fundamental to Bus
Priority in London
The other schemes…
Many of the other components delivered later…
Project/measure Planned Actual
Congestion charging 2003 2003
East London Line 2006 2010
Crossrail 2012 2016
Thameslink 2000 (1991) 2008 2018
Cross River Transit 2007 Cancelled
Greenwich Waterfront
Transit
2007 Cancelled
London – considerations for Melbourne
- An integrated multi modal strategy can deliver range of
outcomes over time
- Planned dates and actual dates rarely agree
- Package of measures needed across modes – Trams / Buses
and bikes have a role to play
- Need short term / medium / long terms plans to move people
and goods
- One size does not fit all

Contenu connexe

Tendances

The Current Transport Policy Environment
The Current Transport Policy Environment The Current Transport Policy Environment
The Current Transport Policy Environment Bakhtiar Zein
 
Afa Interpretation Of Financial Statements Sbs Transist Vs Smrt
Afa Interpretation Of Financial Statements   Sbs Transist Vs SmrtAfa Interpretation Of Financial Statements   Sbs Transist Vs Smrt
Afa Interpretation Of Financial Statements Sbs Transist Vs Smrtruoting
 
Webinar: Some Observations on BRT in North America… and Elsewhere
Webinar: Some Observations on BRT in North America… and ElsewhereWebinar: Some Observations on BRT in North America… and Elsewhere
Webinar: Some Observations on BRT in North America… and ElsewhereBRTCoE
 
Moving from Bus Rapid Transit to Integrated Public Transport
Moving from Bus Rapid Transit to Integrated Public TransportMoving from Bus Rapid Transit to Integrated Public Transport
Moving from Bus Rapid Transit to Integrated Public TransportTristan Wiggill
 
Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwak...
Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwak...Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwak...
Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwak...BRTCoE
 
BRT Chennai
BRT ChennaiBRT Chennai
BRT Chennaiedsley
 
Bus Rapid Transit System (BRTS) - Case Studies in Indian Scenario
Bus Rapid Transit System (BRTS) - Case Studies in Indian Scenario Bus Rapid Transit System (BRTS) - Case Studies in Indian Scenario
Bus Rapid Transit System (BRTS) - Case Studies in Indian Scenario Apparao Gandi
 
MyCiti presentation by Kylie Hatton
MyCiti presentation by Kylie HattonMyCiti presentation by Kylie Hatton
MyCiti presentation by Kylie Hattonguylundy
 
First – Last Mile_MBPJ_2015
First – Last Mile_MBPJ_2015First – Last Mile_MBPJ_2015
First – Last Mile_MBPJ_2015Norma Nun
 
Mohinder Singh - Gestión Institucional del Sistema de Transporte de Singapur
Mohinder Singh - Gestión Institucional del Sistema de Transporte de SingapurMohinder Singh - Gestión Institucional del Sistema de Transporte de Singapur
Mohinder Singh - Gestión Institucional del Sistema de Transporte de SingapurFagner Glinski
 
BRT - EDSA (Bus Rapid Transit) System 2018
BRT - EDSA (Bus Rapid Transit) System 2018BRT - EDSA (Bus Rapid Transit) System 2018
BRT - EDSA (Bus Rapid Transit) System 2018Eduardo C. Arrojado
 

Tendances (20)

The Current Transport Policy Environment
The Current Transport Policy Environment The Current Transport Policy Environment
The Current Transport Policy Environment
 
Afa Interpretation Of Financial Statements Sbs Transist Vs Smrt
Afa Interpretation Of Financial Statements   Sbs Transist Vs SmrtAfa Interpretation Of Financial Statements   Sbs Transist Vs Smrt
Afa Interpretation Of Financial Statements Sbs Transist Vs Smrt
 
Webinar: Some Observations on BRT in North America… and Elsewhere
Webinar: Some Observations on BRT in North America… and ElsewhereWebinar: Some Observations on BRT in North America… and Elsewhere
Webinar: Some Observations on BRT in North America… and Elsewhere
 
Bus Rapid Transit (BRT) in Gauteng, S.A.
Bus Rapid Transit (BRT) in Gauteng, S.A.Bus Rapid Transit (BRT) in Gauteng, S.A.
Bus Rapid Transit (BRT) in Gauteng, S.A.
 
