Industrial Engineering in Garments
(IE in Sewing Department )
Database Management Apparel System
Assignment – 1
Name of Group Members:
1. Suraj Gangurde
2. Shivam Sagar
Index
1. Introduction
2. Roles of IE
3. Requirement analysis
4. Process Flow Diagram
5. Work Flow Diagram
6. Entity Relationship Diagram
7. Data Flow Diagram
Industrial Engineer :
Industrial engineering is a branch of engineering which is
related with the optimization of complex systems or processes.
It is totally concerned with the improvement, development, and
implementation of integrated systems of people, money,
information, knowledge, energy and it’s also analysis as well as
the mathematical, physical and social sciences together with
the principles and systems of engineering design to predict and
assess the results to be obtained from such types of systems.
Roles of IE:
1. Planning layouts
2. Monitoring Production flow system
3. Decide the machines and attachments for all style
4. Monitoring and improve the operator performance
5. Operator training
6. Production control system
7. Quality control
Requirement Analysis :
1. Time study
Time Study is the analysis of a specific job by a qualified worker in an effort to
find the most efficient method in terms of time and effort. Time Study measures
the time necessary for a job or task to be completed using the best method.
2. Method study
Method study the process of subjecting work to systematic, critical scrutiny to
make it more effective and/or more efficient. It is one of the keys to achieving
productivity improvement.
3. M/c Calculation
4. Skill Matrix
Effective tool to boost productivity in apparel Industry Training . Skill
matrix is a table that shows skills of individuals in a team and any gaps between
the skills of employees and the job roles they have.
5. Thread Consumption
Calulation and analysis of the requirement of thread.
6. Calculate SAM
Standard allowed minute (SAM) means how much time is required to make one
complete garment including allowances. SAM is used to measure the task or
work content of a garment. This term is widely used byindustrial engineers and
production people in the garment manufacturing industry.
7. Operation Breakdown
The method of preparing operations' list in a sequence is called as operation
breakdown.
8. Calculate Efficiency
Process Flow of industrial engineer :
Negotiation with Garment Merchandiser
Garment Analysis
Make P.P meetingif all the required fabrics , trimmings and accessories are in housed .
Production Target
Set machine layout
Line setting
Line Balancing
Continuous production meeting
Collecting production data
Preparing production report
Production report analysis
Report submit to factory Manage
Explanation:
01 Negotiation with garments merchandiser
It is the very first work of an industrial engineer. Here, he should vastly discussed with
garments merchandiser about the in-coming garments product.
02 Garments analysis
Confirmed garments product is clearly analyzed here by industrial engineer. It helps to
complete rest of the processes very easily.
03 Make P.P meeting
Here, P.P meeting should be organized if all the required fabrics, trimmings and
accessories .
04 Production target
Production target should set here according to factory capacity. It helps to respect the
shipment date.
05 Set machine layout
Machine layout is set here according to total processes needed to complete a
garment item.
06 Line setting
In this process, actual line setting should be done to utilize the garment workers
properly. If it takes more time in line setting then garments production will be
decreased.
07 Line balancing
To minimize the number of work stations, cycle time, line balancing is done here. Its
a very important process to achieve desired production target.
08 Continuous production meeting
Production meeting should be done here at regular interval. If any problem will arise
during garments production, should take necessary actions to solve that.
09 Collecting production data
Production data should be collected here for preparing production report.
10 Preparing production report
Here, total garments production report has prepared to analysis about the whole
production.
11 Production report analysis
Garments production report is analyzed here from different points of view.
