Performance driven professional with eight years of experiences working in oil and gas industry. Developed
the talent to manage coordination & execution of projects / tasks assigned. Proven ability for
troubleshooting skill, determination and strong operational. Strong leadership skills to organize, motivating,
high influence and ability to forge strong alliances with many parties. Creative thinking mindset to always
look for benefits of the Company to gain more and develop further.
CORE COMPETENCIES
• Planning / organizing
• Controlling
• Stress Tolerance
• End-customer orientation
• Personal “chemistry”
• Analytical skills
• Leadership qualities / managing
people
• Guidance / managing performance
• Sensitivity
PROFESSIONAL EXPERIENCES
DIALOG ENERGY SDN BHD (UPSTREAM)
Project Engineer Mar 2014 - Present
Duties and Responsibilities
Lead the engineering for EPCIC projects.
Organized the safety & engineering workshops for project.
Plan for procurement, fabrication and offshore installation.
Coordinated thoroughly with the offshore team through the offshore campaign.
Organizing the vendors, sub-contractors and engineering consultant.
Coordinated and resolved all engineering / technical enquiries throughout the project.
Coordinated the engineering workshops (HAZOP, HAZID, etc.)
Provide technical & commercial solutions to projects.
Reviewed, evaluated and final selection of Sub-contractors/Vendors technically & commercially.
Prepared projects’ Work Pack.
Participated in project’s Construction Risk Assessment (CRA).
Coordinating the Project’s Final Documentation preparation, submission & close-up.
Responsible to ensure project management was very efficient to improve profits.
Responsible for tender compilation (technical & commercial).
Provide on-going and continuous support to Company’s JV companies for technical review and
budgetary support for project Management Review. (Roc Oil & Bayan Halliburton Petroleum)
PROJECT INVOLVED (DIALOG)
ENGINEERING, PROCUREMENT, CONSTRUCTION, INSTALLATION AND COMMISSIONING (EPCIC)
FOR BAYAN REDEVELOPMENT PROJECT PHASE I OIL INFILL – DECK EXTENSION.
April 2014 – March 2016
Project Engineer
PROVISIONAL OF EPCIC FOR D35DP-A FACILITIES MODIFICATIONS AND WELL TIE-IN FOR CTU
DRILLING ACTIVITIES
October 2015 – June 2016
Project Engineering Lead / Project Engineer
SARAWAK SHELL BERHAD
Project Liaison Engineer (PLE) Mar 2013 - Mar 2014
Duties and Responsibilities
Managed and drove the HSSE for offshore hook-up activities involving Company and contractor teams
in compliance with Company’s policies and standards and meeting Company’s aspirations.
Liaised with Project Engineer and relevant parties (e.g assets, operation, maintenance, logistic, HUC
contractors) to determine project requirements and ensure adequate and optimum use of resources to
meet project schedule considering constraints such as integrated activities, shutdown window,
barges/rigs interference and resources/manpower availability sharing.
Managed & resolved technical enquiries at site.
Ensured project execution is within the allocated budget.
Provided comprehensive work planning at site.
Hot work management as implemented in all oil & gas industry.
Acted-CSR for projects without any accommodation work boat/barge.
Assisted Project Engineer on the review of the latest job workpack prior to the offshore execution.
Assisted the CSR at site on the planning and organization of works at offshore.
MASER MARINE ENGINEERING SDN BHD June 2008 - March 2013
Project Engineer / Mechanical Engineer
Duties and Responsibilities
Prepared tender proposal including the technical & commercial budget estimation.
Prepared monthly operation report to Company’s Executive Directors & CEO.
Appointed to lead the Mechanical Department.
Provided technical support to other departments.
Responsible for the Company’s business development.
Project coordination and management
Responsible as contract / project coordinator.
Resolved Company’s commercial discussions with Client / Vendor / Sub-contractor.
Responsible for project procurements.
Provided technical support for project’s engineering.
Responsible to provide the most suitable construction method for projects.
Responsible for reviewing and approving sub-contractors’ procedures.
Responsible to produce project method statements.
Coordinated projects’ logistics.
Responsible to liaise with the govt. body for 3rd party approval requirements within projects.
Responsible for project QAQC documents.
Prepared final documentation and project close-up report.
Prepared as-built drawings.
Project controls
• Prepared & constructed the WPS for Company.
• Responsible of certifying the Company for ISO 9001. Appointed by management as internal auditor.
