SlideShare une entreprise Scribd logo
1  sur  10
Mario Rey B. Guieb
55-K Ledesma Street, Ozamiz City /
259-E Galvez Bldg, Libertad, Pasay City
Metro Manila, Philippines
Mobile No. Saudi Arabia : +966596913506
Mobile No. Philippines : +639198041385 (Roaming)
Email : rguieb_68@yahoo.com/marioreyguieb@yahoo.com
POSITION APPLYING FOR : QA/QC Electrical Inspector/Instrument Inspector/Telecom Inspector
Construction Engineer ( Electrical or Instrument )
Electrical/Instrument Superintendent
OBJECTIVES : To effectively and economically manage construction projects through
inspection, monitoring and direct supervision.
CAREER SUMMARY :
With 15 years experienced in abroad in construction of plant and building in inspection/testing and supervising the
electrical, instrumentation and telecommunication installation such as power system, lighting system, fire alarm
system, lan system (voice and data), building automation management system, intercom system, camera system,
access control system, public address system, cathodic protection system and tank leak detection system.Have a
knowledged in designing and calculation of power/lighting load schedule, estimate bill of quantities of materials
and material take-off based on approved design drawing.
ACADEMIC QUALIFICATION :
• Bachelor of Science in Electrical Engineering (1985-1990)
Misamis University, Ozamiz City, Philippines.
• Board of Electrical Engineer Examination Licensure – Examination no. 41374, Philippine Regulation
Commission ( October 22 & 23, 1990 ), Manila, Philippines.
TECHNICAL/TRAINING QUALIFICATIONS :
• Certificate in Mv/Hv Cable Splicing Development Program (2 weeks seminar / trainee) Yanbu, KSA.
• Certificate in Plant Electrical Engineering Trainee (4 months actual trainee-installation /operation) Philippine
Compak Boards Inc.
COMPUTER LITERATE :
• Microsoft excel, Microsoft word & Microsoft outlook
WORK EXPERIENCE :
Gulf Mas Engineering & Contracting Co.
Post Box No. 1000 Ras Tanura 31941, Saudi Arabia (February 26, 2013 to Present)
Supplied to:
SK Engineering and Construction (July 30, 2014 to March 31, 2015)
QC Telecommunication Inspector
Wasit Gas Plant Project-Package 4, NGL Fractionation Unit
Saudi Aramco Gas Plant, Khursaniyah Al Jubail, KSA
Client : Saudi Aramco
Duties and Responsibilities :
Page 1
• Prepare and raise the Saudi Aramco Typical Inspection Plan / Saudi Aramco Inspection Checklist and witness
the installation of Paging system call station, beacon light and speakers for outdoor location both in hazardous
and non hazardous location.
• Prepare and raise the Saudi Aramco Typical Inspection Plan / Saudi Aramco Inspection Checklist and witness
the installation of Paging system call station, beacon light and speakers for indoor location both in Substation
270, PIB-570, Emergency generator bldg 770, Operator shelter 333, MSB-469 and OME-369.
• Prepare and raise the Saudi Aramco Typical Inspection Plan / Saudi Aramco Inspection Checklist and witness
the installation of voice and data outlet/box, conduiting, cabling and termination to telecommunication room
rack/lan panel for building Substation 270, PIB-570, Emergency generator bldg 770, Operator shelter 333,
MSB-469 and OME-369.
• Prepare and raise Non conformance report, Corrective action report, Preventive action report & Proactive
notification report to construction team.
• Responsible for discussing with the construction about the standard installation of paging system conduiting,
cable tray and cabling during actual preliminary inspection.
• Responsible for the submittal of red line drawings to SK engineering team and SK interface group during
internal inspection conducted.
• Confirm & witness the rectification of punchlist items in Log book entry(LBE) and Exception item list(EIL)
issued by Saudi Aramco Project Inspection Division prior for closed out.
Gulf Mas Engineering & Contracting Co.
Post Box No. 1000 Ras Tanura 31941, Saudi Arabia (February 26, 2013 to Present)
Supplied to:
Sumitomo Corporation (April 01, 2013 to April 30, 2014)
QC Electrical Inspector
Tanajib Communication Bldg/Nariyah Communication Bldg Expansion Project
Saudi Aramco Gas Plant, Tanajib, KSA
Client : Saudi Aramco
Duties and Responsibilities :
• Prepare and raise the Saudi Aramco Typical Inspection Plan / Saudi Aramco Inspection Checklist and witness
the installation of Cable tray, Emt/Rgs conduit, Lighting system, Receptacle, Main
Distribution/Power/Lighting Panels, Enclosed Ckt breakers, 400Amp, 4W, 3Ø, 480/277 volts, 60hz
Automatic/Manual transfer switch, 300kva, 4W, 3Ø, 480/277 volts, 60hz Generator,12.5kva, 4W, 3Ø, 480v-
208/120v, 60hz Dry type transformer, 300kva, 13.8kv-480/277vac, 3Ø, 4W, 60hz Pad Mounted Transformer,
cable pulling/cable continuity/insulation resistance and termination of low voltage cable.
• Prepare and raise the Saudi Aramco Typical Inspection Plan / Saudi Aramco Inspection Checklist and witness
the Grounding and Bonding, Continuity/Resistance of earthing system.
• Prepare and raise the Saudi Aramco Typical Inspection Plan / Saudi Aramco Inspection Checklist and Saudi
Aramco Pre-commissioning form and witness the illumination test of lighting pole fixture/building perimeter
fixture/indoor fixture and continuity resistance/polarity test of receptacle
• Prepare and raise the Saudi Aramco Typical Inspection Plan / Saudi Aramco Inspection Checklist and Saudi
Aramco Pre-commissioning form and witness the testing of insulation resistance,contact resistance and
thermal trip unit setting/testing of molded circuit breaker in the Distribution/Power/Lighting Panel by the
Vendor(Wescosa).
• Prepare and raise the Saudi Aramco Typical Inspection Plan / Saudi Aramco Inspection Checklist and Saudi
Aramco Pre-commissioning form and witness the Pre-energization functional testing of Automatic/Manual
transfer switch by the vendor(Wescosa).
• Prepare and raise the Saudi Aramco Typical Inspection Plan / Saudi Aramco Inspection Checklist and Saudi
Aramco Pre-commissioning form and witness the Pre-energization testing and functional test with 700kw
resistive load bank for 4 hrs of the 300kva Diesel Generator by the Vendor(Saudi Diesel Equipment Co.).
• Prepare and raise the Saudi Aramco Typical Inspection Plan / Saudi Aramco Inspection Checklist and Saudi
Aramco Pre-commissioning form and witness the Pre-energization testing of the Dry type/Pad mounted
transformer by the Vendor(Wescosa).
Page 2
• Responsible for the issuance of Non-conformance report, Corrective action report, Preventive action and
Proactive notification report to the subcontractor ACES Co.
• Prepare and raise the Saudi Aramco Typical Inspection Plan / Saudi Aramco Inspection Checklist and witness
the conduiting, cable pulling, continuity of Addressable fire alarm and instrumentation facility alarm system.
• Prepare and raise the Saudi Aramco Typical Inspection Plan / Saudi Aramco Inspection Checklist and witness
the installation of fire alarm control panel, sensitivity/multi criteria smoke detectors, heat detectors, fire alarm
horn/audible w/strobe light, facility alarm panel, fire alarm module relay panel, exhaust fan auto
changer/control panel, purge fan/exhaust fan/fire smoke motorized damper monitoring panel and oil/water
leak detector panel of fire alarm and instrumentation facility alarm system.
• Prepare and raise the Saudi Aramco Typical Inspection Plan / Saudi Aramco Inspection Checklist and Saudi
Aramco Pre-commissioning form and witness the Pre-energization calibration, functional testing of fire alarm
control panel and associated instrumentation facility alarm system.
GS Engineering & Construction Corp. (Construction Div.)
Mussafah, United Arab Emirates (Sept. 27, 2011 to Nov. 04, 2012)
QA/QC Electrical/Instrument Inspector
Inter Refineries Pipelines Project ( IRP-II )
Tebodin Consulting Engineers ( Project Management Consultant )
Client : Takreer
Duties and Responsibilities :
• Prepare the Inspection Test Plan and Check list for the Instrumentation and Control System Works ( Rev.A-
F,0 ), Electrical Works ( Rev.A-F,0 ), Telecommunication - Public address & General Alarm ( Rev.A ),
Telephone & Local Network System ( Rev.A,0 ), CCTV System ( Rev.A,0 ), Access Control System
( Rev.A,0), Cathodic Protection System as per vendor installation & testing procedure ( Rev.A-B,0 ), Fiber
Optic Cable Installation & Testing along the Pipeline ( Rev.A-B,0 ) & Fire Alarm System ( Rev.A-0 ) prior
for review, comment & approval by the PMC ( Tebodin Consulting Engineers ).
• Conduct inspection for the continuity test of cathodic hook-up boss/ wire rope to reinforcement bar and rebar
to rebar in the foundation footing of Substation 1100 at Mussafa terminal and Substation 900 in Madinat
zayed terminal.
• Responsible for witnessing the installation of cathodic titanium anode (MMO Ti Ribbon Anode), Conductor
bar, Cu/Cu/SO4 reference electrode, power feeder cable, Anode lead cable, Er probe, isolator and monitoring
pipe in the tank bottom at mussafah and madinat zayed terminal.
• Responsible for the Inspection the installation of monitoring test box station, Cu/Cu/SO4 reference electrode
and Mp3 probe in the tank ring wall and Substation at Mussafah terminal and Madinat Zayed terminal.
• Responsible for the inspection of the installation of cathodic reference electrode ( Ag/AgCl ), MMO Titanium
Tubular Anode, Polarization coupon, Er probe, Test lead cable, Positive header cable, Bonding cable,
negative header cable, reference electrode lead cable, cable to pipe connection, test station, negative junction
box, bonding junction box, positive junction box and anode terminal box ( including supports & base
foundation ) & cathodic cable termination in the pipeline from Mussafa terminal to Al Ain terminal.
• Conduct inspection for the installation of pvc embedded conduit and square box of the telepnone & data,
lightings and small power in the Substation 1100 in mussafah terminal.
• Conduct visual inspection for the electrical/communication sleeves in the Substation 1100 at mussafah
