5. Design Example of Precast Connection
6. Example of Precast Reinforced Concrete Building
7. Example of Precast Prestressed Concrete Building
8. Example of Precast Prestressed Concrete Stadium
9. Structural Damage in Past Earthquake
Resume	
In Japan, catfish is being handed
down to cause earthquakes	
44
ReinforcedconcretePrecastandprestressedconcreteReinforcedconcretePrecastandprestressedconcrete Reinforced concrete Precast and prestressed concrete Reinforced concrete Precast and prestressed concrete Reinforced concrete
Part 2 - 5. Design Example of Precast Connection	
Design of the interface between half-precast beam unit and cast-in-situ floor
slab for shear
Design for shear under service load
condition
Design for shear at ultimate limit state for
seismic loading
Roughened concrete surface for better
shear resistance (5 mm roughness)
Half precast beam unit
with protruded stirrups 45
ReinforcedconcretePrecastandprestressedconcreteReinforcedconcretePrecastandprestressedconcrete Reinforced concrete Precast and prestressed concrete Reinforced concrete Precast and prestressed concrete Reinforced concrete
Part 2 - 5. Design Example of Precast Connection	
Cast-in-place concrete
4-D32 bars
70 mm
Precast half beam unit
4-D32 bars
b=500 mm
80 mm
520 mm
250 mm
D=800 mm
80 mm
x
B=2100 mm
G
5 mm roughness
D+L=242+113=355 kNm 355 kNm
D+L=95+48=143kNm1450l mmΔ =
213 kN
213 kN
Moment diagragm
Shear force diagragm
138 kN 564 kN
Moment diagragm
Shear force diagragm
2200l mmΔ =
1444 kNm
1100 kNm
Clear beam length 7250 mm
Searvice load condition
Ultimate limit state for seismic load condition
Concrete strength Precast unit
Cast-in-situ
'
24cf MPa=
Longitudinal reinforcement D32 bar
Nomical yield strength
Over strength 1.25yo yσ σ=
390y MPaσ =
Stirrup 4-D13, spacing 150 mm
Slab reinforcement D10 bar
295y MPaσ =
1.3yo yσ σ=
Nomical yield strength
Over strength
Nomical yield strength 295y MPaσ =
t
Design of the interface between half-precast beam unit and cast-in-situ floor
slab for shear
Design interface	
 Design range	
Design range	
46
ReinforcedconcretePrecastandprestressedconcreteReinforcedconcretePrecastandprestressedconcrete Reinforced concrete Precast and prestressed concrete Reinforced concrete Precast and prestressed concrete Reinforced concrete
3 7
10
2
213 10 7.53 10
500 4.483 10
0.716 /
d y
xy
V S
bI
N mm
τ
× × ×
= =
× ×
=
2 2
0.5 0.5 ( )
0.5 1.0(0.00667 295 0)
0.999 / 0.716 /
u s y op
N mm N mm
τ µ σ σ= +
= × × +
= >
For service load condition
Design shear stress (elastic theory)
0.5 times of shear
friction strength
(slip < 0.5mm)
Part 2 - 5. Design Example of Precast Connection	
Design of the interface between half-precast beam unit and cast-in-situ floor
Eq. 5
0.5 mm roughness
1.0µ =
47
ReinforcedconcretePrecastandprestressedconcreteReinforcedconcretePrecastandprestressedconcrete Reinforced concrete Precast and prestressed concrete Reinforced concrete Precast and prestressed concrete Reinforced concrete
4 794 1.25 390
10 127 1.3 295
2035000
T
N
Δ = × × ×
+ × × ×
=
2 2
/( )
2035000/(500 2200)
1.85 / 2.00 /
xy T b l
N mm N mm
τ = Δ Δ
= ×
= <
Tension force change
2
( )
1.0(0.00667 295 0)
2.00 /
u s y op
N mm
τ µ σ σ= +
= × +
=
Design shear stress Shear friction strength
For ultimate limit state under earthquake load
Over strength factor of Re-bar
Yield strength
Part 2 - 5. Design Example of Precast Connection	
Design of the interface between half-precast beam unit and cast-in-situ floor
(5)
48
ReinforcedconcretePrecastandprestressedconcreteReinforcedconcretePrecastandprestressedconcrete Reinforced concrete Precast and prestressed concrete Reinforced concrete Precast and prestressed concrete Reinforced concrete
Wall-beam unit
Columnunit
ColumnunitColumnunit
ColumnunitColumnunit
8 shear keys
=length of a shear key at its bottom (200mm)
=width of a shear key (150mm)
ix
iw345y MPaσ =
Beam reinforcement 8 D25 bars
+ Slab bars 10 D13 bars
295y MPaσ =
Wall-beam unit
Vertical reinforcement
22 D25 bars
D25 bar
Horizontal
reinforcement
28 D13 bars
D13 bar
Concrete '
36cf MPa=
11500wl mm= Design moment, shear and wall
axial force for lateral seismic load
75220dM kNm=
92850dM kNm=
111500dM kNm=
2900wh mm=
2900wh mm=
2900wh mm=
6430dhV kN=
6080dhV kN=
5660dhV kN=
2309dN kN=
58810dM kNm=
Horizontal joint
Vertical joint
Part 2 - 5. Design Example of Precast Connection	
Design of precast wall system Structural analysis is conducted
as a monolithic construction
49
ReinforcedconcretePrecastandprestressedconcreteReinforcedconcretePrecastandprestressedconcrete Reinforced concrete Precast and prestressed concrete Reinforced concrete Precast and prestressed concrete Reinforced concrete
whV
whV
wh
wh
wh
wl
w
wh
w
h
V
l
wl
uT
ccV
(a) Truss mechanism and induced force to horizontal bars (b) Interstory arch mechanism
Compression stress field
Horizontal shear Vwh is resisted by shear friction
Compressive force of arch is pull back by beam
bars, a part of wall horizontal bars and slab bars
Horizontal component of concrete compression
is sustained by wall horizontal reinforcement
Part 2 - 5. Design Example of Precast Connection	
Assumed shear transfer mechanism
Lateral shear force carried by Truss Mechanism Lateral shear force carried by Arch Mechanism
50
ReinforcedconcretePrecastandprestressedconcreteReinforcedconcretePrecastandprestressedconcrete Reinforced concrete Precast and prestressed concrete Reinforced concrete Precast and prestressed concrete Reinforced concrete
min( , )uh wh arch cc ctV V V V V= + +
=shear strength of horizontal joint (wall and column bottom)
=shear strength provided by wall bottom interface
=shear transferred by inter-story arch action
=shear strength of compression column at the bottom of
compression arch strut
=shear strength of tension column
ccV
archV
whV