• Managing Company’s QAQC documents.
PROJECTS INVOLVED (MME)
ENGINEERING, PROCUREMENT, CONSTRUCTION, INSTALLATION AND COMMISSIONING (“EPCIC”)
ALLIANCE FOR THE LNG REGASIFICATION UNIT, ISLAND BERTH AND SUBSEA PIPELINE OF THE LNG
REGASIFICATION FACILITIES PROJECT
Subsea Pipeline And Subsea Cable Installation, Testing And Pre-Commissioning
September 2011 – March 2013
Permitting Manager / Planning & Project Engineer
Pipeline Outstanding Work For Maser Development Of Mini Hydro Power Plant Under Small
Renewable Energy Programme At Sungai Rek, Kuala Krai, Kelantan
I.S Energy Sdn Bhd subsidiary of Maser (M) Sdn Bhd
April 2011 – September 2011
Assistant Project Manager
Coordinated and managed the scope of provisional of safety welding habitat to Client.
i. Provision of Rental Safe House Habitat Equipment and Manpower for BEKOK C Project for
Petronas Carigali – PMO
ii. Provision of Rental Safe House Habitat Equipment and Manpower for TIONG, LEDANG,
KEPONG and TINGGI Non Shutdown CWR Project for Petronas Carigali - PMO
iii. Provision of Safe Welding Enclosure with Maintenance Support Services (Exxonmobil
Exploration and Production Malaysia Inc.)
iv. Provision of Rental Safe House Habitat Equipment and Manpower for BEKOK C Doubler
Plate Installation for PCSB-PMO
v. Provision of Rental Safehouse Habitat Equipment & Manpower for DUYONG Pre & Post
Shutdown 2010 for PCSB PMO
vi. Provision of Rental Safety House Habitat at BEKOK Platform Strengthening Work for PCSB-
PMO
vii. Provision of Rental Safe House Habitat Equipment and Manpower at Non BEKOK
Construction for PCSB-PMO
February 2010 – March 2011
Project Engineer
Provision Of Supply Manpower, Materials, Equipment And Consumables For Onshore And
Offshore Area Lightings Replacement for PCSB-SBO – Labuan Gas Terminal (LGAST)
January 2011 – March 2011
Project Engineer
Provision of Fabrication and Installation BEKOK C Chemical Tank Upgrade Phase 2 for PETRONAS
Carigali Sdn Bhd – Peninsular Malaysia Operation
May 2010 – March 2011
Project Engineer
Provision of Procurement and Fabrication of Piping for DULANG Field Shutdown
PETRONAS Carigali PMO
December 2009 – February 2010
Project Engineer
Provision of Procurement and Fabrication for General DULANG Construction Work at Dulang-B
Petronas Carigali PMO
September 2009 – March 2010
Project Engineer
Provision of Supply, Fabrication and Replacement of BEKOK C Piping for 2HX 588
Discharge Line for PETRONAS Carigali Sdn Bhd – Peninsular Malaysia Operation
November 2009 – December 2009
Project Engineer
Provision Of Structural Strengthening For P4040E Extended Deck At ANPG – A
Petronas Carigali PMO
June 2009 – April 2010
Project Engineer
Provision To Supply Manpower, Equipment & Material For PENARA Closed Drain Vessel Pump
Upgrade
Petronas Carigali PMO
June 2009 – October 2009
Project Engineer
Engineering, Procurement, Construction and Commissioning of Colored Beacon Lights
MTBE Malaysia Sdn Bhd
November 2008 – December 2008
Project Engineer
MAXLANE SDN BHD October 2007 - December 2007
Internship as Assistant Quality Engineer
Duties and Responsibilities
Developed instruction manual for quality inspection on products.
Assistant the Quality Engineer on management of ISO 2000:9001 documentation system
Performed quality assessment on products to conform to the Company’s standards and customer’s
requirements.
Assisted the Quality Department on the ISO 2000:9001 pre-compliance audits by SIRIM legislative body
for the Company.
EDUCATION & CREDENTIALS
Bachelor of Engineering in Mechanical (Hons), University Tenaga Nasional (2008)
TRAININGS
BOSIET Basic Offshore Safety and Emergency Training (2012) First Aider Training (2012)
H2S Safety Induction (2012) ISO 9000 Training IEM - Managing Offshore Brownfield
Projects IEM - Hazop Training for Team Members- A Practical Approach DIALOG
Internal – Training For Floor Warden DIALOG Internal – Risk Management DIALOG
Internal – Finance For Non Finance Managers
COMPUTER EXPERTISE
Microsoft Office Projects Microsoft Office Visio Microsoft Visual Basic Adobe
Photoshop Navisworks Freedom
REFERENCES
Name
Telephone
Email
: Ir. Sazali Selamat
: 6017-603 9546 (M)
: ir.sazali@yahoo.com
Name
Telephone
Email
: Amran Yusoff
: 6019-226 5447 (M)
: amranproject@gmail.com
Name
Telephone
Email
: Tengku Izzat Zumairi
: 6019-988 4943 (M)
: izzat@masermarine.com
Name
Telephone
Email
: Ir. Zahari Samat
: 6012-289 0340 (M)
: zahari@masermarine.com
Name
Telephone
Email
: Akmal Azam Fauzi
: 6012-989 3069 (M)
: akazmofa@gmail.com
Name
Telephone
Email
: Venamurthy Ramana
: 6019-6084 4248
: vena.ramana@yahoo.com
Name
Telephone
Email
: Lim Wei Jin
: 6012 278 1351 (M)
: weijin.lim@dialogasia.com
Name
Telephone
Email
: Tay Sher Chong
: 6016 890 9900 (M)
: sherchong.tay@ranhill-worley.com.my