Moving from Bus Rapid Transit to Integrated Public Transport
Moving from Bus Rapid Transit to Integrated Public TransportMoving from Bus Rapid Transit to Integrated Public Transport
Moving from Bus Rapid Transit to Integrated Public Transport
 
Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwak...
Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwak...Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwak...
Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwak...
 
BRT Chennai
BRT ChennaiBRT Chennai
BRT Chennai
 
Tackling future urban mobility demand in singapore
Tackling future urban mobility demand in singaporeTackling future urban mobility demand in singapore
Tackling future urban mobility demand in singapore
 
Bus Rapid Transit System (BRTS) - Case Studies in Indian Scenario
Bus Rapid Transit System (BRTS) - Case Studies in Indian Scenario Bus Rapid Transit System (BRTS) - Case Studies in Indian Scenario
Bus Rapid Transit System (BRTS) - Case Studies in Indian Scenario
 
BRT in China: A brief review
BRT in China: A brief reviewBRT in China: A brief review
BRT in China: A brief review
 
MyCiti presentation by Kylie Hatton
MyCiti presentation by Kylie HattonMyCiti presentation by Kylie Hatton
MyCiti presentation by Kylie Hatton
 
First – Last Mile_MBPJ_2015
First – Last Mile_MBPJ_2015First – Last Mile_MBPJ_2015
First – Last Mile_MBPJ_2015
 
Mohinder Singh - Gestión Institucional del Sistema de Transporte de Singapur
Mohinder Singh - Gestión Institucional del Sistema de Transporte de SingapurMohinder Singh - Gestión Institucional del Sistema de Transporte de Singapur
Mohinder Singh - Gestión Institucional del Sistema de Transporte de Singapur
 
Brt planning week
Brt planning weekBrt planning week
Brt planning week
 
BRT - EDSA (Bus Rapid Transit) System 2018
BRT - EDSA (Bus Rapid Transit) System 2018BRT - EDSA (Bus Rapid Transit) System 2018
BRT - EDSA (Bus Rapid Transit) System 2018
 
Brts
BrtsBrts
Brts
 
Crossrail 2 - Planning for the Future
Crossrail 2 - Planning for the FutureCrossrail 2 - Planning for the Future
Crossrail 2 - Planning for the Future
 
BRTS
BRTSBRTS
BRTS
 
Straddling bus presented by RK
Straddling bus presented by RKStraddling bus presented by RK
Straddling bus presented by RK
 
Makkah Metro Presentation
Makkah Metro Presentation Makkah Metro Presentation
Makkah Metro Presentation
 

En vedette

Tracxn Travel India Startup Landscape - Feb 2015
Tracxn Travel India Startup Landscape - Feb 2015Tracxn Travel India Startup Landscape - Feb 2015
Tracxn Travel India Startup Landscape - Feb 2015Tracxn
 
Valoració de l’impacte social i econòmic de la mobilitat
Valoració de l’impacte social i econòmic de la mobilitatValoració de l’impacte social i econòmic de la mobilitat
Valoració de l’impacte social i econòmic de la mobilitatAMTU
 
MobiWallet Italian Pilot
MobiWallet Italian PilotMobiWallet Italian Pilot
MobiWallet Italian PilotMobiWallet
 
Different ways of travelling
Different ways of travellingDifferent ways of travelling
Different ways of travellingSvetik Svetik
 
Tnooz-Fusion FREE webinar: The science behind ancillary merchandising
Tnooz-Fusion FREE webinar: The science behind ancillary merchandisingTnooz-Fusion FREE webinar: The science behind ancillary merchandising
Tnooz-Fusion FREE webinar: The science behind ancillary merchandisingtnooz
 
