Overall Equipment Effectiveness (OEE) Measure the efficiency of the machine during its loading time Anand Subramaniam
2 “Experience is directly proportional to the amount of equipment ruined.”  - Harrisberger's Fourth Law of the Lab
Overall Equipment Effectiveness  OEE figures are determined by combining the availability and performance of the equipment with the quality of parts made OEE measures the efficiency of the machine during its loading time.   Planned downtime does not effect the OEE figure 3
Overall Equipment Effectiveness (OEE) 4
Equipment Losses 5 Speed Loss Reduced speed Minor stopping  Down Time Loss Set-up / adjustments Equipment failure / breakdowns Quality Loss Rework / scrap Process errors
Material & Manpower Losses 6 Material Loss Material yield Energy losses Manpower Loss Waiting Instructions Waiting Materials Waiting Quality Confirmation Cleaning & Checking
Set-up Availability losses Breakdown Minor Stoppages Performance losses Speed losses Start-up losses Quality losses In process losses Losses – Example Inconsistent Times,  Insufficient skills. Poor Planning & scheduling,  Different methods, Poor tooling, Poor start up controls, Missing parts, Insufficient support, Excess start-up adjustment Lack of maintenance, Low operator interest, not knowing of problems, Poor Training, Design Problems, Inferior Material	 Material not available, Change over at start / end Jams / misfeeds / overloads, operator error, operator absence	 Overall Equipment Effectiveness Unclear design specs., poor maintenance history, incorrect settings, Poor Training, Speed deliberately reduced, inconsistent Material  Poor machine changeover, Inconsistent materials, No start-up check lists, Waiting for temp. - pressures,	Minor adjustments Temperature & pressure changes, inconsistent materials, Process not followed, poor calibration, Gauges not calibrated properly.
OEE Calculation 8 OEE =  Availability *performance * Quality yield  Availability  (Down Time Loss) =   Time available for production - Downtime  				Time available in production Performance  (Speed Loss) =        Ideal cycle time x processing quantity				Operating time Quality Yield (Quality Loss) =      	Total processed quantity – defect 					Total processed quantity
OEE Worked Example = Load – Down Time        Load Time  460 min – 60 min              460 Time x Processed Qty Operating Time 0.5/ unit x 400 units         400 minutes Processed Amount –  Amount of Defects Processed Amount 400 – 8                                                                       400  x 100%          = 87%  x 100%          = 50%  x 100%          = 98% 1. Unexpected Eq. Breakdown 2. Set-up & adjustments 3. Idling and minor stoppages 4. Reduced speed 5. Defects in Process 6. Reduced Yield  Availability : Performance Quality Yield   ] ] = OEE = .87 x .50 x .98  =  46.2 % ] =
10 “Skiing consists of wearing $3,000 worth of clothes and equipment and driving 200 miles in the snow in order to stand around at a bar and drink.”  - P. J. O'Rourke
11 Good Luck http://www.linkedin.com/in/anandsubramaniam

Contenu connexe

Tendances

Total productive maintenance (tpm)
Total productive maintenance (tpm)Total productive maintenance (tpm)
Total productive maintenance (tpm)ranviry49
 
PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)
PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)
PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)Inter Alliance Werardt
 
Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)Brian Thomas
 
Autonomous maintenance Jishu Hozen
Autonomous maintenance Jishu HozenAutonomous maintenance Jishu Hozen
Autonomous maintenance Jishu HozenChetanMehta39
 
Presentation on Total Productive Maintenance
Presentation on Total Productive MaintenancePresentation on Total Productive Maintenance
Presentation on Total Productive MaintenanceMahendra K SHUKLA
 
Aim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu HozenAim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu Hozenavijit biswas
 
Lean Manufacturing Tools
Lean Manufacturing ToolsLean Manufacturing Tools
Lean Manufacturing ToolsJagriti Prasad
 
Autonomous Maintenance (AM)
Autonomous Maintenance (AM)Autonomous Maintenance (AM)
Autonomous Maintenance (AM)Pramod A
 
Jishu hozen
Jishu  hozenJishu  hozen
Jishu hozenQC Labs
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive MaintenanceAnand Subramaniam
 

Tendances (20)

Total productive maintenance (tpm)
Total productive maintenance (tpm)Total productive maintenance (tpm)
Total productive maintenance (tpm)
 
The Six Big Losses of OEE
The Six Big Losses of OEEThe Six Big Losses of OEE
The Six Big Losses of OEE
 
PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)
PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)
PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)
 
TPM: Autonomous Maintenance (Jishu Hozen) Framework Poster
TPM: Autonomous Maintenance (Jishu Hozen) Framework PosterTPM: Autonomous Maintenance (Jishu Hozen) Framework Poster
TPM: Autonomous Maintenance (Jishu Hozen) Framework Poster
 