Contenu connexe

Tendances

Moch Anis - CV rev 2 (1)
Moch  Anis - CV rev 2 (1)Moch  Anis - CV rev 2 (1)
Moch Anis - CV rev 2 (1)Mochammad Anis
 
Yusuf Khan (CV) Up Date
Yusuf Khan (CV) Up DateYusuf Khan (CV) Up Date
Yusuf Khan (CV) Up Dateyusuf khan
 
Updated CV and Certificates (Hayatullah Aimaq)
Updated CV and Certificates (Hayatullah Aimaq)Updated CV and Certificates (Hayatullah Aimaq)
Updated CV and Certificates (Hayatullah Aimaq)Hayatullah Aimaq
 
Updated CV as of May 6, 2016
Updated CV as of May 6, 2016Updated CV as of May 6, 2016
Updated CV as of May 6, 2016Donn Jozwel Laroa
 
CV - Mitesh Soriya - Project Manager
CV - Mitesh Soriya - Project ManagerCV - Mitesh Soriya - Project Manager
CV - Mitesh Soriya - Project ManagerSoriya Mitesh
 
Civil QC Inspector (Aramco Approved)
Civil QC Inspector (Aramco Approved)Civil QC Inspector (Aramco Approved)
Civil QC Inspector (Aramco Approved)Khalid Tamur , PMP®
 
CV of Mohammad Mujeebuddin - PMO QA Manager
CV of Mohammad Mujeebuddin - PMO QA ManagerCV of Mohammad Mujeebuddin - PMO QA Manager
CV of Mohammad Mujeebuddin - PMO QA ManagerMujeebuddin Mohammad
 
How to Prepare your SOP for Real Estate Developer & Contractor
How to Prepare your SOP for Real Estate Developer & ContractorHow to Prepare your SOP for Real Estate Developer & Contractor
How to Prepare your SOP for Real Estate Developer & ContractorREDceo.net
 
Alkaff CV. Quality Manager
Alkaff CV.  Quality ManagerAlkaff CV.  Quality Manager
Alkaff CV. Quality ManagerAbdullah Alkaff
 
CV Handri Susanto - 2016.. Rev. 3
CV Handri Susanto - 2016.. Rev. 3CV Handri Susanto - 2016.. Rev. 3
CV Handri Susanto - 2016.. Rev. 3Handri Susanto
 

Tendances (20)

Rozlan Ramli 2015
Rozlan Ramli 2015Rozlan Ramli 2015
Rozlan Ramli 2015
 
Moch Anis - CV rev 2 (1)
Moch  Anis - CV rev 2 (1)Moch  Anis - CV rev 2 (1)
Moch Anis - CV rev 2 (1)
 
Yusuf Khan (CV) Up Date
Yusuf Khan (CV) Up DateYusuf Khan (CV) Up Date
Yusuf Khan (CV) Up Date
 
Updated CV and Certificates (Hayatullah Aimaq)
Updated CV and Certificates (Hayatullah Aimaq)Updated CV and Certificates (Hayatullah Aimaq)
Updated CV and Certificates (Hayatullah Aimaq)
 
Updated CV as of May 6, 2016
Updated CV as of May 6, 2016Updated CV as of May 6, 2016
Updated CV as of May 6, 2016
 
CV - Mitesh Soriya - Project Manager
CV - Mitesh Soriya - Project ManagerCV - Mitesh Soriya - Project Manager
CV - Mitesh Soriya - Project Manager
 
