Planning and deploying change / programme management initiatives We are not animals. We are not a product of what has happened to us in our past. We have the power of choice. – Stephen Covey Optimise- GB
Change will have an impact on employee behaviour patterns, work processes, technological requirements, and motivation.  Management must assess what employee reactions will be and craft change programmes that will provide support as workers go through the process of accepting change.  The programme must then be implemented, disseminated throughout the organisation, monitored for effectiveness, and adjusted where necessary.  What is Change Management? Optimise- GB
Possible response to change “ Been there done that” “ A new initiative, same as last weeks just a different name” “ Another programme to get rid of us” “ It will never work” “ What more can be done, I am expected to do everything” “ What will this mean for me” “ This is unfair” Optimise- GB What is Change Management?
Reasons for change resistance Underestimating the power of vision Not communicating enough with everyone - Fear of the unknown must be addressed by involving employees in planning - Dislike of uncertainty - Managers talk but not listening Failing to create and demonstrate the benefits of short terms goals - Fear of failure - Possible loss of rewards - Expectation that change means more work without reward - Not giving additional training to ensure success Be seen as a top down management approach - Possible loss of power - Bad past experience Optimise- GB What is Change Management?
Stages of change: Despair Denial Anger Anxiety Acceptance Practice Relief Motivation These are all natural stages of change  Optimise- GB What is Change Management?
Stages of change: Optimise- GB What is Change Management? Stage Clues Needs Despair, Denial, Anger Withdrawn, Wastes time, Acts as though nothing has changed, venting frustration Time to get used to the situation, patience, clear authority, active listening Anxiety Does not know how to make the required change, uncertainty, lack of focus Tolerance, permission to explore, permission to speak freely and think privately Acceptance, practice Selects options, lets go of previous values, behaviours and attitudes, develops new skills Openness, allow experimentation, allow mistakes, support training and development, be supportive Relief, motivation Applies learnings, competence, confidence Encouragement, continuous improvement
Programme management is the process of managing several related projects, often with the intention of improving an organisation's performance -  seen within change management initiatives What is Programme management? Optimise- GB
Programme management may provide a layer above the management of projects and focuses on selecting the best group of projects, defining them in terms of their objectives and providing an environment where projects can be run successfully.  Programme managers should not micromanage, but should leave project management to the project managers. What is Programme management? Optimise- GB
What is Programme management? Optimise- GB
What is Programme management? Programme planning  - using a Programme Plan to ensure control Benefits management  - identifying, optimising and tracking benefits Stakeholder management  - ensuring all interested parties are appropriately involved in the programme  Issue management and Risk management  - having strategy for dealing with current and anticipated problems  Quality management  - ensuring that the end products of the programme are fit for purpose  Configuration management  - keeping monitoring information about the programme up-to-date and accurate  Audit  - ensuring that technical, statutory, contract and accounting standards are used Optimise- GB
Guiding employees through the change process Optimise- GB
Stages of change Optimise- GB What are the major issues? What crisis is on the horizon? What are the consequences of not changing? What is the competition doing? I have been impressed with the urgency of doing. Knowing is not enough; we must apply. Being willing is not enough; we must do – Russell C Taylor
Stages of change Optimise- GB Identify a leader to manage change Build an influential and talented team Identify energetic individuals that embrace, commit to change and have credibility with their colleagues In the past a leader was a boss. Today’s leaders must be partners with their people.. they no longer can lead solely based on positional power - Ken Blanchard
Stages of change Optimise- GB Identify the right change agents Effective communicator Good collaborator Attentive listener Ideas person Realistic Able to prioritise Restless
Team Needs Encourage team members to share ideas, and support one another Individual Needs Monitor working conditions, and help staff develop their full potential Task Needs Determine the task objectives, and consider the problems involved Managers need to cope with all three  needs to ensure the right balance is  consistently achieved.  - Heller Optimise- GB Stages of change
Stages of change Optimise- GB Create a vision - Where we are now? - Where do we want to get to? - How we will get there? Set targets and milestones from the outset Develop a new culture of leaning Create strategies that delivers the vision Better keep yourself clean and bright; you are the window through which you must see the world. - George Bernard Shaw
Stages of change Optimise- GB What are your goals, measurements for each of the four quadrants…
Stages of change Optimise- GB Set up a programme management office: - Identify targets for next 1, 2-3, 4+ years - Create and support project teams - Identify business champions to work with - Monitor scope and pace of transition - Ensure issues / risk management - Document core business processes and measure performance - Identify methods to prioritise projects
Stages of change Optimise- GB Executive Team Managers Staff Communicate from the top down Engage staff at all levels to gain  acceptance and ownership Link targets  together
Stages of change Optimise- GB Communicate the vision, standards and expected benefits through focus groups.  Be upfront about incentives and rewards for employees Allow informal networks to deliver the message Build trust by Being open and honest of what will be done, what is expected and what issues may arise Invite candid questions and actively listen and address concerns
Stages of change Optimise- GB Communicate using: - Focus groups - Management meetings - Intranet - Use walls to communicate vision and results - Feedback boxes to generate new ideas - Newsletters - Build into employee appraisals
Stages of change Optimise- GB Change people, systems and processes that obstruct the change initiative Encourage learning, training, development and do not punish experiments that fail or goes against traditional thinking Identify Projects and formalise through a programme office to help prioritise projects We are an organization that believes in empowering people to be their best - Talal Abu-Ghazaleh
Managers should plan projects and tasks with their staff but let them experiment.  Managers should coach and support their staff during the implementation phase to ease uncertainty “ Feedback must be provided and  staff appraisals let employees  know how they stand with the boss” - McGregor Optimise- GB Stages of change
Stages of change Optimise- GB Plan and share ideas with everyone Communicate what the short and long terms goals are and ensure that the results are known to all, most importantly be supportive Reward those that helped deliver the short and long term wins, create a motivated team that moves the business forward In large organizations the dilution of information as it passes up and down the hierarchy, and horizontally across departments, can undermine the effort to focus on common goals - Mihaly Csikszentmihalyi
Stages of change Optimise- GB Easy to  Implement Big Impact Hard to  implement Small Impact Project 1 Project 3 Project 6 Project 7 Project 4 Project 5 Project 2 Implement Now Possible Kill Implement Later
Stages of change Optimise- GB After people are convinced that the new regime works – build momentum and continue the change process with longer term goals Hire, promote, reward and make examples of good change agents within the company Ensure feedback is open, free from criticism and maintain an open, flexible learning culture…maintain a lessons learned log We need to make sure we have the best people we can in our operations, and that is a constant challenge. There is always room to improve. – James Packer
Stages of change Optimise- GB How did you perform against targets? Are the targets right? What can be changed to achieve targets?
Stages of change Optimise- GB ,[object Object],[object Object],[object Object],[object Object],[object Object]
Stages of change Optimise- GB Communicate communicate communicate the improvements made, the benefits achieved, where you were and where you are now Focus on the customer and develop managers and shop floor staff to focus on continuous  improvement I believe through learning and application of what you learn, you can solve any problem, overcome any obstacle and achieve any goal that you can set for yourself. – Brian Tracy
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Change Management summary Optimise- GB
[object Object],[object Object],[object Object],[object Object],Optimise- GB