uhV
ctV
Part 2 - 5. Design Example of Precast Connection	
Assumed shear transfer mechanism
(12)
51
ReinforcedconcretePrecastandprestressedconcreteReinforcedconcretePrecastandprestressedconcrete Reinforced concrete Precast and prestressed concrete Reinforced concrete Precast and prestressed concrete Reinforced concrete
( )
0.6(11154 345 2309000) 3694000
wh v y dV a N
N
µ σ= +
= × + =
∑
4056 345 (1270 3556) 295 3694 (2990/11500)
1891000
w
arch h y wh
w
h
V a V
l
N
σ= −
= × + + × − ×
=
∑
min( , )
3694 min(1891,3080) 1063 6648 6430
uh wh arch cc ctV V V V V
kN kN
= + +
= + + = >
Shear strength at wall bottom interface
Possible lateral shear by arch mechanism
Total sectional area of wall vertical reinforcement
Wall axial force
Total sectional area of horizontal reinforcement
(Wall, Beam and Slab)
Necessary horizontal force for truss mechanism
(From equilibrium of a wall panel for shear)
Shear strength at horizontal joint
Design lateral shear at horizontal joint
Part 2 - 5. Design Example of Precast Connection	
(13)
(14)
(12)
52
ReinforcedconcretePrecastandprestressedconcreteReinforcedconcretePrecastandprestressedconcrete Reinforced concrete Precast and prestressed concrete Reinforced concrete Precast and prestressed concrete Reinforced concrete
dv e gV V V= +
111500 58810 2.9
1527
3 2.9 11.5
w
e
w
hM
V kN
h l
Δ −
= = × =
Δ ×
1527 260 1787dv e gV V V kN= + = + =
joint shear due to wall vertical load taken as
260 kN
considered wall height, in this example it
was taken as three stories
{ }
'
1 1
0.1
0.1 36 200 150 8 4056 345 (1270 3556) 295
3687 1787
n m
u c i i j y
i j
V f w x a
kN kN
σ
= =
= +
= × × × × + × + + ×
= >
∑ ∑
joint shear due to lateral seismic loadDesign shear
moment change along a wall height hΔ
Shear strength of joint with keys
and joint re-bar
(Proposal of Dr. Mochizuki)
Design shear for vertical joint
Part 2 - 5. Design Example of Precast Connection	
(11)
(15)
(16)
53
ReinforcedconcretePrecastandprestressedconcreteReinforcedconcretePrecastandprestressedconcrete Reinforced concrete Precast and prestressed concrete Reinforced concrete Precast and prestressed concrete Reinforced concrete
Part 2 - 6. Example of Precast Reinforced Concrete Building
38 storied condominium building, Building height 130.7m
Courtesy of Dr. Masaru Teraoka at Fujita Corporation
Building A
54
ReinforcedconcretePrecastandprestressedconcreteReinforcedconcretePrecastandprestressedconcrete Reinforced concrete Precast and prestressed concrete Reinforced concrete Precast and prestressed concrete Reinforced concrete
Part 2 - 6. Example of Precast Reinforced Concrete Building
38 storied condominium building, Building height 130.7m
Assembling of beam
and column units
Casting concreteCast-in-situ
construction
Floor
Concreting
Beam erection
Column
erection
Erection of balcony element
Placing precast floor units
Assembling of precast
floor and balcony units
Construction period
of skeleton frame
17 months (max. 5 days/floor)
Building A
55
ReinforcedconcretePrecastandprestressedconcreteReinforcedconcretePrecastandprestressedconcrete Reinforced concrete Precast and prestressed concrete Reinforced concrete Precast and prestressed concrete Reinforced concrete
Part 2 - 6. Example of Precast Reinforced Concrete Building
38 storied condominium building, Building height 130.7m
Building A
56
ReinforcedconcretePrecastandprestressedconcreteReinforcedconcretePrecastandprestressedconcrete Reinforced concrete Precast and prestressed concrete Reinforced concrete Precast and prestressed concrete Reinforced concrete
Part 2 - 6. Example of Precast Reinforced Concrete Building
38 storied condominium building, Building height 130.7m
Building A
57
ReinforcedconcretePrecastandprestressedconcreteReinforcedconcretePrecastandprestressedconcrete Reinforced concrete Precast and prestressed concrete Reinforced concrete Precast and prestressed concrete Reinforced concrete
Part 2 - 6. Example of Precast Reinforced Concrete Building
Base isolated 5 storied warehouse
Base isolation	
Short	
Grout
injection	
Mechanical
anchor	
Lap splice	
Bottom bar of beam	
Support steel
angle	
Hole for beam
longitudinal bar	
PCa柱	
Half precast
beam unit	
Building B
58
ReinforcedconcretePrecastandprestressedconcreteReinforcedconcretePrecastandprestressedconcrete Reinforced concrete Precast and prestressed concrete Reinforced concrete Precast and prestressed concrete Reinforced concrete
Column base	
 Erection of column 1	
Set of steel angle for beam support	
 Erection of beam 1	
Part 2 - 6. Example of Precast Reinforced Concrete Building
Base isolated 5 storied warehouse
Erection of column 2	
Erection of beam 2	
Building B
59
ReinforcedconcretePrecastandprestressedconcreteReinforcedconcretePrecastandprestressedconcrete Reinforced concrete Precast and prestressed concrete Reinforced concrete Precast and prestressed concrete Reinforced concrete
17
横河電機相模原事業所新築工事	
Part 2 - 6. Example of Precast Reinforced Concrete Building
Base isolated 5 storied warehouse
Building B
60
ReinforcedconcretePrecastandprestressedconcreteReinforcedconcretePrecastandprestressedconcrete Reinforced concrete Precast and prestressed concrete Reinforced concrete Precast and prestressed concrete Reinforced concrete
Part 2 - 7. Example of Precast Prestressed Concrete Building
8 story Office Building
Total height: 34.57 m
Total floor area: 6970 m2
Construction period: 11 months
Courtesy of Dr. Tsutomu Komuro at Taisei Corporation
Building E
8 story office building in Hokkaido
61
ReinforcedconcretePrecastandprestressedconcreteReinforcedconcretePrecastandprestressedconcrete Reinforced concrete Precast and prestressed concrete Reinforced concrete Precast and prestressed concrete Reinforced concrete
Part 2 - 7. Example of Precast Prestressed Concrete Building
Building E
 
