SlideShare une entreprise Scribd logo
1  sur  82
Paramount Unified School District
2016 School Facilities Needs Assessment Analysis
School Campus Improvement and Upgrade Projects Summary
Prepared for:
District Board of Education
& District Management
 DISTRICT-WIDE Types of School Facilities Improvement, Upgrade
Expansion and New Construction Project Needs 1
 INDIVIDUAL School Campus Facilities Improvement, Upgrade,
Expansion and New Construction Needs 2
TABLE OF CONTENTS
Section
2016 School Facilities Needs Assessment Analysis
School Campus Improvement and Upgrade Projects Summary
 Key Facility Objectives and Needs Assessment Process 1
 District School Campuses and Facilities 2
 Primary Types of School Facilities Improvement Needs 3-4
 1. School Safety, Security and Health Projects 5
 2. Improvements and Equipment to Support 21st Century Learning
and District Classroom Instructional Technology 1:1 Program 6
 3. Career Technical Education Facilities, School Building,
Classroom and Support Facility Projects 7
 4. Other School Facility and District-Wide Projects 8
 School Project Types – Preliminary Scope Budget Amounts 9
 School Project Types – District Revenue/Funding Tools 10-11
 G.O. Bond Funding Tool – Preliminary Cash Flow Amounts 12
Section 1:
DISTRICT-WIDE Types of School Facilities Needs
Page
2016 School Facilities Needs Assessment Analysis
School Campus Improvement and Upgrade Projects Summary
Key Facility Objectives and Needs Assessment Process
Section 1: Page 1
 The District is committed to safe schools with
upgraded classrooms, libraries, science,
technology, engineering and mathematics
(STEM) labs and learning environments needed
to support career technical education and 21st-
century instruction.
 The District believes that improving school
facilities will improve the high quality of education
for each student in every classroom.
 The District desires to improve student safety and
security and reduce risks from earthquakes and
fires by upgrading school security communication
systems, fire alarms, and sprinklers, and
retrofitting buildings, as required.
 The District believes that updating instructional
technology will equip our students with skills and
solid background in science, math and
technology needed to succeed in high school,
college and careers.
 As the school facilities age, the District desires to
retrofit, improve and upgrade older school
campuses, playfields and athletic facilities.
 The District conducted a thorough assessment of
its school facility needs and received input from
teachers, staff and the community and evaluated
the District’s urgent and critical school facility
renovation, improvement, upgrade and expansion
needs, including safety issues, computer and
classroom instructional technology needs, class
size reduction objectives, and prepared a needs
assessment in developing the scope of facilities
needed at each school campus.
 The District conducted a comprehensive
Community Survey to receive input regarding the
primary types of school facilities improvements,
and instructional technology upgrades that the
local citizens deemed as priorities.
 The District prepared an updated School
Facilities Needs Assessment Analysis (“SFNA”) in
order to evaluate and address all of the school
facilities needs of the District at each campus and
facility.
 The District evaluated the safety, facility and
classroom technology needs in developing the
priority school projects minimum and maximum
scopes and preliminary budget amounts set forth
in the SFNA.
District School Campuses and Facilities
Section 1: Page 2
The types of facilities renovations, improvements, upgrades and expansions identified in the School
Facilities Needs Assessment Analysis include all of the following school campuses and facilities so
that ALL students have access to safe schools with upgraded classrooms, libraries, science, technology,
engineering and mathematics (STEM) labs and learning environments needed to support career technical
education and 21st-century instruction:
Elementary School Campuses
1. Collins Elementary School
2. Gaines Elementary School
3. Jefferson Elementary School
4. Keppel Elementary School
5. Lincoln Elementary School
6. Los Cerritos Elementary School
7. Mokler Elementary School
8. Roosevelt Elementary School
9. Tanner Elementary School
10. Wirtz Elementary School
Middle School Campuses
1. Alondra Middle School
2. Jackson Middle School
3. Paramount Park Middle School
4. Zamboni Middle School
1. Hollydale K-8 School
High School Campuses
1. Paramount High School - Senior Campus
2. Paramount High School – West Campus
3. Buena Vista High School
Other District-Wide Facilities
1. Paramount Community Day School
2. Paramount Adult School
3. District-Wide Educational Support Facilities
Primary Types of School Facilities Improvement Needs
Project
Type 1
1. School Safety, Security and Health Projects
Project
Type 2
Goal and Purpose: To have safe, secure and up-to-date schools for
all students and teachers enabling the District to retain qualified
teachers and enhance instruction in core subjects like math, science
and career technical educational curriculums'.
2. Improvements and Equipment to Support
21st Century Learning and District Classroom
Instructional Technology 1:1 Program
Section 1: Page 3
Goal and Purpose: To ensure all students have equal access to up-
to-date classrooms, and to upgrade classroom computers and
computer technology needed to enable our teachers and students to
use up-to-date teaching methods and enhance instruction in core
academic subjects like math, science and computer technology.
Primary Types of School Facilities Improvement Needs
Project
Type 3
3. Career Technical Education Facilities,
School Building, Classroom and
Support Facility Projects
Project
Type 4
Goal and Purpose: To ensure all students have equal access to
Career Technology Education programs, and to upgrade classroom
computers and computer technology to enable our teachers and
students to use up-to-date teaching methods and enhance instruction
in core academic subjects like math, science and technology.
4. Other School Facilities and
District-Wide Projects
Section 1: Page 4
Goal and Purpose: To reduce maintenance and operating costs,
thereby returning more money to the classroom, allowing the District
to retain qualified teachers and protect instruction in core subjects
like math, science and technology, and make a variety of basic
repairs, improvements, upgrades, and expansions needed at district-
wide aging school campuses and facilities.
Goal and Purpose:
To have safe, secure and up-to-date
schools for all students and teachers
enabling the District to retain
qualified teachers and enhance
instruction in core subjects like
math, science and career technical
educational curriculums'.
Primary Types of District-Wide School Facilities Projects
 Acquire, replace, upgrade and/or install student safety and
security systems, including lighting, fencing, smoke detectors, fire
alarms, sprinklers, security alarms, signage, safety locks and
hardware, cameras and emergency communication systems.
 Renovate, rehabilitate, re-configure, replace and/or upgrade
portable classrooms and restrooms, and furnish and equip the
same.
 Renovate, replace and/or install drinking fountains.
 Reconfigure, renovate, repair, resurface, improve and/or expand
roads, sidewalks, driveways, parking lots and related areas, and
pick-up/drop-off areas.
 Upgrade/improve sites/grounds and facilities and acquire/install
equipment and furniture, for students with disabilities and
compliance with Americans with Disabilities Act.
 Renovate, repair, resurface, upgrade, expand, construct and/or
install and improve paved and other hard surfaces, playgrounds,
playfields and landscaping, and acquire, improve, replace and/or
upgrade playground equipment and fixtures.
1. School Safety, Security and Health Projects
Section 1: Page 5
Minimum Maximum
Scope Scope
$12,000,000 $15,000,000
Goal and Purpose:
To ensure all students have equal
access to up-to-date classrooms, and to
upgrade classroom computers and
computer technology needed to enable
our teachers and students to use up-to-
date teaching methods and enhance
instruction in core academic subjects
like math, science and computer
technology.
Primary Types of District-Wide School Facilities Projects
 Acquire, install and upgrade technology equipment, fixtures and infrastructure, including interactive
educational technology and projection systems, computers, tablets, laptops, printers, scanners,
digital projectors and cameras, audio systems, video systems, phone and sound projections systems,
peripherals, smart boards, education software, telecommunications software, security software,
monitors, network equipment (including servers, network interface devices, network switches and
routers, wireless network equipment, firewalls, network security equipment, racking, power and
cooling equipment, wiring and uninterruptible power supplies), etc.,.
 Rehabilitate and replace such equipment, fixtures and infrastructure as needed in the future;
technology equipment, fixtures and infrastructure includes existing technology equipment, fixtures
and infrastructure as well as technology equipment, fixtures and infrastructure developed in the
future.
 Renovate, replace, upgrade, acquire, install and integrate electrical (including wiring and related
infrastructure for modern technology) and data systems, equipment, power sources and supplies
and related technology infrastructure.
 Renovate, reconfigure and/or upgrade school facilities as needed to install or accommodate new
technology and equipment.
 Improve, upgrade, renovate, and/or construct and install classroom and lab facilities and related
support facilities needed to support the career technical education requirements for student job
training, career placement, and college preparation.
 Renovate, rehabilitate, re-configure, replace, expand and/or upgrade portable and permanent
classrooms, classroom buildings, labs and school support facilities, including interior and exterior
doors, windows, door and window hardware, roofs, rain gutters and downspouts, walls, marker
boards, ceilings and floors and finishes, paint, siding, insulation, casework, cabinets, carpets, drapes,
window coverings, lighting, sinks, fixtures, signage, fencing, furniture and equipment.
 Acquire and install and/or replace heating, ventilation and air conditioning and lighting systems.
 Furnishing and equipping of career technical education facilities; furnishing and equipping shall
include initial purchases, and scheduled and necessary replacements, upgrades and updating of
technology for career placement and college preparation.
2. 21st Century Learning and Instructional Technology 1:1 Program
Section 1: Page 6
Minimum Maximum
Scope Scope
$15,000,000 $20,000,000
Goal and Purpose:
To ensure all students have equal
access to Career Technology
Education programs, and to upgrade
classroom computers and computer
technology to enable our teachers
and students to use up-to-date
teaching methods and enhance
instruction in core academic
subjects like math, science and
technology.
Primary Types of District-Wide School Facilities Projects
 Improve, upgrade, renovate, and/or construct and install
classroom and lab facilities and related support facilities needed
to support the career technical education requirements for student
job training, career placement, and college preparation.
 Renovate, rehabilitate, re-configure, replace, expand and/or
upgrade portable and permanent classrooms, classroom
buildings, labs and school support facilities, including interior and
exterior doors, windows, door and window hardware, roofs, rain
gutters and downspouts, walls, marker boards, ceilings and floors
and finishes, paint, siding, insulation, casework, cabinets,
carpets, drapes, window coverings, lighting, sinks, fixtures,
signage, fencing, furniture and equipment.
 Acquire and install and/or replace heating, ventilation and air
conditioning and lighting systems.
 Furnishing and equipping of career technical education facilities;
furnishing and equipping shall include initial purchases, and
scheduled and necessary replacements, upgrades and updating
of technology for career placement and college preparation.
3. Career Technical Education Facilities, School Building,
Classroom and Support Facility Projects
Section 1: Page 7
Minimum Maximum
Scope Scope
$19,000,000 $25,000,000
4. Other School Facility and District-Wide Projects
Section 1: Page 8
Primary Types of District-Wide School Facilities Projects
 Improve, update, renovate, and expand athletic fields, tracks, and gym facilities at the middle
school campuses and other school sites as needed.
 Acquisition and improvement of real property and the construction of new school facilities
needed to accommodate future increases in student enrollment and/or from reductions in the
number students per classroom.
 Acquire, install and/or construct renewable energy and/or energy-saving systems,
improvements and equipment, including photovoltaic solar panels, electricity generation and
distribution systems, upgraded insulation, efficient lighting, energy management and
conservation systems, windows and structures to support such systems, improvements and
equipment and related infrastructure. Rehabilitate, renovate, upgrade and/or replace such
systems, improvements and equipment as needed in the future.
 Planning, designing and providing temporary housing.
 The inspection, sampling and analysis of grounds, buildings and building materials to
determine the presence of hazardous materials or substances, including asbestos, lead, etc.,
and the encapsulation, removal, disposal and other remediation or control of such hazardous
materials and substances.
 Necessary onsite and offsite preparation or restoration in connection with new construction,
renovation or remodeling, or installation or removal of relocatable buildings, including
demolition of structures; removing, replacing, or installing irrigation, drainage, utility lines
(gas, water, sewer, electrical, data and voice, etc.), trees and landscaping; relocating fire
access roads.
 Address other unforeseen conditions revealed by construction, renovation or modernization
(including plumbing or gas line breaks, dry rot, seismic and structural deficiencies, etc.).
 Furnishing and equipping of school facilities; furnishing and equipping shall include initial
purchases, and scheduled and necessary replacements, upgrades and updating of
technology systems.
Goal and Purpose:
To reduce maintenance and operating
costs, thereby returning more money to
the classroom, allowing the District to
retain qualified teachers and protect
instruction in core subjects like math,
science and technology, and make a
variety of basic repairs, improvements,
upgrades, and expansions needed at
district-wide aging school campuses
and facilities.
Minimum Maximum
Scope Scope
$69,000,000 $80,000,000
School Project Types – Preliminary Scope Budget Amounts
Section 1: Page 9
District-Wide Types of Minimum Maximum
School Facilities Needs Scope Scope
1. School Safety, Security and Health Projects $12,000,000 $15,000,000
2. 21st Century Learning & Instructional Technology 1:1 15,000,000 20,000,000
3. Career Technical Education Facilities, School Building,
Classroom and Support Facility Projects
4. Other School Facility and District-Wide Projects 69,000,000 80,000,000
School Project Types - Category Preliminary Budget = $115,000,000 $140,000,000
19,000,000 25,000,000
10.71%
14.29%
17.86%
57.14%
ProjectType Maximum Scope%
Type 1 Type 2 Type 3 Type 4
10.43%
13.04%
16.52%60.00%
ProjectType Minimum Scope%
Type 1 Type 2 Type 3 Type 4
School Projects – District Revenue/Funding Tools
Section 1: Page 10
 Funding Tool Type: Local general obligation bonds
(G.O. Bonds) under the Proposition 39 parameters.
 Requirement: Election needed for implementation.
 55%+ = Voter minimum approval requirement.
 General Elections = Must be a general scheduled
election date (typically even numbered years).
 Permitted Uses: School Improvements, Expansions,
New Construction and Equipment (FF&E).
 Use Restriction: Permitted uses of funds is LIMITED
to the authorized types of school facilities and school
campuses set forth the “PROJECT LIST” and
APPROVED by the voters.
 Maximum Bond Amount: No legal maximum principal
amount that can be placed on the ballot.
 Number of Bond Series: No legal limitation on the
number of Bond Series issued.
 Maximum Bond Series Repayment Periods:
 40-Years = Current Interest Bonds (CIBs); and
 25-Years = Capital Appreciation Bonds (CABs).
 Maximum Repayment Ratio: Each Bond Series has a
maximum 4 to 1 repayment ratio (principal/total payments).
Local G.O. Bond Measure
 Funding Tool Type: State matching grants for certain
types of eligible school projects and programs.
 Requirement: The state must have matching grant
funds available – and the district must have “eligibility”.
 Permitted Uses: Use of state matching grants is limited
to the following types of eligible projects and programs:
 School “Modernization” Projects;
 School “New Construction” Projects; and
 Certain School “Program” types.
 State Grant Amounts: The state sets the maximum
budget amounts for the eligible projects and programs –
and currently provides the matching grants based on
the following percentages:
 60% =School Modernization State grant %; and
 50% = School New Construction grant %.
 District Match Requirement: The district MUST have
its minimum local matching (40% = Modernization – 50%
= New Construction) funds AVAILABLE to receive the
state matching grant amounts.
 Use Restriction: Permitted uses of the state matching
grants is LIMITED to the approved eligible school
projects.
State Matching Grants
School Projects – District Revenue/Funding Tools
Section 1: Page 11
 Funding Tool Type: Revenues generated from new
residential and commercial development constructed
within the district’s boundaries.
 Requirement: District must have a need to construct
ADDITIONAL school facilities to accommodate the
impact of the new students generated by the
developments.
 Types of Development Revenues: Development
revenues consist of the following primary types:
 Developer Fees: Paid on building permit issuance
based on a “per-square foot” amount under certain
authorized state parameters;
 Special Taxes: Annual tax amounts per unit and
parameters approved by an election of property
owners; and
 In Kind Contributions: Delivery of new school sites
and/or facilities delivered by the developer under a
mutually approved “developer mitigation agreement”.
 Permitted Uses: New school facilities, expansions, and
related furniture, fixtures and equipment (FF&E).
 Use Restriction: Permitted uses of funds is LIMITED
to NEW and EXPANDED school facilities required to
mitigate the impact of NEW students.
New Development Revenues
 Funding Tool Type: Annual tax revenues generated for
district educational programs and operations.
 Requirement: Election needed for implementation.
 66.67% = Voter minimum approval requirement.
 Any Tuesday Election = Parcel tax elections can be
held on any Tuesday with 90-days notice.
 Permitted Uses: Use of the annual tax revenues is
based on the authorized uses approved by the voters -
but are typically utilized to fund the annual operating
expenses of certain “EDUCATIONAL PROGRAMS”.
 Use Restriction: Permitted uses of parcel tax revenues
is LIMITED to the authorized types of educational
programs and other uses APPROVED by the voters in
each election.
 Term of Revenues: The number of years that the
district can collect the parcel tax revenues is set by the
election parameters approved by the voters – but
typically range from 3 to 9-years per election.
 Renewal of Revenues: The parcel tax revenues uses,
term, and amounts can be extended via additional
elections approved by the voters that are held on or
before the expiration of each authorized term.
Parcel Tax Revenue Measure
G.O. Bond Parameters
 $106 Million Bond Amount: Represents
the District’s practical Bond capacity
under the Proposition 39 parameters.
 4 Bond Series Issued Over 10-Years:
The $106 million bond amount is planned
to accessed via the issuance of 4 bond
series over an 8 to 10-year timeframe.
 $59 Tax-Rate Per Year: The repayment of
the Bonds is planned to consist of an
average tax-rate of $59 per $100,000 of
taxable assessed value (AV) based on the
District’s current $5.2 billion tax based
increasing at a 3.50% average rate.
District Bond Capacity – $106 Million
(Under Proposition 39 Parameters)
G.O. Bond Funding Tool – Preliminary Cash Flow Amounts
Section 1: Page 12
Bond Cash Flows for School Projects Cumulative Bond Cash Flows
Bond Series Year Total Amounts Cumulative Amts.
Series No. 1 2017 $38,000,000 $38,000,000
Series No. 2 2020 28,000,000 $66,000,000
Series No. 3 2023 16,000,000 $82,000,000
Series No. 4 2026 24,000,000 $106,000,000
$106,000,000
Preliminary Bond Cash Flow Amounts
Bond Cash Flow Total =
$0
$40
$80
$120
2017 2020 2023 2026
$38
$66
$82
$106
InMillions
Elementary School Campuses
1. Collins Elementary School 1-3
2. Gaines Elementary School 4-6
3. Jefferson Elementary School 7-9
4. Keppel Elementary School 10-12
5. Lincoln Elementary School 13-15
6. Los Cerritos Elementary School 16-18
7. Mokler Elementary School 19-21
8. Roosevelt Elementary School 22-24
9. Tanner Elementary School 25-27
10. Wirtz Elementary School 28-30
Section 2:
INDIVIDUAL School Campus Facilities Needs
Page Middle/K-8 School Campuses
1. Alondra Middle School 31-33
2. Jackson Middle School 34-36
3. Paramount Park Middle School 37-39
4. Zamboni Middle School 40-42
5. Hollydale K-8 School 43-45
Page
2016 School Facilities Needs Analyses
School Campus Improvement and Upgrade Projects Summary
High School Campuses
1. Paramount HS – Senior Campus 46-48
2. Paramount HS – West Campus 49-51
3. Buena Vista High School 52-54
Other District-Wide Facilities
1. Adult Education School Facilities 55-57
2. Community Day School Facilities 58-59
3. District-Wide Support Facilities 60-61
Elementary School Campuses
2016 School Facilities Needs Analyses
School Campus Improvement and Upgrade Projects Summary
Collins Elementary
Gaines Elementary
Jefferson Elementary
Keppel Elementary
Lincoln Elementary
Los Cerritos Elementary
Mokler Elementary Tanner Elementary
Roosevelt Elementary Wirtz Elementary
1. Collins Elementary School Campus
Section 2: Page 1
Street Address: 6125 Coke Avenue
City Location: Long Beach
Year Completed/Age: 1953 – 63 Years Old
School Site Size: 10 Acres
Grade Levels: K-5th Grades
Section 2: Page 2
1. Collins Elementary School Campus
School Safety, Security and Health Projects:
 Increase parking spaces, improve traffic flow,
and add parking striping/speed bumps.
 Install and upgrade security cameras and
exterior lighting systems.
 Install and upgrade school window coverings.
 Install classroom and school campus
electronic entry systems.
 Install panic gate hardware components.
 Renovate, improve and upgrade school
campus visitor check-in/check-out areas.
 Install security systems in student classroom
areas.
 Upgrade school campus telephone and
integrated emergency communication systems.
 Improve and upgrade classroom and school
campus fire alarm systems.
21st Century Learning and Instructional
Technology 1:1 Program:
 Replace and upgrade teacher/student
classroom technology systems.
 Upgrade school campus technology
infrastructure components.
 Improve, upgrade and expand technology
electrical systems.
 Develop and implement a student technology
devise upgrade and replacement program.
Other School Facility and District-Wide
Projects:
 Replace classroom furniture and repaint
campus facilities.
 Renovate and improve multi-purpose room
stage facilities and kitchen flooring.
 Redesign front entrance of school campus.
 Upgrade library, front office and lounge areas.
 Replace classroom and campus flooring.
 Improve, upgrade and construct new cafeteria
facilities.
Other School Facility and District-Wide
Projects:
 Repair, upgrade and improve campus
playground areas and playfield facilities.
 Improve, upgrade and install campus perimeter
fencing.
 Replace portable classrooms with permanent
buildings.
