THE SCOPE OF GLASS
PROJECTS
Componentization and Supply Chain Mechanics of Ark Design
MDIA
Glass Design Series
V1 Corresponding Load Arrays
V2 Strat the Mat
V3 Agile Design
Glass Design Series…
The Scope of Glass Projects
LOAD ARRAYS STRAT THE MAT AGILE DESIGN
11/7/2022 Brij Consulting, LLC Jean Marshall 2
Glass Design Series
V1 Corresponding Load Arrays
V2 Strat the Mat
V3 Agile Design
New Scope Definition
System Tables
SmallForm>>>Glass
TableMaps
Component>>>Supply
Chain
Forward >>>Market Forward
Component
Interior
Margin
Matrix
Small Form
(Table)
Interior
Margin
New Facts
Decision
Market
Ready?
Component
Specified
System
Table
Media
All Other
Y
N
Y
N
Y
N
We will begin to
plot an agile
delivery from our
waterfall tasking
The generation of
IP, New System
Facts and Market
Strategy are
already timed
Lifecycle changes in
our project are agile
once tasked and
engineered events
are compiled
New Facts related
to the table are
already mapped
IMF IMC IMS
Sum of IM = Low level carriage burden
Review for New Facts
Prep. For MarketReady
Events: part of the distributive cycle
Are the outcome of Tasks IP
11/7/2022 Brij Consulting, LLC Jean Marshall 3
Engineers interact with managers and analysts involved in the Justification,
Financial,Planningand Implementationprocessof new systems.Theyneed
to assessthe environmental,economic,regulatoryand otherrequirements
of a manufacturingorconstruction process.Next to gatherand analyzethe
processora portion of it in orderhelp plan the implementation. And then
find the optimum approachto the implementation. Paraphrasing
EngineeringBOK
Engineers use economic analysis to design a processand to prepare a
justification amongcomplex design alternatives,usingan assessment of
the initial capital costs,annual operation,maintenance,and repaircosts,
periodic upgrade and determination of the remainingeconomic value at the
end of the valuation period. The iterative value of the Revenuecycle and
the scope associatedwith the project operationhelp to delivera
justificationto accept orreject a proposal. If a processis cost reductive or
if it is utilitynecessary,an appropriate justification is used. The
quantificationof the risk maymake the outcome lesslikelyincomparison
to otherviable alternatives.ParaphrasingEngineeringBOK
New Facts on T&M
11/7/2022 Brij Consulting, LLC Jean Marshall 4
Associative Facts
■ Unless the associative facts improve the structural content of the
engineering model they are sometimes set aside.
■ The Method of Testing the whole model is a vast improvement over
any binary method, see Appendix III
■ In a flat format all math is relational
■ The model redacts all rash prospects and dispels all dis-associative
facts in the proof
■ Whatever is not contiguous to the Plan cannot engage its proof
■ The fingerprint and footpath conditions of the componentization
give way to solid state relational threads within the t1 and t2
timeframes
■ Wave and particle theory in electronics is not conducive to building,
compilations or generational instances because it has no glass
container, plait able properties or propensities for scale and design.
This is a Morning Star Ark Based glass capability.
Build Associative Model prior to All-Glass
11/7/2022 Brij Consulting, LLC Jean Marshall 5
MDIA
Mark 2
Ark Media: Dimensional Interface
Data Field
for All Glass
■ Associative Facts
■ Time and Motion
Data