More Related Content

What's hot

Organizational Change Management
Organizational Change ManagementOrganizational Change Management
Organizational Change Managementsharean
 
Change transition management.....
Change transition management.....Change transition management.....
Change transition management.....Moch Kurniawan
 
Change management strategy_team_xyz
Change management strategy_team_xyzChange management strategy_team_xyz
Change management strategy_team_xyzBao Nguyen
 
Giving Effective Feedback.ppt
Giving Effective Feedback.pptGiving Effective Feedback.ppt
Giving Effective Feedback.pptJohnny Schaefer
 
Introduction to change management
Introduction to change managementIntroduction to change management
Introduction to change managementKapil Kant Kaul
 
Coaching & Mentoring
Coaching & MentoringCoaching & Mentoring
Coaching & MentoringAhmed Yasser
 
Change Management Fundamentals PowerPoint Presentation Slides
Change Management Fundamentals PowerPoint Presentation SlidesChange Management Fundamentals PowerPoint Presentation Slides
Change Management Fundamentals PowerPoint Presentation SlidesSlideTeam
 
Train the trainer
Train the trainerTrain the trainer
Train the trainermao samdy
 
Chapter 1: EMPLOYEE TRAINING AND DEVELOPMENT
Chapter 1: EMPLOYEE TRAINING AND DEVELOPMENTChapter 1: EMPLOYEE TRAINING AND DEVELOPMENT
Chapter 1: EMPLOYEE TRAINING AND DEVELOPMENTsourashtra
 
Leading through change workshop flow summary
Leading through change workshop flow summaryLeading through change workshop flow summary
Leading through change workshop flow summaryIrina Burgess
 
Change Management PPT Slides
Change Management PPT SlidesChange Management PPT Slides
Change Management PPT SlidesYodhia Antariksa
 

What's hot (20)

MailCom 2009 Train The Trainer
MailCom 2009 Train The TrainerMailCom 2009 Train The Trainer
MailCom 2009 Train The Trainer
 
Organizational Change Management
Organizational Change ManagementOrganizational Change Management
Organizational Change Management
 
change management -Types of change
change management -Types of changechange management -Types of change
change management -Types of change
 
Train the trainer Training
Train the trainer TrainingTrain the trainer Training
Train the trainer Training
 
Team building
Team buildingTeam building
Team building
 
Change transition management.....
Change transition management.....Change transition management.....
Change transition management.....
 
