Project
Execution
12-03-2015 1
one step towards project management excellence...
Palla Narasimhudu
12-03-2015 2
Introduction:-
12-03-2015 3
Objectives:-
Identify, Analyze the Risk Factors
Perform Qualitative and Quantitative Analysis
Plan for Risk Mitigation
Monitor and Control throughout the project life cycle
Control of future risks and Pro-activeness
Develop Risk Response strategies and Contingency plans for unexpected
Risk register for further similar projects
Scope :-
12-03-2015 4
Risks in EPC Project:-
12-03-2015 5
Engineering
• Project Feasibility
• Viability
• Technology selection
• Design
• Joint venture
• Geographical
conditions
• Funding
Construction
•Utility and Traffic diversion*
•Survey works
•Diaphragm Walling*
•Excavation
•Decking and steel struts*
•Tunnel mining and cross passage*
•Accidents/ Losses of lives
•Non- availability of manpower
•Confined space
•Quality
•Clarity less communication
•Soil condition
•Bad Infrastructure
Procurement
• Underestimate the
need
• Quality supplier
selection
• Offers fail to meet the
needs
• Insufficient funds
Unforeseen
• Sudden collapse of soil
• Heavy rains and floods
• Sudden settlements
• Extreme temperature
Execution
• Delay in land acquisition
• Inexperience project
management/ team
• Ineffective decomposition
of work
• Regulatory issues
• Failure to forecast
• Design changes
• Stake holder management
• Safety/ Environmental
• Political
• Decision making
• Currency / commodities
fluctuation
*varies for different projects
228m
24m19m
228m
24m19m
228m
24m19m
EGMORE NEHRU PARK KMC PACHAIPPA SHENOY
NAGAR
Station Length = 228m + 228m + 228m = 684m
Tunnel Length = 947m + 573m + 898m + 966 = 3384m
22m 22m 24m
Cross Passage = 3nos + 2nos + 3nos + 3nos = 11nos
12-03-2015
6
Case Study- UAA-04 CMRL Project
Risk identification and action plans- UAA-04
12-03-2015 7
12-03-2015 8
Existing Diverted-1 Diverted-2
Impact- Road diversion and D-Wall Construction
Mitigation-
1) Stage wise diversion
2) Interchange and inter-displacement of utilities for D-Wall construction
Risk-
Space constraint in Utility diversion
Utilities running across station
12-03-2015 9
Risk-
Space constraint in traffic diversion
Impact-
D-Wall Construction
Shaft Handover for TBM launching
Mitigation-
1) Stage wise diversion
2) Decking for traffic
12-03-2015 10
UG Metro Station - Plan
20m 20m
40m
60m
Risk- Excavation with strut Impact- Possible Delay in shaft handover for TBM launch
Mitigation-
1) D-Wall design change without strut
2) Modified excavation sequence of 12m max with additional centre opening
12m
Post Risk Analysis-
• Poly-mud level was 1.5mt below the Ground Level
• Due to heavy rain there was contamination of seepage water and polymer properties may reduce which may be
insufficient to withstand the top loose strata
• Continuous rain, rise in ground water level immediately below the guide wall due to the heavy rain, higher than the
poly-mud level
• Vibration due to chiselling
12-03-2015 11
Diaphragm Wall Trench Collapse- P147
Impact-
1) Progress hamper for other panels
2) Plan for mitigation
Mitigation-
1. Bund making over the guide wall and Keeping poly-mud level always
higher than the GW level
2. Equal quantity of crusher dust was stoked for immediate risk mitigation.
Immediate risk response-
Collapsed trench filled with M5 grade concrete
Bund
Risk factor-
Likelihood- 0.25
Potential impact- Time- 1 week delay, Cost- Rs 14 Lacs
Risk cost= 14 Lacs x 0.25= 3.5 Lacs
Risk Time= 1 week x 0.25= 0.25 Week
Post Risk Analysis-
1. Volume losses due to water ingress from the joint locations
2. Under cut/ Over cut while grabbing of D-Wall Panels
3. Honey comb formation due to underwater concreting
4. Chances of soil collapse while concreting affecting quality of concrete
5. Improper fixing of Water bars at joints
12-03-2015 12
Cavity formation at base level of P101 and 102
Impact-
1) Sink hole formation on road
2) Dangerous occurrence
3) Ingress of water and slush inside station
Immediate risk response-
Traffic diversion
Backfilling near affected area
Sink hole filled with concrete
40mm Plate laid over top surface of road
12-03-2015 13
Risk factor-
Likelihood- 0.25
Potential impact- Time- 4 week delay, Cost- Rs 44 Lacs
Risk cost= 44 Lacs x 0.25= 11 Lacs
Risk Time= 4 weeks x 0.25= 1 Week
Mitigation-
1. Installation of bore-well adjacent to the affected D-Walls
2. Lowering the water table with the help of installed bore wells
3. Excavating inside the station box near the affected panel up to a depth of 1m
4. Steel plate fixing at the affected location
5. Micro-concrete grout in the affected panels.
Action taken-
1. Contiguous pile
2. Provision of grouting column around the Contiguous pile
Risk Assessment Matrix
12-03-2015 14
Innovations in Method of Constructions
12-03-2015 15
Utility Diversion
Inter displacement and interchange of Utility diversion Methodology to expedite
Diaphragm wall Construction for streamlining with the planned programme.
Training of one team to take off the diversion works internally to reduce the contractor
dependency risk
Provision of a new opening at Roof for carrying excavation without struts
Elimination of struts at Base level by modified design for D-Walls
By making bund over the guide wall
Keeping the poly-mud level always higher than the ground water level
Installation of bore-well adjacent to the affected D-Walls and lowering water table to
reduce the ingress of water and micro-concrete at 1m at intervals as a control measure to
avoid the risk of sink hole
Excavation Sequence
Soil Collapse in D-Walls
D-Wall Cavity formation
Conclusion and Learnings:-
12-03-2015 16
12-03-2015 17

