SlideShare une entreprise Scribd logo
1  sur  17
Télécharger pour lire hors ligne
Bogor | 09.03.2022
Verania Andria
Senior Advisor for Sustainable Energy
Environment Unit
UNDP Indonesia
Sustainable Infrastructure:
Refuse Derived Fuel (RDF)
Kick-off Meeting – Sustainable Infrastructure Programme in Asia (SIPA)
1 National Priority:
Policy, Target, and Stakeholders
1 | National Priority:
Policy, Target, and Stakeholders
DESCRIPTION
Urgency
• The growth of waste generation has made the government of Indonesia put tremendous efforts to
deal with waste problem
• Huge number of wastes that is not properly managed in sustainable ways
• Limited waste management facilities
• Overloaded landfill
RDF is an alternatives
fuel that can be produce
from municipal solid
waste (MSW) used as an
alternative for fossil fuels
Stakeholders and Target
Target 2030: Utilization of waste by converting to energy
through RDF
Utilization of waste by converting to energy through
RDF (in industry) or as renewable energy source in
PLTSa;
The PLTSa/RDF facilities (million ton)
4.6 (mton)
Avoided CO2-eq (million ton) 1.9
(mtCO2eq)
The Ministry of Environment
and Forestry
The Ministry of Energy and
Mineral Resources
Target 2030: Biomass Utilization
Cofiring Program: Biomass
Utilization (million ton)
9 (mton)
*Source: Enhanced Nationally Determined Contribution (NDC) Republic of Indonesia
MITIGATION
*Source: Enhanced Nationally Determined Contribution (NDC) Republic of Indonesia MITIGATION
2 Potential
RDF Locations
Process Flow from Waste to RDF in Jeruklegi, Cilacap
Inert
Product
Reject
Weigh Bridge
Weighing Truk Unloading
Sorting process
Sorting by waste pickers Shredding
Pre Treatment area
Bay
Drying Process
AF Feeding Facility
Feed to Kiln
Kiln
Delivery RDF
Loading & Delivery RDF
RDF ready to be fed
Waste storage,
600 ton
5
Kapasitas max 20tph atau 400tpd
Product akan ada setiap hari
RDF use in Cement Industry:
Operational RDF Facility Jeruk Legi di Cilacap, Central Java
Suhu dalam tanur >1.800°C
Fasilitas Pengolahan Sampah
Jeruklegi RDF Facility
Cilacap city
SBI Cilacap
120-160 ton per day
Fresh waste
5 - 15 ton per hari residu (+/-
15%) – low calorie residue
40 - 60 ton per hari RDF
(+/- 50% )
1 - 3 ton per hari
bahan daur ulang (
>3% )
+/- 35 % water
dehydrated during
drying process
6
Investment cost of RDF
facility (60 t/day RDF) is
USD 5.8 million
Biomass for
Cofiring in Coal-
fired Power
Plants
2 | Potential RDF Facility & Off-taker
*Source: Ministry of Environment and Forestsry
2 | Potential RDF Production Sites
Integrated Waste Management Site - TPST
*Source: Directorate of Sanitation, Ministry of Public Works and Housing
Aceh
1.Kota Banda Aceh (TPST RDF)
2.Kab. Aceh Besar (TPST RDF)
West Java
1. Kab. Tasikmalaya (TPA
Nangkaleah Area)
2. Kab. Kuningan (TPST
Cibulan)
3. Kab. Garut (TPST)
4. Kab. Kuningan (TPST)
5. Kab. Ciamis (TPST)
Central Java
1. Kab. Jepara (TPST
Sengonbugel)
2. Kab. Jepara (TPST
Bandengan)
3. Kab. Rembang (TPST)
North Maluku
1. Kpta Tidore kepulauan
(TPST)
West Kalimantan
1. Kab. Sambas
(TPST)
West Nusa Tenggara
1. Kota Mataram
(TPST Sandubaya)
Special Region of
Yogyakarta
1. Kab. Sleman (TPST)
Riau Islands
1. Kab. Lingga
(TPST)
East Java
1. Kab. Lumajang
(TPST Lempeni)
2. Kab. Lumajang
(TPST)
3. Kab. Probolinggo
(TPST)
2 | Potential RDF Off-Taker
Aceh
1.Kota Banda Aceh
West Sumatera
1.Kota Padang
South Sumatera
1. Kab. OKU
2. Kab. OKI
3. Kab. Muara Enim
4. Kab. Musi
Banyuasin
5. Kab. Banyuasin
6. Kab. Lahat
Lampung
1.Kota Bandar
Lampung
Riau
1. Kota Pekanbaru
2. Kab. Pelalawan
3. Kab. Siak
4. Kab. Bengkalis
Banten
1. Kota Cilegon
2. Kab. Pandeglang
3. Kab. Lebak
West Java
1. Kota Bogor
2. Kota Tasikmalaya
3. Kota Cirebon
4. Kab. Majalengka
5. Kab. Purwakarta
6. Kab. Ciamis
7. Kab. Sumedang
Central Java
1. Kab. Semarang
2. Kab. Pati
3. Kab. Kudus
4. Kab. Demak
5. Kab. Boyolali
6. Kab. Karanganyar
7. Kab. Bojonegoro
8. Kab. Klaten
9. Kab. Sragen
East Java
1. Kota Malang
2. Kab. Tulungagung
3. Kab. Blitar
4. Kab. Lumajang
5. Kab. Bondowoso
6. Kab. Probolinggo
7. Kab. Mojokerto
8. Kab. Jombang
9. Kab. Nganjuk
10.Kab. Tuban
Bali
1.Kab. Buleleng
West Kalimantan
1. Kab. Sintang
2. Kota Pontianak
3. Kab. Ketapang
4. Kab. Kapuas
Hulu
Central
Kalimantan
1. Pulang Pisau
East Kalimantan
1. Kota Balikpapan
2. Kota Samarinda
3. Kab. Kutai Kertanegara
4. Kab. Berau
5. Kab. Kutai Timur
6. Kab. Paser
Cement Industry
*Source: Green Fiscal Stimulus Assessment in Waste Sector, UNPAGE Project, 2021
South Kalimantan
1. Kab. Tanah Laut
2. Kab. Tanah Bumbu
3. Kota Banjarmasin
2 | Potential RDF Off-takers
Coal Fired Power Plant – PLTU/PLN
Aceh
1. Kab. Nagan
Raya
West Sumatera
1. Kota Padang
2. Kab.
Sawahlunto
South Sumatera
1. Kab. Muara
Enim
2. Kab. Musi
Banyuasin
Lampung
1. Kab.
Lampung
Selatan
Riau Islands
1. Kota Batam
2. Kab. Karimun
Banten
1. Kota Cilegon
2. Kab.
Pandeglang
3. Kab.
Tangerang
West Java
1. Kab.
Sukabumi
2. Kab.
Indramayu
Central Java
1. Kab.
Rembang
2. Kab. Cilacap
3. Kab. Jepara
East Java
1. Kab. Pacitan
2. Kab. Probolinggo
3. Kab. Tuban
Bali
1. Kab. Buleleng
West Kalimantan
1. Kab. Ketapang
2. Kab. Bengkayang
3. Kab. Sintang
East Kalimantan
1. Kab. Kutai
Kertanegara
2. Kab. Berau
South Kalimantan
1. Kab. Tanah Laut
North Sumatera
1. Kab. Labuhan
Ratu
2. Kab. Lahat
Riau
1. Kota Dumai
2. Kab. Indragiri
Bangka Belitung
1. Kab. Bangka
2. Kab. Belitung
East Nusa Tenggara
1. Kab. Ende
2. Kota Kupang
West Nusa Tenggara
1. Kab. Lombok Barat
2. Kota Bima
Gorontalo
1. Kab. Gorontalo Utara
North Sulawesi
1. Kab. Minahasa Selatan
2. Kep. Talaud
South Sulawesi
1. Kab. Barru
2. Kab. Jenepoto
Central Kalimantan
1. Pulang Pisau
*Source: Green Fiscal Stimulus Assessment in Waste Sector, UNPAGE Project, 2021
3 | Alternative RDF Business Models
Public-Private
Partnership
(PPP)
Non-PPP Scheme
(Government-
driven)
Non-PPP Scheme
(Private-driven)
Government-driven
TOSS Facility
Private sector/
Community-driven
TOSS Facility
1 2 3 4 5
3 | Strengths and Weaknesses
of Alternative Business Models for RDF Project
Model Strength Weakness
1
Public-Private
Partnership
The probability of the project to cancel is low The process is administratively complicated and take
long time.
2
Non-PPP Scheme:
Government
Driven
The administrative procedures are relatively simpler. The risk of uncertainty is relatively high since no
government project guarantee.
3
Non-PPP Scheme:
Private Sector
Driven
1. The administrative procedures are relatively simpler.
2. The national budget could be saved and allocated to other
national priorities
The risk of uncertainty is relatively high since no
government project guarantee.
4
TOSS Facility:
Government
Driven
There are several funding sources that available for finance
the project.
Heavily depend on the local government capacity
5
TOSS Facility:
Private Sector/
Community Driven
The private sector has more flexibility on the designing the
product
1. The private need more time to design until
operation process due to securing financial support
2. Several incentives are needed to mobilize
private/community sector
4 Scope
of Interventions
4 | Scope of Interventions
• UNDP’s activities within SIPA
program will focus on RDF Pilot
Project, especially on strengthening
technical capacity for RDF Planning,
Facility and monitoring
• RDF facility relatively provides more
generous advantages compare to
other waste management facilities.
In terms of environmental benefits, the
RDF facility can reduce waste and
emission massively at once which align
with the government plans to achieve its
NDC target. When it comes to
economics benefits, the RDF facility
could create a massive job creation.
SCOPE OF INTERVENTIONS
Stakeholders Engagement
a. Engagement of local government in potential RDF
sites
b. Engagement RDF off-takers
c. Engagement of investors/financiers
Technical Assistance
Study for RDF Planning Facility
a. RDF Technological Assessment based on off-taker
b. RDF facility FS, DED
Impact Assessment of RDF
Implementation
a. Energy generated, GHGs mitigation
a. Reduced waste
3 Alternative
RDF Business Models
THANK YOU