AHUEPS
AHUEPS
WC
PS
DS
18,600
39,600
ATRIUM OFFICE
MM
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
CRINIC・ESTHETIC
RESTAURANT
APAREL SHOP
MECHANICAL
PARKING LOT
EV
HALL
MDF
ROOM
ATRIUM
4100
100
47004600390039003900390039003900
34500
G.L.
1800
Office area
Shopping area
Beam
* Precast beam unit
prestressed by ordinary
high strength deformed bar
Nominal yield strength 685 MPa
8 story office building in Hokkaido
62
ReinforcedconcretePrecastandprestressedconcreteReinforcedconcretePrecastandprestressedconcrete Reinforced concrete Precast and prestressed concrete Reinforced concrete Precast and prestressed concrete Reinforced concrete
Part 2 - 7. Example of Precast Prestressed Concrete Building
Before casting concrete
(Pretension bed)
Yield strength of re-bar 685 MPa
After the release of
prestressing force
Erection of floor beam units
After completion
Building E
8 story office building in Hokkaido
63
ReinforcedconcretePrecastandprestressedconcreteReinforcedconcretePrecastandprestressedconcrete Reinforced concrete Precast and prestressed concrete Reinforced concrete Precast and prestressed concrete Reinforced concrete
Part 2 - 7. Example of Precast Prestressed Concrete Building
Viscous damping
of wall columns
3%
Total input energy during
a design Earthquake
364087kNcm
Ultralowyieldstrengthsteelcouplingbeam
Oil damper
Dissipated energy
by column hinge
Dissipated energy
by oil damper
73%Dissipated energy
By steel coupling
beams
15%
9%
Building E8 story office building in Hokkaido
64
ReinforcedconcretePrecastandprestressedconcreteReinforcedconcretePrecastandprestressedconcrete Reinforced concrete Precast and prestressed concrete Reinforced concrete Precast and prestressed concrete Reinforced concrete
Part 2 - 7. Example of Precast Prestressed Concrete Building
Precast Prestressed Concrete Moment Frame
with Base Isolation System (Apartment)
Courtesy of Kajima Corporation
Building C
65
ReinforcedconcretePrecastandprestressedconcreteReinforcedconcretePrecastandprestressedconcrete Reinforced concrete Precast and prestressed concrete Reinforced concrete Precast and prestressed concrete Reinforced concrete
Laminated
rubber
Deformation at
major earthquake
Response of base
Isolated building
Response of
ordinary building
Response
story shear
Response
story shear
>>
Part 2 - 7. Example of Precast Prestressed Concrete Building
Tension due to
Overturning
moment
Ground motion Ground motion
Precast Prestressed Concrete Moment Frame
with Base Isolation System (Apartment) Building C
66
ReinforcedconcretePrecastandprestressedconcreteReinforcedconcretePrecastandprestressedconcrete Reinforced concrete Precast and prestressed concrete Reinforced concrete Precast and prestressed concrete Reinforced concrete
Part 2 - 7. Example of Precast Prestressed Concrete Building
Precast Prestressed Concrete Moment Frame
with Base Isolation System (Apartment) Building C
67
ReinforcedconcretePrecastandprestressedconcreteReinforcedconcretePrecastandprestressedconcrete Reinforced concrete Precast and prestressed concrete Reinforced concrete Precast and prestressed concrete Reinforced concrete
Part 2 - 7. Example of Precast Prestressed Concrete Building
Precast Prestressed Concrete Moment Frame
with Base Isolation System (Apartment) Building C
68
ReinforcedconcretePrecastandprestressedconcreteReinforcedconcretePrecastandprestressedconcrete Reinforced concrete Precast and prestressed concrete Reinforced concrete Precast and prestressed concrete Reinforced concrete
Climbing up of the crane system
One cycle is for two floors and takes 9 day
Part 2 - 7. Example of Precast Prestressed Concrete Building
Building C
69
ReinforcedconcretePrecastandprestressedconcreteReinforcedconcretePrecastandprestressedconcrete Reinforced concrete Precast and prestressed concrete Reinforced concrete Precast and prestressed concrete Reinforced concrete
Part 2 - 7. Example of Precast Prestressed Concrete Building
Building C
Precast Prestressed Concrete Moment Frame
with Base Isolation System (Apartment)
70
ReinforcedconcretePrecastandprestressedconcreteReinforcedconcretePrecastandprestressedconcrete Reinforced concrete Precast and prestressed concrete Reinforced concrete Precast and prestressed concrete Reinforced concrete
Part 2 - 7. Example of Precast Prestressed Concrete Building
Building C
Precast Prestressed Concrete Moment Frame
with Base Isolation System (Apartment)
71
ReinforcedconcretePrecastandprestressedconcreteReinforcedconcretePrecastandprestressedconcrete Reinforced concrete Precast and prestressed concrete Reinforced concrete Precast and prestressed concrete Reinforced concrete
Part 2 - 7. Example of Precast Prestressed Concrete Building
Building D
Precast Prestressed Concrete Moment Frame (Kyoto University Campus)
72
ReinforcedconcretePrecastandprestressedconcreteReinforcedconcretePrecastandprestressedconcrete Reinforced concrete Precast and prestressed concrete Reinforced concrete Precast and prestressed concrete Reinforced concrete
Part 2 - 7. Example of Precast Prestressed Concrete Building
Precast Prestressed Concrete Moment Frame (Kyoto University Campus)
Post-tensioned precast floor
unit with V groove for piping
Pre-tensioned precast
floor unit
12.2m
12.2m
8m
3.6m
Post-tensioned precast column unit
Post-tensioned precast beam
unit
Post-tensioned
precast beam unit
Building D
73
ReinforcedconcretePrecastandprestressedconcreteReinforcedconcretePrecastandprestressedconcrete Reinforced concrete Precast and prestressed concrete Reinforced concrete Precast and prestressed concrete Reinforced concrete
Part 2 - 7. Example of Precast Prestressed Concrete Building
Precast Prestressed Concrete Moment Frame (Kyoto University Campus)
Building D
74
ReinforcedconcretePrecastandprestressedconcreteReinforcedconcretePrecastandprestressedconcrete Reinforced concrete Precast and prestressed concrete Reinforced concrete Precast and prestressed concrete Reinforced concrete
Part 2 - 7. Example of Precast Prestressed Concrete Building
Precast Prestressed Concrete Moment Frame (Kyoto University Campus)
Building D
75
ReinforcedconcretePrecastandprestressedconcreteReinforcedconcretePrecastandprestressedconcrete Reinforced concrete Precast and prestressed concrete Reinforced concrete Precast and prestressed concrete Reinforced concrete
Part 2 - 7. Example of Precast Prestressed Concrete Stadium
Soccer stadium in Osaka (seating capacity of 40000)
Main stand
Back stand
Away
stand
Home
stand
Building F
76
ReinforcedconcretePrecastandprestressedconcreteReinforcedconcretePrecastandprestressedconcrete Reinforced concrete Precast and prestressed concrete Reinforced concrete Precast and prestressed concrete Reinforced concrete
10m	
30m	
33m	
Roof
Seismically isolated roof
structure
Pile
Prestressed concrete pile
Pile top; semi-rigid connection
Stand structure
Beam ; PCa
Column ; Cast in-site
Footing; PCa
Grade Beam; PCa
Seismic isolator
Soccer stadium in Osaka (seating capacity of 40000)
Building F
Part 2 - 8. Example of Precast Prestressed Concrete Stadium
77
ReinforcedconcretePrecastandprestressedconcreteReinforcedconcretePrecastandprestressedconcrete Reinforced concrete Precast and prestressed concrete Reinforced concrete Precast and prestressed concrete Reinforced concrete
Soccer stadium in Osaka (seating capacity of 40000)
PPC beam	
PPC beam	
Part 2 - 8. Example of Precast Prestressed Concrete Stadium
78	
Building F
ReinforcedconcretePrecastandprestressedconcreteReinforcedconcretePrecastandprestressedconcrete Reinforced concrete Precast and prestressed concrete Reinforced concrete Precast and prestressed concrete Reinforced concrete
Inclined partially prestressed
concrete beams for seats	
Stadium corner	
Parallel middle part of Stadium	
Soccer stadium in Osaka (seating capacity of 40000)
Part 2 - 8. Example of Precast Prestressed Concrete Stadium
79	
Building F
ReinforcedconcretePrecastandprestressedconcreteReinforcedconcretePrecastandprestressedconcrete Reinforced concrete Precast and prestressed concrete Reinforced concrete Precast and prestressed concrete Reinforced concrete
Soccer stadium in Osaka (seating capacity of 40000)
Part 2 - 8. Example of Precast Prestressed Concrete Stadium
80	
Building F