Contenu connexe

Tendances

Resource scheduling in Construction Projects Using MSP
Resource scheduling in Construction Projects Using MSPResource scheduling in Construction Projects Using MSP
Resource scheduling in Construction Projects Using MSPSagar Kaptan
 
Risk analysis and managements large epc projects
Risk analysis and managements  large epc projectsRisk analysis and managements  large epc projects
Risk analysis and managements large epc projectsPALLA NARASIMHUDU
 
Earned value management
Earned value managementEarned value management
Earned value managementAshif AR
 
Scheduling by using microsoft project 2013
Scheduling by using microsoft project 2013Scheduling by using microsoft project 2013
Scheduling by using microsoft project 2013Chetanraj M
 
Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)Nikhil Jaipurkar
 
EPC_EPCM Business process modelling rendition
EPC_EPCM Business process modelling renditionEPC_EPCM Business process modelling rendition
EPC_EPCM Business process modelling renditionJaswin Sood
 
Project Closure Activities In Project Management PowerPoint Presentation Slides
Project Closure Activities In Project Management PowerPoint Presentation Slides Project Closure Activities In Project Management PowerPoint Presentation Slides
Project Closure Activities In Project Management PowerPoint Presentation Slides SlideTeam
 
Road Project Schedule M S Project.ppt
Road Project Schedule M S Project.pptRoad Project Schedule M S Project.ppt
Road Project Schedule M S Project.pptkilldudeMohan
 
Engineering, Procurement and Construction Contracts for Infrastructure Projec...
Engineering, Procurement and Construction Contracts for Infrastructure Projec...Engineering, Procurement and Construction Contracts for Infrastructure Projec...
Engineering, Procurement and Construction Contracts for Infrastructure Projec...John Buchovecky
 
Insurance o Construction Projects
Insurance o Construction ProjectsInsurance o Construction Projects
Insurance o Construction ProjectsGeorge Koutinas
 

Tendances (20)

Resource scheduling in Construction Projects Using MSP
Resource scheduling in Construction Projects Using MSPResource scheduling in Construction Projects Using MSP
Resource scheduling in Construction Projects Using MSP
 
Risk analysis and managements large epc projects
Risk analysis and managements  large epc projectsRisk analysis and managements  large epc projects
Risk analysis and managements large epc projects
 
Project risk management
Project risk managementProject risk management
Project risk management
 
EIA-process
 EIA-process EIA-process
EIA-process
 
Projects, programmes and portfolios, so what is the difference?
Projects, programmes and portfolios, so what is the difference?Projects, programmes and portfolios, so what is the difference?
Projects, programmes and portfolios, so what is the difference?
 