Contenu connexe

Similaire à Session 7a: Part II -Decarbonising industry - Verania Andria-UNDP

Cost and benefit analysis for kota kinabalu (kk) composting project
Cost and benefit analysis for kota kinabalu (kk) composting projectCost and benefit analysis for kota kinabalu (kk) composting project
Cost and benefit analysis for kota kinabalu (kk) composting projectMohd Hasim Ujang
 
Powering sri lanka towards sustainability (Cabraal 03 Apr17)
Powering sri lanka towards sustainability (Cabraal 03 Apr17)Powering sri lanka towards sustainability (Cabraal 03 Apr17)
Powering sri lanka towards sustainability (Cabraal 03 Apr17)Private Consultants
 
Preliminary project work .pptx
Preliminary project work .pptxPreliminary project work .pptx
Preliminary project work .pptxssuser9b43b32
 
Climate change due to fart and energy alternatives
Climate change due to fart and energy alternativesClimate change due to fart and energy alternatives
Climate change due to fart and energy alternativesPadmanabhan Krishnan
 
National resource efficiency policy (1)
National resource efficiency policy (1)National resource efficiency policy (1)
National resource efficiency policy (1)Nidhi Singh
 
Keynote Speech: Online Workshop Series:Exploring Criteria and Indicators for ...
Keynote Speech: Online Workshop Series:Exploring Criteria and Indicators for ...Keynote Speech: Online Workshop Series:Exploring Criteria and Indicators for ...
Keynote Speech: Online Workshop Series:Exploring Criteria and Indicators for ...CIFOR-ICRAF
 
Where is REDD+ going in Indonesia?
Where is REDD+ going in Indonesia?Where is REDD+ going in Indonesia?
Where is REDD+ going in Indonesia?CIFOR-ICRAF
 
