DRAIN
AGE
CULVERT
Y20
Y21
LIMIT
OF PROP
OSED
CULV
ERT
LIMIT
OF EXIST
ING CULV
ERT
LIMIT
OF PROP
OSED
CULV
ERT
LIMIT
OF EXIST
ING CULV
ERT
S07
102
-1/2
-RE
-FC
-05
-04
-00
-35
RE
FE
R TO
DW
G.
No
.
DE
TAIL "A"
38
38
38
38
CONNECTION BETWEEN PROPOSED UTILITIES
CULVERT AND EXISTING CULVERT.
WALL OPENINGS EQUALS TO SAME WIDTH
& DEPTH OF EACH CELL I.L.= 281.00 , DEPTH = 2.00m
R=660.00
AS.2
AS.1
E 585281.192
N 2369403.476
CONNECTION BETWEEN PROPOSED UTILITIES
CULVERT AND EXISTING CULVERT.
WALL OPENINGS EQUALS TO SAME WIDTH
& DEPTH OF EACH CELL I.L.=281.00 , DEPTH = 2.00m
1:10
M.V.3
CHILLER
AJYAD
HARAM2
110KV
SUB-STATION
AH-01
LAYOUT1
DWG #EWD-E-CH .AJD 0002
LAYOUT2
DWG #EWD-E-CH .AJD0003
MV3 LOCATION
(DETAIL 'A)'
HARAM2 (110 KV) SUBSTATION / CHILLER AJYAD LOCATION
DETAIL 'B'
MARWA BUS
STATION
BOUNDARIES
TEMPORARY ELECTRICAL
DUCT BANK LINK
BETWEEN MARWA AND
SHAMIYA EXPANSION
ELECT. CULVERTS
EXISTING CHILLER AJYAD 3
FEEDERS ( 6 CABLES) ROUTE
LOCATION TO BE RELOCATED
AT ET-1 TUNNEL.
GENERAL NOTES:-
Kingdom of Saudi Arabia
LEGEND
CONTRACTOR :
CONSULTANT :
1- THIS DRAWING IS PART OF SHEETSET CONSISTING OF THE FOLLOWING DRAWINGS:
EWD-E-CH. AJD.-0001, EWD-E-CH. AJD.-0002, EWD-E-CH. AJD.-0003,
EWD-E-CH. AJD.-0004, EWD-E-CH. AJD.-0005
2- THIS DRAWING IS CONCEPT SKETCH DRAWING DESIGN PROPOSAL OF
DIVERSIFYING CHIILER AJYAD FEEDING SOURCES (FROM SHAMIYA-2 SUB-STATION +
HARAM -2 110KV SUB-STATION) FOR MORE RELIABILITY .
GE
R3.00
0.60
3.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
1:10
LAYOUT1
FEEDER#AH45
FEEDER#AH06
FEEDER#AH26SEC. 1-1
GENERAL NOTES:-
Kingdom of Saudi Arabia
LEGEND
CONTRACTOR :
CONSULTANT :
1- THIS DRAWING IS PART OF SHEETSET CONSISTING OF THE FOLLOWING DRAWINGS:
EWD-E-CH. AJD.-0001, EWD-E-CH. AJD.-0002, EWD-E-CH. AJD.-0003,
EWD-E-CH. AJD.-0004, EWD-E-CH. AJD.-0005
2- THIS DRAWING IS CONCEPT SKETCH DRAWING DESIGN PROPOSAL OF
DIVERSIFYING CHIILER AJYAD FEEDING SOURCES (FROM SHAMIYA-2 SUB-STATION +
HARAM -2 110KV SUB-STATION) FOR MORE RELIABILITY .
NEW
DRAINAGE
CULVERT
RA
ISE
D
FLO
OR
AR
EA
RAFT
LIMIT
RA
FT
LIM
IT
Y2
0
Y2
1
LIMIT OF PROPOSED CULVERT
LIMIT OF EXISTING CULVERT
LIMIT OF PROPOSED CULVERT
LIMIT OF EXISTING CULVERT
S07102-1/2-RE-FC-05-04-00-35
REFE
R TO
DWG. No.
DETA
IL "A"
4.00
N BETWEEN PROPOSED UTILITIES
ND EXISTING CULVERT.
INGS EQUALS TO SAME WIDTH
EACH CELL I.L.= 281.00 , DEPTH = 2.00m
N BETWEEN PROPOSED UTILITIES
ND EXISTING CULVERT.
INGS EQUALS TO SAME WIDTH
EACH CELL I.L.=281.00 , DEPTH = 2.00m
M.V.3
CHILLER
AJYAD
HARAM2
110KV
SUB-STATION
AH-01
LAYOUT2
DETAIL 'A'
DETAIL 'B'
SEC. 3 - 3
GENERAL NOTES:-
Kingdom of Saudi Arabia
LEGEND
CONTRACTOR :
CONSULTANT :
1- 1- THIS DRAWING IS PART OF SHEETSET CONSISTING OF THE FOLLOWING DRAWINGS:
EWD-E-CH. AJD.-0001, EWD-E-CH. AJD.-0002, EWD-E-CH. AJD.-0003,
EWD-E-CH. AJD.-0004, EWD-E-CH. AJD.-0005
2- THIS DRAWING IS CONCEPT SKETCH DRAWING DESIGN PROPOSAL OF
DIVERSIFYING CHIILER AJYAD FEEDING SOURCES (FROM SHAMIYA-2 SUB-STATION +
HARAM -2 110KV SUB-STATION) FOR MORE RELIABILITY .
TO BE DEMOLISHED
FEEDERS
M.V.3 SEC 2 - 2
BEFORE JOINTING STATUS
FEEDER # FROM TO
TO BE
JOINTED
WITH
AH 45
SHAMIYA 2
SUBSTATION
CHILLER
AJYAD
---
AH 06 AH 02
AH 26 AH 01
AH 01
HARAM 2
110KV
SUBSTATION
MV3
SUBSTATION
AH 26
