Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.
Upcoming SlideShare
11 Killer Strategic Partnership Examples
Next

1

Share

Risk Assessment

Related Audiobooks

Free with a 30 day trial from Scribd

See all

Risk Assessment

  1. 1. RISK How to reduce or What to do if Level of Risk prevent the risk danger occursBags in the way Ensure all bags are Move them out of the Medium left at the back of the way to a safer place hallSlippery Floor Check the flooring Wipe it up as soon as High before anyone has possible arrivedWires in the way Keep wires tied up Move them out of the Medium way and tied upProjection doesn’t Check the projector Have aback projector, Lowwork before the assembly keep a technician on handAssemblies have Have contact with Re schedule Highbeen cancelled head of years assembly dates or send out PowerPointLate arrivals Ensure all students Have someone at the High are brought up by a front to supervise late teacher arrivals
  • jhguerra

    Nov. 20, 2017

Views

Total views

505

On Slideshare

0

From embeds

0

Number of embeds

13

Actions

Downloads

0

Shares

0

Comments

0

Likes

1

×