AGENDA/OBJECTIVES
Learning Objectives:
 Gain a general overview of Change Management objectives and best practices;
 Develop a preliminary understanding of potential change management tools and
frameworks to apply on a consulting project.
Agenda:
 The need for Change Management;
 Generic Overview of Change Management Techniques;
 Change Management Tools and Links;
 Wrap-Up/Questions
1
CHANGE MANAGEMENT
“BURNING PLATFORM”
2
3
CHANGE MANAGEMENT – INTRODUCTION
• Defining and instilling new values, attitudes, norms, and behaviors within an organization that support new ways of
doing work and overcome resistance to change;
• Building consensus among customers and stakeholders on specific changes designed to better meet their needs;
• Planning, testing, and implementing all aspects of the transition from one organizational structure or business
process to another.
While change management can be defined in many different ways, the key
elements will always tend to include the following responsibilities…
* From Business Process Re-engineering Glossary
• At its core, change management is about anticipating and preparing for the ripple effects that any significant
change will have across the organization…
Project Team
Change
Sponsoring Organization
Organization at large
CHANGE MANAGEMENT – WHY IT’S NEEDED
As organizations
continue to change
with increasing speed
and regularity,
professional change
management becomes
ever more important..
PROJECT FAILURE RATES:
 Only 20 to 30% of all reengineering projects succeed1
 Just 43% of quality-improvement efforts make satisfactory
progress2
 9% of all major software development applications in large
organizations are worth the cost. 31% get cancelled before
completion. 53 percent will result in cost overruns by 189%3
Poorly managed change
management is often
cited as a key driver of
project failure…
References:
(1) Hal Lancaster. "Reengineering Authors Reconsider Reengineering." Interview with Michael Hammer and James Champy. The Wall Street Journal. January 17, 1995.
(2) Linda Moran, Jerry Hogeveen, Jan Latham, and Darlene Russ-Eft. Winning Competitive Advantage. Zenger Miller. 1994.
(3) Jim Johnson. "Chaos: The Dollar Drain of IT Failures." Application Development Trends. January, 1995. 3
Change Management is increasingly regarded as a critical success factor,
with numerous executives and project leaders now working to incorporate
proven best practices into their project management methodologies.
HOW BIG IS CHANGE MANAGEMENT?
4
CHANGE MANAGEMENT FRAMEWORK
5
Initial Scoping/ Planning Drive Change Post-Change Monitoring
Complete
Impact
Assessment
Establish
Governance
Structure
Define
Change
Network
Develop
Change Plan
Develop
Marketing/
Communications
Plan
Execute
Marketing Communications
Strategy
Measure
on-going
progress/
ownership
Facilitate
Management
Forums
Establish
Change
Network
Assess
Compliance
Confirm
Impacts
CHANGE
DELIVERED
Identify
Stakeholder
Requirements
KEY CHANGE MANAGEMENT ACTIVITIES
In order to successfully manage a complex change, there are a number of
key tactics to apply, depending on the project phase and requirements.
Surface/
Address Areas
of Resistance
Execute
Rollout
Execute
Organization
Change
Update Impact
assessment
(as necessary)
Update
Business
Case
6
CASE STUDY OVERVIEW
Case Study #1 – eGL LSS Case Studies
Case Study
Background
Throughout 2002-2003, RBCFG elected
to implement a PeopleSoft General
Ledger system – impacting:
- over 40 existing GL’s,
- 246 legal entities,
- 34 implementation sites,
- 55 geographical jurisdictions
- 2800 users
An LSS project that introduced and
implemented technology and
process changes to processing client
transactions – impacting:
- approx. 1000 branches
- approx. 2900 branch users
- approx. 700,000 transactions per
annum
- 4 customer segments
INITIAL SCOPING/PLANNING
The first step is to ensure that all key stakeholders are driving
towards the same “ideal state.”
Current State
ORG
PROCESS
TECH
Ideal State
ORG
PROCESS
TECH
Change Project
•Process reduction
•Org/FTE reduction
•New Technology Add
Initial Scoping/ Planning Drive Change Post-Change Monitoring
CHANGE
DELIVERED
Complete
Impact
Assessment
 At this early stage, the picture will be
somewhat unclear, but an attempt should still
be made to at least capture preliminary
thinking.
 A constant distinction needs to be made
between the project work and the end-
state in order to ensure that there is
appropriate focus on where you’re going
rather than just the journey…
Tools /Techniques:
IMPACT ASSESSMENT
Complete
Impact
Assessment
As Ideal State and project goals become further defined, a
preliminary impact assessment can be crafted.
Project Related Questions:
 What resources will we need for the project team? What will their commitment need to be?
 What levels of participation will be required from the rest of the sponsoring organization?
 How will we introduce the project, who will deliver messages?
Project Impact Related Questions:
 How broad is this change we’re potentially delivering?
 What associated business processes could be impacted?
 How will staff be impacted? How might the organization structure, reporting relationships etc. be changed?
 What new skills may be required?
 How might the technology infrastructure (applications, data, hardware etc.) be impacted?
 What impact might there be to customers, shareholders, suppliers, competitors etc.?
Initial Scoping/ Planning Drive Change Post-Change Monitoring
CHANGE
DELIVERED
Tools /Techniques:
As the result of the initial impact assessment, a high-level “heat-
map” can be created – documenting where in the organization
the potential impacts would be most dramatically felt.
ABC
CP&B US&I Cap
Mkts
GTO Funcs
ABC
ABC
ABC
ABC
ABC
ABC
ABC
ABC
ABC
ABC
ABC
ABC
ABC
ABC
Project
Initiator
Legend:
No Impact
Little/Unknown Impact
Potentially Significant Impact
Impact Heat-Map
CP&B US &
Intl
Cap
Mkts
GTO
Internal Business Processes to be
developed
H M L H
Organizational Structure
to be impacted
H M L H
# FTE’s to be reduced H M L H
New Skills H M L H
Technology Infrastructure H M L H
External Customer Impacts H M L H
Shareholder Impacts H M L H
Supplier Impacts H M L H
Competitor Impacts H M L H
Impact Assessment Tracking
Complete
Impact
Assessment
Initial Scoping/ Planning Drive Change Post-Change Monitoring
CHANGE
DELIVERED
IMPACT ASSESSMENT
Tools /Techniques:
Along with the change management implications of your own
project, you’ll need to take into account other projects as well
and pro-actively manage any potential conflicts that could put
your success or timelines at risk.
CP&B US&I Cap
Mkts
GTO Funcs
ABC
ABC
ABC
ABC
ABC
ABC
ABC
ABC
ABC
ABC
ABC
ABC
Complete
Impact
Assessment
What other
projects could
be impacting
this group?
When will the other project be
impacting the group?
What will the
risks be to our
project?
How will we
mitigate the
risks?
Mammoth IT
implementation
Type Date High – with
these job
changes, the
training
requirements
may need to be
revised
• Involve
project lead
on our
Advisory
Group
• Exchange
project
plans/project
updates.
Introduction
Training
Implementation
Job Changes
05/06
04/06
07/06
08/06 – 12/06
Regulatory
Compliance
(SOX)
Inter-Dependent Project Identification:
Initial Scoping/ Planning Drive Change Post-Change Monitoring
CHANGE
DELIVERED
Project B
Project A
Inter-Dependent Project Management:
IMPACT ASSESSMENT
Tools /Techniques:
Project
Outcome
Change
Implications
Who will be
Impacted
What will the
Likely Impact
Be
Degree of Impact/
Opportunity
(Low-Med-High)
Stakeholder
Engagement
Required
Financial Close
Process
Reduced by 1
day a month
Data made
available one day
earlier than
before
Receivers of the
data – CAD,
Statutory and
Regulatory
Reporting
Could enable
receiving groups
to move up their
calendar by 1 day
Medium Will keep CAD
and reporting
informed, but
leave it up to
them to change
their process.
FTE costs will be
reduced
Financial Ops
teams in all
locations
Could reduce
head-count
requirements
Could free-up
time for other
tasks
High (Removing
one day of close
process will mean a
savings of ~400
manhours)
Will need active
participation
from Finance
Ops managers
to determine
whether
workforce cuts
are possible
Initial Scoping/ Planning Drive Change Post-Change Monitoring
CHANGE
DELIVERED
Impact Assessment /Stakeholder Map
IMPACT ASSESSMENT
From an understanding of the project impacts, the initial
stakeholder requirements can be derived.
Complete
Impact
Assessment
Tools /Techniques:
13
STAKEHOLDER REQUIREMENTS
Where do we need to get Information
From?
When do we need the input? How will gather the input?
Central Finance Representatives Prior Global Design Surveys
BU Finance Prior to Global Design Surveys
External Regulators As the regulations become
updated
Through regulatory officers
Who do we need to Get
Approvals from:
When do we need it? How will we get it? Is there likely to be
resistance?
Department Leaders with
Impacted staff
At launch of the project Have X. Executive introduce the concept and
ask?
YES
Human Resources At launch of the project Work with Y executive to ask No
A stakeholder management approach can be developed to
ensure everyone is as engaged as required.
Who do we need to Keep in
the Loop
What will they be
interested in?
How often will we communicate? What channels will we use?
External Relations Anything impacting the
customers
As needed YES
Finance Executives (J. Brown) The success of the LSS