CPM-Updating
CPM-UpdatingCPM-Updating
CPM-Updating
 
Earned value management
Earned value managementEarned value management
Earned value management
 
Presentation on Project Risk Management
Presentation on Project Risk ManagementPresentation on Project Risk Management
Presentation on Project Risk Management
 
Pep
PepPep
Pep
 
Scheduling by using microsoft project 2013
Scheduling by using microsoft project 2013Scheduling by using microsoft project 2013
Scheduling by using microsoft project 2013
 
Risk management
Risk managementRisk management
Risk management
 
Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)
 
EPC_EPCM Business process modelling rendition
EPC_EPCM Business process modelling renditionEPC_EPCM Business process modelling rendition
EPC_EPCM Business process modelling rendition
 
Microsoft Project
Microsoft ProjectMicrosoft Project
Microsoft Project
 
Project Management Techniques
Project Management TechniquesProject Management Techniques
Project Management Techniques
 
Project Closure Activities In Project Management PowerPoint Presentation Slides
Project Closure Activities In Project Management PowerPoint Presentation Slides Project Closure Activities In Project Management PowerPoint Presentation Slides
Project Closure Activities In Project Management PowerPoint Presentation Slides
 
Road Project Schedule M S Project.ppt
Road Project Schedule M S Project.pptRoad Project Schedule M S Project.ppt
Road Project Schedule M S Project.ppt
 
Engineering, Procurement and Construction Contracts for Infrastructure Projec...
Engineering, Procurement and Construction Contracts for Infrastructure Projec...Engineering, Procurement and Construction Contracts for Infrastructure Projec...
Engineering, Procurement and Construction Contracts for Infrastructure Projec...
 
Epc Vs Epcm
Epc Vs EpcmEpc Vs Epcm
Epc Vs Epcm
 
Insurance o Construction Projects
Insurance o Construction ProjectsInsurance o Construction Projects
Insurance o Construction Projects
 

En vedette

Constructability of ug stations
Constructability of ug stationsConstructability of ug stations
Constructability of ug stationsPALLA NARASIMHUDU
 
Tc iv submited paper risk analysis and managements large epc projects
Tc iv submited paper risk analysis and managements  large epc projectsTc iv submited paper risk analysis and managements  large epc projects
Tc iv submited paper risk analysis and managements large epc projectsPALLA NARASIMHUDU
 
EPC Contracts – Negotiation, Administration and Risk Management
EPC Contracts – Negotiation, Administration and Risk ManagementEPC Contracts – Negotiation, Administration and Risk Management
EPC Contracts – Negotiation, Administration and Risk Managementrockporshe
 
Berezansky Vladimir Trade Sanctions Risk Mitigation Overview
Berezansky Vladimir Trade Sanctions Risk Mitigation OverviewBerezansky Vladimir Trade Sanctions Risk Mitigation Overview
Berezansky Vladimir Trade Sanctions Risk Mitigation OverviewVladimir Berezansky
 
Assessing EPC Contract Risk by using integrated systems
Assessing EPC Contract Risk by using integrated systemsAssessing EPC Contract Risk by using integrated systems
Assessing EPC Contract Risk by using integrated systemsPedram Danesh-Mand
 
Effective Engineering Management in EPC Industry
Effective Engineering Management in EPC IndustryEffective Engineering Management in EPC Industry
Effective Engineering Management in EPC IndustryPMI Chennai Chapter
 
Assessment Of Risk Mitigation
Assessment Of Risk MitigationAssessment Of Risk Mitigation
Assessment Of Risk MitigationEneni Oduwole
 
Advanced program management risk mitigation and management
Advanced program management   risk mitigation and managementAdvanced program management   risk mitigation and management
Advanced program management risk mitigation and managementMarcus Vannini
 
Insurance claims (RISK MANAGEMENT)
Insurance claims (RISK MANAGEMENT)Insurance claims (RISK MANAGEMENT)
Insurance claims (RISK MANAGEMENT)Rishabh Rathi
 
International Financial Management Political Risk
International Financial Management Political RiskInternational Financial Management Political Risk
International Financial Management Political RiskLesly Lising
 
Political risks and management assesment
Political risks and management assesmentPolitical risks and management assesment
Political risks and management assesmentAhmed Adel
 