AH 02 AH 06
AH 03 ---
AH 04 ---
BEFORE JOINTING
AFTER JOINTING
AFTER JOINTING STATUS
(@ MV 3SIDE)
FIRST FEEDER
JOINING END
SECOND
FEEDER JOINING
END
RESULT MERGED FEEDER ROUTE
FROM TO
AH 06 AH 02
SHAMIYA 2
SUBSTATION
MV3
SUBSTATION
AH 26 AH 01
NOTE :FEEDERS #AH & 03AH 04ARE NOT JOINING/MERGING WITH
OTHER FEEDERS (I.E ARE FEEDING MV 3DIRECTLY FROM HARAM 2
110(KV )SUBSTATION)
TABLE 1.1
TABLE 1.0
DETAIL 'A'
REFER TO DWG#
EWD-E-CH. AJD.-0002
GENERAL NOTES:-
Kingdom of Saudi Arabia
LEGEND
CONTRACTOR :
CONSULTANT :
1- THIS DRAWING IS PART OF SHEETSET CONSISTING OF THE FOLLOWING DRAWINGS:
EWD-E-CH. AJD.-0001, EWD-E-CH. AJD.-0002, EWD-E-CH. AJD.-0003,
EWD-E-CH. AJD.-0004, EWD-E-CH. AJD.-0005
2- THIS DRAWING IS CONCEPT SKETCH DRAWING DESIGN PROPOSAL OF
DIVERSIFYING CHIILER AJYAD FEEDING SOURCES (FROM SHAMIYA-2 SUB-STATION +
HARAM -2 110KV SUB-STATION) FOR MORE RELIABILITY .
3- ALL FEEDERS CONSIST OF 2 CABLES 3 X 300 MM2.
4- JOINING/MERGING SYMBOL INDICATED IN THE DRAWING DOES ONLY SHOW THE
CONCEPT OF JOINING/MERGING 2 FEEDERS TOGETHER; IT DOESN'T MEAN THAT THE
CABLES SHALL BE JOINTED AT IT. (I.E. CABLE JOINTS WILL NOT BE INSTALLED IN ANY
CABLES BENDING/TURNS). CABLE JOINTS WILL BE INSTALLED IN STRAIGHT PART -AS
PER SITE CONDITION- BEFORE THE ENTRANCE OF THE STATION.
5- ALL 3 X 300 MM2 CABLES WITH OUTER DIAMETER OF 8.5 CM WILL MAINTAIN MINIMUM
BENDING RADIUS OF AT LEAST 1 METER (8.5 CM X 12 TIMES THE OUTER DIAMETER OF
THE CABLE).
TO BE DEMOLISHED
FEEDERS
FEEDER JOINING/MERGING
SYMBOL
CHILLER
AJYAD
HARAM2
110KV
SUB-STATION
SEC 2 - 2
BEFORE JOINTING
AFTER JOINTING
BEFORE JOINTING STATUS
FEEDER # FROM TO
TO BE
JOINTED WITH
AH 45
SHAMIYA 2
SUBSTATION
CHILLER
AJYAD
---
AH 06 AH 02
AH 26 AH 01
AH 01
HARAM 2
110KV
SUBSTATION
MV3
SUBSTATION
AH 26
AH 02 AH 06
AH 03 ---
AH 04 ---
AFTER JOINTING STATUS
(@ CHILLER AJYAD /HARAM TWO SIDE)
FIRST FEEDER
JOINING END
SECOND
FEEDER JOINING
END
RESULT MERGED FEEDER ROUTE
FROM TO
AH 02 AH 06
HARAM 2
110(KV)
SUBSTATION
CHILLER
AJYAD
AH 01 AH 26
NOTE :FEEDERS #AH 03AND #AH 04ARE NOT JOINING/MERGING
WITH OTHER FEEDERS (I.E ARE FEEDING MV 3DIRECTLY FROM
HARAM 110( 2KV )SUBSTATION)
TABLE 1.0
TABLE 1.2
DETAIL 'B'
GENERAL NOTES:-
Kingdom of Saudi Arabia
LEGEND
CONTRACTOR :
CONSULTANT :
1- THIS DRAWING IS PART OF SHEETSET CONSISTING OF THE FOLLOWING DRAWINGS:
EWD-E-CH. AJD.-0001, EWD-E-CH. AJD.-0002, EWD-E-CH. AJD.-0003,
EWD-E-CH. AJD.-0004, EWD-E-CH. AJD.-0005
2- THIS DRAWING IS CONCEPT SKETCH DRAWING DESIGN PROPOSAL OF
DIVERSIFYING CHIILER AJYAD FEEDING SOURCES (FROM SHAMIYA-2 SUB-STATION +
HARAM -2 110KV SUB-STATION) FOR MORE RELIABILITY .
3- ALL FEEDERS CONSIST OF 2 CABLES 3 X 300 MM2.
4- JOINING/MERGING SYMBOL INDICATED IN THE DRAWING DOES ONLY SHOW THE
CONCEPT OF JOINING/MERGING 2 FEEDERS TOGETHER; IT DOESN'T MEAN THAT THE
CABLES SHALL BE JOINTED AT IT. (I.E. CABLE JOINTS WILL NOT BE INSTALLED IN ANY
CABLES BENDING/TURNS). CABLE JOINTS WILL BE INSTALLED IN STRAIGHT PART -AS
PER SITE CONDITION -BEFORE THE ENTRANCE OF THE STATION.
5- ALL 3 X 300 MM2 CABLES WITH OUTER DIAMETER OF 8.5 CM WILL MAINTAIN MINIMUM
BENDING RADIUS OF AT LEAST 1 METER (8.5 CM X 12 TIMES THE OUTER DIAMETER OF
THE CABLE).
TO BE DEMOLISHED
FEEDERS
FEEDER JOINING/MERGING
SYMBOL