12 Report submit to factory manager
Finally garments production report have to submit into the factory manager.
Work Flow :
CALCULATE SAM OF
GARMENT AND
DIFFERENT
CONSUMPTIONS
WORK
MEASUREMENT OF
NEW CONFIRMED
ORDER
TO ADVICE PRODUCTION
DEPARTMENT ON
GARMENT SAM AND LINE
LAYOUT
TO CALCULATE LINE
EFFICIENCY
DAY TO DAY
ACTIVITY
TO CALCULATE
OPERATOR
EFFECIENCY
GRADE CHANGE OF
OPERATORS
TIME AND METHOD
STUDY
TIME STUDY
CHECK FOR WORK AIDS
AND COMPLIANCES
PREPARATION OF
INCENTIVE SCHEME
Database Management Format:
A data management format helps in manage data, meet funder requirements, and help
others use data if shared.
Buyer:
 Buyer id (int, 5)
 Details (text ,15)
 Order No. (int, 9)
 Style No. (int ,5)
 Product Type (text, 15)
Order Details:
 Style No. (int ,5)
 Product Detail (text, 15)
 Quantity (int, 9)
 Size Ratio (int, 5)
Operation Bulletin:
 Operation no. (int, 3)
 Name (text ,15)
 Runtime (int, 9)
 Efficiency (int, 3)
 SAM (int ,10)
 Work Center (text, 15)
 Remarks (text, 15)
Thread Consumption:
 Style No. (int ,5)
 Size (text ,5)
 SPI (int ,1)
 Quantity (int, 10)
 Operation Description (text, 15)
 Machine Type (text ,10)
 Seam Length (int ,3)
Costing:
 Total thread consumption (int 3)
 Thread rate (int 3)
 Price mtr. (int 4)
Hourly Production:
 Style (int 5)
 Quantity (int 9)
 SAM (int 10)
 Pieces per shift (int 4)
 Total avl. Min (int 10)
 Pieces pr.hr. (int 5)
Sewing:
 Layout (text 10)
 Efficiency (int 3)
BUYER
ORDER
No.
BUYER
Id
DETAIL
S
STYLE
No.
MERCHANDISING
ORDER DETAILS
STYLE No.
PRODUCT
DETAILS
INDUSTRIAL
ENGINEETING
THREAD
CONSUMPTION
OPERATION BULLETIN
SAM
HOURLY
PRODUCTION
SEWING
Product
type
QUANTITY
SIZE
RATIO
TECH
PACK
STYLE
TOTAL
AVAILABLE
MIN.
QUANTITY
PIECES PER
HOUR
SAM
PRICE PER
SHIFT
SAM
OPERATION
No.
OPERATION
NAME
REMARK
RUNTIME
EFFICIENCY
WORK
CENTRE
SIZE
STYLE No.
SPI
OPERTION
DESCRIPTION
SEAM
LENGTH
QUALITY
MACHINE
TYPE
LAYOUT EFFICIENCY
Merchandiser
E-R Diagram
IE
SAM Operation
Bulletin
Thread
Consumption
BUYER MERCHANDISING
Industrial engineeer
(IE)
Production Report
Level-0 Data Flow Diagram
Order Details
Costing Details
Order
Production
Report
Merchandiser
Production
Details
BUYER MERCHANDISING ORDER DETAILS
THREADING
Industrial engineeer
(IE)
FEASIBILITY
OPERATION BULLETIN
HOURLY PRODUCTION
SEWING
Production Report
Level-1 Data Flow Diagram
Order
Requirement
analysis
Sending
Report
Thread
Consumption
Techpack
Procedure Starts
Order
procede
to
sewing
floor
Sending report
Production
Report
Thread
Consumption
Operation
Bulletin
Feasibility
Details
BUYER MERCHANDISING ORDER DETAILS COSTING
THREADING
PURCHASE SOURCING
Industrial engineeer
(IE)
FEASIBILITY
OPERATION BULLETIN
SAM
COSTING
HOURLY PRODUCTION
SEWING
Production Report
Level-2 Data Flow Diagram
Costing Details
Costing
Details
Requirement
analysis
Calculation
Sending
Report
Order
Thread
Consumption
Production
Report
Feasibility
Thread
Consumption
Operation
Bulletin
Details
BUYER MERCHANDISING ORDER DETAILS COSTING
THREADING
PURCHASE SOURCING
Industrial engineeer
(IE)
FEASIBILITY
OPERATION BULLETIN
SAM
COSTING
HOURLY PRODUCTION
SEWING
LINE PLAN
MANPOWER
REQUIREMENT
LINE BALANCING
MACHINE
REQUEST
LINE LAYOUT OPERATIVE CAPACITY
Production Report
Request Generation
Purchase of Thread
Orders
Level-3 Data Flow Diagram
Calculation
Costing Details
Production
Report
Thread
Consumption
Feasibility
Operation
Bulletin
Sending Report
Costing
Details
Order
Sending Report
Requirement
analysis
Details
Normalization:
Normalization is the process of reorganizing data in a database so that it meets two basic
requirements .There is no redundancy of data (all data is stored in only one place), and data
dependencies are logical (all related data items are stored together). Normalization is
important for many reasons, but chiefly because it allows databases to take up as little disk
space as possible, resulting in increased performance.
Buyer:
 Buyer id
 Style no.
 Product Type
Order Details:
 Style No.
 Product Detail
 Quantity
 Size Ratio
Operation Bulletin:
 Style No.
 Operation no.
 Runtime
 Efficiency
 SAM
Thread Consumption:
 Style No.
 Size
 SPI
 Quantity
 Seam Length
Costing:
 Thread rate
 Price mtr.
 Quantity
Hourly Production:
 Style no.
 Quantity
 SAM
 Pieces per shift
 Pieces pr.hr.
Sewing:
 Layout
 Efficiency