■ Statistical Outcome
11/7/2022
Brij
Consulting,
LLC
Jean
Marshall
6
Stratification for
Component Stream
Alpha =.0531
Re-inv
IMC
a
Climb
Climb
The supply chain has the iterative impact
on the asset creation and its subsequent
market demand building the scenario
through its key engineering oversight
Re-inv
a
2.195-2.19652=.00152 carriage burden
11/7/2022
Brij
Consulting,
LLC
Jean
Marshall
7
IMC
See Slide 2
a
712.96145-711[std] =1.9615 -1.9539 = .0075
196.2+.19
Forward payback
achieved in
econometric gain
Proof on App III
Stream Facts in Gate Mechanics
y = -4,705,045,101.57x + 10,351,099,223.46
R² = 1.00
y = 0.6445x-1.4179
R² = 1
-1E+09
0
1E+09
2E+09
3E+09
4E+09
5E+09
6E+09
Sum Average
Poly Stream Matrix
Facts derived from Anova: Two-Factor Without Replication, data field
The data forms a
circle as it cycles and
naturally lends itself
to trig functions,
while in its native
state
Correspondence to Row 10
From this Data-field Table @ Anova
11/7/2022 Brij Consulting, LLC Jean Marshall 8
Instance=Burden
Acquisition w/ Green Wall
Starting Map
■ Glass Future Tables from “Building with Glass”
■ We now have our build equation
11/7/2022 Brij Consulting, LLC Jean Marshall 9
T2
T1
T4 &
T3
Different Engineering
Groups make uniquely
fitted decisions
Based on Time Buckets
on the 50-year Glass Path
See Next: Re-User [RUF] Friendly
Glass Systems Engineering
New
BR
9
Time Bucket designation
was changed on this slide
since T4 & T3 are start
Agile Strategy
V2 Strat the Mat
■ How do we derive the Agile Strategy
from the events timeline and the
Matrix that corresponds to the
Supply Chain? There is a blockchain
theory of completion.
V3 Agile Design
11/7/2022 Brij Consulting, LLC Jean Marshall 10
Glass Design Series
V1 Corresponding Load Arrays
V2 Strat the Mat
V3 Agile Design
■ Who made this Scrummy Plan
anyhow? Tracking overall progress
and informing everyone of
Milestonesand Forward Completion
Coming Next…
Flag and Post
x%
■ Full Branch Capability changes the
design from Contiguous to Continuous
BR
11/7/2022 Brij Consulting, LLC Jean Marshall 11
Appendix I
Compiled
Events
From our Last paper…
From our Events paper…
11/7/2022 Brij Consulting, LLC Jean Marshall 12
Relational Functions of the Model Proof
Interior
margin
Binary
Path
Standards,
Weights
and
Measures
Reinvestment
Path
growth
Rise
over the
Run
Equity
Using the Economic
Model Equity is stated
at Fair Market Value
11/7/2022 Brij Consulting, LLC Jean Marshall 13
The Interior Margin is
preserved using relational
functions of the Model
Ark
Path
See Slide 2
Crystal Sea
■ Mary Star of the Sea is an
Ark Design Magnification of
Mary using the Crystal Sea
composition of the Morning
Star
■ Glass will operate in this
mode and be an available
Stream to everyone interiorly
for achievement and
competency
■ “My Soul Magnifies the
Lord,” her famous Script
■ Very Grateful to Mary for
keeping us on track with God
11/7/2022 Brij Consulting, LLC Jean Marshall 14
Engineering Economics Description The use of economic analysis is
fundamental to the engineering design process and to changes in
systems, processes, or operations nspe-body-of-knowledge.pdf
Design Series
■ This is the First Paper in
our Design Series. Its
facts are derived from
the Learning Series on
Glass in Ark Design,
listing shown next.
■ What we learn in a
Waterfall Patternthen we
do in an Agile Method
11/7/2022 Brij Consulting, LLC Jean Marshall 15
16