Contenu connexe

En vedette

Haram Expansion cables arrangement, MEP coordination and cable trays maneuver
Haram Expansion cables arrangement, MEP coordination and cable trays maneuverHaram Expansion cables arrangement, MEP coordination and cable trays maneuver
Haram Expansion cables arrangement, MEP coordination and cable trays maneuverMohamed Azzam
 
Construction Coordination Underground M.V Relocation works
Construction Coordination Underground M.V Relocation worksConstruction Coordination Underground M.V Relocation works
Construction Coordination Underground M.V Relocation worksMohamed Azzam
 
Haram Expansion M.V substations diversified feeding sources Scenrio
Haram Expansion M.V substations diversified feeding sources ScenrioHaram Expansion M.V substations diversified feeding sources Scenrio
Haram Expansion M.V substations diversified feeding sources ScenrioMohamed Azzam
 
Ablution Power feeding & calculations
Ablution Power feeding & calculationsAblution Power feeding & calculations
Ablution Power feeding & calculationsMohamed Azzam
 
TGI LEICESTER SQUARE ELECTRICAL DRAWING XREF C6 17 9 15-A0 Electrical ONE LIN...
TGI LEICESTER SQUARE ELECTRICAL DRAWING XREF C6 17 9 15-A0 Electrical ONE LIN...TGI LEICESTER SQUARE ELECTRICAL DRAWING XREF C6 17 9 15-A0 Electrical ONE LIN...
TGI LEICESTER SQUARE ELECTRICAL DRAWING XREF C6 17 9 15-A0 Electrical ONE LIN...Nick Hyde CEng MIMechE
 
110 K.V SIEMENS TRANSFORMER JACKING AND SLIDING SCENARIO
110 K.V SIEMENS TRANSFORMER JACKING AND SLIDING SCENARIO110 K.V SIEMENS TRANSFORMER JACKING AND SLIDING SCENARIO
110 K.V SIEMENS TRANSFORMER JACKING AND SLIDING SCENARIOMohamed Azzam
 
M.V/H.V Cable trays earthing systems
M.V/H.V Cable trays earthing systemsM.V/H.V Cable trays earthing systems
M.V/H.V Cable trays earthing systemsMohamed Azzam
 
Haram complementary projects temporary feeding proposals
Haram complementary projects temporary feeding proposalsHaram complementary projects temporary feeding proposals
Haram complementary projects temporary feeding proposalsMohamed Azzam
 
Pinnacle Infotech partaking at 2017 PCI Convention
 Pinnacle Infotech partaking at 2017 PCI Convention  Pinnacle Infotech partaking at 2017 PCI Convention
Pinnacle Infotech partaking at 2017 PCI Convention Pinnacle Infotech
 
Honeymoon suite bedroom tutorial ferry
Honeymoon suite bedroom tutorial ferryHoneymoon suite bedroom tutorial ferry
Honeymoon suite bedroom tutorial ferryNomer Adona
 
How to write a good business letter
How to write a good business letter   How to write a good business letter
How to write a good business letter Sukh Sandhu
 

En vedette (14)

Haram Expansion cables arrangement, MEP coordination and cable trays maneuver
Haram Expansion cables arrangement, MEP coordination and cable trays maneuverHaram Expansion cables arrangement, MEP coordination and cable trays maneuver
Haram Expansion cables arrangement, MEP coordination and cable trays maneuver
 
Construction Coordination Underground M.V Relocation works
Construction Coordination Underground M.V Relocation worksConstruction Coordination Underground M.V Relocation works
Construction Coordination Underground M.V Relocation works
 
Haram Expansion M.V substations diversified feeding sources Scenrio
Haram Expansion M.V substations diversified feeding sources ScenrioHaram Expansion M.V substations diversified feeding sources Scenrio
Haram Expansion M.V substations diversified feeding sources Scenrio
 
3D Renderings
3D Renderings3D Renderings
3D Renderings
 
Ablution Power feeding & calculations
Ablution Power feeding & calculationsAblution Power feeding & calculations
Ablution Power feeding & calculations
 
TGI LEICESTER SQUARE ELECTRICAL DRAWING XREF C6 17 9 15-A0 Electrical ONE LIN...
TGI LEICESTER SQUARE ELECTRICAL DRAWING XREF C6 17 9 15-A0 Electrical ONE LIN...TGI LEICESTER SQUARE ELECTRICAL DRAWING XREF C6 17 9 15-A0 Electrical ONE LIN...
TGI LEICESTER SQUARE ELECTRICAL DRAWING XREF C6 17 9 15-A0 Electrical ONE LIN...
 