Travel vocabulary
Travel vocabularyTravel vocabulary
Travel vocabularyeoihelen
 
Unit 4 Planes Trains and Automobiles
Unit 4 Planes Trains and AutomobilesUnit 4 Planes Trains and Automobiles
Unit 4 Planes Trains and AutomobilesTristan Tolley
 
Improving the digital customer journey to drive bookings
Improving the digital customer journey to drive bookingsImproving the digital customer journey to drive bookings
Improving the digital customer journey to drive bookingstnooz
 
Make My Trip - Successful Journey!!!!
Make My Trip - Successful Journey!!!!Make My Trip - Successful Journey!!!!
Make My Trip - Successful Journey!!!!Sushil Rai
 
ESL Taking a trip flashcards
ESL Taking a trip flashcardsESL Taking a trip flashcards
ESL Taking a trip flashcardsJolyon Dodgson
 
Mapping the Journey – Experience Beyond the Screen
Mapping the Journey – Experience Beyond the ScreenMapping the Journey – Experience Beyond the Screen
Mapping the Journey – Experience Beyond the ScreenJamin Hegeman
 

En vedette (16)

Tracxn Travel India Startup Landscape - Feb 2015
Tracxn Travel India Startup Landscape - Feb 2015Tracxn Travel India Startup Landscape - Feb 2015
Tracxn Travel India Startup Landscape - Feb 2015
 
Travel purchasefunneldisruption ap2015
Travel purchasefunneldisruption ap2015Travel purchasefunneldisruption ap2015
Travel purchasefunneldisruption ap2015
 
Valoració de l’impacte social i econòmic de la mobilitat
Valoració de l’impacte social i econòmic de la mobilitatValoració de l’impacte social i econòmic de la mobilitat
Valoració de l’impacte social i econòmic de la mobilitat
 
MobiWallet Italian Pilot
MobiWallet Italian PilotMobiWallet Italian Pilot
MobiWallet Italian Pilot
 
All about traveling
All about travelingAll about traveling
All about traveling
 
Different ways of travelling
Different ways of travellingDifferent ways of travelling
Different ways of travelling
 
Tnooz-Fusion FREE webinar: The science behind ancillary merchandising
Tnooz-Fusion FREE webinar: The science behind ancillary merchandisingTnooz-Fusion FREE webinar: The science behind ancillary merchandising
Tnooz-Fusion FREE webinar: The science behind ancillary merchandising
 
Travel vocabulary
Travel vocabularyTravel vocabulary
Travel vocabulary
 
Unit 4 Planes Trains and Automobiles
Unit 4 Planes Trains and AutomobilesUnit 4 Planes Trains and Automobiles
Unit 4 Planes Trains and Automobiles
 
Improving the digital customer journey to drive bookings
Improving the digital customer journey to drive bookingsImproving the digital customer journey to drive bookings
Improving the digital customer journey to drive bookings
 
Make My Trip - Successful Journey!!!!
Make My Trip - Successful Journey!!!!Make My Trip - Successful Journey!!!!
Make My Trip - Successful Journey!!!!
 
ESL Taking a trip flashcards
ESL Taking a trip flashcardsESL Taking a trip flashcards
ESL Taking a trip flashcards
 
Mapping the Journey – Experience Beyond the Screen
Mapping the Journey – Experience Beyond the ScreenMapping the Journey – Experience Beyond the Screen
Mapping the Journey – Experience Beyond the Screen
 
Travel vocabulary
Travel vocabularyTravel vocabulary
Travel vocabulary
 
Unit 13
Unit 13Unit 13
Unit 13
 
1 tg4 - holidays
1   tg4 - holidays1   tg4 - holidays
1 tg4 - holidays
 

Similaire à Doing more with less - LBI

London's Crossrail Scheme - its evolution, governance, financing and challenges
London's Crossrail Scheme  - its evolution, governance, financing and challengesLondon's Crossrail Scheme  - its evolution, governance, financing and challenges
London's Crossrail Scheme - its evolution, governance, financing and challengesInstitute for Transport Studies (ITS)
 
