10 Prefab Buildings Surprisingly
Built in Less than a Month
The kindergarten originally
had traditional stick-built
structures, which builders
replaced with steel modular
containers in 2015. The
renovation was completed
in January 2016 and included
34 modules. Materials were
carefully selected to surpass
health and safety codes, with
total costs coming to $1.5
million USD.
Ibaraki Kindergarten,
Japan
Assembled in 30 days.
Little Hero was Melbourne’s
first unitized building project.
In the heart of the Central
Business District, it features
residential and commercial
units. Designed by architect
Nonda Katsalidis.
Little Hero Apartments,
Australia
Construction took 30 days.
As a 1,130 square-foot
family home made of three
containers, this project is
much smaller than others
on the list. It came with wiring,
plumbing, and kitchen &
bathroom features installed.
Total costs came to just
$221,800 USD, plus
$1,500 for shipping
per container.
Diamond Harbour House,
New Zealand
Built in 14 days.
Builders completed
New York’s first building
made entirely from modular
units in 2014. The Stack’s
22 rental apartments started
at $1,755 for a studio, to
$3,990 for a three bedroom
apartment. Construction
costs were $7 million.
The Stack Apartments,
USA
Assembled in 19 days.
In March 2016, the Crowne
Plaza Hotel built an extension
using 252 containers
manufactured in Beijing. The
units are typhoon and 9.0
magnitude earthquake resistant,
and all building materials
are BCA Green Mark Certified.
Crowne Plaza Extension,
Singapore
Assembled in 26 days.
Most haven’t heard of
Changsha, a city of about
seven-and-a-half-million
people in south-central
China. However, it’s become
the site of Broad Sustainable
Building’s (BSB) most ambitious
prefab buildings projects,
including the Mini Sky City.
The 57-story skyscraper was
built with more than 2,
700 modules.
Mini Sky City,
China
Built in 19 days.
Tapping into Queensland’s
$8.8 billion tourism economy,
Kings Park Accommodations
used 90% recycled modular
components to construct nine
large apartment units. The 36
modules, manufactured in
Shanghai, came to US$461
per square meter.
Kings Park
Accommodations,
Australia
Assembled in 7 days.
Another BSB project in
Changsha, the 30-story
T30 Hotel is reportedly much
more energy efficient than
similar projects and is
magnitude 9.0 earthquake
resistant. 200 workers
erected the structure
in record speed.
T30 Hotel,
China
Assembled in 15 days.
Designed by Portuguese
architect Samuel Gonzales,
the Gomos System house
uses modules much different
from other prefab buildings
on this list. The trapezoidal
units, prefabricated off-site,
are made of reinforced concrete
and can be linked together
horizontally.
Gomos Modular Home,
Portugal
Built in 3 days.
Hickory Group’s One9
project is the second Melbourne
building on this list. The
residential apartment consists
of 36 prefabricated modules
that came complete from the
factory with facades, timber
floors, carpets and balconies.
It has a 6-star energy rating.
One9 Apartments,
Australia
Assembled in 5 days.
/Prefabmarket /Prefabmarket /Prefabmarket www.prefabmarket.com

Contenu connexe

Tendances

House of the week providence condo offers spacious living in historic indust...
House of the week  providence condo offers spacious living in historic indust...House of the week  providence condo offers spacious living in historic indust...
House of the week providence condo offers spacious living in historic indust...Lila Delman Real Estate
 
Documento qualità bassa
Documento qualità bassaDocumento qualità bassa
Documento qualità bassasergio gippetto
 
Schneider Associates Launch of the Week: 2 Charlesgate West
Schneider Associates Launch of the Week: 2 Charlesgate WestSchneider Associates Launch of the Week: 2 Charlesgate West
Schneider Associates Launch of the Week: 2 Charlesgate WestMonique Derico
 
Conservation By Kimaya New
Conservation By Kimaya NewConservation By Kimaya New
Conservation By Kimaya Newkimaya1404
 