110 K.V SIEMENS TRANSFORMER JACKING AND SLIDING SCENARIO
110 K.V SIEMENS TRANSFORMER JACKING AND SLIDING SCENARIO110 K.V SIEMENS TRANSFORMER JACKING AND SLIDING SCENARIO
110 K.V SIEMENS TRANSFORMER JACKING AND SLIDING SCENARIO
 
M.V/H.V Cable trays earthing systems
M.V/H.V Cable trays earthing systemsM.V/H.V Cable trays earthing systems
M.V/H.V Cable trays earthing systems
 
STAINES AP-PLANS PHDD C2-A0 HVAC MECH
STAINES AP-PLANS PHDD C2-A0 HVAC  MECHSTAINES AP-PLANS PHDD C2-A0 HVAC  MECH
STAINES AP-PLANS PHDD C2-A0 HVAC MECH
 
1 Generral Layout
1 Generral Layout1 Generral Layout
1 Generral Layout
 
Haram complementary projects temporary feeding proposals
Haram complementary projects temporary feeding proposalsHaram complementary projects temporary feeding proposals
Haram complementary projects temporary feeding proposals
 
Pinnacle Infotech partaking at 2017 PCI Convention
 Pinnacle Infotech partaking at 2017 PCI Convention  Pinnacle Infotech partaking at 2017 PCI Convention
Pinnacle Infotech partaking at 2017 PCI Convention
 
Honeymoon suite bedroom tutorial ferry
Honeymoon suite bedroom tutorial ferryHoneymoon suite bedroom tutorial ferry
Honeymoon suite bedroom tutorial ferry
 
How to write a good business letter
How to write a good business letter   How to write a good business letter
How to write a good business letter
 

Similaire à Diversifying source feeding loads for chiller Ajyad Haram

Hp section weep hole monitoring
Hp section weep hole monitoringHp section weep hole monitoring
Hp section weep hole monitoringPrem Baboo
 
ppt on industrial training of final year studen from ptcul 132kv substation ...
ppt on industrial training of final year studen  from ptcul 132kv substation ...ppt on industrial training of final year studen  from ptcul 132kv substation ...
ppt on industrial training of final year studen from ptcul 132kv substation ...surendra rawat
 
Concept Cable tray drawing
Concept  Cable tray drawing Concept  Cable tray drawing
Concept Cable tray drawing senghou2
 
1902 01_SouthSide Works_Sheet - E400 - ELECTRICAL RISER DIAGRAM
1902 01_SouthSide Works_Sheet - E400 - ELECTRICAL RISER DIAGRAM1902 01_SouthSide Works_Sheet - E400 - ELECTRICAL RISER DIAGRAM
1902 01_SouthSide Works_Sheet - E400 - ELECTRICAL RISER DIAGRAMChad Kurdi, P.E.
 
Akbar trading stock list
Akbar trading stock listAkbar trading stock list
Akbar trading stock listAKBAR TRADING
 
Semiconductor equipment spare parts in usa may 20th 2020
Semiconductor equipment spare parts in usa may 20th 2020Semiconductor equipment spare parts in usa may 20th 2020
Semiconductor equipment spare parts in usa may 20th 2020Emily Tan
 
Semiconductor equipment spare parts in usa may 20th 2020
Semiconductor equipment spare parts in usa may 20th 2020Semiconductor equipment spare parts in usa may 20th 2020
Semiconductor equipment spare parts in usa may 20th 2020Emily Tan
 
Color television chassis cn 001 g
Color television chassis cn 001 gColor television chassis cn 001 g
Color television chassis cn 001 gJuan Miguel Duran
 
15RDM01-2016-Academy Utility Plan
15RDM01-2016-Academy Utility Plan15RDM01-2016-Academy Utility Plan
15RDM01-2016-Academy Utility PlanKevin Stober
 
Rail cum Road Bridge across the Ganga near Munger
Rail cum Road Bridge across the Ganga near MungerRail cum Road Bridge across the Ganga near Munger
Rail cum Road Bridge across the Ganga near MungerAshish Kumar Yadav
 
0 manual hyundai 45 l- 7a
0 manual hyundai 45 l- 7a0 manual hyundai 45 l- 7a
0 manual hyundai 45 l- 7aricardo sanchez
 

Similaire à Diversifying source feeding loads for chiller Ajyad Haram (20)

Hp section weep hole monitoring
Hp section weep hole monitoringHp section weep hole monitoring
Hp section weep hole monitoring
 
Bci184 j
Bci184 jBci184 j
Bci184 j
 
Bci184 f
Bci184 fBci184 f
Bci184 f
 
ppt on industrial training of final year studen from ptcul 132kv substation ...
ppt on industrial training of final year studen  from ptcul 132kv substation ...ppt on industrial training of final year studen  from ptcul 132kv substation ...
ppt on industrial training of final year studen from ptcul 132kv substation ...
 
Stamford pi144 f
Stamford pi144 fStamford pi144 f
Stamford pi144 f
 
Concept Cable tray drawing
Concept  Cable tray drawing Concept  Cable tray drawing
Concept Cable tray drawing
 
1902 01_SouthSide Works_Sheet - E400 - ELECTRICAL RISER DIAGRAM
1902 01_SouthSide Works_Sheet - E400 - ELECTRICAL RISER DIAGRAM1902 01_SouthSide Works_Sheet - E400 - ELECTRICAL RISER DIAGRAM
1902 01_SouthSide Works_Sheet - E400 - ELECTRICAL RISER DIAGRAM
 
Akbar trading stock list
Akbar trading stock listAkbar trading stock list
Akbar trading stock list
 
Uci274 h
Uci274 hUci274 h
Uci274 h
 
Semiconductor equipment spare parts in usa may 20th 2020
Semiconductor equipment spare parts in usa may 20th 2020Semiconductor equipment spare parts in usa may 20th 2020
Semiconductor equipment spare parts in usa may 20th 2020
 
Semiconductor equipment spare parts in usa may 20th 2020
Semiconductor equipment spare parts in usa may 20th 2020Semiconductor equipment spare parts in usa may 20th 2020
Semiconductor equipment spare parts in usa may 20th 2020
 
Color television chassis cn 001 g
Color television chassis cn 001 gColor television chassis cn 001 g
Color television chassis cn 001 g
 
15RDM01-2016-Academy Utility Plan
15RDM01-2016-Academy Utility Plan15RDM01-2016-Academy Utility Plan
15RDM01-2016-Academy Utility Plan
 