Change Management
Change ManagementChange Management
Change Management
 
Change management strategy_team_xyz
Change management strategy_team_xyzChange management strategy_team_xyz
Change management strategy_team_xyz
 
Giving Effective Feedback.ppt
Giving Effective Feedback.pptGiving Effective Feedback.ppt
Giving Effective Feedback.ppt
 
Change management
Change managementChange management
Change management
 
Introduction to change management
Introduction to change managementIntroduction to change management
Introduction to change management
 
Change Management
Change ManagementChange Management
Change Management
 
Coaching & Mentoring
Coaching & MentoringCoaching & Mentoring
Coaching & Mentoring
 
Change Management Fundamentals PowerPoint Presentation Slides
Change Management Fundamentals PowerPoint Presentation SlidesChange Management Fundamentals PowerPoint Presentation Slides
Change Management Fundamentals PowerPoint Presentation Slides
 
Train the trainer
Train the trainerTrain the trainer
Train the trainer
 
Chapter 1: EMPLOYEE TRAINING AND DEVELOPMENT
Chapter 1: EMPLOYEE TRAINING AND DEVELOPMENTChapter 1: EMPLOYEE TRAINING AND DEVELOPMENT
Chapter 1: EMPLOYEE TRAINING AND DEVELOPMENT
 
Leading through change workshop flow summary
Leading through change workshop flow summaryLeading through change workshop flow summary
Leading through change workshop flow summary
 
Coaching Skills
Coaching SkillsCoaching Skills
Coaching Skills
 
Change Management Framework
Change Management FrameworkChange Management Framework
Change Management Framework
 
Change Management PPT Slides
Change Management PPT SlidesChange Management PPT Slides
Change Management PPT Slides
 

Viewers also liked

8 step ikash new(แก้แล้ว).ppt
8 step ikash new(แก้แล้ว).ppt8 step ikash new(แก้แล้ว).ppt
8 step ikash new(แก้แล้ว).pptOrawan Sritiapetch
 
Kotter And The Iceberg
Kotter And The IcebergKotter And The Iceberg
Kotter And The IcebergJenith Mishne
 
Chapter2 การเปลี่ยนแปลงในองค์การ
Chapter2 การเปลี่ยนแปลงในองค์การChapter2 การเปลี่ยนแปลงในองค์การ
Chapter2 การเปลี่ยนแปลงในองค์การwanna2728
 
สรุปการเรียนรู้ Getting diversity
สรุปการเรียนรู้  Getting diversity สรุปการเรียนรู้  Getting diversity
สรุปการเรียนรู้ Getting diversity Songsaeng Srijan
 
The rise and fall rise of nokia
The rise and fall  rise of nokiaThe rise and fall  rise of nokia
The rise and fall rise of nokiapalmyn
 
The decline and fall of nokia
The decline and fall of nokiaThe decline and fall of nokia
The decline and fall of nokiaDavid Cord
 
Kotter Model - The 8-Step Process for Leading Change
Kotter Model - The 8-Step Process for Leading ChangeKotter Model - The 8-Step Process for Leading Change
Kotter Model - The 8-Step Process for Leading ChangeRoberto Giannicola
 
Our Iceberg Is Melting - Changing and Succeeding Under Any Conditions
Our Iceberg Is Melting - Changing and Succeeding Under Any ConditionsOur Iceberg Is Melting - Changing and Succeeding Under Any Conditions
Our Iceberg Is Melting - Changing and Succeeding Under Any ConditionsSamuli Pahkala
 
Smartphone กับ เด็กทับแก้ว
Smartphone กับ เด็กทับแก้วSmartphone กับ เด็กทับแก้ว
Smartphone กับ เด็กทับแก้วyukimoomai
 
Presentation on failure of nokia
Presentation on failure of nokiaPresentation on failure of nokia
Presentation on failure of nokiaabhishekthakur309
 
Change Management in Nokia
Change Management in NokiaChange Management in Nokia
Change Management in NokiaMoumita Roy
 
Nokia's downfall
Nokia's downfallNokia's downfall
Nokia's downfallnooramingad
 
Kotter’s 8 step change model
Kotter’s 8 step change modelKotter’s 8 step change model
Kotter’s 8 step change modelUjjwal Joshi
 
Kotter's 8 step change model
Kotter's 8 step change modelKotter's 8 step change model
Kotter's 8 step change modelSeta Wicaksana
 