Contenu connexe

Similaire à Scope of Glass Projects (V1) Load Arrays.pdf

Glass Cars and New Ark Product Map V1 Architectural Contents.pdf
Glass Cars and New Ark Product Map V1 Architectural Contents.pdfGlass Cars and New Ark Product Map V1 Architectural Contents.pdf
Glass Cars and New Ark Product Map V1 Architectural Contents.pdfBrij Consulting, LLC
 
Supply Side Portfolio V4 The Paradigm Poll.pdf
Supply Side Portfolio V4 The Paradigm Poll.pdfSupply Side Portfolio V4 The Paradigm Poll.pdf
Supply Side Portfolio V4 The Paradigm Poll.pdfBrij Consulting, LLC
 
Simulations Partners w-Addendum.pdf
Simulations Partners w-Addendum.pdfSimulations Partners w-Addendum.pdf
Simulations Partners w-Addendum.pdfBrij Consulting, LLC
 
Step into the World of Glass, Part I.pdf
Step into the World of Glass, Part I.pdfStep into the World of Glass, Part I.pdf
Step into the World of Glass, Part I.pdfBrij Consulting, LLC
 
Comments for Simulations Part III.pdf
Comments for Simulations Part III.pdfComments for Simulations Part III.pdf
Comments for Simulations Part III.pdfJeanMarshall8
 
Simulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdfSimulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdfBrij Consulting, LLC
 
Simulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdfSimulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdfBrij Consulting, LLC
 
Glass Cars and New Ark Product Map V1, V2, V3.pdf
Glass Cars and New Ark Product Map V1, V2, V3.pdfGlass Cars and New Ark Product Map V1, V2, V3.pdf
Glass Cars and New Ark Product Map V1, V2, V3.pdfBrij Consulting, LLC
 
Instancing at the Gate v2 Building the Instance
Instancing at the Gate v2 Building the InstanceInstancing at the Gate v2 Building the Instance
Instancing at the Gate v2 Building the InstanceBrij Consulting, LLC
 
Supply Side Portfolio V1, V2, V3 Timing, Investments, and Custom Engineering.pdf
Supply Side Portfolio V1, V2, V3 Timing, Investments, and Custom Engineering.pdfSupply Side Portfolio V1, V2, V3 Timing, Investments, and Custom Engineering.pdf
Supply Side Portfolio V1, V2, V3 Timing, Investments, and Custom Engineering.pdfBrij Consulting, LLC
 
The Remote Build V2 Ark Conduit Assimilation
The Remote Build V2 Ark Conduit AssimilationThe Remote Build V2 Ark Conduit Assimilation
The Remote Build V2 Ark Conduit AssimilationBrij Consulting, LLC
 
Comments on Simulations Partners.pdf
Comments on Simulations Partners.pdfComments on Simulations Partners.pdf
Comments on Simulations Partners.pdfBrij Consulting, LLC
 
Comments Scorecard Reconfigured -SPO.pdf
Comments Scorecard Reconfigured -SPO.pdfComments Scorecard Reconfigured -SPO.pdf
Comments Scorecard Reconfigured -SPO.pdfBrij Consulting, LLC
 
Instancing at the Gate v3 Observation of Function
Instancing at the Gate v3 Observation of FunctionInstancing at the Gate v3 Observation of Function
Instancing at the Gate v3 Observation of FunctionBrij Consulting, LLC
 
CALENDAR CARTOGRAPHY V1 Calendars and Tasks.pdf
CALENDAR CARTOGRAPHY V1 Calendars and Tasks.pdfCALENDAR CARTOGRAPHY V1 Calendars and Tasks.pdf
CALENDAR CARTOGRAPHY V1 Calendars and Tasks.pdfBrij Consulting, LLC
 
Remote Build, Phase III V1,V2, V3.pdf
Remote Build, Phase III V1,V2, V3.pdfRemote Build, Phase III V1,V2, V3.pdf
Remote Build, Phase III V1,V2, V3.pdfBrij Consulting, LLC
 
Comments on Glass Big Push II & III.pdf
Comments on Glass Big Push II & III.pdfComments on Glass Big Push II & III.pdf
Comments on Glass Big Push II & III.pdfBrij Consulting, LLC
 

Similaire à Scope of Glass Projects (V1) Load Arrays.pdf (20)

Glass Cars and New Ark Product Map V1 Architectural Contents.pdf
Glass Cars and New Ark Product Map V1 Architectural Contents.pdfGlass Cars and New Ark Product Map V1 Architectural Contents.pdf
Glass Cars and New Ark Product Map V1 Architectural Contents.pdf
 
Building with Glass V1,V2,V3.pdf
Building with Glass V1,V2,V3.pdfBuilding with Glass V1,V2,V3.pdf
Building with Glass V1,V2,V3.pdf
 