TYPES OF POLITICAL RISKS
TYPES OF POLITICAL RISKSTYPES OF POLITICAL RISKS
TYPES OF POLITICAL RISKSJuhanahAbir
 
Claims Final (2)
Claims Final (2)Claims Final (2)
Claims Final (2)vijay popat
 
Criterium epc project risks (5.28.13)
Criterium epc project risks (5.28.13)Criterium epc project risks (5.28.13)
Criterium epc project risks (5.28.13)Roland_Nikles
 
Risk Assessment, Mitigation And Management In Epc Projects With Case Study By...
Risk Assessment, Mitigation And Management In Epc Projects With Case Study By...Risk Assessment, Mitigation And Management In Epc Projects With Case Study By...
Risk Assessment, Mitigation And Management In Epc Projects With Case Study By...HIMADRI BANERJI
 
Fundamentals of Claims Management
Fundamentals of Claims ManagementFundamentals of Claims Management
Fundamentals of Claims ManagementSedgwick
 

En vedette (20)

Constructability of ug stations
Constructability of ug stationsConstructability of ug stations
Constructability of ug stations
 
Tc iv submited paper risk analysis and managements large epc projects
Tc iv submited paper risk analysis and managements  large epc projectsTc iv submited paper risk analysis and managements  large epc projects
Tc iv submited paper risk analysis and managements large epc projects
 
EPC Contracts – Negotiation, Administration and Risk Management
EPC Contracts – Negotiation, Administration and Risk ManagementEPC Contracts – Negotiation, Administration and Risk Management
EPC Contracts – Negotiation, Administration and Risk Management
 
Berezansky Vladimir Trade Sanctions Risk Mitigation Overview
Berezansky Vladimir Trade Sanctions Risk Mitigation OverviewBerezansky Vladimir Trade Sanctions Risk Mitigation Overview
Berezansky Vladimir Trade Sanctions Risk Mitigation Overview
 
Assessing EPC Contract Risk by using integrated systems
Assessing EPC Contract Risk by using integrated systemsAssessing EPC Contract Risk by using integrated systems
Assessing EPC Contract Risk by using integrated systems
 
Effective Engineering Management in EPC Industry
Effective Engineering Management in EPC IndustryEffective Engineering Management in EPC Industry
Effective Engineering Management in EPC Industry
 
Assessment Of Risk Mitigation
Assessment Of Risk MitigationAssessment Of Risk Mitigation
Assessment Of Risk Mitigation
 
Project cost management
Project cost management Project cost management
Project cost management
 
Advanced program management risk mitigation and management
Advanced program management   risk mitigation and managementAdvanced program management   risk mitigation and management
Advanced program management risk mitigation and management
 
Political risk assessment
Political risk assessmentPolitical risk assessment
Political risk assessment
 
Insurance claims (RISK MANAGEMENT)
Insurance claims (RISK MANAGEMENT)Insurance claims (RISK MANAGEMENT)
Insurance claims (RISK MANAGEMENT)
 
International Financial Management Political Risk
International Financial Management Political RiskInternational Financial Management Political Risk
International Financial Management Political Risk
 
Political risks and management assesment
Political risks and management assesmentPolitical risks and management assesment
Political risks and management assesment
 
TYPES OF POLITICAL RISKS
TYPES OF POLITICAL RISKSTYPES OF POLITICAL RISKS
TYPES OF POLITICAL RISKS
 
Claims Final (2)
Claims Final (2)Claims Final (2)
Claims Final (2)
 
Criterium epc project risks (5.28.13)
Criterium epc project risks (5.28.13)Criterium epc project risks (5.28.13)
Criterium epc project risks (5.28.13)
 
Risk Assessment, Mitigation And Management In Epc Projects With Case Study By...
Risk Assessment, Mitigation And Management In Epc Projects With Case Study By...Risk Assessment, Mitigation And Management In Epc Projects With Case Study By...
Risk Assessment, Mitigation And Management In Epc Projects With Case Study By...
 