Viewers also liked (20)

8 step ikash new(แก้แล้ว).ppt
8 step ikash new(แก้แล้ว).ppt8 step ikash new(แก้แล้ว).ppt
8 step ikash new(แก้แล้ว).ppt
 
Kotter And The Iceberg
Kotter And The IcebergKotter And The Iceberg
Kotter And The Iceberg
 
Chapter2 การเปลี่ยนแปลงในองค์การ
Chapter2 การเปลี่ยนแปลงในองค์การChapter2 การเปลี่ยนแปลงในองค์การ
Chapter2 การเปลี่ยนแปลงในองค์การ
 
สรุปการเรียนรู้ Getting diversity
สรุปการเรียนรู้  Getting diversity สรุปการเรียนรู้  Getting diversity
สรุปการเรียนรู้ Getting diversity
 
The rise and fall rise of nokia
The rise and fall  rise of nokiaThe rise and fall  rise of nokia
The rise and fall rise of nokia
 
The decline and fall of nokia
The decline and fall of nokiaThe decline and fall of nokia
The decline and fall of nokia
 
First Mobile_21 May 14
First Mobile_21 May 14First Mobile_21 May 14
First Mobile_21 May 14
 
Kotter Model - The 8-Step Process for Leading Change
Kotter Model - The 8-Step Process for Leading ChangeKotter Model - The 8-Step Process for Leading Change
Kotter Model - The 8-Step Process for Leading Change
 
Our Iceberg Is Melting - Changing and Succeeding Under Any Conditions
Our Iceberg Is Melting - Changing and Succeeding Under Any ConditionsOur Iceberg Is Melting - Changing and Succeeding Under Any Conditions
Our Iceberg Is Melting - Changing and Succeeding Under Any Conditions
 
Smartphone กับ เด็กทับแก้ว
Smartphone กับ เด็กทับแก้วSmartphone กับ เด็กทับแก้ว
Smartphone กับ เด็กทับแก้ว
 
Presentation on failure of nokia
Presentation on failure of nokiaPresentation on failure of nokia
Presentation on failure of nokia
 
Our Iceberg Is Melting
Our Iceberg Is MeltingOur Iceberg Is Melting
Our Iceberg Is Melting
 
Case Study on Nokia
Case Study on NokiaCase Study on Nokia
Case Study on Nokia
 
Nokia strategy and marketing
Nokia strategy and marketingNokia strategy and marketing
Nokia strategy and marketing
 
Change Management in Nokia
Change Management in NokiaChange Management in Nokia
Change Management in Nokia
 
Nokia's downfall
Nokia's downfallNokia's downfall
Nokia's downfall
 
Kotter’s 8 step change model
Kotter’s 8 step change modelKotter’s 8 step change model
Kotter’s 8 step change model
 
Kotter's 8 step change model
Kotter's 8 step change modelKotter's 8 step change model
Kotter's 8 step change model
 
Nokia Case Study
Nokia Case StudyNokia Case Study
Nokia Case Study
 
NOKIA PRESENTATION
NOKIA PRESENTATIONNOKIA PRESENTATION
NOKIA PRESENTATION
 

Similar to 8 Stages of change management (Kotter)

Leadership and Culture Journey
Leadership and Culture JourneyLeadership and Culture Journey
Leadership and Culture JourneyMichael Short
 
Successful change - good culture and governance matter Conference - Roger Gar...
Successful change - good culture and governance matter Conference - Roger Gar...Successful change - good culture and governance matter Conference - Roger Gar...
Successful change - good culture and governance matter Conference - Roger Gar...Association for Project Management
 
Reaching agility: Why aren't we done yet?
Reaching agility: Why aren't we done yet?Reaching agility: Why aren't we done yet?
Reaching agility: Why aren't we done yet?Nicola Dourambeis
 
Identifying and Overcoming Roadblocks to Change
Identifying and Overcoming Roadblocks to ChangeIdentifying and Overcoming Roadblocks to Change
Identifying and Overcoming Roadblocks to Changerhefner
 
Building and sustaining total quality organizations
Building and sustaining total quality organizationsBuilding and sustaining total quality organizations
Building and sustaining total quality organizationsLizzette Danan
 
change leadership integration into DMAIC
change leadership integration into DMAICchange leadership integration into DMAIC
change leadership integration into DMAICluis_g_elizondo
 
Skills and Strategies for New Test Managers.pdf
Skills and Strategies for New Test Managers.pdfSkills and Strategies for New Test Managers.pdf
Skills and Strategies for New Test Managers.pdfApplitools
 