Contenu connexe

Tendances

Maintenance management
Maintenance managementMaintenance management
Maintenance managementRajeev Sharan
 
Roll of IE in Garments in Bangladesh
Roll of IE in Garments in BangladeshRoll of IE in Garments in Bangladesh
Roll of IE in Garments in BangladeshAriful Islam
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROLPRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROLDisha Pawar
 
Garment Industries Finishing Department
Garment Industries Finishing DepartmentGarment Industries Finishing Department
Garment Industries Finishing DepartmentsanjeevSingla10
 
Presentation on time study of apparel industry
Presentation on time study of apparel industryPresentation on time study of apparel industry
Presentation on time study of apparel industryTanmoy Antu
 
Assignment: Comparative Study on Various Types of Garment Production System.
Assignment: Comparative Study on Various  Types of Garment Production System.Assignment: Comparative Study on Various  Types of Garment Production System.
Assignment: Comparative Study on Various Types of Garment Production System.Proshanto Saha
 
Analysis of sewing section efficiency by time study technique in apparel indu...
Analysis of sewing section efficiency by time study technique in apparel indu...Analysis of sewing section efficiency by time study technique in apparel indu...
Analysis of sewing section efficiency by time study technique in apparel indu...Khairul Bashar
 
Inspection in garment industry
Inspection in garment industryInspection in garment industry
Inspection in garment industrySherminAkter1
 
Capacity planning in garment industry22 (3 files merged)
Capacity planning in garment industry22 (3 files merged)Capacity planning in garment industry22 (3 files merged)
Capacity planning in garment industry22 (3 files merged)Ankur Shukla
 
Lets understand what are SAM and SMV
Lets understand what are SAM and SMVLets understand what are SAM and SMV
Lets understand what are SAM and SMVThreadSol
 
Standardization & digitalization of sewing operations
Standardization & digitalization of sewing operationsStandardization & digitalization of sewing operations
Standardization & digitalization of sewing operationsArpan Mahato
 
Study on Lean Manufacturing Process in Garments Production
Study on Lean Manufacturing Process in Garments ProductionStudy on Lean Manufacturing Process in Garments Production
Study on Lean Manufacturing Process in Garments ProductionMomin Uddin
 
Maintenance management
Maintenance managementMaintenance management
Maintenance managementRajeev Sharan
 
Increasing the productivity and efficiency of a sewing line in an apparel man...
Increasing the productivity and efficiency of a sewing line in an apparel man...Increasing the productivity and efficiency of a sewing line in an apparel man...
Increasing the productivity and efficiency of a sewing line in an apparel man...Mazedul Islam Soyeb
 

Tendances (20)

Maintenance management
Maintenance managementMaintenance management
Maintenance management
 
Roll of IE in Garments in Bangladesh
Roll of IE in Garments in BangladeshRoll of IE in Garments in Bangladesh
Roll of IE in Garments in Bangladesh
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROLPRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL
 
Work study
Work studyWork study
Work study
 
Garment Industries Finishing Department
Garment Industries Finishing DepartmentGarment Industries Finishing Department
Garment Industries Finishing Department
 
Presentation on time study of apparel industry
Presentation on time study of apparel industryPresentation on time study of apparel industry
Presentation on time study of apparel industry
 
Line Balancing In Garments Industry
Line Balancing In Garments IndustryLine Balancing In Garments Industry
Line Balancing In Garments Industry
 
Assignment: Comparative Study on Various Types of Garment Production System.
Assignment: Comparative Study on Various  Types of Garment Production System.Assignment: Comparative Study on Various  Types of Garment Production System.
Assignment: Comparative Study on Various Types of Garment Production System.
 