Status of Natural Resource Management in Uganda
Status of Natural Resource Management in UgandaStatus of Natural Resource Management in Uganda
Status of Natural Resource Management in UgandaENVIRONMENTALALERTEA1
 
IGES+CCET+Osaka+14.02.2017+(2)Hrptromrp.ppt
IGES+CCET+Osaka+14.02.2017+(2)Hrptromrp.pptIGES+CCET+Osaka+14.02.2017+(2)Hrptromrp.ppt
IGES+CCET+Osaka+14.02.2017+(2)Hrptromrp.pptHarshadPukale
 
WASTE MGT STRATEGY TIWAN.pptx
WASTE MGT STRATEGY TIWAN.pptxWASTE MGT STRATEGY TIWAN.pptx
WASTE MGT STRATEGY TIWAN.pptxendurancechery
 
REGIONAL SLURRY TECHNICAL TEAM REPORT.pdf
REGIONAL SLURRY TECHNICAL TEAM REPORT.pdfREGIONAL SLURRY TECHNICAL TEAM REPORT.pdf
REGIONAL SLURRY TECHNICAL TEAM REPORT.pdfGalfato Gabiso
 
[Climate Change Program]City Paper Presentation : Beijing(China)
[Climate Change Program]City Paper Presentation : Beijing(China)[Climate Change Program]City Paper Presentation : Beijing(China)
[Climate Change Program]City Paper Presentation : Beijing(China)shrdcinfo
 

Similaire à Session 7a: Part II -Decarbonising industry - Verania Andria-UNDP (20)

Cost and benefit analysis for kota kinabalu (kk) composting project
Cost and benefit analysis for kota kinabalu (kk) composting projectCost and benefit analysis for kota kinabalu (kk) composting project
Cost and benefit analysis for kota kinabalu (kk) composting project
 
Powering sri lanka towards sustainability (Cabraal 03 Apr17)
Powering sri lanka towards sustainability (Cabraal 03 Apr17)Powering sri lanka towards sustainability (Cabraal 03 Apr17)
Powering sri lanka towards sustainability (Cabraal 03 Apr17)
 
Preliminary project work .pptx
Preliminary project work .pptxPreliminary project work .pptx
Preliminary project work .pptx
 
6 cea
6 cea6 cea
6 cea
 
7. Clean Cooking Solutions for All in Nepalese Context
7. Clean Cooking Solutions for All in Nepalese Context7. Clean Cooking Solutions for All in Nepalese Context
7. Clean Cooking Solutions for All in Nepalese Context
 
Climate change due to fart and energy alternatives
Climate change due to fart and energy alternativesClimate change due to fart and energy alternatives
Climate change due to fart and energy alternatives
 
Japan
JapanJapan
Japan
 
Pakistan Report
Pakistan ReportPakistan Report
Pakistan Report
 
National resource efficiency policy (1)
National resource efficiency policy (1)National resource efficiency policy (1)
National resource efficiency policy (1)
 
Cities Without Landfills
Cities Without LandfillsCities Without Landfills
Cities Without Landfills
 
Keynote Speech: Online Workshop Series:Exploring Criteria and Indicators for ...
Keynote Speech: Online Workshop Series:Exploring Criteria and Indicators for ...Keynote Speech: Online Workshop Series:Exploring Criteria and Indicators for ...
Keynote Speech: Online Workshop Series:Exploring Criteria and Indicators for ...
 
Where is REDD+ going in Indonesia?
Where is REDD+ going in Indonesia?Where is REDD+ going in Indonesia?
Where is REDD+ going in Indonesia?
 
Adaptation actions in Nepal
Adaptation actions in NepalAdaptation actions in Nepal
Adaptation actions in Nepal
 
Status of Natural Resource Management in Uganda
Status of Natural Resource Management in UgandaStatus of Natural Resource Management in Uganda
Status of Natural Resource Management in Uganda
 
Setyanto Indonesia emisision reduction in agriculture july 2012
Setyanto Indonesia emisision reduction in agriculture july 2012Setyanto Indonesia emisision reduction in agriculture july 2012
Setyanto Indonesia emisision reduction in agriculture july 2012
 
IGES+CCET+Osaka+14.02.2017+(2)Hrptromrp.ppt
IGES+CCET+Osaka+14.02.2017+(2)Hrptromrp.pptIGES+CCET+Osaka+14.02.2017+(2)Hrptromrp.ppt
IGES+CCET+Osaka+14.02.2017+(2)Hrptromrp.ppt
 
WASTE MGT STRATEGY TIWAN.pptx
WASTE MGT STRATEGY TIWAN.pptxWASTE MGT STRATEGY TIWAN.pptx
WASTE MGT STRATEGY TIWAN.pptx
 
REGIONAL SLURRY TECHNICAL TEAM REPORT.pdf
REGIONAL SLURRY TECHNICAL TEAM REPORT.pdfREGIONAL SLURRY TECHNICAL TEAM REPORT.pdf
REGIONAL SLURRY TECHNICAL TEAM REPORT.pdf
 
Kenya national climate change priorities2016 (3)
Kenya national climate change priorities2016 (3)Kenya national climate change priorities2016 (3)
Kenya national climate change priorities2016 (3)
 
[Climate Change Program]City Paper Presentation : Beijing(China)
[Climate Change Program]City Paper Presentation : Beijing(China)[Climate Change Program]City Paper Presentation : Beijing(China)
[Climate Change Program]City Paper Presentation : Beijing(China)
 

Plus de OECD Environment

OECD Green Talks LIVE | Diving deeper: the evolving landscape for assessing w...
OECD Green Talks LIVE | Diving deeper: the evolving landscape for assessing w...OECD Green Talks LIVE | Diving deeper: the evolving landscape for assessing w...
OECD Green Talks LIVE | Diving deeper: the evolving landscape for assessing w...OECD Environment
 
Detlef Van Vuuren- Integrated modelling for interrelated crises.pdf
Detlef Van Vuuren- Integrated modelling for interrelated crises.pdfDetlef Van Vuuren- Integrated modelling for interrelated crises.pdf
Detlef Van Vuuren- Integrated modelling for interrelated crises.pdfOECD Environment
 