terminal prior for closing the shuttering in the sidewall and concrete pouring.
• Witness the installation of tank leak detection pipes at the tank bottom in madinat zayed terminal and al
ruwais terminal.
• Conduct inspection for laying and testing of fiber optic cable for SDH & CCTV along the pipeline from
Mussafah to Al-Ain, Tarif to Madinat and Sheihat to Ruwais.
• Witness the calibration of transmitters, gas detectors, control valve and popping test of safety valve.
• Responsible for the over-all material inspection of electrical, instrument, cathodic protection,
telecommunication & fire alarm in mussafah main warehouse.
• Responsible for the witness inspection of all electrical works in the Substation, Lpg, Pumphouse and trench at
Adnoc Lpg bottling & storage plant-Mussafah Terminal.
• Responsible for instrument inspection of control valve, transmitters, gas detectors, junction boxes & trench in
the Adnoc Lpg bottling and storage plant-Mussafah Terminal.
Page 3
GS Engineering & Construction Corp. (Construction Div.)
Al Ruwais, United Arab Emirates (Oct. 13, 2010 to Aug. 27, 2011)
QA/QC Instrument/Electrical Inspector
Green Diesel Project ( Expansion )
Worley Parsons ( Project Management Consultant )
Client : Takreer
Duties and Responsibilities :
• Responsible for the Quality Inspection & Monitoring for all Instrumentation works to the designated area
( Unit 804, 805, 806 & 812 ).
• Responsible for checking/witnessing the subcontractor’s Inspection Test Request (ITR) prior for clients
inspection & approval.
• Responsible for witnessing the instruments pre-calibration (Simulation) of pressure transmitter, temperature
transmitter,flow transmitter, level transmitter, pressure indicator, transmitter indicator, flow indicator,
temperature element, control valve, solenoid valve, pressure relief valve & etc. by using hart communicator,
milli amps calibrator (0 – 24 vdc/4 – 20ma), instrument, bath calibrator, nitrogen & air compressor.
• Responsible for the issuance of the Non-Conformance Report & Site Observation Memo to the Subcontractor.
• Conduct inspection for the electrical lighting pole-cable/cable tray, electrical heater-cable tray, cable, ckt
breaker/contactor.
• Witness the solo run test of the Mv compressor motor and low voltage motor.
• Witness the illumination test of lightings in the process and perimeter area.
• Conduct inspection for the installation of fire alarm system-manual call point, horn, strobe light, smoke
detector, heat detector and linear heat detector wire.
• Conduct inspection for the installation of public address-speakers, telephone w/ acoustic booth, rotating lamp
and hooter.
• Witness the functional test of the public address system in the process area thru the main console in the new
control building.
• Witness the functional test of the fire alarm system ( mcp, beacon & horn ), linear heat detector wire and
deluge skid in the process area thru the main console in the new control bldg.
• Conduct inspection and testing for the cathodic protection for anode and electrode in unit 804, 805, 806 and
unit 812 thru the cathodic test station box and cathodic rectifier.
• Conduct inspection for the installation & termination of cathodic protection system of rectifier panel, anode
terminal box, test station box and bond junction box.
• Witness the functional test of the cctv camera in the control bldg, substations and process area thru the cctv
monitor in the control room.
Samsung Eng’g & Construction,Saudi Arabia Ltd
Saudi Arabia (Nov. 12, 2009 to May 10, 2010)
QC Electrical Inspector
Diesel Hydrotreator Plant Project ( Expansion )
Saudi Aramco Oil & Gas Refinery Plant Facilities, Ras Tanura, KSA
Client : Saudi Aramco
Duties and Responsibilities :
• Responsible for the Quality Inspection & Monitoring for conduiting, cable tray, cable pulling, installation of
electrical panels, automatic transfer switch ,transformer, switchgear and motor solo run test activities to the
designated area of responsibilities.
• Witness the illumination test of lighting system, trip unit testing/setting of molded circuit breaker, testing and
functional test of dry type/oil filled transformer, testing at no load run test of diesel generator and testing and
functional test of low voltage switchgear at substation.
• Witness the installation and hi-pot test of the medium voltage cable 15 kv from the existing oil filled
transformer to the low voltage switchgear at the substation.
• Responsible of the material inspection for the electrical, paging & intercom, cctv & door contact, telephone &
data and fire alarm system at samsung main warehouse.
Page 4
• Responsible for checking subcontractor’s Request for Inspection (RFI) prior for clients inspection & approval.
• Responsible for the issuance of the Non-Conformance Report to the Subcontractor.
Sendan Al-Emarat Contracting Est.
United Arab Emirates (March 16, 2009 to Aug 5, 2009)
Electrical Superintendent
Dubai Metro Project (Greenline Project-Phase II)
Client : Government of Dubai-Roads and Transport Authority
Main Contractor : Mitsubishi Heavy Industies, Ltd.
Duties and Responsibilities :
• Responsible for the preparation/submittal to Mitsubishi Heavy Industry (MHI) through to our subcontractor
(Concord) the monthly progress report, weekly work schedule plan, weekly progress report , construction
weekly report, daily activity report and the weekly minutes of meeting.
• Responsible for checking & reviewing our subcontractor (Concord) monthly progress report, weekly work
schedule plan, weekly progress report , construction weekly report and daily activity report.
• Monitor the subcontractor work progress for the 20 Stations/Substations and the 33kv cable installation in the
trackside of the Dubai Light Rail Transit based on the Master Schedule of Electrical Installation
Programme for Dubai LRT Green Line Project-Phase II.
• Direct instruction to the field supervisors regarding the target date for the completion of task based on the
work schedule and work progress development.
Tecnimont Icb Pvt Ltd (E & I Division)
Saudi Arabia (JUNE 29, 2008 to DEC 25, 2008)
QA/QC Electrical Inspector
Petrochemicals Project-High Density Polyethylene and Low Density Polyethylene Plant
Jubail, Saudi Arabia
Client : Tasnee
Project Management : Integrated Management Team(IMT)
Duties and Responsibilities :
• Responsible for the inspection and monitoring of all electrical Mv/Lv motors, lighting panels, switchgear, heat
tracing cables & electric heater of mechanical equipment in the Low Density Polyethylene (LDPE) Area.
• Assist and witness the solo run test for the Mv/Lv Motors in the Low Density
Polyethylene (LDPE) Area.
• Responsible for the preparation of attachment documents for construction rectication of final
checking/walkdown inspection of client’s punchlist item prior for acceptance.
• Responsible for the preparation of the punchlist items conducted by the Integrated Management Team prior
for construction rectification.
GS Engineering & Construction Corp. (Construction Div.)
Oman (April 11, 2007-April 10, 2008)
Field Electrical Supervisor/Electrical Inspector
Sohar Aromatics Project
Benzene and Paraxylene Plant
Sohar, Oman
Client : Aromatics Oman L.L.C.
Duties and Responsibilities :
• Over-all supervision for electrical/communication works ( lightings, receptacle, ac power, telephone, paging
and fire alarm system ) for all the bldgs in aromatics project ( four substations, four control rooms, waste
water treatment/dehydrator/mcc bldg, chemical/hazardous warehouse, gate house 1 & 2, demi & desal bldg,
laboratory and administration bldg).
Page 5
• Responsible for checking and confirming the installation of embedded pvc conduit, galvanized conduit and
cable tray prior for inspection by Gs Qa/Qc and client’s electrical engineer.
• Monitor and check subcontractor civil work status in site prior for subcontractor’s installation of electrical and
communication sleeves.
• Coordinate with architectural/civil group for bldg. concreting schedule for slab, beam, sidewall & blockworks
installation prior for electrical/communication cable tray opening & conduit sleeves.
• Prepare material quantity take-off for electrical/communication based on the latest approved drawings prior
for a comparison with subcontractors quantity material take-off.
• Responsible for conducting a meeting thrice a week with the subcontractor of the electrical and
communication regarding the field problems, material status and deliver, manpower and work progress.
• Electrical/Communication representative for a weekly meeting with GS architectural/civil group,
subcontractors architectural/civil, electrical/communi-
cation and hvac/plumbing group concerning with field problems which involve
Architectural/civil/hvac works & electrical/communication material approval.
Hyundai Heavy Industries Co., Ltd (Construction Div.)
Nigeria (Dec 17, 2005-Dec 1, 2006)
QA/QC Electrical/Instrument Inspector
Bonny Terminal Integrated Project-EPIC Contract
Onshore/Offshore Oil and Gas Plant
Bonny Island, Nigeria
Client : Shell Petroleum Development Corporation
Duties and Responsibilities :
• Responsible for the Quality Control inspection and monitoring of all electrical/instrument installation
including substation in accordance to Project Specifications, Standards and Codes of Practices in Nigeria w/c
covered Unit#11,A2/A5(Crude Dehydration & Stabilization Plant),Unit#12,B1/B3
(Emulsion Treatment), Unit#13,A4/A7 (Process Gas Handling),Unit#14,B2/B4 (Produced/Effluent Water
Treatment System), Unit#21, A3/A6 (Crude Export System), Unit #25,E3(Fuel Gas Plant)/Unit #37,E2(Flare
System) at Process Area.
• Responsible for checking and monitoring of all the storaged/preserved electrical equipments, materials and
instruments to assigned area.
• Responsible for the issuing of internal non-conformance report(NCR) & punchlist items to construction and
checking/monitoring electrical/instrument installation punchlist items to assigned area.