The Dynamic tower of Dubai (The Vinci Tower)
The Dynamic tower of Dubai (The Vinci Tower)The Dynamic tower of Dubai (The Vinci Tower)
The Dynamic tower of Dubai (The Vinci Tower)shafim khan
 
Ideas for Eleanor Park Site
Ideas for Eleanor Park SiteIdeas for Eleanor Park Site
Ideas for Eleanor Park SiteGary Mitchell
 
12 Case Studies: Adaptive Reuse of Industrial Buildings
12 Case Studies: Adaptive Reuse of Industrial Buildings12 Case Studies: Adaptive Reuse of Industrial Buildings
12 Case Studies: Adaptive Reuse of Industrial BuildingsSeventh Hill
 
LECTURE 33 NORMAN FOSTER - Copy.pptx
LECTURE 33 NORMAN FOSTER - Copy.pptxLECTURE 33 NORMAN FOSTER - Copy.pptx
LECTURE 33 NORMAN FOSTER - Copy.pptxAnwesha Baruah
 
Rock Prairie Road Corridor Transportation Projects
Rock Prairie Road Corridor Transportation ProjectsRock Prairie Road Corridor Transportation Projects
Rock Prairie Road Corridor Transportation ProjectsCity of College Station
 
Richard G Novitsky Portfolio
Richard G Novitsky PortfolioRichard G Novitsky Portfolio
Richard G Novitsky Portfoliobuckostuco
 
Pivotingskyscrapers
PivotingskyscrapersPivotingskyscrapers
Pivotingskyscrapersireportergr
 
Academic work_Portfolio
Academic work_PortfolioAcademic work_Portfolio
Academic work_PortfolioNazia Farnaz
 
Design and fabrication of water fuel bike
Design and fabrication of water fuel bikeDesign and fabrication of water fuel bike
Design and fabrication of water fuel bikeELDHO AVARACHAN
 

Tendances (18)

CV
CVCV
CV
 
House of the week providence condo offers spacious living in historic indust...
House of the week  providence condo offers spacious living in historic indust...House of the week  providence condo offers spacious living in historic indust...
House of the week providence condo offers spacious living in historic indust...
 
Documento qualità bassa
Documento qualità bassaDocumento qualità bassa
Documento qualità bassa
 
Ourbuildingproject
OurbuildingprojectOurbuildingproject
Ourbuildingproject
 
Schneider Associates Launch of the Week: 2 Charlesgate West
Schneider Associates Launch of the Week: 2 Charlesgate WestSchneider Associates Launch of the Week: 2 Charlesgate West
Schneider Associates Launch of the Week: 2 Charlesgate West
 
Conservation By Kimaya New
Conservation By Kimaya NewConservation By Kimaya New
Conservation By Kimaya New
 
The Dynamic tower of Dubai (The Vinci Tower)
The Dynamic tower of Dubai (The Vinci Tower)The Dynamic tower of Dubai (The Vinci Tower)
The Dynamic tower of Dubai (The Vinci Tower)
 
Ideas for Eleanor Park Site
Ideas for Eleanor Park SiteIdeas for Eleanor Park Site
Ideas for Eleanor Park Site
 
12 Case Studies: Adaptive Reuse of Industrial Buildings
12 Case Studies: Adaptive Reuse of Industrial Buildings12 Case Studies: Adaptive Reuse of Industrial Buildings
12 Case Studies: Adaptive Reuse of Industrial Buildings
 
Concord Cemetery
Concord CemeteryConcord Cemetery
Concord Cemetery
 
LECTURE 33 NORMAN FOSTER - Copy.pptx
LECTURE 33 NORMAN FOSTER - Copy.pptxLECTURE 33 NORMAN FOSTER - Copy.pptx
LECTURE 33 NORMAN FOSTER - Copy.pptx
 