Thomas Hertel- Integrated Policies for the Triple Planetary Crisis.pdf
Thomas Hertel- Integrated Policies for the Triple Planetary Crisis.pdfThomas Hertel- Integrated Policies for the Triple Planetary Crisis.pdf
Thomas Hertel- Integrated Policies for the Triple Planetary Crisis.pdfOECD Environment
 
Jon Sampedro - Assessing synergies and trade offs for health and sustainable ...
Jon Sampedro - Assessing synergies and trade offs for health and sustainable ...Jon Sampedro - Assessing synergies and trade offs for health and sustainable ...
Jon Sampedro - Assessing synergies and trade offs for health and sustainable ...OECD Environment
 
Astrid Bos - Identifying trade offs & searching for synergies.pdf
Astrid Bos - Identifying trade offs & searching for synergies.pdfAstrid Bos - Identifying trade offs & searching for synergies.pdf
Astrid Bos - Identifying trade offs & searching for synergies.pdfOECD Environment
 
Ruth Delzeit - Modelling environmental and socio-economic impacts of cropland...
Ruth Delzeit - Modelling environmental and socio-economic impacts of cropland...Ruth Delzeit - Modelling environmental and socio-economic impacts of cropland...
Ruth Delzeit - Modelling environmental and socio-economic impacts of cropland...OECD Environment
 
Wilfried Winiwarter - Implementing nitrogen pollution control pathways in the...
Wilfried Winiwarter - Implementing nitrogen pollution control pathways in the...Wilfried Winiwarter - Implementing nitrogen pollution control pathways in the...
Wilfried Winiwarter - Implementing nitrogen pollution control pathways in the...OECD Environment
 
Laurent Drouet - Physical and Economic Risks of Climate Change.pdf
Laurent Drouet - Physical and Economic Risks of Climate Change.pdfLaurent Drouet - Physical and Economic Risks of Climate Change.pdf
Laurent Drouet - Physical and Economic Risks of Climate Change.pdfOECD Environment
 
Shinichiro Fujimori - Biodiversity modeling in AIM (Asia pacific Integrated M...
Shinichiro Fujimori - Biodiversity modeling in AIM (Asia pacific Integrated M...Shinichiro Fujimori - Biodiversity modeling in AIM (Asia pacific Integrated M...
Shinichiro Fujimori - Biodiversity modeling in AIM (Asia pacific Integrated M...OECD Environment
 
HyeJin Kim and Simon Smart - The biodiversity nexus across multiple drivers: ...
HyeJin Kim and Simon Smart - The biodiversity nexus across multiple drivers: ...HyeJin Kim and Simon Smart - The biodiversity nexus across multiple drivers: ...
HyeJin Kim and Simon Smart - The biodiversity nexus across multiple drivers: ...OECD Environment
 
GREEN Action Task Force - Full Presentations.pdf
GREEN Action Task Force - Full Presentations.pdfGREEN Action Task Force - Full Presentations.pdf
GREEN Action Task Force - Full Presentations.pdfOECD Environment
 
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...OECD Environment
 
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...OECD Environment
 
Additional Considerations for Pesticide Formulations Containing Microbial Pes...
Additional Considerations for Pesticide Formulations Containing Microbial Pes...Additional Considerations for Pesticide Formulations Containing Microbial Pes...
Additional Considerations for Pesticide Formulations Containing Microbial Pes...OECD Environment
 
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...OECD Environment
 
Considerations for Problem Formulation for Human Health Safety Assessments of...
Considerations for Problem Formulation for Human Health Safety Assessments of...Considerations for Problem Formulation for Human Health Safety Assessments of...
Considerations for Problem Formulation for Human Health Safety Assessments of...OECD Environment
 
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...OECD Environment
 
APVMA outcome-focussed approach to data requirements to support registration ...
APVMA outcome-focussed approach to data requirements to support registration ...APVMA outcome-focussed approach to data requirements to support registration ...
APVMA outcome-focussed approach to data requirements to support registration ...OECD Environment
 
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGESThe U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGESOECD Environment
 
Problem formulation for environmental risk assessment – Finnish case study: ...
Problem formulation for environmental risk assessment – Finnish case study:  ...Problem formulation for environmental risk assessment – Finnish case study:  ...
Problem formulation for environmental risk assessment – Finnish case study: ...OECD Environment
 

Plus de OECD Environment (20)

OECD Green Talks LIVE | Diving deeper: the evolving landscape for assessing w...
OECD Green Talks LIVE | Diving deeper: the evolving landscape for assessing w...OECD Green Talks LIVE | Diving deeper: the evolving landscape for assessing w...
OECD Green Talks LIVE | Diving deeper: the evolving landscape for assessing w...
 
Detlef Van Vuuren- Integrated modelling for interrelated crises.pdf
Detlef Van Vuuren- Integrated modelling for interrelated crises.pdfDetlef Van Vuuren- Integrated modelling for interrelated crises.pdf
Detlef Van Vuuren- Integrated modelling for interrelated crises.pdf
 
Thomas Hertel- Integrated Policies for the Triple Planetary Crisis.pdf
Thomas Hertel- Integrated Policies for the Triple Planetary Crisis.pdfThomas Hertel- Integrated Policies for the Triple Planetary Crisis.pdf
Thomas Hertel- Integrated Policies for the Triple Planetary Crisis.pdf
 
Jon Sampedro - Assessing synergies and trade offs for health and sustainable ...
Jon Sampedro - Assessing synergies and trade offs for health and sustainable ...Jon Sampedro - Assessing synergies and trade offs for health and sustainable ...
Jon Sampedro - Assessing synergies and trade offs for health and sustainable ...
 
Astrid Bos - Identifying trade offs & searching for synergies.pdf
Astrid Bos - Identifying trade offs & searching for synergies.pdfAstrid Bos - Identifying trade offs & searching for synergies.pdf
Astrid Bos - Identifying trade offs & searching for synergies.pdf
 
Ruth Delzeit - Modelling environmental and socio-economic impacts of cropland...
Ruth Delzeit - Modelling environmental and socio-economic impacts of cropland...Ruth Delzeit - Modelling environmental and socio-economic impacts of cropland...
Ruth Delzeit - Modelling environmental and socio-economic impacts of cropland...
 