• Responsible for answering the non-conformance report (NCR) & corrective action report (CAR) from the
client (Shell petroleum development co.)
Samko International Co. W.L.L. (Electro Mechanical)
Qatar (Oct 29, 2004-Oct 29, 2005)
Site Electrical Engineer
Al-Saad Retail Complex Mall Project
Doha, Qatar
Consultant : GHD Management Engineering Environment
Contractor : Ramco Trading & Contracting (W.L.L.)
Duties and Responsibilities :
• Prepare the mechanical work plan in site based on the project planning schedule for the Electrical system and
Communication system.
• Supervised and monitor the work progress for the installation of embedded pvc/galvanized conduit & wirings
for the Mall base building lightings, power, fire alarm system, cctv, telephone, tv, & public address.
• Supervised and monitor the work progress for the installation of galvanized cable tray,cable pulling and
termination of Lv cables & Control cables in the Retail Complex Mall.
• Responsible for the layout of embedded pvc conduit for the Mall base building lightings, power, fire alarm
system, cctv, telephone, tv, and public address prior for the preparation of shop drawing.
Page 6
Al Hussam Technical Services L.L.C. (Electro Mechanical)
United Arab Emirates (Feb 10, 2003-Feb 29, 2004)
Site Electrical Engineer
Dubai Municipality Project, DS 148/1 Main Pumping Station “Q” Phase-1
Drainage Pumping Station DR-20
Consultant : Montgomery Watson Harza
Contractor : Wade Adams Contracting (L.L.C.)
Dubai Municipality Project, DS 148/1 Main Pumping Station “Q” Phase-2
Drainage Pumping Station DR-18 & DR-19
Consultant : Montgomery Watson Harza
Contractor : Al Naboodah Engineering Services
Duties and Responsibilities :
• Responsible for supervising the execution of works and termination of Lv/11Kv Mv cables for the motors,
penstock cable, street light, lightings, power, emergency light, heat/smoke detector, fire alarm & control
cables in the control panel for the drainage pumping station DR-20 of Dubai Municipality Projects.
• Responsible for supervising the execution of works and termination of Mv/Lv cables for the submersible
pumps, penstock cable, fountain lightings, street light, lightings, power, outdoor socket outlet, emergency
light, heat/smoke detector, fire alarm & control cables in the control panel for the drainage pumping stations
DR-18 & DR-19 of Dubai Municipality Projects.
• Responsible for the calculation of load distribution schedule / details of connected load & single line diagram
for the sea water / sewage pumping station in Jebel Ali, Jumeira Island.
Shamael Al-Khaleej Est. (Mech’l/Elect’l/Civil Construction)
KSA (Oct 22, 2000-Dec 18, 2002)
Electrical Engineer
Ministry of Interior Project, New PCC Bldg. (Extension Phase-2)
Security Forces Hospital, Riyadh, KSA
Consultant : Ministry of Interior (Electrical Dept.)
Duties and Responsibilities :
• Supervised installation and termination of Lv cables & Control cables for the building automation and
management system (Bamms), computer and telephone integration system, close circuit television (cctv),
television (tv), intercom and public address and fire alarm system of the New Pcc Building Phase-2 at
Security Forces Hospital.
• Responsible for supervising the installation and termination of Lv cables for the transformer, Lv panel, db
panel, street pole, garden light & power / emergency power for the parking area of Security Forces Hospital.
• Responsible for supervising the execution of works and termination of Lv cables for the db panels, fire alarm
system, lightings, power / emergency power of medical gas plant, pump room and hospital perimeter fence of
the New Pcc Building Phase-2 at Security Forces Hospital.
• Design / estimate bill of materials for panels, lightings, power / emergency power of medical gas plant, pump
room and perimeter fence of the New Pcc Bdg Phase-2 at Security Forces Hospital.
• Design / estimate bill of materials for transformer, switchboard, panel, street pole, garden light and power /
emergency power for the parking area of Security Forces Hospital.
Mohammad Al-Mojil Group (Construction Division)
KSA (April 7, 1999-Mar 28, 2000)
Field Electrical/Instrument Engineer (Engineering Dept.)
Yanbu Petrochemical Polymers Project
Polyethylene & Polypropylene Plant
Yanbu, KSA
Main Contractor : Mitsubishi Heavy Industry (MHI)
Page 7
Duties and Responsibilities :
• Supervised installation and termination of Control cables, Lv cables & 33Kv Mv cables for the transformer,
motors, db panels & installation of cable tray, conduiting & grounding, cable at Yanbu Petrochemical Plant.
• Supervised installation, conduiting, wiring and termination for fire alarm system and communication system
in the process area at Yanbu Petrochemical Plant.
• Supervised installation of cable tray, conduiting & termination of cables for the instruments pressure
transmitter, analyzer, flow transmitter, level transmitter and loop check from instruments up to control room
at Yanbu Petrochemical Plant.
• Prepare/raise technical queries to client/contractor regarding field problems and drawing design discrepancy.
• Prepare request for approval of materials (Rfa) to the client/contractor.
Mohammad Al-Mojil Group (Construction Division)
KSA (Aug 5, 1998-April 6, 1999)
Field Electrical/Instrument Engineer (Engineering Dept.)
Qassim Expansion of Product Supply System
Gasoline & Kerosene Bulk Plant
Saudi Aramco Bulk Plant Facilities, Qassim KSA
Main Contractor: Snc Lavalin Int’l.
Duties and Responsibilities :
• Supervised the installation of cable tray,conduiting,cable pulling and termination of Wires, Lv cables &
34.5Kv Mv cables for the transformer/transformer busduct, Cathodic Protection, switchboard panel in the
substation and installation & termination of lighting panel, paging system, power / emergency power,
telephone and fire alarm system in satellite interface building at Saudi Aramco Bulk Plants Facilities,
Qassim.
• Supervised installation of instrument panels, cable tray, conducting, cable pulling and termination of cables
for the instruments pressure transmitter, flow transmitter, level transmitter, level switch (high and low), motor
operated valve and loop check from instruments up to control room at Saudi Aramco Plant Facilities, Qassim.
• Prepare quantity material take-off based on the latest approved plan drawing prior for purchasing and
installation.
• Design / estimate bill of materials for panels, lightings, power and emergency power in satellite interface
building at Saudi Aramco Bulk Plants Facilities, Qassim.
Mohammad Al-Mojil Group (Construction Division)
KSA (July 11, 1996-July 3, 1998)
Field Electrical/Instrument Engineer (Engineering Dept.)
Abqaiq Modernization of Distribution Control System
Oil & Gas Refinery Plant
Saudi Aramco, Abqaiq, KSA
Main Contractor: Parsons Int’l
Duties and Responsibilities :
• Supervised the installation of cable tray, conduiting, cable pulling and termination and wires, Lv cables & Mv
cables for the transformer, mcc panel, switchgear panel in the substation / control rooms and installation &
termination of lighting panel, power and emergency power at the Saudi Aramco Plants Facilities, Abqaiq.
• Supervised installation of cable tray, conduiting, wiring & termination for fire alarm system and paging
system in the process area, control room & substations at Saudi Aramco Plant Facilities, Abqaiq.
• Supervised installation of marshalling panel, cable tray, conduiting, cable pulling, termination of cables and
hook-up installation of tubing for the instruments pressure transmitter, flow transmitter, level transmitter,
analyzer, level switch (high and low),solenoid valve and loop check from instruments up to control room at
Saudi Aramco Plant Facilities, Abqaiq.
• Prepare bulk of quantities of materials based on the projects contract prior for estimation/comparison against
the material quantity take-off of the latest issued approved design plan drawings.
Page 8
Philippine Compak Boards
Philippines (Feb 20, 1995-Dec 30, 1995)
Control Room Operator
National Power Corporation
Philippines (June 1, 1993-Mar 31, 1994)
Plant Equipment Operator Power Plant Barge-106
Gyro Steel Sales & Services
Philippines (Oct 16, 1990-Nov 15, 1991)
Mechanical Engineering Services
Apprenticeship Trainee
Personal Details:
Name : Mario Rey B. Guieb
Age : 46 y/o
Date of Birth : June 22, 1968
Civil Status : Single
Religion : Roman Catholic
Address : 55-k Ledesma Street, Ozamiz City
Philippine Telephone : (+63) 2-5566212 / (+63) 2-5509051 / (+63) 88-5645217
Contact number : +639393787502
Profession : Philippine Registered Electrical Engineer ( License No. REE 22629 )
Regular Member : Institute of Integrated Electrical Engineers of the Philippines ( IIEE )
Membership No. 32982
Email address : rguieb_68@yahoo.com / marioreyguieb@yahoo.com
I hereby certify that all stated information are true and correct to the best of my knowledge and ability.
Sincerely,
Mario Rey Guieb
Applicant
Page 9
Philippine Compak Boards
Philippines (Feb 20, 1995-Dec 30, 1995)
Control Room Operator
National Power Corporation
Philippines (June 1, 1993-Mar 31, 1994)
Plant Equipment Operator Power Plant Barge-106
Gyro Steel Sales & Services
Philippines (Oct 16, 1990-Nov 15, 1991)
Mechanical Engineering Services
Apprenticeship Trainee
Personal Details:
Name : Mario Rey B. Guieb
Age : 46 y/o
Date of Birth : June 22, 1968
Civil Status : Single
Religion : Roman Catholic
Address : 55-k Ledesma Street, Ozamiz City
Philippine Telephone : (+63) 2-5566212 / (+63) 2-5509051 / (+63) 88-5645217
Contact number : +639393787502
Profession : Philippine Registered Electrical Engineer ( License No. REE 22629 )
Regular Member : Institute of Integrated Electrical Engineers of the Philippines ( IIEE )
Membership No. 32982
Email address : rguieb_68@yahoo.com / marioreyguieb@yahoo.com
I hereby certify that all stated information are true and correct to the best of my knowledge and ability.
Sincerely,
Mario Rey Guieb
Applicant
Page 9