Analysis of sewing section efficiency by time study technique in apparel indu...
Analysis of sewing section efficiency by time study technique in apparel indu...Analysis of sewing section efficiency by time study technique in apparel indu...
Analysis of sewing section efficiency by time study technique in apparel indu...
 
Inspection in garment industry
Inspection in garment industryInspection in garment industry
Inspection in garment industry
 
Assignment on Garments Inspection System
Assignment on Garments Inspection SystemAssignment on Garments Inspection System
Assignment on Garments Inspection System
 
Quality systems for garment
Quality systems for garmentQuality systems for garment
Quality systems for garment
 
How to Improve Productivity
How to Improve ProductivityHow to Improve Productivity
How to Improve Productivity
 
Capacity planning in garment industry22 (3 files merged)
Capacity planning in garment industry22 (3 files merged)Capacity planning in garment industry22 (3 files merged)
Capacity planning in garment industry22 (3 files merged)
 
Marker efficiency
Marker efficiencyMarker efficiency
Marker efficiency
 
Lets understand what are SAM and SMV
Lets understand what are SAM and SMVLets understand what are SAM and SMV
Lets understand what are SAM and SMV
 
Standardization & digitalization of sewing operations
Standardization & digitalization of sewing operationsStandardization & digitalization of sewing operations
Standardization & digitalization of sewing operations
 
Study on Lean Manufacturing Process in Garments Production
Study on Lean Manufacturing Process in Garments ProductionStudy on Lean Manufacturing Process in Garments Production
Study on Lean Manufacturing Process in Garments Production
 
Maintenance management
Maintenance managementMaintenance management
Maintenance management
 
Increasing the productivity and efficiency of a sewing line in an apparel man...
Increasing the productivity and efficiency of a sewing line in an apparel man...Increasing the productivity and efficiency of a sewing line in an apparel man...
Increasing the productivity and efficiency of a sewing line in an apparel man...
 

Similaire à industrial engineering in sewing department

Industrial Engineering Tools & Activities of a RMG !!!
Industrial Engineering Tools & Activities of a RMG !!!Industrial Engineering Tools & Activities of a RMG !!!
Industrial Engineering Tools & Activities of a RMG !!!Mahibur Rahman
 
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...Karina Islam
 
Ie microsoft office power point presentation
Ie  microsoft office power point presentationIe  microsoft office power point presentation
Ie microsoft office power point presentationShamim Hasan
 
Assembly Line Balancing to Improve Productivity using Work Sharing Method in ...
Assembly Line Balancing to Improve Productivity using Work Sharing Method in ...Assembly Line Balancing to Improve Productivity using Work Sharing Method in ...
Assembly Line Balancing to Improve Productivity using Work Sharing Method in ...ijtsrd
 
Guidelines industrial engineering
Guidelines industrial engineeringGuidelines industrial engineering
Guidelines industrial engineeringSyed Jafri
 
2.IE Presentation.pptx
2.IE Presentation.pptx2.IE Presentation.pptx
2.IE Presentation.pptxVarun Mehrotra
 
IRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET- Productivity Improvement in Manufacturing Industry using Lean ToolsIRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET- Productivity Improvement in Manufacturing Industry using Lean ToolsIRJET Journal
 
Application Of Workstudy
Application Of WorkstudyApplication Of Workstudy
Application Of Workstudybejayrocks
 
Increase_the_Efficiency_and_Productivity.pdf
Increase_the_Efficiency_and_Productivity.pdfIncrease_the_Efficiency_and_Productivity.pdf
Increase_the_Efficiency_and_Productivity.pdfHasanSajib3
 
Presentation on challenges and opportunitues of industrial engineer in rmg in...
Presentation on challenges and opportunitues of industrial engineer in rmg in...Presentation on challenges and opportunitues of industrial engineer in rmg in...
Presentation on challenges and opportunitues of industrial engineer in rmg in...HasanRabbi3
 
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...IRJET Journal
 
IRJET - Productivity Improvement by Time Study and Motion Study
IRJET - Productivity Improvement by Time Study and Motion StudyIRJET - Productivity Improvement by Time Study and Motion Study
IRJET - Productivity Improvement by Time Study and Motion StudyIRJET Journal
 