ReinforcedconcretePrecastandprestressedconcreteReinforcedconcretePrecastandprestressedconcrete Reinforced concrete Precast and prestressed concrete Reinforced concrete Precast and prestressed concrete Reinforced concrete
Part 2 - 8. Example of Precast Prestressed Concrete Stadium
Nagano winter Olympic stadium
(1998)
Building G
80-1
ReinforcedconcretePrecastandprestressedconcreteReinforcedconcretePrecastandprestressedconcrete Reinforced concrete Precast and prestressed concrete Reinforced concrete Precast and prestressed concrete Reinforced concrete
Part 2 - 8. Example of Precast Prestressed Concrete Stadium
Flower
Petal	
Flower Petiole	
Steel floor beam	
Spectators seat	
Flower Petal	
Nagano winter Olympic stadium
(1998)
80-2	
Building G
ReinforcedconcretePrecastandprestressedconcreteReinforcedconcretePrecastandprestressedconcrete Reinforced concrete Precast and prestressed concrete Reinforced concrete Precast and prestressed concrete Reinforced concrete
Extra Precast Prestressed Concrete Wind Tower
Mr. MAEDA,
Takashi
Daiwa CorporationRendering by Ai YAMADA	
WATANABE, Fumio
Professor Emeritus, Kyoto University
Executive Technical Advisor of
Takenaka
Mr. OHTA, Yoshihiro
Takenaka
Corporation
Miss TSUMURA , Chikako
Takenaka Corporation
Miss YAMADA , Ai
Takenaka Corporation
Prof. NISHIYAMA , Minehiro
Kyoto University
Prof. KONO, Susumu
Tokyo Institute of
Technology
Rendering by YAMADA, AiRendering by Ai YAMADA
Precast Concrete Wind Turbine Tower assembled
by Spiral Prestressing System
Basic Research is going on
81
ReinforcedconcretePrecastandprestressedconcreteReinforcedconcretePrecastandprestressedconcrete Reinforced concrete Precast and prestressed concrete Reinforced concrete Precast and prestressed concrete Reinforced concrete
Part 2 - 9. Structural Damage in Past Earthquake
Damage during the 2011 Off the Pacific Coast of Tohoku Earthquake
Damage due to ground motion	
81-1	
Acc. Spectrum in Fukushima Prefecture	
500	
1000	
pSa(cm/s/s)	
1500	
2000	
2500	
Aizu-Wakamatsu FKS023	
Nihon-Matsu FKS019	
Souma FKS001	
Yanagawa FKS002	
Furudono FKS002	
Iidate FKS004	
Fukushima FKS003	
Period (s)	
Epicenter	
2011, March 11
14:46 pm
Mw=9.0
ReinforcedconcretePrecastandprestressedconcreteReinforcedconcretePrecastandprestressedconcrete Reinforced concrete Precast and prestressed concrete Reinforced concrete Precast and prestressed concrete Reinforced concrete
Part 2 - 9. Structural Damage in Past Earthquake
Damage during the 2011 Off the Pacific Coast of Tohoku Earthquake
Damage due to ground motion	
Damage to soft first story	
Damage at intermediate story	
Shear failure of columns with
poor lateral reinforcement	
82
ReinforcedconcretePrecastandprestressedconcreteReinforcedconcretePrecastandprestressedconcrete Reinforced concrete Precast and prestressed concrete Reinforced concrete Precast and prestressed concrete Reinforced concrete
Damage during the 2011 Off the Pacific Coast of Tohoku Earthquake
Damage due to ground motion	
Sukagawa city hall building	
Part 2 - 9. Structural Damage in Past Earthquake
83
ReinforcedconcretePrecastandprestressedconcreteReinforcedconcretePrecastandprestressedconcrete Reinforced concrete Precast and prestressed concrete Reinforced concrete Precast and prestressed concrete Reinforced concrete
Part 2 - 9. Structural Damage in Past Earthquake
Prestressed concrete industrial building	
84	
Damage during the 2011 Off the Pacific Coast of Tohoku Earthquake
Damage due to ground motion
ReinforcedconcretePrecastandprestressedconcreteReinforcedconcretePrecastandprestressedconcrete Reinforced concrete Precast and prestressed concrete Reinforced concrete Precast and prestressed concrete Reinforced concrete
Part 2 - 9. Structural Damage in Past Earthquake
Prestressed concrete industrial building	
85	
Damage during the 2011 Off the Pacific Coast of Tohoku Earthquake
Damage due to ground motion
ReinforcedconcretePrecastandprestressedconcreteReinforcedconcretePrecastandprestressedconcrete Reinforced concrete Precast and prestressed concrete Reinforced concrete Precast and prestressed concrete Reinforced concrete
Part 2 - 9. Structural Damage in Past Earthquake
Falling down of glass window and ceiling 	
86	
Damage during the 2011 Off the Pacific Coast of Tohoku Earthquake
Damage due to ground motion
ReinforcedconcretePrecastandprestressedconcreteReinforcedconcretePrecastandprestressedconcrete Reinforced concrete Precast and prestressed concrete Reinforced concrete Precast and prestressed concrete Reinforced concrete
Height (m)	
0 10 20 30 40	
Measured Data	
From Homepage of Building Research Institute, Japan
Max. Run-up height:40m
Average Run-up height:20m
Average Tsunami Height:10m
Inundation height:
10m-height of soil surface
Run-up height
Tsunami height	
Height of Tsunami	
Run-up
height	
Inundation
height	
High
water
mark	
Tide Level	
Tide gage
station	
Part 2 - 9. Structural Damage in Past Earthquake
87	
Damage due to Tsunami	
http://www.coastal.jp/ttjt/
ReinforcedconcretePrecastandprestressedconcreteReinforcedconcretePrecastandprestressedconcrete Reinforced concrete Precast and prestressed concrete Reinforced concrete Precast and prestressed concrete Reinforced concrete
Part 2 - 9. Structural Damage in Past Earthquake
Difference between Tsunami and Normal wave
Normal wave
Tsunami
Courtesy of Dr. Inoue at Takenaka Corporation
ReinforcedconcretePrecastandprestressedconcreteReinforcedconcretePrecastandprestressedconcrete Reinforced concrete Precast and prestressed concrete Reinforced concrete Precast and prestressed concrete Reinforced concrete
Part 2 - 9. Structural Damage in Past Earthquake
Damage due to Tsunami	
Minamisannriku in Miyagi Prefecture	
 87-1
ReinforcedconcretePrecastandprestressedconcreteReinforcedconcretePrecastandprestressedconcrete Reinforced concrete Precast and prestressed concrete Reinforced concrete Precast and prestressed concrete Reinforced concrete
宮城県女川町	
June 5, 2011	
Part 2 - 9. Structural Damage in Past Earthquake
Damage due to Tsunami	
87-2	
Onagawa in Miyagi Prefecture
ReinforcedconcretePrecastandprestressedconcreteReinforcedconcretePrecastandprestressedconcrete Reinforced concrete Precast and prestressed concrete Reinforced concrete Precast and prestressed concrete Reinforced concrete
Damage during the 2011 off the Pacific coast of Tohoku Earthquake
Damage due to tsunami	
Part 2 - 9. Structural Damage in Past Earthquake
70m	
87-3	
Onagawa in Miyagi Prefecture	
Onagawa in Miyagi Prefecture
ReinforcedconcretePrecastandprestressedconcreteReinforcedconcretePrecastandprestressedconcrete Reinforced concrete Precast and prestressed concrete Reinforced concrete Precast and prestressed concrete Reinforced concrete
4階建てRC建物が流される
(4m x 4.5m x 12m)	
Damage during the 2011 off the Pacific coast of Tohoku Earthquake
Damage due to tsunami	
Part 2 - 9. Structural Damage in Past Earthquake
87-4	
Pile foundation:
Pull out and Fracture	
Onagawa in Miyagi Prefecture
ReinforcedconcretePrecastandprestressedconcreteReinforcedconcretePrecastandprestressedconcrete Reinforced concrete Precast and prestressed concrete Reinforced concrete Precast and prestressed concrete Reinforced concrete
Damage during the 2011 off the Pacific coast of Tohoku Earthquake
Damage due to tsunami	
Part 2 - 9. Structural Damage in Past Earthquake
88	
Onagawa in Miyagi Prefecture	
Fracture of anchor bolts due to
water pressure and buoyancy
ReinforcedconcretePrecastandprestressedconcreteReinforcedconcretePrecastandprestressedconcrete Reinforced concrete Precast and prestressed concrete Reinforced concrete Precast and prestressed concrete Reinforced concrete
Damage during the 2011 off the Pacific coast of Tohoku Earthquake
Damage due to tsunami	
Part 2 - 9. Structural Damage in Past Earthquake
残っているSCS版
合計 6枚
Neighboring building	
Remained only one
precast prestressed
roof slab	
89	
Onagawa in Miyagi Prefecture
ReinforcedconcretePrecastandprestressedconcreteReinforcedconcretePrecastandprestressedconcrete Reinforced concrete Precast and prestressed concrete Reinforced concrete Precast and prestressed concrete Reinforced concrete
I would express my hearty sympathy
to the Chilean people who suffered
the heavy losses during the great
earthquake on September 16.	
Thank you for your attention	
CHILE	
JAPAN	
1.76 million < 127 million	
756000 km2 > 378000 km2	
20000 km