project
Monthly 1:1 meetings with Sponsor
Establish
Stakeholder
Reqts
Stakeholder Management Approach
Initial Scoping/ Planning Drive Change Post-Change Monitoring
CHANGE
DELIVERED
Tools /Techniques:
GOVERNANCE STRUCTURE
As stakeholders are identified, an initial governance structure
can be put in place to ensure effective oversight, issue
escalation and decision making.
Decision-Making Bodies:
•Project Management Office
•Business Case Managers
Sponsors/
Champions
Representatives of those
areas from whom you’ll
require something and
may eventually need their
buy-in
Establish
Governance
Structure
Standard Governance Model
Initial Scoping/ Planning Drive Change Post-Change Monitoring
CHANGE
DELIVERED
PROJECT TEAM MEMBERS
• GCS Staff
• Business Area Staff
Team Leads
• Executive Boards
• Steering Committees
Potential Additions if project
size/complexity/contentiousness warrants expansion
Administrative Bodies
•Subject Matter Experts
•Pilot Participants
User Representatives
“Advisory” Groups:
Human Resources
Regulatory Affairs
Interested Parties
 Depending on the size, complexity or contentiousness of the
project, the governance model can be simple or complex:
Tools /Techniques:
GOVERNANCE STRUCTURE
Working Groups Examples Advisory Functions Examples
Sponsors Project
Management
Office
Steering
Committee
Impact Advisory
Office
Business
Advisory Board
Interest Groups
Member
requirements
VP Level Project Managers Supporting Project
Executives
Director Level from
key functional
areas
Director level
from key
customer areas
None – open to
anyone
Mandate  Provide
Executive
Oversight
 Report
progress/issues
to Group
Executive
 Day-to-day
management of
budget, workplan,
resources and
schedule.
 Ensure project
is proceeding
according to
sponsor
expectations,
Manage
Finances
 Provide on-going
assessment of
related impacts
to IT, Process,
Audit Functions
 Provide
customer
input
 Bring up
issues/concer
ns from the
field
 Keep informed
Frequency of
Meeting/Time
Commitment
2 hours a month Full-time Weekly Quarterly Updates ½ a month Quarterly
Channels 1-on-1 meetings NA B. Hamilton Facilitated
Sessions
Facilitated
Sessions
Lunch and Learns
Managed
(agendas,
facilitation etc.)
n/A Self-Managed P. Lead A. Facilitator A. Facilitator
Establishing the precise mandates of each of the groups within the
governance structure will help ensure that members understand
their accountability and levels of decision-making authority.
Establish
Governance
Structure
Mandate Definition
Initial Scoping/ Planning Drive Change Post-Change Monitoring
CHANGE
DELIVERED
Tools /Techniques:
CHANGE PLAN
Dec Jan Feb Apr May Jun Jul
Process
Redesign
Process Redesign
Process Review and Approval
HEADCOUNT FTE requirements Re-
Assessment
Personnel Transition Plan
Resource Redeployment
TRAINING Training Needs Assessed
Training Materials Developed
Training Delivery
ROLL-OUT
READINESS
Technology Infrastructure
Updated
Passwords / Security in place
As the project work proceeds, key change elements, (training,
employee transitioning, technology changes etc.) need to be
scheduled , planned for and tracked.
Develop
Change Plan
Sample Change Plan
Initial Scoping/ Planning Drive Change Post-Change Monitoring
CHANGE
DELIVERED
Project Plan:
Change Readiness Plan:
Tools /Techniques:
CHANGE NETWORK
 Provide project oversight
 Assign resources
 Make Decisions
 Resolve Disputes
Champions:
Impacted Personnel:
Team Leads:
• Can provide input on design or
risks
• Can act as a communication
lead for their area cascading
messages down or up as
needed
• Can become trainer or owner
for new processes, systems
- Those employees who
will in some way feel the
change.
Define
Change
Network
Establishing a change network ensures change agents are in
place, know their role, that messages are appropriately cascaded
down throughout the organization, and end-user input
appropriately collected.
Change Network Diagram
Initial Scoping/ Planning Drive Change Post-Change Monitoring
CHANGE
DELIVERED
GL FUNCTIONS (KWAN)
Financial Operations (BURROWS)
IT IMPLEMENTATION (J. Smith)
CHANGE NETWORK
GL Management Reconciliation Reporting
15 16 8Total
Personnel
Areas:
J. Blow Jane Doe Mr. XRepresented
by:
EGL BPRS
J. Jones M. Smith
6
4
GL FUNCTIONS (KWAN)
Financial Operations (BURROWS)
CHANGE NETWORK
GL Management Reconciliation Reporting
15 16 8Total
Personnel
Areas:
J. Blow Jane Doe Mr. XRepresented
by:
EGL BPRS
J. Jones M. Smith
6
4
“Change
Agents”
can be
found at
all levels
Tools /Techniques:
COMMUNICATIONS AND MARKETING PLAN
WHO do we
need to talk to ?
WHAT do we
need to tell
them (key
messages)
WHAT do we
need them to do
with the
information?
HOW will we deliver the messages
Channels (e-
mails, in-
person,
meetings etc.)
Who
Prepares
Who delivers? How
Frequent
?
An effective communications plan needs to start with a
definition of the actions we need people to take, and later
focuses on the tactics to deliver the required messages.
Marketing
& Comms
Plan
Stakeholder Management
AUDIENCE
SEGMENTATION
REQUIREMENTS CHANNELS
All Finance Understand what we’re
doing there…
Mass email sent from Scott
Burrows
Finance Process Owners Be prepared for the
upcoming interviews
Initial Scoping/ Planning Drive Change Post-Change Monitoring
CHANGE
DELIVERED
Tools /Techniques:
19
DRIVING CHANGE THROUGHOUT THE PROJECT
Drive Change
Execute
Marketing Communications
Strategy
Measure
on-going
progress/
ownership
Facilitate
Management
Forums
Establish
Change
Network
Surface/
Address Areas
of Resistance
Execute
Organization
Change
Update Impact
assessment
(as necessary) With appropriate planning in place,
success will then rely upon effective
execution and monitoring of the
agreed upon plans.
Initial Scoping/ Planning Drive Change Post-Change Monitoring
FACILITATE MANAGEMENT FORUMS
Ensure that all working and executive groups have all the
information they need in the format and frequency they need it
- to enable them to recognize issues, and continue to fulfill their
change agent roles effectively.
Facilitate
Management
Forums
Comments
Scope
Budget
Schedule
Management Forums
Progress
Against Key
Milestones
Decisions to be made?
Key Issues
•Frequency/Timeline
•Who prepares
•Who delivers
•Audience
• Determine what to report on
Initial Scoping/ Planning Drive Change Post-Change Monitoring
• Determine who to report to
• Determine how the reporting will be managed
Tools /Techniques:
UPDATE IMPACT ASSESSMENT
As a project progresses, it is important to revise or validate the
initial impact assessment at pre-defined check-points to ensure
that expectations are being properly managed.
Update
Impact
Assessment
May June July Aug Sept
Project
Start
Impact
Update
Check-Point
Impact
Update
Check-Point
ABC
CP&B US&I Cap
Mkts
GTO Funcs
ABC
ABC
ABC
ABC
ABC
ABC
ABC
ABC
ABC
ABC
ABC
ABC
ABC
ABC
Project
Initiates
High – with
these job
changes, the
training
requirements
may need to be
revised
What will the
risks be to our
project?
• Involve
project lead
on our
Advisory
Group
• Exchange
project
plans/project
updates.
How will we
mitigate the
risks?
Regulatory
Compliance
(SOX
DateType
Mammoth IT
implementation
05/06
04/06
07/06
08/06 – 12/06
Introduction
Training
Implementation
Job Changes
When will the other project be
impacting the group?
What other
projects could
be impacting
this group?
High – with
these job
changes, the
training
requirements
may need to be
revised
What will the
risks be to our
project?
• Involve
project lead
on our
Advisory
Group
• Exchange
project
plans/project
updates.
How will we
mitigate the
risks?
Regulatory
Compliance
(SOX
DateType
Mammoth IT
implementation
05/06
04/06
07/06
08/06 – 12/06
Introduction
Training
Implementation
Job Changes
When will the other project be
impacting the group?
What other
projects could
be impacting
this group?
“Heat Map” “Inter-dependent
Project List”
Passwords / Security in place
Technology Infrastructure UpdatedROLL-OUT
READINESS
Training Delivery
Change Plan
Aug
TRAINING
HEADCOUNT
Process Redesign
JunMayDecNo FebJan AprMar Jul
Training Materials Developed
Training Needs Assessed
Resource Redeployment
Personnel Transition Plan
FTE requirements Re-Assessment
Process Review and Approval
Process Redesign
SE
PT
Passwords / Security in place
Technology Infrastructure UpdatedROLL-OUT
READINESS
Training Delivery
Change Plan
Aug
TRAINING
HEADCOUNT
Process Redesign
JunMayDecNo FebJan AprMar Jul
Training Materials Developed
Training Needs Assessed
Resource Redeployment
Personnel Transition Plan
FTE requirements Re-Assessment
Process Review and Approval
Process Redesign
SE
PT
“Change Plan”
Change Network Diagram
GL FUNCTIONS (KWAN)
Financial Operations (BURROWS)
IT IMPLEMENTATION (J. Smith)
CHANGE NETWORK
GL Management Reconciliation Reporting
15 16 8Total
Areas:
J. Blow Jane Doe Mr. XRepresented
by:
EGL BPRS
J. Jones M. Smith
6
4
GL FUNCTIONS (KWAN)
Financial Operations (BURROWS)
IT IMPLEMENTATION (J. Smith)
CHANGE NETWORK
GL Management Reconciliation Reporting
15 16 8Total
Areas:
J. Blow Jane Doe Mr. XRepresented
by:
EGL BPRS
J. Jones M. Smith
6
4
“Change Network
Initial Scoping/ Planning Drive Change Post-Change Monitoring
• Depending on the length of the project, one or more check-points should be
planned for, with interim check-ins if circumstances warrant it.
Tools /Techniques:
MEASURE ON-GOING OWNERSHIP/BUY-IN
At key stages within a long implementation, or at points of
sponsor or organizational change, it is critical to re-affirm the
