Improving BW Reclaimer Performance &
Asset Integrity using SCADA Data
Bulk Materials Handling
Conference, Perth
Mark Biggs
Adam Mayers
Outline
Improving BW Reclaimer Performance & Asset Integrity
using SCADA Data
• Introduction / context
• Operating within design envelope of machine – AS4324.1 Compliance
o Using SCADA data to compare actual operating loads to design loads.
o Operating loads (conveyor live load, digging loads, etc).
o Machine balance monitoring.
• Capital Planning – When will the machine reach the end of its life?
o Fatigue damage monitoring.
• Improving throughput performance by monitoring SCADA
o Fundamentals of Operation
o Reducing trips and unexpected downtime.
o Alternative control philosophies
o Identify opportunities for performance improvements.
Bucketwheel Reclaimers
• Bucketwheel reclaimers are extensively
used in materials handling facilities in
Australia. Predominately slewing, luffing,
long travel machine.
• Large, expensive items of equipment.
Many new machines have been
constructed in last 5 years.
• Typically high required availability and
utilisation.
• Machines typically fitted with SCADA
system (Supervisory Control and Data
Acquisition).
• Data available to optimise performance
within design envelope of machine.
Challenge is to turn this Data into useful
Information.
• Approach can be applied to different
equipment types.
Improving BW Reclaimer Performance & Asset Integrity
using SCADA Data
AS4324.1 Design Envelope
• AS4324.1 – 1995 is the Australian
Standard relating to ‘Mobile
equipment for continuous handling of
bulk materials’
• Specifies how machine structures are
designed for structural strength and
fatigue life.
• New revision to be released in 2015
• Vast majority of new machines in
Australia have been designed to this
standard.
Improving BW Reclaimer Performance & Asset Integrity
using SCADA Data
AS4324.1 Load Combination Table 3.7 – Related to Fatigue and
Strength Design Loads, and SCADA Data
Rare loads and
accidents – strength
design
e.g.
-Flooded Belt
-Collisions
-Grounding
-Cyclone
Operational
loads used for
strength design
-Dead weight
-Conveyor
-Digging
-Dynamics
Loads used to
calculate fatigue
life of machine
structure
-Conveyor
-Digging
Abnormal operation
strength design
-High digging loads
-Slew bearing jacking
Many of the loads can
be related to drive
torque, or production
rate which are data
logged by the control
system (SCADA
system)Improving BW Reclaimer Performance & Asset Integrity
using SCADA Data
Using SCADA Data to Compare Real Loads with AS4324.1
Luff cylinder
forces:
AS4324.1
-Dead load
balance
-Slew brg loads
-Combined live
loads
-Collisions
Belt weigher tonnes/hr:
AS4324.1
Conveyor live load (F)
Flooded belt (FF)
BW drive power
AS4324.1
Normal digging (U)
Abnormal digging
(UU)
Slew drive power and
angle:
AS4324.1
-Lateral digging (S)
-Lateral collision (FS)
-No. Slew cuts for
fatigue
Bucketwheel boom
Counterweight
Improving BW Reclaimer Performance & Asset Integrity
using SCADA Data
Example – Conveyor Live Loads
Live Load (F) is the
normal operating
load for strength
design.
The load can be
converted to tph
using the belt
speed (green line)
Flooded Belt Load (FF) is
the accidental load used
for strength design
Measured conveyor
throughput is below strength
design envelopes.
Fatigue design to AS4324.1 is
based on 0.8 x (F) = 15,113
tph
Conclusion: Conveyor live load is within strength and
fatigue design envelopes during this SCADA data
sample.
Improving BW Reclaimer Performance & Asset Integrity
using SCADA Data
0 20 40 60 80 100 120 140 160
0
x 10
5
BW motor current
BW motor current (A)
Bincounts(frequency)
0 20 40 60 80 100 120 140 160
0
50
100
Cumulativesum(%)
Cumulative sum
AS 4324.1 fatigue digging CU
.U
Motor full load current 108 A
AS 4324.1 normal digging U 175 kN
AS 4324.1 abnormal digging UU 239 kN
Example – Digging Loads A histogram is useful for large data
sets as it gives an idea of the
amount of time at each load level.
Green line represents
digging load used in
fatigue calculations.
Blue line represents Normal
Digging Load (U) used in
strength design.