Uci274 d
Uci274 dUci274 d
Uci274 d
 
BUSSMANN FUSE ~ AZZAN AL BADI TRADING ~ SOHAR ~ OMAN
BUSSMANN FUSE ~ AZZAN AL BADI TRADING ~ SOHAR ~ OMANBUSSMANN FUSE ~ AZZAN AL BADI TRADING ~ SOHAR ~ OMAN
BUSSMANN FUSE ~ AZZAN AL BADI TRADING ~ SOHAR ~ OMAN
 
Rail cum Road Bridge across the Ganga near Munger
Rail cum Road Bridge across the Ganga near MungerRail cum Road Bridge across the Ganga near Munger
Rail cum Road Bridge across the Ganga near Munger
 
0 manual hyundai 45 l- 7a
0 manual hyundai 45 l- 7a0 manual hyundai 45 l- 7a
0 manual hyundai 45 l- 7a
 
Uci274 f
Uci274 fUci274 f
Uci274 f
 
Contactor hoangphuongjsc.com
Contactor   hoangphuongjsc.comContactor   hoangphuongjsc.com
Contactor hoangphuongjsc.com
 
Hci5 f
Hci5 fHci5 f
Hci5 f
 

Dernier

ChatGPT-and-Generative-AI-Landscape Working of generative ai search
ChatGPT-and-Generative-AI-Landscape Working of generative ai searchChatGPT-and-Generative-AI-Landscape Working of generative ai search
ChatGPT-and-Generative-AI-Landscape Working of generative ai searchrohitcse52
 
nvidia AI-gtc 2024 partial slide deck.pptx
nvidia AI-gtc 2024 partial slide deck.pptxnvidia AI-gtc 2024 partial slide deck.pptx
nvidia AI-gtc 2024 partial slide deck.pptxjasonsedano2
 
Tachyon 100G PCB Performance Attributes and Applications
Tachyon 100G PCB Performance Attributes and ApplicationsTachyon 100G PCB Performance Attributes and Applications
Tachyon 100G PCB Performance Attributes and ApplicationsEpec Engineered Technologies
 
sdfsadopkjpiosufoiasdoifjasldkjfl a asldkjflaskdjflkjsdsdf
sdfsadopkjpiosufoiasdoifjasldkjfl a asldkjflaskdjflkjsdsdfsdfsadopkjpiosufoiasdoifjasldkjfl a asldkjflaskdjflkjsdsdf
sdfsadopkjpiosufoiasdoifjasldkjfl a asldkjflaskdjflkjsdsdfJulia Kaye
 
Vertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptx
Vertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptxVertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptx
Vertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptxLMW Machine Tool Division
 
me3493 manufacturing technology unit 1 Part A
me3493 manufacturing technology unit 1 Part Ame3493 manufacturing technology unit 1 Part A
me3493 manufacturing technology unit 1 Part Akarthi keyan
 
Design Analysis of Alogorithm 1 ppt 2024.pptx
Design Analysis of Alogorithm 1 ppt 2024.pptxDesign Analysis of Alogorithm 1 ppt 2024.pptx
Design Analysis of Alogorithm 1 ppt 2024.pptxrajesshs31r
 
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTION.docx
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTION.docxSUMMER TRAINING REPORT ON BUILDING CONSTRUCTION.docx
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTION.docxNaveenVerma126
 
IT3401-WEB ESSENTIALS PRESENTATIONS.pptx
IT3401-WEB ESSENTIALS PRESENTATIONS.pptxIT3401-WEB ESSENTIALS PRESENTATIONS.pptx
IT3401-WEB ESSENTIALS PRESENTATIONS.pptxSAJITHABANUS
 
A Seminar on Electric Vehicle Software Simulation
A Seminar on Electric Vehicle Software SimulationA Seminar on Electric Vehicle Software Simulation
A Seminar on Electric Vehicle Software SimulationMohsinKhanA
 
دليل تجارب الاسفلت المختبرية - Asphalt Experiments Guide Laboratory
دليل تجارب الاسفلت المختبرية - Asphalt Experiments Guide Laboratoryدليل تجارب الاسفلت المختبرية - Asphalt Experiments Guide Laboratory
دليل تجارب الاسفلت المختبرية - Asphalt Experiments Guide LaboratoryBahzad5
 
Engineering Mechanics Chapter 5 Equilibrium of a Rigid Body
Engineering Mechanics  Chapter 5  Equilibrium of a Rigid BodyEngineering Mechanics  Chapter 5  Equilibrium of a Rigid Body
Engineering Mechanics Chapter 5 Equilibrium of a Rigid BodyAhmadHajasad2
 
Modelling Guide for Timber Structures - FPInnovations
Modelling Guide for Timber Structures - FPInnovationsModelling Guide for Timber Structures - FPInnovations
Modelling Guide for Timber Structures - FPInnovationsYusuf Yıldız
 
Quasi-Stochastic Approximation: Algorithm Design Principles with Applications...
Quasi-Stochastic Approximation: Algorithm Design Principles with Applications...Quasi-Stochastic Approximation: Algorithm Design Principles with Applications...
Quasi-Stochastic Approximation: Algorithm Design Principles with Applications...Sean Meyn
 
Guardians and Glitches: Navigating the Duality of Gen AI in AppSec
Guardians and Glitches: Navigating the Duality of Gen AI in AppSecGuardians and Glitches: Navigating the Duality of Gen AI in AppSec
Guardians and Glitches: Navigating the Duality of Gen AI in AppSecTrupti Shiralkar, CISSP
 