Simulations Partners.pdf
Simulations Partners.pdfSimulations Partners.pdf
Simulations Partners.pdf
 
Supply Side Portfolio V4 The Paradigm Poll.pdf
Supply Side Portfolio V4 The Paradigm Poll.pdfSupply Side Portfolio V4 The Paradigm Poll.pdf
Supply Side Portfolio V4 The Paradigm Poll.pdf
 
Simulations Partners w-Addendum.pdf
Simulations Partners w-Addendum.pdfSimulations Partners w-Addendum.pdf
Simulations Partners w-Addendum.pdf
 
Step into the World of Glass, Part I.pdf
Step into the World of Glass, Part I.pdfStep into the World of Glass, Part I.pdf
Step into the World of Glass, Part I.pdf
 
SSE THE REMOTE END.pdf
SSE THE REMOTE END.pdfSSE THE REMOTE END.pdf
SSE THE REMOTE END.pdf
 
Comments for Simulations Part III.pdf
Comments for Simulations Part III.pdfComments for Simulations Part III.pdf
Comments for Simulations Part III.pdf
 
Simulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdfSimulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdf
 
Simulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdfSimulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdf
 
Glass Cars and New Ark Product Map V1, V2, V3.pdf
Glass Cars and New Ark Product Map V1, V2, V3.pdfGlass Cars and New Ark Product Map V1, V2, V3.pdf
Glass Cars and New Ark Product Map V1, V2, V3.pdf
 
Instancing at the Gate v2 Building the Instance
Instancing at the Gate v2 Building the InstanceInstancing at the Gate v2 Building the Instance
Instancing at the Gate v2 Building the Instance
 
Supply Side Portfolio V1, V2, V3 Timing, Investments, and Custom Engineering.pdf
Supply Side Portfolio V1, V2, V3 Timing, Investments, and Custom Engineering.pdfSupply Side Portfolio V1, V2, V3 Timing, Investments, and Custom Engineering.pdf
Supply Side Portfolio V1, V2, V3 Timing, Investments, and Custom Engineering.pdf
 
The Remote Build V2 Ark Conduit Assimilation
The Remote Build V2 Ark Conduit AssimilationThe Remote Build V2 Ark Conduit Assimilation
The Remote Build V2 Ark Conduit Assimilation
 
Comments on Simulations Partners.pdf
Comments on Simulations Partners.pdfComments on Simulations Partners.pdf
Comments on Simulations Partners.pdf
 
Comments Scorecard Reconfigured -SPO.pdf
Comments Scorecard Reconfigured -SPO.pdfComments Scorecard Reconfigured -SPO.pdf
Comments Scorecard Reconfigured -SPO.pdf
 
Instancing at the Gate v3 Observation of Function
Instancing at the Gate v3 Observation of FunctionInstancing at the Gate v3 Observation of Function
Instancing at the Gate v3 Observation of Function
 
CALENDAR CARTOGRAPHY V1 Calendars and Tasks.pdf
CALENDAR CARTOGRAPHY V1 Calendars and Tasks.pdfCALENDAR CARTOGRAPHY V1 Calendars and Tasks.pdf
CALENDAR CARTOGRAPHY V1 Calendars and Tasks.pdf
 
Remote Build, Phase III V1,V2, V3.pdf
Remote Build, Phase III V1,V2, V3.pdfRemote Build, Phase III V1,V2, V3.pdf
Remote Build, Phase III V1,V2, V3.pdf
 
Comments on Glass Big Push II & III.pdf
Comments on Glass Big Push II & III.pdfComments on Glass Big Push II & III.pdf
Comments on Glass Big Push II & III.pdf
 

Plus de Brij Consulting, LLC

Comments on Step Into the World of Glass (All Parts).pdf
Comments on Step Into the World of Glass (All Parts).pdfComments on Step Into the World of Glass (All Parts).pdf
Comments on Step Into the World of Glass (All Parts).pdfBrij Consulting, LLC
 