required buy-in is in place.
Measure
On-going
Ownership/
Buy-In
Who do we need
to Get Approvals
from:
When do we
need it?
How will we get it? Is there likely to
be resistance?
Department
Leaders with
Impacted staff
At launch of the
project
Have X. Executive introduce
the concept and ask?
YES
Human
Resources
At launch of
the project
Work with Y executive to
ask
No
Who do we
need to Keep
in the Loop
What will
they be
interested
in?
How often will we
communicate?
What
channels will
we use?
External
Relations
Anything
impacting the
customers
As needed YES
Finance
Executives (J.
Fukakusa
The success
of the LSS
project
Monthly 1:1 meetings
with Sponsor
Project Introduction:
• Objectives
• Budget
• Schedule
• Change Assessment
Current Status:
• Earned Value
• Issues
• Pockets of Resistance
Governance Model Update
• Current Roles
• Validation of the role the new
sponsor needs to/wants to
play
Update Stakeholder Analysis New Sponsor Update Structure
Initial Scoping/ Planning Drive Change Post-Change Monitoring
Tools /Techniques:
DEALING WITH AREAS OF RESISTANCE
Although successful change management is focused on
avoiding resistance , there is a likelihood of issues coming up –
leading to a limited number of options open to a project team.
Address
Areas of
Resistance
Confirm
impact of
resistance
Eliminate any
misunderstanding
through clear
communications
• Impacts?
• Readiness?
• Budget?
• Personal
Power?
Clarify the factors driving
the concern
Determine
whether
overcoming
the resistance
is critical to the
success of the
project or just
nice to have.
Use sponsors or
other supporters
to influence
change of heart
• Outline criticality of change to the
organization
• Outline the consequences if change doesn’t
go through
Cancel
project
• Cease operations
• Communicate to all relevant parties that the
project has ceased due to resistance from…etc
• Make change at a later date?
• Sequence the change to mitigate risk?
• Develop/escalate training?
• Add resources from project team?
• Move budget from other areas?
Consider what
options you might
offer to alleviate
the resistance
Negotiate?
Influence?
Use command and
control hierarchy
to order change
to be delivered.
• Leverage sponsors or other senior supporters
to end debate, forcibly remove resistance to
enable the project to move forward.
Order?
Give Up?
Initial Scoping/ Planning Drive Change Post-Change Monitoring
Tools /Techniques:
ESTABLISH CHANGE NETWORK
Establish
Change
Network
CHANGE NETWORK
APPROACH:
 Start with identifying, confirming the end-users to be
impacted by the change.
 Segment the users by level of impact, type of change
required etc.
 Define mandate for user representative:
 Communications? (upwards or downwards)
 Training?
 Impact assessment?
 Other?
 Develop selection criteria for change representative
 Select representatives
 Implement network as necessary:
 Train the trainer
 Communication channels
Leveraging a “change network” enables messages,
training and other change support tactics to be effectively
communicated in all directions throughout an
organization.
Initial Scoping/ Planning Drive Change Post-Change Monitoring
15 16 8Total
Areas:
J. Blow Jane Doe Mr. XRepresented
by:
EGL BPRS
J. Jones M. Smith
6
4
Mgmt REC. REP
15 16 8Total
Areas:
J. Blow Jane Doe Mr. XRepresented
by:
EGL BPRS
J. Jones M. Smith
6
4
Tools /Techniques:
EXECUTE MARKETING / COMMUNICATIONS STRATEGY
As outlined in the marketing/communications plans, execute
the tactics, confirm whether the messages are being received
and acted upon, and update/amend as necessary.
Execute
Mktg/Comms
Strategy
Maintain a regular communication schedule, with an increasing volume as change deployment becomes more imminent.
Jan Feb Mar Apr May June
Change
Implementation
•Executive Memos
•Newsletters
•Off-Site Mtgs
x x x x x
x x x x x
xx x x
Starting
Point Baseline Jan
Post Communications:
Mar Jun
•Knowledge of upcoming change
•Understanding of new role
•Signed-up for training
L
L
L
H
H
H
M
L
M
M
L
L
Initial Scoping/ Planning Drive Change Post-Change Monitoring
Track communications effectiveness and variance from initial baseline.
COMMUNICATION SCHEDULE:
COMMUNICATION TRACKING:
Big Bang: to
EXECUTE ORGANIZATION CHANGE
After all required preparation work has been completed, and
testing has yielded the expected results, the change itself has
to be executed, and the switch from “old” to “new” completed.
Execute
Organization
Change
LAUNCH
New Organization/
Process / Technology
Existing Organization/
Process / Technology
Parallel
Run: to
Sequenced
Change:
Business
Customer
Marketing
Processes
Risk
Initial Scoping/ Planning Drive Change Post-Change Monitoring
Technical
Systems
Access
TESTING
Go/No-Go
Decision
DEPLOYMENT/
WARRANTY
or
or
?Others:
or
Tools /Techniques:
CHANGE FOLLOW-UP AND SUPPORT
Assess
Compliance
Confirm
Impacts
Update
Business
Case
(As Necessary)
Effective change management
should also include the post change
monitoring to drive compliance and
constant improvement.
Initial Scoping/ Planning Drive Change Post-Change Monitoring
ASSESS COMPLIANCE
Throughout a specified “warranty”period, formal monitoring
should be implemented to ensure that the required changes or
new capabilities are in place, understood and being maintained.
Assess
Compliance
- # of steps removed?
- # of metrics now exceeding the
benchmarks?
- # of outputs increased?
- # of defects eliminated?
Planned Actual
Initial Scoping/ Planning Drive Change Post-Change Monitoring
Maintenance Tracking
Tools /Techniques:
EXECUTE ORGANIZATION CHANGE
PREDICTED RESULTS ACTUAL RESULTS
Project
Outcome
Change
Implications
Who will be
Impacted
What will the
Impact Be
Degree of
Impact/
Opportunity
Financial Close
Process Reduced
by 1 day a month
Data made
available one day
earlier than before
Receivers of the
data – CAD,
Statutory and
Regulatory
Reporting
Could enable
receiving groups to
move up their
calendar by 1 day
Medium
FTE costs will be
reduced
Financial Ops
teams in all
locations
Could reduce head-
count requirements
Could free-up time
for other tasks
High (Removing
one day of close
process will mean a
savings of ~400
manhours)
Confirm
Impact
Assessment
Initial Scoping/ Planning Drive Change Post-Change Monitoring
Actual impacts should be assessed to validate business and
help with planning of additional, future projects.
Tools /Techniques:
30
EXECUTE ORGANIZATION CHANGE
As more attention is now being paid to the realization of value
as the per the agreed-upon business case, it is increasingly
important to follow-up on the actual amount realized to drive
additional value as planned or adjust the estimate for current or
future projects.
Update
Business
Case
ORIGINAL BUSINESS CASE ACTUAL VARIANCE
RATIONALE
Cost $10,000,000 $15,000,000 Timelines were
extended and
additional testing
was required
Savings
(specific)
Reduction in FTE $250,000 p.a.
$50,000
High level of support
continued to be
required for first two
years due to system
complexity
Facilitation of system
upgrades
$100,000 p.a. $50,000 Capital markets still
on other system
Savings
(estimated
resulting
benefits)
Facilitate integration of
merger targets
$500,000 Est $300,000 Lower than expected
merger activity.
EXPECTED PAYBACK <5 years >8 years
Initial Scoping/ Planning Drive Change Post-Change Monitoring
Tools /Techniques:
CHANGE MANAGEMENT
TOOLS / LINKS
A “standard” change management
toolkit will have a broad range of
tactics to choose from, and will
constantly evolve with experience.
Stakeholder Goals and Expectations
Impact Assessment
• Business process impacts
• Culture Impacts
• Application and Delivery Impacts
• Human performance impacts
• Physical environment impacts
• Technology Impacts
External Assessment
• Customer Impacts
• Competitor Impacts
• Shareholder Impacts
• Supplier Impacts
• Regulator Impacts
Documented Business Goals and Expectations
Business Value Delivered
Organization Change Delivered
Project Quality Delivered
Risks and Mitigation
Communication and Ownership Approach
Communication Plan:
• Objectives
• Key Messages and Message
Content
• Key Communication Issues
• Critical Success Factors
• Audience Segmentation
• Vehicles Considered
• Timeline and Deliverables
• Development Process
• Approval Process
• Measurement Process
• Staffing Requirements
• Budget
• Local Rollout
Communication
Toolkit/Templates
Change Network Design
• Identification of targets, change
agents, influencers, and sponsors
• Critical relationships between
audiences
• Desired level of commitment
Performance Mgmt Approach
Training Plan
• High-Level Training Needs
Matrix
• Training Delivery Approach
• Curriculum Overview
• Technology Requirements
• Staffing Requirements
• Budget
• Local Rollout Toolkit/Templates
• Training Workplan for
subsequent work effort
Ownership and Commitment
Scorecard
• Approach and structure for
measuring and reporting levels of
awareness, understanding, buy-
in and commitment
Journey Implications
Report
• Critical Success Factors
2 3 4
7 8
9
10 Organization Infrastructure
• High Level Role Impact Analysis
• Local Rollout Toolkit /Templates
• Organization Infrastructure Workplan
for subsequent work effort
11
1
Course of Action
Journey Overview Map
• Key Milestones
• Internal/External Factors
• Business Benefits
• Key Capabilities
• Change Readiness
5 Journey Guidelines
• Enablement
• Leadership
• Measurement
• Navigation
• Ownership
• Quality
6
 