Contenu connexe

Tendances

C:\fakepath\dsi bridge pt presentation
C:\fakepath\dsi bridge pt presentationC:\fakepath\dsi bridge pt presentation
C:\fakepath\dsi bridge pt presentationmbarroca
 
Shear, bond bearing,camber & deflection in prestressed concrete
Shear, bond bearing,camber & deflection in prestressed concreteShear, bond bearing,camber & deflection in prestressed concrete
Shear, bond bearing,camber & deflection in prestressed concreteMAHFUZUR RAHMAN
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concreteParag Pal
 
Post tension Floor System
Post tension Floor SystemPost tension Floor System
Post tension Floor SystemAditya Shah
 
PRESTRESSED CONCRETE
PRESTRESSED CONCRETEPRESTRESSED CONCRETE
PRESTRESSED CONCRETEghildiyal8811
 
Prestressed Concrete Basics
Prestressed Concrete BasicsPrestressed Concrete Basics
Prestressed Concrete BasicsSachin Kulkarni
 
What Is Post Tensioning
What Is Post TensioningWhat Is Post Tensioning
What Is Post TensioningAMSYSCO Inc.
 
prestressed concrete
prestressed concreteprestressed concrete
prestressed concreteParag Pal
 
Optimum design of precast prestressed concrete structural element
Optimum design of precast prestressed concrete structural element Optimum design of precast prestressed concrete structural element
Optimum design of precast prestressed concrete structural element Awinash Tiwari
 
Prestresses concrete
Prestresses concrete Prestresses concrete
Prestresses concrete jaiveer singh
 
CT 3 +5 prestressing b+
CT 3 +5 prestressing b+CT 3 +5 prestressing b+
CT 3 +5 prestressing b+Est
 
5. pre stressed &amp; pre-cast members
5. pre stressed &amp; pre-cast members5. pre stressed &amp; pre-cast members
5. pre stressed &amp; pre-cast membersNoshad Ahmed Wahocho
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concreteRajat Nainwal
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concreteRajesh Burde
 
Shear in prestress concrete
Shear in prestress concreteShear in prestress concrete
Shear in prestress concreteAliAlmayalee
 

Tendances (20)

C:\fakepath\dsi bridge pt presentation
C:\fakepath\dsi bridge pt presentationC:\fakepath\dsi bridge pt presentation
C:\fakepath\dsi bridge pt presentation
 
Final thesis presentation.
Final thesis presentation.Final thesis presentation.
Final thesis presentation.
 
Shear, bond bearing,camber & deflection in prestressed concrete
Shear, bond bearing,camber & deflection in prestressed concreteShear, bond bearing,camber & deflection in prestressed concrete
Shear, bond bearing,camber & deflection in prestressed concrete
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
 
Post tension Floor System
Post tension Floor SystemPost tension Floor System
Post tension Floor System
 
PRESTRESSED CONCRETE
PRESTRESSED CONCRETEPRESTRESSED CONCRETE
PRESTRESSED CONCRETE
 
Prestressed Concrete Basics
Prestressed Concrete BasicsPrestressed Concrete Basics
Prestressed Concrete Basics
 
What Is Post Tensioning
What Is Post TensioningWhat Is Post Tensioning
What Is Post Tensioning
 
prestressed concrete
prestressed concreteprestressed concrete
prestressed concrete
 
Optimum design of precast prestressed concrete structural element
Optimum design of precast prestressed concrete structural element Optimum design of precast prestressed concrete structural element
Optimum design of precast prestressed concrete structural element
 
Prestresses concrete
Prestresses concrete Prestresses concrete
Prestresses concrete
 
CT 3 +5 prestressing b+
CT 3 +5 prestressing b+CT 3 +5 prestressing b+
CT 3 +5 prestressing b+
 
5. pre stressed &amp; pre-cast members
5. pre stressed &amp; pre-cast members5. pre stressed &amp; pre-cast members
5. pre stressed &amp; pre-cast members
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
 
Prestress concrete
Prestress concretePrestress concrete
Prestress concrete
 
Prestressed construction
Prestressed constructionPrestressed construction
Prestressed construction
 
Prestressed Concrete
Prestressed ConcretePrestressed Concrete
Prestressed Concrete
 
Shear in prestress concrete
Shear in prestress concreteShear in prestress concrete
Shear in prestress concrete
 
Pre-stressed Concrete
Pre-stressed ConcretePre-stressed Concrete
Pre-stressed Concrete
 

En vedette

Presentation - Tosca Goldberg
Presentation - Tosca GoldbergPresentation - Tosca Goldberg
Presentation - Tosca GoldbergTosca Goldberg
 
Precast concrete architecture in spain and latin america
Precast concrete architecture in spain and latin americaPrecast concrete architecture in spain and latin america
Precast concrete architecture in spain and latin americaANDECE
 
Precast concrete for sustainable buildings
Precast concrete for sustainable buildingsPrecast concrete for sustainable buildings
Precast concrete for sustainable buildingsMECandPMV
 
North Dakota Precast Concrete
North Dakota Precast ConcreteNorth Dakota Precast Concrete
North Dakota Precast ConcreteJenny Frost
 
My Lean + BIM Journey [Nathan Wood, Brazil Lean Conference]
My Lean + BIM Journey [Nathan Wood, Brazil Lean Conference]My Lean + BIM Journey [Nathan Wood, Brazil Lean Conference]
My Lean + BIM Journey [Nathan Wood, Brazil Lean Conference]Nathan C. Wood
 
FINITE ELEMENT ANALYSIS OF INNOVATIVE SOLUTIONS OF PRECAST CONCRETE BEAM-COLU...
FINITE ELEMENT ANALYSIS OF INNOVATIVE SOLUTIONS OF PRECAST CONCRETE BEAM-COLU...FINITE ELEMENT ANALYSIS OF INNOVATIVE SOLUTIONS OF PRECAST CONCRETE BEAM-COLU...
FINITE ELEMENT ANALYSIS OF INNOVATIVE SOLUTIONS OF PRECAST CONCRETE BEAM-COLU...Franco Bontempi
 
Ventilation system of building
Ventilation system of buildingVentilation system of building
Ventilation system of buildingSulieman KOHISTANI
 
ALL ABOUT PRECAST
ALL ABOUT PRECASTALL ABOUT PRECAST
ALL ABOUT PRECASTjagrutib22
 
7 steps to get beyond excuses
7 steps to get beyond excuses7 steps to get beyond excuses
7 steps to get beyond excusesHarish
 
PRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEMPRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEMSagar Shah
 
Precast concrete construction
Precast concrete constructionPrecast concrete construction
Precast concrete constructionMadan Mohan Jana
 
Precast - A Modern Method of Construction
Precast - A Modern Method of ConstructionPrecast - A Modern Method of Construction
Precast - A Modern Method of Constructionkefholdings
 
Prefabricated structures
Prefabricated structuresPrefabricated structures
Prefabricated structuresFAIZAL MUHAMMED
 
What 33 Successful Entrepreneurs Learned From Failure
What 33 Successful Entrepreneurs Learned From FailureWhat 33 Successful Entrepreneurs Learned From Failure
What 33 Successful Entrepreneurs Learned From FailureReferralCandy
 

En vedette (17)

Artical 32
Artical 32 Artical 32
Artical 32
 
Presentation - Tosca Goldberg
Presentation - Tosca GoldbergPresentation - Tosca Goldberg
Presentation - Tosca Goldberg
 
Tampa Parking Structures
Tampa Parking StructuresTampa Parking Structures
Tampa Parking Structures
 
Precast concrete architecture in spain and latin america
Precast concrete architecture in spain and latin americaPrecast concrete architecture in spain and latin america
Precast concrete architecture in spain and latin america
 
2015 10 06_sem_pref_kimura_precast_seminar_in_santiago_final
2015 10 06_sem_pref_kimura_precast_seminar_in_santiago_final2015 10 06_sem_pref_kimura_precast_seminar_in_santiago_final
2015 10 06_sem_pref_kimura_precast_seminar_in_santiago_final
 
Precast concrete for sustainable buildings
Precast concrete for sustainable buildingsPrecast concrete for sustainable buildings
Precast concrete for sustainable buildings
 
North Dakota Precast Concrete
North Dakota Precast ConcreteNorth Dakota Precast Concrete
North Dakota Precast Concrete
 
My Lean + BIM Journey [Nathan Wood, Brazil Lean Conference]
My Lean + BIM Journey [Nathan Wood, Brazil Lean Conference]My Lean + BIM Journey [Nathan Wood, Brazil Lean Conference]
My Lean + BIM Journey [Nathan Wood, Brazil Lean Conference]
 
FINITE ELEMENT ANALYSIS OF INNOVATIVE SOLUTIONS OF PRECAST CONCRETE BEAM-COLU...
FINITE ELEMENT ANALYSIS OF INNOVATIVE SOLUTIONS OF PRECAST CONCRETE BEAM-COLU...FINITE ELEMENT ANALYSIS OF INNOVATIVE SOLUTIONS OF PRECAST CONCRETE BEAM-COLU...
FINITE ELEMENT ANALYSIS OF INNOVATIVE SOLUTIONS OF PRECAST CONCRETE BEAM-COLU...
 