Summer training report on BUILDING CONSTRUCTION for DIPLOMA Students.pdf
Summer training report on BUILDING CONSTRUCTION for DIPLOMA Students.pdfSummer training report on BUILDING CONSTRUCTION for DIPLOMA Students.pdf
Summer training report on BUILDING CONSTRUCTION for DIPLOMA Students.pdfNaveenVerma126
 
Graphics Primitives and CG Display Devices
Graphics Primitives and CG Display DevicesGraphics Primitives and CG Display Devices
Graphics Primitives and CG Display DevicesDIPIKA83
 
Power System electrical and electronics .pptx
Power System electrical and electronics .pptxPower System electrical and electronics .pptx
Power System electrical and electronics .pptxMUKULKUMAR210
 

Dernier (20)

ChatGPT-and-Generative-AI-Landscape Working of generative ai search
ChatGPT-and-Generative-AI-Landscape Working of generative ai searchChatGPT-and-Generative-AI-Landscape Working of generative ai search
ChatGPT-and-Generative-AI-Landscape Working of generative ai search
 
nvidia AI-gtc 2024 partial slide deck.pptx
nvidia AI-gtc 2024 partial slide deck.pptxnvidia AI-gtc 2024 partial slide deck.pptx
nvidia AI-gtc 2024 partial slide deck.pptx
 
Tachyon 100G PCB Performance Attributes and Applications
Tachyon 100G PCB Performance Attributes and ApplicationsTachyon 100G PCB Performance Attributes and Applications
Tachyon 100G PCB Performance Attributes and Applications
 
Présentation IIRB 2024 Marine Cordonnier.pdf
Présentation IIRB 2024 Marine Cordonnier.pdfPrésentation IIRB 2024 Marine Cordonnier.pdf
Présentation IIRB 2024 Marine Cordonnier.pdf
 
sdfsadopkjpiosufoiasdoifjasldkjfl a asldkjflaskdjflkjsdsdf
sdfsadopkjpiosufoiasdoifjasldkjfl a asldkjflaskdjflkjsdsdfsdfsadopkjpiosufoiasdoifjasldkjfl a asldkjflaskdjflkjsdsdf
sdfsadopkjpiosufoiasdoifjasldkjfl a asldkjflaskdjflkjsdsdf
 
Vertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptx
Vertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptxVertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptx
Vertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptx
 
me3493 manufacturing technology unit 1 Part A
me3493 manufacturing technology unit 1 Part Ame3493 manufacturing technology unit 1 Part A
me3493 manufacturing technology unit 1 Part A
 
Design Analysis of Alogorithm 1 ppt 2024.pptx
Design Analysis of Alogorithm 1 ppt 2024.pptxDesign Analysis of Alogorithm 1 ppt 2024.pptx
Design Analysis of Alogorithm 1 ppt 2024.pptx
 
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTION.docx
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTION.docxSUMMER TRAINING REPORT ON BUILDING CONSTRUCTION.docx
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTION.docx
 
IT3401-WEB ESSENTIALS PRESENTATIONS.pptx
IT3401-WEB ESSENTIALS PRESENTATIONS.pptxIT3401-WEB ESSENTIALS PRESENTATIONS.pptx
IT3401-WEB ESSENTIALS PRESENTATIONS.pptx
 
A Seminar on Electric Vehicle Software Simulation
A Seminar on Electric Vehicle Software SimulationA Seminar on Electric Vehicle Software Simulation
A Seminar on Electric Vehicle Software Simulation
 
دليل تجارب الاسفلت المختبرية - Asphalt Experiments Guide Laboratory
دليل تجارب الاسفلت المختبرية - Asphalt Experiments Guide Laboratoryدليل تجارب الاسفلت المختبرية - Asphalt Experiments Guide Laboratory
دليل تجارب الاسفلت المختبرية - Asphalt Experiments Guide Laboratory
 
Engineering Mechanics Chapter 5 Equilibrium of a Rigid Body
Engineering Mechanics  Chapter 5  Equilibrium of a Rigid BodyEngineering Mechanics  Chapter 5  Equilibrium of a Rigid Body
Engineering Mechanics Chapter 5 Equilibrium of a Rigid Body
 
Modelling Guide for Timber Structures - FPInnovations
Modelling Guide for Timber Structures - FPInnovationsModelling Guide for Timber Structures - FPInnovations
Modelling Guide for Timber Structures - FPInnovations
 
Quasi-Stochastic Approximation: Algorithm Design Principles with Applications...
Quasi-Stochastic Approximation: Algorithm Design Principles with Applications...Quasi-Stochastic Approximation: Algorithm Design Principles with Applications...
Quasi-Stochastic Approximation: Algorithm Design Principles with Applications...
 
Guardians and Glitches: Navigating the Duality of Gen AI in AppSec
Guardians and Glitches: Navigating the Duality of Gen AI in AppSecGuardians and Glitches: Navigating the Duality of Gen AI in AppSec
Guardians and Glitches: Navigating the Duality of Gen AI in AppSec
 
Lecture 2 .pdf
Lecture 2                           .pdfLecture 2                           .pdf
Lecture 2 .pdf
 
Summer training report on BUILDING CONSTRUCTION for DIPLOMA Students.pdf
Summer training report on BUILDING CONSTRUCTION for DIPLOMA Students.pdfSummer training report on BUILDING CONSTRUCTION for DIPLOMA Students.pdf
Summer training report on BUILDING CONSTRUCTION for DIPLOMA Students.pdf
 
Graphics Primitives and CG Display Devices
Graphics Primitives and CG Display DevicesGraphics Primitives and CG Display Devices
Graphics Primitives and CG Display Devices
 
Power System electrical and electronics .pptx
Power System electrical and electronics .pptxPower System electrical and electronics .pptx
Power System electrical and electronics .pptx
 