Step into the World of Glass (All Parts).pdf
Step into the World of Glass (All Parts).pdfStep into the World of Glass (All Parts).pdf
Step into the World of Glass (All Parts).pdfBrij Consulting, LLC
 
Comments on Step Into the World of Glass Building Part I.pdf
Comments on Step Into the World of Glass Building Part I.pdfComments on Step Into the World of Glass Building Part I.pdf
Comments on Step Into the World of Glass Building Part I.pdfBrij Consulting, LLC
 
Square Pi Key to the Investment, SPO.pdf
Square Pi Key to the Investment, SPO.pdfSquare Pi Key to the Investment, SPO.pdf
Square Pi Key to the Investment, SPO.pdfBrij Consulting, LLC
 
Comments on Square Pi- Key to the Investment.pdf
Comments on Square Pi- Key to the Investment.pdfComments on Square Pi- Key to the Investment.pdf
Comments on Square Pi- Key to the Investment.pdfBrij Consulting, LLC
 
Scorecard Reconfigured Scale-Port-Demand
Scorecard Reconfigured Scale-Port-DemandScorecard Reconfigured Scale-Port-Demand
Scorecard Reconfigured Scale-Port-DemandBrij Consulting, LLC
 
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdf
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdfComments on SCORECARD GEARBOX and NEW APPLICATIONS.pdf
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdfBrij Consulting, LLC
 
Scorecard Gearbox and New Applications.pdf
Scorecard Gearbox and New Applications.pdfScorecard Gearbox and New Applications.pdf
Scorecard Gearbox and New Applications.pdfBrij Consulting, LLC
 
Comments on Simulations Partners Addendum.pdf
Comments on Simulations Partners Addendum.pdfComments on Simulations Partners Addendum.pdf
Comments on Simulations Partners Addendum.pdfBrij Consulting, LLC
 
Work sample1 Scorecard, Power BI, Graphic Interpolation.pdf
Work sample1 Scorecard, Power BI,  Graphic Interpolation.pdfWork sample1 Scorecard, Power BI,  Graphic Interpolation.pdf
Work sample1 Scorecard, Power BI, Graphic Interpolation.pdfBrij Consulting, LLC
 
Simulation Watch Window Parts I,II,III.pdf
Simulation Watch Window Parts I,II,III.pdfSimulation Watch Window Parts I,II,III.pdf
Simulation Watch Window Parts I,II,III.pdfBrij Consulting, LLC
 
Comments on Simulation Watch Parts I,II,III.pdf
Comments on Simulation Watch Parts I,II,III.pdfComments on Simulation Watch Parts I,II,III.pdf
Comments on Simulation Watch Parts I,II,III.pdfBrij Consulting, LLC
 
Comments on Simulations Watch Case I & II.pdf
Comments on Simulations Watch Case I & II.pdfComments on Simulations Watch Case I & II.pdf
Comments on Simulations Watch Case I & II.pdfBrij Consulting, LLC
 
Simulation Watch Window Part I.pdf
Simulation Watch Window Part I.pdfSimulation Watch Window Part I.pdf
Simulation Watch Window Part I.pdfBrij Consulting, LLC
 
Comments on Simulations Watch Case Part I.pdf
Comments on  Simulations Watch Case Part I.pdfComments on  Simulations Watch Case Part I.pdf
Comments on Simulations Watch Case Part I.pdfBrij Consulting, LLC
 
Comments on Simulations Project Parts I through III.pdf
Comments on Simulations Project Parts I through III.pdfComments on Simulations Project Parts I through III.pdf
Comments on Simulations Project Parts I through III.pdfBrij Consulting, LLC
 
Simulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdfSimulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdfBrij Consulting, LLC
 
Comments on Simulations Project Parts I & II Marking Contingencies.pdf
Comments on Simulations Project Parts I & II Marking Contingencies.pdfComments on Simulations Project Parts I & II Marking Contingencies.pdf
Comments on Simulations Project Parts I & II Marking Contingencies.pdfBrij Consulting, LLC
 