Civil QC Inspector (Aramco Approved)
Civil QC Inspector (Aramco Approved)Civil QC Inspector (Aramco Approved)
Civil QC Inspector (Aramco Approved)
 
CV of Mohammad Mujeebuddin - PMO QA Manager
CV of Mohammad Mujeebuddin - PMO QA ManagerCV of Mohammad Mujeebuddin - PMO QA Manager
CV of Mohammad Mujeebuddin - PMO QA Manager
 
updated CV
updated CVupdated CV
updated CV
 
Update CV
Update CVUpdate CV
Update CV
 
Certified QA QC Manager
Certified QA QC ManagerCertified QA QC Manager
Certified QA QC Manager
 
Peter L. Cabbab.
Peter L. Cabbab.Peter L. Cabbab.
Peter L. Cabbab.
 
Totie Laurel CV
Totie Laurel CVTotie Laurel CV
Totie Laurel CV
 
CV-PM Ponraj
CV-PM PonrajCV-PM Ponraj
CV-PM Ponraj
 
How to Prepare your SOP for Real Estate Developer & Contractor
How to Prepare your SOP for Real Estate Developer & ContractorHow to Prepare your SOP for Real Estate Developer & Contractor
How to Prepare your SOP for Real Estate Developer & Contractor
 
Alkaff CV. Quality Manager
Alkaff CV.  Quality ManagerAlkaff CV.  Quality Manager
Alkaff CV. Quality Manager
 
Mohamed abdelaziz c.v.
Mohamed abdelaziz c.v.Mohamed abdelaziz c.v.
Mohamed abdelaziz c.v.
 
Moh CV Updated
Moh CV UpdatedMoh CV Updated
Moh CV Updated
 
CV Handri Susanto - 2016.. Rev. 3
CV Handri Susanto - 2016.. Rev. 3CV Handri Susanto - 2016.. Rev. 3
CV Handri Susanto - 2016.. Rev. 3
 
Cv mm
Cv mmCv mm
Cv mm
 

En vedette

Sala de profesores_y_maestros_2011
Sala de profesores_y_maestros_2011Sala de profesores_y_maestros_2011
Sala de profesores_y_maestros_2011lerodriguez08
 
POLYSTEEL PRODUCTS
POLYSTEEL PRODUCTSPOLYSTEEL PRODUCTS
POLYSTEEL PRODUCTSPinkal Shah
 
The failedartist
The failedartistThe failedartist
The failedartistGGRAJAN
 
Koranens mirakler. danish dansk docx
Koranens mirakler. danish dansk docxKoranens mirakler. danish dansk docx
Koranens mirakler. danish dansk docxHarunyahyaDanish
 
Lepote Slovenije
Lepote SlovenijeLepote Slovenije
Lepote SlovenijeRenny
 
Pergamino hermanas molina de v icente
Pergamino hermanas molina de v icentePergamino hermanas molina de v icente
Pergamino hermanas molina de v icenteMaktub
 
Pablo Aguirre
Pablo AguirrePablo Aguirre
Pablo Aguirredaniinver
 
Die wunder des propheten muhammad (friede sei mit ihm). german deutsche
Die wunder des propheten muhammad (friede sei mit ihm). german deutscheDie wunder des propheten muhammad (friede sei mit ihm). german deutsche
Die wunder des propheten muhammad (friede sei mit ihm). german deutscheHarunyahyaGerman
 
Ellis, Edward Resume 3
Ellis, Edward Resume 3Ellis, Edward Resume 3
Ellis, Edward Resume 3epellis
 
La basura electronica
La basura electronicaLa basura electronica
La basura electronicaangimarttinez
 
ChemStation Presentation
ChemStation PresentationChemStation Presentation
ChemStation PresentationLarry Weaver
 
Abc 16.03.2004-pagina 056
Abc 16.03.2004-pagina 056Abc 16.03.2004-pagina 056
Abc 16.03.2004-pagina 056julianlogitrans
 
Educación superior y empleo de los titulados universitarios en Europa
Educación superior y empleo de los titulados universitarios en EuropaEducación superior y empleo de los titulados universitarios en Europa
Educación superior y empleo de los titulados universitarios en EuropaDaniArias9
 
Gravity 100720222751-phpapp01
Gravity 100720222751-phpapp01Gravity 100720222751-phpapp01
Gravity 100720222751-phpapp01betsyjm
 

En vedette (20)