 Replace and upgrade campus drinking
fountains and water bottle fill stations.
 Improve and upgrade campus landscaping with
water conservation/low maintenance systems.
 Upgrade and expand student and staff
restroom facilities.
 Improving, repairing and upgrading school
facilities roofs, walls, electrical, water, gas lines
systems, and seismic/structural deficiencies.
 Furnishing and equipping of facilities including
necessary replacements, improvements and
scheduled improvements of classrooms to
meet ongoing safety, academic, and updated
instructional technology standards.
Section 2: Page 3
1. Collins Elementary School Campus
2. Gaines Elementary School Campus
Section 2: Page 4
Street Address: 7430 Jackson Street
City Location: Paramount
Year Completed/Age: 1951 – 65 Years Old
School Site Size: 4 Acres (Small Site)
Grade Levels: Transitional K-3rd Grades
Section 2: Page 5
School Safety, Security and Health Projects:
 Increase parking spaces, improve traffic flow,
and add parking striping/speed bumps.
 Install and upgrade exterior lighting systems.
 Install and upgrade school window coverings.
 Install classroom and school campus
electronic entry systems.
 Install panic gate hardware components.
 Renovate, improve and upgrade school
campus visitor check-in/check-out areas.
 Install security systems in student classroom
areas.
 Upgrade school campus telephone and
integrated emergency communication systems.
 Improve and upgrade classroom and school
campus fire alarm systems.
21st Century Learning and Instructional
Technology 1:1 Program:
 Replace and upgrade teacher/student
classroom technology systems.
 Upgrade school campus technology
infrastructure components.
 Improve, upgrade and expand technology
electrical systems.
 Develop and implement a student technology
devise upgrade and replacement program.
2. Gaines Elementary School Campus
Other School Facility and District-Wide
Projects:
 Replace classroom furniture and repaint
campus facilities.
 Renovate and improve multi-purpose room
stage facilities and kitchen flooring.
 Redesign front entrance of school campus.
 Upgrade library, front office and lounge areas.
 Replace classroom and campus flooring.
 Improve, upgrade and construct new cafeteria
facilities.
Other School Facility and District-Wide
Projects:
 Repair, upgrade and improve campus
playground areas and playfield facilities.
 Improve, upgrade and install campus perimeter
fencing.
 Replace portable classrooms with permanent
buildings.
 Replace and upgrade campus drinking
fountains and water bottle fill stations.
 Improve and upgrade campus landscaping with
water conservation/low maintenance systems.
 Upgrade and expand student and staff
restroom facilities.
 Improving, repairing and upgrading school
facilities roofs, walls, electrical, water, gas lines
systems, and seismic/structural deficiencies.
 Furnishing and equipping of facilities including
necessary replacements, improvements and
scheduled improvements of classrooms to
meet ongoing safety, academic, and updated
instructional technology standards.
Section 2: Page 6
2. Gaines Elementary School Campus
3. Jefferson Elementary School Campus
Section 2: Page 7
Street Address: 8600 Jefferson Street
City Location: Paramount
Year Completed/Age: 2000 – 16 Years Old
School Site Size: 2.07 Acres (Small Site)
Grade Levels: K-5th Grades
Section 2: Page 8
School Safety, Security and Health Projects:
 Increase parking spaces, improve traffic flow,
and add parking striping/speed bumps.
 Install and upgrade exterior lighting systems.
 Install and upgrade school window coverings.
 Install classroom and school campus
electronic entry systems.
 Install panic gate hardware components.
 Renovate, improve and upgrade school
campus visitor check-in/check-out areas.
 Install security systems in student classroom
areas.
 Upgrade school campus telephone and
integrated emergency communication systems.
 Improve and upgrade classroom and school
campus fire alarm systems.
21st Century Learning and Instructional
Technology 1:1 Program:
 Replace and upgrade teacher/student
classroom technology systems.
 Upgrade school campus technology
infrastructure components.
 Improve, upgrade and expand technology
electrical systems.
 Develop and implement a student technology
devise upgrade and replacement program.
3. Jefferson Elementary School Campus
Other School Facility and District-Wide
Projects:
 Replace classroom furniture and repaint
campus facilities.
 Renovate and improve multi-purpose room
stage facilities and kitchen flooring.
 Redesign front entrance of school campus.
 Upgrade library, front office and lounge areas.
 Replace classroom and campus flooring.
 Improve, upgrade and construct new cafeteria
facilities.
Other School Facility and District-Wide
Projects:
 Repair, upgrade and improve campus
playground areas and playfield facilities.
 Improve, upgrade and install campus perimeter
fencing.
 Replace portable classrooms with permanent
buildings.
 Replace and upgrade campus drinking
fountains and water bottle fill stations.
 Improve and upgrade campus landscaping with
water conservation/low maintenance systems.
 Upgrade and expand student and staff
restroom facilities.
 Improving, repairing and upgrading school
facilities roofs, walls, electrical, water, gas lines
systems, and seismic/structural deficiencies.
 Furnishing and equipping of facilities including
necessary replacements, improvements and
scheduled improvements of classrooms to
meet ongoing safety, academic, and updated
instructional technology standards.
Section 2: Page 9
3. Jefferson Elementary School Campus
4. Keppel Elementary School Campus
Section 2: Page 10
Street Address: 6630 Mark Keppel Street
City Location: Paramount
Year Completed/Age: 1951 – 65 Years Old
School Site Size: 0.4 Acres (Small Site)
Grade Levels: K-5th Grades
Section 2: Page 11
School Safety, Security and Health Projects:
 Increase parking spaces, improve traffic flow,
and add parking striping/speed bumps.
 Install and upgrade exterior lighting systems.
 Install and upgrade school window coverings.
 Install classroom and school campus
electronic entry systems.
 Install panic gate hardware components.
 Renovate, improve and upgrade school
campus visitor check-in/check-out areas.
 Install security systems in student classroom
areas.
 Upgrade school campus telephone and
integrated emergency communication systems.
 Improve and upgrade classroom and school
campus fire alarm systems.
21st Century Learning and Instructional
Technology 1:1 Program:
 Replace and upgrade teacher/student
classroom technology systems.
 Upgrade school campus technology
infrastructure components.
 Improve, upgrade and expand technology
electrical systems.
 Develop and implement a student technology
devise upgrade and replacement program.
4. Keppel Elementary School Campus
Other School Facility and District-Wide
Projects:
 Replace classroom furniture and repaint
campus facilities.
 Renovate and improve multi-purpose room
stage facilities and kitchen flooring.
 Redesign front entrance of school campus.
 Upgrade library, front office and lounge areas.
 Replace classroom and campus flooring.
 Improve, upgrade and construct new cafeteria
facilities.
Other School Facility and District-Wide
Projects:
 Repair, upgrade and improve campus
playground areas and playfield facilities.
 Improve, upgrade and install campus perimeter
fencing.
 Replace portable classrooms with permanent
buildings.
 Replace and upgrade campus drinking
fountains and water bottle fill stations.
 Improve and upgrade campus landscaping with
water conservation/low maintenance systems.
 Upgrade and expand student and staff
restroom facilities.
 Improving, repairing and upgrading school
facilities roofs, walls, electrical, water, gas lines
systems, and seismic/structural deficiencies.
 Furnishing and equipping of facilities including
necessary replacements, improvements and
scheduled improvements of classrooms to
meet ongoing safety, academic, and updated
instructional technology standards.
Section 2: Page 12
4. Keppel Elementary School Campus
5. Lincoln Elementary School Campus
Section 2: Page 13
Street Address: 15324 California Ave.
City Location: Paramount
Year Completed/Age: 1956 – 60 Years Old
School Site Size: 4.7 Acres (Small Site)
Grade Levels: K-5th Grades
Section 2: Page 14
School Safety, Security and Health Projects:
 Increase parking spaces, improve traffic flow,
and add parking striping/speed bumps.
 Install and upgrade exterior lighting systems.
 Install and upgrade school window coverings.
 Install classroom and school campus
electronic entry systems.
 Install panic gate hardware components.
 Renovate, improve and upgrade school
campus visitor check-in/check-out areas.
 Install security systems in student classroom
areas.
 Upgrade school campus telephone and
integrated emergency communication systems.
 Improve and upgrade classroom and school
campus fire alarm systems.
21st Century Learning and Instructional
Technology 1:1 Program:
 Replace and upgrade teacher/student
classroom technology systems.
 Upgrade school campus technology
infrastructure components.
 Improve, upgrade and expand technology
electrical systems.
 Develop and implement a student technology
devise upgrade and replacement program.
5. Lincoln Elementary School Campus
Other School Facility and District-Wide
Projects:
 Replace classroom furniture and repaint
campus facilities.
 Renovate and improve multi-purpose room
stage facilities and kitchen flooring.
 Redesign front entrance of school campus.
 Upgrade library, front office and lounge areas.
 Replace classroom and campus flooring.
 Improve, upgrade and construct new cafeteria
facilities.
Other School Facility and District-Wide
Projects:
 Repair, upgrade and improve campus
playground areas and playfield facilities.
 Improve, upgrade and install campus perimeter
fencing.
 Replace portable classrooms with permanent
buildings.
 Replace and upgrade campus drinking
fountains and water bottle fill stations.
 Improve and upgrade campus landscaping with
water conservation/low maintenance systems.
 Upgrade and expand student and staff
restroom facilities.
 Improving, repairing and upgrading school
facilities roofs, walls, electrical, water, gas lines
systems, and seismic/structural deficiencies.
 Furnishing and equipping of facilities including
necessary replacements, improvements and
scheduled improvements of classrooms to
meet ongoing safety, academic, and updated
instructional technology standards.
Section 2: Page 15
5. Lincoln Elementary School Campus
6. Los Cerritos Elementary School Campus
Section 2: Page 16
Street Address: 14626 Gundry Ave.
City Location: Paramount
Year Completed/Age: 1950 – 66 Years Old
School Site Size: 2.59 Acres (Small Site)
Grade Levels: Transitional K-5th Grades
Section 2: Page 17
School Safety, Security and Health Projects:
 Increase parking spaces, improve traffic flow,
and add parking striping/speed bumps.
 Install and upgrade exterior lighting systems.
 Install and upgrade school window coverings.
 Install classroom and school campus
electronic entry systems.
 Install panic gate hardware components.
 Renovate, improve and upgrade school
campus visitor check-in/check-out areas.
 Install security systems in student classroom
areas.
 Upgrade school campus telephone and
integrated emergency communication systems.
 Improve and upgrade classroom and school
campus fire alarm systems.
21st Century Learning and Instructional
Technology 1:1 Program:
 Replace and upgrade teacher/student
classroom technology systems.
 Upgrade school campus technology
infrastructure components.
 Improve, upgrade and expand technology
electrical systems.
 Develop and implement a student technology
devise upgrade and replacement program.
6. Los Cerritos Elementary School Campus
Other School Facility and District-Wide
Projects:
 Replace classroom furniture and repaint
campus facilities.
 Renovate and improve multi-purpose room
stage facilities and kitchen flooring.
 Redesign front entrance of school campus.
 Upgrade library, front office and lounge areas.
 Replace classroom and campus flooring.
 Improve, upgrade and construct new cafeteria
facilities.
Other School Facility and District-Wide
Projects:
 Repair, upgrade and improve campus
playground areas and playfield facilities.
 Improve, upgrade and install campus perimeter
fencing.
 Replace portable classrooms with permanent
buildings.
 Replace and upgrade campus drinking
fountains and water bottle fill stations.
 Improve and upgrade campus landscaping with
water conservation/low maintenance systems.
 Upgrade and expand student and staff
restroom facilities.
 Improving, repairing and upgrading school
facilities roofs, walls, electrical, water, gas lines
systems, and seismic/structural deficiencies.
 Furnishing and equipping of facilities including
necessary replacements, improvements and
scheduled improvements of classrooms to
meet ongoing safety, academic, and updated
instructional technology standards.
Section 2: Page 18
6. Los Cerritos Elementary School Campus
7. Mokler Elementary School Campus
Section 2: Page 19
Street Address: 8571 Flower Street
City Location: Paramount
Year Completed/Age: 1959 – 57 Years Old
School Site Size: 12.31 Acres
Grade Levels: Transitional K-5th Grades
Section 2: Page 20
School Safety, Security and Health Projects:
 Increase parking spaces, improve traffic flow,
and add parking striping/speed bumps.
 Install and upgrade security cameras and
exterior lighting systems.
 Install and upgrade school window coverings.
 Install classroom and school campus
electronic entry systems.
 Install panic gate hardware components.
 Renovate, improve and upgrade school
campus visitor check-in/check-out areas.
 Install security systems in student classroom
areas.
 Upgrade school campus telephone and
integrated emergency communication systems.
 Improve and upgrade classroom and school
campus fire alarm systems.
21st Century Learning and Instructional
Technology 1:1 Program:
 Replace and upgrade teacher/student
classroom technology systems.
 Upgrade school campus technology
infrastructure components.
 Improve, upgrade and expand technology
electrical systems.
 Develop and implement a student technology
devise upgrade and replacement program.
7. Mokler Elementary School Campus
Other School Facility and District-Wide
Projects:
 Replace classroom furniture and repaint
campus facilities.
 Renovate and improve multi-purpose room
stage facilities and kitchen flooring.
 Redesign front entrance of school campus.
 Upgrade library, front office and lounge areas.
 Replace classroom and campus flooring.
 Improve, upgrade and construct new cafeteria
facilities.
Other School Facility and District-Wide
Projects:
 Repair, upgrade and improve campus
playground areas and playfield facilities.
 Improve, upgrade and install campus perimeter
fencing.
 Replace portable classrooms with permanent
buildings.
 Replace and upgrade campus drinking
fountains and water bottle fill stations.
 Improve and upgrade campus landscaping with
water conservation/low maintenance systems.
 Upgrade and expand student and staff
restroom facilities.
 Improving, repairing and upgrading school
facilities roofs, walls, electrical, water, gas lines
systems, and seismic/structural deficiencies.
 Furnishing and equipping of facilities including
necessary replacements, improvements and
scheduled improvements of classrooms to
meet ongoing safety, academic, and updated
instructional technology standards.
Section 2: Page 21
7. Mokler Elementary School Campus
8. Roosevelt Elementary School Campus
Section 2: Page 22
Street Address: 13451 Merkel Ave.
City Location: Paramount
Year Completed/Age: 1963 – 53 Years Old
School Site Size: 9.22 Acres
Grade Levels: K-5th Grades
Section 2: Page 23
School Safety, Security and Health Projects:
 Increase parking spaces, improve traffic flow,
and add parking striping/speed bumps.
 Install and upgrade exterior lighting systems.
 Install and upgrade school window coverings.
 Install classroom and school campus
electronic entry systems.
 Install panic gate hardware components.
 Renovate, improve and upgrade school
campus visitor check-in/check-out areas.
 Install security systems in student classroom
areas.
 Upgrade school campus telephone and
integrated emergency communication systems.
 Improve and upgrade classroom and school
campus fire alarm systems.
21st Century Learning and Instructional
Technology 1:1 Program:
 Replace and upgrade teacher/student
classroom technology systems.
 Upgrade school campus technology
infrastructure components.
 Improve, upgrade and expand technology
electrical systems.
 Develop and implement a student technology
devise upgrade and replacement program.
8. Roosevelt Elementary School Campus
Other School Facility and District-Wide
Projects:
 Replace classroom furniture and repaint
campus facilities.
 Renovate and improve multi-purpose room
stage facilities and kitchen flooring.
 Redesign front entrance of school campus.
 Upgrade library, front office and lounge areas.
 Replace classroom and campus flooring.
 Improve, upgrade and construct new cafeteria
facilities.
Other School Facility and District-Wide
Projects:
 Repair, upgrade and improve campus
playground areas and playfield facilities.
 Improve, upgrade and install campus perimeter
fencing.
 Replace portable classrooms with permanent
buildings.
 Replace and upgrade campus drinking
fountains and water bottle fill stations.
 Improve and upgrade campus landscaping with
water conservation/low maintenance systems.
 Upgrade and expand student and staff
restroom facilities.
 Improving, repairing and upgrading school
facilities roofs, walls, electrical, water, gas lines
systems, and seismic/structural deficiencies.
 Furnishing and equipping of facilities including
necessary replacements, improvements and
scheduled improvements of classrooms to
meet ongoing safety, academic, and updated
instructional technology standards.
Section 2: Page 24
8. Roosevelt Elementary School Campus
9. Tanner Elementary School Campus
Section 2: Page 25
Street Address: 7210 Rosecrans Ave.
City Location: Paramount
Year Completed/Age: 2005 – 11 Years Old
School Site Size: 3.6 Acres (Small Site)
Grade Levels: Transitional K-5th Grades
Section 2: Page 26
School Safety, Security and Health Projects:
 Increase parking spaces, improve traffic flow,
and add parking striping/speed bumps.
 Install and upgrade exterior lighting systems.
 Install and upgrade school window coverings.
 Install classroom and school campus
electronic entry systems.
 Install panic gate hardware components.
 Renovate, improve and upgrade school
campus visitor check-in/check-out areas.
 Install security systems in student classroom
areas.
 Upgrade school campus telephone and
integrated emergency communication systems.
 Improve and upgrade classroom and school
campus fire alarm systems.
21st Century Learning and Instructional
Technology 1:1 Program:
 Replace and upgrade teacher/student
classroom technology systems.
 Upgrade school campus technology
infrastructure components.
 Improve, upgrade and expand technology
electrical systems.
 Develop and implement a student technology
devise upgrade and replacement program.
9. Tanner Elementary School Campus
Other School Facility and District-Wide
Projects:
 Replace classroom furniture and repaint
campus facilities.
 Renovate and improve multi-purpose room
stage facilities and kitchen flooring.
 Redesign front entrance of school campus.
 Upgrade library, front office and lounge areas.
 Replace classroom and campus flooring.
 Improve, upgrade and construct new cafeteria
facilities.
Other School Facility and District-Wide
Projects:
 Repair, upgrade and improve campus
playground areas and playfield facilities.
 Improve, upgrade and install campus perimeter
fencing.
 Replace portable classrooms with permanent
buildings.
 Replace and upgrade campus drinking
fountains and water bottle fill stations.
 Improve and upgrade campus landscaping with
water conservation/low maintenance systems.
 Upgrade and expand student and staff
restroom facilities.
 Improving, repairing and upgrading school
facilities roofs, walls, electrical, water, gas lines
systems, and seismic/structural deficiencies.
 Furnishing and equipping of facilities including
necessary replacements, improvements and
scheduled improvements of classrooms to
meet ongoing safety, academic, and updated
instructional technology standards.
Section 2: Page 27
9. Tanner Elementary School Campus
10. Wirtz Elementary School Campus
Section 2: Page 28
Street Address: 8535 Contreras Street
City Location: Paramount
Year Completed/Age: 1951 – 65 Years Old
School Site Size: 8.83 Acres
Grade Levels: Pre K-5th Grades
Section 2: Page 29
School Safety, Security and Health Projects:
 Increase parking spaces, improve traffic flow,
and add parking striping/speed bumps.
 Install and upgrade exterior lighting systems.
 Install and upgrade school window coverings.
 Install classroom and school campus
electronic entry systems.
 Install panic gate hardware components.
 Renovate, improve and upgrade school
campus visitor check-in/check-out areas.
 Install security systems in student classroom
areas.
 Upgrade school campus telephone and
integrated emergency communication systems.
 Improve and upgrade classroom and school
campus fire alarm systems.
21st Century Learning and Instructional
Technology 1:1 Program:
 Replace and upgrade teacher/student
classroom technology systems.
 Upgrade school campus technology
infrastructure components.
 Improve, upgrade and expand technology
electrical systems.
 Develop and implement a student technology
devise upgrade and replacement program.
10. Wirtz Elementary School Campus
Other School Facility and District-Wide
Projects:
 Replace classroom furniture and repaint
campus facilities.
 Renovate and improve multi-purpose room
stage facilities and kitchen flooring.
 Redesign front entrance of school campus.
 Upgrade library, front office and lounge areas.
 Replace classroom and campus flooring.
 Improve, upgrade and construct new cafeteria
facilities.
Other School Facility and District-Wide
Projects:
 Repair, upgrade and improve campus
playground areas and playfield facilities.
 Improve, upgrade and install campus perimeter
fencing.
 Replace portable classrooms with permanent
buildings.
 Replace and upgrade campus drinking
fountains and water bottle fill stations.
 Improve and upgrade campus landscaping with
water conservation/low maintenance systems.
 Upgrade and expand student and staff
restroom facilities.
 Improving, repairing and upgrading school
facilities roofs, walls, electrical, water, gas lines
systems, and seismic/structural deficiencies.
 Furnishing and equipping of facilities including
necessary replacements, improvements and
scheduled improvements of classrooms to
meet ongoing safety, academic, and updated
instructional technology standards.
Section 2: Page 30
10. Wirtz Elementary School Campus
Middle School Campuses
Alondra Middle School
2016 School Facilities Needs Analyses
School Campus Improvement and Upgrade Projects Summary
Paramount Park Middle School
Jackson Middle School Zamboni Middle School
1. Alondra Middle School Campus
Section 2: Page 31
Street Address: 16200 South Downey Ave.
City Location: Paramount
Year Completed/Age: 1963 – 53 Years Old
School Site Size: 17.85 Acres
Grade Levels: Grades 6th – 8th
Section 2: Page 32
1. Alondra Middle School Campus
School Safety, Security and Health Projects:
 Increase parking spaces, improve traffic flow,
and add parking striping/speed bumps.
 Install and upgrade security cameras and
exterior lighting systems.
 Install and upgrade school window coverings.
 Install classroom and school campus
electronic entry systems.
 Install panic gate hardware components.
 Renovate, improve and upgrade school
campus visitor check-in/check-out areas.
 Install security systems in student classroom
areas.
 Improve and upgrade classroom and school
campus fire alarm systems.
21st Century Learning and Instructional
Technology 1:1 Program:
 Upgrade and provide STEM labs.
 Replace and upgrade teacher/student
classroom technology systems.
 Upgrade school campus technology
infrastructure components.
 Improve, upgrade and expand technology
electrical systems.
 Develop and implement a student technology