Wilfried Winiwarter - Implementing nitrogen pollution control pathways in the...
Wilfried Winiwarter - Implementing nitrogen pollution control pathways in the...Wilfried Winiwarter - Implementing nitrogen pollution control pathways in the...
Wilfried Winiwarter - Implementing nitrogen pollution control pathways in the...
 
Laurent Drouet - Physical and Economic Risks of Climate Change.pdf
Laurent Drouet - Physical and Economic Risks of Climate Change.pdfLaurent Drouet - Physical and Economic Risks of Climate Change.pdf
Laurent Drouet - Physical and Economic Risks of Climate Change.pdf
 
Shinichiro Fujimori - Biodiversity modeling in AIM (Asia pacific Integrated M...
Shinichiro Fujimori - Biodiversity modeling in AIM (Asia pacific Integrated M...Shinichiro Fujimori - Biodiversity modeling in AIM (Asia pacific Integrated M...
Shinichiro Fujimori - Biodiversity modeling in AIM (Asia pacific Integrated M...
 
HyeJin Kim and Simon Smart - The biodiversity nexus across multiple drivers: ...
HyeJin Kim and Simon Smart - The biodiversity nexus across multiple drivers: ...HyeJin Kim and Simon Smart - The biodiversity nexus across multiple drivers: ...
HyeJin Kim and Simon Smart - The biodiversity nexus across multiple drivers: ...
 
GREEN Action Task Force - Full Presentations.pdf
GREEN Action Task Force - Full Presentations.pdfGREEN Action Task Force - Full Presentations.pdf
GREEN Action Task Force - Full Presentations.pdf
 
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
 
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
 
Additional Considerations for Pesticide Formulations Containing Microbial Pes...
Additional Considerations for Pesticide Formulations Containing Microbial Pes...Additional Considerations for Pesticide Formulations Containing Microbial Pes...
Additional Considerations for Pesticide Formulations Containing Microbial Pes...
 
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
 
Considerations for Problem Formulation for Human Health Safety Assessments of...
Considerations for Problem Formulation for Human Health Safety Assessments of...Considerations for Problem Formulation for Human Health Safety Assessments of...
Considerations for Problem Formulation for Human Health Safety Assessments of...
 
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
 
APVMA outcome-focussed approach to data requirements to support registration ...
APVMA outcome-focussed approach to data requirements to support registration ...APVMA outcome-focussed approach to data requirements to support registration ...
APVMA outcome-focussed approach to data requirements to support registration ...
 
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGESThe U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
 
Problem formulation for environmental risk assessment – Finnish case study: ...
Problem formulation for environmental risk assessment – Finnish case study:  ...Problem formulation for environmental risk assessment – Finnish case study:  ...
Problem formulation for environmental risk assessment – Finnish case study: ...
 

Dernier

NO1 Popular kala ilam Expert In Peshwar Mirpur Kala Jadu Specialist In Peshw...
NO1 Popular kala ilam Expert In Peshwar Mirpur  Kala Jadu Specialist In Peshw...NO1 Popular kala ilam Expert In Peshwar Mirpur  Kala Jadu Specialist In Peshw...
NO1 Popular kala ilam Expert In Peshwar Mirpur Kala Jadu Specialist In Peshw...Amil baba
 
Global warming, Types, Causes and Effects.
Global warming, Types, Causes and Effects.Global warming, Types, Causes and Effects.
Global warming, Types, Causes and Effects.meenakshiii2706
 
A Wide Range of Eco System Services with Mangroves
A Wide Range of Eco System Services with MangrovesA Wide Range of Eco System Services with Mangroves
A Wide Range of Eco System Services with MangrovesCIFOR-ICRAF
 
LaPlace Transforms 2 with use of Matlab.pptx
LaPlace Transforms 2 with use of Matlab.pptxLaPlace Transforms 2 with use of Matlab.pptx
LaPlace Transforms 2 with use of Matlab.pptxjoshuaclack73
 
2024-05-16 Composting at Home 101 without link to voucher
2024-05-16 Composting at Home 101 without link to voucher2024-05-16 Composting at Home 101 without link to voucher
2024-05-16 Composting at Home 101 without link to voucherEllen Book
 
Presentation on GLOBALISATION IN MBA sem
Presentation on GLOBALISATION IN MBA semPresentation on GLOBALISATION IN MBA sem
Presentation on GLOBALISATION IN MBA semAnikaSingh30
 
The Key to Sustainable Energy Optimization: A Data-Driven Approach for Manufa...
The Key to Sustainable Energy Optimization: A Data-Driven Approach for Manufa...The Key to Sustainable Energy Optimization: A Data-Driven Approach for Manufa...
The Key to Sustainable Energy Optimization: A Data-Driven Approach for Manufa...Aggregage
 
Carbon Stock Assessment in Banten Province and Demak, Central Java, Indonesia
Carbon Stock Assessment in Banten Province and Demak, Central Java, IndonesiaCarbon Stock Assessment in Banten Province and Demak, Central Java, Indonesia
Carbon Stock Assessment in Banten Province and Demak, Central Java, IndonesiaCIFOR-ICRAF
 
NO1 Best Amil Baba In Pakistan Authentic Amil In pakistan Best Amil In Pakist...
NO1 Best Amil Baba In Pakistan Authentic Amil In pakistan Best Amil In Pakist...NO1 Best Amil Baba In Pakistan Authentic Amil In pakistan Best Amil In Pakist...
NO1 Best Amil Baba In Pakistan Authentic Amil In pakistan Best Amil In Pakist...Amil baba
 
ecosystem class 12 ppt investigatory project
ecosystem class 12 ppt investigatory projectecosystem class 12 ppt investigatory project
ecosystem class 12 ppt investigatory projectMayank524181
 
Laplace Transforms.pptxhhhhhhhhhhhhhhhhh
Laplace Transforms.pptxhhhhhhhhhhhhhhhhhLaplace Transforms.pptxhhhhhhhhhhhhhhhhh
Laplace Transforms.pptxhhhhhhhhhhhhhhhhhjoshuaclack73
 