Tools of lean mfg
Tools of lean mfgTools of lean mfg
Tools of lean mfg
 
Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)
 
TPM: Autonomous Maintenance
TPM: Autonomous MaintenanceTPM: Autonomous Maintenance
TPM: Autonomous Maintenance
 
Autonomous maintenance Jishu Hozen
Autonomous maintenance Jishu HozenAutonomous maintenance Jishu Hozen
Autonomous maintenance Jishu Hozen
 
Presentation on Total Productive Maintenance
Presentation on Total Productive MaintenancePresentation on Total Productive Maintenance
Presentation on Total Productive Maintenance
 
Aim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu HozenAim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu Hozen
 
Lean Manufacturing Tools
Lean Manufacturing ToolsLean Manufacturing Tools
Lean Manufacturing Tools
 
OEE
OEEOEE
OEE
 
Autonomous Maintenance (AM)
Autonomous Maintenance (AM)Autonomous Maintenance (AM)
Autonomous Maintenance (AM)
 
Autonomous Maintenance
Autonomous MaintenanceAutonomous Maintenance
Autonomous Maintenance
 
TPM Implementation Strategy
TPM Implementation StrategyTPM Implementation Strategy
TPM Implementation Strategy
 
16 major losses tng
16 major losses tng16 major losses tng
16 major losses tng
 
Jishu hozen
Jishu  hozenJishu  hozen
Jishu hozen
 
Lean Manufacturing Training
Lean Manufacturing TrainingLean Manufacturing Training
Lean Manufacturing Training
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive Maintenance
 
My machine camp
My machine campMy machine camp
My machine camp
 

En vedette (20)

Project Health Check
Project Health CheckProject Health Check
Project Health Check
 
Sales Performance Measures
Sales Performance MeasuresSales Performance Measures
Sales Performance Measures
 
Erp (Re) Implementation
Erp (Re) ImplementationErp (Re) Implementation
Erp (Re) Implementation
 
Strategic Sourcing & E Procurement
Strategic Sourcing & E ProcurementStrategic Sourcing & E Procurement
Strategic Sourcing & E Procurement
 
The 7 sorrows of mary
The 7 sorrows of maryThe 7 sorrows of mary
The 7 sorrows of mary
 
Business Case ~ Formulation
Business Case ~  FormulationBusiness Case ~  Formulation
Business Case ~ Formulation
 
LSS - 5 Year Strategy
LSS -  5 Year StrategyLSS -  5 Year Strategy
LSS - 5 Year Strategy
 
3 MU
3 MU3 MU
3 MU
 
Enterprise Performance Management (EPM)
Enterprise Performance Management (EPM)Enterprise Performance Management (EPM)
Enterprise Performance Management (EPM)
 
Innovation
InnovationInnovation
Innovation
 
Lesson Learned Report
Lesson Learned ReportLesson Learned Report
Lesson Learned Report
 
Design For Six Sigma
Design For Six SigmaDesign For Six Sigma
Design For Six Sigma
 
Business Plan
Business PlanBusiness Plan
Business Plan
 
LSS Idea Generation to Project Execution
LSS Idea Generation to Project ExecutionLSS Idea Generation to Project Execution
LSS Idea Generation to Project Execution
 
Process Audit
Process AuditProcess Audit
Process Audit
 
IT Processes & Systems
IT Processes & SystemsIT Processes & Systems
IT Processes & Systems
 
Link (Non)Financial To Supply Chain Performance Metrics
Link (Non)Financial To Supply Chain Performance MetricsLink (Non)Financial To Supply Chain Performance Metrics
Link (Non)Financial To Supply Chain Performance Metrics
 
Gemba kaizen
Gemba kaizenGemba kaizen
Gemba kaizen
 
FMEA Analysis Cycle
FMEA Analysis CycleFMEA Analysis Cycle
FMEA Analysis Cycle
 
QMS & ISO 9001:2000
QMS & ISO 9001:2000QMS & ISO 9001:2000
QMS & ISO 9001:2000
 

Similaire à Overall Equipment Effectiveness

6 big losses at work place and how to recover that losses
6 big losses at work place and how to recover that losses6 big losses at work place and how to recover that losses
6 big losses at work place and how to recover that lossesdrneerajbhandari
 
OEE (overall eqipment effectiveness)
OEE (overall eqipment effectiveness)OEE (overall eqipment effectiveness)
OEE (overall eqipment effectiveness)mechanicalinventors
 
16_Major_Losses_in_Production_Complete_Presentation_1662385512.pdf
16_Major_Losses_in_Production_Complete_Presentation_1662385512.pdf16_Major_Losses_in_Production_Complete_Presentation_1662385512.pdf
16_Major_Losses_in_Production_Complete_Presentation_1662385512.pdfssuser72dffc
 