devise upgrade and replacement program.
Section 2: Page 33
1. Alondra Middle School Campus
Other School Facility and District-Wide
Projects:
 Replace classroom furniture and repaint
campus facilities.
 Renovate and improve multi-purpose room
stage facilities and kitchen flooring.
 Redesign front entrance of school campus.
 Upgrade library, front office and lounge areas.
 Replace classroom and campus flooring.
 Improve, upgrade and construct new cafeteria
facilities.
Other School Facility and District-Wide
Projects:
 Repair, upgrade and improve campus athletic
fields and track facilities.
 Improve, upgrade and install campus perimeter
fencing.
 Replace portable classrooms with permanent
buildings.
 Replace and upgrade campus drinking
fountains and water bottle fill stations.
 Improve and upgrade campus landscaping with
water conservation/low maintenance systems.
 Upgrade and expand student and staff
restroom facilities.
 Improving, repairing and upgrading school
facilities roofs, walls, electrical, water, gas lines
systems, and seismic/structural deficiencies.
 Furnishing and equipping of facilities including
necessary replacements, improvements and
scheduled improvements of classrooms to
meet ongoing safety, academic, and updated
instructional technology standards.
2. Jackson Middle School Campus
Section 2: Page 34
Street Address: 7220 East Jackson St.
City Location: Paramount
Year Completed/Age: 2002 – 14 Years Old
School Site Size: 5.61 Acres (Small Site)
Grade Levels: Grades 4th – 8th
Section 2: Page 35
21st Century Learning and Instructional
Technology 1:1 Program:
 Upgrade and provide STEM labs.
 Replace and upgrade teacher/student
classroom technology systems.
 Upgrade school campus technology
infrastructure components.
 Improve, upgrade and expand technology
electrical systems.
 Develop and implement a student technology
devise upgrade and replacement program.
2. Jackson Middle School Campus
School Safety, Security and Health Projects:
 Increase parking spaces, improve traffic flow,
and add parking striping/speed bumps.
 Install and upgrade exterior lighting systems.
 Install and upgrade school window coverings.
 Install classroom and school campus
electronic entry systems.
 Install panic gate hardware components.
 Renovate, improve and upgrade school
campus visitor check-in/check-out areas.
 Install security systems in student classroom
areas.
 Improve and upgrade classroom and school
campus fire alarm systems.
Section 2: Page 36
Other School Facility and District-Wide
Projects:
 Replace classroom furniture and repaint
campus facilities.
 Renovate and improve multi-purpose room
stage facilities and kitchen flooring.
 Redesign front entrance of school campus.
 Upgrade library, front office and lounge areas.
 Replace classroom and campus flooring.
 Improve, upgrade and construct new cafeteria
facilities.
Other School Facility and District-Wide
Projects:
 Repair, upgrade and improve campus athletic
fields and track facilities.
 Improve, upgrade and install campus perimeter
fencing.
 Replace portable classrooms with permanent
buildings.
 Replace and upgrade campus drinking
fountains and water bottle fill stations.
 Improve and upgrade campus landscaping with
water conservation/low maintenance systems.
 Upgrade and expand student and staff
restroom facilities.
 Improving, repairing and upgrading school
facilities roofs, walls, electrical, water, gas lines
systems, and seismic/structural deficiencies.
 Furnishing and equipping of facilities including
necessary replacements, improvements and
scheduled improvements of classrooms to
meet ongoing safety, academic, and updated
instructional technology standards.
2. Jackson Middle School Campus
3. Paramount Park Middle School Campus
Section 2: Page 37
Street Address: 14608 Paramount Blvd.
City Location: Paramount
Year Completed/Age: 1998 – 18 Years Old
School Site Size: 3.15 Acres (Small Site)
Grade Levels: Grades 6th – 8th
Section 2: Page 38
21st Century Learning and Instructional
Technology 1:1 Program:
 Upgrade and provide STEM labs.
 Replace and upgrade teacher/student
classroom technology systems.
 Upgrade school campus technology
infrastructure components.
 Improve, upgrade and expand technology
electrical systems.
 Develop and implement a student technology
devise upgrade and replacement program.
3. Paramount Park Middle School Campus
School Safety, Security and Health Projects:
 Increase parking spaces, improve traffic flow,
and add parking striping/speed bumps.
 Install and upgrade security cameras and
exterior lighting systems.
 Install and upgrade school window coverings.
 Install classroom and school campus
electronic entry systems.
 Install panic gate hardware components.
 Renovate, improve and upgrade school
campus visitor check-in/check-out areas.
 Install security systems in student classroom
areas.
 Improve and upgrade classroom and school
campus fire alarm systems.
Section 2: Page 39
Other School Facility and District-Wide
Projects:
 Replace classroom furniture and repaint
campus facilities.
 Renovate and improve multi-purpose room
stage facilities and kitchen flooring.
 Redesign front entrance of school campus.
 Upgrade library, front office and lounge areas.
 Replace classroom and campus flooring.
 Improve, upgrade and construct new cafeteria
facilities.
Other School Facility and District-Wide
Projects:
 Repair, upgrade and improve campus athletic
fields and track facilities.
 Improve, upgrade and install campus perimeter
fencing.
 Replace portable classrooms with permanent
buildings.
 Replace and upgrade campus drinking
fountains and water bottle fill stations.
 Improve and upgrade campus landscaping with
water conservation/low maintenance systems.
 Upgrade and expand student and staff
restroom facilities.
 Improving, repairing and upgrading school
facilities roofs, walls, electrical, water, gas lines
systems, and seismic/structural deficiencies.
 Furnishing and equipping of facilities including
necessary replacements, improvements and
scheduled improvements of classrooms to
meet ongoing safety, academic, and updated
instructional technology standards.
3. Paramount Park Middle School Campus
4. Zamboni Middle School Campus
Section 2: Page 40
Street Address: 15733 Orange Ave.
City Location: Paramount
Year Completed/Age: 1996 – 20 Years Old
School Site Size: 8.1 Acres (Small Site)
Grade Levels: Grades 6th – 8th
Section 2: Page 41
21st Century Learning and Instructional
Technology 1:1 Program:
 Upgrade and provide STEM labs.
 Replace and upgrade teacher/student
classroom technology systems.
 Upgrade school campus technology
infrastructure components.
 Improve, upgrade and expand technology
electrical systems.
 Develop and implement a student technology
devise upgrade and replacement program.
School Safety, Security and Health Projects:
 Increase parking spaces, improve traffic flow,
and add parking striping/speed bumps.
 Install and upgrade exterior lighting systems.
 Install and upgrade school window coverings.
 Install classroom and school campus
electronic entry systems.
 Install panic gate hardware components.
 Renovate, improve and upgrade school
campus visitor check-in/check-out areas.
 Install security systems in student classroom
areas.
 Improve and upgrade classroom and school
campus fire alarm systems.
4. Zamboni Middle School Campus
Section 2: Page 42
Other School Facility and District-Wide
Projects:
 Replace classroom furniture and repaint
campus facilities.
 Renovate and improve multi-purpose room
stage facilities and kitchen flooring.
 Redesign front entrance of school campus.
 Upgrade library, front office and lounge areas.
 Replace classroom and campus flooring.
 Improve, upgrade and construct new cafeteria
facilities.
Other School Facility and District-Wide
Projects:
 Repair, upgrade and improve campus athletic
fields and track facilities.
 Improve, upgrade and install campus perimeter
fencing.
 Replace portable classrooms with permanent
buildings.
 Replace and upgrade campus drinking
fountains and water bottle fill stations.
 Improve and upgrade campus landscaping with
water conservation/low maintenance systems.
 Upgrade and expand student and staff
restroom facilities.
 Improving, repairing and upgrading school
facilities roofs, walls, electrical, water, gas lines
systems, and seismic/structural deficiencies.
 Furnishing and equipping of facilities including
necessary replacements, improvements and
scheduled improvements of classrooms to
meet ongoing safety, academic, and updated
instructional technology standards.
4. Zamboni Middle School Campus
Hollydale K-8 School Campus
2016 School Facilities Needs Analyses
School Campus Improvement and Upgrade Projects Summary
1. Hollydale K-8 School Campus
Section 2: Page 43
Street Address: 5511 Century Blvd.
City Location: South Gate
Year Completed/Age:
School Site Size:
Grade Levels: Grades K – 8th
Section 2: Page 44
1. Hollydale K-8 School Campus
School Safety, Security and Health Projects:
 Increase parking spaces, improve traffic flow,
and add parking striping/speed bumps.
 Install and upgrade school window coverings.
 Install classroom and school campus
electronic entry systems.
 Install panic gate hardware components.
 Renovate, improve and upgrade school
campus visitor check-in/check-out areas.
 Improve and upgrade classroom and school
campus fire alarm systems.
21st Century Learning and Instructional
Technology 1:1 Program:
 Upgrade and provide STEM labs.
 Replace and upgrade teacher/student
classroom technology systems.
 Upgrade school campus technology
infrastructure components.
 Improve, upgrade and expand technology
electrical systems.
 Develop and implement a student technology
devise upgrade and replacement program.
Section 2: Page 45
1. Hollydale K-8 School Campus
Other School Facility and District-Wide
Projects:
 Replace classroom furniture and repaint
campus facilities.
 Renovate and improve multi-purpose room
stage facilities and kitchen flooring.
 Upgrade library, front office and lounge areas.
 Replace classroom and campus flooring.
 Improve, upgrade and construct new cafeteria
facilities.
Other School Facility and District-Wide
Projects:
 Improve, upgrade and install campus perimeter
fencing.
 Replace portable classrooms with permanent
buildings.
 Replace and upgrade campus drinking
fountains and water bottle fill stations.
 Improve and upgrade campus landscaping with
water conservation/low maintenance systems.
 Upgrade and expand student and staff
restroom facilities.
 Improving, repairing and upgrading school
facilities roofs, walls, electrical, water, gas lines
systems, and seismic/structural deficiencies.
 Furnishing and equipping of facilities including
necessary replacements, improvements and
scheduled improvements of classrooms to
meet ongoing safety, academic, and updated
instructional technology standards.
High School Campuses
Paramount HS – Senior Campus
2016 School Facilities Needs Analyses
School Campus Improvement and Upgrade Projects Summary
Paramount HS – West Campus
Buena Vista Continuation High School
1. Paramount HS - Senior Campus
Section 2: Page 46
Street Address: 14429 Downey Ave.
City Location: Paramount
Year Completed/Age: 1952 – 64 Years Old
School Site Size: 35.1 Acres (Small Site)
Grade Levels: Grades 10th – 12th
Section 2: Page 47
1. Paramount HS - Senior Campus
School Safety, Security and Health Projects:
 Increase parking spaces, improve traffic flow,
and add parking striping/speed bumps.
 Install and upgrade security cameras and
exterior lighting systems.
 Install and upgrade school window coverings.
 Install classroom and school campus
electronic entry systems.
 Install panic gate hardware components.
 Renovate, improve and upgrade school
campus visitor check-in/check-out areas.
 Upgrade school campus telephone and
integrated emergency communication systems.
 Improve and upgrade classroom and school
campus fire alarm systems.
21st Century Learning and Instructional
Technology 1:1 Program:
 Upgrade and provide STEM labs.
 Replace and upgrade teacher/student
classroom technology systems.
 Upgrade school campus technology
infrastructure components.
 Improve, upgrade and expand technology
electrical systems.
 Develop and implement a student technology
devise upgrade and replacement program.
Section 2: Page 48
Career Technical Education Facilities,
School Building and Support Projects:
 Renovate and reconstruct school classrooms
for new culinary laboratories.
 Develop facility designs for building
conversions to support Career Technical
Educational programs.
 Develop flexible facility and classroom spaces
needed for periodic future upgrades,
expansions and changes needed Career
Technical Education programs.
 Development and implementation of integrated
technology systems with high speed
infrastructure components.
Other School Facility and District-Wide
Projects:
 Replace classroom furniture and repaint campus
facilities.
 Renovate and improve multi-purpose room stage
facilities and kitchen flooring.
 Redesign front entrance of school campus.
 Upgrade library, front office and lounge areas.
 Replace classroom and campus flooring.
 Improve, upgrade and construct new cafeteria facilities.
 Improve, upgrade and install campus perimeter fencing.
 Replace portable classrooms with permanent buildings.
 Replace and upgrade campus drinking fountains and
water bottle fill stations.
 Improve and upgrade campus landscaping with water
conservation/low maintenance systems.
 Upgrade and expand student and staff restroom
facilities.
 Improving, repairing and upgrading school facilities
roofs, walls, electrical, water, gas lines systems, and
seismic/structural deficiencies.
 Furnishing and equipping of facilities including
necessary replacements, improvements and scheduled
improvements of classrooms to meet ongoing safety,
academic, and updated instructional technology
standards.
1. Paramount HS - Senior Campus
2. Paramount HS - West Campus
Section 2: Page 49
Street Address: 14708 Paramount Blvd.
City Location: Paramount
Year Completed/Age: 1933 – 83 Years Old
School Site Size: 20.74 Acres
Grade Levels: 9th Grade Campus
Section 2: Page 50
School Safety, Security and Health Projects:
 Increase parking spaces, improve traffic flow,
and add parking striping/speed bumps.
 Install and upgrade security cameras and
exterior lighting systems.
 Install and upgrade school window coverings.
 Install classroom and school campus
electronic entry systems.
 Install panic gate hardware components.
 Renovate, improve and upgrade school
campus visitor check-in/check-out areas.
 Upgrade school campus telephone and
integrated emergency communication systems.
 Improve and upgrade classroom and school
campus fire alarm systems.
21st Century Learning and Instructional
Technology 1:1 Program:
 Upgrade and provide STEM labs.
 Replace and upgrade teacher/student
classroom technology systems.
 Upgrade school campus technology
infrastructure components.
 Improve, upgrade and expand technology
electrical systems.
 Develop and implement a student technology
devise upgrade and replacement program.
2. Paramount HS - West Campus
Section 2: Page 51
Career Technical Education Facilities,
School Building and Support Projects:
 Develop facility designs for building
conversions to support Career Technical
Educational programs.
 Develop flexible facility and classroom spaces
needed for periodic future upgrades,
expansions and changes needed Career
Technical Education programs.
 Development and implementation of integrated
technology systems with high speed
infrastructure components.
Other School Facility and District-Wide
Projects:
 Replace classroom furniture and repaint campus
facilities.
 Renovate and improve multi-purpose room stage
facilities and kitchen flooring.
 Redesign front entrance of school campus.
 Upgrade library, front office and lounge areas.
 Replace classroom and campus flooring.
 Improve, upgrade and construct new cafeteria facilities.
 Improve, upgrade and install campus perimeter fencing.
 Replace portable classrooms with permanent buildings.
 Replace and upgrade campus drinking fountains and
water bottle fill stations.
 Improve and upgrade campus landscaping with water
conservation/low maintenance systems.
 Upgrade and expand student and staff restroom
facilities.
 Improving, repairing and upgrading school facilities
roofs, walls, electrical, water, gas lines systems, and
seismic/structural deficiencies.
 Furnishing and equipping of facilities including
necessary replacements, improvements and scheduled
improvements of classrooms to meet ongoing safety,
academic, and updated instructional technology
standards.
2. Paramount HS - West Campus
3. Buena Vista Continuation High School Campus
Section 2: Page 52
Street Address: 3717 Michelson Street
City Location: Lakewood
Year Completed/Age: 1983 – 33 Years Old
School Site Size: 9.57 Acres
Grade Levels: High School Continuation
Section 2: Page 53
School Safety, Security and Health Projects:
 Install and upgrade school window coverings.
 Install classroom and school campus
electronic entry systems.
 Install panic gate hardware components.
 Install security systems in student classroom
areas.
 Improve and upgrade classroom and school
campus fire alarm systems.
21st Century Learning and Instructional
Technology 1:1 Program:
 Upgrade and provide STEM labs.
 Replace and upgrade teacher/student
classroom technology systems.
 Upgrade school campus technology
infrastructure components.
 Improve, upgrade and expand technology
electrical systems.
 Develop and implement a student technology
devise upgrade and replacement program.
3. Buena Vista Continuation High School Campus
Section 2: Page 54
Career Technical Education Facilities,
School Building and Support Projects:
 Develop facility designs for building
conversions to support Career Technical
Educational programs.
 Develop flexible facility and classroom spaces
needed for periodic future upgrades,
expansions and changes needed Career
Technical Education programs.
 Development and implementation of integrated
technology systems with high speed
infrastructure components.
Other School Facility and District-Wide
Projects:
 Replace classroom furniture and repaint
campus facilities.
 Renovate and improve multi-purpose room
stage facilities.
 Replace classroom and campus flooring.
 Improve and upgrade campus landscaping with
water conservation/low maintenance systems.
 Upgrade and expand student and staff
restroom facilities.
 Improving, repairing and upgrading school
facilities roofs, walls, electrical, water, gas lines
systems, and seismic/structural deficiencies.
 Furnishing and equipping of facilities including
necessary replacements, improvements and
scheduled improvements of classrooms to
meet ongoing safety, academic, and updated
instructional technology standards.
3. Buena Vista Continuation High School Campus
Other District-Wide Facilities
Adult Education School Facilities
2016 School Facilities Needs Analyses
School Campus Improvement and Upgrade Projects Summary
District-Wide Support Facilities
Community Day School Facilities
1. Adult Education School Facilities
Section 2: Page 55
Street Address: 3701 Michelson Street
City Location: Lakewood
Year Completed/Age: 1995 – 21 Years Old
School Site Size:
Grade Levels: Independent Study Grades
Section 2: Page 56
21st Century Learning and Instructional
Technology 1:1 Program:
 Replace and upgrade teacher/student
classroom technology systems.
 Upgrade school campus technology
infrastructure components.
 Improve, upgrade and expand technology
electrical systems.
 Develop and implement a student technology
devise upgrade and replacement program.
1. Adult Education School Facilities
School Safety, Security and Health Projects:
 Increase parking spaces, improve traffic flow,
and add parking striping/speed bumps.
 Install and upgrade security cameras and
exterior lighting systems.
 Install and upgrade school window coverings.
 Install classroom and school campus
electronic entry systems.
 Install panic gate hardware components.
 Renovate, improve and upgrade school
campus visitor check-in/check-out areas.
 Improve and upgrade classroom and school
campus fire alarm systems.
Section 2: Page 57
Career Technical Education Facilities,
School Building and Support Projects:
 Development and implementation of integrated
technology systems with high speed
infrastructure components.
1. Adult Education School Facilities
Other School Facility and District-Wide
Projects:
 Replace classroom furniture and repaint
campus facilities.
 Renovate and improve multi-purpose room
stage facilities and kitchen flooring.
 Redesign front entrance of school campus.
 Replace classroom and campus flooring.
Other School Facility and District-Wide
Projects:
 Upgrade and expand student and staff
restroom facilities.
 Replace portable classrooms with permanent
buildings.
 Improving, repairing and upgrading school
facilities roofs, walls, electrical, water, gas lines
systems, and seismic/structural deficiencies.
 Furnishing and equipping of facilities including
necessary replacements, improvements and
scheduled improvements of classrooms to
meet ongoing safety, academic, and updated
instructional technology standards.
2. Community Day School Facilities
Section 2: Page 58
Street Address: 14507 Paramount Blvd.
City Location: Paramount
Year Completed/Age: 1994 – 22 Years Old
School Site Size:
Grade Levels: Alternative Ed. Grades
Section 2: Page 59
2. Community Day School Facilities
School Safety, Security and Health Projects:
 Install and upgrade security cameras and
exterior lighting systems.
 Install and upgrade school window coverings.
 Install classroom and school campus
electronic entry systems.
 Install panic gate hardware components.
 Improve and upgrade classroom and school
campus fire alarm systems.
21st Century Learning and Instructional
Technology 1:1 Program:
 Replace and upgrade teacher/student
classroom technology systems.
 Upgrade school campus technology
infrastructure components.
 Improve, upgrade and expand technology
electrical systems.
 Develop and implement a student technology
devise upgrade and replacement program.
Other School Facility and District-Wide
Projects:
 Replace classroom furniture and repaint
campus facilities.
 Replace classroom and campus flooring.
 Improve and upgrade campus landscaping with
water conservation/low maintenance systems.
 Upgrade and expand student and staff
restroom facilities.
 Improving, repairing and upgrading school
facilities roofs, walls, electrical, water, gas lines
systems, and seismic/structural deficiencies.
 Furnishing and equipping of facilities including
necessary replacements, improvements and
scheduled improvements of classrooms to
meet ongoing safety, academic, and updated
instructional technology standards.
3. District-Wide Support Facilities
Section 2: Page 60
Paramount Unified School District:
 Operated as a unified school
district since 1953 (K–12th Grade)
 Provides instructional services to
15,864 students at nineteen (19)
school locations, including:
 One (1) K-8 school
 Eleven (11) elementary schools
 Four (4) middle schools
 Two (2) high schools
 One (1) Alternative Education
Center
Section 2: Page 61
Other School Facility and District-Wide
Projects:
 Replace support facilities flooring.
 Upgrade and expand support facilities
restroom facilities.
 Improving, repairing and upgrading school
facilities roofs, walls, electrical, water, gas lines
systems, and seismic/structural deficiencies.
3. District-Wide Support Facilities
School Safety, Security and Health Projects:
 Increase parking spaces, improve traffic flow,
and add parking striping/speed bumps.
 Install and upgrade security cameras and
exterior lighting systems.
 Install classroom and school campus
electronic entry systems.
 Install panic gate hardware components.
 Improve and upgrade classroom and school
campus fire alarm systems.
21st Century Learning and Instructional
Technology 1:1 Program:
 Upgrade and provide STEM labs.
 Replace and upgrade teacher/student
classroom technology systems.
 Upgrade school campus technology
infrastructure components.
 Improve, upgrade and expand technology
electrical systems.
 Develop and implement a student technology
devise upgrade and replacement program.