Comments on Simulations Project.pdf
Comments on Simulations Project.pdfComments on Simulations Project.pdf
Comments on Simulations Project.pdfBrij Consulting, LLC
 

Plus de Brij Consulting, LLC (20)

Comments on Step Into the World of Glass (All Parts).pdf
Comments on Step Into the World of Glass (All Parts).pdfComments on Step Into the World of Glass (All Parts).pdf
Comments on Step Into the World of Glass (All Parts).pdf
 
Step into the World of Glass (All Parts).pdf
Step into the World of Glass (All Parts).pdfStep into the World of Glass (All Parts).pdf
Step into the World of Glass (All Parts).pdf
 
Comments on Step Into the World of Glass Building Part I.pdf
Comments on Step Into the World of Glass Building Part I.pdfComments on Step Into the World of Glass Building Part I.pdf
Comments on Step Into the World of Glass Building Part I.pdf
 
Square Pi Key to the Investment, SPO.pdf
Square Pi Key to the Investment, SPO.pdfSquare Pi Key to the Investment, SPO.pdf
Square Pi Key to the Investment, SPO.pdf
 
Comments on Square Pi- Key to the Investment.pdf
Comments on Square Pi- Key to the Investment.pdfComments on Square Pi- Key to the Investment.pdf
Comments on Square Pi- Key to the Investment.pdf
 
Scorecard Reconfigured Scale-Port-Demand
Scorecard Reconfigured Scale-Port-DemandScorecard Reconfigured Scale-Port-Demand
Scorecard Reconfigured Scale-Port-Demand
 
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdf
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdfComments on SCORECARD GEARBOX and NEW APPLICATIONS.pdf
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdf
 
Scorecard Gearbox and New Applications.pdf
Scorecard Gearbox and New Applications.pdfScorecard Gearbox and New Applications.pdf
Scorecard Gearbox and New Applications.pdf
 
Comments on Simulations Partners Addendum.pdf
Comments on Simulations Partners Addendum.pdfComments on Simulations Partners Addendum.pdf
Comments on Simulations Partners Addendum.pdf
 
Work sample1 Scorecard, Power BI, Graphic Interpolation.pdf
Work sample1 Scorecard, Power BI,  Graphic Interpolation.pdfWork sample1 Scorecard, Power BI,  Graphic Interpolation.pdf
Work sample1 Scorecard, Power BI, Graphic Interpolation.pdf
 
Simulation Watch Window Parts I,II,III.pdf
Simulation Watch Window Parts I,II,III.pdfSimulation Watch Window Parts I,II,III.pdf
Simulation Watch Window Parts I,II,III.pdf
 
Comments on Simulation Watch Parts I,II,III.pdf
Comments on Simulation Watch Parts I,II,III.pdfComments on Simulation Watch Parts I,II,III.pdf
Comments on Simulation Watch Parts I,II,III.pdf
 
Simulation Watch Window.pdf
Simulation Watch Window.pdfSimulation Watch Window.pdf
Simulation Watch Window.pdf
 
Comments on Simulations Watch Case I & II.pdf
Comments on Simulations Watch Case I & II.pdfComments on Simulations Watch Case I & II.pdf
Comments on Simulations Watch Case I & II.pdf
 
Simulation Watch Window Part I.pdf
Simulation Watch Window Part I.pdfSimulation Watch Window Part I.pdf
Simulation Watch Window Part I.pdf
 
Comments on Simulations Watch Case Part I.pdf
Comments on  Simulations Watch Case Part I.pdfComments on  Simulations Watch Case Part I.pdf
Comments on Simulations Watch Case Part I.pdf
 
Comments on Simulations Project Parts I through III.pdf
Comments on Simulations Project Parts I through III.pdfComments on Simulations Project Parts I through III.pdf
Comments on Simulations Project Parts I through III.pdf
 
Simulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdfSimulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdf
 
Comments on Simulations Project Parts I & II Marking Contingencies.pdf
Comments on Simulations Project Parts I & II Marking Contingencies.pdfComments on Simulations Project Parts I & II Marking Contingencies.pdf
Comments on Simulations Project Parts I & II Marking Contingencies.pdf
 
