SlideShare une entreprise Scribd logo
1  sur  33
Just in Time JIT Implementation Roadmap - to achieve a balanced rapid flow from planning to scheduling  Anand Subramaniam
[object Object],[object Object]
Highlights ,[object Object],[object Object],[object Object],[object Object]
JIT -  Overview
JIT Philosophy JIT Lower inventory levels / small lots sizes Streamlined with no waste or variability in production system A “Pull” system thru the plant Fewer suppliers (keiretsu) with long-term guaranteed contract Employee empowerment Guaranteed delivery times A management philosophy Works well in high-volume production with minimal inventory (RM, WIP, FG) Exposes problems & bottlenecks, requires TQM
JIT - Big Vs. Little ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
JIT Objectives Objectives Zero lead time Zero failures Flow process Flexible manufacture Eliminate waste Zero Inventory
JIT – Building Blocks JIT Product Design Process Design Manf Plan & Control Human Resource / Organisation
JIT – Building Blocks ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
JIT Requirements ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Requirement
JIT Relationship
JIT in Manufacturing Planning & Control
MRP vs. JIT ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
JIT & TQM ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Supplier / Buyer Partnership ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Build Trust
Supplier – Partnership & Concerns ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Kanban Pull System
What is Kanban Kanban Kan=card  Ban= signal Cards to signal & communicate reorder information Minimise storage in the production area Workstations only produce / deliver components when a card PLUS empty container is received Toyota in 1950s developed it to manage line / material flows Authorisation to produce more inventory Limits the amount of inventory in process  To deliver components to a work station as & when needed (pull) Work-station produces enough to fill the container
Kanban System Machine Centre Assembly Line Bin Part A Bin Part A Material Flow Card (signal) Flow Withdrawal kanban Production kanban
Kanban - Pull Signal
Kanban Card # of containers released Name / location of  preceding process Routing process Store bin / location Units of measure Part # Container type & capacity Name / location of next process Supplier Part  # Supplier Name Reorder / Lot Qty Description Kanban #
Kanban - Rules ,[object Object],[object Object],[object Object],[object Object],[object Object]
Kanban Card Calculation ,[object Object],[object Object],k =  No. of kanbans in card set  d  = Average No. of units demanded over the period L  = lead time to replenish order (same units of time as demand) S  = Safety stock as % of demand during lead time C  = Container size   C S dL ) (1   k Container capacity Expected demand during lead time + safety stock 
Example ,[object Object],[object Object],[object Object],[object Object],  C dL  (1  S ) 4 5(2)(1.1) 2.75 or 3   k size of container Expected demand during lead time + safety stock 
Kanban Challenges Challenges Assumes stable repetitive production Gets complex when upstream w/station makes several parts, each with separate signaling card Poor quality (scrap & rework) affect functioning Doesn't eliminate variability and / or lengthy down times Less suited to industries where mix & volumes fluctuate Buffer stocks may be needed
JIT -  Implementation Roadmap
JIT – Phased Implementation Phase 1 Phase 2 Phase 3 Design Flow Process Review product design, TQC & SPC Kanban Pull Review inventory policies Work & build trust with Vendors Manage Stakeholder Expectations JIT Implementation Inventory reduction Skill / Capability Development Measure performance Business Improvement Improve product design  1  2  3  4    5    6  7 Months Baseline & Stabilise schedules Project / Change Management
JIT – Implementation Steps  Design Flow Process Total Quality Control Baseline & Stabilise Schedule Demand / Kanban Pull Inventory Review & Reduction Build Skills & Capabilities Improve Product Design Continuously Improve Work & Build Trust with Vendors Measures & Metrics
JIT – Implementation Steps (Contd.) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
JIT – Implementation Steps (Contd.) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
JIT – Continuously Improve Design Flow Process Total Quality Control Baseline & Stabilise Schedule Demand / Kanban Pull Inventory Review & Reduction Build Skills & Capabilities Improve Product Design Work & Build Trust with Vendors Measures & Metrics
[object Object],[object Object]
[object Object],[object Object]