Transport appraisal – evolution development and current challenges
Transport appraisal – evolution development and current challengesTransport appraisal – evolution development and current challenges
Transport appraisal – evolution development and current challengesInstitute for Transport Studies (ITS)
 
Fbe Transport presentation
Fbe Transport presentationFbe Transport presentation
Fbe Transport presentationFBE Manchester
 
OPDC revised draft Local Plan presentation - Transport
OPDC revised draft Local Plan presentation - TransportOPDC revised draft Local Plan presentation - Transport
OPDC revised draft Local Plan presentation - TransportAlexandra Dobson
 
Louisa Sorrentino
Louisa SorrentinoLouisa Sorrentino
Louisa SorrentinoJumpingJaq
 
Community liason-group-presentation-10-02-2015
Community liason-group-presentation-10-02-2015Community liason-group-presentation-10-02-2015
Community liason-group-presentation-10-02-2015Auckland Transport
 
Integrated transport - investing in Auckland's future
Integrated transport - investing in Auckland's futureIntegrated transport - investing in Auckland's future
Integrated transport - investing in Auckland's futureAuckland Transport
 
The Move Towards Sustainable Transport in London - Mr. Steve Kearns
The Move Towards Sustainable Transport in London - Mr. Steve KearnsThe Move Towards Sustainable Transport in London - Mr. Steve Kearns
The Move Towards Sustainable Transport in London - Mr. Steve KearnsIPPAI
 
European Bus Operators' Forum - Mark O'Donovan
European Bus Operators' Forum - Mark O'DonovanEuropean Bus Operators' Forum - Mark O'Donovan
European Bus Operators' Forum - Mark O'DonovanRussell Publishing
 
10 Nov Future of Transport
10 Nov Future of Transport10 Nov Future of Transport
10 Nov Future of Transportfutureoflondon
 
TFL Presentation
TFL Presentation TFL Presentation
TFL Presentation Sandra Idio
 

Similaire à Doing more with less - LBI (20)

London's Crossrail Scheme - its evolution, governance, financing and challenges
London's Crossrail Scheme  - its evolution, governance, financing and challengesLondon's Crossrail Scheme  - its evolution, governance, financing and challenges
London's Crossrail Scheme - its evolution, governance, financing and challenges
 
Transport appraisal – evolution development and current challenges
Transport appraisal – evolution development and current challengesTransport appraisal – evolution development and current challenges
Transport appraisal – evolution development and current challenges
 
SmartTrack Presentation - June, 2015
SmartTrack Presentation - June, 2015SmartTrack Presentation - June, 2015
SmartTrack Presentation - June, 2015
 
Fbe Transport presentation
Fbe Transport presentationFbe Transport presentation
Fbe Transport presentation
 
OPDC revised draft Local Plan presentation - Transport
OPDC revised draft Local Plan presentation - TransportOPDC revised draft Local Plan presentation - Transport
OPDC revised draft Local Plan presentation - Transport
 
Scarborough Subway Extension - Phase 2 Presentation
Scarborough Subway Extension - Phase 2 PresentationScarborough Subway Extension - Phase 2 Presentation
Scarborough Subway Extension - Phase 2 Presentation
 
Coordinated Transit Planning in Toronto
Coordinated Transit Planning in TorontoCoordinated Transit Planning in Toronto
Coordinated Transit Planning in Toronto
 
Louisa Sorrentino
Louisa SorrentinoLouisa Sorrentino
Louisa Sorrentino
 
Community liason-group-presentation-10-02-2015
Community liason-group-presentation-10-02-2015Community liason-group-presentation-10-02-2015
Community liason-group-presentation-10-02-2015
 
Integrated transport - investing in Auckland's future
Integrated transport - investing in Auckland's futureIntegrated transport - investing in Auckland's future
Integrated transport - investing in Auckland's future
 
