MATERIAL SHORTAGES AND FLUCTUATIONS
CLAUSES IN STANDARD FORM CONTRACTS
SEAN SULIVAN GIBBS
BSc, LLB (Hons) PG Dip Arb, Dip Adj, LLM, MICE, FRICS, FCIARB, FCIOB, FCICES
CEO - HANSCOMB INTERCONTINENTAL LTD
5 CHANCERY LANE, LONDON, UK
T: +44 (0)7722 643 816
Email: sean.gibbs@hanscombintercontinental.co.uk
KATIE PICKERING
SOLICITOR – BPE SOLICITORS LLP
ST JAMES HOUSE , CHELTENHAM
T: 01242 248271
Email: katie.pickering@bpe.co.uk
KEITH BLIZZARD
Partner (non-solicitor),
Head of Construction & Engineering Team
63 Church Street, Birmingham, B3 2DP
T: 0330 107 2967
Email: kblizzard@hcrlaw.com
Construction has officially recovered from the record 44%
plunge in activity seen at the height of the first Covid
lockdown.
Latest figures for output in March reveal construction grew
nearly 6%, lifting activity above the pre-pandemic watermark
recorded last February.
The latest bellwether IHS Markit/CIPS UK
Construction PMI Total Activity Index posted 61.6
in April, down only fractionally from March’s six-
and-a-half year peak of 61.7.
Any figure above 50.0 indicates an overall
expansion of construction output and the index
has posted in growth territory in ten of the past
eleven months, with January 2021 the exception.
But demand and supply imbalances meant that
the rate of input cost inflation picked up for the
seventh month in a row to its highest since the
survey began in April 1997.
Commercial work was the best performing sector
in April with civil engineering enjoying its fastest
speed of recovery since September 2014.
A rapid rise in demand for construction products
and materials continued to stretch supply chains
and the latest lengthening of suppliers’ delivery
times was the third-greatest since the survey
began in 1997, exceeded only by those seen
during the lockdown in April and May last year.
HEADLINES ON 19 MAY 2021
HEADLINES ON 19 MAY 2021
Be careful when tendering for
jobs.
Most tenders are in the form of
a binding offer capable of
acceptance.
You must submit a qualified bid
if the contract does not include
for fluctuations, labour material
shortages and you need to
negotiate these with the client.
• Products are available but lead times
have lengthened.
• Current demand is proving difficult
for manufacturers and supplier to
build up stock levels.
• Global demand continues to impact
prices and delivery times.
• Shortage of materials will lead to
price inflation
• Extension of time
• Loss and expense
• Fluctuation provisions
• Force Majeure
• Option B
Force Majeure
JCT Design and Build 2016
Relevant Event – clause2.26.14
JCT Intermediate Building Contract with Contractor’s Design 2016
Relevant Event – clause2.20.13
JCT Standard Building Contract Without Quants 2016
Relevant Event – clause2.29.14
Fluctuation Provisions
JCT Design and Build 2016
JCT Intermediate Building Contract with Contractor’s Design 2016
JCT Standard Building Contract Without Quants 2016
Clause 4.2.3
Default position – Option A – Contribution, levy
and tax fluctuations
Clause 4.3.2
Default position –Contribution, levy and tax
fluctuations
Clause 4.3.3
Default position – Option A – Contribution, levy
and tax fluctuations
How do we take account for shortage of materials and increased costs
going forward?
Letters of Intent
Provisional Sum
Negotiation
Allocation of Risk
Fluctuation Provisions
Glos CE - material shortages & fluctuations in standard forms of contr5act
Glos CE - material shortages & fluctuations in standard forms of contr5act
Glos CE - material shortages & fluctuations in standard forms of contr5act

Contenu connexe

Similaire à Glos CE - material shortages & fluctuations in standard forms of contr5act

Costs and climate impact of offsetting emissions under CORSIA
Costs and climate impact of offsetting emissions under CORSIACosts and climate impact of offsetting emissions under CORSIA
Costs and climate impact of offsetting emissions under CORSIANicolas Fux
 
Green Report - spreads
Green Report - spreadsGreen Report - spreads
Green Report - spreadsRon Farr
 
BIM Show Live 2015: 110 Queen Street – A BIM exemplar
BIM Show Live 2015: 110 Queen Street – A BIM exemplarBIM Show Live 2015: 110 Queen Street – A BIM exemplar
BIM Show Live 2015: 110 Queen Street – A BIM exemplarBuiltEnvironmentUBM
 
NEC-newsletter-70
NEC-newsletter-70NEC-newsletter-70
NEC-newsletter-70sam hyde
 
Best value contracting
Best value contractingBest value contracting
Best value contractingahmed saeed
 
2010 uci douglas hospital team platinum award by bdc
2010 uci douglas hospital team platinum award by bdc2010 uci douglas hospital team platinum award by bdc
2010 uci douglas hospital team platinum award by bdcAvi Grigorescu
 
Construction Monthly Progress Report - June 2011
Construction Monthly Progress Report - June 2011Construction Monthly Progress Report - June 2011
Construction Monthly Progress Report - June 2011Jamal Nelson, CCM
 
Prefabricated structures in UK
Prefabricated structures in UKPrefabricated structures in UK
Prefabricated structures in UKsanthitunuguntla
 
UKA Newsletter Apr 2022.pdf
UKA Newsletter Apr 2022.pdfUKA Newsletter Apr 2022.pdf
UKA Newsletter Apr 2022.pdfSeanGibbs12
 
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...Praveen Premkumar
 
CV-Jeff Chan 2016
CV-Jeff Chan 2016CV-Jeff Chan 2016
CV-Jeff Chan 2016Jeff Chan
 
Modular Construction in MENA 2019
Modular Construction in MENA 2019Modular Construction in MENA 2019
Modular Construction in MENA 2019Alexandra Tohme
 
Laura - Construction Manager (Main), June 2016
Laura - Construction Manager (Main), June 2016Laura - Construction Manager (Main), June 2016
Laura - Construction Manager (Main), June 2016Laura Lintott (Teodorescu)
 
The Business of Sustainable Supply Chains for Manufacturers
The Business of Sustainable Supply Chains for ManufacturersThe Business of Sustainable Supply Chains for Manufacturers
The Business of Sustainable Supply Chains for ManufacturersWithum
 
The Channel Tunnel
The Channel TunnelThe Channel Tunnel
The Channel TunnelPriya Raj
 
Common mistakes by novice property developers and home owners extending , con...
Common mistakes by novice property developers and home owners extending , con...Common mistakes by novice property developers and home owners extending , con...
Common mistakes by novice property developers and home owners extending , con...marcpreston
 
Bis 13-955-construction-2025-industrial-strategy(4)
Bis 13-955-construction-2025-industrial-strategy(4)Bis 13-955-construction-2025-industrial-strategy(4)
Bis 13-955-construction-2025-industrial-strategy(4)justincorbett
 

Similaire à Glos CE - material shortages & fluctuations in standard forms of contr5act (20)

Lee Sadowski
Lee Sadowski Lee Sadowski
Lee Sadowski
 
Costs and climate impact of offsetting emissions under CORSIA
Costs and climate impact of offsetting emissions under CORSIACosts and climate impact of offsetting emissions under CORSIA
Costs and climate impact of offsetting emissions under CORSIA
 
Green Report - spreads
Green Report - spreadsGreen Report - spreads
Green Report - spreads
 
BIM Show Live 2015: 110 Queen Street – A BIM exemplar
BIM Show Live 2015: 110 Queen Street – A BIM exemplarBIM Show Live 2015: 110 Queen Street – A BIM exemplar
BIM Show Live 2015: 110 Queen Street – A BIM exemplar
 
NEC-newsletter-70
NEC-newsletter-70NEC-newsletter-70
NEC-newsletter-70
 
Best value contracting
Best value contractingBest value contracting
Best value contracting
 
2010 uci douglas hospital team platinum award by bdc
2010 uci douglas hospital team platinum award by bdc2010 uci douglas hospital team platinum award by bdc
2010 uci douglas hospital team platinum award by bdc
 
Construction Monthly Progress Report - June 2011
Construction Monthly Progress Report - June 2011Construction Monthly Progress Report - June 2011
Construction Monthly Progress Report - June 2011
 
Prefabricated structures in UK
Prefabricated structures in UKPrefabricated structures in UK
Prefabricated structures in UK
 
UKA Newsletter Apr 2022.pdf
UKA Newsletter Apr 2022.pdfUKA Newsletter Apr 2022.pdf
UKA Newsletter Apr 2022.pdf
 
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...
 
CV-Jeff Chan 2016
CV-Jeff Chan 2016CV-Jeff Chan 2016
CV-Jeff Chan 2016
 
BIM Presentation Issue 1 - 9 March 2015
BIM Presentation Issue 1 - 9 March 2015BIM Presentation Issue 1 - 9 March 2015
BIM Presentation Issue 1 - 9 March 2015
 
Modular Construction in MENA 2019
Modular Construction in MENA 2019Modular Construction in MENA 2019
Modular Construction in MENA 2019
 
Laura - Construction Manager (Main), June 2016
Laura - Construction Manager (Main), June 2016Laura - Construction Manager (Main), June 2016
Laura - Construction Manager (Main), June 2016
 
The Business of Sustainable Supply Chains for Manufacturers
The Business of Sustainable Supply Chains for ManufacturersThe Business of Sustainable Supply Chains for Manufacturers
The Business of Sustainable Supply Chains for Manufacturers
 
UK Adjudicators July 2020 newsletter
UK Adjudicators July 2020 newsletterUK Adjudicators July 2020 newsletter
UK Adjudicators July 2020 newsletter
 
The Channel Tunnel
The Channel TunnelThe Channel Tunnel
The Channel Tunnel
 
Common mistakes by novice property developers and home owners extending , con...
Common mistakes by novice property developers and home owners extending , con...Common mistakes by novice property developers and home owners extending , con...
Common mistakes by novice property developers and home owners extending , con...
 
Bis 13-955-construction-2025-industrial-strategy(4)
Bis 13-955-construction-2025-industrial-strategy(4)Bis 13-955-construction-2025-industrial-strategy(4)
Bis 13-955-construction-2025-industrial-strategy(4)
 

Plus de Sean Gibbs DipArb, FCIARB, FCIOB, FRICS, MICE

Plus de Sean Gibbs DipArb, FCIARB, FCIOB, FRICS, MICE (20)

UKA Newsletter May 2022.pdf
UKA Newsletter May 2022.pdfUKA Newsletter May 2022.pdf
UKA Newsletter May 2022.pdf
 
UK Adjudicators September 2021 Newsletter
UK Adjudicators  September 2021 Newsletter UK Adjudicators  September 2021 Newsletter
UK Adjudicators September 2021 Newsletter
 
UK Adjudicators 2021 London Adjudication & Arbitration Conference pack
UK Adjudicators 2021 London Adjudication & Arbitration Conference packUK Adjudicators 2021 London Adjudication & Arbitration Conference pack
UK Adjudicators 2021 London Adjudication & Arbitration Conference pack
 
UK Adjudicators 2021 London Conference pack
UK Adjudicators 2021 London Conference packUK Adjudicators 2021 London Conference pack
UK Adjudicators 2021 London Conference pack
 
UK Adjudicators London 2021 Conference pack
UK Adjudicators London 2021 Conference packUK Adjudicators London 2021 Conference pack
UK Adjudicators London 2021 Conference pack
 
UK Adjudicators Newsletter August 2021
UK Adjudicators Newsletter August 2021UK Adjudicators Newsletter August 2021
UK Adjudicators Newsletter August 2021
 
UK Adjudicators Newsletter July 2021
UK Adjudicators Newsletter July 2021UK Adjudicators Newsletter July 2021
UK Adjudicators Newsletter July 2021
 
UK Adjudicators London 2021 Adjudication & Arbitration Conference
UK Adjudicators  London 2021 Adjudication & Arbitration ConferenceUK Adjudicators  London 2021 Adjudication & Arbitration Conference
UK Adjudicators London 2021 Adjudication & Arbitration Conference
 
UK Adjudicators Newsletter June 2021
UK Adjudicators  Newsletter June 2021UK Adjudicators  Newsletter June 2021
UK Adjudicators Newsletter June 2021
 
The need for dispute boards on international waste to energy projects
The need for dispute boards on international waste to energy projectsThe need for dispute boards on international waste to energy projects
The need for dispute boards on international waste to energy projects
 
JCT Dispute Adjudication Board 20221
JCT Dispute Adjudication  Board 20221JCT Dispute Adjudication  Board 20221
JCT Dispute Adjudication Board 20221
 
UK Adjudicators newsletter May 2021
UK Adjudicators newsletter May 2021UK Adjudicators newsletter May 2021
UK Adjudicators newsletter May 2021
 
UK Adjudicators April 2021 newsletter
UK Adjudicators April 2021 newsletterUK Adjudicators April 2021 newsletter
UK Adjudicators April 2021 newsletter
 
UK Adjudicators panel members 14 March 2021
UK Adjudicators panel members 14 March 2021UK Adjudicators panel members 14 March 2021
UK Adjudicators panel members 14 March 2021
 
Vis East Moot Programme 2021
Vis East Moot Programme 2021Vis East Moot Programme 2021
Vis East Moot Programme 2021
 
UK Adjudicators Panel Members
UK Adjudicators Panel MembersUK Adjudicators Panel Members
UK Adjudicators Panel Members
 
Hanscomb Intercontinental brochure expert advisory & expert witness services
Hanscomb Intercontinental brochure expert advisory & expert witness servicesHanscomb Intercontinental brochure expert advisory & expert witness services
Hanscomb Intercontinental brochure expert advisory & expert witness services
 
UK Adjudicators November 2020 Newsletter
UK Adjudicators November 2020 NewsletterUK Adjudicators November 2020 Newsletter
UK Adjudicators November 2020 Newsletter
 
UK Adjudicators October 2020 Newsletter
UK Adjudicators  October 2020 NewsletterUK Adjudicators  October 2020 Newsletter
UK Adjudicators October 2020 Newsletter
 
Hanscomb Intercontinental expert advisory & expert witness services
Hanscomb Intercontinental expert advisory & expert witness servicesHanscomb Intercontinental expert advisory & expert witness services
Hanscomb Intercontinental expert advisory & expert witness services
 

Dernier

Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Intro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfIntro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfrs7054576148
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 

Dernier (20)

NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Intro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfIntro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdf
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 

Glos CE - material shortages & fluctuations in standard forms of contr5act

  • 1. MATERIAL SHORTAGES AND FLUCTUATIONS CLAUSES IN STANDARD FORM CONTRACTS
  • 2. SEAN SULIVAN GIBBS BSc, LLB (Hons) PG Dip Arb, Dip Adj, LLM, MICE, FRICS, FCIARB, FCIOB, FCICES CEO - HANSCOMB INTERCONTINENTAL LTD 5 CHANCERY LANE, LONDON, UK T: +44 (0)7722 643 816 Email: sean.gibbs@hanscombintercontinental.co.uk
  • 3. KATIE PICKERING SOLICITOR – BPE SOLICITORS LLP ST JAMES HOUSE , CHELTENHAM T: 01242 248271 Email: katie.pickering@bpe.co.uk
  • 4. KEITH BLIZZARD Partner (non-solicitor), Head of Construction & Engineering Team 63 Church Street, Birmingham, B3 2DP T: 0330 107 2967 Email: kblizzard@hcrlaw.com
  • 5. Construction has officially recovered from the record 44% plunge in activity seen at the height of the first Covid lockdown. Latest figures for output in March reveal construction grew nearly 6%, lifting activity above the pre-pandemic watermark recorded last February.
  • 6.
  • 7.
  • 8. The latest bellwether IHS Markit/CIPS UK Construction PMI Total Activity Index posted 61.6 in April, down only fractionally from March’s six- and-a-half year peak of 61.7. Any figure above 50.0 indicates an overall expansion of construction output and the index has posted in growth territory in ten of the past eleven months, with January 2021 the exception. But demand and supply imbalances meant that the rate of input cost inflation picked up for the seventh month in a row to its highest since the survey began in April 1997. Commercial work was the best performing sector in April with civil engineering enjoying its fastest speed of recovery since September 2014. A rapid rise in demand for construction products and materials continued to stretch supply chains and the latest lengthening of suppliers’ delivery times was the third-greatest since the survey began in 1997, exceeded only by those seen during the lockdown in April and May last year.
  • 9.
  • 10. HEADLINES ON 19 MAY 2021
  • 11. HEADLINES ON 19 MAY 2021
  • 12. Be careful when tendering for jobs. Most tenders are in the form of a binding offer capable of acceptance. You must submit a qualified bid if the contract does not include for fluctuations, labour material shortages and you need to negotiate these with the client.
  • 13.
  • 14. • Products are available but lead times have lengthened. • Current demand is proving difficult for manufacturers and supplier to build up stock levels. • Global demand continues to impact prices and delivery times. • Shortage of materials will lead to price inflation
  • 15.
  • 16. • Extension of time • Loss and expense • Fluctuation provisions • Force Majeure • Option B
  • 17. Force Majeure JCT Design and Build 2016 Relevant Event – clause2.26.14 JCT Intermediate Building Contract with Contractor’s Design 2016 Relevant Event – clause2.20.13 JCT Standard Building Contract Without Quants 2016 Relevant Event – clause2.29.14
  • 18. Fluctuation Provisions JCT Design and Build 2016 JCT Intermediate Building Contract with Contractor’s Design 2016 JCT Standard Building Contract Without Quants 2016 Clause 4.2.3 Default position – Option A – Contribution, levy and tax fluctuations Clause 4.3.2 Default position –Contribution, levy and tax fluctuations Clause 4.3.3 Default position – Option A – Contribution, levy and tax fluctuations
  • 19. How do we take account for shortage of materials and increased costs going forward? Letters of Intent Provisional Sum Negotiation Allocation of Risk Fluctuation Provisions