Contenu connexe

Tendances

CV Instrument Control Inspector QAQC
CV Instrument Control Inspector  QAQC CV Instrument Control Inspector  QAQC
CV Instrument Control Inspector QAQC Firoz Mohammad
 
ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)Vijayakumar Kumar
 
Konstantinos Valvis CV 17.08.2016
Konstantinos Valvis  CV 17.08.2016Konstantinos Valvis  CV 17.08.2016
Konstantinos Valvis CV 17.08.2016Konstantinos Valvis
 
Zaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed
 
CV NGUYEN HUU THUC - ELECTRICAL & INSTRUMENT ENGINEER
CV NGUYEN HUU THUC - ELECTRICAL & INSTRUMENT ENGINEERCV NGUYEN HUU THUC - ELECTRICAL & INSTRUMENT ENGINEER
CV NGUYEN HUU THUC - ELECTRICAL & INSTRUMENT ENGINEERNguyen Thuc
 
CV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerCV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerDeva Narayanan
 
Manoj Ahire-Resume
Manoj Ahire-ResumeManoj Ahire-Resume
Manoj Ahire-ResumeManoj Ahire
 
Noman Jamil CV and Certificates updated
Noman Jamil CV and Certificates updatedNoman Jamil CV and Certificates updated
Noman Jamil CV and Certificates updatedNouman Jamil
 
TEXT RESUME FOR SENDING
TEXT RESUME FOR SENDINGTEXT RESUME FOR SENDING
TEXT RESUME FOR SENDINGshams ahmad
 
Ankit updated Resume
Ankit updated  ResumeAnkit updated  Resume
Ankit updated ResumeAnkit Agarwal
 

Tendances (18)

CV Instrument Control Inspector QAQC
CV Instrument Control Inspector  QAQC CV Instrument Control Inspector  QAQC
CV Instrument Control Inspector QAQC
 
ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)
 
Konstantinos Valvis CV 17.08.2016
Konstantinos Valvis  CV 17.08.2016Konstantinos Valvis  CV 17.08.2016
Konstantinos Valvis CV 17.08.2016
 
Resume 2016 june
Resume 2016 juneResume 2016 june
Resume 2016 june
 
Zaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed E&I Professional
Zaheer Ahmed E&I Professional
 
Satham Mohamed.A-CV..
Satham Mohamed.A-CV..Satham Mohamed.A-CV..
Satham Mohamed.A-CV..
 
Khaled elhag cv
Khaled elhag cvKhaled elhag cv
Khaled elhag cv
 
Moncrieff_Craig_CV
Moncrieff_Craig_CVMoncrieff_Craig_CV
Moncrieff_Craig_CV
 
CV NGUYEN HUU THUC - ELECTRICAL & INSTRUMENT ENGINEER
CV NGUYEN HUU THUC - ELECTRICAL & INSTRUMENT ENGINEERCV NGUYEN HUU THUC - ELECTRICAL & INSTRUMENT ENGINEER
CV NGUYEN HUU THUC - ELECTRICAL & INSTRUMENT ENGINEER
 
cv Instrument Commissioning Engineer
cv Instrument Commissioning Engineercv Instrument Commissioning Engineer
cv Instrument Commissioning Engineer
 
CV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerCV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation Engineer
 
Manoj Ahire-Resume
Manoj Ahire-ResumeManoj Ahire-Resume
Manoj Ahire-Resume
 
Ahmed Fahmy_CV
Ahmed Fahmy_CVAhmed Fahmy_CV
Ahmed Fahmy_CV
 
saif.resume dxb
saif.resume dxbsaif.resume dxb
saif.resume dxb
 
Noman Jamil CV and Certificates updated
Noman Jamil CV and Certificates updatedNoman Jamil CV and Certificates updated
Noman Jamil CV and Certificates updated
 
TEXT RESUME FOR SENDING
TEXT RESUME FOR SENDINGTEXT RESUME FOR SENDING
TEXT RESUME FOR SENDING
 
Ankit updated Resume
Ankit updated  ResumeAnkit updated  Resume
Ankit updated Resume
 
Instrument Engineeer
Instrument EngineeerInstrument Engineeer
Instrument Engineeer
 

En vedette

UNITED FOOD INDUSTRIES CORPOTATION LTD. COMPANY EXPORT
UNITED FOOD INDUSTRIES CORPOTATION LTD. COMPANY EXPORTUNITED FOOD INDUSTRIES CORPOTATION LTD. COMPANY EXPORT
UNITED FOOD INDUSTRIES CORPOTATION LTD. COMPANY EXPORTStanley Cayari
 
ICHLC Corporate Health Trends Report
ICHLC Corporate Health Trends ReportICHLC Corporate Health Trends Report
ICHLC Corporate Health Trends ReportErin Giordano, MBA
 
HEAVENS FLOODGATES EASYWELL SHOPPINGS LTD
HEAVENS FLOODGATES EASYWELL SHOPPINGS LTDHEAVENS FLOODGATES EASYWELL SHOPPINGS LTD
HEAVENS FLOODGATES EASYWELL SHOPPINGS LTDADENIYI AIYESA
 
Nanoencapsulation of essential oils with enhanced antimicrobial activity: A n...
Nanoencapsulation of essential oils with enhanced antimicrobial activity: A n...Nanoencapsulation of essential oils with enhanced antimicrobial activity: A n...
Nanoencapsulation of essential oils with enhanced antimicrobial activity: A n...Uploadworld
 
2015 - Images of MAY - May 01 - May 08
2015 - Images of MAY - May 01 - May 082015 - Images of MAY - May 01 - May 08
2015 - Images of MAY - May 01 - May 08vinhbinh2010
 
tebodin-world-april-2011
tebodin-world-april-2011tebodin-world-april-2011
tebodin-world-april-2011Dennis Brand
 
Amacom.administrative.assistants.secretarys.handbook
Amacom.administrative.assistants.secretarys.handbookAmacom.administrative.assistants.secretarys.handbook
Amacom.administrative.assistants.secretarys.handbookDaisy Galzote
 
Yahia Eisa- pipeline technical specialist
Yahia Eisa- pipeline technical specialistYahia Eisa- pipeline technical specialist
Yahia Eisa- pipeline technical specialistYahia Ibrahim
 
201104 food manufacturing and automation show
201104   food manufacturing and automation show201104   food manufacturing and automation show
201104 food manufacturing and automation showtnessen
 
Elbarbary Group - Company Profile.txt
Elbarbary Group - Company Profile.txtElbarbary Group - Company Profile.txt
Elbarbary Group - Company Profile.txtElbarbary Group
 
World bank final project
World bank final projectWorld bank final project
World bank final projects-mb
 
LCR Hallcrest Handbook of Liquid Crystal Technology RT006 rev01 usa
LCR Hallcrest Handbook of Liquid Crystal Technology RT006 rev01 usaLCR Hallcrest Handbook of Liquid Crystal Technology RT006 rev01 usa
LCR Hallcrest Handbook of Liquid Crystal Technology RT006 rev01 usaJohn Romano
 
