EMPIRE STATE BUILDING
CASE STUDY SUMMARY
EXTENET SYSTEMS
TONY EIGEN
AUGUST 5, 2015
2© 2015 EXTENET SYSTEMS, INC. CONFIDENTIAL & PROPRIETARY
EXTENET SYSTEMS - FAST FACTS
OUTDOOR
NETWORKS
Experience and Expertise – Design, Build, Operate, and Own.
DAS and Small Cell networks have been deployed by ExteNet
since 2005 as part of the Solution Network Architecture
~100 Million square feet of Operational Indoor Distributed
Networks in major MSAs like New York City, Chicago, Las Vegas,
Boston and Miami
>60 Operational Outdoor Distributed Networks in major MSAs
like New York City, Chicago, San Francisco, Las Vegas and Boston
Proven Track Record - Successful deployments and activities
with REITS and organizations like Empire State Building,
Fairmont Hotels, Barclays Center, Banner Healthcare
All US National Wireless Carriers are Satisfied Customers on our
Networks
INDOOR
NETWORKS
3© 2015 EXTENET SYSTEMS, INC. CONFIDENTIAL & PROPRIETARY
EMPIRE STATE BUILDING – FAST FACTS
 102 floor structure covering ~ 2.8M square feet in
Mid-town Manhattan
 Building has its own zip code
 NYC and US historic landmark
 Opened in 1931
 Ranked #1 on America’s Favorite Architecture List
 Owned by Empire State Realty Trust
 REIT owners of 8 other properties in Manhattan
 2010 - $550M+ renovation began and continues
today
 At end of 2014 ~ 86% space is leased
 Tenants include: FDIC, LinkedIn, Global Brands Group
 “TAMI” Tenants sought after by venue and carriers
 Technology – Advertising – Media - IT
 Total number of visitors each year >4M
4© 2015 EXTENET SYSTEMS, INC. CONFIDENTIAL & PROPRIETARY
PROJECT SCOPE AND HIGHLIGHTS
 Basic requirements for cellular coverage
 Provide 4G-LTE voice and data coverage for all 102
floors, including the observatory, office space, retail space
and the underground wind tunnel
 Coverage area is 90% of leasable space inclusive of
elevators and stair wells
 Radio/TV Broadcast floors - coverage in corridor only
 Robust distributed network that supports multi-carrier on
day 1
 Network operated by ExteNet
 ESB provides own Wi-Fi network
5© 2015 EXTENET SYSTEMS, INC. CONFIDENTIAL & PROPRIETARY
 Network infrastructure summary
 Equipment Head End Room – 1,000 sq ft on Concourse Level
 DAS-based Solution
 6 sectors
 41- 5 watt nodes powered from Head End
 763 antennas
 90,000 linear feet (~17+ miles) of coax cabling
 25,000 linear feet (~5 miles) fiber cabling
 Other Peripherals
 Cooling - 20 ton cooling capacity, 2 x 10 ton lead lag units installed
along with 20 ton cooling tower installed above the loading dock
 Power - 600A 208V electric service with ATS for future generator
connection
 Fire suppression FM200 primary with back up
 Solution design - forward thinking ~ 20% “buffer” built in
 Operated and Owned by ExteNet
TURNKEY SOLUTION OVERVIEW
6© 2015 EXTENET SYSTEMS, INC. CONFIDENTIAL & PROPRIETARY
IMPLEMENTATION CHALLENGES
 Obtaining the multiple necessary building approvals
 Ownership - ESRT requirements
 Carriers’ design/requirements (anchor vs. add-ons) (signal levels
required)
 Head End location changes
 Generator / Cooling components location
 All Tenant approvals 190 tenants!
 National historic landmark approval
 Design changes due to the changing outdoor macro
environment and carrier requirements
 Four design changes after construction began
 Scheduling
 Tenant/building coordination
 Observatory operations
7© 2015 EXTENET SYSTEMS, INC. CONFIDENTIAL & PROPRIETARY
IMPLEMENTATION CHALLENGES CONT’D
 Enterprise tenant coordination
 Acceptable work hours differ for each tenant – 190 tenants!
 Tenant-specific finishes
 Different aesthetic finishes for each suite
 Restoring suite to original condition at the end of each shift
 General building requirements
 Work areas and respective work hours
 Security/escorts/access to various spaces (tenant/building)
8© 2015 EXTENET SYSTEMS, INC. CONFIDENTIAL & PROPRIETARY
CARRIER STATUS
Operational February 2015
• LTE 2100 MHz, ….
Operational October 2014
• LTE 1800 MHz, VoLTE...
Under Planning Review
Under Planning Review
9© 2015 EXTENET SYSTEMS, INC. CONFIDENTIAL & PROPRIETARY
SUMMARY – LESSONS LEARNED
 Process for engaging large and complex CRE
customers – duplicate solution models across venues
 ExteNet shows its value
 Increasing Priority for Carriers
 Design holistic solution for long term
 Multicarrier & growth
 Negotiate baseline for outside macro levels with carriers
 Managing large number of disparate enterprise tenants
 Understanding impact of existing construction status
 Plan to coordinate renovations prior to construction
 Develop three week look ahead with contingency plan
 Constant Communications before, during, and
after…many moving parts
10© 2015 EXTENET SYSTEMS, INC. CONFIDENTIAL & PROPRIETARY