Efektivitas peralatan secara keseluruhan
Efektivitas peralatan secara keseluruhanEfektivitas peralatan secara keseluruhan
Efektivitas peralatan secara keseluruhanAwalJaNuarySaragi
 
16 Major production losses.pdf
16 Major production losses.pdf16 Major production losses.pdf
16 Major production losses.pdfPTD QUYCOCTU
 
Maintenance
Maintenance Maintenance
Maintenance NsbmUcd
 
OEE Financial Benefits From Component Improvement
OEE Financial Benefits From Component ImprovementOEE Financial Benefits From Component Improvement
OEE Financial Benefits From Component ImprovementLean Teams USA
 
MAINTENANCE , advanced management
MAINTENANCE , advanced managementMAINTENANCE , advanced management
MAINTENANCE , advanced managementrushdi3
 
Work study method-and_time_study-final
Work study method-and_time_study-finalWork study method-and_time_study-final
Work study method-and_time_study-finalHareesh M
 
A038301010
A038301010A038301010
A038301010theijes
 
Work study method and time study-final - copy
Work study method and time study-final - copyWork study method and time study-final - copy
Work study method and time study-final - copyHareesh M
 

Similaire à Overall Equipment Effectiveness (20)

Sop oee [1]
Sop   oee [1]Sop   oee [1]
Sop oee [1]
 
Sop oee [1]
Sop   oee [1]Sop   oee [1]
Sop oee [1]
 
6 big losses at work place and how to recover that losses
6 big losses at work place and how to recover that losses6 big losses at work place and how to recover that losses
6 big losses at work place and how to recover that losses
 
OEE (overall eqipment effectiveness)
OEE (overall eqipment effectiveness)OEE (overall eqipment effectiveness)
OEE (overall eqipment effectiveness)
 
16_Major_Losses_in_Production_Complete_Presentation_1662385512.pdf
16_Major_Losses_in_Production_Complete_Presentation_1662385512.pdf16_Major_Losses_in_Production_Complete_Presentation_1662385512.pdf
16_Major_Losses_in_Production_Complete_Presentation_1662385512.pdf
 
Efektivitas peralatan secara keseluruhan
Efektivitas peralatan secara keseluruhanEfektivitas peralatan secara keseluruhan
Efektivitas peralatan secara keseluruhan
 
16 Major production losses.pdf
16 Major production losses.pdf16 Major production losses.pdf
16 Major production losses.pdf
 
Oee and its Application
Oee and its ApplicationOee and its Application
Oee and its Application
 
Maintenance
Maintenance Maintenance
Maintenance
 
OEE Financial Benefits From Component Improvement
OEE Financial Benefits From Component ImprovementOEE Financial Benefits From Component Improvement
OEE Financial Benefits From Component Improvement
 
Ole training
Ole trainingOle training
Ole training
 
OLE training
OLE trainingOLE training
OLE training
 
OEE CALCULATION PPT
OEE CALCULATION PPTOEE CALCULATION PPT
OEE CALCULATION PPT
 
MAINTENANCE , advanced management
MAINTENANCE , advanced managementMAINTENANCE , advanced management
MAINTENANCE , advanced management
 
BLUE BELT -NIBM.pp
BLUE BELT  -NIBM.ppBLUE BELT  -NIBM.pp
BLUE BELT -NIBM.pp
 
Work study method-and_time_study-final
Work study method-and_time_study-finalWork study method-and_time_study-final
Work study method-and_time_study-final
 
A038301010
A038301010A038301010
A038301010
 
Work study method and time study-final - copy
Work study method and time study-final - copyWork study method and time study-final - copy
Work study method and time study-final - copy
 
Overall Equipment Efficiency
Overall Equipment EfficiencyOverall Equipment Efficiency
Overall Equipment Efficiency
 
Motion and time study
Motion and time studyMotion and time study
Motion and time study
 

Plus de Anand Subramaniam (20)

Lean transformation
Lean transformationLean transformation
Lean transformation
 
Lean principles
Lean principlesLean principles
Lean principles
 
Lean thinking
Lean thinkingLean thinking
Lean thinking
 
Anand dossier 2
Anand dossier 2Anand dossier 2
Anand dossier 2
 
Anand short dossier
Anand short dossierAnand short dossier
Anand short dossier
 
Set up reduction
Set up reductionSet up reduction
Set up reduction
 
Waste Walk ~ Audit
Waste Walk ~ AuditWaste Walk ~ Audit
Waste Walk ~ Audit
 
Muda in service industries
Muda in service industriesMuda in service industries
Muda in service industries
 