Conclusion: Digging load is higher than assumed in the fatigue
design which may reduce the life of certain areas of the structure.
The loads are generally within the strength design envelope
Magenta line represents the
Abnormal Digging Load (UU)
used in strength design.
Improving BW Reclaimer Performance & Asset Integrity
using SCADA Data
Example – Luff Cylinder Loads
The combined
effect of the live
loads can be seen in
the luff cylinder
pressures/loads.
We can also infer
information about
the dead load
balance e.g.
counterweight trim
compared to design.
Improving BW Reclaimer Performance & Asset Integrity
using SCADA Data
Example – Luff Cylinder Loads
Machine is slightly
discharge boom
heavy compared to
design balance
(green line)
Peak tensile luff cylinder loads
approach the AS4324.1 III/6 Flooded
Belt and Blocked Chute Combination
but are inside the strength envelope
(red dotted line)
Loads exceed the
fatigue design
assumptions quite
often (blue line) Conclusions:
- Strength OK.
- May need CW trim
- Fatigue life may be
shorter than design
Improving BW Reclaimer Performance & Asset Integrity
using SCADA Data
Capital Planning – Remaining Fatigue Life
• Machines specifications typically require 20 years of operation or perhaps 100,000
operating hrs. Typically, primarily limitation on life of machine structure is
accumulated steel fatigue damage which results in cracking, at which point,
machine replacement is often required.
• Fatigue is caused by stress fluctuations at the welds. The magnitude of the stress
range and the number of cycles are important.
• For a Bucketwheel Reclaimer, the stress fluctuations and cycles are mainly
proportional to the number of slew cuts i.e. the digging and conveyor load cycles,
and magnitude of loads. The designer therefore converts the 20 year life
requirement to a number of slew cut cycles for the fatigue design calculations. The
conversion is based on the annual throughput rate, stockpile shape and digging
parameters.
• SCADA data can be analysed to count the number of slew cuts that actually occur
per million tonnes reclaimed and estimate the magnitude of loads, to estimate
remaining life based on historical throughput data.
Improving BW Reclaimer Performance & Asset Integrity
using SCADA Data
Example – Remaining Fatigue Life
0 90 180 270 360
0
500
1000
1500
2000
2500
3000
3500
4000
4500
5000
Slew passes at slew angle
Slew angle (deg)
Slewpassespermilliontonnesreclaimedperquadrant
Statistic can be
calculated for
number of slew cuts
per million tonnes
reclaimed e.g. 4,300
slew cuts per Mt
Improving BW Reclaimer Performance & Asset Integrity
using SCADA Data
Example – Remaining Fatigue Life
Historical
production records
converted to
accumulated slew
cuts e.g. 4,300 x
annual production.
Variations in the
production rate are
captured.
Current point in
time
Estimated point in time
when the design
fatigue life will have
been consumed.
Suited to longer term
capital planning i.e.
approximate machine
replacement
Improving BW Reclaimer Performance & Asset Integrity
using SCADA Data
Example – More Detailed Fatigue Assessment
 SCADA analysis and FEA can be used
together to derive stress/cycle
distributions as inputs to fatigue life
calculations.
 More accurate because it includes the
load variations and cycles.
 Suited to life extension studies and
targeting resources for asset integrity
inspections.
Finite Element Structural ModelFinite Element Structural Model
LoadsLoads
Stress cyclesStress cycles
Fatigue life
calculation
Fatigue life
calculation
Improving BW Reclaimer Performance & Asset Integrity
using SCADA Data
Improving Performance - Fundamentals of Operation
Re-positioning
Losses at ends of
cut
Trips result in
production
losses
Geometric & Control
opportunities
Improving BW Reclaimer Performance & Asset Integrity
using SCADA Data
Example – Modifying the Geometry of the Reclaim Process
SCADA data review
and subsequent
reclaim simulation
indicated that a
Stacker-Reclaimer
was under-
performing. One
suggested change
including moving
from 4 bench to 3
bench reclaiming –
estimated 10%
improvement in
average reclaim rate.
Change implemented