Contenu connexe

Tendances

HOTEL CASESTUDY - HYATT REGENCY, PUNE
HOTEL CASESTUDY - HYATT REGENCY, PUNEHOTEL CASESTUDY - HYATT REGENCY, PUNE
HOTEL CASESTUDY - HYATT REGENCY, PUNEjagrutib22
 
Auditorium design ppt
Auditorium design pptAuditorium design ppt
Auditorium design pptAlok Ranjan
 
LE MERIDIEN case study
LE MERIDIEN case studyLE MERIDIEN case study
LE MERIDIEN case studyRabi Nain
 
High rise building case study
High rise building case study High rise building case study
High rise building case study VISHAKA BOTHRA
 
Iiit allahabad case study
Iiit allahabad   case studyIiit allahabad   case study
Iiit allahabad case studyMOHAMMAD FARZAN
 
Supertech supernova
Supertech supernovaSupertech supernova
Supertech supernovaShubham Jain
 
working drawing portfolio 1
working drawing portfolio 1 working drawing portfolio 1
working drawing portfolio 1 SHARATH REDDY
 
Case study of international architecture college
Case study of international architecture collegeCase study of international architecture college
Case study of international architecture collegeNilanjana Pal
 
Acoustic material market survey.pdf
Acoustic material market survey.pdfAcoustic material market survey.pdf
Acoustic material market survey.pdfNehaRanade2
 
Achuyt kanvinde
Achuyt kanvindeAchuyt kanvinde
Achuyt kanvindeGinni Jain
 
Tagore Theater case study
Tagore Theater case studyTagore Theater case study
Tagore Theater case studyRohan Choudhary
 
Pearl academy of fashion
Pearl academy of fashionPearl academy of fashion
Pearl academy of fashionSagar Panchal
 
Long span structures case study (LINK IN DESCRIPTION FOR DOWNLOAD)
Long span structures case study (LINK IN DESCRIPTION FOR DOWNLOAD)Long span structures case study (LINK IN DESCRIPTION FOR DOWNLOAD)
Long span structures case study (LINK IN DESCRIPTION FOR DOWNLOAD)Dimple Poddar
 

Tendances (20)

HOTEL CASESTUDY - HYATT REGENCY, PUNE
HOTEL CASESTUDY - HYATT REGENCY, PUNEHOTEL CASESTUDY - HYATT REGENCY, PUNE
HOTEL CASESTUDY - HYATT REGENCY, PUNE
 
Iit delhi case study
Iit delhi case studyIit delhi case study
Iit delhi case study
 
Kohinoor square
Kohinoor squareKohinoor square
Kohinoor square
 
Auditorium design ppt
Auditorium design pptAuditorium design ppt
Auditorium design ppt
 
LE MERIDIEN case study
LE MERIDIEN case studyLE MERIDIEN case study
LE MERIDIEN case study
 
Bhurj khalifa _Net Case Study
Bhurj khalifa _Net Case StudyBhurj khalifa _Net Case Study
Bhurj khalifa _Net Case Study
 
High rise building case study
High rise building case study High rise building case study
High rise building case study
 
Iiit allahabad case study
Iiit allahabad   case studyIiit allahabad   case study
Iiit allahabad case study
 
Supertech supernova
Supertech supernovaSupertech supernova
Supertech supernova
 
working drawing portfolio 1
working drawing portfolio 1 working drawing portfolio 1
working drawing portfolio 1
 
Case study of international architecture college
Case study of international architecture collegeCase study of international architecture college
Case study of international architecture college
 
Sears tower
Sears tower Sears tower
Sears tower
 
ANANT RAJE
ANANT RAJEANANT RAJE
ANANT RAJE
 
Acoustic material market survey.pdf
Acoustic material market survey.pdfAcoustic material market survey.pdf
Acoustic material market survey.pdf
 
Achuyt kanvinde
Achuyt kanvindeAchuyt kanvinde
Achuyt kanvinde
 
Tagore Theater case study
Tagore Theater case studyTagore Theater case study
Tagore Theater case study
 
Pearl academy of fashion
Pearl academy of fashionPearl academy of fashion
Pearl academy of fashion
 
Long span structures case study (LINK IN DESCRIPTION FOR DOWNLOAD)
Long span structures case study (LINK IN DESCRIPTION FOR DOWNLOAD)Long span structures case study (LINK IN DESCRIPTION FOR DOWNLOAD)
Long span structures case study (LINK IN DESCRIPTION FOR DOWNLOAD)
 
tara group housing
tara group housingtara group housing
tara group housing
 
432 park avenue
432 park avenue432 park avenue
432 park avenue
 

En vedette

Empire state building presentation
Empire state building presentationEmpire state building presentation
Empire state building presentationGabriela Soto Bazán
 
Empire state building.docx
Empire state building.docxEmpire state building.docx
Empire state building.docxMs Wilson
 
Empire State Building
Empire State BuildingEmpire State Building
Empire State Buildinggrouse130
 
The empire state building
The empire state buildingThe empire state building
The empire state buildingHaley Evans
 
Construction Photos Of Empire State Building
Construction Photos Of Empire State BuildingConstruction Photos Of Empire State Building
Construction Photos Of Empire State Buildingvtsiri
 
Analyzing Empire State Building - Lean Project Delivery
Analyzing Empire State Building - Lean Project DeliveryAnalyzing Empire State Building - Lean Project Delivery
Analyzing Empire State Building - Lean Project DeliveryJamal Nelson, CCM
 
Empire state building
Empire state buildingEmpire state building
Empire state buildingCOMM 2213
 
Mumbai High Rise Buildings Case studies of Kohinoor Square, Aquaria Grande, K...
Mumbai High Rise Buildings Case studies of Kohinoor Square, Aquaria Grande, K...Mumbai High Rise Buildings Case studies of Kohinoor Square, Aquaria Grande, K...
Mumbai High Rise Buildings Case studies of Kohinoor Square, Aquaria Grande, K...Prateek Srivastava
 
Building the empire state building
Building the empire state buildingBuilding the empire state building
Building the empire state buildingsheila bert
 
Do Green Buildings Make Dollars & Sense?
Do Green Buildings Make Dollars & Sense?Do Green Buildings Make Dollars & Sense?
Do Green Buildings Make Dollars & Sense?halatious
 
Photos Of The Construction Of The Empire State Building
Photos Of The Construction Of The Empire State BuildingPhotos Of The Construction Of The Empire State Building
Photos Of The Construction Of The Empire State Buildingprofer21
 
A Tour of New York City - Powerpoint Activity
A Tour of New York City - Powerpoint ActivityA Tour of New York City - Powerpoint Activity
A Tour of New York City - Powerpoint Activitymcnamart
 
Green Buildings or Green Wash in the United States
Green Buildings or Green Wash in the United StatesGreen Buildings or Green Wash in the United States
Green Buildings or Green Wash in the United StatesChicago Metallic Corporation
 
Empire State Building. Estructura y proceso de Construcción.
Empire State Building. Estructura y proceso de Construcción.Empire State Building. Estructura y proceso de Construcción.
Empire State Building. Estructura y proceso de Construcción.construccionpesada1
 
Burj Al Arab Conceptos De Fuerza Original
Burj Al Arab Conceptos De Fuerza OriginalBurj Al Arab Conceptos De Fuerza Original
Burj Al Arab Conceptos De Fuerza OriginalMunicipalidad de Pirque
 
17 concepts you should know to pass the LEED v4 GA Exam
17 concepts you should know to pass the LEED v4 GA Exam17 concepts you should know to pass the LEED v4 GA Exam
17 concepts you should know to pass the LEED v4 GA ExamRob Freeman
 
Highrise buildings....
Highrise buildings....Highrise buildings....
Highrise buildings....MSulmanSarwar
 

En vedette (20)

Empire state building presentation
Empire state building presentationEmpire state building presentation
Empire state building presentation
 
Empire state building.docx
Empire state building.docxEmpire state building.docx
Empire state building.docx
 
Empire State Building
Empire State BuildingEmpire State Building
Empire State Building
 
The empire state building
The empire state buildingThe empire state building
The empire state building
 
Empire state
Empire stateEmpire state
Empire state
 
Group8 empire state building
Group8 empire state buildingGroup8 empire state building
Group8 empire state building
 
Construction Photos Of Empire State Building
Construction Photos Of Empire State BuildingConstruction Photos Of Empire State Building
Construction Photos Of Empire State Building
 
Analyzing Empire State Building - Lean Project Delivery
Analyzing Empire State Building - Lean Project DeliveryAnalyzing Empire State Building - Lean Project Delivery
Analyzing Empire State Building - Lean Project Delivery
 
Empire state building
Empire state buildingEmpire state building
Empire state building
 
Mumbai High Rise Buildings Case studies of Kohinoor Square, Aquaria Grande, K...
Mumbai High Rise Buildings Case studies of Kohinoor Square, Aquaria Grande, K...Mumbai High Rise Buildings Case studies of Kohinoor Square, Aquaria Grande, K...
Mumbai High Rise Buildings Case studies of Kohinoor Square, Aquaria Grande, K...
 
Building the empire state building
Building the empire state buildingBuilding the empire state building
Building the empire state building
 
Do Green Buildings Make Dollars & Sense?
Do Green Buildings Make Dollars & Sense?Do Green Buildings Make Dollars & Sense?
Do Green Buildings Make Dollars & Sense?
 
Photos Of The Construction Of The Empire State Building
Photos Of The Construction Of The Empire State BuildingPhotos Of The Construction Of The Empire State Building
Photos Of The Construction Of The Empire State Building
 
A Tour of New York City - Powerpoint Activity
A Tour of New York City - Powerpoint ActivityA Tour of New York City - Powerpoint Activity
A Tour of New York City - Powerpoint Activity
 
Green Buildings or Green Wash in the United States
Green Buildings or Green Wash in the United StatesGreen Buildings or Green Wash in the United States
Green Buildings or Green Wash in the United States
 
Empire State Building. Estructura y proceso de Construcción.
Empire State Building. Estructura y proceso de Construcción.Empire State Building. Estructura y proceso de Construcción.
Empire State Building. Estructura y proceso de Construcción.
 
modern architecture
modern architecturemodern architecture
modern architecture
 
Burj Al Arab Conceptos De Fuerza Original
Burj Al Arab Conceptos De Fuerza OriginalBurj Al Arab Conceptos De Fuerza Original
Burj Al Arab Conceptos De Fuerza Original
 
17 concepts you should know to pass the LEED v4 GA Exam
17 concepts you should know to pass the LEED v4 GA Exam17 concepts you should know to pass the LEED v4 GA Exam
17 concepts you should know to pass the LEED v4 GA Exam
 
Highrise buildings....
Highrise buildings....Highrise buildings....
Highrise buildings....
 

Similaire à EMPIRE STATE BUILDING CASE STUDY SUMMARY

Spidercloud Wireless - Small Cell enterprise deployment
Spidercloud Wireless  - Small Cell enterprise deploymentSpidercloud Wireless  - Small Cell enterprise deployment
Spidercloud Wireless - Small Cell enterprise deploymentSmall Cell Forum
 
SpiderCloud Wireless Scaling Small Cells indoors
SpiderCloud Wireless Scaling Small Cells indoorsSpiderCloud Wireless Scaling Small Cells indoors
SpiderCloud Wireless Scaling Small Cells indoorsSmall Cell Forum
 
Techcv 4 3 2010 2003london
Techcv 4 3 2010 2003londonTechcv 4 3 2010 2003london
Techcv 4 3 2010 2003londonnmeadows
 
Greg_Merriweather_5.7
Greg_Merriweather_5.7Greg_Merriweather_5.7
Greg_Merriweather_5.7Kai El
 
Utilipath Company Overview
Utilipath Company OverviewUtilipath Company Overview
Utilipath Company Overviewminerlawrence
 
Armando Gomez Resume2016-2
Armando Gomez Resume2016-2Armando Gomez Resume2016-2
Armando Gomez Resume2016-2Armando Gomez
 
Powernet Presentation
Powernet PresentationPowernet Presentation
Powernet PresentationPowernet
 
Powernet dossier
Powernet dossierPowernet dossier
Powernet dossierPowernet
 
MasterResumeDAVIDCLARK111715
MasterResumeDAVIDCLARK111715MasterResumeDAVIDCLARK111715
MasterResumeDAVIDCLARK111715David Clark
 
DavidClark1PageResume111715
DavidClark1PageResume111715DavidClark1PageResume111715
DavidClark1PageResume111715David Clark
 
It managed-services
It managed-servicesIt managed-services
It managed-servicesFlight Case
 
Resume for James McGarity
Resume for James McGarityResume for James McGarity
Resume for James McGarityJames McGarity
 
Product Management Telecommunications
Product Management   TelecommunicationsProduct Management   Telecommunications
Product Management TelecommunicationsJeanne Rog
 

Similaire à EMPIRE STATE BUILDING CASE STUDY SUMMARY (20)

Spidercloud Wireless - Small Cell enterprise deployment
Spidercloud Wireless  - Small Cell enterprise deploymentSpidercloud Wireless  - Small Cell enterprise deployment
Spidercloud Wireless - Small Cell enterprise deployment
 
SpiderCloud Wireless Scaling Small Cells indoors
SpiderCloud Wireless Scaling Small Cells indoorsSpiderCloud Wireless Scaling Small Cells indoors
SpiderCloud Wireless Scaling Small Cells indoors
 
Techcv 4 3 2010 2003london
Techcv 4 3 2010 2003londonTechcv 4 3 2010 2003london
Techcv 4 3 2010 2003london
 
Greg_Merriweather_5.7
Greg_Merriweather_5.7Greg_Merriweather_5.7
Greg_Merriweather_5.7
 
Herndon's
Herndon'sHerndon's
Herndon's
 
CV-ROB
CV-ROBCV-ROB
CV-ROB
 
Utilipath Company Overview
Utilipath Company OverviewUtilipath Company Overview
Utilipath Company Overview
 
Resume_Ritesh-JGD
Resume_Ritesh-JGDResume_Ritesh-JGD
Resume_Ritesh-JGD
 
Armando Gomez Resume2016-2
Armando Gomez Resume2016-2Armando Gomez Resume2016-2
Armando Gomez Resume2016-2
 
Powernet Presentation
Powernet PresentationPowernet Presentation
Powernet Presentation
 
Powernet dossier
Powernet dossierPowernet dossier
Powernet dossier
 
MasterResumeDAVIDCLARK111715
MasterResumeDAVIDCLARK111715MasterResumeDAVIDCLARK111715
MasterResumeDAVIDCLARK111715
 
System Integrator
System IntegratorSystem Integrator
System Integrator
 
Resume Rediker 10-21-2015
Resume Rediker 10-21-2015Resume Rediker 10-21-2015
Resume Rediker 10-21-2015
 
DavidClark1PageResume111715
DavidClark1PageResume111715DavidClark1PageResume111715
DavidClark1PageResume111715
 
It managed-services
It managed-servicesIt managed-services
It managed-services
 
CV SIDDARTH
CV SIDDARTHCV SIDDARTH
CV SIDDARTH
 
9 27 16 resume
9 27 16 resume9 27 16 resume
9 27 16 resume
 
Resume for James McGarity
Resume for James McGarityResume for James McGarity
Resume for James McGarity
 
Product Management Telecommunications
Product Management   TelecommunicationsProduct Management   Telecommunications
Product Management Telecommunications
 

Plus de Sharpe Smith

HetNet Forum Wireless Trends
HetNet Forum Wireless TrendsHetNet Forum Wireless Trends
HetNet Forum Wireless TrendsSharpe Smith
 
Samuel Hall Fastback Networks
Samuel Hall Fastback NetworksSamuel Hall Fastback Networks
Samuel Hall Fastback NetworksSharpe Smith
 
Mike Jones Advanced RF Technologies
Mike Jones Advanced RF TechnologiesMike Jones Advanced RF Technologies
Mike Jones Advanced RF TechnologiesSharpe Smith
 
Clayton funk Media Venture Partners
Clayton funk Media Venture PartnersClayton funk Media Venture Partners
Clayton funk Media Venture PartnersSharpe Smith
 
John Stevens Infinigy Presentation AGL Conference Denver Aug. 5, 2015
John Stevens Infinigy Presentation AGL Conference Denver Aug. 5, 2015John Stevens Infinigy Presentation AGL Conference Denver Aug. 5, 2015
John Stevens Infinigy Presentation AGL Conference Denver Aug. 5, 2015Sharpe Smith
 
Presentation by Edward Parkinson, FirstNet, at AGL Conference, June 19, Washi...
Presentation by Edward Parkinson, FirstNet, at AGL Conference, June 19, Washi...Presentation by Edward Parkinson, FirstNet, at AGL Conference, June 19, Washi...
Presentation by Edward Parkinson, FirstNet, at AGL Conference, June 19, Washi...Sharpe Smith
 
Security 2 Q 07[1]
Security 2 Q 07[1]Security 2 Q 07[1]
Security 2 Q 07[1]Sharpe Smith
 
Field Service Automation Main[1]
Field Service Automation Main[1]Field Service Automation Main[1]
Field Service Automation Main[1]Sharpe Smith
 
American University
American UniversityAmerican University
American UniversitySharpe Smith
 

Plus de Sharpe Smith (16)

HetNet Forum Wireless Trends
HetNet Forum Wireless TrendsHetNet Forum Wireless Trends
HetNet Forum Wireless Trends
 
Samuel Hall Fastback Networks
Samuel Hall Fastback NetworksSamuel Hall Fastback Networks
Samuel Hall Fastback Networks
 
Mike Jones Advanced RF Technologies
Mike Jones Advanced RF TechnologiesMike Jones Advanced RF Technologies
Mike Jones Advanced RF Technologies
 
Clayton funk Media Venture Partners
Clayton funk Media Venture PartnersClayton funk Media Venture Partners
Clayton funk Media Venture Partners
 
John Stevens Infinigy Presentation AGL Conference Denver Aug. 5, 2015
John Stevens Infinigy Presentation AGL Conference Denver Aug. 5, 2015John Stevens Infinigy Presentation AGL Conference Denver Aug. 5, 2015
John Stevens Infinigy Presentation AGL Conference Denver Aug. 5, 2015
 
Public safety
Public safetyPublic safety
Public safety
 
Presentation by Edward Parkinson, FirstNet, at AGL Conference, June 19, Washi...
Presentation by Edward Parkinson, FirstNet, at AGL Conference, June 19, Washi...Presentation by Edward Parkinson, FirstNet, at AGL Conference, June 19, Washi...
Presentation by Edward Parkinson, FirstNet, at AGL Conference, June 19, Washi...
 
Collectors3
Collectors3Collectors3
Collectors3
 
Security 2 Q 07[1]
Security 2 Q 07[1]Security 2 Q 07[1]
Security 2 Q 07[1]
 
Nostalgia 2
Nostalgia 2Nostalgia 2
Nostalgia 2
 
Field Service Automation Main[1]
Field Service Automation Main[1]Field Service Automation Main[1]
Field Service Automation Main[1]
 
Blue Man Group
Blue Man GroupBlue Man Group
Blue Man Group
 
Thompson
ThompsonThompson
Thompson
 
Carnegie
CarnegieCarnegie
Carnegie
 
American University
American UniversityAmerican University
American University
 
Utility
UtilityUtility
Utility
 

Dernier

UiPath Studio Web workshop series - Day 8
UiPath Studio Web workshop series - Day 8UiPath Studio Web workshop series - Day 8
UiPath Studio Web workshop series - Day 8DianaGray10
 
Crea il tuo assistente AI con lo Stregatto (open source python framework)
Crea il tuo assistente AI con lo Stregatto (open source python framework)Crea il tuo assistente AI con lo Stregatto (open source python framework)
Crea il tuo assistente AI con lo Stregatto (open source python framework)Commit University
 
Comparing Sidecar-less Service Mesh from Cilium and Istio
Comparing Sidecar-less Service Mesh from Cilium and IstioComparing Sidecar-less Service Mesh from Cilium and Istio
Comparing Sidecar-less Service Mesh from Cilium and IstioChristian Posta
 
AI Fame Rush Review – Virtual Influencer Creation In Just Minutes
AI Fame Rush Review – Virtual Influencer Creation In Just MinutesAI Fame Rush Review – Virtual Influencer Creation In Just Minutes
AI Fame Rush Review – Virtual Influencer Creation In Just MinutesMd Hossain Ali
 
Empowering Africa's Next Generation: The AI Leadership Blueprint
Empowering Africa's Next Generation: The AI Leadership BlueprintEmpowering Africa's Next Generation: The AI Leadership Blueprint
Empowering Africa's Next Generation: The AI Leadership BlueprintMahmoud Rabie
 
How Accurate are Carbon Emissions Projections?
How Accurate are Carbon Emissions Projections?How Accurate are Carbon Emissions Projections?
How Accurate are Carbon Emissions Projections?IES VE
 
UiPath Studio Web workshop series - Day 7
UiPath Studio Web workshop series - Day 7UiPath Studio Web workshop series - Day 7
UiPath Studio Web workshop series - Day 7DianaGray10
 
Nanopower In Semiconductor Industry.pdf
Nanopower  In Semiconductor Industry.pdfNanopower  In Semiconductor Industry.pdf
Nanopower In Semiconductor Industry.pdfPedro Manuel
 
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdf
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdfUiPath Solutions Management Preview - Northern CA Chapter - March 22.pdf
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdfDianaGray10
 
UiPath Community: AI for UiPath Automation Developers
UiPath Community: AI for UiPath Automation DevelopersUiPath Community: AI for UiPath Automation Developers
UiPath Community: AI for UiPath Automation DevelopersUiPathCommunity
 
ADOPTING WEB 3 FOR YOUR BUSINESS: A STEP-BY-STEP GUIDE
ADOPTING WEB 3 FOR YOUR BUSINESS: A STEP-BY-STEP GUIDEADOPTING WEB 3 FOR YOUR BUSINESS: A STEP-BY-STEP GUIDE
ADOPTING WEB 3 FOR YOUR BUSINESS: A STEP-BY-STEP GUIDELiveplex
 
Machine Learning Model Validation (Aijun Zhang 2024).pdf
Machine Learning Model Validation (Aijun Zhang 2024).pdfMachine Learning Model Validation (Aijun Zhang 2024).pdf
Machine Learning Model Validation (Aijun Zhang 2024).pdfAijun Zhang
 
Bird eye's view on Camunda open source ecosystem
Bird eye's view on Camunda open source ecosystemBird eye's view on Camunda open source ecosystem
Bird eye's view on Camunda open source ecosystemAsko Soukka
 
20230202 - Introduction to tis-py
20230202 - Introduction to tis-py20230202 - Introduction to tis-py
20230202 - Introduction to tis-pyJamie (Taka) Wang
 
IaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdf
IaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdfIaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdf
IaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdfDaniel Santiago Silva Capera
 
9 Steps For Building Winning Founding Team
9 Steps For Building Winning Founding Team9 Steps For Building Winning Founding Team
9 Steps For Building Winning Founding TeamAdam Moalla
 
Using IESVE for Loads, Sizing and Heat Pump Modeling to Achieve Decarbonization
Using IESVE for Loads, Sizing and Heat Pump Modeling to Achieve DecarbonizationUsing IESVE for Loads, Sizing and Heat Pump Modeling to Achieve Decarbonization
Using IESVE for Loads, Sizing and Heat Pump Modeling to Achieve DecarbonizationIES VE
 
Computer 10: Lesson 10 - Online Crimes and Hazards
Computer 10: Lesson 10 - Online Crimes and HazardsComputer 10: Lesson 10 - Online Crimes and Hazards
Computer 10: Lesson 10 - Online Crimes and HazardsSeth Reyes
 
Linked Data in Production: Moving Beyond Ontologies
Linked Data in Production: Moving Beyond OntologiesLinked Data in Production: Moving Beyond Ontologies
Linked Data in Production: Moving Beyond OntologiesDavid Newbury
 

Dernier (20)

UiPath Studio Web workshop series - Day 8
UiPath Studio Web workshop series - Day 8UiPath Studio Web workshop series - Day 8
UiPath Studio Web workshop series - Day 8
 
Crea il tuo assistente AI con lo Stregatto (open source python framework)
Crea il tuo assistente AI con lo Stregatto (open source python framework)Crea il tuo assistente AI con lo Stregatto (open source python framework)
Crea il tuo assistente AI con lo Stregatto (open source python framework)
 
Comparing Sidecar-less Service Mesh from Cilium and Istio
Comparing Sidecar-less Service Mesh from Cilium and IstioComparing Sidecar-less Service Mesh from Cilium and Istio
Comparing Sidecar-less Service Mesh from Cilium and Istio
 
AI Fame Rush Review – Virtual Influencer Creation In Just Minutes
AI Fame Rush Review – Virtual Influencer Creation In Just MinutesAI Fame Rush Review – Virtual Influencer Creation In Just Minutes
AI Fame Rush Review – Virtual Influencer Creation In Just Minutes
 
Empowering Africa's Next Generation: The AI Leadership Blueprint
Empowering Africa's Next Generation: The AI Leadership BlueprintEmpowering Africa's Next Generation: The AI Leadership Blueprint
Empowering Africa's Next Generation: The AI Leadership Blueprint
 
How Accurate are Carbon Emissions Projections?
How Accurate are Carbon Emissions Projections?How Accurate are Carbon Emissions Projections?
How Accurate are Carbon Emissions Projections?
 
201610817 - edge part1
201610817 - edge part1201610817 - edge part1
201610817 - edge part1
 
UiPath Studio Web workshop series - Day 7
UiPath Studio Web workshop series - Day 7UiPath Studio Web workshop series - Day 7
UiPath Studio Web workshop series - Day 7
 
Nanopower In Semiconductor Industry.pdf
Nanopower  In Semiconductor Industry.pdfNanopower  In Semiconductor Industry.pdf
Nanopower In Semiconductor Industry.pdf
 
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdf
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdfUiPath Solutions Management Preview - Northern CA Chapter - March 22.pdf
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdf
 
UiPath Community: AI for UiPath Automation Developers
UiPath Community: AI for UiPath Automation DevelopersUiPath Community: AI for UiPath Automation Developers
UiPath Community: AI for UiPath Automation Developers
 
ADOPTING WEB 3 FOR YOUR BUSINESS: A STEP-BY-STEP GUIDE
ADOPTING WEB 3 FOR YOUR BUSINESS: A STEP-BY-STEP GUIDEADOPTING WEB 3 FOR YOUR BUSINESS: A STEP-BY-STEP GUIDE
ADOPTING WEB 3 FOR YOUR BUSINESS: A STEP-BY-STEP GUIDE
 
Machine Learning Model Validation (Aijun Zhang 2024).pdf
Machine Learning Model Validation (Aijun Zhang 2024).pdfMachine Learning Model Validation (Aijun Zhang 2024).pdf
Machine Learning Model Validation (Aijun Zhang 2024).pdf
 
Bird eye's view on Camunda open source ecosystem
Bird eye's view on Camunda open source ecosystemBird eye's view on Camunda open source ecosystem
Bird eye's view on Camunda open source ecosystem
 
20230202 - Introduction to tis-py
20230202 - Introduction to tis-py20230202 - Introduction to tis-py
20230202 - Introduction to tis-py
 
IaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdf
IaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdfIaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdf
IaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdf
 
9 Steps For Building Winning Founding Team
9 Steps For Building Winning Founding Team9 Steps For Building Winning Founding Team
9 Steps For Building Winning Founding Team
 
Using IESVE for Loads, Sizing and Heat Pump Modeling to Achieve Decarbonization
Using IESVE for Loads, Sizing and Heat Pump Modeling to Achieve DecarbonizationUsing IESVE for Loads, Sizing and Heat Pump Modeling to Achieve Decarbonization
Using IESVE for Loads, Sizing and Heat Pump Modeling to Achieve Decarbonization
 
Computer 10: Lesson 10 - Online Crimes and Hazards
Computer 10: Lesson 10 - Online Crimes and HazardsComputer 10: Lesson 10 - Online Crimes and Hazards
Computer 10: Lesson 10 - Online Crimes and Hazards
 
Linked Data in Production: Moving Beyond Ontologies
Linked Data in Production: Moving Beyond OntologiesLinked Data in Production: Moving Beyond Ontologies
Linked Data in Production: Moving Beyond Ontologies
 

EMPIRE STATE BUILDING CASE STUDY SUMMARY

  • 1. 1© 2015 EXTENET SYSTEMS, INC. CONFIDENTIAL & PROPRIETARY© 2015 EXTENET SYSTEMS, INC. CONFIDENTIAL & PROPRIETARY EMPIRE STATE BUILDING CASE STUDY SUMMARY EXTENET SYSTEMS TONY EIGEN AUGUST 5, 2015
  • 2. 2© 2015 EXTENET SYSTEMS, INC. CONFIDENTIAL & PROPRIETARY EXTENET SYSTEMS - FAST FACTS OUTDOOR NETWORKS Experience and Expertise – Design, Build, Operate, and Own. DAS and Small Cell networks have been deployed by ExteNet since 2005 as part of the Solution Network Architecture ~100 Million square feet of Operational Indoor Distributed Networks in major MSAs like New York City, Chicago, Las Vegas, Boston and Miami >60 Operational Outdoor Distributed Networks in major MSAs like New York City, Chicago, San Francisco, Las Vegas and Boston Proven Track Record - Successful deployments and activities with REITS and organizations like Empire State Building, Fairmont Hotels, Barclays Center, Banner Healthcare All US National Wireless Carriers are Satisfied Customers on our Networks INDOOR NETWORKS
  • 3. 3© 2015 EXTENET SYSTEMS, INC. CONFIDENTIAL & PROPRIETARY EMPIRE STATE BUILDING – FAST FACTS  102 floor structure covering ~ 2.8M square feet in Mid-town Manhattan  Building has its own zip code  NYC and US historic landmark  Opened in 1931  Ranked #1 on America’s Favorite Architecture List  Owned by Empire State Realty Trust  REIT owners of 8 other properties in Manhattan  2010 - $550M+ renovation began and continues today  At end of 2014 ~ 86% space is leased  Tenants include: FDIC, LinkedIn, Global Brands Group  “TAMI” Tenants sought after by venue and carriers  Technology – Advertising – Media - IT  Total number of visitors each year >4M
  • 4. 4© 2015 EXTENET SYSTEMS, INC. CONFIDENTIAL & PROPRIETARY PROJECT SCOPE AND HIGHLIGHTS  Basic requirements for cellular coverage  Provide 4G-LTE voice and data coverage for all 102 floors, including the observatory, office space, retail space and the underground wind tunnel  Coverage area is 90% of leasable space inclusive of elevators and stair wells  Radio/TV Broadcast floors - coverage in corridor only  Robust distributed network that supports multi-carrier on day 1  Network operated by ExteNet  ESB provides own Wi-Fi network
  • 5. 5© 2015 EXTENET SYSTEMS, INC. CONFIDENTIAL & PROPRIETARY  Network infrastructure summary  Equipment Head End Room – 1,000 sq ft on Concourse Level  DAS-based Solution  6 sectors  41- 5 watt nodes powered from Head End  763 antennas  90,000 linear feet (~17+ miles) of coax cabling  25,000 linear feet (~5 miles) fiber cabling  Other Peripherals  Cooling - 20 ton cooling capacity, 2 x 10 ton lead lag units installed along with 20 ton cooling tower installed above the loading dock  Power - 600A 208V electric service with ATS for future generator connection  Fire suppression FM200 primary with back up  Solution design - forward thinking ~ 20% “buffer” built in  Operated and Owned by ExteNet TURNKEY SOLUTION OVERVIEW
  • 6. 6© 2015 EXTENET SYSTEMS, INC. CONFIDENTIAL & PROPRIETARY IMPLEMENTATION CHALLENGES  Obtaining the multiple necessary building approvals  Ownership - ESRT requirements  Carriers’ design/requirements (anchor vs. add-ons) (signal levels required)  Head End location changes  Generator / Cooling components location  All Tenant approvals 190 tenants!  National historic landmark approval  Design changes due to the changing outdoor macro environment and carrier requirements  Four design changes after construction began  Scheduling  Tenant/building coordination  Observatory operations
  • 7. 7© 2015 EXTENET SYSTEMS, INC. CONFIDENTIAL & PROPRIETARY IMPLEMENTATION CHALLENGES CONT’D  Enterprise tenant coordination  Acceptable work hours differ for each tenant – 190 tenants!  Tenant-specific finishes  Different aesthetic finishes for each suite  Restoring suite to original condition at the end of each shift  General building requirements  Work areas and respective work hours  Security/escorts/access to various spaces (tenant/building)
  • 8. 8© 2015 EXTENET SYSTEMS, INC. CONFIDENTIAL & PROPRIETARY CARRIER STATUS Operational February 2015 • LTE 2100 MHz, …. Operational October 2014 • LTE 1800 MHz, VoLTE... Under Planning Review Under Planning Review
  • 9. 9© 2015 EXTENET SYSTEMS, INC. CONFIDENTIAL & PROPRIETARY SUMMARY – LESSONS LEARNED  Process for engaging large and complex CRE customers – duplicate solution models across venues  ExteNet shows its value  Increasing Priority for Carriers  Design holistic solution for long term  Multicarrier & growth  Negotiate baseline for outside macro levels with carriers  Managing large number of disparate enterprise tenants  Understanding impact of existing construction status  Plan to coordinate renovations prior to construction  Develop three week look ahead with contingency plan  Constant Communications before, during, and after…many moving parts
  • 10. 10© 2015 EXTENET SYSTEMS, INC. CONFIDENTIAL & PROPRIETARY