AL ARRAB CONTRACTING COMPANY PROFILE 2015 Arabic
AL ARRAB CONTRACTING COMPANY PROFILE 2015 Arabic AL ARRAB CONTRACTING COMPANY PROFILE 2015 Arabic
AL ARRAB CONTRACTING COMPANY PROFILE 2015 Arabic Ibrahim Al-Hudhaif
 
Posidonia 2012: A forum for the Global Shipping Community
Posidonia 2012: A forum for the Global Shipping CommunityPosidonia 2012: A forum for the Global Shipping Community
Posidonia 2012: A forum for the Global Shipping CommunityACE Rent a Car Greece
 
0.1 Muaz Hassan Resume
0.1 Muaz Hassan  Resume0.1 Muaz Hassan  Resume
0.1 Muaz Hassan ResumeMuaz Hassan
 
AIM Global Clear Book OPP
AIM Global Clear Book OPPAIM Global Clear Book OPP
AIM Global Clear Book OPPiaimglobalnet
 

En vedette (20)

CV of JN SHARMA
CV of JN SHARMACV of JN SHARMA
CV of JN SHARMA
 
UNITED FOOD INDUSTRIES CORPOTATION LTD. COMPANY EXPORT
UNITED FOOD INDUSTRIES CORPOTATION LTD. COMPANY EXPORTUNITED FOOD INDUSTRIES CORPOTATION LTD. COMPANY EXPORT
UNITED FOOD INDUSTRIES CORPOTATION LTD. COMPANY EXPORT
 
ICHLC Corporate Health Trends Report
ICHLC Corporate Health Trends ReportICHLC Corporate Health Trends Report
ICHLC Corporate Health Trends Report
 
kamal final cv
kamal final cvkamal final cv
kamal final cv
 
HEAVENS FLOODGATES EASYWELL SHOPPINGS LTD
HEAVENS FLOODGATES EASYWELL SHOPPINGS LTDHEAVENS FLOODGATES EASYWELL SHOPPINGS LTD
HEAVENS FLOODGATES EASYWELL SHOPPINGS LTD
 
Nanoencapsulation of essential oils with enhanced antimicrobial activity: A n...
Nanoencapsulation of essential oils with enhanced antimicrobial activity: A n...Nanoencapsulation of essential oils with enhanced antimicrobial activity: A n...
Nanoencapsulation of essential oils with enhanced antimicrobial activity: A n...
 
2015 - Images of MAY - May 01 - May 08
2015 - Images of MAY - May 01 - May 082015 - Images of MAY - May 01 - May 08
2015 - Images of MAY - May 01 - May 08
 
tebodin-world-april-2011
tebodin-world-april-2011tebodin-world-april-2011
tebodin-world-april-2011
 
Amacom.administrative.assistants.secretarys.handbook
Amacom.administrative.assistants.secretarys.handbookAmacom.administrative.assistants.secretarys.handbook
Amacom.administrative.assistants.secretarys.handbook
 
Yahia Eisa- pipeline technical specialist
Yahia Eisa- pipeline technical specialistYahia Eisa- pipeline technical specialist
Yahia Eisa- pipeline technical specialist
 
201104 food manufacturing and automation show
201104   food manufacturing and automation show201104   food manufacturing and automation show
201104 food manufacturing and automation show
 
Elbarbary Group - Company Profile.txt
Elbarbary Group - Company Profile.txtElbarbary Group - Company Profile.txt
Elbarbary Group - Company Profile.txt
 
World bank final project
World bank final projectWorld bank final project
World bank final project
 
LCR Hallcrest Handbook of Liquid Crystal Technology RT006 rev01 usa
LCR Hallcrest Handbook of Liquid Crystal Technology RT006 rev01 usaLCR Hallcrest Handbook of Liquid Crystal Technology RT006 rev01 usa
LCR Hallcrest Handbook of Liquid Crystal Technology RT006 rev01 usa
 
Pepsi hajipur
Pepsi hajipurPepsi hajipur
Pepsi hajipur
 
AL ARRAB CONTRACTING COMPANY PROFILE 2015 Arabic
AL ARRAB CONTRACTING COMPANY PROFILE 2015 Arabic AL ARRAB CONTRACTING COMPANY PROFILE 2015 Arabic
AL ARRAB CONTRACTING COMPANY PROFILE 2015 Arabic
 
Posidonia 2012: A forum for the Global Shipping Community
Posidonia 2012: A forum for the Global Shipping CommunityPosidonia 2012: A forum for the Global Shipping Community
Posidonia 2012: A forum for the Global Shipping Community
 
0.1 Muaz Hassan Resume
0.1 Muaz Hassan  Resume0.1 Muaz Hassan  Resume
0.1 Muaz Hassan Resume
 
Watchlist 1.1.2014
Watchlist 1.1.2014Watchlist 1.1.2014
Watchlist 1.1.2014
 
AIM Global Clear Book OPP
AIM Global Clear Book OPPAIM Global Clear Book OPP
AIM Global Clear Book OPP
 

Similaire à Curriculum Vitae of Mario Rey Guieb

Similaire à Curriculum Vitae of Mario Rey Guieb (20)

Commission resume
Commission resumeCommission resume
Commission resume
 
atallah mohammed farhan CV
atallah mohammed farhan CVatallah mohammed farhan CV
atallah mohammed farhan CV
 
CV of Ronnel T. Domingo - Electrical Engineer
CV of Ronnel T. Domingo - Electrical EngineerCV of Ronnel T. Domingo - Electrical Engineer
CV of Ronnel T. Domingo - Electrical Engineer
 
Russell bruce cv 2016.
Russell bruce cv 2016.Russell bruce cv 2016.
Russell bruce cv 2016.
 
Updated-Mohammed Khursheed -CV -Alam, VELOSI LLC
Updated-Mohammed Khursheed -CV -Alam, VELOSI LLCUpdated-Mohammed Khursheed -CV -Alam, VELOSI LLC
Updated-Mohammed Khursheed -CV -Alam, VELOSI LLC
 
resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986
 
Abraham Sanni CV
Abraham Sanni CVAbraham Sanni CV
Abraham Sanni CV
 
Resume - Sr.QC Inspector-Mech.welding-painting-piping-pipeline
Resume -   Sr.QC Inspector-Mech.welding-painting-piping-pipelineResume -   Sr.QC Inspector-Mech.welding-painting-piping-pipeline
Resume - Sr.QC Inspector-Mech.welding-painting-piping-pipeline
 
Lead Inspection Engineer CV
Lead Inspection Engineer CVLead Inspection Engineer CV
Lead Inspection Engineer CV
 
CV_E&I QC
CV_E&I QCCV_E&I QC
CV_E&I QC
 
RESUME-Sijin
RESUME-SijinRESUME-Sijin
RESUME-Sijin
 
Mohamed Abd Alhamid CV.pdf
Mohamed Abd Alhamid CV.pdfMohamed Abd Alhamid CV.pdf
Mohamed Abd Alhamid CV.pdf
 
Khalid -cv_electrical_engineer (1)
Khalid  -cv_electrical_engineer (1)Khalid  -cv_electrical_engineer (1)
Khalid -cv_electrical_engineer (1)
 
Tabrez
TabrezTabrez
Tabrez
 
Vimal cv
Vimal cv Vimal cv
Vimal cv
 
QA/QC ENGINEER
QA/QC ENGINEERQA/QC ENGINEER
QA/QC ENGINEER
 
Sameh Youssef _Electrical Engineer_CV
Sameh Youssef _Electrical Engineer_CVSameh Youssef _Electrical Engineer_CV
Sameh Youssef _Electrical Engineer_CV
 