Plastic angel or demon/recycling process
Plastic angel or demon/recycling processPlastic angel or demon/recycling process
Plastic angel or demon/recycling processMustafa Alp
 
Lecture 6- Bacteria- Pathathogenesis.ppt
Lecture 6- Bacteria- Pathathogenesis.pptLecture 6- Bacteria- Pathathogenesis.ppt
Lecture 6- Bacteria- Pathathogenesis.pptDiptiPriya6
 
Learn Creative Upcycling Ideas for Old T-Shirts: Transform Your Wardrobe Now
Learn Creative Upcycling Ideas for Old T-Shirts: Transform Your Wardrobe NowLearn Creative Upcycling Ideas for Old T-Shirts: Transform Your Wardrobe Now
Learn Creative Upcycling Ideas for Old T-Shirts: Transform Your Wardrobe NowSwag Cycle
 
New Metrics for Sustainable Prosperity: Options for GDP+3
New Metrics for Sustainable Prosperity: Options for GDP+3New Metrics for Sustainable Prosperity: Options for GDP+3
New Metrics for Sustainable Prosperity: Options for GDP+3susannedejong
 
Introducing Blue Carbon Deck seeking for actionable partnerships
Introducing Blue Carbon Deck seeking for actionable partnershipsIntroducing Blue Carbon Deck seeking for actionable partnerships
Introducing Blue Carbon Deck seeking for actionable partnershipsCIFOR-ICRAF
 
Sungsang Mangrove Restoration and Ecotourism (SMART): A participatory action ...
Sungsang Mangrove Restoration and Ecotourism (SMART): A participatory action ...Sungsang Mangrove Restoration and Ecotourism (SMART): A participatory action ...
Sungsang Mangrove Restoration and Ecotourism (SMART): A participatory action ...CIFOR-ICRAF
 
LANDFILL AND ITS EFFECT(Managing waste).pptx
LANDFILL AND ITS EFFECT(Managing waste).pptxLANDFILL AND ITS EFFECT(Managing waste).pptx
LANDFILL AND ITS EFFECT(Managing waste).pptxKrish DS
 
LaPlace Transform Questions.pptjjjjjjjjjx
LaPlace Transform Questions.pptjjjjjjjjjxLaPlace Transform Questions.pptjjjjjjjjjx
LaPlace Transform Questions.pptjjjjjjjjjxjoshuaclack73
 
New Metrics for Sustainable Prosperity: Options for GDP+3 (preliminary study)
New Metrics for Sustainable Prosperity: Options for GDP+3 (preliminary study)New Metrics for Sustainable Prosperity: Options for GDP+3 (preliminary study)
New Metrics for Sustainable Prosperity: Options for GDP+3 (preliminary study)susannedejong
 

Dernier (20)

NO1 Popular kala ilam Expert In Peshwar Mirpur Kala Jadu Specialist In Peshw...
NO1 Popular kala ilam Expert In Peshwar Mirpur  Kala Jadu Specialist In Peshw...NO1 Popular kala ilam Expert In Peshwar Mirpur  Kala Jadu Specialist In Peshw...
NO1 Popular kala ilam Expert In Peshwar Mirpur Kala Jadu Specialist In Peshw...
 
Global warming, Types, Causes and Effects.
Global warming, Types, Causes and Effects.Global warming, Types, Causes and Effects.
Global warming, Types, Causes and Effects.
 
A Wide Range of Eco System Services with Mangroves
A Wide Range of Eco System Services with MangrovesA Wide Range of Eco System Services with Mangroves
A Wide Range of Eco System Services with Mangroves
 
LaPlace Transforms 2 with use of Matlab.pptx
LaPlace Transforms 2 with use of Matlab.pptxLaPlace Transforms 2 with use of Matlab.pptx
LaPlace Transforms 2 with use of Matlab.pptx
 
2024-05-16 Composting at Home 101 without link to voucher
2024-05-16 Composting at Home 101 without link to voucher2024-05-16 Composting at Home 101 without link to voucher
2024-05-16 Composting at Home 101 without link to voucher
 
Presentation on GLOBALISATION IN MBA sem
Presentation on GLOBALISATION IN MBA semPresentation on GLOBALISATION IN MBA sem
Presentation on GLOBALISATION IN MBA sem
 
The Key to Sustainable Energy Optimization: A Data-Driven Approach for Manufa...
The Key to Sustainable Energy Optimization: A Data-Driven Approach for Manufa...The Key to Sustainable Energy Optimization: A Data-Driven Approach for Manufa...
The Key to Sustainable Energy Optimization: A Data-Driven Approach for Manufa...
 
Carbon Stock Assessment in Banten Province and Demak, Central Java, Indonesia
Carbon Stock Assessment in Banten Province and Demak, Central Java, IndonesiaCarbon Stock Assessment in Banten Province and Demak, Central Java, Indonesia
Carbon Stock Assessment in Banten Province and Demak, Central Java, Indonesia
 
NO1 Best Amil Baba In Pakistan Authentic Amil In pakistan Best Amil In Pakist...
NO1 Best Amil Baba In Pakistan Authentic Amil In pakistan Best Amil In Pakist...NO1 Best Amil Baba In Pakistan Authentic Amil In pakistan Best Amil In Pakist...
NO1 Best Amil Baba In Pakistan Authentic Amil In pakistan Best Amil In Pakist...
 
ecosystem class 12 ppt investigatory project
ecosystem class 12 ppt investigatory projectecosystem class 12 ppt investigatory project
ecosystem class 12 ppt investigatory project
 
Laplace Transforms.pptxhhhhhhhhhhhhhhhhh
Laplace Transforms.pptxhhhhhhhhhhhhhhhhhLaplace Transforms.pptxhhhhhhhhhhhhhhhhh
Laplace Transforms.pptxhhhhhhhhhhhhhhhhh
 
Plastic angel or demon/recycling process
Plastic angel or demon/recycling processPlastic angel or demon/recycling process
Plastic angel or demon/recycling process
 