Rock Prairie Road Corridor Transportation Projects
Rock Prairie Road Corridor Transportation ProjectsRock Prairie Road Corridor Transportation Projects
Rock Prairie Road Corridor Transportation Projects
 
Richard G Novitsky Portfolio
Richard G Novitsky PortfolioRichard G Novitsky Portfolio
Richard G Novitsky Portfolio
 
+
++
+
 
Pivotingskyscrapers
PivotingskyscrapersPivotingskyscrapers
Pivotingskyscrapers
 
Pivotingskyscrapers
PivotingskyscrapersPivotingskyscrapers
Pivotingskyscrapers
 
Academic work_Portfolio
Academic work_PortfolioAcademic work_Portfolio
Academic work_Portfolio
 
Design and fabrication of water fuel bike
Design and fabrication of water fuel bikeDesign and fabrication of water fuel bike
Design and fabrication of water fuel bike
 

Similaire à Fast Modular Building

Shanghai office tower (salsa)
Shanghai office tower (salsa)Shanghai office tower (salsa)
Shanghai office tower (salsa)salsa moyara
 
Joyce Lee_2016_ARCADIS_CV
Joyce Lee_2016_ARCADIS_CVJoyce Lee_2016_ARCADIS_CV
Joyce Lee_2016_ARCADIS_CVJoyce Lee
 
Joyce Lee_2016_ARCADIS_CV
Joyce Lee_2016_ARCADIS_CVJoyce Lee_2016_ARCADIS_CV
Joyce Lee_2016_ARCADIS_CVJoyce Lee
 
The_Marina_Bay_Sands_Complex_in_Singapore_A_Modern.pdf
The_Marina_Bay_Sands_Complex_in_Singapore_A_Modern.pdfThe_Marina_Bay_Sands_Complex_in_Singapore_A_Modern.pdf
The_Marina_Bay_Sands_Complex_in_Singapore_A_Modern.pdfRonnyCholca
 
The_Marina_Bay_Sands_Complex_in_Singapore_A_Modern.pdf
The_Marina_Bay_Sands_Complex_in_Singapore_A_Modern.pdfThe_Marina_Bay_Sands_Complex_in_Singapore_A_Modern.pdf
The_Marina_Bay_Sands_Complex_in_Singapore_A_Modern.pdfJazminJemal
 
Recent Project List 4-2015
Recent Project List 4-2015Recent Project List 4-2015
Recent Project List 4-2015Chip Lowe
 
Shanghai tower
Shanghai towerShanghai tower
Shanghai towerAmnarao3
 
Petronas Twin Towers
Petronas Twin TowersPetronas Twin Towers
Petronas Twin Towersmatsrock
 
Projects excuted 001
Projects excuted 001Projects excuted 001
Projects excuted 001SURESH CHAWLA
 
Architectural concept of henna hotel
Architectural concept of henna hotelArchitectural concept of henna hotel
Architectural concept of henna hotelAnupama Krishnan
 
Final wisma lee rubber compilation (new)
Final wisma lee rubber compilation (new)Final wisma lee rubber compilation (new)
Final wisma lee rubber compilation (new)WC Yan
 
Asian architecture case study paper_8d_house
Asian architecture case study paper_8d_houseAsian architecture case study paper_8d_house
Asian architecture case study paper_8d_houseChengWei Chia
 
Asian Architecture: 8D House Case Study Paper
Asian Architecture: 8D House Case Study PaperAsian Architecture: 8D House Case Study Paper
Asian Architecture: 8D House Case Study Paperdouglasloon
 
Leeser Architecture 2016
Leeser Architecture 2016Leeser Architecture 2016
Leeser Architecture 2016Nena Miller
 
Leeser Architecture 2016
Leeser Architecture 2016Leeser Architecture 2016
Leeser Architecture 2016Nena Miller
 
architectural concept
architectural conceptarchitectural concept
architectural conceptHezhaHaydar
 