MNC-14
MNC-14MNC-14
MNC-14
 
QAQC E&I
QAQC E&IQAQC E&I
QAQC E&I
 
Resume-Sudhin
Resume-SudhinResume-Sudhin
Resume-Sudhin
 

Curriculum Vitae of Mario Rey Guieb

  • 1. Mario Rey B. Guieb 55-K Ledesma Street, Ozamiz City / 259-E Galvez Bldg, Libertad, Pasay City Metro Manila, Philippines Mobile No. Saudi Arabia : +966596913506 Mobile No. Philippines : +639198041385 (Roaming) Email : rguieb_68@yahoo.com/marioreyguieb@yahoo.com POSITION APPLYING FOR : QA/QC Electrical Inspector/Instrument Inspector/Telecom Inspector Construction Engineer ( Electrical or Instrument ) Electrical/Instrument Superintendent OBJECTIVES : To effectively and economically manage construction projects through inspection, monitoring and direct supervision. CAREER SUMMARY : With 15 years experienced in abroad in construction of plant and building in inspection/testing and supervising the electrical, instrumentation and telecommunication installation such as power system, lighting system, fire alarm system, lan system (voice and data), building automation management system, intercom system, camera system, access control system, public address system, cathodic protection system and tank leak detection system.Have a knowledged in designing and calculation of power/lighting load schedule, estimate bill of quantities of materials and material take-off based on approved design drawing. ACADEMIC QUALIFICATION : • Bachelor of Science in Electrical Engineering (1985-1990) Misamis University, Ozamiz City, Philippines. • Board of Electrical Engineer Examination Licensure – Examination no. 41374, Philippine Regulation Commission ( October 22 & 23, 1990 ), Manila, Philippines. TECHNICAL/TRAINING QUALIFICATIONS : • Certificate in Mv/Hv Cable Splicing Development Program (2 weeks seminar / trainee) Yanbu, KSA. • Certificate in Plant Electrical Engineering Trainee (4 months actual trainee-installation /operation) Philippine Compak Boards Inc. COMPUTER LITERATE : • Microsoft excel, Microsoft word & Microsoft outlook WORK EXPERIENCE : Gulf Mas Engineering & Contracting Co. Post Box No. 1000 Ras Tanura 31941, Saudi Arabia (February 26, 2013 to Present) Supplied to: SK Engineering and Construction (July 30, 2014 to March 31, 2015) QC Telecommunication Inspector Wasit Gas Plant Project-Package 4, NGL Fractionation Unit Saudi Aramco Gas Plant, Khursaniyah Al Jubail, KSA Client : Saudi Aramco Duties and Responsibilities : Page 1
  • 2. • Prepare and raise the Saudi Aramco Typical Inspection Plan / Saudi Aramco Inspection Checklist and witness the installation of Paging system call station, beacon light and speakers for outdoor location both in hazardous and non hazardous location. • Prepare and raise the Saudi Aramco Typical Inspection Plan / Saudi Aramco Inspection Checklist and witness the installation of Paging system call station, beacon light and speakers for indoor location both in Substation 270, PIB-570, Emergency generator bldg 770, Operator shelter 333, MSB-469 and OME-369. • Prepare and raise the Saudi Aramco Typical Inspection Plan / Saudi Aramco Inspection Checklist and witness the installation of voice and data outlet/box, conduiting, cabling and termination to telecommunication room rack/lan panel for building Substation 270, PIB-570, Emergency generator bldg 770, Operator shelter 333, MSB-469 and OME-369. • Prepare and raise Non conformance report, Corrective action report, Preventive action report & Proactive notification report to construction team. • Responsible for discussing with the construction about the standard installation of paging system conduiting, cable tray and cabling during actual preliminary inspection. • Responsible for the submittal of red line drawings to SK engineering team and SK interface group during internal inspection conducted. • Confirm & witness the rectification of punchlist items in Log book entry(LBE) and Exception item list(EIL) issued by Saudi Aramco Project Inspection Division prior for closed out. Gulf Mas Engineering & Contracting Co. Post Box No. 1000 Ras Tanura 31941, Saudi Arabia (February 26, 2013 to Present) Supplied to: Sumitomo Corporation (April 01, 2013 to April 30, 2014) QC Electrical Inspector Tanajib Communication Bldg/Nariyah Communication Bldg Expansion Project Saudi Aramco Gas Plant, Tanajib, KSA Client : Saudi Aramco Duties and Responsibilities : • Prepare and raise the Saudi Aramco Typical Inspection Plan / Saudi Aramco Inspection Checklist and witness the installation of Cable tray, Emt/Rgs conduit, Lighting system, Receptacle, Main Distribution/Power/Lighting Panels, Enclosed Ckt breakers, 400Amp, 4W, 3Ø, 480/277 volts, 60hz Automatic/Manual transfer switch, 300kva, 4W, 3Ø, 480/277 volts, 60hz Generator,12.5kva, 4W, 3Ø, 480v- 208/120v, 60hz Dry type transformer, 300kva, 13.8kv-480/277vac, 3Ø, 4W, 60hz Pad Mounted Transformer, cable pulling/cable continuity/insulation resistance and termination of low voltage cable. • Prepare and raise the Saudi Aramco Typical Inspection Plan / Saudi Aramco Inspection Checklist and witness the Grounding and Bonding, Continuity/Resistance of earthing system. • Prepare and raise the Saudi Aramco Typical Inspection Plan / Saudi Aramco Inspection Checklist and Saudi Aramco Pre-commissioning form and witness the illumination test of lighting pole fixture/building perimeter fixture/indoor fixture and continuity resistance/polarity test of receptacle • Prepare and raise the Saudi Aramco Typical Inspection Plan / Saudi Aramco Inspection Checklist and Saudi Aramco Pre-commissioning form and witness the testing of insulation resistance,contact resistance and thermal trip unit setting/testing of molded circuit breaker in the Distribution/Power/Lighting Panel by the Vendor(Wescosa). • Prepare and raise the Saudi Aramco Typical Inspection Plan / Saudi Aramco Inspection Checklist and Saudi Aramco Pre-commissioning form and witness the Pre-energization functional testing of Automatic/Manual transfer switch by the vendor(Wescosa). • Prepare and raise the Saudi Aramco Typical Inspection Plan / Saudi Aramco Inspection Checklist and Saudi Aramco Pre-commissioning form and witness the Pre-energization testing and functional test with 700kw resistive load bank for 4 hrs of the 300kva Diesel Generator by the Vendor(Saudi Diesel Equipment Co.). • Prepare and raise the Saudi Aramco Typical Inspection Plan / Saudi Aramco Inspection Checklist and Saudi Aramco Pre-commissioning form and witness the Pre-energization testing of the Dry type/Pad mounted transformer by the Vendor(Wescosa). Page 2
  • 3. • Responsible for the issuance of Non-conformance report, Corrective action report, Preventive action and Proactive notification report to the subcontractor ACES Co. • Prepare and raise the Saudi Aramco Typical Inspection Plan / Saudi Aramco Inspection Checklist and witness the conduiting, cable pulling, continuity of Addressable fire alarm and instrumentation facility alarm system. • Prepare and raise the Saudi Aramco Typical Inspection Plan / Saudi Aramco Inspection Checklist and witness the installation of fire alarm control panel, sensitivity/multi criteria smoke detectors, heat detectors, fire alarm horn/audible w/strobe light, facility alarm panel, fire alarm module relay panel, exhaust fan auto changer/control panel, purge fan/exhaust fan/fire smoke motorized damper monitoring panel and oil/water leak detector panel of fire alarm and instrumentation facility alarm system. • Prepare and raise the Saudi Aramco Typical Inspection Plan / Saudi Aramco Inspection Checklist and Saudi Aramco Pre-commissioning form and witness the Pre-energization calibration, functional testing of fire alarm control panel and associated instrumentation facility alarm system. GS Engineering & Construction Corp. (Construction Div.) Mussafah, United Arab Emirates (Sept. 27, 2011 to Nov. 04, 2012) QA/QC Electrical/Instrument Inspector Inter Refineries Pipelines Project ( IRP-II ) Tebodin Consulting Engineers ( Project Management Consultant ) Client : Takreer Duties and Responsibilities : • Prepare the Inspection Test Plan and Check list for the Instrumentation and Control System Works ( Rev.A- F,0 ), Electrical Works ( Rev.A-F,0 ), Telecommunication - Public address & General Alarm ( Rev.A ), Telephone & Local Network System ( Rev.A,0 ), CCTV System ( Rev.A,0 ), Access Control System ( Rev.A,0), Cathodic Protection System as per vendor installation & testing procedure ( Rev.A-B,0 ), Fiber Optic Cable Installation & Testing along the Pipeline ( Rev.A-B,0 ) & Fire Alarm System ( Rev.A-0 ) prior for review, comment & approval by the PMC ( Tebodin Consulting Engineers ). • Conduct inspection for the continuity test of cathodic hook-up boss/ wire rope to reinforcement bar and rebar to rebar in the foundation footing of Substation 1100 at Mussafa terminal and Substation 900 in Madinat zayed terminal. • Responsible for witnessing the installation of cathodic titanium anode (MMO Ti Ribbon Anode), Conductor bar, Cu/Cu/SO4 reference electrode, power feeder cable, Anode lead cable, Er probe, isolator and monitoring pipe in the tank bottom at mussafah and madinat zayed terminal. • Responsible for the Inspection the installation of monitoring test box station, Cu/Cu/SO4 reference electrode and Mp3 probe in the tank ring wall and Substation at Mussafah terminal and Madinat Zayed terminal. • Responsible for the inspection of the installation of cathodic reference electrode ( Ag/AgCl ), MMO Titanium Tubular Anode, Polarization coupon, Er probe, Test lead cable, Positive header cable, Bonding cable, negative header cable, reference electrode lead cable, cable to pipe connection, test station, negative junction box, bonding junction box, positive junction box and anode terminal box ( including supports & base foundation ) & cathodic cable termination in the pipeline from Mussafa terminal to Al Ain terminal. • Conduct inspection for the installation of pvc embedded conduit and square box of the telepnone & data, lightings and small power in the Substation 1100 in mussafah terminal. • Conduct visual inspection for the electrical/communication sleeves in the Substation 1100 at mussafah terminal prior for closing the shuttering in the sidewall and concrete pouring. • Witness the installation of tank leak detection pipes at the tank bottom in madinat zayed terminal and al ruwais terminal. • Conduct inspection for laying and testing of fiber optic cable for SDH & CCTV along the pipeline from Mussafah to Al-Ain, Tarif to Madinat and Sheihat to Ruwais. • Witness the calibration of transmitters, gas detectors, control valve and popping test of safety valve. • Responsible for the over-all material inspection of electrical, instrument, cathodic protection, telecommunication & fire alarm in mussafah main warehouse. • Responsible for the witness inspection of all electrical works in the Substation, Lpg, Pumphouse and trench at Adnoc Lpg bottling & storage plant-Mussafah Terminal. • Responsible for instrument inspection of control valve, transmitters, gas detectors, junction boxes & trench in the Adnoc Lpg bottling and storage plant-Mussafah Terminal. Page 3