Comments on Simulations Project.pdf
Comments on Simulations Project.pdfComments on Simulations Project.pdf
Comments on Simulations Project.pdf
 

Dernier

Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechNewman George Leech
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Socio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptxSocio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptxtrishalcan8
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
DEPED Work From Home WORKWEEK-PLAN.docx
DEPED Work From Home  WORKWEEK-PLAN.docxDEPED Work From Home  WORKWEEK-PLAN.docx
DEPED Work From Home WORKWEEK-PLAN.docxRodelinaLaud
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 

Dernier (20)

Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman Leech
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Socio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptxSocio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptx
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
DEPED Work From Home WORKWEEK-PLAN.docx
DEPED Work From Home  WORKWEEK-PLAN.docxDEPED Work From Home  WORKWEEK-PLAN.docx
DEPED Work From Home WORKWEEK-PLAN.docx
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)
 

Scope of Glass Projects (V1) Load Arrays.pdf

  • 1. THE SCOPE OF GLASS PROJECTS Componentization and Supply Chain Mechanics of Ark Design MDIA Glass Design Series V1 Corresponding Load Arrays V2 Strat the Mat V3 Agile Design
  • 2. Glass Design Series… The Scope of Glass Projects LOAD ARRAYS STRAT THE MAT AGILE DESIGN 11/7/2022 Brij Consulting, LLC Jean Marshall 2 Glass Design Series V1 Corresponding Load Arrays V2 Strat the Mat V3 Agile Design New Scope Definition
  • 3. System Tables SmallForm>>>Glass TableMaps Component>>>Supply Chain Forward >>>Market Forward Component Interior Margin Matrix Small Form (Table) Interior Margin New Facts Decision Market Ready? Component Specified System Table Media All Other Y N Y N Y N We will begin to plot an agile delivery from our waterfall tasking The generation of IP, New System Facts and Market Strategy are already timed Lifecycle changes in our project are agile once tasked and engineered events are compiled New Facts related to the table are already mapped IMF IMC IMS Sum of IM = Low level carriage burden Review for New Facts Prep. For MarketReady Events: part of the distributive cycle Are the outcome of Tasks IP 11/7/2022 Brij Consulting, LLC Jean Marshall 3
  • 4. Engineers interact with managers and analysts involved in the Justification, Financial,Planningand Implementationprocessof new systems.Theyneed to assessthe environmental,economic,regulatoryand otherrequirements of a manufacturingorconstruction process.Next to gatherand analyzethe processora portion of it in orderhelp plan the implementation. And then find the optimum approachto the implementation. Paraphrasing EngineeringBOK Engineers use economic analysis to design a processand to prepare a justification amongcomplex design alternatives,usingan assessment of the initial capital costs,annual operation,maintenance,and repaircosts, periodic upgrade and determination of the remainingeconomic value at the end of the valuation period. The iterative value of the Revenuecycle and the scope associatedwith the project operationhelp to delivera justificationto accept orreject a proposal. If a processis cost reductive or if it is utilitynecessary,an appropriate justification is used. The quantificationof the risk maymake the outcome lesslikelyincomparison to otherviable alternatives.ParaphrasingEngineeringBOK New Facts on T&M 11/7/2022 Brij Consulting, LLC Jean Marshall 4