Sala de profesores_y_maestros_2011
Sala de profesores_y_maestros_2011Sala de profesores_y_maestros_2011
Sala de profesores_y_maestros_2011
 
Entidadcertifica
EntidadcertificaEntidadcertifica
Entidadcertifica
 
VG
VGVG
VG
 
Etnografía
Etnografía   Etnografía
Etnografía
 
POLYSTEEL PRODUCTS
POLYSTEEL PRODUCTSPOLYSTEEL PRODUCTS
POLYSTEEL PRODUCTS
 
edificios mas grandes del mundo (ingles)
edificios mas grandes del mundo (ingles)edificios mas grandes del mundo (ingles)
edificios mas grandes del mundo (ingles)
 
Carta Completa!!
Carta Completa!! Carta Completa!!
Carta Completa!!
 
The failedartist
The failedartistThe failedartist
The failedartist
 
Koranens mirakler. danish dansk docx
Koranens mirakler. danish dansk docxKoranens mirakler. danish dansk docx
Koranens mirakler. danish dansk docx
 
Lepote Slovenije
Lepote SlovenijeLepote Slovenije
Lepote Slovenije
 
Pergamino hermanas molina de v icente
Pergamino hermanas molina de v icentePergamino hermanas molina de v icente
Pergamino hermanas molina de v icente
 
Sistema endocrino
Sistema endocrinoSistema endocrino
Sistema endocrino
 
Pablo Aguirre
Pablo AguirrePablo Aguirre
Pablo Aguirre
 
Die wunder des propheten muhammad (friede sei mit ihm). german deutsche
Die wunder des propheten muhammad (friede sei mit ihm). german deutscheDie wunder des propheten muhammad (friede sei mit ihm). german deutsche
Die wunder des propheten muhammad (friede sei mit ihm). german deutsche
 
Ellis, Edward Resume 3
Ellis, Edward Resume 3Ellis, Edward Resume 3
Ellis, Edward Resume 3
 
La basura electronica
La basura electronicaLa basura electronica
La basura electronica
 
ChemStation Presentation
ChemStation PresentationChemStation Presentation
ChemStation Presentation
 
Abc 16.03.2004-pagina 056
Abc 16.03.2004-pagina 056Abc 16.03.2004-pagina 056
Abc 16.03.2004-pagina 056
 
Educación superior y empleo de los titulados universitarios en Europa
Educación superior y empleo de los titulados universitarios en EuropaEducación superior y empleo de los titulados universitarios en Europa
Educación superior y empleo de los titulados universitarios en Europa
 
Gravity 100720222751-phpapp01
Gravity 100720222751-phpapp01Gravity 100720222751-phpapp01
Gravity 100720222751-phpapp01
 

Similaire à My Resume

nixon cv-Jan2016 _2_
nixon cv-Jan2016 _2_nixon cv-Jan2016 _2_
nixon cv-Jan2016 _2_Nixon Das
 
Muhammad hafiz
Muhammad hafizMuhammad hafiz
Muhammad hafizMuhd Hafiz
 
CV( Affendy Ali )040515new
CV( Affendy Ali )040515newCV( Affendy Ali )040515new
CV( Affendy Ali )040515newaffendy ali
 
EZEIFEDI OBINNA RESUME 2015
EZEIFEDI OBINNA RESUME 2015EZEIFEDI OBINNA RESUME 2015
EZEIFEDI OBINNA RESUME 2015Obinna Ezeifedi
 
Curriculum Vitae of R M Rico
Curriculum Vitae of R M RicoCurriculum Vitae of R M Rico
Curriculum Vitae of R M RicoRene Rico
 
Norazwan Mohamad Yusak Resume_880515015307
Norazwan Mohamad Yusak Resume_880515015307Norazwan Mohamad Yusak Resume_880515015307
Norazwan Mohamad Yusak Resume_880515015307Norazwan Mohamad Yusak
 
Resume_Bernard Estrada Buenaventura._Updated as of 2017
Resume_Bernard Estrada Buenaventura._Updated as of 2017Resume_Bernard Estrada Buenaventura._Updated as of 2017
Resume_Bernard Estrada Buenaventura._Updated as of 2017Bernie Buenavent
 
Belal Khalid Alrwadieh-25 Oct 2016
Belal Khalid Alrwadieh-25 Oct 2016Belal Khalid Alrwadieh-25 Oct 2016
Belal Khalid Alrwadieh-25 Oct 2016belal alrwadieh
 
Amrendra Singh's Resume
Amrendra Singh's ResumeAmrendra Singh's Resume
Amrendra Singh's ResumeAmrendra Singh
 