Contenu connexe

Tendances

Lean Supply Chain Management--by JULIAN KALAC
Lean Supply Chain Management--by JULIAN KALACLean Supply Chain Management--by JULIAN KALAC
Lean Supply Chain Management--by JULIAN KALACJulian Kalac P.Eng
 
Just in Time and Lean Manufacturing
Just in Time and Lean ManufacturingJust in Time and Lean Manufacturing
Just in Time and Lean Manufacturingshahroze11
 
Production planning control ppt
Production planning control pptProduction planning control ppt
Production planning control pptsudhir pawar
 
work measurement_operation management
work measurement_operation managementwork measurement_operation management
work measurement_operation managementSaravanan Murugan
 
Just in time (JIT).
Just in time (JIT).Just in time (JIT).
Just in time (JIT).ravi bhivra
 
Material requirement planning - Production and Operation Management
Material requirement planning - Production and Operation ManagementMaterial requirement planning - Production and Operation Management
Material requirement planning - Production and Operation ManagementSuryakumar Thangarasu
 
just in time management
just in time managementjust in time management
just in time managementumesh yadav
 
Value Stream Mapping Process
Value Stream Mapping ProcessValue Stream Mapping Process
Value Stream Mapping ProcessAnand Subramaniam
 
Facility layout ppt
Facility layout pptFacility layout ppt
Facility layout pptAnju Rana
 
Material requirement planning, MRP.
Material requirement planning, MRP. Material requirement planning, MRP.
Material requirement planning, MRP. shoaibzaheer1
 
Jit principles
Jit principlesJit principles
Jit principlesamarshelke
 
Lean Manufacturing Tools
Lean Manufacturing ToolsLean Manufacturing Tools
Lean Manufacturing ToolsJagriti Prasad
 
Just In Time and Lean Management
Just In Time and Lean ManagementJust In Time and Lean Management
Just In Time and Lean ManagementRuhi Beri
 

Tendances (20)

Line balancing
Line balancingLine balancing
Line balancing
 
Lean Supply Chain Management--by JULIAN KALAC
Lean Supply Chain Management--by JULIAN KALACLean Supply Chain Management--by JULIAN KALAC
Lean Supply Chain Management--by JULIAN KALAC
 
Just in Time and Lean Manufacturing
Just in Time and Lean ManufacturingJust in Time and Lean Manufacturing
Just in Time and Lean Manufacturing
 
Production planning control ppt
Production planning control pptProduction planning control ppt
Production planning control ppt
 
Kanban system presentation
Kanban system presentationKanban system presentation
Kanban system presentation
 
work measurement_operation management
work measurement_operation managementwork measurement_operation management
work measurement_operation management
 
CAPACITY PLANNING
CAPACITY PLANNINGCAPACITY PLANNING
CAPACITY PLANNING
 
Just in time (JIT).
Just in time (JIT).Just in time (JIT).
Just in time (JIT).
 
Just in time
Just in timeJust in time
Just in time
 
Material requirement planning - Production and Operation Management
Material requirement planning - Production and Operation ManagementMaterial requirement planning - Production and Operation Management
Material requirement planning - Production and Operation Management
 
just in time management
just in time managementjust in time management
just in time management
 
Value Stream Mapping Process
Value Stream Mapping ProcessValue Stream Mapping Process
Value Stream Mapping Process
 
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 
Kanban system
Kanban systemKanban system
Kanban system
 
Facility layout ppt
Facility layout pptFacility layout ppt
Facility layout ppt
 
Material requirement planning, MRP.
Material requirement planning, MRP. Material requirement planning, MRP.
Material requirement planning, MRP.
 