in early 2015. SCADA
review confirmed
approx. 10% increase
in average rate!
Improving BW Reclaimer Performance & Asset Integrity
using SCADA Data
Example – Troubleshooting Trips to Minimise Production Delays
using 3D Graphics: Slew Clutch Alarms
 Colour scale shows SCADA parameter as a function of 3D boom tip position e.g. BW
current, throughput, slew torque
 Black dots are logged alarms/trips which represent production delays (lost revenue)
 Concise way of finding patterns using very large data sets e.g. ~5 million data points in
picture below
 Easy to see that trips mainly occur at outer edges of lower benches using this technique
 Not easy to look at these patterns using normal “trend” software
1 month of 1Hz data1 month of 1Hz data
Improving BW Reclaimer Performance & Asset Integrity
using SCADA Data
Example – Troubleshooting Trips to Minimise Production Delays
using 3D Graphics: Slew Clutch Alarms
 Trips occur when slew speed is changing
quickly.
 Zooming in on individual trips found that
the slew brakes were being applied
incorrectly.
Brake always applies
before trips
Improving BW Reclaimer Performance & Asset Integrity
using SCADA Data
Example – Troubleshooting Trips to Minimise Production Delays
using 3D Graphics: Luff Cylinder Trips
 Machine balance is boom heavy
 Luff cylinders trip the machine due to
spikes in the digging load
 Each black dot is a trip which stops the
machine until it is re-set. The average
delay is 3 mins
 195 alarms in 90 days
 195 alarms x 3 mins x 8,500 tph x $60/t
= $5M potential lost revenue per quarter
 $20M annualised
195
trips
Trip frequency
vs duration
Improving BW Reclaimer Performance & Asset Integrity
using SCADA Data
Example – Troubleshooting Trips to Minimise Production Delays
using 3D Graphics: Luff Cylinder Trips
Add 2 tonnes to
counterweight
Trips reduce from 195 to
69
Improving BW Reclaimer Performance & Asset Integrity
using SCADA Data
Example – Troubleshooting Trips to Minimise Production Delays
using 3D Graphics: Luff Cylinder Trips
Add 8 tonnes to
counterweight
Improving BW Reclaimer Performance & Asset Integrity
using SCADA Data
Example – Identification of Repositioning Losses
12 second delay
between weightometer
and BW. Consider incl.
some BW torque
feedback or relocate
weightometer.
Significant
repositioning losses,
particularly at far end
of slew cut.
Improving BW Reclaimer Performance & Asset Integrity
using SCADA Data
Additional Opportunities
• Throughput measurements typically lag behind reclaim operation → slows control
system response. Alternative more direct feedback, such as bucketwheel current
or torque arm feedback control can be effective.
• Using SCADA data to benchmark performance against similar machines in fleet.
Recent example showed two identical machines were performing differently:
Reclaimer 1 average = 2815 TPH, Reclaimer 2 average = 3050 TPH → 8%
difference.
• Learn mode algorithms can be implemented to provide predictive feedback based
on SCADA data. Control of one slew reclaim cut is influenced by previous slew
reclaim cuts (e.g. pile edges, soft / hard sections of stockpile etc).
• Good stacking is very important!
Improving BW Reclaimer Performance & Asset Integrity
using SCADA Data
Summary – Benefits of SCADA based Engineering Analysis
Asset Management
• Understand whether operating machines are compliant with AS4324.1
• If not full compliant, risks can be explored
• Targeting structural integrity inspections to fatigue prone areas
• Understanding machine balance via the luff cylinders.
Capital Planning
• Estimate when machine may need to be replaced in the future based on remaining
fatigue life.
Production
• Reduce production losses due to overload trips
• Identify under-utilisation within the design envelope and opportunities to increase
production rates.
• Benchmark production performance against similar machines in the fleet
• Highly cost effective method of “sweating the assets” for maximum productivity.
Improving BW Reclaimer Performance & Asset Integrity
using SCADA Data
Thank you!
Improving BW Reclaimer Performance & Asset Integrity
using SCADA Data