How to prepare your Standard Operating Procedures (SOP) for Property Developm...
How to prepare your Standard Operating Procedures (SOP) for Property Developm...How to prepare your Standard Operating Procedures (SOP) for Property Developm...
How to prepare your Standard Operating Procedures (SOP) for Property Developm...REDceo.net
 
Irene Lim (Resume)
Irene Lim (Resume)Irene Lim (Resume)
Irene Lim (Resume)Irene Lim
 

Similaire à My Resume (20)

nixon cv-Jan2016 _2_
nixon cv-Jan2016 _2_nixon cv-Jan2016 _2_
nixon cv-Jan2016 _2_
 
Muhammad hafiz
Muhammad hafizMuhammad hafiz
Muhammad hafiz
 
Ramanuja CV-
Ramanuja CV-Ramanuja CV-
Ramanuja CV-
 
CV( Affendy Ali )040515new
CV( Affendy Ali )040515newCV( Affendy Ali )040515new
CV( Affendy Ali )040515new
 
EZEIFEDI OBINNA RESUME 2015
EZEIFEDI OBINNA RESUME 2015EZEIFEDI OBINNA RESUME 2015
EZEIFEDI OBINNA RESUME 2015
 
BBA resume_2017
BBA resume_2017BBA resume_2017
BBA resume_2017
 
Curriculum Vitae of R M Rico
Curriculum Vitae of R M RicoCurriculum Vitae of R M Rico
Curriculum Vitae of R M Rico
 
Resume_rev.3
Resume_rev.3Resume_rev.3
Resume_rev.3
 
Resume (updated)
Resume (updated)Resume (updated)
Resume (updated)
 
Norazwan Mohamad Yusak Resume_880515015307
Norazwan Mohamad Yusak Resume_880515015307Norazwan Mohamad Yusak Resume_880515015307
Norazwan Mohamad Yusak Resume_880515015307
 
Resume
ResumeResume
Resume
 
Resume_Bernard Estrada Buenaventura._Updated as of 2017
Resume_Bernard Estrada Buenaventura._Updated as of 2017Resume_Bernard Estrada Buenaventura._Updated as of 2017
Resume_Bernard Estrada Buenaventura._Updated as of 2017
 
khawar Resume
khawar Resumekhawar Resume
khawar Resume
 
Belal Khalid Alrwadieh-25 Oct 2016
Belal Khalid Alrwadieh-25 Oct 2016Belal Khalid Alrwadieh-25 Oct 2016
Belal Khalid Alrwadieh-25 Oct 2016
 
Amrendra Singh's Resume
Amrendra Singh's ResumeAmrendra Singh's Resume
Amrendra Singh's Resume
 
Resume 2016 PH Updated
Resume 2016  PH UpdatedResume 2016  PH Updated
Resume 2016 PH Updated
 
Zahur Resume Updated
Zahur Resume UpdatedZahur Resume Updated
Zahur Resume Updated
 
Manoj resume
Manoj resumeManoj resume
Manoj resume
 
How to prepare your Standard Operating Procedures (SOP) for Property Developm...
How to prepare your Standard Operating Procedures (SOP) for Property Developm...How to prepare your Standard Operating Procedures (SOP) for Property Developm...
How to prepare your Standard Operating Procedures (SOP) for Property Developm...
 
Irene Lim (Resume)
Irene Lim (Resume)Irene Lim (Resume)
Irene Lim (Resume)
 