Ventilation system of building
Ventilation system of buildingVentilation system of building
Ventilation system of building
 
ALL ABOUT PRECAST
ALL ABOUT PRECASTALL ABOUT PRECAST
ALL ABOUT PRECAST
 
7 steps to get beyond excuses
7 steps to get beyond excuses7 steps to get beyond excuses
7 steps to get beyond excuses
 
PRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEMPRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEM
 
Precast concrete construction
Precast concrete constructionPrecast concrete construction
Precast concrete construction
 
Precast - A Modern Method of Construction
Precast - A Modern Method of ConstructionPrecast - A Modern Method of Construction
Precast - A Modern Method of Construction
 
Prefabricated structures
Prefabricated structuresPrefabricated structures
Prefabricated structures
 
What 33 Successful Entrepreneurs Learned From Failure
What 33 Successful Entrepreneurs Learned From FailureWhat 33 Successful Entrepreneurs Learned From Failure
What 33 Successful Entrepreneurs Learned From Failure
 

Similaire à 2015 10 06_sem_pref_watanabe_chile_presentationoct2015(part2)

PRESTRESSED CONCRETE
PRESTRESSED CONCRETEPRESTRESSED CONCRETE
PRESTRESSED CONCRETEghildiyal8811
 
26901321007_SAPTADEEP DASGUPTA_CE(PE)702A.pdf
26901321007_SAPTADEEP DASGUPTA_CE(PE)702A.pdf26901321007_SAPTADEEP DASGUPTA_CE(PE)702A.pdf
26901321007_SAPTADEEP DASGUPTA_CE(PE)702A.pdfRijuDasgupta
 
prestressgrouppresentation-140202022807-phpapp02.pptx
prestressgrouppresentation-140202022807-phpapp02.pptxprestressgrouppresentation-140202022807-phpapp02.pptx
prestressgrouppresentation-140202022807-phpapp02.pptxAnbarasan Sivaraj
 
1-Basics of Prestressed Concrete.pdforgs
1-Basics of Prestressed Concrete.pdforgs1-Basics of Prestressed Concrete.pdforgs
1-Basics of Prestressed Concrete.pdforgs632k18BilalAhmad
 
Lecture 4 5 Urm Shear Walls
Lecture 4 5 Urm Shear WallsLecture 4 5 Urm Shear Walls
Lecture 4 5 Urm Shear WallsTeja Ande
 
Analysisanddesignofamulti storeyreinforcedconcrete-120923065657-phpapp01
Analysisanddesignofamulti storeyreinforcedconcrete-120923065657-phpapp01Analysisanddesignofamulti storeyreinforcedconcrete-120923065657-phpapp01
Analysisanddesignofamulti storeyreinforcedconcrete-120923065657-phpapp01ARUNTHEGEOTECH
 
PRCD - Chapter 4 edited.pdf
PRCD - Chapter 4 edited.pdfPRCD - Chapter 4 edited.pdf
PRCD - Chapter 4 edited.pdfUmarSaba1
 
Prestressing Concept, Materilas and Prestressing System
Prestressing Concept, Materilas and Prestressing SystemPrestressing Concept, Materilas and Prestressing System
Prestressing Concept, Materilas and Prestressing SystemLatif Hyder Wadho
 
Structural Analysis of Unbonded Post-Tensioned Shear Wall
Structural Analysis of Unbonded Post-Tensioned Shear WallStructural Analysis of Unbonded Post-Tensioned Shear Wall
Structural Analysis of Unbonded Post-Tensioned Shear WallIRJET Journal
 
Design of tension member.pptx
Design of tension member.pptxDesign of tension member.pptx
Design of tension member.pptxmayur280524
 
CT3 Group Assignment Report
CT3 Group Assignment ReportCT3 Group Assignment Report
CT3 Group Assignment ReportWan Nee
 
Residual capacity from aggregate interlock
Residual capacity from aggregate interlockResidual capacity from aggregate interlock
Residual capacity from aggregate interlockEva Lantsoght
 
SEISMIC DESIGN STEPS.ppt
SEISMIC DESIGN STEPS.pptSEISMIC DESIGN STEPS.ppt
SEISMIC DESIGN STEPS.pptAteeqRahman26
 

Similaire à 2015 10 06_sem_pref_watanabe_chile_presentationoct2015(part2) (20)

PRESTRESSED CONCRETE
PRESTRESSED CONCRETEPRESTRESSED CONCRETE
PRESTRESSED CONCRETE
 
26901321007_SAPTADEEP DASGUPTA_CE(PE)702A.pdf
26901321007_SAPTADEEP DASGUPTA_CE(PE)702A.pdf26901321007_SAPTADEEP DASGUPTA_CE(PE)702A.pdf
26901321007_SAPTADEEP DASGUPTA_CE(PE)702A.pdf
 
Prestressing ppt
Prestressing pptPrestressing ppt
Prestressing ppt
 
prestressgrouppresentation-140202022807-phpapp02.pptx
prestressgrouppresentation-140202022807-phpapp02.pptxprestressgrouppresentation-140202022807-phpapp02.pptx
prestressgrouppresentation-140202022807-phpapp02.pptx
 
1-Basics of Prestressed Concrete.pdforgs
1-Basics of Prestressed Concrete.pdforgs1-Basics of Prestressed Concrete.pdforgs
1-Basics of Prestressed Concrete.pdforgs
 
Lecture 4 5 Urm Shear Walls
Lecture 4 5 Urm Shear WallsLecture 4 5 Urm Shear Walls
Lecture 4 5 Urm Shear Walls
 
Analysisanddesignofamulti storeyreinforcedconcrete-120923065657-phpapp01
Analysisanddesignofamulti storeyreinforcedconcrete-120923065657-phpapp01Analysisanddesignofamulti storeyreinforcedconcrete-120923065657-phpapp01
Analysisanddesignofamulti storeyreinforcedconcrete-120923065657-phpapp01
 
PRCD - Chapter 4 edited.pdf
PRCD - Chapter 4 edited.pdfPRCD - Chapter 4 edited.pdf
PRCD - Chapter 4 edited.pdf
 
Prestressing Concept, Materilas and Prestressing System
Prestressing Concept, Materilas and Prestressing SystemPrestressing Concept, Materilas and Prestressing System
Prestressing Concept, Materilas and Prestressing System
 
Structural Analysis of Unbonded Post-Tensioned Shear Wall
Structural Analysis of Unbonded Post-Tensioned Shear WallStructural Analysis of Unbonded Post-Tensioned Shear Wall
Structural Analysis of Unbonded Post-Tensioned Shear Wall
 
B012550812
B012550812B012550812
B012550812
 
Presentation1
Presentation1Presentation1
Presentation1
 
Design of tension member.pptx
Design of tension member.pptxDesign of tension member.pptx
Design of tension member.pptx
 
CT3 Group Assignment Report
CT3 Group Assignment ReportCT3 Group Assignment Report
CT3 Group Assignment Report
 
Acm Unit 1
Acm Unit 1Acm Unit 1
Acm Unit 1
 
Residual capacity from aggregate interlock
Residual capacity from aggregate interlockResidual capacity from aggregate interlock
Residual capacity from aggregate interlock
 
slabs.ppt
slabs.pptslabs.ppt
slabs.ppt
 
PSC Design and construction.ppt
PSC Design and construction.pptPSC Design and construction.ppt
PSC Design and construction.ppt
 