Contenu connexe

Tendances

268489261 diseno-de-elementos-de-madera-a-flexion-y-a-flexo-compresion
268489261 diseno-de-elementos-de-madera-a-flexion-y-a-flexo-compresion268489261 diseno-de-elementos-de-madera-a-flexion-y-a-flexo-compresion
268489261 diseno-de-elementos-de-madera-a-flexion-y-a-flexo-compresion
MARCELOPILCO2
 
Viga compuestas de acero ejemplo práctico
Viga compuestas de acero ejemplo prácticoViga compuestas de acero ejemplo práctico
Viga compuestas de acero ejemplo práctico
Alioska Aguirre Mendoza
 

Tendances (20)

Socavacion en puentes calculo
Socavacion en puentes calculoSocavacion en puentes calculo
Socavacion en puentes calculo
 
DISEÑO DE TABLERO
DISEÑO DE TABLERODISEÑO DE TABLERO
DISEÑO DE TABLERO
 
268489261 diseno-de-elementos-de-madera-a-flexion-y-a-flexo-compresion
268489261 diseno-de-elementos-de-madera-a-flexion-y-a-flexo-compresion268489261 diseno-de-elementos-de-madera-a-flexion-y-a-flexo-compresion
268489261 diseno-de-elementos-de-madera-a-flexion-y-a-flexo-compresion
 
Silindirle Sıkıştırılmış Beton Baraj Uygulamalari
Silindirle Sıkıştırılmış Beton Baraj UygulamalariSilindirle Sıkıştırılmış Beton Baraj Uygulamalari
Silindirle Sıkıştırılmış Beton Baraj Uygulamalari
 
Cempanel short a
Cempanel short aCempanel short a
Cempanel short a
 
Manual
ManualManual
Manual
 
Diseño estructural
Diseño estructuralDiseño estructural
Diseño estructural
 
Diseño en Concreto Armado Roberto Morales Morales.pdf
Diseño en Concreto Armado Roberto Morales Morales.pdfDiseño en Concreto Armado Roberto Morales Morales.pdf
Diseño en Concreto Armado Roberto Morales Morales.pdf
 
Project report on truck turnaround time
Project report on truck turnaround timeProject report on truck turnaround time
Project report on truck turnaround time
 
Calculo de concreto armado
Calculo de concreto armadoCalculo de concreto armado
Calculo de concreto armado
 
Design of silo
Design of siloDesign of silo
Design of silo
 
MANUAL SAP 2000 2010
MANUAL SAP 2000  2010MANUAL SAP 2000  2010
MANUAL SAP 2000 2010
 
Vrm roller bearing_r3_maintenance_report
Vrm roller bearing_r3_maintenance_reportVrm roller bearing_r3_maintenance_report
Vrm roller bearing_r3_maintenance_report
 
Combinación de acciones
Combinación de accionesCombinación de acciones
Combinación de acciones
 
Pre diseño estructura metálica de la cubierta para la cancha deportiva de la ...
Pre diseño estructura metálica de la cubierta para la cancha deportiva de la ...Pre diseño estructura metálica de la cubierta para la cancha deportiva de la ...
Pre diseño estructura metálica de la cubierta para la cancha deportiva de la ...
 
Infome Ph Paradise Towers Abr 2008
Infome Ph Paradise Towers Abr 2008Infome Ph Paradise Towers Abr 2008
Infome Ph Paradise Towers Abr 2008
 
AISC-10 SPECS.pdf
AISC-10 SPECS.pdfAISC-10 SPECS.pdf
AISC-10 SPECS.pdf
 
Nsr 10 titulo-b
Nsr 10 titulo-bNsr 10 titulo-b
Nsr 10 titulo-b
 
Viga compuestas de acero ejemplo práctico
Viga compuestas de acero ejemplo prácticoViga compuestas de acero ejemplo práctico
Viga compuestas de acero ejemplo práctico
 
Manual-mallas-electrosoldadas
Manual-mallas-electrosoldadasManual-mallas-electrosoldadas
Manual-mallas-electrosoldadas
 

Similaire à Improving Bucketwheel Reclaimer Performance and Asset Integrity using SCADA Data

Microprocessor based autonomous control system
Microprocessor based autonomous control systemMicroprocessor based autonomous control system
Microprocessor based autonomous control system
Dr. Rajesh P Barnwal
 
Baja Falcons Tuning and Instrumentation Team IGEN430 Poster - VR (1)
Baja Falcons Tuning and Instrumentation Team IGEN430 Poster - VR (1)Baja Falcons Tuning and Instrumentation Team IGEN430 Poster - VR (1)
Baja Falcons Tuning and Instrumentation Team IGEN430 Poster - VR (1)
Vaughn Richards
 
Gabriel India Limited_ProjectPresentation
Gabriel India Limited_ProjectPresentationGabriel India Limited_ProjectPresentation
Gabriel India Limited_ProjectPresentation
Ameya Margaj
 

Similaire à Improving Bucketwheel Reclaimer Performance and Asset Integrity using SCADA Data (20)

Full Scale Data Handling in Shipping: A Big Data Solution
Full Scale Data Handling in Shipping: A Big Data SolutionFull Scale Data Handling in Shipping: A Big Data Solution
Full Scale Data Handling in Shipping: A Big Data Solution
 
