1. Piers
2. Pier head
3. Wharf
4. Jetty
5. Docks
6. Mooring Accessories
 Piers-
The structure which are built
perpendicular to the shore of a sea are known
as piers In the sea, the piers are constructed
where the sea is not deep and the natural
harbour is not convenient for allowing the ships
to berth adjacent to the shore. In many cases,
the piers are constructed with piles, columns
and braces leaving good space for the ocean
current to flow without causing any
obstruction.
 Pier heads-
A pier head is at the entrance to a harbour
and as it is expose on three sides, it is subject to
more shock than a breakwater.
 Wharf-
The landing places or platforms built near
shore for vessels to berth are known as
wharves. Thus, a wharf affords a working
platform alongside the ship in continuity of the
shore.
The level of wharf should be above the
high water level, but at the same time, it
should be economical to load the vessels when
the water level is low.
Wharf
 Jetties-
These are structure in the form of pilled
projections. They are built from the shore to
the deep water. They may be constructed in
the sea or in a navigable river.
In the sea, jetties are provided where
harbour entrance is affected by littoral drift or
the sea is shallow for a long distance. The
jetties extend from the shore to the deep sea
to receive the ship.
 Difference between wharf and jetty-
A started earlier, a jetty is a piled
projection from shore to deep water to berth
vessels along side. Some times a piled
projection parallel to the shore is called a wharf.
 Thus we may say that a jetty differs from a
wharf as follows:
a)The wharf is a berth parallel to the shore,
where as a jetty is perpendicular to the shore
or break water.
b)The wharf has berth on one side only as it has
a back fill of earth. A jetty may have berths on
two faces.
 Docks
1. Docks are enclosed areas for berthing the
ships to keep them afloat at a uniform level
to facilitate loading and unloading cargo.
2. A marine structure for berthing of vessels for
loading and unloading cargo and passengers.
3. Necessary for discharging of the cargo
4. As ships require a number of days for
discharging cargo, during which period they
need a uniform water level.
If ship is subjected to a vertical movement by
the tides, great inconvenience will be felt in
lifting the cargo from the ship and special
arrangement will be needed for lifting the
cargo.
 Docks can be classified into following two
categories:
 Wet docks.
 Dry docks.
Wet docks-
• Docks required for berthing of ships or vessels
to facilitate the loading and unloading of
passengers and cargo are called wet docks.
• These are also known as harbor docks.
 Dry docks
• The docks used for repairs of ships are known
as dry docks.
• It is long excavated chamber, having side walls,
a semi circular end wall and a floor.
• The open end of the chamber is provided with
a gate and acts as the entrance to the dock.
 Different Mooring Accessories-
Following are the accessories for a fixed type
mooring-
1. Mooring Port-
For bringing the ship in to the dock, corner
mooring ports are provided they are attached to
the corners of a pier or at the ends of a wharf.
2. Bollard-
These are the thick posts designed to take
up pulls up to 35 tonnes or 350KN. They may be
provided either by single bit or double bit.
3. Caspton-
It is an apparatus consisting of an up right
cylinder around which cables are wound either
by hand or machinery. These are helpful when
the rope lines to be handled are long and large.
Open Chock
Closed Chock
Berthing structures

Contenu connexe

Tendances

harbour and dock engineering ppt 01 introduction
harbour and dock engineering ppt 01 introductionharbour and dock engineering ppt 01 introduction
harbour and dock engineering ppt 01 introductionHasna Hassan
 
Classification of port and harbour ppt.pptx
Classification of port and harbour ppt.pptxClassification of port and harbour ppt.pptx
Classification of port and harbour ppt.pptxJAYA LAKSHMI ATHRAM
 
Harbours and docks
Harbours and docksHarbours and docks
Harbours and docksMHarishbabu
 
CHAPTER - 2. HARBOUR PLANNING.pptx
CHAPTER - 2. HARBOUR PLANNING.pptxCHAPTER - 2. HARBOUR PLANNING.pptx
CHAPTER - 2. HARBOUR PLANNING.pptxjaswanthyadav12
 