Seismic design steps
Seismic design stepsSeismic design steps
Seismic design steps
 
SEISMIC DESIGN STEPS.ppt
SEISMIC DESIGN STEPS.pptSEISMIC DESIGN STEPS.ppt
SEISMIC DESIGN STEPS.ppt
 

Plus de Instituto del cemento y Hormigón de Chile

Caracterización experimental de propiedades de los hormigones reforzados con ...
Caracterización experimental de propiedades de los hormigones reforzados con ...Caracterización experimental de propiedades de los hormigones reforzados con ...
Caracterización experimental de propiedades de los hormigones reforzados con ...Instituto del cemento y Hormigón de Chile
 
Metodología simple de Especificación y Control de Hormigones por Durabilidad
Metodología simple de Especificación y Control de Hormigones por DurabilidadMetodología simple de Especificación y Control de Hormigones por Durabilidad
Metodología simple de Especificación y Control de Hormigones por DurabilidadInstituto del cemento y Hormigón de Chile
 
Solución de Pavimento de Hormigón Articulado con Geoceldas Hyson-Cells para U...
Solución de Pavimento de Hormigón Articulado con Geoceldas Hyson-Cells para U...Solución de Pavimento de Hormigón Articulado con Geoceldas Hyson-Cells para U...
Solución de Pavimento de Hormigón Articulado con Geoceldas Hyson-Cells para U...Instituto del cemento y Hormigón de Chile
 

Plus de Instituto del cemento y Hormigón de Chile (20)

Proyecto Puente Chacao: Desafío Técnico Logístico en Condiciones Extremas
Proyecto Puente Chacao: Desafío Técnico Logístico en Condiciones ExtremasProyecto Puente Chacao: Desafío Técnico Logístico en Condiciones Extremas
Proyecto Puente Chacao: Desafío Técnico Logístico en Condiciones Extremas
 
Nuevas líneas de Metro de Santiago
Nuevas líneas de Metro de Santiago Nuevas líneas de Metro de Santiago
Nuevas líneas de Metro de Santiago
 
Especificaciones en Concreto ¿Un Arte o Una Ciencia?
Especificaciones en Concreto ¿Un Arte o Una Ciencia?Especificaciones en Concreto ¿Un Arte o Una Ciencia?
Especificaciones en Concreto ¿Un Arte o Una Ciencia?
 
Comportamiento del Hormigón en Condiciones de Evaporación
Comportamiento del Hormigón en Condiciones de EvaporaciónComportamiento del Hormigón en Condiciones de Evaporación
Comportamiento del Hormigón en Condiciones de Evaporación
 
Hormigón, desafíos para mejorar la productividad
Hormigón, desafíos para mejorar la productividadHormigón, desafíos para mejorar la productividad
Hormigón, desafíos para mejorar la productividad
 
Criterios de aceptación de la Resistencia en Hormigón Proyectado
Criterios de aceptación de la Resistencia en Hormigón ProyectadoCriterios de aceptación de la Resistencia en Hormigón Proyectado
Criterios de aceptación de la Resistencia en Hormigón Proyectado
 
Caracterización experimental de propiedades de los hormigones reforzados con ...
Caracterización experimental de propiedades de los hormigones reforzados con ...Caracterización experimental de propiedades de los hormigones reforzados con ...
Caracterización experimental de propiedades de los hormigones reforzados con ...
 
Metodología simple de Especificación y Control de Hormigones por Durabilidad
Metodología simple de Especificación y Control de Hormigones por DurabilidadMetodología simple de Especificación y Control de Hormigones por Durabilidad
Metodología simple de Especificación y Control de Hormigones por Durabilidad
 
Nanotecnología: Fundamentos y Potenciales Aplicaciones en el Hormigón
Nanotecnología: Fundamentos y Potenciales Aplicaciones en el HormigónNanotecnología: Fundamentos y Potenciales Aplicaciones en el Hormigón
Nanotecnología: Fundamentos y Potenciales Aplicaciones en el Hormigón
 
Nuevo Hormigón Estructural que flota (Proyecto HEAT)
Nuevo Hormigón Estructural que flota (Proyecto HEAT)Nuevo Hormigón Estructural que flota (Proyecto HEAT)
Nuevo Hormigón Estructural que flota (Proyecto HEAT)
 
La importancia de una correcta especificación para sistemas de anclajes
La importancia de una correcta especificación para sistemas de anclajes La importancia de una correcta especificación para sistemas de anclajes
La importancia de una correcta especificación para sistemas de anclajes
 
Soluciones para reparación y reforzamiento estructural
Soluciones para reparación y reforzamiento estructuralSoluciones para reparación y reforzamiento estructural
Soluciones para reparación y reforzamiento estructural
 
Nueva Certificación ACI de instalador de anclajes
Nueva Certificación ACI de instalador de anclajesNueva Certificación ACI de instalador de anclajes
Nueva Certificación ACI de instalador de anclajes
 
Structural Strengthening, Proyectos Relevantes y Desafíos de Ingeniería
Structural Strengthening, Proyectos Relevantes y Desafíos de IngenieríaStructural Strengthening, Proyectos Relevantes y Desafíos de Ingeniería
Structural Strengthening, Proyectos Relevantes y Desafíos de Ingeniería
 
Proyectos subterráneos civiles
 Proyectos subterráneos civiles Proyectos subterráneos civiles
Proyectos subterráneos civiles
 
Avances hacia una normativa nacional de Shotcrete
Avances hacia una normativa nacional de ShotcreteAvances hacia una normativa nacional de Shotcrete
Avances hacia una normativa nacional de Shotcrete
 
Metro, infraestructura y desarrollo subterráneo
Metro, infraestructura y desarrollo subterráneoMetro, infraestructura y desarrollo subterráneo
Metro, infraestructura y desarrollo subterráneo
 
Solución de Pavimento de Hormigón Articulado con Geoceldas Hyson-Cells para U...
Solución de Pavimento de Hormigón Articulado con Geoceldas Hyson-Cells para U...Solución de Pavimento de Hormigón Articulado con Geoceldas Hyson-Cells para U...
Solución de Pavimento de Hormigón Articulado con Geoceldas Hyson-Cells para U...
 
Proyecto de Pavimentación Camino La Polvora
Proyecto de Pavimentación Camino La PolvoraProyecto de Pavimentación Camino La Polvora
Proyecto de Pavimentación Camino La Polvora
 
Claves de Éxito de un piso industrial
Claves de Éxito de un piso industrialClaves de Éxito de un piso industrial
Claves de Éxito de un piso industrial
 

Dernier

How to Write a Good Scientific Paper.pdf
How to Write a Good Scientific Paper.pdfHow to Write a Good Scientific Paper.pdf
How to Write a Good Scientific Paper.pdfRedhwan Qasem Shaddad
 
GENERAL CONDITIONS FOR CONTRACTS OF CIVIL ENGINEERING WORKS
GENERAL CONDITIONS  FOR  CONTRACTS OF CIVIL ENGINEERING WORKS GENERAL CONDITIONS  FOR  CONTRACTS OF CIVIL ENGINEERING WORKS
GENERAL CONDITIONS FOR CONTRACTS OF CIVIL ENGINEERING WORKS Bahzad5
 
Design of Clutches and Brakes in Design of Machine Elements.pptx
Design of Clutches and Brakes in Design of Machine Elements.pptxDesign of Clutches and Brakes in Design of Machine Elements.pptx
Design of Clutches and Brakes in Design of Machine Elements.pptxYogeshKumarKJMIT
 
Landsman converter for power factor improvement
Landsman converter for power factor improvementLandsman converter for power factor improvement
Landsman converter for power factor improvementVijayMuni2
 