Uav Stability Augmentation System Usas
Uav Stability Augmentation System   UsasUav Stability Augmentation System   Usas
Uav Stability Augmentation System Usas
 
How Idaho Power Company uses AURORAxmp
How Idaho Power Company uses AURORAxmpHow Idaho Power Company uses AURORAxmp
How Idaho Power Company uses AURORAxmp
 
Microprocessor based autonomous control system
Microprocessor based autonomous control systemMicroprocessor based autonomous control system
Microprocessor based autonomous control system
 
Baja Falcons Tuning and Instrumentation Team IGEN430 Poster - VR (1)
Baja Falcons Tuning and Instrumentation Team IGEN430 Poster - VR (1)Baja Falcons Tuning and Instrumentation Team IGEN430 Poster - VR (1)
Baja Falcons Tuning and Instrumentation Team IGEN430 Poster - VR (1)
 
Co-simulation with Siemens NX - David van Os, Ugent
Co-simulation with Siemens NX - David van Os, UgentCo-simulation with Siemens NX - David van Os, Ugent
Co-simulation with Siemens NX - David van Os, Ugent
 
Virtual Durability Simulation for Chassis of Commercial vehicle
Virtual Durability Simulation for Chassis of Commercial vehicleVirtual Durability Simulation for Chassis of Commercial vehicle
Virtual Durability Simulation for Chassis of Commercial vehicle
 
2014 Wind Turbine Blade Workshop- Bottasso
2014 Wind Turbine Blade Workshop- Bottasso2014 Wind Turbine Blade Workshop- Bottasso
2014 Wind Turbine Blade Workshop- Bottasso
 
Falling weight deflection test
Falling weight deflection testFalling weight deflection test
Falling weight deflection test
 
PowerArtist: RTL Design for Power Platform
PowerArtist: RTL Design for Power PlatformPowerArtist: RTL Design for Power Platform
PowerArtist: RTL Design for Power Platform
 
What’s new in VictoriaLogs (Q3 2023)
What’s new in VictoriaLogs (Q3 2023)What’s new in VictoriaLogs (Q3 2023)
What’s new in VictoriaLogs (Q3 2023)
 
Asprova Case Study for Metal, Plastics, Paper and Textiles Industry
Asprova Case Study for Metal, Plastics, Paper and Textiles IndustryAsprova Case Study for Metal, Plastics, Paper and Textiles Industry
Asprova Case Study for Metal, Plastics, Paper and Textiles Industry
 
Doubling a VFD driven test-stand’s throughput and capacity
Doubling a VFD driven test-stand’s throughput and capacityDoubling a VFD driven test-stand’s throughput and capacity
Doubling a VFD driven test-stand’s throughput and capacity
 
Nyk and weather routing
Nyk and weather routingNyk and weather routing
Nyk and weather routing
 
Cross country bar mill control modernization
Cross country bar mill control modernizationCross country bar mill control modernization
Cross country bar mill control modernization
 
Design and Analysis of Spiral Wind Turbine with Various Wind Speed
Design and Analysis of Spiral Wind Turbine with Various Wind SpeedDesign and Analysis of Spiral Wind Turbine with Various Wind Speed
Design and Analysis of Spiral Wind Turbine with Various Wind Speed
 
presentation3-final.pptx
presentation3-final.pptxpresentation3-final.pptx
presentation3-final.pptx
 
Gabriel India Limited_ProjectPresentation
Gabriel India Limited_ProjectPresentationGabriel India Limited_ProjectPresentation
Gabriel India Limited_ProjectPresentation
 
Optimal Design Parameters for an Inclined Conveyor
Optimal Design Parameters for an Inclined ConveyorOptimal Design Parameters for an Inclined Conveyor
Optimal Design Parameters for an Inclined Conveyor
 
Optimal Design Parameters for an Inclined Conveyor
Optimal Design Parameters for an Inclined ConveyorOptimal Design Parameters for an Inclined Conveyor
Optimal Design Parameters for an Inclined Conveyor
 

Dernier

Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
pritamlangde
 

Dernier (20)

Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
 
Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)
 
Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptx
 
8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessor8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessor
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Post office management system project ..pdf
Post office management system project ..pdfPost office management system project ..pdf
Post office management system project ..pdf
 
Unsatisfied Bhabhi ℂall Girls Ahmedabad Book Esha 6378878445 Top Class ℂall G...
Unsatisfied Bhabhi ℂall Girls Ahmedabad Book Esha 6378878445 Top Class ℂall G...Unsatisfied Bhabhi ℂall Girls Ahmedabad Book Esha 6378878445 Top Class ℂall G...
Unsatisfied Bhabhi ℂall Girls Ahmedabad Book Esha 6378878445 Top Class ℂall G...
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Passive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.pptPassive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.ppt
 
Danikor Product Catalog- Screw Feeder.pdf
Danikor Product Catalog- Screw Feeder.pdfDanikor Product Catalog- Screw Feeder.pdf
Danikor Product Catalog- Screw Feeder.pdf
 
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdflitvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth Reinforcement
 
Signal Processing and Linear System Analysis
Signal Processing and Linear System AnalysisSignal Processing and Linear System Analysis
Signal Processing and Linear System Analysis
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptx
 
Fundamentals of Internet of Things (IoT) Part-2
Fundamentals of Internet of Things (IoT) Part-2Fundamentals of Internet of Things (IoT) Part-2
Fundamentals of Internet of Things (IoT) Part-2
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...
 
Compressing and Sparsifying LLM in GenAI Applications
Compressing and Sparsifying LLM in GenAI ApplicationsCompressing and Sparsifying LLM in GenAI Applications
Compressing and Sparsifying LLM in GenAI Applications
 

Improving Bucketwheel Reclaimer Performance and Asset Integrity using SCADA Data

  • 1. Improving BW Reclaimer Performance & Asset Integrity using SCADA Data Bulk Materials Handling Conference, Perth Mark Biggs Adam Mayers
  • 2. Outline Improving BW Reclaimer Performance & Asset Integrity using SCADA Data • Introduction / context • Operating within design envelope of machine – AS4324.1 Compliance o Using SCADA data to compare actual operating loads to design loads. o Operating loads (conveyor live load, digging loads, etc). o Machine balance monitoring. • Capital Planning – When will the machine reach the end of its life? o Fatigue damage monitoring. • Improving throughput performance by monitoring SCADA o Fundamentals of Operation o Reducing trips and unexpected downtime. o Alternative control philosophies o Identify opportunities for performance improvements.
  • 3. Bucketwheel Reclaimers • Bucketwheel reclaimers are extensively used in materials handling facilities in Australia. Predominately slewing, luffing, long travel machine. • Large, expensive items of equipment. Many new machines have been constructed in last 5 years. • Typically high required availability and utilisation. • Machines typically fitted with SCADA system (Supervisory Control and Data Acquisition). • Data available to optimise performance within design envelope of machine. Challenge is to turn this Data into useful Information. • Approach can be applied to different equipment types. Improving BW Reclaimer Performance & Asset Integrity using SCADA Data
  • 4. AS4324.1 Design Envelope • AS4324.1 – 1995 is the Australian Standard relating to ‘Mobile equipment for continuous handling of bulk materials’ • Specifies how machine structures are designed for structural strength and fatigue life. • New revision to be released in 2015 • Vast majority of new machines in Australia have been designed to this standard. Improving BW Reclaimer Performance & Asset Integrity using SCADA Data
  • 5. AS4324.1 Load Combination Table 3.7 – Related to Fatigue and Strength Design Loads, and SCADA Data Rare loads and accidents – strength design e.g. -Flooded Belt -Collisions -Grounding -Cyclone Operational loads used for strength design -Dead weight -Conveyor -Digging -Dynamics Loads used to calculate fatigue life of machine structure -Conveyor -Digging Abnormal operation strength design -High digging loads -Slew bearing jacking Many of the loads can be related to drive torque, or production rate which are data logged by the control system (SCADA system)Improving BW Reclaimer Performance & Asset Integrity using SCADA Data
  • 6. Using SCADA Data to Compare Real Loads with AS4324.1 Luff cylinder forces: AS4324.1 -Dead load balance -Slew brg loads -Combined live loads -Collisions Belt weigher tonnes/hr: AS4324.1 Conveyor live load (F) Flooded belt (FF) BW drive power AS4324.1 Normal digging (U) Abnormal digging (UU) Slew drive power and angle: AS4324.1 -Lateral digging (S) -Lateral collision (FS) -No. Slew cuts for fatigue Bucketwheel boom Counterweight Improving BW Reclaimer Performance & Asset Integrity using SCADA Data
  • 7. Example – Conveyor Live Loads Live Load (F) is the normal operating load for strength design. The load can be converted to tph using the belt speed (green line) Flooded Belt Load (FF) is the accidental load used for strength design Measured conveyor throughput is below strength design envelopes. Fatigue design to AS4324.1 is based on 0.8 x (F) = 15,113 tph Conclusion: Conveyor live load is within strength and fatigue design envelopes during this SCADA data sample. Improving BW Reclaimer Performance & Asset Integrity using SCADA Data
  • 8. 0 20 40 60 80 100 120 140 160 0 x 10 5 BW motor current BW motor current (A) Bincounts(frequency) 0 20 40 60 80 100 120 140 160 0 50 100 Cumulativesum(%) Cumulative sum AS 4324.1 fatigue digging CU .U Motor full load current 108 A AS 4324.1 normal digging U 175 kN AS 4324.1 abnormal digging UU 239 kN Example – Digging Loads A histogram is useful for large data sets as it gives an idea of the amount of time at each load level. Green line represents digging load used in fatigue calculations. Blue line represents Normal Digging Load (U) used in strength design. Conclusion: Digging load is higher than assumed in the fatigue design which may reduce the life of certain areas of the structure. The loads are generally within the strength design envelope Magenta line represents the Abnormal Digging Load (UU) used in strength design. Improving BW Reclaimer Performance & Asset Integrity using SCADA Data
  • 9. Example – Luff Cylinder Loads The combined effect of the live loads can be seen in the luff cylinder pressures/loads. We can also infer information about the dead load balance e.g. counterweight trim compared to design. Improving BW Reclaimer Performance & Asset Integrity using SCADA Data
  • 10. Example – Luff Cylinder Loads Machine is slightly discharge boom heavy compared to design balance (green line) Peak tensile luff cylinder loads approach the AS4324.1 III/6 Flooded Belt and Blocked Chute Combination but are inside the strength envelope (red dotted line) Loads exceed the fatigue design assumptions quite often (blue line) Conclusions: - Strength OK. - May need CW trim - Fatigue life may be shorter than design Improving BW Reclaimer Performance & Asset Integrity using SCADA Data
  • 11. Capital Planning – Remaining Fatigue Life • Machines specifications typically require 20 years of operation or perhaps 100,000 operating hrs. Typically, primarily limitation on life of machine structure is accumulated steel fatigue damage which results in cracking, at which point, machine replacement is often required. • Fatigue is caused by stress fluctuations at the welds. The magnitude of the stress range and the number of cycles are important. • For a Bucketwheel Reclaimer, the stress fluctuations and cycles are mainly proportional to the number of slew cuts i.e. the digging and conveyor load cycles, and magnitude of loads. The designer therefore converts the 20 year life requirement to a number of slew cut cycles for the fatigue design calculations. The conversion is based on the annual throughput rate, stockpile shape and digging parameters. • SCADA data can be analysed to count the number of slew cuts that actually occur per million tonnes reclaimed and estimate the magnitude of loads, to estimate remaining life based on historical throughput data. Improving BW Reclaimer Performance & Asset Integrity using SCADA Data