Similaire à Fast Modular Building (20)

Shanghai office tower (salsa)
Shanghai office tower (salsa)Shanghai office tower (salsa)
Shanghai office tower (salsa)
 
Joyce Lee_2016_ARCADIS_CV
Joyce Lee_2016_ARCADIS_CVJoyce Lee_2016_ARCADIS_CV
Joyce Lee_2016_ARCADIS_CV
 
Joyce Lee_2016_ARCADIS_CV
Joyce Lee_2016_ARCADIS_CVJoyce Lee_2016_ARCADIS_CV
Joyce Lee_2016_ARCADIS_CV
 
The_Marina_Bay_Sands_Complex_in_Singapore_A_Modern.pdf
The_Marina_Bay_Sands_Complex_in_Singapore_A_Modern.pdfThe_Marina_Bay_Sands_Complex_in_Singapore_A_Modern.pdf
The_Marina_Bay_Sands_Complex_in_Singapore_A_Modern.pdf
 
The_Marina_Bay_Sands_Complex_in_Singapore_A_Modern.pdf
The_Marina_Bay_Sands_Complex_in_Singapore_A_Modern.pdfThe_Marina_Bay_Sands_Complex_in_Singapore_A_Modern.pdf
The_Marina_Bay_Sands_Complex_in_Singapore_A_Modern.pdf
 
Presentation1
Presentation1Presentation1
Presentation1
 
Recent Project List 4-2015
Recent Project List 4-2015Recent Project List 4-2015
Recent Project List 4-2015
 
Shanghai tower
Shanghai towerShanghai tower
Shanghai tower
 
Petronas Twin Towers
Petronas Twin TowersPetronas Twin Towers
Petronas Twin Towers
 
Projects excuted 001
Projects excuted 001Projects excuted 001
Projects excuted 001
 
Architectural concept of henna hotel
Architectural concept of henna hotelArchitectural concept of henna hotel
Architectural concept of henna hotel
 
solus4_Arch_Portfolio01
solus4_Arch_Portfolio01solus4_Arch_Portfolio01
solus4_Arch_Portfolio01
 
Final wisma lee rubber compilation (new)
Final wisma lee rubber compilation (new)Final wisma lee rubber compilation (new)
Final wisma lee rubber compilation (new)
 
Asian architecture case study paper_8d_house
Asian architecture case study paper_8d_houseAsian architecture case study paper_8d_house
Asian architecture case study paper_8d_house
 
Asian Architecture: 8D House Case Study Paper
Asian Architecture: 8D House Case Study PaperAsian Architecture: 8D House Case Study Paper
Asian Architecture: 8D House Case Study Paper
 
Shanghai tower
Shanghai towerShanghai tower
Shanghai tower
 
International
InternationalInternational
International
 
Leeser Architecture 2016
Leeser Architecture 2016Leeser Architecture 2016
Leeser Architecture 2016
 
Leeser Architecture 2016
Leeser Architecture 2016Leeser Architecture 2016
Leeser Architecture 2016
 
architectural concept
architectural conceptarchitectural concept
architectural concept
 

Dernier

Call Girls In Dev kunj Delhi 9654467111 Short 1500 Night 6000
Call Girls In Dev kunj Delhi 9654467111 Short 1500 Night 6000Call Girls In Dev kunj Delhi 9654467111 Short 1500 Night 6000
Call Girls In Dev kunj Delhi 9654467111 Short 1500 Night 6000Sapana Sha
 
The 15 Minute Breakdown: 2024 Beauty Marketing Study
The 15 Minute Breakdown: 2024 Beauty Marketing StudyThe 15 Minute Breakdown: 2024 Beauty Marketing Study
The 15 Minute Breakdown: 2024 Beauty Marketing StudyTinuiti
 