Common factors for managing successful change, presented by Elisabeth Goodman...
Common factors for managing successful change, presented by Elisabeth Goodman...Common factors for managing successful change, presented by Elisabeth Goodman...
Common factors for managing successful change, presented by Elisabeth Goodman...Association for Project Management
 
Enterprise project management organisation – joining strategy to delivery and...
Enterprise project management organisation – joining strategy to delivery and...Enterprise project management organisation – joining strategy to delivery and...
Enterprise project management organisation – joining strategy to delivery and...Association for Project Management
 
Linda Dulye IABC 2010 Global Conference Presentation
Linda Dulye IABC 2010 Global Conference PresentationLinda Dulye IABC 2010 Global Conference Presentation
Linda Dulye IABC 2010 Global Conference PresentationDulye
 

Similar to 8 Stages of change management (Kotter) (20)

Strategy in Action
Strategy in ActionStrategy in Action
Strategy in Action
 
Leadership and Culture Journey
Leadership and Culture JourneyLeadership and Culture Journey
Leadership and Culture Journey
 
Successful change - good culture and governance matter Conference - Roger Gar...
Successful change - good culture and governance matter Conference - Roger Gar...Successful change - good culture and governance matter Conference - Roger Gar...
Successful change - good culture and governance matter Conference - Roger Gar...
 
Make Change That Lasts
Make Change That LastsMake Change That Lasts
Make Change That Lasts
 
Reaching agility: Why aren't we done yet?
Reaching agility: Why aren't we done yet?Reaching agility: Why aren't we done yet?
Reaching agility: Why aren't we done yet?
 
Identifying and Overcoming Roadblocks to Change
Identifying and Overcoming Roadblocks to ChangeIdentifying and Overcoming Roadblocks to Change
Identifying and Overcoming Roadblocks to Change
 
BGT PwC - Benintende
 BGT PwC - Benintende  BGT PwC - Benintende
BGT PwC - Benintende
 
How to create a change management plan
How to create a change management planHow to create a change management plan
How to create a change management plan
 
Common factors for managing successful change leeds jan 2016
Common factors for managing successful change   leeds jan 2016 Common factors for managing successful change   leeds jan 2016
Common factors for managing successful change leeds jan 2016
 
Change success
Change successChange success
Change success
 
Building and sustaining total quality organizations
Building and sustaining total quality organizationsBuilding and sustaining total quality organizations
Building and sustaining total quality organizations
 
change leadership integration into DMAIC
change leadership integration into DMAICchange leadership integration into DMAIC
change leadership integration into DMAIC
 
Skills and Strategies for New Test Managers.pdf
Skills and Strategies for New Test Managers.pdfSkills and Strategies for New Test Managers.pdf
Skills and Strategies for New Test Managers.pdf
 
Team Development Program
Team Development ProgramTeam Development Program
Team Development Program
 
Kepner tregoe Presentation
Kepner tregoe Presentation Kepner tregoe Presentation
Kepner tregoe Presentation
 
Common factors for managing successful change, presented by Elisabeth Goodman...
Common factors for managing successful change, presented by Elisabeth Goodman...Common factors for managing successful change, presented by Elisabeth Goodman...
Common factors for managing successful change, presented by Elisabeth Goodman...
 
Enterprise project management organisation – joining strategy to delivery and...
Enterprise project management organisation – joining strategy to delivery and...Enterprise project management organisation – joining strategy to delivery and...
Enterprise project management organisation – joining strategy to delivery and...
 
NP brochure A4 v4.0
NP brochure A4 v4.0NP brochure A4 v4.0
NP brochure A4 v4.0
 
Linda Dulye IABC 2010 Global Conference Presentation
Linda Dulye IABC 2010 Global Conference PresentationLinda Dulye IABC 2010 Global Conference Presentation
Linda Dulye IABC 2010 Global Conference Presentation
 
The Change
The ChangeThe Change
The Change
 

More from Simon Misiewicz

Creative thinking template
Creative thinking templateCreative thinking template
Creative thinking templateSimon Misiewicz
 
Is starting a business right time for you
Is starting a business right time for youIs starting a business right time for you
Is starting a business right time for youSimon Misiewicz
 
Raising finance for your business
Raising finance for your businessRaising finance for your business
Raising finance for your businessSimon Misiewicz
 
Business user requirements for it development
Business user requirements for it developmentBusiness user requirements for it development
Business user requirements for it developmentSimon Misiewicz
 
Business process re-engineering and systems design - implementation
Business process re-engineering and systems design - implementationBusiness process re-engineering and systems design - implementation
Business process re-engineering and systems design - implementationSimon Misiewicz
 