  • 4. GS Engineering & Construction Corp. (Construction Div.) Al Ruwais, United Arab Emirates (Oct. 13, 2010 to Aug. 27, 2011) QA/QC Instrument/Electrical Inspector Green Diesel Project ( Expansion ) Worley Parsons ( Project Management Consultant ) Client : Takreer Duties and Responsibilities : • Responsible for the Quality Inspection & Monitoring for all Instrumentation works to the designated area ( Unit 804, 805, 806 & 812 ). • Responsible for checking/witnessing the subcontractor’s Inspection Test Request (ITR) prior for clients inspection & approval. • Responsible for witnessing the instruments pre-calibration (Simulation) of pressure transmitter, temperature transmitter,flow transmitter, level transmitter, pressure indicator, transmitter indicator, flow indicator, temperature element, control valve, solenoid valve, pressure relief valve & etc. by using hart communicator, milli amps calibrator (0 – 24 vdc/4 – 20ma), instrument, bath calibrator, nitrogen & air compressor. • Responsible for the issuance of the Non-Conformance Report & Site Observation Memo to the Subcontractor. • Conduct inspection for the electrical lighting pole-cable/cable tray, electrical heater-cable tray, cable, ckt breaker/contactor. • Witness the solo run test of the Mv compressor motor and low voltage motor. • Witness the illumination test of lightings in the process and perimeter area. • Conduct inspection for the installation of fire alarm system-manual call point, horn, strobe light, smoke detector, heat detector and linear heat detector wire. • Conduct inspection for the installation of public address-speakers, telephone w/ acoustic booth, rotating lamp and hooter. • Witness the functional test of the public address system in the process area thru the main console in the new control building. • Witness the functional test of the fire alarm system ( mcp, beacon & horn ), linear heat detector wire and deluge skid in the process area thru the main console in the new control bldg. • Conduct inspection and testing for the cathodic protection for anode and electrode in unit 804, 805, 806 and unit 812 thru the cathodic test station box and cathodic rectifier. • Conduct inspection for the installation & termination of cathodic protection system of rectifier panel, anode terminal box, test station box and bond junction box. • Witness the functional test of the cctv camera in the control bldg, substations and process area thru the cctv monitor in the control room. Samsung Eng’g & Construction,Saudi Arabia Ltd Saudi Arabia (Nov. 12, 2009 to May 10, 2010) QC Electrical Inspector Diesel Hydrotreator Plant Project ( Expansion ) Saudi Aramco Oil & Gas Refinery Plant Facilities, Ras Tanura, KSA Client : Saudi Aramco Duties and Responsibilities : • Responsible for the Quality Inspection & Monitoring for conduiting, cable tray, cable pulling, installation of electrical panels, automatic transfer switch ,transformer, switchgear and motor solo run test activities to the designated area of responsibilities. • Witness the illumination test of lighting system, trip unit testing/setting of molded circuit breaker, testing and functional test of dry type/oil filled transformer, testing at no load run test of diesel generator and testing and functional test of low voltage switchgear at substation. • Witness the installation and hi-pot test of the medium voltage cable 15 kv from the existing oil filled transformer to the low voltage switchgear at the substation. • Responsible of the material inspection for the electrical, paging & intercom, cctv & door contact, telephone & data and fire alarm system at samsung main warehouse. Page 4
  • 5. • Responsible for checking subcontractor’s Request for Inspection (RFI) prior for clients inspection & approval. • Responsible for the issuance of the Non-Conformance Report to the Subcontractor. Sendan Al-Emarat Contracting Est. United Arab Emirates (March 16, 2009 to Aug 5, 2009) Electrical Superintendent Dubai Metro Project (Greenline Project-Phase II) Client : Government of Dubai-Roads and Transport Authority Main Contractor : Mitsubishi Heavy Industies, Ltd. Duties and Responsibilities : • Responsible for the preparation/submittal to Mitsubishi Heavy Industry (MHI) through to our subcontractor (Concord) the monthly progress report, weekly work schedule plan, weekly progress report , construction weekly report, daily activity report and the weekly minutes of meeting. • Responsible for checking & reviewing our subcontractor (Concord) monthly progress report, weekly work schedule plan, weekly progress report , construction weekly report and daily activity report. • Monitor the subcontractor work progress for the 20 Stations/Substations and the 33kv cable installation in the trackside of the Dubai Light Rail Transit based on the Master Schedule of Electrical Installation Programme for Dubai LRT Green Line Project-Phase II. • Direct instruction to the field supervisors regarding the target date for the completion of task based on the work schedule and work progress development. Tecnimont Icb Pvt Ltd (E & I Division) Saudi Arabia (JUNE 29, 2008 to DEC 25, 2008) QA/QC Electrical Inspector Petrochemicals Project-High Density Polyethylene and Low Density Polyethylene Plant Jubail, Saudi Arabia Client : Tasnee Project Management : Integrated Management Team(IMT) Duties and Responsibilities : • Responsible for the inspection and monitoring of all electrical Mv/Lv motors, lighting panels, switchgear, heat tracing cables & electric heater of mechanical equipment in the Low Density Polyethylene (LDPE) Area. • Assist and witness the solo run test for the Mv/Lv Motors in the Low Density Polyethylene (LDPE) Area. • Responsible for the preparation of attachment documents for construction rectication of final checking/walkdown inspection of client’s punchlist item prior for acceptance. • Responsible for the preparation of the punchlist items conducted by the Integrated Management Team prior for construction rectification. GS Engineering & Construction Corp. (Construction Div.) Oman (April 11, 2007-April 10, 2008) Field Electrical Supervisor/Electrical Inspector Sohar Aromatics Project Benzene and Paraxylene Plant Sohar, Oman Client : Aromatics Oman L.L.C. Duties and Responsibilities : • Over-all supervision for electrical/communication works ( lightings, receptacle, ac power, telephone, paging and fire alarm system ) for all the bldgs in aromatics project ( four substations, four control rooms, waste water treatment/dehydrator/mcc bldg, chemical/hazardous warehouse, gate house 1 & 2, demi & desal bldg, laboratory and administration bldg). Page 5
  • 6. • Responsible for checking and confirming the installation of embedded pvc conduit, galvanized conduit and cable tray prior for inspection by Gs Qa/Qc and client’s electrical engineer. • Monitor and check subcontractor civil work status in site prior for subcontractor’s installation of electrical and communication sleeves. • Coordinate with architectural/civil group for bldg. concreting schedule for slab, beam, sidewall & blockworks installation prior for electrical/communication cable tray opening & conduit sleeves. • Prepare material quantity take-off for electrical/communication based on the latest approved drawings prior for a comparison with subcontractors quantity material take-off. • Responsible for conducting a meeting thrice a week with the subcontractor of the electrical and communication regarding the field problems, material status and deliver, manpower and work progress. • Electrical/Communication representative for a weekly meeting with GS architectural/civil group, subcontractors architectural/civil, electrical/communi- cation and hvac/plumbing group concerning with field problems which involve Architectural/civil/hvac works & electrical/communication material approval. Hyundai Heavy Industries Co., Ltd (Construction Div.) Nigeria (Dec 17, 2005-Dec 1, 2006) QA/QC Electrical/Instrument Inspector Bonny Terminal Integrated Project-EPIC Contract Onshore/Offshore Oil and Gas Plant Bonny Island, Nigeria Client : Shell Petroleum Development Corporation Duties and Responsibilities : • Responsible for the Quality Control inspection and monitoring of all electrical/instrument installation including substation in accordance to Project Specifications, Standards and Codes of Practices in Nigeria w/c covered Unit#11,A2/A5(Crude Dehydration & Stabilization Plant),Unit#12,B1/B3 (Emulsion Treatment), Unit#13,A4/A7 (Process Gas Handling),Unit#14,B2/B4 (Produced/Effluent Water Treatment System), Unit#21, A3/A6 (Crude Export System), Unit #25,E3(Fuel Gas Plant)/Unit #37,E2(Flare System) at Process Area. • Responsible for checking and monitoring of all the storaged/preserved electrical equipments, materials and instruments to assigned area. • Responsible for the issuing of internal non-conformance report(NCR) & punchlist items to construction and checking/monitoring electrical/instrument installation punchlist items to assigned area. • Responsible for answering the non-conformance report (NCR) & corrective action report (CAR) from the client (Shell petroleum development co.) Samko International Co. W.L.L. (Electro Mechanical) Qatar (Oct 29, 2004-Oct 29, 2005) Site Electrical Engineer Al-Saad Retail Complex Mall Project Doha, Qatar Consultant : GHD Management Engineering Environment Contractor : Ramco Trading & Contracting (W.L.L.) Duties and Responsibilities : • Prepare the mechanical work plan in site based on the project planning schedule for the Electrical system and Communication system. • Supervised and monitor the work progress for the installation of embedded pvc/galvanized conduit & wirings for the Mall base building lightings, power, fire alarm system, cctv, telephone, tv, & public address. • Supervised and monitor the work progress for the installation of galvanized cable tray,cable pulling and termination of Lv cables & Control cables in the Retail Complex Mall. • Responsible for the layout of embedded pvc conduit for the Mall base building lightings, power, fire alarm system, cctv, telephone, tv, and public address prior for the preparation of shop drawing. Page 6
  • 7. Al Hussam Technical Services L.L.C. (Electro Mechanical) United Arab Emirates (Feb 10, 2003-Feb 29, 2004) Site Electrical Engineer Dubai Municipality Project, DS 148/1 Main Pumping Station “Q” Phase-1 Drainage Pumping Station DR-20 Consultant : Montgomery Watson Harza Contractor : Wade Adams Contracting (L.L.C.) Dubai Municipality Project, DS 148/1 Main Pumping Station “Q” Phase-2 Drainage Pumping Station DR-18 & DR-19 Consultant : Montgomery Watson Harza Contractor : Al Naboodah Engineering Services Duties and Responsibilities : • Responsible for supervising the execution of works and termination of Lv/11Kv Mv cables for the motors, penstock cable, street light, lightings, power, emergency light, heat/smoke detector, fire alarm & control cables in the control panel for the drainage pumping station DR-20 of Dubai Municipality Projects. • Responsible for supervising the execution of works and termination of Mv/Lv cables for the submersible pumps, penstock cable, fountain lightings, street light, lightings, power, outdoor socket outlet, emergency light, heat/smoke detector, fire alarm & control cables in the control panel for the drainage pumping stations DR-18 & DR-19 of Dubai Municipality Projects. • Responsible for the calculation of load distribution schedule / details of connected load & single line diagram for the sea water / sewage pumping station in Jebel Ali, Jumeira Island. Shamael Al-Khaleej Est. (Mech’l/Elect’l/Civil Construction) KSA (Oct 22, 2000-Dec 18, 2002) Electrical Engineer Ministry of Interior Project, New PCC Bldg. (Extension Phase-2) Security Forces Hospital, Riyadh, KSA Consultant : Ministry of Interior (Electrical Dept.) Duties and Responsibilities : • Supervised installation and termination of Lv cables & Control cables for the building automation and management system (Bamms), computer and telephone integration system, close circuit television (cctv), television (tv), intercom and public address and fire alarm system of the New Pcc Building Phase-2 at Security Forces Hospital. • Responsible for supervising the installation and termination of Lv cables for the transformer, Lv panel, db panel, street pole, garden light & power / emergency power for the parking area of Security Forces Hospital. • Responsible for supervising the execution of works and termination of Lv cables for the db panels, fire alarm system, lightings, power / emergency power of medical gas plant, pump room and hospital perimeter fence of the New Pcc Building Phase-2 at Security Forces Hospital. • Design / estimate bill of materials for panels, lightings, power / emergency power of medical gas plant, pump room and perimeter fence of the New Pcc Bdg Phase-2 at Security Forces Hospital. • Design / estimate bill of materials for transformer, switchboard, panel, street pole, garden light and power / emergency power for the parking area of Security Forces Hospital. Mohammad Al-Mojil Group (Construction Division) KSA (April 7, 1999-Mar 28, 2000) Field Electrical/Instrument Engineer (Engineering Dept.) Yanbu Petrochemical Polymers Project Polyethylene & Polypropylene Plant Yanbu, KSA Main Contractor : Mitsubishi Heavy Industry (MHI) Page 7
  • 8. Duties and Responsibilities : • Supervised installation and termination of Control cables, Lv cables & 33Kv Mv cables for the transformer, motors, db panels & installation of cable tray, conduiting & grounding, cable at Yanbu Petrochemical Plant. • Supervised installation, conduiting, wiring and termination for fire alarm system and communication system in the process area at Yanbu Petrochemical Plant. • Supervised installation of cable tray, conduiting & termination of cables for the instruments pressure transmitter, analyzer, flow transmitter, level transmitter and loop check from instruments up to control room at Yanbu Petrochemical Plant. • Prepare/raise technical queries to client/contractor regarding field problems and drawing design discrepancy. • Prepare request for approval of materials (Rfa) to the client/contractor. Mohammad Al-Mojil Group (Construction Division) KSA (Aug 5, 1998-April 6, 1999) Field Electrical/Instrument Engineer (Engineering Dept.) Qassim Expansion of Product Supply System Gasoline & Kerosene Bulk Plant Saudi Aramco Bulk Plant Facilities, Qassim KSA Main Contractor: Snc Lavalin Int’l. Duties and Responsibilities : • Supervised the installation of cable tray,conduiting,cable pulling and termination of Wires, Lv cables & 34.5Kv Mv cables for the transformer/transformer busduct, Cathodic Protection, switchboard panel in the substation and installation & termination of lighting panel, paging system, power / emergency power, telephone and fire alarm system in satellite interface building at Saudi Aramco Bulk Plants Facilities, Qassim. • Supervised installation of instrument panels, cable tray, conducting, cable pulling and termination of cables for the instruments pressure transmitter, flow transmitter, level transmitter, level switch (high and low), motor operated valve and loop check from instruments up to control room at Saudi Aramco Plant Facilities, Qassim. • Prepare quantity material take-off based on the latest approved plan drawing prior for purchasing and installation. • Design / estimate bill of materials for panels, lightings, power and emergency power in satellite interface building at Saudi Aramco Bulk Plants Facilities, Qassim. Mohammad Al-Mojil Group (Construction Division) KSA (July 11, 1996-July 3, 1998) Field Electrical/Instrument Engineer (Engineering Dept.) Abqaiq Modernization of Distribution Control System Oil & Gas Refinery Plant Saudi Aramco, Abqaiq, KSA Main Contractor: Parsons Int’l Duties and Responsibilities : • Supervised the installation of cable tray, conduiting, cable pulling and termination and wires, Lv cables & Mv cables for the transformer, mcc panel, switchgear panel in the substation / control rooms and installation & termination of lighting panel, power and emergency power at the Saudi Aramco Plants Facilities, Abqaiq. • Supervised installation of cable tray, conduiting, wiring & termination for fire alarm system and paging system in the process area, control room & substations at Saudi Aramco Plant Facilities, Abqaiq. • Supervised installation of marshalling panel, cable tray, conduiting, cable pulling, termination of cables and hook-up installation of tubing for the instruments pressure transmitter, flow transmitter, level transmitter, analyzer, level switch (high and low),solenoid valve and loop check from instruments up to control room at Saudi Aramco Plant Facilities, Abqaiq. • Prepare bulk of quantities of materials based on the projects contract prior for estimation/comparison against the material quantity take-off of the latest issued approved design plan drawings. Page 8
  • 9. Philippine Compak Boards Philippines (Feb 20, 1995-Dec 30, 1995) Control Room Operator National Power Corporation Philippines (June 1, 1993-Mar 31, 1994) Plant Equipment Operator Power Plant Barge-106 Gyro Steel Sales & Services Philippines (Oct 16, 1990-Nov 15, 1991) Mechanical Engineering Services Apprenticeship Trainee Personal Details: Name : Mario Rey B. Guieb Age : 46 y/o Date of Birth : June 22, 1968 Civil Status : Single Religion : Roman Catholic Address : 55-k Ledesma Street, Ozamiz City Philippine Telephone : (+63) 2-5566212 / (+63) 2-5509051 / (+63) 88-5645217 Contact number : +639393787502 Profession : Philippine Registered Electrical Engineer ( License No. REE 22629 ) Regular Member : Institute of Integrated Electrical Engineers of the Philippines ( IIEE ) Membership No. 32982 Email address : rguieb_68@yahoo.com / marioreyguieb@yahoo.com I hereby certify that all stated information are true and correct to the best of my knowledge and ability. Sincerely, Mario Rey Guieb Applicant Page 9
  • 10. Philippine Compak Boards Philippines (Feb 20, 1995-Dec 30, 1995) Control Room Operator National Power Corporation Philippines (June 1, 1993-Mar 31, 1994) Plant Equipment Operator Power Plant Barge-106 Gyro Steel Sales & Services Philippines (Oct 16, 1990-Nov 15, 1991) Mechanical Engineering Services Apprenticeship Trainee Personal Details: Name : Mario Rey B. Guieb Age : 46 y/o Date of Birth : June 22, 1968 Civil Status : Single Religion : Roman Catholic Address : 55-k Ledesma Street, Ozamiz City Philippine Telephone : (+63) 2-5566212 / (+63) 2-5509051 / (+63) 88-5645217 Contact number : +639393787502 Profession : Philippine Registered Electrical Engineer ( License No. REE 22629 ) Regular Member : Institute of Integrated Electrical Engineers of the Philippines ( IIEE ) Membership No. 32982 Email address : rguieb_68@yahoo.com / marioreyguieb@yahoo.com I hereby certify that all stated information are true and correct to the best of my knowledge and ability. Sincerely, Mario Rey Guieb Applicant Page 9