Contenu connexe

Tendances

Power point action plan
Power point   action planPower point   action plan
Power point action planBLyles11
 
Jennifer Joines Facilities Plan
Jennifer Joines Facilities PlanJennifer Joines Facilities Plan
Jennifer Joines Facilities Planjjoines
 
Ndangle e learning africa 2010
Ndangle e learning africa 2010Ndangle e learning africa 2010
Ndangle e learning africa 2010ROCARE / ERNWACA
 
Aby and jhoe educ 2
Aby and jhoe educ 2Aby and jhoe educ 2
Aby and jhoe educ 2joefine548
 
Technology Integration Plan
Technology Integration PlanTechnology Integration Plan
Technology Integration Plancchrispen
 
Tech Plan
Tech PlanTech Plan
Tech PlanIngMu
 
Technology Plan Wong
Technology Plan WongTechnology Plan Wong
Technology Plan WongMo Wong
 
Infomatica Academy - Engineering Degree - Biomedical Engineering Syllabus
Infomatica Academy - Engineering Degree - Biomedical Engineering SyllabusInfomatica Academy - Engineering Degree - Biomedical Engineering Syllabus
Infomatica Academy - Engineering Degree - Biomedical Engineering SyllabusInfomatica Academy
 
Technology plan
Technology planTechnology plan
Technology planpayne5030
 
Technology Implementation Plan.
Technology Implementation Plan.Technology Implementation Plan.
Technology Implementation Plan.Miguel Perdomo
 
E learning and-its_applicability_in_basic_education.pptx
E learning and-its_applicability_in_basic_education.pptxE learning and-its_applicability_in_basic_education.pptx
E learning and-its_applicability_in_basic_education.pptxAbir Almaqrashi
 
Pascarella k assignment 1 tech plan
Pascarella k assignment 1 tech planPascarella k assignment 1 tech plan
Pascarella k assignment 1 tech plankpasc17
 
Educational plan
Educational planEducational plan
Educational planjamkan
 
Flowchart, action plan and plan of evaluation
Flowchart, action plan and plan of evaluationFlowchart, action plan and plan of evaluation
Flowchart, action plan and plan of evaluationlglee
 

Tendances (17)

Power point action plan
Power point   action planPower point   action plan
Power point action plan
 
Jennifer Joines Facilities Plan
Jennifer Joines Facilities PlanJennifer Joines Facilities Plan
Jennifer Joines Facilities Plan
 
Ndangle e learning africa 2010
Ndangle e learning africa 2010Ndangle e learning africa 2010
Ndangle e learning africa 2010
 
Aby and jhoe educ 2
Aby and jhoe educ 2Aby and jhoe educ 2
Aby and jhoe educ 2
 
Technology Integration Plan
Technology Integration PlanTechnology Integration Plan
Technology Integration Plan
 
Cullen Tech Plan
Cullen Tech PlanCullen Tech Plan
Cullen Tech Plan
 
Distance Learning
Distance LearningDistance Learning
Distance Learning
 
Texas STaR Chart Summary
Texas STaR Chart SummaryTexas STaR Chart Summary
Texas STaR Chart Summary
 
Tech Plan
Tech PlanTech Plan
Tech Plan
 
Technology Plan Wong
Technology Plan WongTechnology Plan Wong
Technology Plan Wong
 
Infomatica Academy - Engineering Degree - Biomedical Engineering Syllabus
Infomatica Academy - Engineering Degree - Biomedical Engineering SyllabusInfomatica Academy - Engineering Degree - Biomedical Engineering Syllabus
Infomatica Academy - Engineering Degree - Biomedical Engineering Syllabus
 
Technology plan
Technology planTechnology plan
Technology plan
 
Technology Implementation Plan.
Technology Implementation Plan.Technology Implementation Plan.
Technology Implementation Plan.
 