LEGEND:
 Items/approaches covered in this tutorial
TOOLBOX/CHECKLIST OF CHANGE TOOLS/TECHNIQUES
ADDITIONAL REFERENCES/LINKS
http://www.advisormailout.com/Advisor/Subscribe.aspx?m=70 – New products and commentary from the “Who
moved my cheese” folks.
http://www.isixsigma.com/ce/change_management/ - A wealth of Change Management perspective for the SixSigma
world
http://www.vtpi.org/tdm/tdm114.htm - Touching on some of the basics
http://www.beyondresistance.com/htm/3newsletter.html - Newsletters
http://www.cisco.com/warp/public/126/chmgmt.shtml - Overview of some tools and techniques
Managing the Change Process: A Field Book for Change Agents, Team
Leaders and Reengineering Managers; David K. Carr,Kelvin J. Hard,William J. Trahant
Making Sense of Change Management: A Complete Guide to the Models, Tools & Techniques of Organizational Change
by Esther Cameron and Mike Green
Managing Change and Transition (Paperback) by Harvard Business School Press
Change Management by Jeffrey M. Hiatt and Timothy J. Creasey (Paperback - Sep 2003)
The Complete Idiot’s Guide to Change Management by MBA, CMC, Jeff Davidson (Paperback - Sep 28, 2001)
LINKS:
BOOKS:
QUESTIONS & ANSWERS