  • 5. Associative Facts ■ Unless the associative facts improve the structural content of the engineering model they are sometimes set aside. ■ The Method of Testing the whole model is a vast improvement over any binary method, see Appendix III ■ In a flat format all math is relational ■ The model redacts all rash prospects and dispels all dis-associative facts in the proof ■ Whatever is not contiguous to the Plan cannot engage its proof ■ The fingerprint and footpath conditions of the componentization give way to solid state relational threads within the t1 and t2 timeframes ■ Wave and particle theory in electronics is not conducive to building, compilations or generational instances because it has no glass container, plait able properties or propensities for scale and design. This is a Morning Star Ark Based glass capability. Build Associative Model prior to All-Glass 11/7/2022 Brij Consulting, LLC Jean Marshall 5 MDIA Mark 2 Ark Media: Dimensional Interface
  • 6. Data Field for All Glass ■ Associative Facts ■ Time and Motion Data ■ Statistical Outcome 11/7/2022 Brij Consulting, LLC Jean Marshall 6
  • 7. Stratification for Component Stream Alpha =.0531 Re-inv IMC a Climb Climb The supply chain has the iterative impact on the asset creation and its subsequent market demand building the scenario through its key engineering oversight Re-inv a 2.195-2.19652=.00152 carriage burden 11/7/2022 Brij Consulting, LLC Jean Marshall 7 IMC See Slide 2 a 712.96145-711[std] =1.9615 -1.9539 = .0075 196.2+.19 Forward payback achieved in econometric gain Proof on App III
  • 8. Stream Facts in Gate Mechanics y = -4,705,045,101.57x + 10,351,099,223.46 R² = 1.00 y = 0.6445x-1.4179 R² = 1 -1E+09 0 1E+09 2E+09 3E+09 4E+09 5E+09 6E+09 Sum Average Poly Stream Matrix Facts derived from Anova: Two-Factor Without Replication, data field The data forms a circle as it cycles and naturally lends itself to trig functions, while in its native state Correspondence to Row 10 From this Data-field Table @ Anova 11/7/2022 Brij Consulting, LLC Jean Marshall 8 Instance=Burden Acquisition w/ Green Wall
  • 9. Starting Map ■ Glass Future Tables from “Building with Glass” ■ We now have our build equation 11/7/2022 Brij Consulting, LLC Jean Marshall 9 T2 T1 T4 & T3 Different Engineering Groups make uniquely fitted decisions Based on Time Buckets on the 50-year Glass Path See Next: Re-User [RUF] Friendly Glass Systems Engineering New BR 9 Time Bucket designation was changed on this slide since T4 & T3 are start
  • 10. Agile Strategy V2 Strat the Mat ■ How do we derive the Agile Strategy from the events timeline and the Matrix that corresponds to the Supply Chain? There is a blockchain theory of completion. V3 Agile Design 11/7/2022 Brij Consulting, LLC Jean Marshall 10 Glass Design Series V1 Corresponding Load Arrays V2 Strat the Mat V3 Agile Design ■ Who made this Scrummy Plan anyhow? Tracking overall progress and informing everyone of Milestonesand Forward Completion Coming Next… Flag and Post x% ■ Full Branch Capability changes the design from Contiguous to Continuous BR
  • 11. 11/7/2022 Brij Consulting, LLC Jean Marshall 11 Appendix I Compiled Events
  • 12. From our Last paper… From our Events paper… 11/7/2022 Brij Consulting, LLC Jean Marshall 12
  • 13. Relational Functions of the Model Proof Interior margin Binary Path Standards, Weights and Measures Reinvestment Path growth Rise over the Run Equity Using the Economic Model Equity is stated at Fair Market Value 11/7/2022 Brij Consulting, LLC Jean Marshall 13 The Interior Margin is preserved using relational functions of the Model Ark Path See Slide 2
  • 14. Crystal Sea ■ Mary Star of the Sea is an Ark Design Magnification of Mary using the Crystal Sea composition of the Morning Star ■ Glass will operate in this mode and be an available Stream to everyone interiorly for achievement and competency ■ “My Soul Magnifies the Lord,” her famous Script ■ Very Grateful to Mary for keeping us on track with God 11/7/2022 Brij Consulting, LLC Jean Marshall 14 Engineering Economics Description The use of economic analysis is fundamental to the engineering design process and to changes in systems, processes, or operations nspe-body-of-knowledge.pdf
  • 15. Design Series ■ This is the First Paper in our Design Series. Its facts are derived from the Learning Series on Glass in Ark Design, listing shown next. ■ What we learn in a Waterfall Patternthen we do in an Agile Method 11/7/2022 Brij Consulting, LLC Jean Marshall 15
  • 16. 16