E learning and-its_applicability_in_basic_education.pptx
E learning and-its_applicability_in_basic_education.pptxE learning and-its_applicability_in_basic_education.pptx
E learning and-its_applicability_in_basic_education.pptx
 
Pascarella k assignment 1 tech plan
Pascarella k assignment 1 tech planPascarella k assignment 1 tech plan
Pascarella k assignment 1 tech plan
 
Educational plan
Educational planEducational plan
Educational plan
 
Flowchart, action plan and plan of evaluation
Flowchart, action plan and plan of evaluationFlowchart, action plan and plan of evaluation
Flowchart, action plan and plan of evaluation
 

En vedette

needs analysis presentation
needs analysis presentationneeds analysis presentation
needs analysis presentationGissell Suarez
 
Needs Analysis of an English for Academic Purpose (Eap) Programme: English La...
Needs Analysis of an English for Academic Purpose (Eap) Programme: English La...Needs Analysis of an English for Academic Purpose (Eap) Programme: English La...
Needs Analysis of an English for Academic Purpose (Eap) Programme: English La...iosrjce
 
The needs analysis
The needs analysisThe needs analysis
The needs analysisJohn Cissik
 
English For Specific Purposes
English For Specific PurposesEnglish For Specific Purposes
English For Specific Purposesguest7f1ad678
 
Needs analysis
Needs analysisNeeds analysis
Needs analysistahajoon
 

En vedette (8)

Needs Analysis
Needs AnalysisNeeds Analysis
Needs Analysis
 
needs analysis presentation
needs analysis presentationneeds analysis presentation
needs analysis presentation
 
Need analysis & design
Need analysis & designNeed analysis & design
Need analysis & design
 
Needs Analysis of an English for Academic Purpose (Eap) Programme: English La...
Needs Analysis of an English for Academic Purpose (Eap) Programme: English La...Needs Analysis of an English for Academic Purpose (Eap) Programme: English La...
Needs Analysis of an English for Academic Purpose (Eap) Programme: English La...
 
The needs analysis
The needs analysisThe needs analysis
The needs analysis
 
English For Specific Purposes
English For Specific PurposesEnglish For Specific Purposes
English For Specific Purposes
 
Needs Analysis
Needs AnalysisNeeds Analysis
Needs Analysis
 
Needs analysis
Needs analysisNeeds analysis
Needs analysis
 

Similaire à Paramount USD School Facilities Needs Assessment Analysis v.1

CCS Technology Budget Presentation (1).pdf
CCS Technology Budget Presentation (1).pdfCCS Technology Budget Presentation (1).pdf
CCS Technology Budget Presentation (1).pdfKehindeEsther4
 
School technology and readiness powerpoint
School technology and readiness powerpointSchool technology and readiness powerpoint
School technology and readiness powerpointcoachurbina
 
E rate program
E rate programE rate program
E rate programPattiWolf
 
E rate program
E rate programE rate program
E rate programPattiWolf
 
Long range plan for technology
Long range plan for technologyLong range plan for technology
Long range plan for technologyMaritza Villa
 
Final grant
Final grantFinal grant
Final grantAGON75
 
Final grant
Final grantFinal grant
Final grantAGON75
 
Final grant
Final grantFinal grant
Final grantAGON75
 
Final grant
Final grantFinal grant
Final grantAGON75
 
Dalhart high school
Dalhart high schoolDalhart high school
Dalhart high schoolrjbarrow
 
Peace valley elementary technology plan 2010 2013
Peace valley  elementary technology plan 2010 2013Peace valley  elementary technology plan 2010 2013
Peace valley elementary technology plan 2010 2013EduardoMeza06
 
Nurturing Excellence Through Comprehensive Facilities and Diverse Courses in ...
Nurturing Excellence Through Comprehensive Facilities and Diverse Courses in ...Nurturing Excellence Through Comprehensive Facilities and Diverse Courses in ...
Nurturing Excellence Through Comprehensive Facilities and Diverse Courses in ...SaurabhISOLS
 
Technology Integration Plan
Technology Integration PlanTechnology Integration Plan
Technology Integration Plancchrispen
 
GCCISD Technology Plan
GCCISD Technology Plan GCCISD Technology Plan
GCCISD Technology Plan mjjoseph
 
Peace valley elementary technology plan 2010 2013
Peace valley  elementary technology plan 2010 2013Peace valley  elementary technology plan 2010 2013
Peace valley elementary technology plan 2010 2013EduardoMeza06
 
Peace valley elementary technology plan 2010 2013
Peace valley  elementary technology plan 2010 2013Peace valley  elementary technology plan 2010 2013
Peace valley elementary technology plan 2010 2013EduardoMeza06
 
Lrtp 1
Lrtp 1Lrtp 1
Lrtp 1AGON75
 

Similaire à Paramount USD School Facilities Needs Assessment Analysis v.1 (20)

CCS Technology Budget Presentation (1).pdf
CCS Technology Budget Presentation (1).pdfCCS Technology Budget Presentation (1).pdf
CCS Technology Budget Presentation (1).pdf
 
School technology and readiness powerpoint
School technology and readiness powerpointSchool technology and readiness powerpoint
School technology and readiness powerpoint
 
E rate program
E rate programE rate program
E rate program
 
E rate program
E rate programE rate program
E rate program
 
Long range plan for technology
Long range plan for technologyLong range plan for technology
Long range plan for technology
 
Edld5362 williams week5
Edld5362 williams week5Edld5362 williams week5
Edld5362 williams week5
 
Final grant
Final grantFinal grant
Final grant
 
Final grant
Final grantFinal grant
Final grant
 
Final grant
Final grantFinal grant
Final grant
 
Final grant
Final grantFinal grant
Final grant
 
Dalhart high school
Dalhart high schoolDalhart high school
Dalhart high school
 
Technology Action Plan
Technology Action PlanTechnology Action Plan
Technology Action Plan
 
Peace valley elementary technology plan 2010 2013
Peace valley  elementary technology plan 2010 2013Peace valley  elementary technology plan 2010 2013
Peace valley elementary technology plan 2010 2013
 
Nurturing Excellence Through Comprehensive Facilities and Diverse Courses in ...
Nurturing Excellence Through Comprehensive Facilities and Diverse Courses in ...Nurturing Excellence Through Comprehensive Facilities and Diverse Courses in ...
Nurturing Excellence Through Comprehensive Facilities and Diverse Courses in ...
 
Technology Integration Plan
Technology Integration PlanTechnology Integration Plan
Technology Integration Plan
 
GCCISD Technology Plan
GCCISD Technology Plan GCCISD Technology Plan
GCCISD Technology Plan
 
Peace valley elementary technology plan 2010 2013
Peace valley  elementary technology plan 2010 2013Peace valley  elementary technology plan 2010 2013
Peace valley elementary technology plan 2010 2013
 
Peace valley elementary technology plan 2010 2013
Peace valley  elementary technology plan 2010 2013Peace valley  elementary technology plan 2010 2013
Peace valley elementary technology plan 2010 2013
 
Misd tech plan
Misd tech plan  Misd tech plan
Misd tech plan
 
Lrtp 1
Lrtp 1Lrtp 1
Lrtp 1
 

Dernier

ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfSpandanaRallapalli
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxAshokKarra1
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Jisc
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Celine George
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Mark Reed
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)lakshayb543
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxHumphrey A Beña
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfphamnguyenenglishnb
 
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYKayeClaireEstoconing
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomnelietumpap1
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSJoshuaGantuangco2
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptxSherlyMaeNeri
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4MiaBumagat1
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17Celine George
 

Dernier (20)

ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdf
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptx
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
 
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choom
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptx
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
 
OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17
 

Paramount USD School Facilities Needs Assessment Analysis v.1

  • 1. Paramount Unified School District 2016 School Facilities Needs Assessment Analysis School Campus Improvement and Upgrade Projects Summary Prepared for: District Board of Education & District Management
  • 2.  DISTRICT-WIDE Types of School Facilities Improvement, Upgrade Expansion and New Construction Project Needs 1  INDIVIDUAL School Campus Facilities Improvement, Upgrade, Expansion and New Construction Needs 2 TABLE OF CONTENTS Section 2016 School Facilities Needs Assessment Analysis School Campus Improvement and Upgrade Projects Summary
  • 3.  Key Facility Objectives and Needs Assessment Process 1  District School Campuses and Facilities 2  Primary Types of School Facilities Improvement Needs 3-4  1. School Safety, Security and Health Projects 5  2. Improvements and Equipment to Support 21st Century Learning and District Classroom Instructional Technology 1:1 Program 6  3. Career Technical Education Facilities, School Building, Classroom and Support Facility Projects 7  4. Other School Facility and District-Wide Projects 8  School Project Types – Preliminary Scope Budget Amounts 9  School Project Types – District Revenue/Funding Tools 10-11  G.O. Bond Funding Tool – Preliminary Cash Flow Amounts 12 Section 1: DISTRICT-WIDE Types of School Facilities Needs Page 2016 School Facilities Needs Assessment Analysis School Campus Improvement and Upgrade Projects Summary
  • 4. Key Facility Objectives and Needs Assessment Process Section 1: Page 1  The District is committed to safe schools with upgraded classrooms, libraries, science, technology, engineering and mathematics (STEM) labs and learning environments needed to support career technical education and 21st- century instruction.  The District believes that improving school facilities will improve the high quality of education for each student in every classroom.  The District desires to improve student safety and security and reduce risks from earthquakes and fires by upgrading school security communication systems, fire alarms, and sprinklers, and retrofitting buildings, as required.  The District believes that updating instructional technology will equip our students with skills and solid background in science, math and technology needed to succeed in high school, college and careers.  As the school facilities age, the District desires to retrofit, improve and upgrade older school campuses, playfields and athletic facilities.  The District conducted a thorough assessment of its school facility needs and received input from teachers, staff and the community and evaluated the District’s urgent and critical school facility renovation, improvement, upgrade and expansion needs, including safety issues, computer and classroom instructional technology needs, class size reduction objectives, and prepared a needs assessment in developing the scope of facilities needed at each school campus.  The District conducted a comprehensive Community Survey to receive input regarding the primary types of school facilities improvements, and instructional technology upgrades that the local citizens deemed as priorities.  The District prepared an updated School Facilities Needs Assessment Analysis (“SFNA”) in order to evaluate and address all of the school facilities needs of the District at each campus and facility.  The District evaluated the safety, facility and classroom technology needs in developing the priority school projects minimum and maximum scopes and preliminary budget amounts set forth in the SFNA.
  • 5. District School Campuses and Facilities Section 1: Page 2 The types of facilities renovations, improvements, upgrades and expansions identified in the School Facilities Needs Assessment Analysis include all of the following school campuses and facilities so that ALL students have access to safe schools with upgraded classrooms, libraries, science, technology, engineering and mathematics (STEM) labs and learning environments needed to support career technical education and 21st-century instruction: Elementary School Campuses 1. Collins Elementary School 2. Gaines Elementary School 3. Jefferson Elementary School 4. Keppel Elementary School 5. Lincoln Elementary School 6. Los Cerritos Elementary School 7. Mokler Elementary School 8. Roosevelt Elementary School 9. Tanner Elementary School 10. Wirtz Elementary School Middle School Campuses 1. Alondra Middle School 2. Jackson Middle School 3. Paramount Park Middle School 4. Zamboni Middle School 1. Hollydale K-8 School High School Campuses 1. Paramount High School - Senior Campus 2. Paramount High School – West Campus 3. Buena Vista High School Other District-Wide Facilities 1. Paramount Community Day School 2. Paramount Adult School 3. District-Wide Educational Support Facilities
  • 6. Primary Types of School Facilities Improvement Needs Project Type 1 1. School Safety, Security and Health Projects Project Type 2 Goal and Purpose: To have safe, secure and up-to-date schools for all students and teachers enabling the District to retain qualified teachers and enhance instruction in core subjects like math, science and career technical educational curriculums'. 2. Improvements and Equipment to Support 21st Century Learning and District Classroom Instructional Technology 1:1 Program Section 1: Page 3 Goal and Purpose: To ensure all students have equal access to up- to-date classrooms, and to upgrade classroom computers and computer technology needed to enable our teachers and students to use up-to-date teaching methods and enhance instruction in core academic subjects like math, science and computer technology.
  • 7. Primary Types of School Facilities Improvement Needs Project Type 3 3. Career Technical Education Facilities, School Building, Classroom and Support Facility Projects Project Type 4 Goal and Purpose: To ensure all students have equal access to Career Technology Education programs, and to upgrade classroom computers and computer technology to enable our teachers and students to use up-to-date teaching methods and enhance instruction in core academic subjects like math, science and technology. 4. Other School Facilities and District-Wide Projects Section 1: Page 4 Goal and Purpose: To reduce maintenance and operating costs, thereby returning more money to the classroom, allowing the District to retain qualified teachers and protect instruction in core subjects like math, science and technology, and make a variety of basic repairs, improvements, upgrades, and expansions needed at district- wide aging school campuses and facilities.
  • 8. Goal and Purpose: To have safe, secure and up-to-date schools for all students and teachers enabling the District to retain qualified teachers and enhance instruction in core subjects like math, science and career technical educational curriculums'. Primary Types of District-Wide School Facilities Projects  Acquire, replace, upgrade and/or install student safety and security systems, including lighting, fencing, smoke detectors, fire alarms, sprinklers, security alarms, signage, safety locks and hardware, cameras and emergency communication systems.  Renovate, rehabilitate, re-configure, replace and/or upgrade portable classrooms and restrooms, and furnish and equip the same.  Renovate, replace and/or install drinking fountains.  Reconfigure, renovate, repair, resurface, improve and/or expand roads, sidewalks, driveways, parking lots and related areas, and pick-up/drop-off areas.  Upgrade/improve sites/grounds and facilities and acquire/install equipment and furniture, for students with disabilities and compliance with Americans with Disabilities Act.  Renovate, repair, resurface, upgrade, expand, construct and/or install and improve paved and other hard surfaces, playgrounds, playfields and landscaping, and acquire, improve, replace and/or upgrade playground equipment and fixtures. 1. School Safety, Security and Health Projects Section 1: Page 5 Minimum Maximum Scope Scope $12,000,000 $15,000,000
  • 9. Goal and Purpose: To ensure all students have equal access to up-to-date classrooms, and to upgrade classroom computers and computer technology needed to enable our teachers and students to use up-to- date teaching methods and enhance instruction in core academic subjects like math, science and computer technology. Primary Types of District-Wide School Facilities Projects  Acquire, install and upgrade technology equipment, fixtures and infrastructure, including interactive educational technology and projection systems, computers, tablets, laptops, printers, scanners, digital projectors and cameras, audio systems, video systems, phone and sound projections systems, peripherals, smart boards, education software, telecommunications software, security software, monitors, network equipment (including servers, network interface devices, network switches and routers, wireless network equipment, firewalls, network security equipment, racking, power and cooling equipment, wiring and uninterruptible power supplies), etc.,.  Rehabilitate and replace such equipment, fixtures and infrastructure as needed in the future; technology equipment, fixtures and infrastructure includes existing technology equipment, fixtures and infrastructure as well as technology equipment, fixtures and infrastructure developed in the future.  Renovate, replace, upgrade, acquire, install and integrate electrical (including wiring and related infrastructure for modern technology) and data systems, equipment, power sources and supplies and related technology infrastructure.  Renovate, reconfigure and/or upgrade school facilities as needed to install or accommodate new technology and equipment.  Improve, upgrade, renovate, and/or construct and install classroom and lab facilities and related support facilities needed to support the career technical education requirements for student job training, career placement, and college preparation.  Renovate, rehabilitate, re-configure, replace, expand and/or upgrade portable and permanent classrooms, classroom buildings, labs and school support facilities, including interior and exterior doors, windows, door and window hardware, roofs, rain gutters and downspouts, walls, marker boards, ceilings and floors and finishes, paint, siding, insulation, casework, cabinets, carpets, drapes, window coverings, lighting, sinks, fixtures, signage, fencing, furniture and equipment.  Acquire and install and/or replace heating, ventilation and air conditioning and lighting systems.  Furnishing and equipping of career technical education facilities; furnishing and equipping shall include initial purchases, and scheduled and necessary replacements, upgrades and updating of technology for career placement and college preparation. 2. 21st Century Learning and Instructional Technology 1:1 Program Section 1: Page 6 Minimum Maximum Scope Scope $15,000,000 $20,000,000
  • 10. Goal and Purpose: To ensure all students have equal access to Career Technology Education programs, and to upgrade classroom computers and computer technology to enable our teachers and students to use up-to-date teaching methods and enhance instruction in core academic subjects like math, science and technology. Primary Types of District-Wide School Facilities Projects  Improve, upgrade, renovate, and/or construct and install classroom and lab facilities and related support facilities needed to support the career technical education requirements for student job training, career placement, and college preparation.  Renovate, rehabilitate, re-configure, replace, expand and/or upgrade portable and permanent classrooms, classroom buildings, labs and school support facilities, including interior and exterior doors, windows, door and window hardware, roofs, rain gutters and downspouts, walls, marker boards, ceilings and floors and finishes, paint, siding, insulation, casework, cabinets, carpets, drapes, window coverings, lighting, sinks, fixtures, signage, fencing, furniture and equipment.  Acquire and install and/or replace heating, ventilation and air conditioning and lighting systems.  Furnishing and equipping of career technical education facilities; furnishing and equipping shall include initial purchases, and scheduled and necessary replacements, upgrades and updating of technology for career placement and college preparation. 3. Career Technical Education Facilities, School Building, Classroom and Support Facility Projects Section 1: Page 7 Minimum Maximum Scope Scope $19,000,000 $25,000,000
  • 11. 4. Other School Facility and District-Wide Projects Section 1: Page 8 Primary Types of District-Wide School Facilities Projects  Improve, update, renovate, and expand athletic fields, tracks, and gym facilities at the middle school campuses and other school sites as needed.  Acquisition and improvement of real property and the construction of new school facilities needed to accommodate future increases in student enrollment and/or from reductions in the number students per classroom.  Acquire, install and/or construct renewable energy and/or energy-saving systems, improvements and equipment, including photovoltaic solar panels, electricity generation and distribution systems, upgraded insulation, efficient lighting, energy management and conservation systems, windows and structures to support such systems, improvements and equipment and related infrastructure. Rehabilitate, renovate, upgrade and/or replace such systems, improvements and equipment as needed in the future.  Planning, designing and providing temporary housing.  The inspection, sampling and analysis of grounds, buildings and building materials to determine the presence of hazardous materials or substances, including asbestos, lead, etc., and the encapsulation, removal, disposal and other remediation or control of such hazardous materials and substances.  Necessary onsite and offsite preparation or restoration in connection with new construction, renovation or remodeling, or installation or removal of relocatable buildings, including demolition of structures; removing, replacing, or installing irrigation, drainage, utility lines (gas, water, sewer, electrical, data and voice, etc.), trees and landscaping; relocating fire access roads.  Address other unforeseen conditions revealed by construction, renovation or modernization (including plumbing or gas line breaks, dry rot, seismic and structural deficiencies, etc.).  Furnishing and equipping of school facilities; furnishing and equipping shall include initial purchases, and scheduled and necessary replacements, upgrades and updating of technology systems. Goal and Purpose: To reduce maintenance and operating costs, thereby returning more money to the classroom, allowing the District to retain qualified teachers and protect instruction in core subjects like math, science and technology, and make a variety of basic repairs, improvements, upgrades, and expansions needed at district-wide aging school campuses and facilities. Minimum Maximum Scope Scope $69,000,000 $80,000,000
  • 12. School Project Types – Preliminary Scope Budget Amounts Section 1: Page 9 District-Wide Types of Minimum Maximum School Facilities Needs Scope Scope 1. School Safety, Security and Health Projects $12,000,000 $15,000,000 2. 21st Century Learning & Instructional Technology 1:1 15,000,000 20,000,000 3. Career Technical Education Facilities, School Building, Classroom and Support Facility Projects 4. Other School Facility and District-Wide Projects 69,000,000 80,000,000 School Project Types - Category Preliminary Budget = $115,000,000 $140,000,000 19,000,000 25,000,000 10.71% 14.29% 17.86% 57.14% ProjectType Maximum Scope% Type 1 Type 2 Type 3 Type 4 10.43% 13.04% 16.52%60.00% ProjectType Minimum Scope% Type 1 Type 2 Type 3 Type 4
  • 13. School Projects – District Revenue/Funding Tools Section 1: Page 10  Funding Tool Type: Local general obligation bonds (G.O. Bonds) under the Proposition 39 parameters.  Requirement: Election needed for implementation.  55%+ = Voter minimum approval requirement.  General Elections = Must be a general scheduled election date (typically even numbered years).  Permitted Uses: School Improvements, Expansions, New Construction and Equipment (FF&E).  Use Restriction: Permitted uses of funds is LIMITED to the authorized types of school facilities and school campuses set forth the “PROJECT LIST” and APPROVED by the voters.  Maximum Bond Amount: No legal maximum principal amount that can be placed on the ballot.  Number of Bond Series: No legal limitation on the number of Bond Series issued.  Maximum Bond Series Repayment Periods:  40-Years = Current Interest Bonds (CIBs); and  25-Years = Capital Appreciation Bonds (CABs).  Maximum Repayment Ratio: Each Bond Series has a maximum 4 to 1 repayment ratio (principal/total payments). Local G.O. Bond Measure  Funding Tool Type: State matching grants for certain types of eligible school projects and programs.  Requirement: The state must have matching grant funds available – and the district must have “eligibility”.  Permitted Uses: Use of state matching grants is limited to the following types of eligible projects and programs:  School “Modernization” Projects;  School “New Construction” Projects; and  Certain School “Program” types.  State Grant Amounts: The state sets the maximum budget amounts for the eligible projects and programs – and currently provides the matching grants based on the following percentages:  60% =School Modernization State grant %; and  50% = School New Construction grant %.  District Match Requirement: The district MUST have its minimum local matching (40% = Modernization – 50% = New Construction) funds AVAILABLE to receive the state matching grant amounts.  Use Restriction: Permitted uses of the state matching grants is LIMITED to the approved eligible school projects. State Matching Grants
  • 14. School Projects – District Revenue/Funding Tools Section 1: Page 11  Funding Tool Type: Revenues generated from new residential and commercial development constructed within the district’s boundaries.  Requirement: District must have a need to construct ADDITIONAL school facilities to accommodate the impact of the new students generated by the developments.  Types of Development Revenues: Development revenues consist of the following primary types:  Developer Fees: Paid on building permit issuance based on a “per-square foot” amount under certain authorized state parameters;  Special Taxes: Annual tax amounts per unit and parameters approved by an election of property owners; and  In Kind Contributions: Delivery of new school sites and/or facilities delivered by the developer under a mutually approved “developer mitigation agreement”.  Permitted Uses: New school facilities, expansions, and related furniture, fixtures and equipment (FF&E).  Use Restriction: Permitted uses of funds is LIMITED to NEW and EXPANDED school facilities required to mitigate the impact of NEW students. New Development Revenues  Funding Tool Type: Annual tax revenues generated for district educational programs and operations.  Requirement: Election needed for implementation.  66.67% = Voter minimum approval requirement.  Any Tuesday Election = Parcel tax elections can be held on any Tuesday with 90-days notice.  Permitted Uses: Use of the annual tax revenues is based on the authorized uses approved by the voters - but are typically utilized to fund the annual operating expenses of certain “EDUCATIONAL PROGRAMS”.  Use Restriction: Permitted uses of parcel tax revenues is LIMITED to the authorized types of educational programs and other uses APPROVED by the voters in each election.  Term of Revenues: The number of years that the district can collect the parcel tax revenues is set by the election parameters approved by the voters – but typically range from 3 to 9-years per election.  Renewal of Revenues: The parcel tax revenues uses, term, and amounts can be extended via additional elections approved by the voters that are held on or before the expiration of each authorized term. Parcel Tax Revenue Measure
  • 15. G.O. Bond Parameters  $106 Million Bond Amount: Represents the District’s practical Bond capacity under the Proposition 39 parameters.  4 Bond Series Issued Over 10-Years: The $106 million bond amount is planned to accessed via the issuance of 4 bond series over an 8 to 10-year timeframe.  $59 Tax-Rate Per Year: The repayment of the Bonds is planned to consist of an average tax-rate of $59 per $100,000 of taxable assessed value (AV) based on the District’s current $5.2 billion tax based increasing at a 3.50% average rate. District Bond Capacity – $106 Million (Under Proposition 39 Parameters) G.O. Bond Funding Tool – Preliminary Cash Flow Amounts Section 1: Page 12 Bond Cash Flows for School Projects Cumulative Bond Cash Flows Bond Series Year Total Amounts Cumulative Amts. Series No. 1 2017 $38,000,000 $38,000,000 Series No. 2 2020 28,000,000 $66,000,000 Series No. 3 2023 16,000,000 $82,000,000 Series No. 4 2026 24,000,000 $106,000,000 $106,000,000 Preliminary Bond Cash Flow Amounts Bond Cash Flow Total = $0 $40 $80 $120 2017 2020 2023 2026 $38 $66 $82 $106 InMillions
  • 16. Elementary School Campuses 1. Collins Elementary School 1-3 2. Gaines Elementary School 4-6 3. Jefferson Elementary School 7-9 4. Keppel Elementary School 10-12 5. Lincoln Elementary School 13-15 6. Los Cerritos Elementary School 16-18 7. Mokler Elementary School 19-21 8. Roosevelt Elementary School 22-24 9. Tanner Elementary School 25-27 10. Wirtz Elementary School 28-30 Section 2: INDIVIDUAL School Campus Facilities Needs Page Middle/K-8 School Campuses 1. Alondra Middle School 31-33 2. Jackson Middle School 34-36 3. Paramount Park Middle School 37-39 4. Zamboni Middle School 40-42 5. Hollydale K-8 School 43-45 Page 2016 School Facilities Needs Analyses School Campus Improvement and Upgrade Projects Summary High School Campuses 1. Paramount HS – Senior Campus 46-48 2. Paramount HS – West Campus 49-51 3. Buena Vista High School 52-54 Other District-Wide Facilities 1. Adult Education School Facilities 55-57 2. Community Day School Facilities 58-59 3. District-Wide Support Facilities 60-61
  • 17. Elementary School Campuses 2016 School Facilities Needs Analyses School Campus Improvement and Upgrade Projects Summary Collins Elementary Gaines Elementary Jefferson Elementary Keppel Elementary Lincoln Elementary Los Cerritos Elementary Mokler Elementary Tanner Elementary Roosevelt Elementary Wirtz Elementary
  • 18. 1. Collins Elementary School Campus Section 2: Page 1 Street Address: 6125 Coke Avenue City Location: Long Beach Year Completed/Age: 1953 – 63 Years Old School Site Size: 10 Acres Grade Levels: K-5th Grades
  • 19. Section 2: Page 2 1. Collins Elementary School Campus School Safety, Security and Health Projects:  Increase parking spaces, improve traffic flow, and add parking striping/speed bumps.  Install and upgrade security cameras and exterior lighting systems.  Install and upgrade school window coverings.  Install classroom and school campus electronic entry systems.  Install panic gate hardware components.  Renovate, improve and upgrade school campus visitor check-in/check-out areas.  Install security systems in student classroom areas.  Upgrade school campus telephone and integrated emergency communication systems.  Improve and upgrade classroom and school campus fire alarm systems. 21st Century Learning and Instructional Technology 1:1 Program:  Replace and upgrade teacher/student classroom technology systems.  Upgrade school campus technology infrastructure components.  Improve, upgrade and expand technology electrical systems.  Develop and implement a student technology devise upgrade and replacement program.
  • 20. Other School Facility and District-Wide Projects:  Replace classroom furniture and repaint campus facilities.  Renovate and improve multi-purpose room stage facilities and kitchen flooring.  Redesign front entrance of school campus.  Upgrade library, front office and lounge areas.  Replace classroom and campus flooring.  Improve, upgrade and construct new cafeteria facilities. Other School Facility and District-Wide Projects:  Repair, upgrade and improve campus playground areas and playfield facilities.  Improve, upgrade and install campus perimeter fencing.  Replace portable classrooms with permanent buildings.  Replace and upgrade campus drinking fountains and water bottle fill stations.  Improve and upgrade campus landscaping with water conservation/low maintenance systems.  Upgrade and expand student and staff restroom facilities.  Improving, repairing and upgrading school facilities roofs, walls, electrical, water, gas lines systems, and seismic/structural deficiencies.  Furnishing and equipping of facilities including necessary replacements, improvements and scheduled improvements of classrooms to meet ongoing safety, academic, and updated instructional technology standards. Section 2: Page 3 1. Collins Elementary School Campus
