This document provides an operator training program for H R Textile Mills ltd's Fabrics Finishing Department. The training covers:
1) Working procedures such as quality checks, special requirements, and machine parameters
2) The process flow chart from delivery to finished fabrics storage
3) Job responsibilities including following procedures, meeting production targets, and quality requirements
4) Introductions to machines used in fabrics finishing like slitters, stenters, and dryers
5) Spirality control procedures for single jersey fabrics
6) Standard operating procedures for machines like stenters
7) Methods for increasing productivity through optimized feeding and parameter adjustment
8) Skills development analysis and safety training on fire
4. ltd
1. Working Procedure
2. Process Flow Chart
3. Job Responsibility
4. Machine introduce
5. Spirality Control
6. SOP Analysis
7. How to Increase Productivity
8. Skills Development analysis
9. Fire & Safety
Topic
7. ltd 2. Process Flow Chart
Delivery to Garments
Tube Compact.
Peach Finish Brush Finish
Stenter
De-Watering Slitting.
Dryer(Tube/collar) Stenter
Dyeing
Open Width Compact
Inspection
Finish Fabrics Store
Combing
Sharing
8. ltd 3. Job Responsibility
1. Follow the Coordinator Concept
2. Timely M/c Clean
3. Fulfil Production Target
4. Floor Clean in your area
5. Chemical prepare with consumption
6. Fulfil all information in the Batch Card
7. Every Batch must be conform with information
8. Fulfil Quality Requirement
9. Fabrics Keep with cover avoid Dirty/ Color spot
10. Every Batch Time maintained & Update in DNF
10. ltd Below-150 GSM- (Only Single Jersey)
Left Side Right Side
Mahlo (Weft Straightener)
Stenter
Fabric s
5. Spirality Control
11. ltd 6. SOP Analysis
Batch Card
Machine
Parameter
Standard Operating Procedure (Stenter M/ c )
1. Chec k Req uirem ent
2. DIA, GSM, Stitc h Leng th, Ya rn Count
3. Follo w a ny Sp ec ia l Instruc tion
1. Need Clea n or no t/ Filter
2. Air & Ga s Pressure Suffic ient or not
3. Tem p era ture a ll b urner sa m e?
Dia wise wid th set up
Overfeed , Und er feed & Sp eed
Tem p era ture Set fa b ric s typ e wise
Ba c k sid e-1, Op era ting Sid e-1, Front sid e-1
Qua lity Chec k & Fa b ric s feed ing -1 p erson
Softener Prep a ra tion-1 p erson
Wid th & GSM Chec k
Sha d e g ive to Qua lity for c onfirm
Ha nd feel, Qua lity issue c onfirm from Qua lity
Manpower
Check
12. ltd 7. How to Increase Productivity
1. Color wise Fabrics Feeding
2. M/c down time Reduce
3. Fabrics wise temperature adjust (Moisture Maintain 8-9%)
4. Padder Pressure Maintain 2-3 Bar
5. Blower Adjust Maximum
6. Overfeed Maintain 40-50%
7. Parameter & Chemical Make sure before Start
8. Every Stenter M/c Minimum 3 batch Ready for process
9. Filter Clean time to time
10.Before Process Ensure Shade & Quality
11. Make sure each chamber 1.5 tons, total 21 chamber 31.5 tons
13. ltd 8. Skills Development analysis
SL Point Self Report
1 Job of Knowledge 5
2 Achievement Capability 5
3 Quality of Work 5
4 Wastage Reduction 5
5 Attendance & Discipline 5
6 Health & Safety 5
7 House Keeping 5
8 Behavioral Attributes 5
9 Dependability 5
10 Communication 5
14. ltd 9. Fire & Safety
4. Fire Extinguisher
A. ABC Powder
B. CO2