Docks, Harbour and Ports
Docks, Harbour and PortsDocks, Harbour and Ports
Docks, Harbour and PortsArbaz Kazi
 
Mooring accessories & Navigational aids
Mooring accessories & Navigational aidsMooring accessories & Navigational aids
Mooring accessories & Navigational aidsChockalingam T
 
Docks and their classification
Docks and their classificationDocks and their classification
Docks and their classificationLatif Hyder Wadho
 
H & d ppt 05 wet docks
H & d ppt 05 wet docksH & d ppt 05 wet docks
H & d ppt 05 wet docksHasna Hassan
 
Docks & harbors construction
Docks & harbors construction  Docks & harbors construction
Docks & harbors construction madhura92
 
Breakwater, jetties and groins.
Breakwater, jetties and groins.Breakwater, jetties and groins.
Breakwater, jetties and groins.Latif Hyder Wadho
 
H & d ppt 06 repair docks
H & d ppt 06 repair docksH & d ppt 06 repair docks
H & d ppt 06 repair docksHasna Hassan
 
Breakwaters and types
Breakwaters and types Breakwaters and types
Breakwaters and types M Aamer Raza
 
4. WATER TRANSPORTATION (TRE) GTU 3150611
4. WATER TRANSPORTATION (TRE) GTU 31506114. WATER TRANSPORTATION (TRE) GTU 3150611
4. WATER TRANSPORTATION (TRE) GTU 3150611VATSAL PATEL
 
H & d ppt 07 lock & lock gates
H & d ppt 07 lock & lock gatesH & d ppt 07 lock & lock gates
H & d ppt 07 lock & lock gatesHasna Hassan
 

Tendances (20)

Harbour
HarbourHarbour
Harbour
 
harbour and dock engineering ppt 01 introduction
harbour and dock engineering ppt 01 introductionharbour and dock engineering ppt 01 introduction
harbour and dock engineering ppt 01 introduction
 
HARBOUR ENGINEERING
HARBOUR ENGINEERING HARBOUR ENGINEERING
HARBOUR ENGINEERING
 
Classification of port and harbour ppt.pptx
Classification of port and harbour ppt.pptxClassification of port and harbour ppt.pptx
Classification of port and harbour ppt.pptx
 
Harbours and docks
Harbours and docksHarbours and docks
Harbours and docks
 
CHAPTER - 2. HARBOUR PLANNING.pptx
CHAPTER - 2. HARBOUR PLANNING.pptxCHAPTER - 2. HARBOUR PLANNING.pptx
CHAPTER - 2. HARBOUR PLANNING.pptx
 
Docks, Harbour and Ports
Docks, Harbour and PortsDocks, Harbour and Ports
Docks, Harbour and Ports
 
Mooring accessories & Navigational aids
Mooring accessories & Navigational aidsMooring accessories & Navigational aids
Mooring accessories & Navigational aids
 
Docks and their classification
Docks and their classificationDocks and their classification
Docks and their classification
 
H & d ppt 05 wet docks
H & d ppt 05 wet docksH & d ppt 05 wet docks
H & d ppt 05 wet docks
 
Docks & harbors construction
Docks & harbors construction  Docks & harbors construction
Docks & harbors construction
 
Breakwater, jetties and groins.
Breakwater, jetties and groins.Breakwater, jetties and groins.
Breakwater, jetties and groins.
 
H & d ppt 06 repair docks
H & d ppt 06 repair docksH & d ppt 06 repair docks
H & d ppt 06 repair docks
 
Breakwaters and types
Breakwaters and types Breakwaters and types
Breakwaters and types
 
HARBOURS ENGINEERING
HARBOURS ENGINEERING HARBOURS ENGINEERING
HARBOURS ENGINEERING
 
4. WATER TRANSPORTATION (TRE) GTU 3150611
4. WATER TRANSPORTATION (TRE) GTU 31506114. WATER TRANSPORTATION (TRE) GTU 3150611
4. WATER TRANSPORTATION (TRE) GTU 3150611
 
Docks and Harbors.pptx
Docks and Harbors.pptxDocks and Harbors.pptx
Docks and Harbors.pptx
 
Breakwaters
BreakwatersBreakwaters
Breakwaters
 
H & d ppt 07 lock & lock gates
H & d ppt 07 lock & lock gatesH & d ppt 07 lock & lock gates
H & d ppt 07 lock & lock gates
 
The Port Planning Process
The Port Planning ProcessThe Port Planning Process
The Port Planning Process
 

En vedette (9)

Port Development - a handbook for planners in developing countries
Port Development - a handbook for planners in developing countries Port Development - a handbook for planners in developing countries
Port Development - a handbook for planners in developing countries
 
Design of Rubble Mound Seawall
Design of Rubble Mound SeawallDesign of Rubble Mound Seawall
Design of Rubble Mound Seawall
 
Port Planning Pricing Tariff
Port Planning  Pricing TariffPort Planning  Pricing Tariff
Port Planning Pricing Tariff
 
Significant Guidance for Design and Construction of Marine and Offshore Struc...
Significant Guidance for Design and Construction of Marine and Offshore Struc...Significant Guidance for Design and Construction of Marine and Offshore Struc...
Significant Guidance for Design and Construction of Marine and Offshore Struc...
 
Breakwaters
BreakwatersBreakwaters
Breakwaters
 
Spillways
SpillwaysSpillways
Spillways
 
Spillways and Flood Control Works
Spillways and Flood Control WorksSpillways and Flood Control Works
Spillways and Flood Control Works
 
Coastal zone management
Coastal zone managementCoastal zone management
Coastal zone management
 
Port operations & management slideshow
Port operations & management slideshowPort operations & management slideshow
Port operations & management slideshow
 

Similaire à Berthing structures

Presentation (1).pptx
Presentation (1).pptxPresentation (1).pptx
Presentation (1).pptxManaliGujar1
 
harbour-160808044336.ppt
harbour-160808044336.pptharbour-160808044336.ppt
harbour-160808044336.pptRishi Nath
 
Harbour 160808044336 (1)
Harbour 160808044336 (1)Harbour 160808044336 (1)
Harbour 160808044336 (1)ArunKumar7403
 
195925358-Harbour-and-Jetty-Structures (1).ppt
195925358-Harbour-and-Jetty-Structures (1).ppt195925358-Harbour-and-Jetty-Structures (1).ppt
195925358-Harbour-and-Jetty-Structures (1).pptMridulHasan15
 
Ports&harbor, some of its parts and modern facilities
Ports&harbor, some of its parts and modern facilitiesPorts&harbor, some of its parts and modern facilities
Ports&harbor, some of its parts and modern facilitiesKristel Rejean Ramos
 
Marine civil engineering and Gujarat
Marine civil engineering and GujaratMarine civil engineering and Gujarat
Marine civil engineering and Gujaratadhyaru19
 
Harbor_Classification 27.11.2022.docx
Harbor_Classification 27.11.2022.docxHarbor_Classification 27.11.2022.docx
Harbor_Classification 27.11.2022.docxgksaha2007
 
Nautical and engineering terms and concepts .pptx
Nautical and engineering terms and concepts .pptxNautical and engineering terms and concepts .pptx
Nautical and engineering terms and concepts .pptxdevmarineacademy
 
Jsas 002 04_01_sadeghi
Jsas 002 04_01_sadeghiJsas 002 04_01_sadeghi
Jsas 002 04_01_sadeghiKabir Sadeghi
 
An Overview of Design, Analysis, Construction and Installation of Offshore Pe...
An Overview of Design, Analysis, Construction and Installation of Offshore Pe...An Overview of Design, Analysis, Construction and Installation of Offshore Pe...
An Overview of Design, Analysis, Construction and Installation of Offshore Pe...Professor Kabir Sadeghi
 
Horbour & Dock Engineerin
Horbour & Dock EngineerinHorbour & Dock Engineerin
Horbour & Dock Engineerinjamalkhan619
 

Similaire à Berthing structures (20)

Presentation (1).pptx
Presentation (1).pptxPresentation (1).pptx
Presentation (1).pptx
 
harbour-160808044336.ppt
harbour-160808044336.pptharbour-160808044336.ppt
harbour-160808044336.ppt
 
project
projectproject
project
 
Harbour 160808044336 (1)
Harbour 160808044336 (1)Harbour 160808044336 (1)
Harbour 160808044336 (1)
 
195925358-Harbour-and-Jetty-Structures (1).ppt
195925358-Harbour-and-Jetty-Structures (1).ppt195925358-Harbour-and-Jetty-Structures (1).ppt
195925358-Harbour-and-Jetty-Structures (1).ppt
 
Ports&harbor, some of its parts and modern facilities
Ports&harbor, some of its parts and modern facilitiesPorts&harbor, some of its parts and modern facilities
Ports&harbor, some of its parts and modern facilities
 
Marine civil engineering and Gujarat
Marine civil engineering and GujaratMarine civil engineering and Gujarat
Marine civil engineering and Gujarat
 
Harbor_Classification 27.11.2022.docx
Harbor_Classification 27.11.2022.docxHarbor_Classification 27.11.2022.docx
Harbor_Classification 27.11.2022.docx
 
Nautical and engineering terms and concepts .pptx
Nautical and engineering terms and concepts .pptxNautical and engineering terms and concepts .pptx
Nautical and engineering terms and concepts .pptx
 
Waterways
WaterwaysWaterways
Waterways
 
Internship Report
Internship ReportInternship Report
Internship Report
 
Unit 1
Unit 1Unit 1
Unit 1
 
Sadeghi
SadeghiSadeghi
Sadeghi
 
Jsas 002 04_01_sadeghi
Jsas 002 04_01_sadeghiJsas 002 04_01_sadeghi
Jsas 002 04_01_sadeghi
 
Habour and dock engineering
Habour and dock engineeringHabour and dock engineering
Habour and dock engineering
 
An Overview of Design, Analysis, Construction and Installation of Offshore Pe...
An Overview of Design, Analysis, Construction and Installation of Offshore Pe...An Overview of Design, Analysis, Construction and Installation of Offshore Pe...
An Overview of Design, Analysis, Construction and Installation of Offshore Pe...
 
M3_IE_D&HE.pdf
M3_IE_D&HE.pdfM3_IE_D&HE.pdf
M3_IE_D&HE.pdf
 
Horbour & Dock Engineerin
Horbour & Dock EngineerinHorbour & Dock Engineerin
Horbour & Dock Engineerin
 
harbor types and site selection
harbor types and site selectionharbor types and site selection
harbor types and site selection
 
Offshore_Technology.pptx
Offshore_Technology.pptxOffshore_Technology.pptx
Offshore_Technology.pptx
 

Plus de Er Ajay Makwana

Plus de Er Ajay Makwana (7)

Traffic Engineering
Traffic EngineeringTraffic Engineering
Traffic Engineering
 
Types of valves
Types of valvesTypes of valves
Types of valves
 
Street furniture
Street furnitureStreet furniture
Street furniture
 
Organisation IN CPM
Organisation IN CPMOrganisation IN CPM
Organisation IN CPM
 
Formwok
FormwokFormwok
Formwok
 
Contributer personality program
Contributer personality programContributer personality program
Contributer personality program
 
Widening of curve
Widening of curveWidening of curve
Widening of curve
 

Dernier

Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating SystemRashmi Bhat
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...
NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...
NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...Amil Baba Dawood bangali
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptNarmatha D
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Industrial Safety Unit-I SAFETY TERMINOLOGIES
Industrial Safety Unit-I SAFETY TERMINOLOGIESIndustrial Safety Unit-I SAFETY TERMINOLOGIES
Industrial Safety Unit-I SAFETY TERMINOLOGIESNarmatha D
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm Systemirfanmechengr
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgsaravananr517913
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptMadan Karki
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadaditya806802
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 
The SRE Report 2024 - Great Findings for the teams
The SRE Report 2024 - Great Findings for the teamsThe SRE Report 2024 - Great Findings for the teams
The SRE Report 2024 - Great Findings for the teamsDILIPKUMARMONDAL6
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingBootNeck1
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating SystemRashmi Bhat
 

Dernier (20)

Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating System
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...
NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...
NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.ppt
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Industrial Safety Unit-I SAFETY TERMINOLOGIES
Industrial Safety Unit-I SAFETY TERMINOLOGIESIndustrial Safety Unit-I SAFETY TERMINOLOGIES
Industrial Safety Unit-I SAFETY TERMINOLOGIES
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm System
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.ppt
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasad
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 
The SRE Report 2024 - Great Findings for the teams
The SRE Report 2024 - Great Findings for the teamsThe SRE Report 2024 - Great Findings for the teams
The SRE Report 2024 - Great Findings for the teams
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event Scheduling
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating System
 

Berthing structures

  • 2.  Berthing Structures- 1. Piers 2. Pier head 3. Wharf 4. Jetty 5. Docks 6. Mooring Accessories
  • 3.  Piers- The structure which are built perpendicular to the shore of a sea are known as piers In the sea, the piers are constructed where the sea is not deep and the natural harbour is not convenient for allowing the ships to berth adjacent to the shore. In many cases, the piers are constructed with piles, columns and braces leaving good space for the ocean current to flow without causing any obstruction.
  • 4.
  • 5.  Pier heads- A pier head is at the entrance to a harbour and as it is expose on three sides, it is subject to more shock than a breakwater.
  • 6.  Wharf- The landing places or platforms built near shore for vessels to berth are known as wharves. Thus, a wharf affords a working platform alongside the ship in continuity of the shore. The level of wharf should be above the high water level, but at the same time, it should be economical to load the vessels when the water level is low.
  • 8.  Jetties- These are structure in the form of pilled projections. They are built from the shore to the deep water. They may be constructed in the sea or in a navigable river. In the sea, jetties are provided where harbour entrance is affected by littoral drift or the sea is shallow for a long distance. The jetties extend from the shore to the deep sea to receive the ship.
  • 9.
  • 10.  Difference between wharf and jetty- A started earlier, a jetty is a piled projection from shore to deep water to berth vessels along side. Some times a piled projection parallel to the shore is called a wharf.  Thus we may say that a jetty differs from a wharf as follows: a)The wharf is a berth parallel to the shore, where as a jetty is perpendicular to the shore or break water. b)The wharf has berth on one side only as it has a back fill of earth. A jetty may have berths on two faces.
  • 11.  Docks 1. Docks are enclosed areas for berthing the ships to keep them afloat at a uniform level to facilitate loading and unloading cargo. 2. A marine structure for berthing of vessels for loading and unloading cargo and passengers. 3. Necessary for discharging of the cargo 4. As ships require a number of days for discharging cargo, during which period they need a uniform water level.
  • 12. If ship is subjected to a vertical movement by the tides, great inconvenience will be felt in lifting the cargo from the ship and special arrangement will be needed for lifting the cargo.  Docks can be classified into following two categories:  Wet docks.  Dry docks.
  • 13. Wet docks- • Docks required for berthing of ships or vessels to facilitate the loading and unloading of passengers and cargo are called wet docks. • These are also known as harbor docks.
  • 14.
  • 15.  Dry docks • The docks used for repairs of ships are known as dry docks. • It is long excavated chamber, having side walls, a semi circular end wall and a floor. • The open end of the chamber is provided with a gate and acts as the entrance to the dock.
  • 16.
  • 17.  Different Mooring Accessories- Following are the accessories for a fixed type mooring- 1. Mooring Port- For bringing the ship in to the dock, corner mooring ports are provided they are attached to the corners of a pier or at the ends of a wharf.
  • 18. 2. Bollard- These are the thick posts designed to take up pulls up to 35 tonnes or 350KN. They may be provided either by single bit or double bit.
  • 19. 3. Caspton- It is an apparatus consisting of an up right cylinder around which cables are wound either by hand or machinery. These are helpful when the rope lines to be handled are long and large.