  • 21. 2. Gaines Elementary School Campus Section 2: Page 4 Street Address: 7430 Jackson Street City Location: Paramount Year Completed/Age: 1951 – 65 Years Old School Site Size: 4 Acres (Small Site) Grade Levels: Transitional K-3rd Grades
  • 22. Section 2: Page 5 School Safety, Security and Health Projects:  Increase parking spaces, improve traffic flow, and add parking striping/speed bumps.  Install and upgrade exterior lighting systems.  Install and upgrade school window coverings.  Install classroom and school campus electronic entry systems.  Install panic gate hardware components.  Renovate, improve and upgrade school campus visitor check-in/check-out areas.  Install security systems in student classroom areas.  Upgrade school campus telephone and integrated emergency communication systems.  Improve and upgrade classroom and school campus fire alarm systems. 21st Century Learning and Instructional Technology 1:1 Program:  Replace and upgrade teacher/student classroom technology systems.  Upgrade school campus technology infrastructure components.  Improve, upgrade and expand technology electrical systems.  Develop and implement a student technology devise upgrade and replacement program. 2. Gaines Elementary School Campus
  • 23. Other School Facility and District-Wide Projects:  Replace classroom furniture and repaint campus facilities.  Renovate and improve multi-purpose room stage facilities and kitchen flooring.  Redesign front entrance of school campus.  Upgrade library, front office and lounge areas.  Replace classroom and campus flooring.  Improve, upgrade and construct new cafeteria facilities. Other School Facility and District-Wide Projects:  Repair, upgrade and improve campus playground areas and playfield facilities.  Improve, upgrade and install campus perimeter fencing.  Replace portable classrooms with permanent buildings.  Replace and upgrade campus drinking fountains and water bottle fill stations.  Improve and upgrade campus landscaping with water conservation/low maintenance systems.  Upgrade and expand student and staff restroom facilities.  Improving, repairing and upgrading school facilities roofs, walls, electrical, water, gas lines systems, and seismic/structural deficiencies.  Furnishing and equipping of facilities including necessary replacements, improvements and scheduled improvements of classrooms to meet ongoing safety, academic, and updated instructional technology standards. Section 2: Page 6 2. Gaines Elementary School Campus
  • 24. 3. Jefferson Elementary School Campus Section 2: Page 7 Street Address: 8600 Jefferson Street City Location: Paramount Year Completed/Age: 2000 – 16 Years Old School Site Size: 2.07 Acres (Small Site) Grade Levels: K-5th Grades
  • 25. Section 2: Page 8 School Safety, Security and Health Projects:  Increase parking spaces, improve traffic flow, and add parking striping/speed bumps.  Install and upgrade exterior lighting systems.  Install and upgrade school window coverings.  Install classroom and school campus electronic entry systems.  Install panic gate hardware components.  Renovate, improve and upgrade school campus visitor check-in/check-out areas.  Install security systems in student classroom areas.  Upgrade school campus telephone and integrated emergency communication systems.  Improve and upgrade classroom and school campus fire alarm systems. 21st Century Learning and Instructional Technology 1:1 Program:  Replace and upgrade teacher/student classroom technology systems.  Upgrade school campus technology infrastructure components.  Improve, upgrade and expand technology electrical systems.  Develop and implement a student technology devise upgrade and replacement program. 3. Jefferson Elementary School Campus
  • 26. Other School Facility and District-Wide Projects:  Replace classroom furniture and repaint campus facilities.  Renovate and improve multi-purpose room stage facilities and kitchen flooring.  Redesign front entrance of school campus.  Upgrade library, front office and lounge areas.  Replace classroom and campus flooring.  Improve, upgrade and construct new cafeteria facilities. Other School Facility and District-Wide Projects:  Repair, upgrade and improve campus playground areas and playfield facilities.  Improve, upgrade and install campus perimeter fencing.  Replace portable classrooms with permanent buildings.  Replace and upgrade campus drinking fountains and water bottle fill stations.  Improve and upgrade campus landscaping with water conservation/low maintenance systems.  Upgrade and expand student and staff restroom facilities.  Improving, repairing and upgrading school facilities roofs, walls, electrical, water, gas lines systems, and seismic/structural deficiencies.  Furnishing and equipping of facilities including necessary replacements, improvements and scheduled improvements of classrooms to meet ongoing safety, academic, and updated instructional technology standards. Section 2: Page 9 3. Jefferson Elementary School Campus
  • 27. 4. Keppel Elementary School Campus Section 2: Page 10 Street Address: 6630 Mark Keppel Street City Location: Paramount Year Completed/Age: 1951 – 65 Years Old School Site Size: 0.4 Acres (Small Site) Grade Levels: K-5th Grades
  • 28. Section 2: Page 11 School Safety, Security and Health Projects:  Increase parking spaces, improve traffic flow, and add parking striping/speed bumps.  Install and upgrade exterior lighting systems.  Install and upgrade school window coverings.  Install classroom and school campus electronic entry systems.  Install panic gate hardware components.  Renovate, improve and upgrade school campus visitor check-in/check-out areas.  Install security systems in student classroom areas.  Upgrade school campus telephone and integrated emergency communication systems.  Improve and upgrade classroom and school campus fire alarm systems. 21st Century Learning and Instructional Technology 1:1 Program:  Replace and upgrade teacher/student classroom technology systems.  Upgrade school campus technology infrastructure components.  Improve, upgrade and expand technology electrical systems.  Develop and implement a student technology devise upgrade and replacement program. 4. Keppel Elementary School Campus
  • 29. Other School Facility and District-Wide Projects:  Replace classroom furniture and repaint campus facilities.  Renovate and improve multi-purpose room stage facilities and kitchen flooring.  Redesign front entrance of school campus.  Upgrade library, front office and lounge areas.  Replace classroom and campus flooring.  Improve, upgrade and construct new cafeteria facilities. Other School Facility and District-Wide Projects:  Repair, upgrade and improve campus playground areas and playfield facilities.  Improve, upgrade and install campus perimeter fencing.  Replace portable classrooms with permanent buildings.  Replace and upgrade campus drinking fountains and water bottle fill stations.  Improve and upgrade campus landscaping with water conservation/low maintenance systems.  Upgrade and expand student and staff restroom facilities.  Improving, repairing and upgrading school facilities roofs, walls, electrical, water, gas lines systems, and seismic/structural deficiencies.  Furnishing and equipping of facilities including necessary replacements, improvements and scheduled improvements of classrooms to meet ongoing safety, academic, and updated instructional technology standards. Section 2: Page 12 4. Keppel Elementary School Campus
  • 30. 5. Lincoln Elementary School Campus Section 2: Page 13 Street Address: 15324 California Ave. City Location: Paramount Year Completed/Age: 1956 – 60 Years Old School Site Size: 4.7 Acres (Small Site) Grade Levels: K-5th Grades
  • 31. Section 2: Page 14 School Safety, Security and Health Projects:  Increase parking spaces, improve traffic flow, and add parking striping/speed bumps.  Install and upgrade exterior lighting systems.  Install and upgrade school window coverings.  Install classroom and school campus electronic entry systems.  Install panic gate hardware components.  Renovate, improve and upgrade school campus visitor check-in/check-out areas.  Install security systems in student classroom areas.  Upgrade school campus telephone and integrated emergency communication systems.  Improve and upgrade classroom and school campus fire alarm systems. 21st Century Learning and Instructional Technology 1:1 Program:  Replace and upgrade teacher/student classroom technology systems.  Upgrade school campus technology infrastructure components.  Improve, upgrade and expand technology electrical systems.  Develop and implement a student technology devise upgrade and replacement program. 5. Lincoln Elementary School Campus
  • 32. Other School Facility and District-Wide Projects:  Replace classroom furniture and repaint campus facilities.  Renovate and improve multi-purpose room stage facilities and kitchen flooring.  Redesign front entrance of school campus.  Upgrade library, front office and lounge areas.  Replace classroom and campus flooring.  Improve, upgrade and construct new cafeteria facilities. Other School Facility and District-Wide Projects:  Repair, upgrade and improve campus playground areas and playfield facilities.  Improve, upgrade and install campus perimeter fencing.  Replace portable classrooms with permanent buildings.  Replace and upgrade campus drinking fountains and water bottle fill stations.  Improve and upgrade campus landscaping with water conservation/low maintenance systems.  Upgrade and expand student and staff restroom facilities.  Improving, repairing and upgrading school facilities roofs, walls, electrical, water, gas lines systems, and seismic/structural deficiencies.  Furnishing and equipping of facilities including necessary replacements, improvements and scheduled improvements of classrooms to meet ongoing safety, academic, and updated instructional technology standards. Section 2: Page 15 5. Lincoln Elementary School Campus
  • 33. 6. Los Cerritos Elementary School Campus Section 2: Page 16 Street Address: 14626 Gundry Ave. City Location: Paramount Year Completed/Age: 1950 – 66 Years Old School Site Size: 2.59 Acres (Small Site) Grade Levels: Transitional K-5th Grades
  • 34. Section 2: Page 17 School Safety, Security and Health Projects:  Increase parking spaces, improve traffic flow, and add parking striping/speed bumps.  Install and upgrade exterior lighting systems.  Install and upgrade school window coverings.  Install classroom and school campus electronic entry systems.  Install panic gate hardware components.  Renovate, improve and upgrade school campus visitor check-in/check-out areas.  Install security systems in student classroom areas.  Upgrade school campus telephone and integrated emergency communication systems.  Improve and upgrade classroom and school campus fire alarm systems. 21st Century Learning and Instructional Technology 1:1 Program:  Replace and upgrade teacher/student classroom technology systems.  Upgrade school campus technology infrastructure components.  Improve, upgrade and expand technology electrical systems.  Develop and implement a student technology devise upgrade and replacement program. 6. Los Cerritos Elementary School Campus
  • 35. Other School Facility and District-Wide Projects:  Replace classroom furniture and repaint campus facilities.  Renovate and improve multi-purpose room stage facilities and kitchen flooring.  Redesign front entrance of school campus.  Upgrade library, front office and lounge areas.  Replace classroom and campus flooring.  Improve, upgrade and construct new cafeteria facilities. Other School Facility and District-Wide Projects:  Repair, upgrade and improve campus playground areas and playfield facilities.  Improve, upgrade and install campus perimeter fencing.  Replace portable classrooms with permanent buildings.  Replace and upgrade campus drinking fountains and water bottle fill stations.  Improve and upgrade campus landscaping with water conservation/low maintenance systems.  Upgrade and expand student and staff restroom facilities.  Improving, repairing and upgrading school facilities roofs, walls, electrical, water, gas lines systems, and seismic/structural deficiencies.  Furnishing and equipping of facilities including necessary replacements, improvements and scheduled improvements of classrooms to meet ongoing safety, academic, and updated instructional technology standards. Section 2: Page 18 6. Los Cerritos Elementary School Campus
  • 36. 7. Mokler Elementary School Campus Section 2: Page 19 Street Address: 8571 Flower Street City Location: Paramount Year Completed/Age: 1959 – 57 Years Old School Site Size: 12.31 Acres Grade Levels: Transitional K-5th Grades
  • 37. Section 2: Page 20 School Safety, Security and Health Projects:  Increase parking spaces, improve traffic flow, and add parking striping/speed bumps.  Install and upgrade security cameras and exterior lighting systems.  Install and upgrade school window coverings.  Install classroom and school campus electronic entry systems.  Install panic gate hardware components.  Renovate, improve and upgrade school campus visitor check-in/check-out areas.  Install security systems in student classroom areas.  Upgrade school campus telephone and integrated emergency communication systems.  Improve and upgrade classroom and school campus fire alarm systems. 21st Century Learning and Instructional Technology 1:1 Program:  Replace and upgrade teacher/student classroom technology systems.  Upgrade school campus technology infrastructure components.  Improve, upgrade and expand technology electrical systems.  Develop and implement a student technology devise upgrade and replacement program. 7. Mokler Elementary School Campus
  • 38. Other School Facility and District-Wide Projects:  Replace classroom furniture and repaint campus facilities.  Renovate and improve multi-purpose room stage facilities and kitchen flooring.  Redesign front entrance of school campus.  Upgrade library, front office and lounge areas.  Replace classroom and campus flooring.  Improve, upgrade and construct new cafeteria facilities. Other School Facility and District-Wide Projects:  Repair, upgrade and improve campus playground areas and playfield facilities.  Improve, upgrade and install campus perimeter fencing.  Replace portable classrooms with permanent buildings.  Replace and upgrade campus drinking fountains and water bottle fill stations.  Improve and upgrade campus landscaping with water conservation/low maintenance systems.  Upgrade and expand student and staff restroom facilities.  Improving, repairing and upgrading school facilities roofs, walls, electrical, water, gas lines systems, and seismic/structural deficiencies.  Furnishing and equipping of facilities including necessary replacements, improvements and scheduled improvements of classrooms to meet ongoing safety, academic, and updated instructional technology standards. Section 2: Page 21 7. Mokler Elementary School Campus
  • 39. 8. Roosevelt Elementary School Campus Section 2: Page 22 Street Address: 13451 Merkel Ave. City Location: Paramount Year Completed/Age: 1963 – 53 Years Old School Site Size: 9.22 Acres Grade Levels: K-5th Grades
  • 40. Section 2: Page 23 School Safety, Security and Health Projects:  Increase parking spaces, improve traffic flow, and add parking striping/speed bumps.  Install and upgrade exterior lighting systems.  Install and upgrade school window coverings.  Install classroom and school campus electronic entry systems.  Install panic gate hardware components.  Renovate, improve and upgrade school campus visitor check-in/check-out areas.  Install security systems in student classroom areas.  Upgrade school campus telephone and integrated emergency communication systems.  Improve and upgrade classroom and school campus fire alarm systems. 21st Century Learning and Instructional Technology 1:1 Program:  Replace and upgrade teacher/student classroom technology systems.  Upgrade school campus technology infrastructure components.  Improve, upgrade and expand technology electrical systems.  Develop and implement a student technology devise upgrade and replacement program. 8. Roosevelt Elementary School Campus
  • 41. Other School Facility and District-Wide Projects:  Replace classroom furniture and repaint campus facilities.  Renovate and improve multi-purpose room stage facilities and kitchen flooring.  Redesign front entrance of school campus.  Upgrade library, front office and lounge areas.  Replace classroom and campus flooring.  Improve, upgrade and construct new cafeteria facilities. Other School Facility and District-Wide Projects:  Repair, upgrade and improve campus playground areas and playfield facilities.  Improve, upgrade and install campus perimeter fencing.  Replace portable classrooms with permanent buildings.  Replace and upgrade campus drinking fountains and water bottle fill stations.  Improve and upgrade campus landscaping with water conservation/low maintenance systems.  Upgrade and expand student and staff restroom facilities.  Improving, repairing and upgrading school facilities roofs, walls, electrical, water, gas lines systems, and seismic/structural deficiencies.  Furnishing and equipping of facilities including necessary replacements, improvements and scheduled improvements of classrooms to meet ongoing safety, academic, and updated instructional technology standards. Section 2: Page 24 8. Roosevelt Elementary School Campus
  • 42. 9. Tanner Elementary School Campus Section 2: Page 25 Street Address: 7210 Rosecrans Ave. City Location: Paramount Year Completed/Age: 2005 – 11 Years Old School Site Size: 3.6 Acres (Small Site) Grade Levels: Transitional K-5th Grades
  • 43. Section 2: Page 26 School Safety, Security and Health Projects:  Increase parking spaces, improve traffic flow, and add parking striping/speed bumps.  Install and upgrade exterior lighting systems.  Install and upgrade school window coverings.  Install classroom and school campus electronic entry systems.  Install panic gate hardware components.  Renovate, improve and upgrade school campus visitor check-in/check-out areas.  Install security systems in student classroom areas.  Upgrade school campus telephone and integrated emergency communication systems.  Improve and upgrade classroom and school campus fire alarm systems. 21st Century Learning and Instructional Technology 1:1 Program:  Replace and upgrade teacher/student classroom technology systems.  Upgrade school campus technology infrastructure components.  Improve, upgrade and expand technology electrical systems.  Develop and implement a student technology devise upgrade and replacement program. 9. Tanner Elementary School Campus
  • 44. Other School Facility and District-Wide Projects:  Replace classroom furniture and repaint campus facilities.  Renovate and improve multi-purpose room stage facilities and kitchen flooring.  Redesign front entrance of school campus.  Upgrade library, front office and lounge areas.  Replace classroom and campus flooring.  Improve, upgrade and construct new cafeteria facilities. Other School Facility and District-Wide Projects:  Repair, upgrade and improve campus playground areas and playfield facilities.  Improve, upgrade and install campus perimeter fencing.  Replace portable classrooms with permanent buildings.  Replace and upgrade campus drinking fountains and water bottle fill stations.  Improve and upgrade campus landscaping with water conservation/low maintenance systems.  Upgrade and expand student and staff restroom facilities.  Improving, repairing and upgrading school facilities roofs, walls, electrical, water, gas lines systems, and seismic/structural deficiencies.  Furnishing and equipping of facilities including necessary replacements, improvements and scheduled improvements of classrooms to meet ongoing safety, academic, and updated instructional technology standards. Section 2: Page 27 9. Tanner Elementary School Campus
  • 45. 10. Wirtz Elementary School Campus Section 2: Page 28 Street Address: 8535 Contreras Street City Location: Paramount Year Completed/Age: 1951 – 65 Years Old School Site Size: 8.83 Acres Grade Levels: Pre K-5th Grades
  • 46. Section 2: Page 29 School Safety, Security and Health Projects:  Increase parking spaces, improve traffic flow, and add parking striping/speed bumps.  Install and upgrade exterior lighting systems.  Install and upgrade school window coverings.  Install classroom and school campus electronic entry systems.  Install panic gate hardware components.  Renovate, improve and upgrade school campus visitor check-in/check-out areas.  Install security systems in student classroom areas.  Upgrade school campus telephone and integrated emergency communication systems.  Improve and upgrade classroom and school campus fire alarm systems. 21st Century Learning and Instructional Technology 1:1 Program:  Replace and upgrade teacher/student classroom technology systems.  Upgrade school campus technology infrastructure components.  Improve, upgrade and expand technology electrical systems.  Develop and implement a student technology devise upgrade and replacement program. 10. Wirtz Elementary School Campus
  • 47. Other School Facility and District-Wide Projects:  Replace classroom furniture and repaint campus facilities.  Renovate and improve multi-purpose room stage facilities and kitchen flooring.  Redesign front entrance of school campus.  Upgrade library, front office and lounge areas.  Replace classroom and campus flooring.  Improve, upgrade and construct new cafeteria facilities. Other School Facility and District-Wide Projects:  Repair, upgrade and improve campus playground areas and playfield facilities.  Improve, upgrade and install campus perimeter fencing.  Replace portable classrooms with permanent buildings.  Replace and upgrade campus drinking fountains and water bottle fill stations.  Improve and upgrade campus landscaping with water conservation/low maintenance systems.  Upgrade and expand student and staff restroom facilities.  Improving, repairing and upgrading school facilities roofs, walls, electrical, water, gas lines systems, and seismic/structural deficiencies.  Furnishing and equipping of facilities including necessary replacements, improvements and scheduled improvements of classrooms to meet ongoing safety, academic, and updated instructional technology standards. Section 2: Page 30 10. Wirtz Elementary School Campus
  • 48. Middle School Campuses Alondra Middle School 2016 School Facilities Needs Analyses School Campus Improvement and Upgrade Projects Summary Paramount Park Middle School Jackson Middle School Zamboni Middle School
  • 49. 1. Alondra Middle School Campus Section 2: Page 31 Street Address: 16200 South Downey Ave. City Location: Paramount Year Completed/Age: 1963 – 53 Years Old School Site Size: 17.85 Acres Grade Levels: Grades 6th – 8th
  • 50. Section 2: Page 32 1. Alondra Middle School Campus School Safety, Security and Health Projects:  Increase parking spaces, improve traffic flow, and add parking striping/speed bumps.  Install and upgrade security cameras and exterior lighting systems.  Install and upgrade school window coverings.  Install classroom and school campus electronic entry systems.  Install panic gate hardware components.  Renovate, improve and upgrade school campus visitor check-in/check-out areas.  Install security systems in student classroom areas.  Improve and upgrade classroom and school campus fire alarm systems. 21st Century Learning and Instructional Technology 1:1 Program:  Upgrade and provide STEM labs.  Replace and upgrade teacher/student classroom technology systems.  Upgrade school campus technology infrastructure components.  Improve, upgrade and expand technology electrical systems.  Develop and implement a student technology devise upgrade and replacement program.