Contenu connexe

Tendances

Kotter Leading Change Article Presentation
Kotter Leading Change Article PresentationKotter Leading Change Article Presentation
Kotter Leading Change Article PresentationMayank Kumar
 
Leading change management
Leading change managementLeading change management
Leading change managementHackerEarth
 
Barriers to Change: Understanding Roadblocks to Progress in Organizations and...
Barriers to Change: Understanding Roadblocks to Progress in Organizations and...Barriers to Change: Understanding Roadblocks to Progress in Organizations and...
Barriers to Change: Understanding Roadblocks to Progress in Organizations and...4Good.org
 
Change management
Change management Change management
Change management Abhi Bhatt
 
Change Management - Leading Organizational Change
Change Management - Leading Organizational ChangeChange Management - Leading Organizational Change
Change Management - Leading Organizational Changejohnnyg14
 
Change transition management.....
Change transition management.....Change transition management.....
Change transition management.....Moch Kurniawan
 
Managing organizational change
Managing organizational changeManaging organizational change
Managing organizational changeSalim Bajubair
 
Change Management Fundamentals PowerPoint Presentation Slides
Change Management Fundamentals PowerPoint Presentation SlidesChange Management Fundamentals PowerPoint Presentation Slides
Change Management Fundamentals PowerPoint Presentation SlidesSlideTeam
 
Corporate Transformation And Change Management By Ravinder Tulsiani
Corporate Transformation And Change Management By Ravinder TulsianiCorporate Transformation And Change Management By Ravinder Tulsiani
Corporate Transformation And Change Management By Ravinder TulsianiRavinder Tulsiani
 
Change Management Readiness for New Supervisors
Change Management Readiness for New SupervisorsChange Management Readiness for New Supervisors
Change Management Readiness for New SupervisorsRobin Weldon-Cope
 
Change Management Toolkit including Models, Plans, Frameworks & Tools
Change Management Toolkit including Models, Plans, Frameworks & ToolsChange Management Toolkit including Models, Plans, Frameworks & Tools
Change Management Toolkit including Models, Plans, Frameworks & ToolsAurelien Domont, MBA
 

Tendances (20)

Change management ppt
Change management pptChange management ppt
Change management ppt
 
Change Management
Change ManagementChange Management
Change Management
 
Organizational Change Management - Middle East
Organizational Change Management - Middle EastOrganizational Change Management - Middle East
Organizational Change Management - Middle East
 
Kotter Leading Change Article Presentation
Kotter Leading Change Article PresentationKotter Leading Change Article Presentation
Kotter Leading Change Article Presentation
 
Leading change management
Leading change managementLeading change management
Leading change management
 
Barriers to Change: Understanding Roadblocks to Progress in Organizations and...
Barriers to Change: Understanding Roadblocks to Progress in Organizations and...Barriers to Change: Understanding Roadblocks to Progress in Organizations and...
Barriers to Change: Understanding Roadblocks to Progress in Organizations and...
 
Change Management
Change ManagementChange Management
Change Management
 
Change management
Change management Change management
Change management
 
Change Management - Leading Organizational Change
Change Management - Leading Organizational ChangeChange Management - Leading Organizational Change
Change Management - Leading Organizational Change
 
Change transition management.....
Change transition management.....Change transition management.....
Change transition management.....
 
Managing organizational change
Managing organizational changeManaging organizational change
Managing organizational change
 
Leading Organizational Change
Leading Organizational ChangeLeading Organizational Change
Leading Organizational Change
 
Change Management Fundamentals PowerPoint Presentation Slides
Change Management Fundamentals PowerPoint Presentation SlidesChange Management Fundamentals PowerPoint Presentation Slides
Change Management Fundamentals PowerPoint Presentation Slides
 
An introduction to agile leadership
An introduction to agile leadershipAn introduction to agile leadership
An introduction to agile leadership
 
Corporate Transformation And Change Management By Ravinder Tulsiani
Corporate Transformation And Change Management By Ravinder TulsianiCorporate Transformation And Change Management By Ravinder Tulsiani
Corporate Transformation And Change Management By Ravinder Tulsiani
 
Change Management Readiness for New Supervisors
Change Management Readiness for New SupervisorsChange Management Readiness for New Supervisors
Change Management Readiness for New Supervisors
 
Change management 101
Change management 101Change management 101
Change management 101
 
Change Management Toolkit including Models, Plans, Frameworks & Tools
Change Management Toolkit including Models, Plans, Frameworks & ToolsChange Management Toolkit including Models, Plans, Frameworks & Tools
Change Management Toolkit including Models, Plans, Frameworks & Tools
 
Change Management
Change Management  Change Management
Change Management
 
Managing change, change process, change types and challenges in change manage...
Managing change, change process, change types and challenges in change manage...Managing change, change process, change types and challenges in change manage...
Managing change, change process, change types and challenges in change manage...
 

En vedette

Bbp change impact analysis sample_2009_v07
Bbp change impact analysis sample_2009_v07Bbp change impact analysis sample_2009_v07
Bbp change impact analysis sample_2009_v07Muhammad_Abdelgawad
 
Impact Analysis Template - Enterprise
Impact Analysis Template - EnterpriseImpact Analysis Template - Enterprise
Impact Analysis Template - EnterpriseToby Elwin
 
Scope or: How to Manage Projects for Organization Success
Scope or: How to Manage Projects for Organization SuccessScope or: How to Manage Projects for Organization Success
Scope or: How to Manage Projects for Organization SuccessToby Elwin
 
Introduction to Stakeholder Analysis
Introduction to Stakeholder AnalysisIntroduction to Stakeholder Analysis
Introduction to Stakeholder AnalysisEndeavor Management
 
Change Management PPT Slides
Change Management PPT SlidesChange Management PPT Slides
Change Management PPT SlidesYodhia Antariksa
 
Prosci-Webinar-Five-Tenets-Slides
Prosci-Webinar-Five-Tenets-SlidesProsci-Webinar-Five-Tenets-Slides
Prosci-Webinar-Five-Tenets-SlidesParsons Corporation
 
Prosci Webinar 1 Overiew of 2016 Best Practices Report 050416
Prosci Webinar 1 Overiew of 2016 Best Practices Report 050416Prosci Webinar 1 Overiew of 2016 Best Practices Report 050416
Prosci Webinar 1 Overiew of 2016 Best Practices Report 050416Catherine Smithson
 
Change management 2016
Change management 2016Change management 2016
Change management 2016Timothy Holden
 
Change Management Plan
Change Management PlanChange Management Plan
Change Management PlanDemand Metric
 
Aalto Yl En Haasteet Ubiikkiyhteiskunnassa 1.10.2009
Aalto Yl En Haasteet Ubiikkiyhteiskunnassa 1.10.2009Aalto Yl En Haasteet Ubiikkiyhteiskunnassa 1.10.2009
Aalto Yl En Haasteet Ubiikkiyhteiskunnassa 1.10.2009Tuija Aalto
 
Project Management Scope Templates for SharePoint
Project Management Scope Templates for SharePointProject Management Scope Templates for SharePoint
Project Management Scope Templates for SharePointToby Elwin
 
ChangeMakers How to change things. Tell me a story.
ChangeMakers     How to change things. Tell me a story.ChangeMakers     How to change things. Tell me a story.
ChangeMakers How to change things. Tell me a story.Frederic Vandaele
 
Enterprise risk management february 9th solution training
Enterprise risk management february 9th   solution trainingEnterprise risk management february 9th   solution training
Enterprise risk management february 9th solution trainingveritama
 