Optimise-GB's Lean Six Sigma's DMAIC & DMADV Programme imporvement plan Manag...
Optimise-GB's Lean Six Sigma's DMAIC & DMADV Programme imporvement plan Manag...Optimise-GB's Lean Six Sigma's DMAIC & DMADV Programme imporvement plan Manag...
Optimise-GB's Lean Six Sigma's DMAIC & DMADV Programme imporvement plan Manag...Simon Misiewicz
 
Business Process Improvement - Doing the right things effectively and efficie...
Business Process Improvement - Doing the right things effectively and efficie...Business Process Improvement - Doing the right things effectively and efficie...
Business Process Improvement - Doing the right things effectively and efficie...Simon Misiewicz
 
Communicating strategic missions, vision, project progress and celebrate succ...
Communicating strategic missions, vision, project progress and celebrate succ...Communicating strategic missions, vision, project progress and celebrate succ...
Communicating strategic missions, vision, project progress and celebrate succ...Simon Misiewicz
 
Deliver training to suit varying learning styles
Deliver training to suit varying learning stylesDeliver training to suit varying learning styles
Deliver training to suit varying learning stylesSimon Misiewicz
 
4 steps to formulating strategies from the boardroom through to every employee
4 steps to formulating strategies from the boardroom through to every employee 4 steps to formulating strategies from the boardroom through to every employee
4 steps to formulating strategies from the boardroom through to every employee Simon Misiewicz
 
Stakeholder engagement and management
Stakeholder engagement and managementStakeholder engagement and management
Stakeholder engagement and managementSimon Misiewicz
 
Lean, Six Sigma, ToC using DMAIC project management
Lean, Six Sigma, ToC  using DMAIC project managementLean, Six Sigma, ToC  using DMAIC project management
Lean, Six Sigma, ToC using DMAIC project managementSimon Misiewicz
 
Effective Communication for successful working and personal relationships
Effective  Communication for successful working and personal relationships Effective  Communication for successful working and personal relationships
Effective Communication for successful working and personal relationships Simon Misiewicz
 
Strategic improvement through the balanced scorecard and programme management
Strategic improvement through the balanced scorecard and programme managementStrategic improvement through the balanced scorecard and programme management
Strategic improvement through the balanced scorecard and programme managementSimon Misiewicz
 
Programme start up document - Optimised Programme Methodology
Programme start up document - Optimised Programme Methodology Programme start up document - Optimised Programme Methodology
Programme start up document - Optimised Programme Methodology Simon Misiewicz
 
Staff appraisal document - template
Staff appraisal document - template Staff appraisal document - template
Staff appraisal document - template Simon Misiewicz
 
Optimised - Programme start up
Optimised - Programme start upOptimised - Programme start up
Optimised - Programme start upSimon Misiewicz
 
Project End Report - Project Management template
Project End Report - Project Management template Project End Report - Project Management template
Project End Report - Project Management template Simon Misiewicz
 
Lessons learned Report - Project Management template
Lessons learned Report - Project Management template Lessons learned Report - Project Management template
Lessons learned Report - Project Management template Simon Misiewicz
 

More from Simon Misiewicz (20)

Creative thinking template
Creative thinking templateCreative thinking template
Creative thinking template
 
Is starting a business right time for you
Is starting a business right time for youIs starting a business right time for you
Is starting a business right time for you
 
Raising finance for your business
Raising finance for your businessRaising finance for your business
Raising finance for your business
 
Business user requirements for it development
Business user requirements for it developmentBusiness user requirements for it development
Business user requirements for it development
 
Business process re-engineering and systems design - implementation
Business process re-engineering and systems design - implementationBusiness process re-engineering and systems design - implementation
Business process re-engineering and systems design - implementation
 
Optimise-GB's Lean Six Sigma's DMAIC & DMADV Programme imporvement plan Manag...
Optimise-GB's Lean Six Sigma's DMAIC & DMADV Programme imporvement plan Manag...Optimise-GB's Lean Six Sigma's DMAIC & DMADV Programme imporvement plan Manag...
Optimise-GB's Lean Six Sigma's DMAIC & DMADV Programme imporvement plan Manag...
 
Business Process Improvement - Doing the right things effectively and efficie...
Business Process Improvement - Doing the right things effectively and efficie...Business Process Improvement - Doing the right things effectively and efficie...
Business Process Improvement - Doing the right things effectively and efficie...
 
Communicating strategic missions, vision, project progress and celebrate succ...
Communicating strategic missions, vision, project progress and celebrate succ...Communicating strategic missions, vision, project progress and celebrate succ...
Communicating strategic missions, vision, project progress and celebrate succ...
 