Diversifying source feeding loads for chiller Ajyad Haram

  • 1. NEW DRAIN AGE CULVERT Y20 Y21 LIMIT OF PROP OSED CULV ERT LIMIT OF EXIST ING CULV ERT LIMIT OF PROP OSED CULV ERT LIMIT OF EXIST ING CULV ERT S07 102 -1/2 -RE -FC -05 -04 -00 -35 RE FE R TO DW G. No . DE TAIL "A" 38 38 38 38 CONNECTION BETWEEN PROPOSED UTILITIES CULVERT AND EXISTING CULVERT. WALL OPENINGS EQUALS TO SAME WIDTH & DEPTH OF EACH CELL I.L.= 281.00 , DEPTH = 2.00m R=660.00 AS.2 AS.1 E 585281.192 N 2369403.476 CONNECTION BETWEEN PROPOSED UTILITIES CULVERT AND EXISTING CULVERT. WALL OPENINGS EQUALS TO SAME WIDTH & DEPTH OF EACH CELL I.L.=281.00 , DEPTH = 2.00m 1:10 M.V.3 CHILLER AJYAD HARAM2 110KV SUB-STATION AH-01 LAYOUT1 DWG #EWD-E-CH .AJD 0002 LAYOUT2 DWG #EWD-E-CH .AJD0003 MV3 LOCATION (DETAIL 'A)' HARAM2 (110 KV) SUBSTATION / CHILLER AJYAD LOCATION DETAIL 'B' MARWA BUS STATION BOUNDARIES TEMPORARY ELECTRICAL DUCT BANK LINK BETWEEN MARWA AND SHAMIYA EXPANSION ELECT. CULVERTS EXISTING CHILLER AJYAD 3 FEEDERS ( 6 CABLES) ROUTE LOCATION TO BE RELOCATED AT ET-1 TUNNEL. GENERAL NOTES:- Kingdom of Saudi Arabia LEGEND CONTRACTOR : CONSULTANT : 1- THIS DRAWING IS PART OF SHEETSET CONSISTING OF THE FOLLOWING DRAWINGS: EWD-E-CH. AJD.-0001, EWD-E-CH. AJD.-0002, EWD-E-CH. AJD.-0003, EWD-E-CH. AJD.-0004, EWD-E-CH. AJD.-0005 2- THIS DRAWING IS CONCEPT SKETCH DRAWING DESIGN PROPOSAL OF DIVERSIFYING CHIILER AJYAD FEEDING SOURCES (FROM SHAMIYA-2 SUB-STATION + HARAM -2 110KV SUB-STATION) FOR MORE RELIABILITY .
  • 2. GE R3.00 0.60 3.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 1:10 LAYOUT1 FEEDER#AH45 FEEDER#AH06 FEEDER#AH26SEC. 1-1 GENERAL NOTES:- Kingdom of Saudi Arabia LEGEND CONTRACTOR : CONSULTANT : 1- THIS DRAWING IS PART OF SHEETSET CONSISTING OF THE FOLLOWING DRAWINGS: EWD-E-CH. AJD.-0001, EWD-E-CH. AJD.-0002, EWD-E-CH. AJD.-0003, EWD-E-CH. AJD.-0004, EWD-E-CH. AJD.-0005 2- THIS DRAWING IS CONCEPT SKETCH DRAWING DESIGN PROPOSAL OF DIVERSIFYING CHIILER AJYAD FEEDING SOURCES (FROM SHAMIYA-2 SUB-STATION + HARAM -2 110KV SUB-STATION) FOR MORE RELIABILITY .
  • 3. NEW DRAINAGE CULVERT RA ISE D FLO OR AR EA RAFT LIMIT RA FT LIM IT Y2 0 Y2 1 LIMIT OF PROPOSED CULVERT LIMIT OF EXISTING CULVERT LIMIT OF PROPOSED CULVERT LIMIT OF EXISTING CULVERT S07102-1/2-RE-FC-05-04-00-35 REFE R TO DWG. No. DETA IL "A" 4.00 N BETWEEN PROPOSED UTILITIES ND EXISTING CULVERT. INGS EQUALS TO SAME WIDTH EACH CELL I.L.= 281.00 , DEPTH = 2.00m N BETWEEN PROPOSED UTILITIES ND EXISTING CULVERT. INGS EQUALS TO SAME WIDTH EACH CELL I.L.=281.00 , DEPTH = 2.00m M.V.3 CHILLER AJYAD HARAM2 110KV SUB-STATION AH-01 LAYOUT2 DETAIL 'A' DETAIL 'B' SEC. 3 - 3 GENERAL NOTES:- Kingdom of Saudi Arabia LEGEND CONTRACTOR : CONSULTANT : 1- 1- THIS DRAWING IS PART OF SHEETSET CONSISTING OF THE FOLLOWING DRAWINGS: EWD-E-CH. AJD.-0001, EWD-E-CH. AJD.-0002, EWD-E-CH. AJD.-0003, EWD-E-CH. AJD.-0004, EWD-E-CH. AJD.-0005 2- THIS DRAWING IS CONCEPT SKETCH DRAWING DESIGN PROPOSAL OF DIVERSIFYING CHIILER AJYAD FEEDING SOURCES (FROM SHAMIYA-2 SUB-STATION + HARAM -2 110KV SUB-STATION) FOR MORE RELIABILITY . TO BE DEMOLISHED FEEDERS