  • 12. Example – Remaining Fatigue Life 0 90 180 270 360 0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000 Slew passes at slew angle Slew angle (deg) Slewpassespermilliontonnesreclaimedperquadrant Statistic can be calculated for number of slew cuts per million tonnes reclaimed e.g. 4,300 slew cuts per Mt Improving BW Reclaimer Performance & Asset Integrity using SCADA Data
  • 13. Example – Remaining Fatigue Life Historical production records converted to accumulated slew cuts e.g. 4,300 x annual production. Variations in the production rate are captured. Current point in time Estimated point in time when the design fatigue life will have been consumed. Suited to longer term capital planning i.e. approximate machine replacement Improving BW Reclaimer Performance & Asset Integrity using SCADA Data
  • 14. Example – More Detailed Fatigue Assessment  SCADA analysis and FEA can be used together to derive stress/cycle distributions as inputs to fatigue life calculations.  More accurate because it includes the load variations and cycles.  Suited to life extension studies and targeting resources for asset integrity inspections. Finite Element Structural ModelFinite Element Structural Model LoadsLoads Stress cyclesStress cycles Fatigue life calculation Fatigue life calculation Improving BW Reclaimer Performance & Asset Integrity using SCADA Data
  • 15. Improving Performance - Fundamentals of Operation Re-positioning Losses at ends of cut Trips result in production losses Geometric & Control opportunities Improving BW Reclaimer Performance & Asset Integrity using SCADA Data
  • 16. Example – Modifying the Geometry of the Reclaim Process SCADA data review and subsequent reclaim simulation indicated that a Stacker-Reclaimer was under- performing. One suggested change including moving from 4 bench to 3 bench reclaiming – estimated 10% improvement in average reclaim rate. Change implemented in early 2015. SCADA review confirmed approx. 10% increase in average rate! Improving BW Reclaimer Performance & Asset Integrity using SCADA Data
  • 17. Example – Troubleshooting Trips to Minimise Production Delays using 3D Graphics: Slew Clutch Alarms  Colour scale shows SCADA parameter as a function of 3D boom tip position e.g. BW current, throughput, slew torque  Black dots are logged alarms/trips which represent production delays (lost revenue)  Concise way of finding patterns using very large data sets e.g. ~5 million data points in picture below  Easy to see that trips mainly occur at outer edges of lower benches using this technique  Not easy to look at these patterns using normal “trend” software 1 month of 1Hz data1 month of 1Hz data Improving BW Reclaimer Performance & Asset Integrity using SCADA Data
  • 18. Example – Troubleshooting Trips to Minimise Production Delays using 3D Graphics: Slew Clutch Alarms  Trips occur when slew speed is changing quickly.  Zooming in on individual trips found that the slew brakes were being applied incorrectly. Brake always applies before trips Improving BW Reclaimer Performance & Asset Integrity using SCADA Data
  • 19. Example – Troubleshooting Trips to Minimise Production Delays using 3D Graphics: Luff Cylinder Trips  Machine balance is boom heavy  Luff cylinders trip the machine due to spikes in the digging load  Each black dot is a trip which stops the machine until it is re-set. The average delay is 3 mins  195 alarms in 90 days  195 alarms x 3 mins x 8,500 tph x $60/t = $5M potential lost revenue per quarter  $20M annualised 195 trips Trip frequency vs duration Improving BW Reclaimer Performance & Asset Integrity using SCADA Data
  • 20. Example – Troubleshooting Trips to Minimise Production Delays using 3D Graphics: Luff Cylinder Trips Add 2 tonnes to counterweight Trips reduce from 195 to 69 Improving BW Reclaimer Performance & Asset Integrity using SCADA Data
  • 21. Example – Troubleshooting Trips to Minimise Production Delays using 3D Graphics: Luff Cylinder Trips Add 8 tonnes to counterweight Improving BW Reclaimer Performance & Asset Integrity using SCADA Data
  • 22. Example – Identification of Repositioning Losses 12 second delay between weightometer and BW. Consider incl. some BW torque feedback or relocate weightometer. Significant repositioning losses, particularly at far end of slew cut. Improving BW Reclaimer Performance & Asset Integrity using SCADA Data
  • 23. Additional Opportunities • Throughput measurements typically lag behind reclaim operation → slows control system response. Alternative more direct feedback, such as bucketwheel current or torque arm feedback control can be effective. • Using SCADA data to benchmark performance against similar machines in fleet. Recent example showed two identical machines were performing differently: Reclaimer 1 average = 2815 TPH, Reclaimer 2 average = 3050 TPH → 8% difference. • Learn mode algorithms can be implemented to provide predictive feedback based on SCADA data. Control of one slew reclaim cut is influenced by previous slew reclaim cuts (e.g. pile edges, soft / hard sections of stockpile etc). • Good stacking is very important! Improving BW Reclaimer Performance & Asset Integrity using SCADA Data
  • 24. Summary – Benefits of SCADA based Engineering Analysis Asset Management • Understand whether operating machines are compliant with AS4324.1 • If not full compliant, risks can be explored • Targeting structural integrity inspections to fatigue prone areas • Understanding machine balance via the luff cylinders. Capital Planning • Estimate when machine may need to be replaced in the future based on remaining fatigue life. Production • Reduce production losses due to overload trips • Identify under-utilisation within the design envelope and opportunities to increase production rates. • Benchmark production performance against similar machines in the fleet • Highly cost effective method of “sweating the assets” for maximum productivity. Improving BW Reclaimer Performance & Asset Integrity using SCADA Data
  • 25. Thank you! Improving BW Reclaimer Performance & Asset Integrity using SCADA Data