RESEARCH ON PLANT LAYOUT AND PRODUCTION LINE RUNNING SIMULATION IN PISTON FAC...
RESEARCH ON PLANT LAYOUT AND PRODUCTION LINE RUNNING SIMULATION IN PISTON FAC...RESEARCH ON PLANT LAYOUT AND PRODUCTION LINE RUNNING SIMULATION IN PISTON FAC...
RESEARCH ON PLANT LAYOUT AND PRODUCTION LINE RUNNING SIMULATION IN PISTON FAC...IAEME Publication
 
PRODUCTIVITY IMPROVEMENT IN SPREADING (CUTTING) SECTION BY IMPLEMENTING PRE-D...
PRODUCTIVITY IMPROVEMENT IN SPREADING (CUTTING) SECTION BY IMPLEMENTING PRE-D...PRODUCTIVITY IMPROVEMENT IN SPREADING (CUTTING) SECTION BY IMPLEMENTING PRE-D...
PRODUCTIVITY IMPROVEMENT IN SPREADING (CUTTING) SECTION BY IMPLEMENTING PRE-D...IRJET Journal
 
IRJET- Efficiency Enhancement by Reducing Production and Machining Time
IRJET-  	  Efficiency Enhancement by Reducing Production and Machining TimeIRJET-  	  Efficiency Enhancement by Reducing Production and Machining Time
IRJET- Efficiency Enhancement by Reducing Production and Machining TimeIRJET Journal
 
A038301010
A038301010A038301010
A038301010theijes
 

Similaire à industrial engineering in sewing department (20)

Industrial Engineering Tools & Activities of a RMG !!!
Industrial Engineering Tools & Activities of a RMG !!!Industrial Engineering Tools & Activities of a RMG !!!
Industrial Engineering Tools & Activities of a RMG !!!
 
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
 
Ie microsoft office power point presentation
Ie  microsoft office power point presentationIe  microsoft office power point presentation
Ie microsoft office power point presentation
 
Assembly Line Balancing to Improve Productivity using Work Sharing Method in ...
Assembly Line Balancing to Improve Productivity using Work Sharing Method in ...Assembly Line Balancing to Improve Productivity using Work Sharing Method in ...
Assembly Line Balancing to Improve Productivity using Work Sharing Method in ...
 
Guidelines industrial engineering
Guidelines industrial engineeringGuidelines industrial engineering
Guidelines industrial engineering
 
2.IE Presentation.pptx
2.IE Presentation.pptx2.IE Presentation.pptx
2.IE Presentation.pptx
 
IRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET- Productivity Improvement in Manufacturing Industry using Lean ToolsIRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
 
Application Of Workstudy
Application Of WorkstudyApplication Of Workstudy
Application Of Workstudy
 
Aie module3 handout
Aie module3 handoutAie module3 handout
Aie module3 handout
 
Increase_the_Efficiency_and_Productivity.pdf
Increase_the_Efficiency_and_Productivity.pdfIncrease_the_Efficiency_and_Productivity.pdf
Increase_the_Efficiency_and_Productivity.pdf
 
Presentation on challenges and opportunitues of industrial engineer in rmg in...
Presentation on challenges and opportunitues of industrial engineer in rmg in...Presentation on challenges and opportunitues of industrial engineer in rmg in...
Presentation on challenges and opportunitues of industrial engineer in rmg in...
 
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
 
IRJET - Productivity Improvement by Time Study and Motion Study
IRJET - Productivity Improvement by Time Study and Motion StudyIRJET - Productivity Improvement by Time Study and Motion Study
IRJET - Productivity Improvement by Time Study and Motion Study
 
RESEARCH ON PLANT LAYOUT AND PRODUCTION LINE RUNNING SIMULATION IN PISTON FAC...
RESEARCH ON PLANT LAYOUT AND PRODUCTION LINE RUNNING SIMULATION IN PISTON FAC...RESEARCH ON PLANT LAYOUT AND PRODUCTION LINE RUNNING SIMULATION IN PISTON FAC...
RESEARCH ON PLANT LAYOUT AND PRODUCTION LINE RUNNING SIMULATION IN PISTON FAC...
 
30120140504022
3012014050402230120140504022
30120140504022
 
PRODUCTIVITY IMPROVEMENT IN SPREADING (CUTTING) SECTION BY IMPLEMENTING PRE-D...
PRODUCTIVITY IMPROVEMENT IN SPREADING (CUTTING) SECTION BY IMPLEMENTING PRE-D...PRODUCTIVITY IMPROVEMENT IN SPREADING (CUTTING) SECTION BY IMPLEMENTING PRE-D...
PRODUCTIVITY IMPROVEMENT IN SPREADING (CUTTING) SECTION BY IMPLEMENTING PRE-D...
 
WORK study& LINE BALANCING
WORK study& LINE BALANCING WORK study& LINE BALANCING
WORK study& LINE BALANCING
 
IRJET- Efficiency Enhancement by Reducing Production and Machining Time
IRJET-  	  Efficiency Enhancement by Reducing Production and Machining TimeIRJET-  	  Efficiency Enhancement by Reducing Production and Machining Time
IRJET- Efficiency Enhancement by Reducing Production and Machining Time
 
A038301010
A038301010A038301010
A038301010
 
Line balancing
Line balancing Line balancing
Line balancing
 

Plus de ShivamSagar13

Plus de ShivamSagar13 (9)

Technical garments by ying gao
Technical garments by ying gaoTechnical garments by ying gao
Technical garments by ying gao
 
Attitude
AttitudeAttitude
Attitude
 
Ipr of vespa scooter
Ipr of vespa scooterIpr of vespa scooter
Ipr of vespa scooter
 
Zipper
ZipperZipper
Zipper
 
Event management system
Event management systemEvent management system
Event management system
 
Pottery docuemtation
Pottery docuemtationPottery docuemtation
Pottery docuemtation
 
Formal jackets
Formal jacketsFormal jackets
Formal jackets
 
Ai in sampling
Ai in samplingAi in sampling
Ai in sampling
 
Swot, 4 ps of mi
Swot, 4 ps of miSwot, 4 ps of mi
Swot, 4 ps of mi
 

Dernier

Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substationstephanwindworld
 
Ch10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfCh10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfChristianCDAM
 
Risk Management in Engineering Construction Project
Risk Management in Engineering Construction ProjectRisk Management in Engineering Construction Project
Risk Management in Engineering Construction ProjectErbil Polytechnic University
 
Configuration of IoT devices - Systems managament
Configuration of IoT devices - Systems managamentConfiguration of IoT devices - Systems managament
Configuration of IoT devices - Systems managamentBharaniDharan195623
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingBootNeck1
 
Autonomous emergency braking system (aeb) ppt.ppt
Autonomous emergency braking system (aeb) ppt.pptAutonomous emergency braking system (aeb) ppt.ppt
Autonomous emergency braking system (aeb) ppt.pptbibisarnayak0
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptNarmatha D
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgsaravananr517913
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - GuideGOPINATHS437943
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONjhunlian
 
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Erbil Polytechnic University
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...Erbil Polytechnic University
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptMadan Karki
 
Crystal Structure analysis and detailed information pptx
Crystal Structure analysis and detailed information pptxCrystal Structure analysis and detailed information pptx
Crystal Structure analysis and detailed information pptxachiever3003
 

Dernier (20)

Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substation
 
Ch10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfCh10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdf
 
Risk Management in Engineering Construction Project
Risk Management in Engineering Construction ProjectRisk Management in Engineering Construction Project
Risk Management in Engineering Construction Project
 
Configuration of IoT devices - Systems managament
Configuration of IoT devices - Systems managamentConfiguration of IoT devices - Systems managament
Configuration of IoT devices - Systems managament
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event Scheduling
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
Autonomous emergency braking system (aeb) ppt.ppt
Autonomous emergency braking system (aeb) ppt.pptAutonomous emergency braking system (aeb) ppt.ppt
Autonomous emergency braking system (aeb) ppt.ppt
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.ppt
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - Guide
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
 