Lecture 6- Bacteria- Pathathogenesis.ppt
Lecture 6- Bacteria- Pathathogenesis.pptLecture 6- Bacteria- Pathathogenesis.ppt
Lecture 6- Bacteria- Pathathogenesis.ppt
 
Learn Creative Upcycling Ideas for Old T-Shirts: Transform Your Wardrobe Now
Learn Creative Upcycling Ideas for Old T-Shirts: Transform Your Wardrobe NowLearn Creative Upcycling Ideas for Old T-Shirts: Transform Your Wardrobe Now
Learn Creative Upcycling Ideas for Old T-Shirts: Transform Your Wardrobe Now
 
New Metrics for Sustainable Prosperity: Options for GDP+3
New Metrics for Sustainable Prosperity: Options for GDP+3New Metrics for Sustainable Prosperity: Options for GDP+3
New Metrics for Sustainable Prosperity: Options for GDP+3
 
Introducing Blue Carbon Deck seeking for actionable partnerships
Introducing Blue Carbon Deck seeking for actionable partnershipsIntroducing Blue Carbon Deck seeking for actionable partnerships
Introducing Blue Carbon Deck seeking for actionable partnerships
 
Sungsang Mangrove Restoration and Ecotourism (SMART): A participatory action ...
Sungsang Mangrove Restoration and Ecotourism (SMART): A participatory action ...Sungsang Mangrove Restoration and Ecotourism (SMART): A participatory action ...
Sungsang Mangrove Restoration and Ecotourism (SMART): A participatory action ...
 
LANDFILL AND ITS EFFECT(Managing waste).pptx
LANDFILL AND ITS EFFECT(Managing waste).pptxLANDFILL AND ITS EFFECT(Managing waste).pptx
LANDFILL AND ITS EFFECT(Managing waste).pptx
 
LaPlace Transform Questions.pptjjjjjjjjjx
LaPlace Transform Questions.pptjjjjjjjjjxLaPlace Transform Questions.pptjjjjjjjjjx
LaPlace Transform Questions.pptjjjjjjjjjx
 
New Metrics for Sustainable Prosperity: Options for GDP+3 (preliminary study)
New Metrics for Sustainable Prosperity: Options for GDP+3 (preliminary study)New Metrics for Sustainable Prosperity: Options for GDP+3 (preliminary study)
New Metrics for Sustainable Prosperity: Options for GDP+3 (preliminary study)
 