Fundamentals of Claims Management
Fundamentals of Claims ManagementFundamentals of Claims Management
Fundamentals of Claims Management
 
Claim settlement
Claim settlementClaim settlement
Claim settlement
 
Iso 31000
Iso 31000Iso 31000
Iso 31000
 

Similaire à Risk management large epc projects

Mine Haul Road Upgrade Project OZ Minerals Prominent Hill South Australia
Mine Haul Road Upgrade Project OZ Minerals Prominent Hill South AustraliaMine Haul Road Upgrade Project OZ Minerals Prominent Hill South Australia
Mine Haul Road Upgrade Project OZ Minerals Prominent Hill South AustraliaStephen McKnight
 
Project Management Challenges in an Effluent Treatment Plant Construction
Project Management  Challenges in an Effluent Treatment Plant Construction Project Management  Challenges in an Effluent Treatment Plant Construction
Project Management Challenges in an Effluent Treatment Plant Construction PRABHASH GOKARN
 
20220817 Presentation wapda.pptx
20220817 Presentation wapda.pptx20220817 Presentation wapda.pptx
20220817 Presentation wapda.pptxAmirShafiq25
 
151111 Exploring the challenges of underground construction in urban areas_Be...
151111 Exploring the challenges of underground construction in urban areas_Be...151111 Exploring the challenges of underground construction in urban areas_Be...
151111 Exploring the challenges of underground construction in urban areas_Be...Benoit Latapie
 
Whitescape Civil Engineering Case Study
Whitescape Civil Engineering Case StudyWhitescape Civil Engineering Case Study
Whitescape Civil Engineering Case StudyAndrew White
 
Woodrock retrofit 11-13-14
Woodrock retrofit 11-13-14Woodrock retrofit 11-13-14
Woodrock retrofit 11-13-14MCDEP
 
LMPP Final Presentation_FINAL1
LMPP Final Presentation_FINAL1LMPP Final Presentation_FINAL1
LMPP Final Presentation_FINAL1Theodore McNeal
 
Ground Engineering Issues with Alazhar Tunnel Egypt ICE Journal Paper
Ground Engineering Issues with Alazhar Tunnel Egypt  ICE Journal Paper Ground Engineering Issues with Alazhar Tunnel Egypt  ICE Journal Paper
Ground Engineering Issues with Alazhar Tunnel Egypt ICE Journal Paper Tehmas Saeed
 
Method statement tank base concrete pouring
Method statement  tank base concrete pouringMethod statement  tank base concrete pouring
Method statement tank base concrete pouringBharatha Rathnayke
 
Ct2 presentation
Ct2 presentationCt2 presentation
Ct2 presentationqayyum23
 
Typical challenges in tunnelling
Typical challenges in tunnellingTypical challenges in tunnelling
Typical challenges in tunnellingAntti Nykänen
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)Sachin Chitnis
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)Sachin Chitnis
 
Stormwater Wastewater Consolidation
Stormwater Wastewater ConsolidationStormwater Wastewater Consolidation
Stormwater Wastewater ConsolidationFairfax County
 
IRJET- A Review on Box Pushing Technique
IRJET- A Review on Box Pushing TechniqueIRJET- A Review on Box Pushing Technique
IRJET- A Review on Box Pushing TechniqueIRJET Journal
 
ATAL TUNNEL.pptx
ATAL TUNNEL.pptxATAL TUNNEL.pptx
ATAL TUNNEL.pptxAditya Mane
 

Similaire à Risk management large epc projects (20)

Promoting Climate Resilient Rural Infrastructure in Northern Vietnam: Final W...
Promoting Climate Resilient Rural Infrastructure in Northern Vietnam: Final W...Promoting Climate Resilient Rural Infrastructure in Northern Vietnam: Final W...
Promoting Climate Resilient Rural Infrastructure in Northern Vietnam: Final W...
 
Mine Haul Road Upgrade Project OZ Minerals Prominent Hill South Australia
Mine Haul Road Upgrade Project OZ Minerals Prominent Hill South AustraliaMine Haul Road Upgrade Project OZ Minerals Prominent Hill South Australia
Mine Haul Road Upgrade Project OZ Minerals Prominent Hill South Australia
 
Project Management Challenges in an Effluent Treatment Plant Construction
Project Management  Challenges in an Effluent Treatment Plant Construction Project Management  Challenges in an Effluent Treatment Plant Construction
Project Management Challenges in an Effluent Treatment Plant Construction
 
JUNDEE MAR TEJEDO
JUNDEE MAR TEJEDOJUNDEE MAR TEJEDO
JUNDEE MAR TEJEDO
 
20220817 Presentation wapda.pptx
20220817 Presentation wapda.pptx20220817 Presentation wapda.pptx
20220817 Presentation wapda.pptx
 
151111 Exploring the challenges of underground construction in urban areas_Be...
151111 Exploring the challenges of underground construction in urban areas_Be...151111 Exploring the challenges of underground construction in urban areas_Be...
151111 Exploring the challenges of underground construction in urban areas_Be...
 