Digital Business Strategy - How Food Brands Compete Through Technology
Digital Business Strategy - How Food Brands Compete Through TechnologyDigital Business Strategy - How Food Brands Compete Through Technology
Digital Business Strategy - How Food Brands Compete Through TechnologyJoanne Cabaero
 
The 15 Minute Breakdown: 2024 Beauty Marketing Study
The 15 Minute Breakdown: 2024 Beauty Marketing StudyThe 15 Minute Breakdown: 2024 Beauty Marketing Study
The 15 Minute Breakdown: 2024 Beauty Marketing StudyKatherineBishop4
 
Indian Call Girl In Dubai #$# O5634O3O18 #$# Dubai Call Girl
Indian Call Girl In Dubai #$# O5634O3O18 #$# Dubai Call GirlIndian Call Girl In Dubai #$# O5634O3O18 #$# Dubai Call Girl
Indian Call Girl In Dubai #$# O5634O3O18 #$# Dubai Call GirlAroojKhan71
 
call Now 9811711561 Cash Payment乂 Call Girls in Dwarka
call Now 9811711561 Cash Payment乂 Call Girls in Dwarkacall Now 9811711561 Cash Payment乂 Call Girls in Dwarka
call Now 9811711561 Cash Payment乂 Call Girls in Dwarkavikas rana
 
Top Rated Pune Call Girls Talegaon Dabhade ⟟ 6297143586 ⟟ Call Me For Genuin...
Top Rated  Pune Call Girls Talegaon Dabhade ⟟ 6297143586 ⟟ Call Me For Genuin...Top Rated  Pune Call Girls Talegaon Dabhade ⟟ 6297143586 ⟟ Call Me For Genuin...
Top Rated Pune Call Girls Talegaon Dabhade ⟟ 6297143586 ⟟ Call Me For Genuin...Call Girls in Nagpur High Profile
 
Film= Dubai Call Girls O525547819 Call Girls Dubai Whsatapp
Film= Dubai Call Girls O525547819 Call Girls Dubai WhsatappFilm= Dubai Call Girls O525547819 Call Girls Dubai Whsatapp
Film= Dubai Call Girls O525547819 Call Girls Dubai Whsatappkojalkojal131
 

Dernier (8)

Call Girls In Dev kunj Delhi 9654467111 Short 1500 Night 6000
Call Girls In Dev kunj Delhi 9654467111 Short 1500 Night 6000Call Girls In Dev kunj Delhi 9654467111 Short 1500 Night 6000
Call Girls In Dev kunj Delhi 9654467111 Short 1500 Night 6000
 
The 15 Minute Breakdown: 2024 Beauty Marketing Study
The 15 Minute Breakdown: 2024 Beauty Marketing StudyThe 15 Minute Breakdown: 2024 Beauty Marketing Study
The 15 Minute Breakdown: 2024 Beauty Marketing Study
 
Digital Business Strategy - How Food Brands Compete Through Technology
Digital Business Strategy - How Food Brands Compete Through TechnologyDigital Business Strategy - How Food Brands Compete Through Technology
Digital Business Strategy - How Food Brands Compete Through Technology
 
The 15 Minute Breakdown: 2024 Beauty Marketing Study
The 15 Minute Breakdown: 2024 Beauty Marketing StudyThe 15 Minute Breakdown: 2024 Beauty Marketing Study
The 15 Minute Breakdown: 2024 Beauty Marketing Study
 
Indian Call Girl In Dubai #$# O5634O3O18 #$# Dubai Call Girl
Indian Call Girl In Dubai #$# O5634O3O18 #$# Dubai Call GirlIndian Call Girl In Dubai #$# O5634O3O18 #$# Dubai Call Girl
Indian Call Girl In Dubai #$# O5634O3O18 #$# Dubai Call Girl
 
call Now 9811711561 Cash Payment乂 Call Girls in Dwarka
call Now 9811711561 Cash Payment乂 Call Girls in Dwarkacall Now 9811711561 Cash Payment乂 Call Girls in Dwarka
call Now 9811711561 Cash Payment乂 Call Girls in Dwarka
 