Deliver training to suit varying learning styles
Deliver training to suit varying learning stylesDeliver training to suit varying learning styles
Deliver training to suit varying learning styles
 
4 steps to formulating strategies from the boardroom through to every employee
4 steps to formulating strategies from the boardroom through to every employee 4 steps to formulating strategies from the boardroom through to every employee
4 steps to formulating strategies from the boardroom through to every employee
 
Stakeholder engagement and management
Stakeholder engagement and managementStakeholder engagement and management
Stakeholder engagement and management
 
Lean, Six Sigma, ToC using DMAIC project management
Lean, Six Sigma, ToC  using DMAIC project managementLean, Six Sigma, ToC  using DMAIC project management
Lean, Six Sigma, ToC using DMAIC project management
 
Effective Communication for successful working and personal relationships
Effective  Communication for successful working and personal relationships Effective  Communication for successful working and personal relationships
Effective Communication for successful working and personal relationships
 
Strategic improvement through the balanced scorecard and programme management
Strategic improvement through the balanced scorecard and programme managementStrategic improvement through the balanced scorecard and programme management
Strategic improvement through the balanced scorecard and programme management
 
Programme start up document - Optimised Programme Methodology
Programme start up document - Optimised Programme Methodology Programme start up document - Optimised Programme Methodology
Programme start up document - Optimised Programme Methodology
 
Staff appraisal document - template
Staff appraisal document - template Staff appraisal document - template
Staff appraisal document - template
 
Be proactive
Be proactiveBe proactive
Be proactive
 
Optimised - Programme start up
Optimised - Programme start upOptimised - Programme start up
Optimised - Programme start up
 
Project End Report - Project Management template
Project End Report - Project Management template Project End Report - Project Management template
Project End Report - Project Management template
 
Lessons learned Report - Project Management template
Lessons learned Report - Project Management template Lessons learned Report - Project Management template
Lessons learned Report - Project Management template
 

Recently uploaded

NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Peter Ward
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfShashank Mehta
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environmentelijahj01012
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 

Recently uploaded (20)

No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
Call Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North GoaCall Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North Goa
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdf
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environment
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 