Session 7a: Part II -Decarbonising industry - Verania Andria-UNDP

  • 1. Bogor | 09.03.2022 Verania Andria Senior Advisor for Sustainable Energy Environment Unit UNDP Indonesia Sustainable Infrastructure: Refuse Derived Fuel (RDF) Kick-off Meeting – Sustainable Infrastructure Programme in Asia (SIPA)
  • 2. 1 National Priority: Policy, Target, and Stakeholders
  • 3. 1 | National Priority: Policy, Target, and Stakeholders DESCRIPTION Urgency • The growth of waste generation has made the government of Indonesia put tremendous efforts to deal with waste problem • Huge number of wastes that is not properly managed in sustainable ways • Limited waste management facilities • Overloaded landfill RDF is an alternatives fuel that can be produce from municipal solid waste (MSW) used as an alternative for fossil fuels Stakeholders and Target Target 2030: Utilization of waste by converting to energy through RDF Utilization of waste by converting to energy through RDF (in industry) or as renewable energy source in PLTSa; The PLTSa/RDF facilities (million ton) 4.6 (mton) Avoided CO2-eq (million ton) 1.9 (mtCO2eq) The Ministry of Environment and Forestry The Ministry of Energy and Mineral Resources Target 2030: Biomass Utilization Cofiring Program: Biomass Utilization (million ton) 9 (mton) *Source: Enhanced Nationally Determined Contribution (NDC) Republic of Indonesia MITIGATION *Source: Enhanced Nationally Determined Contribution (NDC) Republic of Indonesia MITIGATION
  • 5. Process Flow from Waste to RDF in Jeruklegi, Cilacap Inert Product Reject Weigh Bridge Weighing Truk Unloading Sorting process Sorting by waste pickers Shredding Pre Treatment area Bay Drying Process AF Feeding Facility Feed to Kiln Kiln Delivery RDF Loading & Delivery RDF RDF ready to be fed Waste storage, 600 ton 5 Kapasitas max 20tph atau 400tpd Product akan ada setiap hari
  • 6. RDF use in Cement Industry: Operational RDF Facility Jeruk Legi di Cilacap, Central Java Suhu dalam tanur >1.800°C Fasilitas Pengolahan Sampah Jeruklegi RDF Facility Cilacap city SBI Cilacap 120-160 ton per day Fresh waste 5 - 15 ton per hari residu (+/- 15%) – low calorie residue 40 - 60 ton per hari RDF (+/- 50% ) 1 - 3 ton per hari bahan daur ulang ( >3% ) +/- 35 % water dehydrated during drying process 6 Investment cost of RDF facility (60 t/day RDF) is USD 5.8 million
  • 7. Biomass for Cofiring in Coal- fired Power Plants
  • 8. 2 | Potential RDF Facility & Off-taker *Source: Ministry of Environment and Forestsry
  • 9. 2 | Potential RDF Production Sites Integrated Waste Management Site - TPST *Source: Directorate of Sanitation, Ministry of Public Works and Housing Aceh 1.Kota Banda Aceh (TPST RDF) 2.Kab. Aceh Besar (TPST RDF) West Java 1. Kab. Tasikmalaya (TPA Nangkaleah Area) 2. Kab. Kuningan (TPST Cibulan) 3. Kab. Garut (TPST) 4. Kab. Kuningan (TPST) 5. Kab. Ciamis (TPST) Central Java 1. Kab. Jepara (TPST Sengonbugel) 2. Kab. Jepara (TPST Bandengan) 3. Kab. Rembang (TPST) North Maluku 1. Kpta Tidore kepulauan (TPST) West Kalimantan 1. Kab. Sambas (TPST) West Nusa Tenggara 1. Kota Mataram (TPST Sandubaya) Special Region of Yogyakarta 1. Kab. Sleman (TPST) Riau Islands 1. Kab. Lingga (TPST) East Java 1. Kab. Lumajang (TPST Lempeni) 2. Kab. Lumajang (TPST) 3. Kab. Probolinggo (TPST)
  • 10. 2 | Potential RDF Off-Taker Aceh 1.Kota Banda Aceh West Sumatera 1.Kota Padang South Sumatera 1. Kab. OKU 2. Kab. OKI 3. Kab. Muara Enim 4. Kab. Musi Banyuasin 5. Kab. Banyuasin 6. Kab. Lahat Lampung 1.Kota Bandar Lampung Riau 1. Kota Pekanbaru 2. Kab. Pelalawan 3. Kab. Siak 4. Kab. Bengkalis Banten 1. Kota Cilegon 2. Kab. Pandeglang 3. Kab. Lebak West Java 1. Kota Bogor 2. Kota Tasikmalaya 3. Kota Cirebon 4. Kab. Majalengka 5. Kab. Purwakarta 6. Kab. Ciamis 7. Kab. Sumedang Central Java 1. Kab. Semarang 2. Kab. Pati 3. Kab. Kudus 4. Kab. Demak 5. Kab. Boyolali 6. Kab. Karanganyar 7. Kab. Bojonegoro 8. Kab. Klaten 9. Kab. Sragen East Java 1. Kota Malang 2. Kab. Tulungagung 3. Kab. Blitar 4. Kab. Lumajang 5. Kab. Bondowoso 6. Kab. Probolinggo 7. Kab. Mojokerto 8. Kab. Jombang 9. Kab. Nganjuk 10.Kab. Tuban Bali 1.Kab. Buleleng West Kalimantan 1. Kab. Sintang 2. Kota Pontianak 3. Kab. Ketapang 4. Kab. Kapuas Hulu Central Kalimantan 1. Pulang Pisau East Kalimantan 1. Kota Balikpapan 2. Kota Samarinda 3. Kab. Kutai Kertanegara 4. Kab. Berau 5. Kab. Kutai Timur 6. Kab. Paser Cement Industry *Source: Green Fiscal Stimulus Assessment in Waste Sector, UNPAGE Project, 2021 South Kalimantan 1. Kab. Tanah Laut 2. Kab. Tanah Bumbu 3. Kota Banjarmasin
  • 11. 2 | Potential RDF Off-takers Coal Fired Power Plant – PLTU/PLN Aceh 1. Kab. Nagan Raya West Sumatera 1. Kota Padang 2. Kab. Sawahlunto South Sumatera 1. Kab. Muara Enim 2. Kab. Musi Banyuasin Lampung 1. Kab. Lampung Selatan Riau Islands 1. Kota Batam 2. Kab. Karimun Banten 1. Kota Cilegon 2. Kab. Pandeglang 3. Kab. Tangerang West Java 1. Kab. Sukabumi 2. Kab. Indramayu Central Java 1. Kab. Rembang 2. Kab. Cilacap 3. Kab. Jepara East Java 1. Kab. Pacitan 2. Kab. Probolinggo 3. Kab. Tuban Bali 1. Kab. Buleleng West Kalimantan 1. Kab. Ketapang 2. Kab. Bengkayang 3. Kab. Sintang East Kalimantan 1. Kab. Kutai Kertanegara 2. Kab. Berau South Kalimantan 1. Kab. Tanah Laut North Sumatera 1. Kab. Labuhan Ratu 2. Kab. Lahat Riau 1. Kota Dumai 2. Kab. Indragiri Bangka Belitung 1. Kab. Bangka 2. Kab. Belitung East Nusa Tenggara 1. Kab. Ende 2. Kota Kupang West Nusa Tenggara 1. Kab. Lombok Barat 2. Kota Bima Gorontalo 1. Kab. Gorontalo Utara North Sulawesi 1. Kab. Minahasa Selatan 2. Kep. Talaud South Sulawesi 1. Kab. Barru 2. Kab. Jenepoto Central Kalimantan 1. Pulang Pisau *Source: Green Fiscal Stimulus Assessment in Waste Sector, UNPAGE Project, 2021
  • 12. 3 | Alternative RDF Business Models Public-Private Partnership (PPP) Non-PPP Scheme (Government- driven) Non-PPP Scheme (Private-driven) Government-driven TOSS Facility Private sector/ Community-driven TOSS Facility 1 2 3 4 5
  • 13. 3 | Strengths and Weaknesses of Alternative Business Models for RDF Project Model Strength Weakness 1 Public-Private Partnership The probability of the project to cancel is low The process is administratively complicated and take long time. 2 Non-PPP Scheme: Government Driven The administrative procedures are relatively simpler. The risk of uncertainty is relatively high since no government project guarantee. 3 Non-PPP Scheme: Private Sector Driven 1. The administrative procedures are relatively simpler. 2. The national budget could be saved and allocated to other national priorities The risk of uncertainty is relatively high since no government project guarantee. 4 TOSS Facility: Government Driven There are several funding sources that available for finance the project. Heavily depend on the local government capacity 5 TOSS Facility: Private Sector/ Community Driven The private sector has more flexibility on the designing the product 1. The private need more time to design until operation process due to securing financial support 2. Several incentives are needed to mobilize private/community sector
  • 15. 4 | Scope of Interventions • UNDP’s activities within SIPA program will focus on RDF Pilot Project, especially on strengthening technical capacity for RDF Planning, Facility and monitoring • RDF facility relatively provides more generous advantages compare to other waste management facilities. In terms of environmental benefits, the RDF facility can reduce waste and emission massively at once which align with the government plans to achieve its NDC target. When it comes to economics benefits, the RDF facility could create a massive job creation. SCOPE OF INTERVENTIONS Stakeholders Engagement a. Engagement of local government in potential RDF sites b. Engagement RDF off-takers c. Engagement of investors/financiers Technical Assistance Study for RDF Planning Facility a. RDF Technological Assessment based on off-taker b. RDF facility FS, DED Impact Assessment of RDF Implementation a. Energy generated, GHGs mitigation a. Reduced waste