Top Rated Pune Call Girls Talegaon Dabhade ⟟ 6297143586 ⟟ Call Me For Genuin...
Top Rated  Pune Call Girls Talegaon Dabhade ⟟ 6297143586 ⟟ Call Me For Genuin...Top Rated  Pune Call Girls Talegaon Dabhade ⟟ 6297143586 ⟟ Call Me For Genuin...
Top Rated Pune Call Girls Talegaon Dabhade ⟟ 6297143586 ⟟ Call Me For Genuin...
 
Film= Dubai Call Girls O525547819 Call Girls Dubai Whsatapp
Film= Dubai Call Girls O525547819 Call Girls Dubai WhsatappFilm= Dubai Call Girls O525547819 Call Girls Dubai Whsatapp
Film= Dubai Call Girls O525547819 Call Girls Dubai Whsatapp
 

Fast Modular Building

  • 1. 10 Prefab Buildings Surprisingly Built in Less than a Month
  • 2. The kindergarten originally had traditional stick-built structures, which builders replaced with steel modular containers in 2015. The renovation was completed in January 2016 and included 34 modules. Materials were carefully selected to surpass health and safety codes, with total costs coming to $1.5 million USD. Ibaraki Kindergarten, Japan Assembled in 30 days.
  • 3. Little Hero was Melbourne’s first unitized building project. In the heart of the Central Business District, it features residential and commercial units. Designed by architect Nonda Katsalidis. Little Hero Apartments, Australia Construction took 30 days.
  • 4. As a 1,130 square-foot family home made of three containers, this project is much smaller than others on the list. It came with wiring, plumbing, and kitchen & bathroom features installed. Total costs came to just $221,800 USD, plus $1,500 for shipping per container. Diamond Harbour House, New Zealand Built in 14 days.
  • 5. Builders completed New York’s first building made entirely from modular units in 2014. The Stack’s 22 rental apartments started at $1,755 for a studio, to $3,990 for a three bedroom apartment. Construction costs were $7 million. The Stack Apartments, USA Assembled in 19 days.
  • 6. In March 2016, the Crowne Plaza Hotel built an extension using 252 containers manufactured in Beijing. The units are typhoon and 9.0 magnitude earthquake resistant, and all building materials are BCA Green Mark Certified. Crowne Plaza Extension, Singapore Assembled in 26 days.
  • 7. Most haven’t heard of Changsha, a city of about seven-and-a-half-million people in south-central China. However, it’s become the site of Broad Sustainable Building’s (BSB) most ambitious prefab buildings projects, including the Mini Sky City. The 57-story skyscraper was built with more than 2, 700 modules. Mini Sky City, China Built in 19 days.
  • 8. Tapping into Queensland’s $8.8 billion tourism economy, Kings Park Accommodations used 90% recycled modular components to construct nine large apartment units. The 36 modules, manufactured in Shanghai, came to US$461 per square meter. Kings Park Accommodations, Australia Assembled in 7 days.
  • 9. Another BSB project in Changsha, the 30-story T30 Hotel is reportedly much more energy efficient than similar projects and is magnitude 9.0 earthquake resistant. 200 workers erected the structure in record speed. T30 Hotel, China Assembled in 15 days.
  • 10. Designed by Portuguese architect Samuel Gonzales, the Gomos System house uses modules much different from other prefab buildings on this list. The trapezoidal units, prefabricated off-site, are made of reinforced concrete and can be linked together horizontally. Gomos Modular Home, Portugal Built in 3 days.
  • 11. Hickory Group’s One9 project is the second Melbourne building on this list. The residential apartment consists of 36 prefabricated modules that came complete from the factory with facades, timber floors, carpets and balconies. It has a 6-star energy rating. One9 Apartments, Australia Assembled in 5 days.