2015 06-15 relief line presentation
2015 06-15 relief line presentation2015 06-15 relief line presentation
2015 06-15 relief line presentation
 
The Move Towards Sustainable Transport in London - Mr. Steve Kearns
The Move Towards Sustainable Transport in London - Mr. Steve KearnsThe Move Towards Sustainable Transport in London - Mr. Steve Kearns
The Move Towards Sustainable Transport in London - Mr. Steve Kearns
 
Rapid transit system
Rapid transit systemRapid transit system
Rapid transit system
 
European Bus Operators' Forum - Mark O'Donovan
European Bus Operators' Forum - Mark O'DonovanEuropean Bus Operators' Forum - Mark O'Donovan
European Bus Operators' Forum - Mark O'Donovan
 
15-03 Relief Line Public Meeting Presentation
15-03 Relief Line Public Meeting Presentation15-03 Relief Line Public Meeting Presentation
15-03 Relief Line Public Meeting Presentation
 
5 route network rs final
5 route network rs final5 route network rs final
5 route network rs final
 
10 Nov Future of Transport
10 Nov Future of Transport10 Nov Future of Transport
10 Nov Future of Transport
 
TFL Presentation
TFL Presentation TFL Presentation
TFL Presentation
 
monorail system implication in Sri Lanka
monorail system implication in Sri Lankamonorail system implication in Sri Lanka
monorail system implication in Sri Lanka
 
2016-06-06 Scarborough Subway Extension SAG
2016-06-06 Scarborough Subway Extension SAG2016-06-06 Scarborough Subway Extension SAG
2016-06-06 Scarborough Subway Extension SAG
 