My Resume

  • 1. MOHD ZAMILL BIN ZAINAL • NO 2 JALAN QAMARI U5/112B • • TMN NUSA SUBANG • SEK U5 • • 40150 SHAH ALAM • • SELANGOR • MALAYSIA • • 840728-06-5029 • • mohdzamillzainal@gmail.com • • +6016 6868225 • • +6019 3907868 • BEM reg. no. GE 73494 A Performance driven professional with eight years of experiences working in oil and gas industry. Developed the talent to manage coordination & execution of projects / tasks assigned. Proven ability for troubleshooting skill, determination and strong operational. Strong leadership skills to organize, motivating, high influence and ability to forge strong alliances with many parties. Creative thinking mindset to always look for benefits of the Company to gain more and develop further. CORE COMPETENCIES • Planning / organizing • Controlling • Stress Tolerance • End-customer orientation • Personal “chemistry” • Analytical skills • Leadership qualities / managing people • Guidance / managing performance • Sensitivity PROFESSIONAL EXPERIENCES DIALOG ENERGY SDN BHD (UPSTREAM) Project Engineer Mar 2014 - Present Duties and Responsibilities Lead the engineering for EPCIC projects. Organized the safety & engineering workshops for project. Plan for procurement, fabrication and offshore installation. Coordinated thoroughly with the offshore team through the offshore campaign. Organizing the vendors, sub-contractors and engineering consultant. Coordinated and resolved all engineering / technical enquiries throughout the project. Coordinated the engineering workshops (HAZOP, HAZID, etc.) Provide technical & commercial solutions to projects. Reviewed, evaluated and final selection of Sub-contractors/Vendors technically & commercially. Prepared projects’ Work Pack. Participated in project’s Construction Risk Assessment (CRA). Coordinating the Project’s Final Documentation preparation, submission & close-up. Responsible to ensure project management was very efficient to improve profits. Responsible for tender compilation (technical & commercial). Provide on-going and continuous support to Company’s JV companies for technical review and budgetary support for project Management Review. (Roc Oil & Bayan Halliburton Petroleum) PROJECT INVOLVED (DIALOG) ENGINEERING, PROCUREMENT, CONSTRUCTION, INSTALLATION AND COMMISSIONING (EPCIC) FOR BAYAN REDEVELOPMENT PROJECT PHASE I OIL INFILL – DECK EXTENSION. April 2014 – March 2016 Project Engineer PROVISIONAL OF EPCIC FOR D35DP-A FACILITIES MODIFICATIONS AND WELL TIE-IN FOR CTU DRILLING ACTIVITIES
  • 2. October 2015 – June 2016 Project Engineering Lead / Project Engineer SARAWAK SHELL BERHAD Project Liaison Engineer (PLE) Mar 2013 - Mar 2014 Duties and Responsibilities Managed and drove the HSSE for offshore hook-up activities involving Company and contractor teams in compliance with Company’s policies and standards and meeting Company’s aspirations. Liaised with Project Engineer and relevant parties (e.g assets, operation, maintenance, logistic, HUC contractors) to determine project requirements and ensure adequate and optimum use of resources to meet project schedule considering constraints such as integrated activities, shutdown window, barges/rigs interference and resources/manpower availability sharing. Managed & resolved technical enquiries at site. Ensured project execution is within the allocated budget. Provided comprehensive work planning at site. Hot work management as implemented in all oil & gas industry. Acted-CSR for projects without any accommodation work boat/barge. Assisted Project Engineer on the review of the latest job workpack prior to the offshore execution. Assisted the CSR at site on the planning and organization of works at offshore. MASER MARINE ENGINEERING SDN BHD June 2008 - March 2013 Project Engineer / Mechanical Engineer Duties and Responsibilities Prepared tender proposal including the technical & commercial budget estimation. Prepared monthly operation report to Company’s Executive Directors & CEO. Appointed to lead the Mechanical Department. Provided technical support to other departments. Responsible for the Company’s business development. Project coordination and management Responsible as contract / project coordinator. Resolved Company’s commercial discussions with Client / Vendor / Sub-contractor. Responsible for project procurements. Provided technical support for project’s engineering. Responsible to provide the most suitable construction method for projects. Responsible for reviewing and approving sub-contractors’ procedures. Responsible to produce project method statements. Coordinated projects’ logistics. Responsible to liaise with the govt. body for 3rd party approval requirements within projects. Responsible for project QAQC documents. Prepared final documentation and project close-up report. Prepared as-built drawings. Project controls • Prepared & constructed the WPS