Whitescape Civil Engineering Case Study
Whitescape Civil Engineering Case StudyWhitescape Civil Engineering Case Study
Whitescape Civil Engineering Case Study
 
Curricula Vitae - NVB
Curricula Vitae - NVBCurricula Vitae - NVB
Curricula Vitae - NVB
 
Woodrock retrofit 11-13-14
Woodrock retrofit 11-13-14Woodrock retrofit 11-13-14
Woodrock retrofit 11-13-14
 
LMPP Final Presentation_FINAL1
LMPP Final Presentation_FINAL1LMPP Final Presentation_FINAL1
LMPP Final Presentation_FINAL1
 
Ground Engineering Issues with Alazhar Tunnel Egypt ICE Journal Paper
Ground Engineering Issues with Alazhar Tunnel Egypt  ICE Journal Paper Ground Engineering Issues with Alazhar Tunnel Egypt  ICE Journal Paper
Ground Engineering Issues with Alazhar Tunnel Egypt ICE Journal Paper
 
Method statement tank base concrete pouring
Method statement  tank base concrete pouringMethod statement  tank base concrete pouring
Method statement tank base concrete pouring
 
Ct2 presentation
Ct2 presentationCt2 presentation
Ct2 presentation
 
Typical challenges in tunnelling
Typical challenges in tunnellingTypical challenges in tunnelling
Typical challenges in tunnelling
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 
Stormwater Wastewater Consolidation
Stormwater Wastewater ConsolidationStormwater Wastewater Consolidation
Stormwater Wastewater Consolidation
 
Swwe300615 presentation
Swwe300615 presentationSwwe300615 presentation
Swwe300615 presentation
 
IRJET- A Review on Box Pushing Technique
IRJET- A Review on Box Pushing TechniqueIRJET- A Review on Box Pushing Technique
IRJET- A Review on Box Pushing Technique
 
ATAL TUNNEL.pptx
ATAL TUNNEL.pptxATAL TUNNEL.pptx
ATAL TUNNEL.pptx
 

Dernier

Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgsaravananr517913
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
Crushers to screens in aggregate production
Crushers to screens in aggregate productionCrushers to screens in aggregate production
Crushers to screens in aggregate productionChinnuNinan
 
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Erbil Polytechnic University
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
DM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in projectDM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in projectssuserb6619e
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - GuideGOPINATHS437943
 
Ch10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfCh10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfChristianCDAM
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Coursebim.edu.pl
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm Systemirfanmechengr
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating SystemRashmi Bhat
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communicationpanditadesh123
 

Dernier (20)

Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
Crushers to screens in aggregate production
Crushers to screens in aggregate productionCrushers to screens in aggregate production
Crushers to screens in aggregate production
 
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
DM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in projectDM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in project
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - Guide
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
Ch10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfCh10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdf
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Course
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm System
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating System
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communication
 