Doing more with less - LBI

  • 1.
  • 2. Presentation Structure - London Transport Strategy 2000 • Main components - Buses and the London Bus Initiative - What else happened - Considerations for Melbourne
  • 3. Background – London in 1999 “Congestion and overcrowding on London’s transport networks is acute.” - Urgent need for measures to reduce heavy all day traffic congestion - Slow and unreliable bus services - Difficulties for business in servicing and delivery movements - Unreliability and gross overcrowding of National Rail and Underground services - Growth in the number of people using transport - London’s population and economy growth
  • 4. Background – London in 1999 Key issues for outer London include: - Inadequate public transport options, particularly for non-radial and off-peak trips - Heavy and growing traffic congestion on key routes and in town centres affecting both individuals and businesses - Pockets of deprivation and regeneration sites which are not well linked to the main transport networks
  • 5. Background - The Mayors Transport Strategy - Creation of ‘Transport for London’ provided a new opportunity - “Balanced set of priorities needed to facilitate the required changes in the transport network in the short and medium term” - Overcoming backlog of investment in the Underground - Radical improvements to bus services - Improving capacity including cross city and orbital rail, a new Thames crossing - Increase travel choice
  • 6. Package of measures proposed - Overground Rail – Crossrail, East London Line extension, Thameslink 2000 - Underground – station upgrades e.g. Tottenham Court Road, Victoria, etc (and Docklands Light Rail extensions) - Intermediate modes (Tram/BRT) – Cross River Transit, East London Transit, - Smartcards and fare changes - Congestion charging
  • 7. Role of buses - Bus system offered potential for rapid (i.e. short term) improvements - Could relieve overcrowding on Underground - Offer an alternative to the car especially in outer London - Building off the back of Red Routes (Clearways) and Pilot Route 43 project - Key short term focus was London Bus Initiative • Improvements on 27 key routes • £60 million over 2 years
  • 8. London Bus Initiative – The Strategy The vision: - To deliver a ‘step-change’ enhancement of the actual and perceived quality of London’s bus services Key objectives were to: - Promote a change in travel habits to get more people onto London’s buses - Make buses more attractive for potential users - Make buses the first choice mode of transport on LBI routes - Deliver the above on a ‘whole route’ basis - Aligned to Mayor’s strategy
  • 9. London Bus Initiative What was different? - Corridor based – not hotspot targets on 27 routes - Multi-agency approach • TfL / Councils / Operators / Police - Reviewed whole trip - Not just infrastructure focused
  • 10. London Bus Initiative – Whole route/trip approach - Whole (Bus) Route - Whole trip corridor approach • Door to Door • Total Journey Quality - Partnership (multi-agency) approach based on responsibilities - NOT just bus priority i.e. bus lanes and vehicle detection at signals, etc Origin/Home Walk to Bus Stop Wait at Bus Stop Bus Journey Board the Bus Alight from Bus Walk to Destination
  • 11. London Bus Initiative – package of measures
  • 12. London Bus Initiative - KPIs Targets/KPIs – Multi issue/agency examples: - Reductions in journey time (10 – 20%) - Improved reliability (excess wait time) - Increased coverage of routes with bus lanes (real and virtual) - Increased patronage - Reductions in bus stop dwell time - Bus stop accessibility (50 – 100%) - Improved customer satisfaction - Improved bus cleanliness
  • 13. London Bus Initiative – Package of measures - Route Traffic Management Strategy • To review use of carriageway space • Introduce real and ‘virtual’ bus lanes - Review of kerbside parking/loading controls - Extension of hours/days of Red Routes (clearways) - Detailed Traffic Signal Review - Bus stop improvements/rationalisation - Total Route Control Strategy (flagship routes only) • i.e. Control any aspect likely to cause delay - Integrated Traffic Management – link and node
  • 14. - Delivered via Program Team - Dedicated LBI Communications Team assisted delivery - Consultation widened to include bus passengers London Bus Initiative – other features
  • 15. London Bus Initiative – What was delivered? Over LBI 1 – (2+1 years): - 108 new sections of bus lanes • 84 extended in length / 40 in hours - 50 new pedestrian crossings - Bus Priority added to 306 traffic signals - 146 physical intersection improvements • 200 signal timing changes - 40% of 2,500 route stops made DDA complaint
  • 16. London Bus Initiative – total spend Spending breakdown: (2002 GBP – 2013 AUD equivalent) - Enforcement £11m $24m AUD - Traffic engineering £28m $60m AUD - Bus operations £3.5m $8m AUD - Programme support £9m $20m AUD - Major projects £8.5m $18.5m AUD - $130m AUD
  • 17. London Bus Initiative – Benefits - Increased bus patronage +21.9% during LBI • Patronage increase equivalent to $12 million in benefits pa - Mixed journey time improvements • Big wins on contra-flow schemes • More time spent at stops negated some journey time benefits - Over long term improved reliability • Reduced operating costs • Protected buses from worsening congestion
  • 18. London Bus Initiative - legacy - Bus Stops accepted as vital part of trip - Increased patronage increased time at stops - Acknowledgement of need to reduce boarding/alighting time - Led to: • Cashless Operation – and Smartcards • Articulated buses – multi-door entry/exit
  • 19. London Bus Initiative – other legacy - Enforcement seen as key to urban arterial operations - Expansion of decriminalisation (non police enforcement) to both Borough and Transport for London Road Network - Transport Operational Command Unit (TOCU) - Expansion of CCTV enforcement (211 new cameras) • Bus Lanes • Parking / Loading / Stopping • On bus cameras on 600 buses - Enforcement Strategies now seen as fundamental to Bus Priority in London
  • 20. The other schemes… Many of the other components delivered later… Project/measure Planned Actual Congestion charging 2003 2003 East London Line 2006 2010 Crossrail 2012 2016 Thameslink 2000 (1991) 2008 2018 Cross River Transit 2007 Cancelled Greenwich Waterfront Transit 2007 Cancelled
  • 21. London – considerations for Melbourne - An integrated multi modal strategy can deliver range of outcomes over time - Planned dates and actual dates rarely agree - Package of measures needed across modes – Trams / Buses and bikes have a role to play - Need short term / medium / long terms plans to move people and goods - One size does not fit all