Defects Vs. Errors
Defects Vs. ErrorsDefects Vs. Errors
Defects Vs. Errors
 
Ninbennoaru Jidoka
Ninbennoaru JidokaNinbennoaru Jidoka
Ninbennoaru Jidoka
 
Lean Six Sigma Projects & Strategy Linkage
Lean Six Sigma Projects & Strategy LinkageLean Six Sigma Projects & Strategy Linkage
Lean Six Sigma Projects & Strategy Linkage
 
CMMI & Six Sigma Integration
CMMI & Six Sigma IntegrationCMMI & Six Sigma Integration
CMMI & Six Sigma Integration
 
CMMI Capability Maturity Model Integration
CMMI   Capability Maturity Model Integration CMMI   Capability Maturity Model Integration
CMMI Capability Maturity Model Integration
 
8 D – Problem Solving Process
8 D – Problem Solving Process8 D – Problem Solving Process
8 D – Problem Solving Process
 
VSM – Current & Future
VSM – Current & FutureVSM – Current & Future
VSM – Current & Future
 
Material Handling
Material Handling Material Handling
Material Handling
 
Service / Product Innovation
Service / Product InnovationService / Product Innovation
Service / Product Innovation
 
Innovation Assessment & Tools
Innovation Assessment & ToolsInnovation Assessment & Tools
Innovation Assessment & Tools
 
Innovation & Change Management
Innovation & Change ManagementInnovation & Change Management
Innovation & Change Management
 
Innovation – What, Why, How…
Innovation – What, Why, How…Innovation – What, Why, How…
Innovation – What, Why, How…
 

Dernier

Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaShree Krishna Exports
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Tina Ji
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 

Dernier (20)

Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in India
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 

Overall Equipment Effectiveness

  • 1. Overall Equipment Effectiveness (OEE) Measure the efficiency of the machine during its loading time Anand Subramaniam
  • 2. 2 “Experience is directly proportional to the amount of equipment ruined.” - Harrisberger's Fourth Law of the Lab
  • 3. Overall Equipment Effectiveness OEE figures are determined by combining the availability and performance of the equipment with the quality of parts made OEE measures the efficiency of the machine during its loading time. Planned downtime does not effect the OEE figure 3
  • 5. Equipment Losses 5 Speed Loss Reduced speed Minor stopping Down Time Loss Set-up / adjustments Equipment failure / breakdowns Quality Loss Rework / scrap Process errors
  • 6. Material & Manpower Losses 6 Material Loss Material yield Energy losses Manpower Loss Waiting Instructions Waiting Materials Waiting Quality Confirmation Cleaning & Checking
  • 7. Set-up Availability losses Breakdown Minor Stoppages Performance losses Speed losses Start-up losses Quality losses In process losses Losses – Example Inconsistent Times, Insufficient skills. Poor Planning & scheduling, Different methods, Poor tooling, Poor start up controls, Missing parts, Insufficient support, Excess start-up adjustment Lack of maintenance, Low operator interest, not knowing of problems, Poor Training, Design Problems, Inferior Material Material not available, Change over at start / end Jams / misfeeds / overloads, operator error, operator absence Overall Equipment Effectiveness Unclear design specs., poor maintenance history, incorrect settings, Poor Training, Speed deliberately reduced, inconsistent Material Poor machine changeover, Inconsistent materials, No start-up check lists, Waiting for temp. - pressures, Minor adjustments Temperature & pressure changes, inconsistent materials, Process not followed, poor calibration, Gauges not calibrated properly.
  • 8. OEE Calculation 8 OEE = Availability *performance * Quality yield Availability (Down Time Loss) = Time available for production - Downtime Time available in production Performance (Speed Loss) = Ideal cycle time x processing quantity Operating time Quality Yield (Quality Loss) = Total processed quantity – defect Total processed quantity
  • 9. OEE Worked Example = Load – Down Time Load Time 460 min – 60 min 460 Time x Processed Qty Operating Time 0.5/ unit x 400 units 400 minutes Processed Amount – Amount of Defects Processed Amount 400 – 8 400 x 100% = 87% x 100% = 50% x 100% = 98% 1. Unexpected Eq. Breakdown 2. Set-up & adjustments 3. Idling and minor stoppages 4. Reduced speed 5. Defects in Process 6. Reduced Yield Availability : Performance Quality Yield ] ] = OEE = .87 x .50 x .98 = 46.2 % ] =
  • 10. 10 “Skiing consists of wearing $3,000 worth of clothes and equipment and driving 200 miles in the snow in order to stand around at a bar and drink.” - P. J. O'Rourke
  • 11. 11 Good Luck http://www.linkedin.com/in/anandsubramaniam