Risk management large epc projects

  • 1. Project Execution 12-03-2015 1 one step towards project management excellence... Palla Narasimhudu
  • 3. 12-03-2015 3 Objectives:- Identify, Analyze the Risk Factors Perform Qualitative and Quantitative Analysis Plan for Risk Mitigation Monitor and Control throughout the project life cycle Control of future risks and Pro-activeness Develop Risk Response strategies and Contingency plans for unexpected Risk register for further similar projects
  • 5. Risks in EPC Project:- 12-03-2015 5 Engineering • Project Feasibility • Viability • Technology selection • Design • Joint venture • Geographical conditions • Funding Construction •Utility and Traffic diversion* •Survey works •Diaphragm Walling* •Excavation •Decking and steel struts* •Tunnel mining and cross passage* •Accidents/ Losses of lives •Non- availability of manpower •Confined space •Quality •Clarity less communication •Soil condition •Bad Infrastructure Procurement • Underestimate the need • Quality supplier selection • Offers fail to meet the needs • Insufficient funds Unforeseen • Sudden collapse of soil • Heavy rains and floods • Sudden settlements • Extreme temperature Execution • Delay in land acquisition • Inexperience project management/ team • Ineffective decomposition of work • Regulatory issues • Failure to forecast • Design changes • Stake holder management • Safety/ Environmental • Political • Decision making • Currency / commodities fluctuation *varies for different projects
  • 6. 228m 24m19m 228m 24m19m 228m 24m19m EGMORE NEHRU PARK KMC PACHAIPPA SHENOY NAGAR Station Length = 228m + 228m + 228m = 684m Tunnel Length = 947m + 573m + 898m + 966 = 3384m 22m 22m 24m Cross Passage = 3nos + 2nos + 3nos + 3nos = 11nos 12-03-2015 6 Case Study- UAA-04 CMRL Project
  • 7. Risk identification and action plans- UAA-04 12-03-2015 7
  • 8. 12-03-2015 8 Existing Diverted-1 Diverted-2 Impact- Road diversion and D-Wall Construction Mitigation- 1) Stage wise diversion 2) Interchange and inter-displacement of utilities for D-Wall construction Risk- Space constraint in Utility diversion Utilities running across station
  • 9. 12-03-2015 9 Risk- Space constraint in traffic diversion Impact- D-Wall Construction Shaft Handover for TBM launching Mitigation- 1) Stage wise diversion 2) Decking for traffic
  • 10. 12-03-2015 10 UG Metro Station - Plan 20m 20m 40m 60m Risk- Excavation with strut Impact- Possible Delay in shaft handover for TBM launch Mitigation- 1) D-Wall design change without strut 2) Modified excavation sequence of 12m max with additional centre opening 12m
  • 11. Post Risk Analysis- • Poly-mud level was 1.5mt below the Ground Level • Due to heavy rain there was contamination of seepage water and polymer properties may reduce which may be insufficient to withstand the top loose strata • Continuous rain, rise in ground water level immediately below the guide wall due to the heavy rain, higher than the poly-mud level • Vibration due to chiselling 12-03-2015 11 Diaphragm Wall Trench Collapse- P147 Impact- 1) Progress hamper for other panels 2) Plan for mitigation Mitigation- 1. Bund making over the guide wall and Keeping poly-mud level always higher than the GW level 2. Equal quantity of crusher dust was stoked for immediate risk mitigation. Immediate risk response- Collapsed trench filled with M5 grade concrete Bund Risk factor- Likelihood- 0.25 Potential impact- Time- 1 week delay, Cost- Rs 14 Lacs Risk cost= 14 Lacs x 0.25= 3.5 Lacs Risk Time= 1 week x 0.25= 0.25 Week
  • 12. Post Risk Analysis- 1. Volume losses due to water ingress from the joint locations 2. Under cut/ Over cut while grabbing of D-Wall Panels 3. Honey comb formation due to underwater concreting 4. Chances of soil collapse while concreting affecting quality of concrete 5. Improper fixing of Water bars at joints 12-03-2015 12 Cavity formation at base level of P101 and 102 Impact- 1) Sink hole formation on road 2) Dangerous occurrence 3) Ingress of water and slush inside station Immediate risk response- Traffic diversion Backfilling near affected area Sink hole filled with concrete 40mm Plate laid over top surface of road
  • 13. 12-03-2015 13 Risk factor- Likelihood- 0.25 Potential impact- Time- 4 week delay, Cost- Rs 44 Lacs Risk cost= 44 Lacs x 0.25= 11 Lacs Risk Time= 4 weeks x 0.25= 1 Week Mitigation- 1. Installation of bore-well adjacent to the affected D-Walls 2. Lowering the water table with the help of installed bore wells 3. Excavating inside the station box near the affected panel up to a depth of 1m 4. Steel plate fixing at the affected location 5. Micro-concrete grout in the affected panels. Action taken- 1. Contiguous pile 2. Provision of grouting column around the Contiguous pile
  • 15. Innovations in Method of Constructions 12-03-2015 15 Utility Diversion Inter displacement and interchange of Utility diversion Methodology to expedite Diaphragm wall Construction for streamlining with the planned programme. Training of one team to take off the diversion works internally to reduce the contractor dependency risk Provision of a new opening at Roof for carrying excavation without struts Elimination of struts at Base level by modified design for D-Walls By making bund over the guide wall Keeping the poly-mud level always higher than the ground water level Installation of bore-well adjacent to the affected D-Walls and lowering water table to reduce the ingress of water and micro-concrete at 1m at intervals as a control measure to avoid the risk of sink hole Excavation Sequence Soil Collapse in D-Walls D-Wall Cavity formation