ASME BPVC 2023 Section I para leer y entender
ASME BPVC 2023 Section I para leer y entenderASME BPVC 2023 Section I para leer y entender
ASME BPVC 2023 Section I para leer y entenderjuancarlos286641
 
Strategies of Urban Morphologyfor Improving Outdoor Thermal Comfort and Susta...
Strategies of Urban Morphologyfor Improving Outdoor Thermal Comfort and Susta...Strategies of Urban Morphologyfor Improving Outdoor Thermal Comfort and Susta...
Strategies of Urban Morphologyfor Improving Outdoor Thermal Comfort and Susta...amrabdallah9
 
Vertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptx
Vertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptxVertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptx
Vertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptxLMW Machine Tool Division
 
Popular-NO1 Kala Jadu Expert Specialist In Germany Kala Jadu Expert Specialis...
Popular-NO1 Kala Jadu Expert Specialist In Germany Kala Jadu Expert Specialis...Popular-NO1 Kala Jadu Expert Specialist In Germany Kala Jadu Expert Specialis...
Popular-NO1 Kala Jadu Expert Specialist In Germany Kala Jadu Expert Specialis...Amil baba
 
Technology Features of Apollo HDD Machine, Its Technical Specification with C...
Technology Features of Apollo HDD Machine, Its Technical Specification with C...Technology Features of Apollo HDD Machine, Its Technical Specification with C...
Technology Features of Apollo HDD Machine, Its Technical Specification with C...Apollo Techno Industries Pvt Ltd
 
solar wireless electric vechicle charging system
solar wireless electric vechicle charging systemsolar wireless electric vechicle charging system
solar wireless electric vechicle charging systemgokuldongala
 
Nodal seismic construction requirements.pptx
Nodal seismic construction requirements.pptxNodal seismic construction requirements.pptx
Nodal seismic construction requirements.pptxwendy cai
 
Multicomponent Spiral Wound Membrane Separation Model.pdf
Multicomponent Spiral Wound Membrane Separation Model.pdfMulticomponent Spiral Wound Membrane Separation Model.pdf
Multicomponent Spiral Wound Membrane Separation Model.pdfGiovanaGhasary1
 
Test of Significance of Large Samples for Mean = µ.pptx
Test of Significance of Large Samples for Mean = µ.pptxTest of Significance of Large Samples for Mean = µ.pptx
Test of Significance of Large Samples for Mean = µ.pptxHome
 
cloud computing notes for anna university syllabus
cloud computing notes for anna university syllabuscloud computing notes for anna university syllabus
cloud computing notes for anna university syllabusViolet Violet
 
Modelling Guide for Timber Structures - FPInnovations
Modelling Guide for Timber Structures - FPInnovationsModelling Guide for Timber Structures - FPInnovations
Modelling Guide for Timber Structures - FPInnovationsYusuf Yıldız
 
Quasi-Stochastic Approximation: Algorithm Design Principles with Applications...
Quasi-Stochastic Approximation: Algorithm Design Principles with Applications...Quasi-Stochastic Approximation: Algorithm Design Principles with Applications...
Quasi-Stochastic Approximation: Algorithm Design Principles with Applications...Sean Meyn
 
The relationship between iot and communication technology
The relationship between iot and communication technologyThe relationship between iot and communication technology
The relationship between iot and communication technologyabdulkadirmukarram03
 
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTION.docx
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTION.docxSUMMER TRAINING REPORT ON BUILDING CONSTRUCTION.docx
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTION.docxNaveenVerma126
 

Dernier (20)

How to Write a Good Scientific Paper.pdf
How to Write a Good Scientific Paper.pdfHow to Write a Good Scientific Paper.pdf
How to Write a Good Scientific Paper.pdf
 
GENERAL CONDITIONS FOR CONTRACTS OF CIVIL ENGINEERING WORKS
GENERAL CONDITIONS  FOR  CONTRACTS OF CIVIL ENGINEERING WORKS GENERAL CONDITIONS  FOR  CONTRACTS OF CIVIL ENGINEERING WORKS
GENERAL CONDITIONS FOR CONTRACTS OF CIVIL ENGINEERING WORKS
 
Lecture 2 .pdf
Lecture 2                           .pdfLecture 2                           .pdf
Lecture 2 .pdf
 
Design of Clutches and Brakes in Design of Machine Elements.pptx
Design of Clutches and Brakes in Design of Machine Elements.pptxDesign of Clutches and Brakes in Design of Machine Elements.pptx
Design of Clutches and Brakes in Design of Machine Elements.pptx
 
Landsman converter for power factor improvement
Landsman converter for power factor improvementLandsman converter for power factor improvement
Landsman converter for power factor improvement
 
ASME BPVC 2023 Section I para leer y entender
ASME BPVC 2023 Section I para leer y entenderASME BPVC 2023 Section I para leer y entender
ASME BPVC 2023 Section I para leer y entender
 
Strategies of Urban Morphologyfor Improving Outdoor Thermal Comfort and Susta...
Strategies of Urban Morphologyfor Improving Outdoor Thermal Comfort and Susta...Strategies of Urban Morphologyfor Improving Outdoor Thermal Comfort and Susta...
Strategies of Urban Morphologyfor Improving Outdoor Thermal Comfort and Susta...
 
Vertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptx
Vertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptxVertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptx
Vertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptx
 
計劃趕得上變化
計劃趕得上變化計劃趕得上變化
計劃趕得上變化
 
Popular-NO1 Kala Jadu Expert Specialist In Germany Kala Jadu Expert Specialis...
Popular-NO1 Kala Jadu Expert Specialist In Germany Kala Jadu Expert Specialis...Popular-NO1 Kala Jadu Expert Specialist In Germany Kala Jadu Expert Specialis...
Popular-NO1 Kala Jadu Expert Specialist In Germany Kala Jadu Expert Specialis...
 
Technology Features of Apollo HDD Machine, Its Technical Specification with C...
Technology Features of Apollo HDD Machine, Its Technical Specification with C...Technology Features of Apollo HDD Machine, Its Technical Specification with C...
Technology Features of Apollo HDD Machine, Its Technical Specification with C...
 
solar wireless electric vechicle charging system
solar wireless electric vechicle charging systemsolar wireless electric vechicle charging system
solar wireless electric vechicle charging system
 
Nodal seismic construction requirements.pptx
Nodal seismic construction requirements.pptxNodal seismic construction requirements.pptx
Nodal seismic construction requirements.pptx
 
Multicomponent Spiral Wound Membrane Separation Model.pdf
Multicomponent Spiral Wound Membrane Separation Model.pdfMulticomponent Spiral Wound Membrane Separation Model.pdf
Multicomponent Spiral Wound Membrane Separation Model.pdf
 
Test of Significance of Large Samples for Mean = µ.pptx
Test of Significance of Large Samples for Mean = µ.pptxTest of Significance of Large Samples for Mean = µ.pptx
Test of Significance of Large Samples for Mean = µ.pptx
 
cloud computing notes for anna university syllabus
cloud computing notes for anna university syllabuscloud computing notes for anna university syllabus
cloud computing notes for anna university syllabus
 
Modelling Guide for Timber Structures - FPInnovations
Modelling Guide for Timber Structures - FPInnovationsModelling Guide for Timber Structures - FPInnovations
Modelling Guide for Timber Structures - FPInnovations
 
Quasi-Stochastic Approximation: Algorithm Design Principles with Applications...
Quasi-Stochastic Approximation: Algorithm Design Principles with Applications...Quasi-Stochastic Approximation: Algorithm Design Principles with Applications...
Quasi-Stochastic Approximation: Algorithm Design Principles with Applications...
 
The relationship between iot and communication technology
The relationship between iot and communication technologyThe relationship between iot and communication technology
The relationship between iot and communication technology
 
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTION.docx
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTION.docxSUMMER TRAINING REPORT ON BUILDING CONSTRUCTION.docx
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTION.docx
 

2015 10 06_sem_pref_watanabe_chile_presentationoct2015(part2)