for Company. • Responsible of certifying the Company for ISO 9001. Appointed by management as internal auditor. • Managing Company’s QAQC documents. PROJECTS INVOLVED (MME) ENGINEERING, PROCUREMENT, CONSTRUCTION, INSTALLATION AND COMMISSIONING (“EPCIC”) ALLIANCE FOR THE LNG REGASIFICATION UNIT, ISLAND BERTH AND SUBSEA PIPELINE OF THE LNG REGASIFICATION FACILITIES PROJECT Subsea Pipeline And Subsea Cable Installation, Testing And Pre-Commissioning September 2011 – March 2013 Permitting Manager / Planning & Project Engineer Pipeline Outstanding Work For Maser Development Of Mini Hydro Power Plant Under Small Renewable Energy Programme At Sungai Rek, Kuala Krai, Kelantan I.S Energy Sdn Bhd subsidiary of Maser (M) Sdn Bhd April 2011 – September 2011
  • 3. Assistant Project Manager Coordinated and managed the scope of provisional of safety welding habitat to Client. i. Provision of Rental Safe House Habitat Equipment and Manpower for BEKOK C Project for Petronas Carigali – PMO ii. Provision of Rental Safe House Habitat Equipment and Manpower for TIONG, LEDANG, KEPONG and TINGGI Non Shutdown CWR Project for Petronas Carigali - PMO iii. Provision of Safe Welding Enclosure with Maintenance Support Services (Exxonmobil Exploration and Production Malaysia Inc.) iv. Provision of Rental Safe House Habitat Equipment and Manpower for BEKOK C Doubler Plate Installation for PCSB-PMO v. Provision of Rental Safehouse Habitat Equipment & Manpower for DUYONG Pre & Post Shutdown 2010 for PCSB PMO vi. Provision of Rental Safety House Habitat at BEKOK Platform Strengthening Work for PCSB- PMO vii. Provision of Rental Safe House Habitat Equipment and Manpower at Non BEKOK Construction for PCSB-PMO February 2010 – March 2011 Project Engineer Provision Of Supply Manpower, Materials, Equipment And Consumables For Onshore And Offshore Area Lightings Replacement for PCSB-SBO – Labuan Gas Terminal (LGAST) January 2011 – March 2011 Project Engineer Provision of Fabrication and Installation BEKOK C Chemical Tank Upgrade Phase 2 for PETRONAS Carigali Sdn Bhd – Peninsular Malaysia Operation May 2010 – March 2011 Project Engineer Provision of Procurement and Fabrication of Piping for DULANG Field Shutdown PETRONAS Carigali PMO December 2009 – February 2010 Project Engineer Provision of Procurement and Fabrication for General DULANG Construction Work at Dulang-B Petronas Carigali PMO September 2009 – March 2010 Project Engineer Provision of Supply, Fabrication and Replacement of BEKOK C Piping for 2HX 588 Discharge Line for PETRONAS Carigali Sdn Bhd – Peninsular Malaysia Operation November 2009 – December 2009 Project Engineer Provision Of Structural Strengthening For P4040E Extended Deck At ANPG – A Petronas Carigali PMO June 2009 – April 2010 Project Engineer Provision To Supply Manpower, Equipment & Material For PENARA Closed Drain Vessel Pump Upgrade Petronas Carigali PMO June 2009 – October 2009 Project Engineer Engineering, Procurement, Construction and Commissioning of Colored Beacon Lights MTBE Malaysia Sdn Bhd November 2008 – December 2008
  • 4. Project Engineer MAXLANE SDN BHD October 2007 - December 2007 Internship as Assistant Quality Engineer Duties and Responsibilities Developed instruction manual for quality inspection on products. Assistant the Quality Engineer on management of ISO 2000:9001 documentation system Performed quality assessment on products to conform to the Company’s standards and customer’s requirements. Assisted the Quality Department on the ISO 2000:9001 pre-compliance audits by SIRIM legislative body for the Company. EDUCATION & CREDENTIALS Bachelor of Engineering in Mechanical (Hons), University Tenaga Nasional (2008) TRAININGS BOSIET Basic Offshore Safety and Emergency Training (2012) First Aider Training (2012) H2S Safety Induction (2012) ISO 9000 Training IEM - Managing Offshore Brownfield Projects IEM - Hazop Training for Team Members- A Practical Approach DIALOG Internal – Training For Floor Warden DIALOG Internal – Risk Management DIALOG Internal – Finance For Non Finance Managers COMPUTER EXPERTISE Microsoft Office Projects Microsoft Office Visio Microsoft Visual Basic Adobe Photoshop Navisworks Freedom REFERENCES Name Telephone Email : Ir. Sazali Selamat : 6017-603 9546 (M) : ir.sazali@yahoo.com Name Telephone Email : Amran Yusoff : 6019-226 5447 (M) : amranproject@gmail.com Name Telephone Email : Tengku Izzat Zumairi : 6019-988 4943 (M) : izzat@masermarine.com Name Telephone Email : Ir. Zahari Samat : 6012-289 0340 (M) : zahari@masermarine.com Name Telephone Email : Akmal Azam Fauzi : 6012-989 3069 (M) : akazmofa@gmail.com Name Telephone Email : Venamurthy Ramana : 6019-6084 4248 : vena.ramana@yahoo.com Name Telephone Email : Lim Wei Jin : 6012 278 1351 (M) : weijin.lim@dialogasia.com Name Telephone Email : Tay Sher Chong : 6016 890 9900 (M) : sherchong.tay@ranhill-worley.com.my