Guidelines for Change Management for an organisation
Guidelines for Change Management for an organisationGuidelines for Change Management for an organisation
Guidelines for Change Management for an organisationAbhishek Dutta
 
Change management plan : Ready template
Change management plan : Ready templateChange management plan : Ready template
Change management plan : Ready templateDhawal Thakkar PMP
 

En vedette (20)

Change management-training-s1-final fi
Change management-training-s1-final fiChange management-training-s1-final fi
Change management-training-s1-final fi
 
Bbp change impact analysis sample_2009_v07
Bbp change impact analysis sample_2009_v07Bbp change impact analysis sample_2009_v07
Bbp change impact analysis sample_2009_v07
 
Impact Analysis Template - Enterprise
Impact Analysis Template - EnterpriseImpact Analysis Template - Enterprise
Impact Analysis Template - Enterprise
 
Scope or: How to Manage Projects for Organization Success
Scope or: How to Manage Projects for Organization SuccessScope or: How to Manage Projects for Organization Success
Scope or: How to Manage Projects for Organization Success
 
Introduction to Stakeholder Analysis
Introduction to Stakeholder AnalysisIntroduction to Stakeholder Analysis
Introduction to Stakeholder Analysis
 
Stakeholder Analysis
Stakeholder AnalysisStakeholder Analysis
Stakeholder Analysis
 
Stakeholder Analysis
Stakeholder AnalysisStakeholder Analysis
Stakeholder Analysis
 
Change Management PPT Slides
Change Management PPT SlidesChange Management PPT Slides
Change Management PPT Slides
 
Prosci-Webinar-Five-Tenets-Slides
Prosci-Webinar-Five-Tenets-SlidesProsci-Webinar-Five-Tenets-Slides
Prosci-Webinar-Five-Tenets-Slides
 
Prosci Webinar 1 Overiew of 2016 Best Practices Report 050416
Prosci Webinar 1 Overiew of 2016 Best Practices Report 050416Prosci Webinar 1 Overiew of 2016 Best Practices Report 050416
Prosci Webinar 1 Overiew of 2016 Best Practices Report 050416
 
Change management 2016
Change management 2016Change management 2016
Change management 2016
 
Change Management Plan
Change Management PlanChange Management Plan
Change Management Plan
 
Aalto Yl En Haasteet Ubiikkiyhteiskunnassa 1.10.2009
Aalto Yl En Haasteet Ubiikkiyhteiskunnassa 1.10.2009Aalto Yl En Haasteet Ubiikkiyhteiskunnassa 1.10.2009
Aalto Yl En Haasteet Ubiikkiyhteiskunnassa 1.10.2009
 
Project Management Scope Templates for SharePoint
Project Management Scope Templates for SharePointProject Management Scope Templates for SharePoint
Project Management Scope Templates for SharePoint
 
ChangeMakers How to change things. Tell me a story.
ChangeMakers     How to change things. Tell me a story.ChangeMakers     How to change things. Tell me a story.
ChangeMakers How to change things. Tell me a story.
 
Enterprise risk management february 9th solution training
Enterprise risk management february 9th   solution trainingEnterprise risk management february 9th   solution training
Enterprise risk management february 9th solution training
 
Better Business Cases - APMG
Better Business Cases - APMGBetter Business Cases - APMG
Better Business Cases - APMG
 
Mahsa_Rezaei_BPMS
Mahsa_Rezaei_BPMSMahsa_Rezaei_BPMS
Mahsa_Rezaei_BPMS
 
Guidelines for Change Management for an organisation
Guidelines for Change Management for an organisationGuidelines for Change Management for an organisation
Guidelines for Change Management for an organisation
 
Change management plan : Ready template
Change management plan : Ready templateChange management plan : Ready template
Change management plan : Ready template
 

Similaire à Change Management Training

Change Management 2004
Change Management 2004Change Management 2004
Change Management 2004jim
 
thechangeaccelerationprocess-140215034525-phpapp01.pptx
thechangeaccelerationprocess-140215034525-phpapp01.pptxthechangeaccelerationprocess-140215034525-phpapp01.pptx
thechangeaccelerationprocess-140215034525-phpapp01.pptxSamuelLee440194
 
Implementing Change at Iowa DOT - Path to Performance Management - TRB 01-11-16
Implementing Change at Iowa DOT - Path to Performance Management - TRB 01-11-16Implementing Change at Iowa DOT - Path to Performance Management - TRB 01-11-16
Implementing Change at Iowa DOT - Path to Performance Management - TRB 01-11-16DPutz
 
Rt sundari ashutosh_pandey
Rt sundari ashutosh_pandeyRt sundari ashutosh_pandey
Rt sundari ashutosh_pandeyPMI2011
 
Rtsundari ashutoshpandey-131008015758-phpapp02
Rtsundari ashutoshpandey-131008015758-phpapp02Rtsundari ashutoshpandey-131008015758-phpapp02
Rtsundari ashutoshpandey-131008015758-phpapp02PMI_IREP_TP
 
İTÜ İşletme ve Teknoloji Yönetimi - Lojistik & Tedarik Zinciri Yönetimi
İTÜ İşletme ve Teknoloji Yönetimi - Lojistik & Tedarik Zinciri YönetimiİTÜ İşletme ve Teknoloji Yönetimi - Lojistik & Tedarik Zinciri Yönetimi
İTÜ İşletme ve Teknoloji Yönetimi - Lojistik & Tedarik Zinciri YönetimiElif Tuygan Arslançeri
 
Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"David Pedreno
 
Change in the cloud
Change in the cloudChange in the cloud
Change in the cloudpck100
 
Integrating Organisational Change within IT Transition and Transformation
Integrating Organisational Change within IT Transition and TransformationIntegrating Organisational Change within IT Transition and Transformation
Integrating Organisational Change within IT Transition and TransformationNUS-ISS
 
Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"David Pedreno
 
141212 brochure change management for hp
141212 brochure change management for hp141212 brochure change management for hp
141212 brochure change management for hpchange-factory
 
Organization Change Management.pptx
Organization Change Management.pptxOrganization Change Management.pptx
Organization Change Management.pptxMeghaVarghese12
 
Organization Change Management for the handling change in organizations
Organization Change Management for the handling change in organizationsOrganization Change Management for the handling change in organizations
Organization Change Management for the handling change in organizationsGoharSaeed6
 
Project Reviews 20100414 1 0
Project Reviews   20100414 1 0Project Reviews   20100414 1 0
Project Reviews 20100414 1 0Gavin Berry
 
Change Management Strategy/Plan
Change Management Strategy/PlanChange Management Strategy/Plan
Change Management Strategy/Plansheliashelton
 
Change Management Strategies Webinar Slides
Change Management Strategies Webinar SlidesChange Management Strategies Webinar Slides
Change Management Strategies Webinar Slidesthechangesource
 
Does Your Organization Need a Better Technology Roadmap?
Does Your Organization Need a Better Technology Roadmap?Does Your Organization Need a Better Technology Roadmap?
Does Your Organization Need a Better Technology Roadmap?Community IT Innovators
 
Interactive work: Project management for dummies
Interactive work: Project management for dummiesInteractive work: Project management for dummies
Interactive work: Project management for dummiesJorge Rengifo
 

Similaire à Change Management Training (20)

Change Management 2004
Change Management 2004Change Management 2004
Change Management 2004
 
thechangeaccelerationprocess-140215034525-phpapp01.pptx
thechangeaccelerationprocess-140215034525-phpapp01.pptxthechangeaccelerationprocess-140215034525-phpapp01.pptx
thechangeaccelerationprocess-140215034525-phpapp01.pptx
 
Implementing Change at Iowa DOT - Path to Performance Management - TRB 01-11-16
Implementing Change at Iowa DOT - Path to Performance Management - TRB 01-11-16Implementing Change at Iowa DOT - Path to Performance Management - TRB 01-11-16
Implementing Change at Iowa DOT - Path to Performance Management - TRB 01-11-16
 
Rt sundari ashutosh_pandey
Rt sundari ashutosh_pandeyRt sundari ashutosh_pandey
Rt sundari ashutosh_pandey
 
Rtsundari ashutoshpandey-131008015758-phpapp02
Rtsundari ashutoshpandey-131008015758-phpapp02Rtsundari ashutoshpandey-131008015758-phpapp02
Rtsundari ashutoshpandey-131008015758-phpapp02
 
İTÜ İşletme ve Teknoloji Yönetimi - Lojistik & Tedarik Zinciri Yönetimi
İTÜ İşletme ve Teknoloji Yönetimi - Lojistik & Tedarik Zinciri YönetimiİTÜ İşletme ve Teknoloji Yönetimi - Lojistik & Tedarik Zinciri Yönetimi
İTÜ İşletme ve Teknoloji Yönetimi - Lojistik & Tedarik Zinciri Yönetimi
 
Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"
 
Change in the cloud
Change in the cloudChange in the cloud
Change in the cloud
 
Integrating Organisational Change within IT Transition and Transformation
Integrating Organisational Change within IT Transition and TransformationIntegrating Organisational Change within IT Transition and Transformation
Integrating Organisational Change within IT Transition and Transformation
 
Atitude
AtitudeAtitude
Atitude
 
Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"
 
141212 brochure change management for hp
141212 brochure change management for hp141212 brochure change management for hp
141212 brochure change management for hp
 
Organization Change Management.pptx
Organization Change Management.pptxOrganization Change Management.pptx
Organization Change Management.pptx
 
Organization Change Management for the handling change in organizations
Organization Change Management for the handling change in organizationsOrganization Change Management for the handling change in organizations
Organization Change Management for the handling change in organizations
 
Project Reviews 20100414 1 0
Project Reviews   20100414 1 0Project Reviews   20100414 1 0
Project Reviews 20100414 1 0
 
Change Management Strategy/Plan
Change Management Strategy/PlanChange Management Strategy/Plan
Change Management Strategy/Plan
 
project management essentials
project management essentialsproject management essentials
project management essentials
 
Change Management Strategies Webinar Slides
Change Management Strategies Webinar SlidesChange Management Strategies Webinar Slides
Change Management Strategies Webinar Slides
 
Does Your Organization Need a Better Technology Roadmap?
Does Your Organization Need a Better Technology Roadmap?Does Your Organization Need a Better Technology Roadmap?
Does Your Organization Need a Better Technology Roadmap?
 