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.ppt
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
Crystal Structure analysis and detailed information pptx
Crystal Structure analysis and detailed information pptxCrystal Structure analysis and detailed information pptx
Crystal Structure analysis and detailed information pptx
 

industrial engineering in sewing department

  • 1. Industrial Engineering in Garments (IE in Sewing Department ) Database Management Apparel System Assignment – 1 Name of Group Members: 1. Suraj Gangurde 2. Shivam Sagar
  • 2. Index 1. Introduction 2. Roles of IE 3. Requirement analysis 4. Process Flow Diagram 5. Work Flow Diagram 6. Entity Relationship Diagram 7. Data Flow Diagram
  • 3. Industrial Engineer : Industrial engineering is a branch of engineering which is related with the optimization of complex systems or processes. It is totally concerned with the improvement, development, and implementation of integrated systems of people, money, information, knowledge, energy and it’s also analysis as well as the mathematical, physical and social sciences together with the principles and systems of engineering design to predict and assess the results to be obtained from such types of systems.
  • 4. Roles of IE: 1. Planning layouts 2. Monitoring Production flow system 3. Decide the machines and attachments for all style 4. Monitoring and improve the operator performance 5. Operator training 6. Production control system 7. Quality control Requirement Analysis : 1. Time study Time Study is the analysis of a specific job by a qualified worker in an effort to find the most efficient method in terms of time and effort. Time Study measures the time necessary for a job or task to be completed using the best method. 2. Method study
  • 5. Method study the process of subjecting work to systematic, critical scrutiny to make it more effective and/or more efficient. It is one of the keys to achieving productivity improvement. 3. M/c Calculation 4. Skill Matrix Effective tool to boost productivity in apparel Industry Training . Skill matrix is a table that shows skills of individuals in a team and any gaps between the skills of employees and the job roles they have. 5. Thread Consumption Calulation and analysis of the requirement of thread. 6. Calculate SAM Standard allowed minute (SAM) means how much time is required to make one complete garment including allowances. SAM is used to measure the task or work content of a garment. This term is widely used byindustrial engineers and production people in the garment manufacturing industry. 7. Operation Breakdown The method of preparing operations' list in a sequence is called as operation breakdown. 8. Calculate Efficiency
  • 6. Process Flow of industrial engineer : Negotiation with Garment Merchandiser Garment Analysis Make P.P meetingif all the required fabrics , trimmings and accessories are in housed . Production Target Set machine layout
  • 7. Line setting Line Balancing Continuous production meeting Collecting production data Preparing production report Production report analysis Report submit to factory Manage
  • 8. Explanation: 01 Negotiation with garments merchandiser It is the very first work of an industrial engineer. Here, he should vastly discussed with garments merchandiser about the in-coming garments product. 02 Garments analysis Confirmed garments product is clearly analyzed here by industrial engineer. It helps to complete rest of the processes very easily. 03 Make P.P meeting Here, P.P meeting should be organized if all the required fabrics, trimmings and accessories . 04 Production target Production target should set here according to factory capacity. It helps to respect the shipment date. 05 Set machine layout Machine layout is set here according to total processes needed to complete a garment item. 06 Line setting In this process, actual line setting should be done to utilize the garment workers properly. If it takes more time in line setting then garments production will be decreased. 07 Line balancing To minimize the number of work stations, cycle time, line balancing is done here. Its a very important process to achieve desired production target. 08 Continuous production meeting Production meeting should be done here at regular interval. If any problem will arise during garments production, should take necessary actions to solve that. 09 Collecting production data Production data should be collected here for preparing production report. 10 Preparing production report Here, total garments production report has prepared to analysis about the whole production. 11 Production report analysis Garments production report is analyzed here from different points of view. 12 Report submit to factory manager Finally garments production report have to submit into the factory manager.
  • 9. Work Flow : CALCULATE SAM OF GARMENT AND DIFFERENT CONSUMPTIONS WORK MEASUREMENT OF NEW CONFIRMED ORDER TO ADVICE PRODUCTION DEPARTMENT ON GARMENT SAM AND LINE LAYOUT TO CALCULATE LINE EFFICIENCY DAY TO DAY ACTIVITY TO CALCULATE OPERATOR EFFECIENCY GRADE CHANGE OF OPERATORS TIME AND METHOD STUDY TIME STUDY CHECK FOR WORK AIDS AND COMPLIANCES PREPARATION OF INCENTIVE SCHEME
  • 10. Database Management Format: A data management format helps in manage data, meet funder requirements, and help others use data if shared. Buyer:  Buyer id (int, 5)  Details (text ,15)  Order No. (int, 9)  Style No. (int ,5)  Product Type (text, 15) Order Details:  Style No. (int ,5)  Product Detail (text, 15)  Quantity (int, 9)  Size Ratio (int, 5) Operation Bulletin:  Operation no. (int, 3)  Name (text ,15)  Runtime (int, 9)  Efficiency (int, 3)  SAM (int ,10)  Work Center (text, 15)  Remarks (text, 15) Thread Consumption:  Style No. (int ,5)  Size (text ,5)  SPI (int ,1)  Quantity (int, 10)  Operation Description (text, 15)  Machine Type (text ,10)  Seam Length (int ,3)
  • 11. Costing:  Total thread consumption (int 3)  Thread rate (int 3)  Price mtr. (int 4) Hourly Production:  Style (int 5)  Quantity (int 9)  SAM (int 10)  Pieces per shift (int 4)  Total avl. Min (int 10)  Pieces pr.hr. (int 5) Sewing:  Layout (text 10)  Efficiency (int 3)
  • 12. BUYER ORDER No. BUYER Id DETAIL S STYLE No. MERCHANDISING ORDER DETAILS STYLE No. PRODUCT DETAILS INDUSTRIAL ENGINEETING THREAD CONSUMPTION OPERATION BULLETIN SAM HOURLY PRODUCTION SEWING Product type QUANTITY SIZE RATIO TECH PACK STYLE TOTAL AVAILABLE MIN. QUANTITY PIECES PER HOUR SAM PRICE PER SHIFT SAM OPERATION No. OPERATION NAME REMARK RUNTIME EFFICIENCY WORK CENTRE SIZE STYLE No. SPI OPERTION DESCRIPTION SEAM LENGTH QUALITY MACHINE TYPE LAYOUT EFFICIENCY Merchandiser E-R Diagram IE SAM Operation Bulletin Thread Consumption
  • 13. BUYER MERCHANDISING Industrial engineeer (IE) Production Report Level-0 Data Flow Diagram Order Details Costing Details Order Production Report Merchandiser Production Details
  • 14. BUYER MERCHANDISING ORDER DETAILS THREADING Industrial engineeer (IE) FEASIBILITY OPERATION BULLETIN HOURLY PRODUCTION SEWING Production Report Level-1 Data Flow Diagram Order Requirement analysis Sending Report Thread Consumption Techpack Procedure Starts Order procede to sewing floor Sending report Production Report Thread Consumption Operation Bulletin Feasibility Details
  • 15. BUYER MERCHANDISING ORDER DETAILS COSTING THREADING PURCHASE SOURCING Industrial engineeer (IE) FEASIBILITY OPERATION BULLETIN SAM COSTING HOURLY PRODUCTION SEWING Production Report Level-2 Data Flow Diagram Costing Details Costing Details Requirement analysis Calculation Sending Report Order Thread Consumption Production Report Feasibility Thread Consumption Operation Bulletin Details
  • 16. BUYER MERCHANDISING ORDER DETAILS COSTING THREADING PURCHASE SOURCING Industrial engineeer (IE) FEASIBILITY OPERATION BULLETIN SAM COSTING HOURLY PRODUCTION SEWING LINE PLAN MANPOWER REQUIREMENT LINE BALANCING MACHINE REQUEST LINE LAYOUT OPERATIVE CAPACITY Production Report Request Generation Purchase of Thread Orders Level-3 Data Flow Diagram Calculation Costing Details Production Report Thread Consumption Feasibility Operation Bulletin Sending Report Costing Details Order Sending Report Requirement analysis Details
  • 17.
  • 18.
  • 19. Normalization: Normalization is the process of reorganizing data in a database so that it meets two basic requirements .There is no redundancy of data (all data is stored in only one place), and data dependencies are logical (all related data items are stored together). Normalization is important for many reasons, but chiefly because it allows databases to take up as little disk space as possible, resulting in increased performance. Buyer:  Buyer id  Style no.  Product Type Order Details:  Style No.  Product Detail  Quantity  Size Ratio Operation Bulletin:  Style No.  Operation no.  Runtime  Efficiency  SAM Thread Consumption:  Style No.  Size  SPI  Quantity  Seam Length Costing:  Thread rate
  • 20.  Price mtr.  Quantity Hourly Production:  Style no.  Quantity  SAM  Pieces per shift  Pieces pr.hr. Sewing:  Layout  Efficiency