8 Stages of change management (Kotter)

  • 1. Planning and deploying change / programme management initiatives We are not animals. We are not a product of what has happened to us in our past. We have the power of choice. – Stephen Covey Optimise- GB
  • 2. Change will have an impact on employee behaviour patterns, work processes, technological requirements, and motivation. Management must assess what employee reactions will be and craft change programmes that will provide support as workers go through the process of accepting change. The programme must then be implemented, disseminated throughout the organisation, monitored for effectiveness, and adjusted where necessary. What is Change Management? Optimise- GB
  • 3. Possible response to change “ Been there done that” “ A new initiative, same as last weeks just a different name” “ Another programme to get rid of us” “ It will never work” “ What more can be done, I am expected to do everything” “ What will this mean for me” “ This is unfair” Optimise- GB What is Change Management?
  • 4. Reasons for change resistance Underestimating the power of vision Not communicating enough with everyone - Fear of the unknown must be addressed by involving employees in planning - Dislike of uncertainty - Managers talk but not listening Failing to create and demonstrate the benefits of short terms goals - Fear of failure - Possible loss of rewards - Expectation that change means more work without reward - Not giving additional training to ensure success Be seen as a top down management approach - Possible loss of power - Bad past experience Optimise- GB What is Change Management?
  • 5. Stages of change: Despair Denial Anger Anxiety Acceptance Practice Relief Motivation These are all natural stages of change Optimise- GB What is Change Management?
  • 6. Stages of change: Optimise- GB What is Change Management? Stage Clues Needs Despair, Denial, Anger Withdrawn, Wastes time, Acts as though nothing has changed, venting frustration Time to get used to the situation, patience, clear authority, active listening Anxiety Does not know how to make the required change, uncertainty, lack of focus Tolerance, permission to explore, permission to speak freely and think privately Acceptance, practice Selects options, lets go of previous values, behaviours and attitudes, develops new skills Openness, allow experimentation, allow mistakes, support training and development, be supportive Relief, motivation Applies learnings, competence, confidence Encouragement, continuous improvement
  • 7. Programme management is the process of managing several related projects, often with the intention of improving an organisation's performance - seen within change management initiatives What is Programme management? Optimise- GB
  • 8. Programme management may provide a layer above the management of projects and focuses on selecting the best group of projects, defining them in terms of their objectives and providing an environment where projects can be run successfully. Programme managers should not micromanage, but should leave project management to the project managers. What is Programme management? Optimise- GB
  • 9. What is Programme management? Optimise- GB
  • 10. What is Programme management? Programme planning - using a Programme Plan to ensure control Benefits management - identifying, optimising and tracking benefits Stakeholder management - ensuring all interested parties are appropriately involved in the programme Issue management and Risk management - having strategy for dealing with current and anticipated problems Quality management - ensuring that the end products of the programme are fit for purpose Configuration management - keeping monitoring information about the programme up-to-date and accurate Audit - ensuring that technical, statutory, contract and accounting standards are used Optimise- GB
  • 11. Guiding employees through the change process Optimise- GB
  • 12. Stages of change Optimise- GB What are the major issues? What crisis is on the horizon? What are the consequences of not changing? What is the competition doing? I have been impressed with the urgency of doing. Knowing is not enough; we must apply. Being willing is not enough; we must do – Russell C Taylor
  • 13. Stages of change Optimise- GB Identify a leader to manage change Build an influential and talented team Identify energetic individuals that embrace, commit to change and have credibility with their colleagues In the past a leader was a boss. Today’s leaders must be partners with their people.. they no longer can lead solely based on positional power - Ken Blanchard
  • 14. Stages of change Optimise- GB Identify the right change agents Effective communicator Good collaborator Attentive listener Ideas person Realistic Able to prioritise Restless
  • 15. Team Needs Encourage team members to share ideas, and support one another Individual Needs Monitor working conditions, and help staff develop their full potential Task Needs Determine the task objectives, and consider the problems involved Managers need to cope with all three needs to ensure the right balance is consistently achieved. - Heller Optimise- GB Stages of change
  • 16. Stages of change Optimise- GB Create a vision - Where we are now? - Where do we want to get to? - How we will get there? Set targets and milestones from the outset Develop a new culture of leaning Create strategies that delivers the vision Better keep yourself clean and bright; you are the window through which you must see the world. - George Bernard Shaw
  • 17. Stages of change Optimise- GB What are your goals, measurements for each of the four quadrants…
  • 18. Stages of change Optimise- GB Set up a programme management office: - Identify targets for next 1, 2-3, 4+ years - Create and support project teams - Identify business champions to work with - Monitor scope and pace of transition - Ensure issues / risk management - Document core business processes and measure performance - Identify methods to prioritise projects
  • 19. Stages of change Optimise- GB Executive Team Managers Staff Communicate from the top down Engage staff at all levels to gain acceptance and ownership Link targets together
  • 20. Stages of change Optimise- GB Communicate the vision, standards and expected benefits through focus groups. Be upfront about incentives and rewards for employees Allow informal networks to deliver the message Build trust by Being open and honest of what will be done, what is expected and what issues may arise Invite candid questions and actively listen and address concerns
  • 21. Stages of change Optimise- GB Communicate using: - Focus groups - Management meetings - Intranet - Use walls to communicate vision and results - Feedback boxes to generate new ideas - Newsletters - Build into employee appraisals
  • 22. Stages of change Optimise- GB Change people, systems and processes that obstruct the change initiative Encourage learning, training, development and do not punish experiments that fail or goes against traditional thinking Identify Projects and formalise through a programme office to help prioritise projects We are an organization that believes in empowering people to be their best - Talal Abu-Ghazaleh
  • 23. Managers should plan projects and tasks with their staff but let them experiment. Managers should coach and support their staff during the implementation phase to ease uncertainty “ Feedback must be provided and staff appraisals let employees know how they stand with the boss” - McGregor Optimise- GB Stages of change
  • 24. Stages of change Optimise- GB Plan and share ideas with everyone Communicate what the short and long terms goals are and ensure that the results are known to all, most importantly be supportive Reward those that helped deliver the short and long term wins, create a motivated team that moves the business forward In large organizations the dilution of information as it passes up and down the hierarchy, and horizontally across departments, can undermine the effort to focus on common goals - Mihaly Csikszentmihalyi
  • 25. Stages of change Optimise- GB Easy to Implement Big Impact Hard to implement Small Impact Project 1 Project 3 Project 6 Project 7 Project 4 Project 5 Project 2 Implement Now Possible Kill Implement Later
  • 26. Stages of change Optimise- GB After people are convinced that the new regime works – build momentum and continue the change process with longer term goals Hire, promote, reward and make examples of good change agents within the company Ensure feedback is open, free from criticism and maintain an open, flexible learning culture…maintain a lessons learned log We need to make sure we have the best people we can in our operations, and that is a constant challenge. There is always room to improve. – James Packer
  • 27. Stages of change Optimise- GB How did you perform against targets? Are the targets right? What can be changed to achieve targets?
  • 28.
  • 29. Stages of change Optimise- GB Communicate communicate communicate the improvements made, the benefits achieved, where you were and where you are now Focus on the customer and develop managers and shop floor staff to focus on continuous improvement I believe through learning and application of what you learn, you can solve any problem, overcome any obstacle and achieve any goal that you can set for yourself. – Brian Tracy
  • 30.