Jit principles
Jit principlesJit principles
Jit principles
 
Lean Manufacturing Tools
Lean Manufacturing ToolsLean Manufacturing Tools
Lean Manufacturing Tools
 
Just In Time and Lean Management
Just In Time and Lean ManagementJust In Time and Lean Management
Just In Time and Lean Management
 
Just In Time (JIT)
Just In Time (JIT)Just In Time (JIT)
Just In Time (JIT)
 

En vedette (20)

Project Execution & Control Checklist
Project Execution & Control ChecklistProject Execution & Control Checklist
Project Execution & Control Checklist
 
Lean Transformation ~ A Journey
Lean Transformation ~ A JourneyLean Transformation ~ A Journey
Lean Transformation ~ A Journey
 
Innovation – What, Why, How…
Innovation – What, Why, How…Innovation – What, Why, How…
Innovation – What, Why, How…
 
5 S – Office Audit
5 S – Office Audit5 S – Office Audit
5 S – Office Audit
 
The 7 sorrows of mary
The 7 sorrows of maryThe 7 sorrows of mary
The 7 sorrows of mary
 
TPM Implementation Strategy
TPM Implementation StrategyTPM Implementation Strategy
TPM Implementation Strategy
 
Innovation
InnovationInnovation
Innovation
 
Sales Performance Measures
Sales Performance MeasuresSales Performance Measures
Sales Performance Measures
 
IT Processes & Systems
IT Processes & SystemsIT Processes & Systems
IT Processes & Systems
 
Gemba kaizen
Gemba kaizenGemba kaizen
Gemba kaizen
 
Business Plan
Business PlanBusiness Plan
Business Plan
 
Defects Vs. Errors
Defects Vs. ErrorsDefects Vs. Errors
Defects Vs. Errors
 
Performance Improvement Culture
Performance Improvement CulturePerformance Improvement Culture
Performance Improvement Culture
 
Material Handling
Material Handling Material Handling
Material Handling
 
5 S – Manufacturing Audit
5 S – Manufacturing Audit5 S – Manufacturing Audit
5 S – Manufacturing Audit
 
Change Management
Change ManagementChange Management
Change Management
 
Software Development
Software DevelopmentSoftware Development
Software Development
 
Practice Management
Practice ManagementPractice Management
Practice Management
 
Stakeholder Relationship Management Audit
Stakeholder Relationship Management AuditStakeholder Relationship Management Audit
Stakeholder Relationship Management Audit
 
Enterprise Content Management (ECM) System
Enterprise Content Management (ECM) SystemEnterprise Content Management (ECM) System
Enterprise Content Management (ECM) System
 

Similaire à JIT

Session 8
Session 8Session 8
Session 8thangv
 
Session 8_OM
Session 8_OMSession 8_OM
Session 8_OMthangv
 
SMED Setup & Lead Time Reduction
SMED Setup & Lead Time ReductionSMED Setup & Lead Time Reduction
SMED Setup & Lead Time ReductionAnand Subramaniam
 
lean-simple-solutions
 lean-simple-solutions lean-simple-solutions
lean-simple-solutionssashi prabhu
 
37022309 lean-simple-solutions
37022309 lean-simple-solutions37022309 lean-simple-solutions
37022309 lean-simple-solutionssashi prabhu
 
37021790 just-in-time-by-sashi-prabhu
37021790 just-in-time-by-sashi-prabhu37021790 just-in-time-by-sashi-prabhu
37021790 just-in-time-by-sashi-prabhusashi prabhu
 
just-in-time-by-sashi-prabhu
 just-in-time-by-sashi-prabhu just-in-time-by-sashi-prabhu
just-in-time-by-sashi-prabhusashi prabhu
 
11 Operation System Design And Planning
11 Operation System Design And Planning11 Operation System Design And Planning
11 Operation System Design And PlanningDhimas kasep
 
Case study value of it strategy in hi tech industry
Case study value of it strategy in hi tech industryCase study value of it strategy in hi tech industry
Case study value of it strategy in hi tech industryiasaglobal
 
Product Life Cycle Management
Product Life Cycle ManagementProduct Life Cycle Management
Product Life Cycle ManagementAnand Subramaniam
 
Customer Supplier chain TQM
Customer Supplier chain TQM Customer Supplier chain TQM
Customer Supplier chain TQM Jun Sollestre
 

Similaire à JIT (20)