  • 51. Section 2: Page 33 1. Alondra Middle School Campus Other School Facility and District-Wide Projects:  Replace classroom furniture and repaint campus facilities.  Renovate and improve multi-purpose room stage facilities and kitchen flooring.  Redesign front entrance of school campus.  Upgrade library, front office and lounge areas.  Replace classroom and campus flooring.  Improve, upgrade and construct new cafeteria facilities. Other School Facility and District-Wide Projects:  Repair, upgrade and improve campus athletic fields and track facilities.  Improve, upgrade and install campus perimeter fencing.  Replace portable classrooms with permanent buildings.  Replace and upgrade campus drinking fountains and water bottle fill stations.  Improve and upgrade campus landscaping with water conservation/low maintenance systems.  Upgrade and expand student and staff restroom facilities.  Improving, repairing and upgrading school facilities roofs, walls, electrical, water, gas lines systems, and seismic/structural deficiencies.  Furnishing and equipping of facilities including necessary replacements, improvements and scheduled improvements of classrooms to meet ongoing safety, academic, and updated instructional technology standards.
  • 52. 2. Jackson Middle School Campus Section 2: Page 34 Street Address: 7220 East Jackson St. City Location: Paramount Year Completed/Age: 2002 – 14 Years Old School Site Size: 5.61 Acres (Small Site) Grade Levels: Grades 4th – 8th
  • 53. Section 2: Page 35 21st Century Learning and Instructional Technology 1:1 Program:  Upgrade and provide STEM labs.  Replace and upgrade teacher/student classroom technology systems.  Upgrade school campus technology infrastructure components.  Improve, upgrade and expand technology electrical systems.  Develop and implement a student technology devise upgrade and replacement program. 2. Jackson Middle School Campus School Safety, Security and Health Projects:  Increase parking spaces, improve traffic flow, and add parking striping/speed bumps.  Install and upgrade exterior lighting systems.  Install and upgrade school window coverings.  Install classroom and school campus electronic entry systems.  Install panic gate hardware components.  Renovate, improve and upgrade school campus visitor check-in/check-out areas.  Install security systems in student classroom areas.  Improve and upgrade classroom and school campus fire alarm systems.
  • 54. Section 2: Page 36 Other School Facility and District-Wide Projects:  Replace classroom furniture and repaint campus facilities.  Renovate and improve multi-purpose room stage facilities and kitchen flooring.  Redesign front entrance of school campus.  Upgrade library, front office and lounge areas.  Replace classroom and campus flooring.  Improve, upgrade and construct new cafeteria facilities. Other School Facility and District-Wide Projects:  Repair, upgrade and improve campus athletic fields and track facilities.  Improve, upgrade and install campus perimeter fencing.  Replace portable classrooms with permanent buildings.  Replace and upgrade campus drinking fountains and water bottle fill stations.  Improve and upgrade campus landscaping with water conservation/low maintenance systems.  Upgrade and expand student and staff restroom facilities.  Improving, repairing and upgrading school facilities roofs, walls, electrical, water, gas lines systems, and seismic/structural deficiencies.  Furnishing and equipping of facilities including necessary replacements, improvements and scheduled improvements of classrooms to meet ongoing safety, academic, and updated instructional technology standards. 2. Jackson Middle School Campus
  • 55. 3. Paramount Park Middle School Campus Section 2: Page 37 Street Address: 14608 Paramount Blvd. City Location: Paramount Year Completed/Age: 1998 – 18 Years Old School Site Size: 3.15 Acres (Small Site) Grade Levels: Grades 6th – 8th
  • 56. Section 2: Page 38 21st Century Learning and Instructional Technology 1:1 Program:  Upgrade and provide STEM labs.  Replace and upgrade teacher/student classroom technology systems.  Upgrade school campus technology infrastructure components.  Improve, upgrade and expand technology electrical systems.  Develop and implement a student technology devise upgrade and replacement program. 3. Paramount Park Middle School Campus School Safety, Security and Health Projects:  Increase parking spaces, improve traffic flow, and add parking striping/speed bumps.  Install and upgrade security cameras and exterior lighting systems.  Install and upgrade school window coverings.  Install classroom and school campus electronic entry systems.  Install panic gate hardware components.  Renovate, improve and upgrade school campus visitor check-in/check-out areas.  Install security systems in student classroom areas.  Improve and upgrade classroom and school campus fire alarm systems.
  • 57. Section 2: Page 39 Other School Facility and District-Wide Projects:  Replace classroom furniture and repaint campus facilities.  Renovate and improve multi-purpose room stage facilities and kitchen flooring.  Redesign front entrance of school campus.  Upgrade library, front office and lounge areas.  Replace classroom and campus flooring.  Improve, upgrade and construct new cafeteria facilities. Other School Facility and District-Wide Projects:  Repair, upgrade and improve campus athletic fields and track facilities.  Improve, upgrade and install campus perimeter fencing.  Replace portable classrooms with permanent buildings.  Replace and upgrade campus drinking fountains and water bottle fill stations.  Improve and upgrade campus landscaping with water conservation/low maintenance systems.  Upgrade and expand student and staff restroom facilities.  Improving, repairing and upgrading school facilities roofs, walls, electrical, water, gas lines systems, and seismic/structural deficiencies.  Furnishing and equipping of facilities including necessary replacements, improvements and scheduled improvements of classrooms to meet ongoing safety, academic, and updated instructional technology standards. 3. Paramount Park Middle School Campus
  • 58. 4. Zamboni Middle School Campus Section 2: Page 40 Street Address: 15733 Orange Ave. City Location: Paramount Year Completed/Age: 1996 – 20 Years Old School Site Size: 8.1 Acres (Small Site) Grade Levels: Grades 6th – 8th
  • 59. Section 2: Page 41 21st Century Learning and Instructional Technology 1:1 Program:  Upgrade and provide STEM labs.  Replace and upgrade teacher/student classroom technology systems.  Upgrade school campus technology infrastructure components.  Improve, upgrade and expand technology electrical systems.  Develop and implement a student technology devise upgrade and replacement program. School Safety, Security and Health Projects:  Increase parking spaces, improve traffic flow, and add parking striping/speed bumps.  Install and upgrade exterior lighting systems.  Install and upgrade school window coverings.  Install classroom and school campus electronic entry systems.  Install panic gate hardware components.  Renovate, improve and upgrade school campus visitor check-in/check-out areas.  Install security systems in student classroom areas.  Improve and upgrade classroom and school campus fire alarm systems. 4. Zamboni Middle School Campus
  • 60. Section 2: Page 42 Other School Facility and District-Wide Projects:  Replace classroom furniture and repaint campus facilities.  Renovate and improve multi-purpose room stage facilities and kitchen flooring.  Redesign front entrance of school campus.  Upgrade library, front office and lounge areas.  Replace classroom and campus flooring.  Improve, upgrade and construct new cafeteria facilities. Other School Facility and District-Wide Projects:  Repair, upgrade and improve campus athletic fields and track facilities.  Improve, upgrade and install campus perimeter fencing.  Replace portable classrooms with permanent buildings.  Replace and upgrade campus drinking fountains and water bottle fill stations.  Improve and upgrade campus landscaping with water conservation/low maintenance systems.  Upgrade and expand student and staff restroom facilities.  Improving, repairing and upgrading school facilities roofs, walls, electrical, water, gas lines systems, and seismic/structural deficiencies.  Furnishing and equipping of facilities including necessary replacements, improvements and scheduled improvements of classrooms to meet ongoing safety, academic, and updated instructional technology standards. 4. Zamboni Middle School Campus
  • 61. Hollydale K-8 School Campus 2016 School Facilities Needs Analyses School Campus Improvement and Upgrade Projects Summary
  • 62. 1. Hollydale K-8 School Campus Section 2: Page 43 Street Address: 5511 Century Blvd. City Location: South Gate Year Completed/Age: School Site Size: Grade Levels: Grades K – 8th
  • 63. Section 2: Page 44 1. Hollydale K-8 School Campus School Safety, Security and Health Projects:  Increase parking spaces, improve traffic flow, and add parking striping/speed bumps.  Install and upgrade school window coverings.  Install classroom and school campus electronic entry systems.  Install panic gate hardware components.  Renovate, improve and upgrade school campus visitor check-in/check-out areas.  Improve and upgrade classroom and school campus fire alarm systems. 21st Century Learning and Instructional Technology 1:1 Program:  Upgrade and provide STEM labs.  Replace and upgrade teacher/student classroom technology systems.  Upgrade school campus technology infrastructure components.  Improve, upgrade and expand technology electrical systems.  Develop and implement a student technology devise upgrade and replacement program.
  • 64. Section 2: Page 45 1. Hollydale K-8 School Campus Other School Facility and District-Wide Projects:  Replace classroom furniture and repaint campus facilities.  Renovate and improve multi-purpose room stage facilities and kitchen flooring.  Upgrade library, front office and lounge areas.  Replace classroom and campus flooring.  Improve, upgrade and construct new cafeteria facilities. Other School Facility and District-Wide Projects:  Improve, upgrade and install campus perimeter fencing.  Replace portable classrooms with permanent buildings.  Replace and upgrade campus drinking fountains and water bottle fill stations.  Improve and upgrade campus landscaping with water conservation/low maintenance systems.  Upgrade and expand student and staff restroom facilities.  Improving, repairing and upgrading school facilities roofs, walls, electrical, water, gas lines systems, and seismic/structural deficiencies.  Furnishing and equipping of facilities including necessary replacements, improvements and scheduled improvements of classrooms to meet ongoing safety, academic, and updated instructional technology standards.
  • 65. High School Campuses Paramount HS – Senior Campus 2016 School Facilities Needs Analyses School Campus Improvement and Upgrade Projects Summary Paramount HS – West Campus Buena Vista Continuation High School
  • 66. 1. Paramount HS - Senior Campus Section 2: Page 46 Street Address: 14429 Downey Ave. City Location: Paramount Year Completed/Age: 1952 – 64 Years Old School Site Size: 35.1 Acres (Small Site) Grade Levels: Grades 10th – 12th
  • 67. Section 2: Page 47 1. Paramount HS - Senior Campus School Safety, Security and Health Projects:  Increase parking spaces, improve traffic flow, and add parking striping/speed bumps.  Install and upgrade security cameras and exterior lighting systems.  Install and upgrade school window coverings.  Install classroom and school campus electronic entry systems.  Install panic gate hardware components.  Renovate, improve and upgrade school campus visitor check-in/check-out areas.  Upgrade school campus telephone and integrated emergency communication systems.  Improve and upgrade classroom and school campus fire alarm systems. 21st Century Learning and Instructional Technology 1:1 Program:  Upgrade and provide STEM labs.  Replace and upgrade teacher/student classroom technology systems.  Upgrade school campus technology infrastructure components.  Improve, upgrade and expand technology electrical systems.  Develop and implement a student technology devise upgrade and replacement program.
  • 68. Section 2: Page 48 Career Technical Education Facilities, School Building and Support Projects:  Renovate and reconstruct school classrooms for new culinary laboratories.  Develop facility designs for building conversions to support Career Technical Educational programs.  Develop flexible facility and classroom spaces needed for periodic future upgrades, expansions and changes needed Career Technical Education programs.  Development and implementation of integrated technology systems with high speed infrastructure components. Other School Facility and District-Wide Projects:  Replace classroom furniture and repaint campus facilities.  Renovate and improve multi-purpose room stage facilities and kitchen flooring.  Redesign front entrance of school campus.  Upgrade library, front office and lounge areas.  Replace classroom and campus flooring.  Improve, upgrade and construct new cafeteria facilities.  Improve, upgrade and install campus perimeter fencing.  Replace portable classrooms with permanent buildings.  Replace and upgrade campus drinking fountains and water bottle fill stations.  Improve and upgrade campus landscaping with water conservation/low maintenance systems.  Upgrade and expand student and staff restroom facilities.  Improving, repairing and upgrading school facilities roofs, walls, electrical, water, gas lines systems, and seismic/structural deficiencies.  Furnishing and equipping of facilities including necessary replacements, improvements and scheduled improvements of classrooms to meet ongoing safety, academic, and updated instructional technology standards. 1. Paramount HS - Senior Campus
  • 69. 2. Paramount HS - West Campus Section 2: Page 49 Street Address: 14708 Paramount Blvd. City Location: Paramount Year Completed/Age: 1933 – 83 Years Old School Site Size: 20.74 Acres Grade Levels: 9th Grade Campus
  • 70. Section 2: Page 50 School Safety, Security and Health Projects:  Increase parking spaces, improve traffic flow, and add parking striping/speed bumps.  Install and upgrade security cameras and exterior lighting systems.  Install and upgrade school window coverings.  Install classroom and school campus electronic entry systems.  Install panic gate hardware components.  Renovate, improve and upgrade school campus visitor check-in/check-out areas.  Upgrade school campus telephone and integrated emergency communication systems.  Improve and upgrade classroom and school campus fire alarm systems. 21st Century Learning and Instructional Technology 1:1 Program:  Upgrade and provide STEM labs.  Replace and upgrade teacher/student classroom technology systems.  Upgrade school campus technology infrastructure components.  Improve, upgrade and expand technology electrical systems.  Develop and implement a student technology devise upgrade and replacement program. 2. Paramount HS - West Campus
  • 71. Section 2: Page 51 Career Technical Education Facilities, School Building and Support Projects:  Develop facility designs for building conversions to support Career Technical Educational programs.  Develop flexible facility and classroom spaces needed for periodic future upgrades, expansions and changes needed Career Technical Education programs.  Development and implementation of integrated technology systems with high speed infrastructure components. Other School Facility and District-Wide Projects:  Replace classroom furniture and repaint campus facilities.  Renovate and improve multi-purpose room stage facilities and kitchen flooring.  Redesign front entrance of school campus.  Upgrade library, front office and lounge areas.  Replace classroom and campus flooring.  Improve, upgrade and construct new cafeteria facilities.  Improve, upgrade and install campus perimeter fencing.  Replace portable classrooms with permanent buildings.  Replace and upgrade campus drinking fountains and water bottle fill stations.  Improve and upgrade campus landscaping with water conservation/low maintenance systems.  Upgrade and expand student and staff restroom facilities.  Improving, repairing and upgrading school facilities roofs, walls, electrical, water, gas lines systems, and seismic/structural deficiencies.  Furnishing and equipping of facilities including necessary replacements, improvements and scheduled improvements of classrooms to meet ongoing safety, academic, and updated instructional technology standards. 2. Paramount HS - West Campus
  • 72. 3. Buena Vista Continuation High School Campus Section 2: Page 52 Street Address: 3717 Michelson Street City Location: Lakewood Year Completed/Age: 1983 – 33 Years Old School Site Size: 9.57 Acres Grade Levels: High School Continuation
  • 73. Section 2: Page 53 School Safety, Security and Health Projects:  Install and upgrade school window coverings.  Install classroom and school campus electronic entry systems.  Install panic gate hardware components.  Install security systems in student classroom areas.  Improve and upgrade classroom and school campus fire alarm systems. 21st Century Learning and Instructional Technology 1:1 Program:  Upgrade and provide STEM labs.  Replace and upgrade teacher/student classroom technology systems.  Upgrade school campus technology infrastructure components.  Improve, upgrade and expand technology electrical systems.  Develop and implement a student technology devise upgrade and replacement program. 3. Buena Vista Continuation High School Campus
  • 74. Section 2: Page 54 Career Technical Education Facilities, School Building and Support Projects:  Develop facility designs for building conversions to support Career Technical Educational programs.  Develop flexible facility and classroom spaces needed for periodic future upgrades, expansions and changes needed Career Technical Education programs.  Development and implementation of integrated technology systems with high speed infrastructure components. Other School Facility and District-Wide Projects:  Replace classroom furniture and repaint campus facilities.  Renovate and improve multi-purpose room stage facilities.  Replace classroom and campus flooring.  Improve and upgrade campus landscaping with water conservation/low maintenance systems.  Upgrade and expand student and staff restroom facilities.  Improving, repairing and upgrading school facilities roofs, walls, electrical, water, gas lines systems, and seismic/structural deficiencies.  Furnishing and equipping of facilities including necessary replacements, improvements and scheduled improvements of classrooms to meet ongoing safety, academic, and updated instructional technology standards. 3. Buena Vista Continuation High School Campus
  • 75. Other District-Wide Facilities Adult Education School Facilities 2016 School Facilities Needs Analyses School Campus Improvement and Upgrade Projects Summary District-Wide Support Facilities Community Day School Facilities
  • 76. 1. Adult Education School Facilities Section 2: Page 55 Street Address: 3701 Michelson Street City Location: Lakewood Year Completed/Age: 1995 – 21 Years Old School Site Size: Grade Levels: Independent Study Grades
  • 77. Section 2: Page 56 21st Century Learning and Instructional Technology 1:1 Program:  Replace and upgrade teacher/student classroom technology systems.  Upgrade school campus technology infrastructure components.  Improve, upgrade and expand technology electrical systems.  Develop and implement a student technology devise upgrade and replacement program. 1. Adult Education School Facilities School Safety, Security and Health Projects:  Increase parking spaces, improve traffic flow, and add parking striping/speed bumps.  Install and upgrade security cameras and exterior lighting systems.  Install and upgrade school window coverings.  Install classroom and school campus electronic entry systems.  Install panic gate hardware components.  Renovate, improve and upgrade school campus visitor check-in/check-out areas.  Improve and upgrade classroom and school campus fire alarm systems.
  • 78. Section 2: Page 57 Career Technical Education Facilities, School Building and Support Projects:  Development and implementation of integrated technology systems with high speed infrastructure components. 1. Adult Education School Facilities Other School Facility and District-Wide Projects:  Replace classroom furniture and repaint campus facilities.  Renovate and improve multi-purpose room stage facilities and kitchen flooring.  Redesign front entrance of school campus.  Replace classroom and campus flooring. Other School Facility and District-Wide Projects:  Upgrade and expand student and staff restroom facilities.  Replace portable classrooms with permanent buildings.  Improving, repairing and upgrading school facilities roofs, walls, electrical, water, gas lines systems, and seismic/structural deficiencies.  Furnishing and equipping of facilities including necessary replacements, improvements and scheduled improvements of classrooms to meet ongoing safety, academic, and updated instructional technology standards.
  • 79. 2. Community Day School Facilities Section 2: Page 58 Street Address: 14507 Paramount Blvd. City Location: Paramount Year Completed/Age: 1994 – 22 Years Old School Site Size: Grade Levels: Alternative Ed. Grades
  • 80. Section 2: Page 59 2. Community Day School Facilities School Safety, Security and Health Projects:  Install and upgrade security cameras and exterior lighting systems.  Install and upgrade school window coverings.  Install classroom and school campus electronic entry systems.  Install panic gate hardware components.  Improve and upgrade classroom and school campus fire alarm systems. 21st Century Learning and Instructional Technology 1:1 Program:  Replace and upgrade teacher/student classroom technology systems.  Upgrade school campus technology infrastructure components.  Improve, upgrade and expand technology electrical systems.  Develop and implement a student technology devise upgrade and replacement program. Other School Facility and District-Wide Projects:  Replace classroom furniture and repaint campus facilities.  Replace classroom and campus flooring.  Improve and upgrade campus landscaping with water conservation/low maintenance systems.  Upgrade and expand student and staff restroom facilities.  Improving, repairing and upgrading school facilities roofs, walls, electrical, water, gas lines systems, and seismic/structural deficiencies.  Furnishing and equipping of facilities including necessary replacements, improvements and scheduled improvements of classrooms to meet ongoing safety, academic, and updated instructional technology standards.
  • 81. 3. District-Wide Support Facilities Section 2: Page 60 Paramount Unified School District:  Operated as a unified school district since 1953 (K–12th Grade)  Provides instructional services to 15,864 students at nineteen (19) school locations, including:  One (1) K-8 school  Eleven (11) elementary schools  Four (4) middle schools  Two (2) high schools  One (1) Alternative Education Center
  • 82. Section 2: Page 61 Other School Facility and District-Wide Projects:  Replace support facilities flooring.  Upgrade and expand support facilities restroom facilities.  Improving, repairing and upgrading school facilities roofs, walls, electrical, water, gas lines systems, and seismic/structural deficiencies. 3. District-Wide Support Facilities School Safety, Security and Health Projects:  Increase parking spaces, improve traffic flow, and add parking striping/speed bumps.  Install and upgrade security cameras and exterior lighting systems.  Install classroom and school campus electronic entry systems.  Install panic gate hardware components.  Improve and upgrade classroom and school campus fire alarm systems. 21st Century Learning and Instructional Technology 1:1 Program:  Upgrade and provide STEM labs.  Replace and upgrade teacher/student classroom technology systems.  Upgrade school campus technology infrastructure components.  Improve, upgrade and expand technology electrical systems.  Develop and implement a student technology devise upgrade and replacement program.

Notes de l'éditeur

  1. , and