  • 4. M.V.3 SEC 2 - 2 BEFORE JOINTING STATUS FEEDER # FROM TO TO BE JOINTED WITH AH 45 SHAMIYA 2 SUBSTATION CHILLER AJYAD --- AH 06 AH 02 AH 26 AH 01 AH 01 HARAM 2 110KV SUBSTATION MV3 SUBSTATION AH 26 AH 02 AH 06 AH 03 --- AH 04 --- BEFORE JOINTING AFTER JOINTING AFTER JOINTING STATUS (@ MV 3SIDE) FIRST FEEDER JOINING END SECOND FEEDER JOINING END RESULT MERGED FEEDER ROUTE FROM TO AH 06 AH 02 SHAMIYA 2 SUBSTATION MV3 SUBSTATION AH 26 AH 01 NOTE :FEEDERS #AH & 03AH 04ARE NOT JOINING/MERGING WITH OTHER FEEDERS (I.E ARE FEEDING MV 3DIRECTLY FROM HARAM 2 110(KV )SUBSTATION) TABLE 1.1 TABLE 1.0 DETAIL 'A' REFER TO DWG# EWD-E-CH. AJD.-0002 GENERAL NOTES:- Kingdom of Saudi Arabia LEGEND CONTRACTOR : CONSULTANT : 1- THIS DRAWING IS PART OF SHEETSET CONSISTING OF THE FOLLOWING DRAWINGS: EWD-E-CH. AJD.-0001, EWD-E-CH. AJD.-0002, EWD-E-CH. AJD.-0003, EWD-E-CH. AJD.-0004, EWD-E-CH. AJD.-0005 2- THIS DRAWING IS CONCEPT SKETCH DRAWING DESIGN PROPOSAL OF DIVERSIFYING CHIILER AJYAD FEEDING SOURCES (FROM SHAMIYA-2 SUB-STATION + HARAM -2 110KV SUB-STATION) FOR MORE RELIABILITY . 3- ALL FEEDERS CONSIST OF 2 CABLES 3 X 300 MM2. 4- JOINING/MERGING SYMBOL INDICATED IN THE DRAWING DOES ONLY SHOW THE CONCEPT OF JOINING/MERGING 2 FEEDERS TOGETHER; IT DOESN'T MEAN THAT THE CABLES SHALL BE JOINTED AT IT. (I.E. CABLE JOINTS WILL NOT BE INSTALLED IN ANY CABLES BENDING/TURNS). CABLE JOINTS WILL BE INSTALLED IN STRAIGHT PART -AS PER SITE CONDITION- BEFORE THE ENTRANCE OF THE STATION. 5- ALL 3 X 300 MM2 CABLES WITH OUTER DIAMETER OF 8.5 CM WILL MAINTAIN MINIMUM BENDING RADIUS OF AT LEAST 1 METER (8.5 CM X 12 TIMES THE OUTER DIAMETER OF THE CABLE). TO BE DEMOLISHED FEEDERS FEEDER JOINING/MERGING SYMBOL
  • 5. CHILLER AJYAD HARAM2 110KV SUB-STATION SEC 2 - 2 BEFORE JOINTING AFTER JOINTING BEFORE JOINTING STATUS FEEDER # FROM TO TO BE JOINTED WITH AH 45 SHAMIYA 2 SUBSTATION CHILLER AJYAD --- AH 06 AH 02 AH 26 AH 01 AH 01 HARAM 2 110KV SUBSTATION MV3 SUBSTATION AH 26 AH 02 AH 06 AH 03 --- AH 04 --- AFTER JOINTING STATUS (@ CHILLER AJYAD /HARAM TWO SIDE) FIRST FEEDER JOINING END SECOND FEEDER JOINING END RESULT MERGED FEEDER ROUTE FROM TO AH 02 AH 06 HARAM 2 110(KV) SUBSTATION CHILLER AJYAD AH 01 AH 26 NOTE :FEEDERS #AH 03AND #AH 04ARE NOT JOINING/MERGING WITH OTHER FEEDERS (I.E ARE FEEDING MV 3DIRECTLY FROM HARAM 110( 2KV )SUBSTATION) TABLE 1.0 TABLE 1.2 DETAIL 'B' GENERAL NOTES:- Kingdom of Saudi Arabia LEGEND CONTRACTOR : CONSULTANT : 1- THIS DRAWING IS PART OF SHEETSET CONSISTING OF THE FOLLOWING DRAWINGS: EWD-E-CH. AJD.-0001, EWD-E-CH. AJD.-0002, EWD-E-CH. AJD.-0003, EWD-E-CH. AJD.-0004, EWD-E-CH. AJD.-0005 2- THIS DRAWING IS CONCEPT SKETCH DRAWING DESIGN PROPOSAL OF DIVERSIFYING CHIILER AJYAD FEEDING SOURCES (FROM SHAMIYA-2 SUB-STATION + HARAM -2 110KV SUB-STATION) FOR MORE RELIABILITY . 3- ALL FEEDERS CONSIST OF 2 CABLES 3 X 300 MM2. 4- JOINING/MERGING SYMBOL INDICATED IN THE DRAWING DOES ONLY SHOW THE CONCEPT OF JOINING/MERGING 2 FEEDERS TOGETHER; IT DOESN'T MEAN THAT THE CABLES SHALL BE JOINTED AT IT. (I.E. CABLE JOINTS WILL NOT BE INSTALLED IN ANY CABLES BENDING/TURNS). CABLE JOINTS WILL BE INSTALLED IN STRAIGHT PART -AS PER SITE CONDITION -BEFORE THE ENTRANCE OF THE STATION. 5- ALL 3 X 300 MM2 CABLES WITH OUTER DIAMETER OF 8.5 CM WILL MAINTAIN MINIMUM BENDING RADIUS OF AT LEAST 1 METER (8.5 CM X 12 TIMES THE OUTER DIAMETER OF THE CABLE). TO BE DEMOLISHED FEEDERS FEEDER JOINING/MERGING SYMBOL