Jit And Lean
Jit And LeanJit And Lean
Jit And Lean
 
Session 8
Session 8Session 8
Session 8
 
Session 8_OM
Session 8_OMSession 8_OM
Session 8_OM
 
Just In Time
Just In TimeJust In Time
Just In Time
 
SMED Setup & Lead Time Reduction
SMED Setup & Lead Time ReductionSMED Setup & Lead Time Reduction
SMED Setup & Lead Time Reduction
 
file000239.pdf
file000239.pdffile000239.pdf
file000239.pdf
 
JIT and Lean Manufacturing
JIT and Lean Manufacturing JIT and Lean Manufacturing
JIT and Lean Manufacturing
 
Jit
JitJit
Jit
 
lean-simple-solutions
 lean-simple-solutions lean-simple-solutions
lean-simple-solutions
 
37022309 lean-simple-solutions
37022309 lean-simple-solutions37022309 lean-simple-solutions
37022309 lean-simple-solutions
 
37021790 just-in-time-by-sashi-prabhu
37021790 just-in-time-by-sashi-prabhu37021790 just-in-time-by-sashi-prabhu
37021790 just-in-time-by-sashi-prabhu
 
just-in-time-by-sashi-prabhu
 just-in-time-by-sashi-prabhu just-in-time-by-sashi-prabhu
just-in-time-by-sashi-prabhu
 
Planning_sample
Planning_samplePlanning_sample
Planning_sample
 
Planning Sample
Planning SamplePlanning Sample
Planning Sample
 
Planning Sample
Planning SamplePlanning Sample
Planning Sample
 
11 Operation System Design And Planning
11 Operation System Design And Planning11 Operation System Design And Planning
11 Operation System Design And Planning
 
Case study value of it strategy in hi tech industry
Case study value of it strategy in hi tech industryCase study value of it strategy in hi tech industry
Case study value of it strategy in hi tech industry
 
Product Life Cycle Management
Product Life Cycle ManagementProduct Life Cycle Management
Product Life Cycle Management
 
Customer Supplier chain TQM
Customer Supplier chain TQM Customer Supplier chain TQM
Customer Supplier chain TQM
 
Planning_sample
Planning_samplePlanning_sample
Planning_sample
 

Plus de Anand Subramaniam (20)

Lean transformation
Lean transformationLean transformation
Lean transformation
 
Lean principles
Lean principlesLean principles
Lean principles
 
Lean thinking
Lean thinkingLean thinking
Lean thinking
 
Anand dossier 2
Anand dossier 2Anand dossier 2
Anand dossier 2
 
Anand short dossier
Anand short dossierAnand short dossier
Anand short dossier
 
Set up reduction
Set up reductionSet up reduction
Set up reduction
 
Waste Walk ~ Audit
Waste Walk ~ AuditWaste Walk ~ Audit
Waste Walk ~ Audit
 
Muda in service industries
Muda in service industriesMuda in service industries
Muda in service industries
 
3 MU
3 MU3 MU
3 MU
 
Ninbennoaru Jidoka
Ninbennoaru JidokaNinbennoaru Jidoka
Ninbennoaru Jidoka
 
LSS Idea Generation to Project Execution
LSS Idea Generation to Project ExecutionLSS Idea Generation to Project Execution
LSS Idea Generation to Project Execution
 
LSS - 5 Year Strategy
LSS -  5 Year StrategyLSS -  5 Year Strategy
LSS - 5 Year Strategy
 
Lean Six Sigma Projects & Strategy Linkage
Lean Six Sigma Projects & Strategy LinkageLean Six Sigma Projects & Strategy Linkage
Lean Six Sigma Projects & Strategy Linkage
 
CMMI & Six Sigma Integration
CMMI & Six Sigma IntegrationCMMI & Six Sigma Integration
CMMI & Six Sigma Integration
 
CMMI Capability Maturity Model Integration
CMMI   Capability Maturity Model Integration CMMI   Capability Maturity Model Integration
CMMI Capability Maturity Model Integration
 
8 D – Problem Solving Process
8 D – Problem Solving Process8 D – Problem Solving Process
8 D – Problem Solving Process
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive Maintenance
 
Overall Equipment Effectiveness
Overall Equipment EffectivenessOverall Equipment Effectiveness
Overall Equipment Effectiveness
 
Autonomous Maintenance
Autonomous MaintenanceAutonomous Maintenance
Autonomous Maintenance
 
VSM – Current & Future
VSM – Current & FutureVSM – Current & Future
VSM – Current & Future
 

Dernier

Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...amitlee9823
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableSeo
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceDamini Dixit
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...lizamodels9
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperityhemanthkumar470700
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Anamikakaur10
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptxnandhinijagan9867
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentationuneakwhite
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...lizamodels9
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...amitlee9823
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLkapoorjyoti4444
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture conceptP&CO
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangaloreamitlee9823
 

Dernier (20)

Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 

JIT

  • 1. Just in Time JIT Implementation Roadmap - to achieve a balanced rapid flow from planning to scheduling Anand Subramaniam
  • 2.
  • 3.
  • 4. JIT - Overview
  • 5. JIT Philosophy JIT Lower inventory levels / small lots sizes Streamlined with no waste or variability in production system A “Pull” system thru the plant Fewer suppliers (keiretsu) with long-term guaranteed contract Employee empowerment Guaranteed delivery times A management philosophy Works well in high-volume production with minimal inventory (RM, WIP, FG) Exposes problems & bottlenecks, requires TQM
  • 6.
  • 7. JIT Objectives Objectives Zero lead time Zero failures Flow process Flexible manufacture Eliminate waste Zero Inventory
  • 8. JIT – Building Blocks JIT Product Design Process Design Manf Plan & Control Human Resource / Organisation
  • 9.
  • 10.
  • 12. JIT in Manufacturing Planning & Control
  • 13.
  • 14.
  • 15.
  • 16.
  • 18. What is Kanban Kanban Kan=card Ban= signal Cards to signal & communicate reorder information Minimise storage in the production area Workstations only produce / deliver components when a card PLUS empty container is received Toyota in 1950s developed it to manage line / material flows Authorisation to produce more inventory Limits the amount of inventory in process To deliver components to a work station as & when needed (pull) Work-station produces enough to fill the container
  • 19. Kanban System Machine Centre Assembly Line Bin Part A Bin Part A Material Flow Card (signal) Flow Withdrawal kanban Production kanban
  • 20. Kanban - Pull Signal
  • 21. Kanban Card # of containers released Name / location of preceding process Routing process Store bin / location Units of measure Part # Container type & capacity Name / location of next process Supplier Part # Supplier Name Reorder / Lot Qty Description Kanban #
  • 22.
  • 23.
  • 24.
  • 25. Kanban Challenges Challenges Assumes stable repetitive production Gets complex when upstream w/station makes several parts, each with separate signaling card Poor quality (scrap & rework) affect functioning Doesn't eliminate variability and / or lengthy down times Less suited to industries where mix & volumes fluctuate Buffer stocks may be needed
  • 26. JIT - Implementation Roadmap
  • 27. JIT – Phased Implementation Phase 1 Phase 2 Phase 3 Design Flow Process Review product design, TQC & SPC Kanban Pull Review inventory policies Work & build trust with Vendors Manage Stakeholder Expectations JIT Implementation Inventory reduction Skill / Capability Development Measure performance Business Improvement Improve product design 1 2 3 4 5 6 7 Months Baseline & Stabilise schedules Project / Change Management
  • 28. JIT – Implementation Steps Design Flow Process Total Quality Control Baseline & Stabilise Schedule Demand / Kanban Pull Inventory Review & Reduction Build Skills & Capabilities Improve Product Design Continuously Improve Work & Build Trust with Vendors Measures & Metrics
  • 29.
  • 30.
  • 31. JIT – Continuously Improve Design Flow Process Total Quality Control Baseline & Stabilise Schedule Demand / Kanban Pull Inventory Review & Reduction Build Skills & Capabilities Improve Product Design Work & Build Trust with Vendors Measures & Metrics
  • 32.
  • 33.