Interactive work: Project management for dummies
Interactive work: Project management for dummiesInteractive work: Project management for dummies
Interactive work: Project management for dummies
 

Change Management Training

  • 1. AGENDA/OBJECTIVES Learning Objectives:  Gain a general overview of Change Management objectives and best practices;  Develop a preliminary understanding of potential change management tools and frameworks to apply on a consulting project. Agenda:  The need for Change Management;  Generic Overview of Change Management Techniques;  Change Management Tools and Links;  Wrap-Up/Questions 1
  • 3. 3 CHANGE MANAGEMENT – INTRODUCTION • Defining and instilling new values, attitudes, norms, and behaviors within an organization that support new ways of doing work and overcome resistance to change; • Building consensus among customers and stakeholders on specific changes designed to better meet their needs; • Planning, testing, and implementing all aspects of the transition from one organizational structure or business process to another. While change management can be defined in many different ways, the key elements will always tend to include the following responsibilities… * From Business Process Re-engineering Glossary • At its core, change management is about anticipating and preparing for the ripple effects that any significant change will have across the organization… Project Team Change Sponsoring Organization Organization at large
  • 4. CHANGE MANAGEMENT – WHY IT’S NEEDED As organizations continue to change with increasing speed and regularity, professional change management becomes ever more important.. PROJECT FAILURE RATES:  Only 20 to 30% of all reengineering projects succeed1  Just 43% of quality-improvement efforts make satisfactory progress2  9% of all major software development applications in large organizations are worth the cost. 31% get cancelled before completion. 53 percent will result in cost overruns by 189%3 Poorly managed change management is often cited as a key driver of project failure… References: (1) Hal Lancaster. "Reengineering Authors Reconsider Reengineering." Interview with Michael Hammer and James Champy. The Wall Street Journal. January 17, 1995. (2) Linda Moran, Jerry Hogeveen, Jan Latham, and Darlene Russ-Eft. Winning Competitive Advantage. Zenger Miller. 1994. (3) Jim Johnson. "Chaos: The Dollar Drain of IT Failures." Application Development Trends. January, 1995. 3
  • 5. Change Management is increasingly regarded as a critical success factor, with numerous executives and project leaders now working to incorporate proven best practices into their project management methodologies. HOW BIG IS CHANGE MANAGEMENT? 4
  • 7. Initial Scoping/ Planning Drive Change Post-Change Monitoring Complete Impact Assessment Establish Governance Structure Define Change Network Develop Change Plan Develop Marketing/ Communications Plan Execute Marketing Communications Strategy Measure on-going progress/ ownership Facilitate Management Forums Establish Change Network Assess Compliance Confirm Impacts CHANGE DELIVERED Identify Stakeholder Requirements KEY CHANGE MANAGEMENT ACTIVITIES In order to successfully manage a complex change, there are a number of key tactics to apply, depending on the project phase and requirements. Surface/ Address Areas of Resistance Execute Rollout Execute Organization Change Update Impact assessment (as necessary) Update Business Case 6
  • 8. CASE STUDY OVERVIEW Case Study #1 – eGL LSS Case Studies Case Study Background Throughout 2002-2003, RBCFG elected to implement a PeopleSoft General Ledger system – impacting: - over 40 existing GL’s, - 246 legal entities, - 34 implementation sites, - 55 geographical jurisdictions - 2800 users An LSS project that introduced and implemented technology and process changes to processing client transactions – impacting: - approx. 1000 branches - approx. 2900 branch users - approx. 700,000 transactions per annum - 4 customer segments
  • 9. INITIAL SCOPING/PLANNING The first step is to ensure that all key stakeholders are driving towards the same “ideal state.” Current State ORG PROCESS TECH Ideal State ORG PROCESS TECH Change Project •Process reduction •Org/FTE reduction •New Technology Add Initial Scoping/ Planning Drive Change Post-Change Monitoring CHANGE DELIVERED Complete Impact Assessment  At this early stage, the picture will be somewhat unclear, but an attempt should still be made to at least capture preliminary thinking.  A constant distinction needs to be made between the project work and the end- state in order to ensure that there is appropriate focus on where you’re going rather than just the journey… Tools /Techniques:
  • 10. IMPACT ASSESSMENT Complete Impact Assessment As Ideal State and project goals become further defined, a preliminary impact assessment can be crafted. Project Related Questions:  What resources will we need for the project team? What will their commitment need to be?  What levels of participation will be required from the rest of the sponsoring organization?  How will we introduce the project, who will deliver messages? Project Impact Related Questions:  How broad is this change we’re potentially delivering?  What associated business processes could be impacted?  How will staff be impacted? How might the organization structure, reporting relationships etc. be changed?  What new skills may be required?  How might the technology infrastructure (applications, data, hardware etc.) be impacted?  What impact might there be to customers, shareholders, suppliers, competitors etc.? Initial Scoping/ Planning Drive Change Post-Change Monitoring CHANGE DELIVERED Tools /Techniques:
  • 11. As the result of the initial impact assessment, a high-level “heat- map” can be created – documenting where in the organization the potential impacts would be most dramatically felt. ABC CP&B US&I Cap Mkts GTO Funcs ABC ABC ABC ABC ABC ABC ABC ABC ABC ABC ABC ABC ABC ABC Project Initiator Legend: No Impact Little/Unknown Impact Potentially Significant Impact Impact Heat-Map CP&B US & Intl Cap Mkts GTO Internal Business Processes to be developed H M L H Organizational Structure to be impacted H M L H # FTE’s to be reduced H M L H New Skills H M L H Technology Infrastructure H M L H External Customer Impacts H M L H Shareholder Impacts H M L H Supplier Impacts H M L H Competitor Impacts H M L H Impact Assessment Tracking Complete Impact Assessment Initial Scoping/ Planning Drive Change Post-Change Monitoring CHANGE DELIVERED IMPACT ASSESSMENT Tools /Techniques:
  • 12. Along with the change management implications of your own project, you’ll need to take into account other projects as well and pro-actively manage any potential conflicts that could put your success or timelines at risk. CP&B US&I Cap Mkts GTO Funcs ABC ABC ABC ABC ABC ABC ABC ABC ABC ABC ABC ABC Complete Impact Assessment What other projects could be impacting this group? When will the other project be impacting the group? What will the risks be to our project? How will we mitigate the risks? Mammoth IT implementation Type Date High – with these job changes, the training requirements may need to be revised • Involve project lead on our Advisory Group • Exchange project plans/project updates. Introduction Training Implementation Job Changes 05/06 04/06 07/06 08/06 – 12/06 Regulatory Compliance (SOX) Inter-Dependent Project Identification: Initial Scoping/ Planning Drive Change Post-Change Monitoring CHANGE DELIVERED Project B Project A Inter-Dependent Project Management: IMPACT ASSESSMENT Tools /Techniques:
  • 13. Project Outcome Change Implications Who will be Impacted What will the Likely Impact Be Degree of Impact/ Opportunity (Low-Med-High) Stakeholder Engagement Required Financial Close Process Reduced by 1 day a month Data made available one day earlier than before Receivers of the data – CAD, Statutory and Regulatory Reporting Could enable receiving groups to move up their calendar by 1 day Medium Will keep CAD and reporting informed, but leave it up to them to change their process. FTE costs will be reduced Financial Ops teams in all locations Could reduce head-count requirements Could free-up time for other tasks High (Removing one day of close process will mean a savings of ~400 manhours) Will need active participation from Finance Ops managers to determine whether workforce cuts are possible Initial Scoping/ Planning Drive Change Post-Change Monitoring CHANGE DELIVERED Impact Assessment /Stakeholder Map IMPACT ASSESSMENT From an understanding of the project impacts, the initial stakeholder requirements can be derived. Complete Impact Assessment Tools /Techniques: 13
  • 14. STAKEHOLDER REQUIREMENTS Where do we need to get Information From? When do we need the input? How will gather the input? Central Finance Representatives Prior Global Design Surveys BU Finance Prior to Global Design Surveys External Regulators As the regulations become updated Through regulatory officers Who do we need to Get Approvals from: When do we need it? How will we get it? Is there likely to be resistance? Department Leaders with Impacted staff At launch of the project Have X. Executive introduce the concept and ask? YES Human Resources At launch of the project Work with Y executive to ask No A stakeholder management approach can be developed to ensure everyone is as engaged as required. Who do we need to Keep in the Loop What will they be interested in? How often will we communicate? What channels will we use? External Relations Anything impacting the customers As needed YES Finance Executives (J. Brown) The success of the LSS project Monthly 1:1 meetings with Sponsor Establish Stakeholder Reqts Stakeholder Management Approach Initial Scoping/ Planning Drive Change Post-Change Monitoring CHANGE DELIVERED Tools /Techniques:
  • 15. GOVERNANCE STRUCTURE As stakeholders are identified, an initial governance structure can be put in place to ensure effective oversight, issue escalation and decision making. Decision-Making Bodies: •Project Management Office •Business Case Managers Sponsors/ Champions Representatives of those areas from whom you’ll require something and may eventually need their buy-in Establish Governance Structure Standard Governance Model Initial Scoping/ Planning Drive Change Post-Change Monitoring CHANGE DELIVERED PROJECT TEAM MEMBERS • GCS Staff • Business Area Staff Team Leads • Executive Boards • Steering Committees Potential Additions if project size/complexity/contentiousness warrants expansion Administrative Bodies •Subject Matter Experts •Pilot Participants User Representatives “Advisory” Groups: Human Resources Regulatory Affairs Interested Parties  Depending on the size, complexity or contentiousness of the project, the governance model can be simple or complex: Tools /Techniques:
  • 16. GOVERNANCE STRUCTURE Working Groups Examples Advisory Functions Examples Sponsors Project Management Office Steering Committee Impact Advisory Office Business Advisory Board Interest Groups Member requirements VP Level Project Managers Supporting Project Executives Director Level from key functional areas Director level from key customer areas None – open to anyone Mandate  Provide Executive Oversight  Report progress/issues to Group Executive  Day-to-day management of budget, workplan, resources and schedule.  Ensure project is proceeding according to sponsor expectations, Manage Finances  Provide on-going assessment of related impacts to IT, Process, Audit Functions  Provide customer input  Bring up issues/concer ns from the field  Keep informed Frequency of Meeting/Time Commitment 2 hours a month Full-time Weekly Quarterly Updates ½ a month Quarterly Channels 1-on-1 meetings NA B. Hamilton Facilitated Sessions Facilitated Sessions Lunch and Learns Managed (agendas, facilitation etc.) n/A Self-Managed P. Lead A. Facilitator A. Facilitator Establishing the precise mandates of each of the groups within the governance structure will help ensure that members understand their accountability and levels of decision-making authority. Establish Governance Structure Mandate Definition Initial Scoping/ Planning Drive Change Post-Change Monitoring CHANGE DELIVERED Tools /Techniques:
  • 17. CHANGE PLAN Dec Jan Feb Apr May Jun Jul Process Redesign Process Redesign Process Review and Approval HEADCOUNT FTE requirements Re- Assessment Personnel Transition Plan Resource Redeployment TRAINING Training Needs Assessed Training Materials Developed Training Delivery ROLL-OUT READINESS Technology Infrastructure Updated Passwords / Security in place As the project work proceeds, key change elements, (training, employee transitioning, technology changes etc.) need to be scheduled , planned for and tracked. Develop Change Plan Sample Change Plan Initial Scoping/ Planning Drive Change Post-Change Monitoring CHANGE DELIVERED Project Plan: Change Readiness Plan: Tools /Techniques:
  • 18. CHANGE NETWORK  Provide project oversight  Assign resources  Make Decisions  Resolve Disputes Champions: Impacted Personnel: Team Leads: • Can provide input on design or risks • Can act as a communication lead for their area cascading messages down or up as needed • Can become trainer or owner for new processes, systems - Those employees who will in some way feel the change. Define Change Network Establishing a change network ensures change agents are in place, know their role, that messages are appropriately cascaded down throughout the organization, and end-user input appropriately collected. Change Network Diagram Initial Scoping/ Planning Drive Change Post-Change Monitoring CHANGE DELIVERED GL FUNCTIONS (KWAN) Financial Operations (BURROWS) IT IMPLEMENTATION (J. Smith) CHANGE NETWORK GL Management Reconciliation Reporting 15 16 8Total Personnel Areas: J. Blow Jane Doe Mr. XRepresented by: EGL BPRS J. Jones M. Smith 6 4 GL FUNCTIONS (KWAN) Financial Operations (BURROWS) CHANGE NETWORK GL Management Reconciliation Reporting 15 16 8Total Personnel Areas: J. Blow Jane Doe Mr. XRepresented by: EGL BPRS J. Jones M. Smith 6 4 “Change Agents” can be found at all levels Tools /Techniques:
  • 19. COMMUNICATIONS AND MARKETING PLAN WHO do we need to talk to ? WHAT do we need to tell them (key messages) WHAT do we need them to do with the information? HOW will we deliver the messages Channels (e- mails, in- person, meetings etc.) Who Prepares Who delivers? How Frequent ? An effective communications plan needs to start with a definition of the actions we need people to take, and later focuses on the tactics to deliver the required messages. Marketing & Comms Plan Stakeholder Management AUDIENCE SEGMENTATION REQUIREMENTS CHANNELS All Finance Understand what we’re doing there… Mass email sent from Scott Burrows Finance Process Owners Be prepared for the upcoming interviews Initial Scoping/ Planning Drive Change Post-Change Monitoring CHANGE DELIVERED Tools /Techniques: 19
  • 20. DRIVING CHANGE THROUGHOUT THE PROJECT Drive Change Execute Marketing Communications Strategy Measure on-going progress/ ownership Facilitate Management Forums Establish Change Network Surface/ Address Areas of Resistance Execute Organization Change Update Impact assessment (as necessary) With appropriate planning in place, success will then rely upon effective execution and monitoring of the agreed upon plans. Initial Scoping/ Planning Drive Change Post-Change Monitoring
  • 21. FACILITATE MANAGEMENT FORUMS Ensure that all working and executive groups have all the information they need in the format and frequency they need it - to enable them to recognize issues, and continue to fulfill their change agent roles effectively. Facilitate Management Forums Comments Scope Budget Schedule Management Forums Progress Against Key Milestones Decisions to be made? Key Issues •Frequency/Timeline •Who prepares •Who delivers •Audience • Determine what to report on Initial Scoping/ Planning Drive Change Post-Change Monitoring • Determine who to report to • Determine how the reporting will be managed Tools /Techniques:
  • 22. UPDATE IMPACT ASSESSMENT As a project progresses, it is important to revise or validate the initial impact assessment at pre-defined check-points to ensure that expectations are being properly managed. Update Impact Assessment May June July Aug Sept Project Start Impact Update Check-Point Impact Update Check-Point ABC CP&B US&I Cap Mkts GTO Funcs ABC ABC ABC ABC ABC ABC ABC ABC ABC ABC ABC ABC ABC ABC Project Initiates High – with these job changes, the training requirements may need to be revised What will the risks be to our project? • Involve project lead on our Advisory Group • Exchange project plans/project updates. How will we mitigate the risks? Regulatory Compliance (SOX DateType Mammoth IT implementation 05/06 04/06 07/06 08/06 – 12/06 Introduction Training Implementation Job Changes When will the other project be impacting the group? What other projects could be impacting this group? High – with these job changes, the training requirements may need to be revised What will the risks be to our project? • Involve project lead on our Advisory Group • Exchange project plans/project updates. How will we mitigate the risks? Regulatory Compliance (SOX DateType Mammoth IT implementation 05/06 04/06 07/06 08/06 – 12/06 Introduction Training Implementation Job Changes When will the other project be impacting the group? What other projects could be impacting this group? “Heat Map” “Inter-dependent Project List” Passwords / Security in place Technology Infrastructure UpdatedROLL-OUT READINESS Training Delivery Change Plan Aug TRAINING HEADCOUNT Process Redesign JunMayDecNo FebJan AprMar Jul Training Materials Developed Training Needs Assessed Resource Redeployment Personnel Transition Plan FTE requirements Re-Assessment Process Review and Approval Process Redesign SE PT Passwords / Security in place Technology Infrastructure UpdatedROLL-OUT READINESS Training Delivery Change Plan Aug TRAINING HEADCOUNT Process Redesign JunMayDecNo FebJan AprMar Jul Training Materials Developed Training Needs Assessed Resource Redeployment Personnel Transition Plan FTE requirements Re-Assessment Process Review and Approval Process Redesign SE PT “Change Plan” Change Network Diagram GL FUNCTIONS (KWAN) Financial Operations (BURROWS) IT IMPLEMENTATION (J. Smith) CHANGE NETWORK GL Management Reconciliation Reporting 15 16 8Total Areas: J. Blow Jane Doe Mr. XRepresented by: EGL BPRS J. Jones M. Smith 6 4 GL FUNCTIONS (KWAN) Financial Operations (BURROWS) IT IMPLEMENTATION (J. Smith) CHANGE NETWORK GL Management Reconciliation Reporting 15 16 8Total Areas: J. Blow Jane Doe Mr. XRepresented by: EGL BPRS J. Jones M. Smith 6 4 “Change Network Initial Scoping/ Planning Drive Change Post-Change Monitoring • Depending on the length of the project, one or more check-points should be planned for, with interim check-ins if circumstances warrant it. Tools /Techniques:
  • 23. MEASURE ON-GOING OWNERSHIP/BUY-IN At key stages within a long implementation, or at points of sponsor or organizational change, it is critical to re-affirm the required buy-in is in place. Measure On-going Ownership/ Buy-In Who do we need to Get Approvals from: When do we need it? How will we get it? Is there likely to be resistance? Department Leaders with Impacted staff At launch of the project Have X. Executive introduce the concept and ask? YES Human Resources At launch of the project Work with Y executive to ask No Who do we need to Keep in the Loop What will they be interested in? How often will we communicate? What channels will we use? External Relations Anything impacting the customers As needed YES Finance Executives (J. Fukakusa The success of the LSS project Monthly 1:1 meetings with Sponsor Project Introduction: • Objectives • Budget • Schedule • Change Assessment Current Status: • Earned Value • Issues • Pockets of Resistance Governance Model Update • Current Roles • Validation of the role the new sponsor needs to/wants to play Update Stakeholder Analysis New Sponsor Update Structure Initial Scoping/ Planning Drive Change Post-Change Monitoring Tools /Techniques:
  • 24. DEALING WITH AREAS OF RESISTANCE Although successful change management is focused on avoiding resistance , there is a likelihood of issues coming up – leading to a limited number of options open to a project team. Address Areas of Resistance Confirm impact of resistance Eliminate any misunderstanding through clear communications • Impacts? • Readiness? • Budget? • Personal Power? Clarify the factors driving the concern Determine whether overcoming the resistance is critical to the success of the project or just nice to have. Use sponsors or other supporters to influence change of heart • Outline criticality of change to the organization • Outline the consequences if change doesn’t go through Cancel project • Cease operations • Communicate to all relevant parties that the project has ceased due to resistance from…etc • Make change at a later date? • Sequence the change to mitigate risk? • Develop/escalate training? • Add resources from project team? • Move budget from other areas? Consider what options you might offer to alleviate the resistance Negotiate? Influence? Use command and control hierarchy to order change to be delivered. • Leverage sponsors or other senior supporters to end debate, forcibly remove resistance to enable the project to move forward. Order? Give Up? Initial Scoping/ Planning Drive Change Post-Change Monitoring Tools /Techniques:
  • 25. ESTABLISH CHANGE NETWORK Establish Change Network CHANGE NETWORK APPROACH:  Start with identifying, confirming the end-users to be impacted by the change.  Segment the users by level of impact, type of change required etc.  Define mandate for user representative:  Communications? (upwards or downwards)  Training?  Impact assessment?  Other?  Develop selection criteria for change representative  Select representatives  Implement network as necessary:  Train the trainer  Communication channels Leveraging a “change network” enables messages, training and other change support tactics to be effectively communicated in all directions throughout an organization. Initial Scoping/ Planning Drive Change Post-Change Monitoring 15 16 8Total Areas: J. Blow Jane Doe Mr. XRepresented by: EGL BPRS J. Jones M. Smith 6 4 Mgmt REC. REP 15 16 8Total Areas: J. Blow Jane Doe Mr. XRepresented by: EGL BPRS J. Jones M. Smith 6 4 Tools /Techniques:
  • 26. EXECUTE MARKETING / COMMUNICATIONS STRATEGY As outlined in the marketing/communications plans, execute the tactics, confirm whether the messages are being received and acted upon, and update/amend as necessary. Execute Mktg/Comms Strategy Maintain a regular communication schedule, with an increasing volume as change deployment becomes more imminent. Jan Feb Mar Apr May June Change Implementation •Executive Memos •Newsletters •Off-Site Mtgs x x x x x x x x x x xx x x Starting Point Baseline Jan Post Communications: Mar Jun •Knowledge of upcoming change •Understanding of new role •Signed-up for training L L L H H H M L M M L L Initial Scoping/ Planning Drive Change Post-Change Monitoring Track communications effectiveness and variance from initial baseline. COMMUNICATION SCHEDULE: COMMUNICATION TRACKING:
  • 27. Big Bang: to EXECUTE ORGANIZATION CHANGE After all required preparation work has been completed, and testing has yielded the expected results, the change itself has to be executed, and the switch from “old” to “new” completed. Execute Organization Change LAUNCH New Organization/ Process / Technology Existing Organization/ Process / Technology Parallel Run: to Sequenced Change: Business Customer Marketing Processes Risk Initial Scoping/ Planning Drive Change Post-Change Monitoring Technical Systems Access TESTING Go/No-Go Decision DEPLOYMENT/ WARRANTY or or ?Others: or Tools /Techniques:
  • 28. CHANGE FOLLOW-UP AND SUPPORT Assess Compliance Confirm Impacts Update Business Case (As Necessary) Effective change management should also include the post change monitoring to drive compliance and constant improvement. Initial Scoping/ Planning Drive Change Post-Change Monitoring
  • 29. ASSESS COMPLIANCE Throughout a specified “warranty”period, formal monitoring should be implemented to ensure that the required changes or new capabilities are in place, understood and being maintained. Assess Compliance - # of steps removed? - # of metrics now exceeding the benchmarks? - # of outputs increased? - # of defects eliminated? Planned Actual Initial Scoping/ Planning Drive Change Post-Change Monitoring Maintenance Tracking Tools /Techniques:
  • 30. EXECUTE ORGANIZATION CHANGE PREDICTED RESULTS ACTUAL RESULTS Project Outcome Change Implications Who will be Impacted What will the Impact Be Degree of Impact/ Opportunity Financial Close Process Reduced by 1 day a month Data made available one day earlier than before Receivers of the data – CAD, Statutory and Regulatory Reporting Could enable receiving groups to move up their calendar by 1 day Medium FTE costs will be reduced Financial Ops teams in all locations Could reduce head- count requirements Could free-up time for other tasks High (Removing one day of close process will mean a savings of ~400 manhours) Confirm Impact Assessment Initial Scoping/ Planning Drive Change Post-Change Monitoring Actual impacts should be assessed to validate business and help with planning of additional, future projects. Tools /Techniques: 30
  • 31. EXECUTE ORGANIZATION CHANGE As more attention is now being paid to the realization of value as the per the agreed-upon business case, it is increasingly important to follow-up on the actual amount realized to drive additional value as planned or adjust the estimate for current or future projects. Update Business Case ORIGINAL BUSINESS CASE ACTUAL VARIANCE RATIONALE Cost $10,000,000 $15,000,000 Timelines were extended and additional testing was required Savings (specific) Reduction in FTE $250,000 p.a. $50,000 High level of support continued to be required for first two years due to system complexity Facilitation of system upgrades $100,000 p.a. $50,000 Capital markets still on other system Savings (estimated resulting benefits) Facilitate integration of merger targets $500,000 Est $300,000 Lower than expected merger activity. EXPECTED PAYBACK <5 years >8 years Initial Scoping/ Planning Drive Change Post-Change Monitoring Tools /Techniques:
  • 33. A “standard” change management toolkit will have a broad range of tactics to choose from, and will constantly evolve with experience. Stakeholder Goals and Expectations Impact Assessment • Business process impacts • Culture Impacts • Application and Delivery Impacts • Human performance impacts • Physical environment impacts • Technology Impacts External Assessment • Customer Impacts • Competitor Impacts • Shareholder Impacts • Supplier Impacts • Regulator Impacts Documented Business Goals and Expectations Business Value Delivered Organization Change Delivered Project Quality Delivered Risks and Mitigation Communication and Ownership Approach Communication Plan: • Objectives • Key Messages and Message Content • Key Communication Issues • Critical Success Factors • Audience Segmentation • Vehicles Considered • Timeline and Deliverables • Development Process • Approval Process • Measurement Process • Staffing Requirements • Budget • Local Rollout Communication Toolkit/Templates Change Network Design • Identification of targets, change agents, influencers, and sponsors • Critical relationships between audiences • Desired level of commitment Performance Mgmt Approach Training Plan • High-Level Training Needs Matrix • Training Delivery Approach • Curriculum Overview • Technology Requirements • Staffing Requirements • Budget • Local Rollout Toolkit/Templates • Training Workplan for subsequent work effort Ownership and Commitment Scorecard • Approach and structure for measuring and reporting levels of awareness, understanding, buy- in and commitment Journey Implications Report • Critical Success Factors 2 3 4 7 8 9 10 Organization Infrastructure • High Level Role Impact Analysis • Local Rollout Toolkit /Templates • Organization Infrastructure Workplan for subsequent work effort 11 1 Course of Action Journey Overview Map • Key Milestones • Internal/External Factors • Business Benefits • Key Capabilities • Change Readiness 5 Journey Guidelines • Enablement • Leadership • Measurement • Navigation • Ownership • Quality 6              LEGEND:  Items/approaches covered in this tutorial TOOLBOX/CHECKLIST OF CHANGE TOOLS/TECHNIQUES
  • 34. ADDITIONAL REFERENCES/LINKS http://www.advisormailout.com/Advisor/Subscribe.aspx?m=70 – New products and commentary from the “Who moved my cheese” folks. http://www.isixsigma.com/ce/change_management/ - A wealth of Change Management perspective for the SixSigma world http://www.vtpi.org/tdm/tdm114.htm - Touching on some of the basics http://www.beyondresistance.com/htm/3newsletter.html - Newsletters http://www.cisco.com/warp/public/126/chmgmt.shtml - Overview of some tools and techniques Managing the Change Process: A Field Book for Change Agents, Team Leaders and Reengineering Managers; David K. Carr,Kelvin J. Hard,William J. Trahant Making Sense of Change Management: A Complete Guide to the Models, Tools & Techniques of Organizational Change by Esther Cameron and Mike Green Managing Change and Transition (Paperback) by Harvard Business School Press Change Management by Jeffrey M. Hiatt and Timothy J. Creasey (Paperback - Sep 2003) The Complete Idiot’s Guide to Change Management by MBA, CMC, Jeff Davidson (Paperback - Sep 28, 2001) LINKS: BOOKS: