ICTF 2010 (Green desktop computing)
The Ashmolean Green IT Strategy
A (developing) Green IT
Strategy
2 of 20
ICTF 2010 (Green desktop computing)
• No. of Public Galleries: 67
• No. of Offices/Labs/Work Areas: 82
• No. of Stores: 25
Background Information: Building
3 of 20
ICTF 2010 (Green desktop computing)
• Full-time Staff: 169
• Part-time Staff: 86 (includes VSAs)
• Volunteers & Interns: 26 (varies)
More Background: “Human Resources”
4 of 20
ICTF 2010 (Green desktop computing)
The Strategy: 1 - Monitor
Identify
Manage
Communicate
Monitor
Establish
Policies
5 of 20
ICTF 2010 (Green desktop computing)
OUED Electricity Meters feed
* Internet Explorer only
http://ionenterprise1.survey.ox.ac.uk/ion/
6 of 20
ICTF 2010 (Green desktop computing)
Oxford Monitoring Service
greenit@oucs.ox.ac.uk
Snapshot location
7 of 20
ICTF 2010 (Green desktop computing)
Datasynergy : Powerman
ActiveInactive while on
http://www.datasynergy.co.uk/
8 of 20
ICTF 2010 (Green desktop computing)
PC Powerdown monitor
9 of 20
ICTF 2010 (Green desktop computing)
The Strategy: 2 - Identify
Identify
Monitor
Manage
Communicate
Establish
Policies
10 of 20
ICTF 2010 (Green desktop computing)
Identify … “but it’s not just IT stuff”
Servers
Non IT Equipment
IT Equipment
Workstations
Others
It should be remembered that energy is consumed by many pieces of
equipment, not just IT stuff!
11 of 20
ICTF 2010 (Green desktop computing)
“Yet More Background: ICT Infrastructure”
• No. of “active” Workstations: 150
• No. of Servers: 26
• No. of Switches: 31
• No, of UPS: 50
• No. of Printers: >60
(perhaps about 40 are attached to the
network)
12 of 20
ICTF 2010 (Green desktop computing)
The Strategy: 3 - Manage
Identify
Monitor
Establish
Policies
Manage
Communicate
13 of 20
ICTF 2010 (Green desktop computing)
Manage: Workstations – FiDo
Power management monitoring (PMM) and Wake on LAN
(WOL)
• User driven wake up on demand
• Group Wake up
• Easy Administration
• Client less
• Excellent Support
OUCS, OeRC, OUCE & OUED
http://www.oucs.ox.ac.uk/greenit/wol.xml
14 of 20
ICTF 2010 (Green desktop computing)
Manage: Workstations – PC Power Down
Powerdown Server and Monitor
• Modular plugin Application
• Client – Server based deployment
• Group Shutdown management
PC Powerdown
Powerdown Server
Powerdown
Clients
Policies set
on server
15 of 20
ICTF 2010 (Green desktop computing)
Datasynergy Systems
Powerman 5 Power Manager
• Activity Based Monitoring
• Easy Group Policy based configuration
• Client – Server application
AD Container
Active
Directory
Policies
Powerman
Management
Server
Manage
Reports
Manage: Workstations – Powerman
16 of 20
ICTF 2010 (Green desktop computing)
Identify
Monitor
Establish
Policies
Manage
Communicate
The Strategy: 4 – Establish Policies
17 of 20
ICTF 2010 (Green desktop computing)
Establish Policies & Guidelines
Infrastructure services
• Citrix based server virtualisation
• Storage virtualisation and consolidation
Desktop policies
• Hibernate when inactive
• Promote remote working
• Tie in remote working with OUCS WOL
• Virtual desktop delivery
• Reuse low spec computers
• Printer consolidation and management
18 of 20
ICTF 2010 (Green desktop computing)
The Future
• User education
• Shared knowledge and initiative
• Increase and consolidate server
virtualisation
• Aim for the best of all worlds
• Reduce our Monthly
Energy Bill (£15,000)
Open Source
In houseCommercial
19 of 20
ICTF 2010 (Green desktop computing)
1. Manage Expectations!
• Reduce our Energy Bill (£15,000pm)
• ICT contribution: <<10% probably <£800pm
• Potential “Saving”: “only” £200pm (<2%)
2. Beware of “Responsibility Creep”
• What is consuming the power?
• Just because it is “controlled” by computer software
does not necessarily mean it’s an IT Problem!
Two Warnings
20 of 20
ICTF 2010 (Green desktop computing)
Useful Contacts
•Data Synergy (PowerMan):
geofft@datasynergy.co.uk
http://www.datasynergy.co.uk/
•OUCS Green Team:
greenit@oucs.ox.ac.uk
http://www.oucs.ox.ac.uk/greenit/
• OUED Online:
philip.pike@oued.ox.ac.uk
http://ionenterprise1.survey.ox.ac.uk/ion/
•Qubic Group plc (PC Power Down):
Luke.Norris@pcpowerdown.com
http://www.pcpowerdown.com/
•Jonathan.moffett@ashmus.ox.ac.uk
(“management/policy stuff”)
•Anjanesh.babu@ashmus.ox.ac.uk
(“technical/really useful stuff”)
Contacts
Ashmolean Contacts

More Related Content

What's hot

Waternomics Application Platform
Waternomics Application PlatformWaternomics Application Platform
Waternomics Application PlatformWaternomics
 
Waternomics - ICT for Water Resource Management - Water Information Platform
Waternomics - ICT for Water Resource Management - Water Information PlatformWaternomics - ICT for Water Resource Management - Water Information Platform
Waternomics - ICT for Water Resource Management - Water Information PlatformWaternomics
 
Bde sc3 2nd_workshop_2016_10_04_p07_laustsen_jens
Bde sc3 2nd_workshop_2016_10_04_p07_laustsen_jensBde sc3 2nd_workshop_2016_10_04_p07_laustsen_jens
Bde sc3 2nd_workshop_2016_10_04_p07_laustsen_jensBigData_Europe
 
SCKC Inverness Ideas Forum: Connectivity Issues for Inverness
SCKC Inverness Ideas Forum: Connectivity Issues for InvernessSCKC Inverness Ideas Forum: Connectivity Issues for Inverness
SCKC Inverness Ideas Forum: Connectivity Issues for Invernesswmud
 
Societal Challnge 5 and Big Data Europe 1st hangout
Societal Challnge 5 and Big Data Europe 1st hangout Societal Challnge 5 and Big Data Europe 1st hangout
Societal Challnge 5 and Big Data Europe 1st hangout BigData_Europe
 
02 agriculture challenges, existing standardisation efforts and data bio agri...
02 agriculture challenges, existing standardisation efforts and data bio agri...02 agriculture challenges, existing standardisation efforts and data bio agri...
02 agriculture challenges, existing standardisation efforts and data bio agri...plan4all
 
Bde sc3 2nd_workshop_2016_10_04_p08_bems
Bde sc3 2nd_workshop_2016_10_04_p08_bemsBde sc3 2nd_workshop_2016_10_04_p08_bems
Bde sc3 2nd_workshop_2016_10_04_p08_bemsBigData_Europe
 
Bde sc3 2nd_workshop_2016_10_04_p00_welcome_agenda
Bde sc3 2nd_workshop_2016_10_04_p00_welcome_agendaBde sc3 2nd_workshop_2016_10_04_p00_welcome_agenda
Bde sc3 2nd_workshop_2016_10_04_p00_welcome_agendaBigData_Europe
 
SC7 Workshop 2: The BigDataEurope project
SC7 Workshop 2: The BigDataEurope projectSC7 Workshop 2: The BigDataEurope project
SC7 Workshop 2: The BigDataEurope projectBigData_Europe
 
Waternomics Methodology: A Standards based Methodology for the Implementation...
Waternomics Methodology: A Standards based Methodology for the Implementation...Waternomics Methodology: A Standards based Methodology for the Implementation...
Waternomics Methodology: A Standards based Methodology for the Implementation...Waternomics
 
Walkalytics - Accurate planning for your pedestrian-based services
Walkalytics - Accurate planning for your pedestrian-based servicesWalkalytics - Accurate planning for your pedestrian-based services
Walkalytics - Accurate planning for your pedestrian-based servicesStephan Heuel
 
Bde sc3 2nd_workshop_2016_10_04_p10_maja_skrjanc
Bde sc3 2nd_workshop_2016_10_04_p10_maja_skrjancBde sc3 2nd_workshop_2016_10_04_p10_maja_skrjanc
Bde sc3 2nd_workshop_2016_10_04_p10_maja_skrjancBigData_Europe
 
01 introduction mildorf
01 introduction mildorf01 introduction mildorf
01 introduction mildorfplan4all
 
Bde sc3 2nd_workshop_2016_10_04_p05_bde_system_monitoring
Bde sc3 2nd_workshop_2016_10_04_p05_bde_system_monitoringBde sc3 2nd_workshop_2016_10_04_p05_bde_system_monitoring
Bde sc3 2nd_workshop_2016_10_04_p05_bde_system_monitoringBigData_Europe
 
2019 05-21 egi and eosc - final
2019 05-21 egi and eosc - final2019 05-21 egi and eosc - final
2019 05-21 egi and eosc - finalEOSC-hub project
 

What's hot (20)

Waternomics Application Platform
Waternomics Application PlatformWaternomics Application Platform
Waternomics Application Platform
 
2 SMART GROUND - COCOON - RAWFILL Workshop
2 SMART GROUND - COCOON - RAWFILL Workshop 2 SMART GROUND - COCOON - RAWFILL Workshop
2 SMART GROUND - COCOON - RAWFILL Workshop
 
Waternomics - ICT for Water Resource Management - Water Information Platform
Waternomics - ICT for Water Resource Management - Water Information PlatformWaternomics - ICT for Water Resource Management - Water Information Platform
Waternomics - ICT for Water Resource Management - Water Information Platform
 
Bde sc3 2nd_workshop_2016_10_04_p07_laustsen_jens
Bde sc3 2nd_workshop_2016_10_04_p07_laustsen_jensBde sc3 2nd_workshop_2016_10_04_p07_laustsen_jens
Bde sc3 2nd_workshop_2016_10_04_p07_laustsen_jens
 
SCKC Inverness Ideas Forum: Connectivity Issues for Inverness
SCKC Inverness Ideas Forum: Connectivity Issues for InvernessSCKC Inverness Ideas Forum: Connectivity Issues for Inverness
SCKC Inverness Ideas Forum: Connectivity Issues for Inverness
 
Societal Challnge 5 and Big Data Europe 1st hangout
Societal Challnge 5 and Big Data Europe 1st hangout Societal Challnge 5 and Big Data Europe 1st hangout
Societal Challnge 5 and Big Data Europe 1st hangout
 
02 agriculture challenges, existing standardisation efforts and data bio agri...
02 agriculture challenges, existing standardisation efforts and data bio agri...02 agriculture challenges, existing standardisation efforts and data bio agri...
02 agriculture challenges, existing standardisation efforts and data bio agri...
 
Bde sc3 2nd_workshop_2016_10_04_p08_bems
Bde sc3 2nd_workshop_2016_10_04_p08_bemsBde sc3 2nd_workshop_2016_10_04_p08_bems
Bde sc3 2nd_workshop_2016_10_04_p08_bems
 
Bde sc3 2nd_workshop_2016_10_04_p00_welcome_agenda
Bde sc3 2nd_workshop_2016_10_04_p00_welcome_agendaBde sc3 2nd_workshop_2016_10_04_p00_welcome_agenda
Bde sc3 2nd_workshop_2016_10_04_p00_welcome_agenda
 
SC7 Workshop 2: The BigDataEurope project
SC7 Workshop 2: The BigDataEurope projectSC7 Workshop 2: The BigDataEurope project
SC7 Workshop 2: The BigDataEurope project
 
Waternomics Methodology: A Standards based Methodology for the Implementation...
Waternomics Methodology: A Standards based Methodology for the Implementation...Waternomics Methodology: A Standards based Methodology for the Implementation...
Waternomics Methodology: A Standards based Methodology for the Implementation...
 
Walkalytics - Accurate planning for your pedestrian-based services
Walkalytics - Accurate planning for your pedestrian-based servicesWalkalytics - Accurate planning for your pedestrian-based services
Walkalytics - Accurate planning for your pedestrian-based services
 
Bde sc3 2nd_workshop_2016_10_04_p10_maja_skrjanc
Bde sc3 2nd_workshop_2016_10_04_p10_maja_skrjancBde sc3 2nd_workshop_2016_10_04_p10_maja_skrjanc
Bde sc3 2nd_workshop_2016_10_04_p10_maja_skrjanc
 
Excellerat CoE
Excellerat CoEExcellerat CoE
Excellerat CoE
 
01 introduction mildorf
01 introduction mildorf01 introduction mildorf
01 introduction mildorf
 
EERAdata: Data-driven decision-support to increase energy efficiency through ...
EERAdata: Data-driven decision-support to increase energy efficiency through ...EERAdata: Data-driven decision-support to increase energy efficiency through ...
EERAdata: Data-driven decision-support to increase energy efficiency through ...
 
SMART GROUND - Sardinia Symposium
SMART GROUND - Sardinia SymposiumSMART GROUND - Sardinia Symposium
SMART GROUND - Sardinia Symposium
 
The SNAP Project
The SNAP ProjectThe SNAP Project
The SNAP Project
 
Bde sc3 2nd_workshop_2016_10_04_p05_bde_system_monitoring
Bde sc3 2nd_workshop_2016_10_04_p05_bde_system_monitoringBde sc3 2nd_workshop_2016_10_04_p05_bde_system_monitoring
Bde sc3 2nd_workshop_2016_10_04_p05_bde_system_monitoring
 
2019 05-21 egi and eosc - final
2019 05-21 egi and eosc - final2019 05-21 egi and eosc - final
2019 05-21 egi and eosc - final
 

Viewers also liked

ANTALYA, KURŞUNLU ŞELALESİ, WATERFALL
ANTALYA, KURŞUNLU ŞELALESİ, WATERFALLANTALYA, KURŞUNLU ŞELALESİ, WATERFALL
ANTALYA, KURŞUNLU ŞELALESİ, WATERFALL***
 
La tecnologia
La tecnologiaLa tecnologia
La tecnologiaDEISSYTA
 
Optify webinar: 5 New Services Every Agency Can Offer Tomorrow
Optify webinar: 5 New Services Every Agency Can Offer TomorrowOptify webinar: 5 New Services Every Agency Can Offer Tomorrow
Optify webinar: 5 New Services Every Agency Can Offer TomorrowOptify
 
Technological flexibility brings competitive advantage to We Fight Any Claim ...
Technological flexibility brings competitive advantage to We Fight Any Claim ...Technological flexibility brings competitive advantage to We Fight Any Claim ...
Technological flexibility brings competitive advantage to We Fight Any Claim ...Altitude Software
 
Case Study of Performance Audit of National Library, Kolkata, India
Case Study of Performance Audit of National Library, Kolkata, IndiaCase Study of Performance Audit of National Library, Kolkata, India
Case Study of Performance Audit of National Library, Kolkata, IndiaShantanu Basu
 
PDA COURSE - Facility Design
PDA COURSE - Facility DesignPDA COURSE - Facility Design
PDA COURSE - Facility Designmadhmad
 
Wilno prezentacja
Wilno   prezentacjaWilno   prezentacja
Wilno prezentacjaMonika1008
 

Viewers also liked (8)

Membuat blog
Membuat blogMembuat blog
Membuat blog
 
ANTALYA, KURŞUNLU ŞELALESİ, WATERFALL
ANTALYA, KURŞUNLU ŞELALESİ, WATERFALLANTALYA, KURŞUNLU ŞELALESİ, WATERFALL
ANTALYA, KURŞUNLU ŞELALESİ, WATERFALL
 
La tecnologia
La tecnologiaLa tecnologia
La tecnologia
 
Optify webinar: 5 New Services Every Agency Can Offer Tomorrow
Optify webinar: 5 New Services Every Agency Can Offer TomorrowOptify webinar: 5 New Services Every Agency Can Offer Tomorrow
Optify webinar: 5 New Services Every Agency Can Offer Tomorrow
 
Technological flexibility brings competitive advantage to We Fight Any Claim ...
Technological flexibility brings competitive advantage to We Fight Any Claim ...Technological flexibility brings competitive advantage to We Fight Any Claim ...
Technological flexibility brings competitive advantage to We Fight Any Claim ...
 
Case Study of Performance Audit of National Library, Kolkata, India
Case Study of Performance Audit of National Library, Kolkata, IndiaCase Study of Performance Audit of National Library, Kolkata, India
Case Study of Performance Audit of National Library, Kolkata, India
 
PDA COURSE - Facility Design
PDA COURSE - Facility DesignPDA COURSE - Facility Design
PDA COURSE - Facility Design
 
Wilno prezentacja
Wilno   prezentacjaWilno   prezentacja
Wilno prezentacja
 

Similar to Ashmolean Green IT strategy

DCP: Data Center Futures 2010 Japan/ Korea
DCP: Data Center Futures 2010 Japan/ KoreaDCP: Data Center Futures 2010 Japan/ Korea
DCP: Data Center Futures 2010 Japan/ KoreaTim Crawford
 
Cisco Energy Management-tech-intro-for-paris-hackathon
Cisco Energy Management-tech-intro-for-paris-hackathonCisco Energy Management-tech-intro-for-paris-hackathon
Cisco Energy Management-tech-intro-for-paris-hackathonCisco DevNet
 
Update on european data centre standards socitm 2013
Update on european data centre standards   socitm 2013Update on european data centre standards   socitm 2013
Update on european data centre standards socitm 2013Capitoline LLP
 
Introduction to the EOSC-hub project
Introduction to the EOSC-hub projectIntroduction to the EOSC-hub project
Introduction to the EOSC-hub projectEOSC-hub project
 
17.03.06. i qnergy startup sauna
17.03.06. i qnergy   startup sauna17.03.06. i qnergy   startup sauna
17.03.06. i qnergy startup saunaEgor Chistyakov
 
Innovize it for_db2_empowering the dba_april_2016
Innovize it for_db2_empowering the dba_april_2016Innovize it for_db2_empowering the dba_april_2016
Innovize it for_db2_empowering the dba_april_2016Eliezer Harkavi
 
Introducing the IRUSdataUK pilot webinar
Introducing the IRUSdataUK pilot webinarIntroducing the IRUSdataUK pilot webinar
Introducing the IRUSdataUK pilot webinarJisc
 
Partners in Technology 11Oct2013 DSDIP DLGCRR Mark Cushing
Partners in Technology 11Oct2013 DSDIP DLGCRR Mark CushingPartners in Technology 11Oct2013 DSDIP DLGCRR Mark Cushing
Partners in Technology 11Oct2013 DSDIP DLGCRR Mark CushingDigital Queensland
 
Flexibility needs at system level and how RD&I projects are leveraging these ...
Flexibility needs at system level and how RD&I projects are leveraging these ...Flexibility needs at system level and how RD&I projects are leveraging these ...
Flexibility needs at system level and how RD&I projects are leveraging these ...Leonardo ENERGY
 
Smarter, Greener Learning: Findings from the SusteIT Project
Smarter, Greener Learning: Findings from the SusteIT ProjectSmarter, Greener Learning: Findings from the SusteIT Project
Smarter, Greener Learning: Findings from the SusteIT ProjectMax Norton
 
Presentation - Mckinsey - Exploring the potential of the “Internet of Things”...
Presentation - Mckinsey - Exploring the potential of the “Internet of Things”...Presentation - Mckinsey - Exploring the potential of the “Internet of Things”...
Presentation - Mckinsey - Exploring the potential of the “Internet of Things”...Ajay Gangakhedkar
 
Commercial Overview DC Session 4 Introduction To Energy In The Data Centre
Commercial Overview   DC Session 4   Introduction To Energy In The Data CentreCommercial Overview   DC Session 4   Introduction To Energy In The Data Centre
Commercial Overview DC Session 4 Introduction To Energy In The Data Centrepaul_mathews
 

Similar to Ashmolean Green IT strategy (20)

DCP: Data Center Futures 2010 Japan/ Korea
DCP: Data Center Futures 2010 Japan/ KoreaDCP: Data Center Futures 2010 Japan/ Korea
DCP: Data Center Futures 2010 Japan/ Korea
 
Cisco Energy Management-tech-intro-for-paris-hackathon
Cisco Energy Management-tech-intro-for-paris-hackathonCisco Energy Management-tech-intro-for-paris-hackathon
Cisco Energy Management-tech-intro-for-paris-hackathon
 
Update on european data centre standards socitm 2013
Update on european data centre standards   socitm 2013Update on european data centre standards   socitm 2013
Update on european data centre standards socitm 2013
 
A Framework for Data Collection, Transformation and Processing in industrial...
A Framework for Data Collection,  Transformation and Processing in industrial...A Framework for Data Collection,  Transformation and Processing in industrial...
A Framework for Data Collection, Transformation and Processing in industrial...
 
Green cloud computing
Green cloud computingGreen cloud computing
Green cloud computing
 
Introduction to the EOSC-hub project
Introduction to the EOSC-hub projectIntroduction to the EOSC-hub project
Introduction to the EOSC-hub project
 
17.03.06. i qnergy startup sauna
17.03.06. i qnergy   startup sauna17.03.06. i qnergy   startup sauna
17.03.06. i qnergy startup sauna
 
Can you afford not to consider sustainable ICT?
Can you afford not to consider sustainable ICT?Can you afford not to consider sustainable ICT?
Can you afford not to consider sustainable ICT?
 
Workshop on Network Management and Monitoring Summary
Workshop on Network Management and Monitoring SummaryWorkshop on Network Management and Monitoring Summary
Workshop on Network Management and Monitoring Summary
 
ELS Presentation
ELS PresentationELS Presentation
ELS Presentation
 
Innovize it for_db2_empowering the dba_april_2016
Innovize it for_db2_empowering the dba_april_2016Innovize it for_db2_empowering the dba_april_2016
Innovize it for_db2_empowering the dba_april_2016
 
Introducing the IRUSdataUK pilot webinar
Introducing the IRUSdataUK pilot webinarIntroducing the IRUSdataUK pilot webinar
Introducing the IRUSdataUK pilot webinar
 
Partners in Technology 11Oct2013 DSDIP DLGCRR Mark Cushing
Partners in Technology 11Oct2013 DSDIP DLGCRR Mark CushingPartners in Technology 11Oct2013 DSDIP DLGCRR Mark Cushing
Partners in Technology 11Oct2013 DSDIP DLGCRR Mark Cushing
 
Flexibility needs at system level and how RD&I projects are leveraging these ...
Flexibility needs at system level and how RD&I projects are leveraging these ...Flexibility needs at system level and how RD&I projects are leveraging these ...
Flexibility needs at system level and how RD&I projects are leveraging these ...
 
Smarter, Greener Learning: Findings from the SusteIT Project
Smarter, Greener Learning: Findings from the SusteIT ProjectSmarter, Greener Learning: Findings from the SusteIT Project
Smarter, Greener Learning: Findings from the SusteIT Project
 
AEP data center marketing webinar
AEP data center marketing webinarAEP data center marketing webinar
AEP data center marketing webinar
 
Green it
Green itGreen it
Green it
 
GREEN_CLOUD_COMPUTING.ppt
GREEN_CLOUD_COMPUTING.pptGREEN_CLOUD_COMPUTING.ppt
GREEN_CLOUD_COMPUTING.ppt
 
Presentation - Mckinsey - Exploring the potential of the “Internet of Things”...
Presentation - Mckinsey - Exploring the potential of the “Internet of Things”...Presentation - Mckinsey - Exploring the potential of the “Internet of Things”...
Presentation - Mckinsey - Exploring the potential of the “Internet of Things”...
 
Commercial Overview DC Session 4 Introduction To Energy In The Data Centre
Commercial Overview   DC Session 4   Introduction To Energy In The Data CentreCommercial Overview   DC Session 4   Introduction To Energy In The Data Centre
Commercial Overview DC Session 4 Introduction To Energy In The Data Centre
 

More from anjaneshbabu

Augmented Reality IFITTtalk@Manchester
Augmented Reality IFITTtalk@ManchesterAugmented Reality IFITTtalk@Manchester
Augmented Reality IFITTtalk@Manchesteranjaneshbabu
 
Indoor Visitor Tracking
Indoor Visitor Tracking Indoor Visitor Tracking
Indoor Visitor Tracking anjaneshbabu
 
Mapping Digital Pathways to Enhance Visitor Experience (Digital Humanities at...
Mapping Digital Pathways to Enhance Visitor Experience (Digital Humanities at...Mapping Digital Pathways to Enhance Visitor Experience (Digital Humanities at...
Mapping Digital Pathways to Enhance Visitor Experience (Digital Humanities at...anjaneshbabu
 
Public Wi-Fi-University-Museums-and-Super-Connected-Oxford
Public Wi-Fi-University-Museums-and-Super-Connected-OxfordPublic Wi-Fi-University-Museums-and-Super-Connected-Oxford
Public Wi-Fi-University-Museums-and-Super-Connected-Oxfordanjaneshbabu
 
Connecting BT UK analogue phones to FortiVoice 40 systems
Connecting BT UK analogue phones to FortiVoice 40 systemsConnecting BT UK analogue phones to FortiVoice 40 systems
Connecting BT UK analogue phones to FortiVoice 40 systemsanjaneshbabu
 
Web Apps vs Native Apps
Web Apps vs Native Apps Web Apps vs Native Apps
Web Apps vs Native Apps anjaneshbabu
 
The challenge of integrating the networks of 3 University Museums
The challenge of integrating the networks of 3 University MuseumsThe challenge of integrating the networks of 3 University Museums
The challenge of integrating the networks of 3 University Museumsanjaneshbabu
 

More from anjaneshbabu (7)

Augmented Reality IFITTtalk@Manchester
Augmented Reality IFITTtalk@ManchesterAugmented Reality IFITTtalk@Manchester
Augmented Reality IFITTtalk@Manchester
 
Indoor Visitor Tracking
Indoor Visitor Tracking Indoor Visitor Tracking
Indoor Visitor Tracking
 
Mapping Digital Pathways to Enhance Visitor Experience (Digital Humanities at...
Mapping Digital Pathways to Enhance Visitor Experience (Digital Humanities at...Mapping Digital Pathways to Enhance Visitor Experience (Digital Humanities at...
Mapping Digital Pathways to Enhance Visitor Experience (Digital Humanities at...
 
Public Wi-Fi-University-Museums-and-Super-Connected-Oxford
Public Wi-Fi-University-Museums-and-Super-Connected-OxfordPublic Wi-Fi-University-Museums-and-Super-Connected-Oxford
Public Wi-Fi-University-Museums-and-Super-Connected-Oxford
 
Connecting BT UK analogue phones to FortiVoice 40 systems
Connecting BT UK analogue phones to FortiVoice 40 systemsConnecting BT UK analogue phones to FortiVoice 40 systems
Connecting BT UK analogue phones to FortiVoice 40 systems
 
Web Apps vs Native Apps
Web Apps vs Native Apps Web Apps vs Native Apps
Web Apps vs Native Apps
 
The challenge of integrating the networks of 3 University Museums
The challenge of integrating the networks of 3 University MuseumsThe challenge of integrating the networks of 3 University Museums
The challenge of integrating the networks of 3 University Museums
 

Recently uploaded

Engineering Drawing section of solid
Engineering Drawing     section of solidEngineering Drawing     section of solid
Engineering Drawing section of solidnamansinghjarodiya
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm Systemirfanmechengr
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...Erbil Polytechnic University
 
Ch10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfCh10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfChristianCDAM
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the weldingMuhammadUzairLiaqat
 
Autonomous emergency braking system (aeb) ppt.ppt
Autonomous emergency braking system (aeb) ppt.pptAutonomous emergency braking system (aeb) ppt.ppt
Autonomous emergency braking system (aeb) ppt.pptbibisarnayak0
 
BSNL Internship Training presentation.pptx
BSNL Internship Training presentation.pptxBSNL Internship Training presentation.pptx
BSNL Internship Training presentation.pptxNiranjanYadav41
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
DM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in projectDM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in projectssuserb6619e
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdfCaalaaAbdulkerim
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating SystemRashmi Bhat
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Coursebim.edu.pl
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating SystemRashmi Bhat
 
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Erbil Polytechnic University
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxsiddharthjain2303
 

Recently uploaded (20)

Engineering Drawing section of solid
Engineering Drawing     section of solidEngineering Drawing     section of solid
Engineering Drawing section of solid
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm System
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...
 
Ch10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfCh10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdf
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the welding
 
Autonomous emergency braking system (aeb) ppt.ppt
Autonomous emergency braking system (aeb) ppt.pptAutonomous emergency braking system (aeb) ppt.ppt
Autonomous emergency braking system (aeb) ppt.ppt
 
BSNL Internship Training presentation.pptx
BSNL Internship Training presentation.pptxBSNL Internship Training presentation.pptx
BSNL Internship Training presentation.pptx
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
DM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in projectDM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in project
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdf
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating System
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Course
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating System
 
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptx
 

Ashmolean Green IT strategy

  • 1. 1 of 20 ICTF 2010 (Green desktop computing) The Ashmolean Green IT Strategy A (developing) Green IT Strategy
  • 2. 2 of 20 ICTF 2010 (Green desktop computing) • No. of Public Galleries: 67 • No. of Offices/Labs/Work Areas: 82 • No. of Stores: 25 Background Information: Building
  • 3. 3 of 20 ICTF 2010 (Green desktop computing) • Full-time Staff: 169 • Part-time Staff: 86 (includes VSAs) • Volunteers & Interns: 26 (varies) More Background: “Human Resources”
  • 4. 4 of 20 ICTF 2010 (Green desktop computing) The Strategy: 1 - Monitor Identify Manage Communicate Monitor Establish Policies
  • 5. 5 of 20 ICTF 2010 (Green desktop computing) OUED Electricity Meters feed * Internet Explorer only http://ionenterprise1.survey.ox.ac.uk/ion/
  • 6. 6 of 20 ICTF 2010 (Green desktop computing) Oxford Monitoring Service greenit@oucs.ox.ac.uk Snapshot location
  • 7. 7 of 20 ICTF 2010 (Green desktop computing) Datasynergy : Powerman ActiveInactive while on http://www.datasynergy.co.uk/
  • 8. 8 of 20 ICTF 2010 (Green desktop computing) PC Powerdown monitor
  • 9. 9 of 20 ICTF 2010 (Green desktop computing) The Strategy: 2 - Identify Identify Monitor Manage Communicate Establish Policies
  • 10. 10 of 20 ICTF 2010 (Green desktop computing) Identify … “but it’s not just IT stuff” Servers Non IT Equipment IT Equipment Workstations Others It should be remembered that energy is consumed by many pieces of equipment, not just IT stuff!
  • 11. 11 of 20 ICTF 2010 (Green desktop computing) “Yet More Background: ICT Infrastructure” • No. of “active” Workstations: 150 • No. of Servers: 26 • No. of Switches: 31 • No, of UPS: 50 • No. of Printers: >60 (perhaps about 40 are attached to the network)
  • 12. 12 of 20 ICTF 2010 (Green desktop computing) The Strategy: 3 - Manage Identify Monitor Establish Policies Manage Communicate
  • 13. 13 of 20 ICTF 2010 (Green desktop computing) Manage: Workstations – FiDo Power management monitoring (PMM) and Wake on LAN (WOL) • User driven wake up on demand • Group Wake up • Easy Administration • Client less • Excellent Support OUCS, OeRC, OUCE & OUED http://www.oucs.ox.ac.uk/greenit/wol.xml
  • 14. 14 of 20 ICTF 2010 (Green desktop computing) Manage: Workstations – PC Power Down Powerdown Server and Monitor • Modular plugin Application • Client – Server based deployment • Group Shutdown management PC Powerdown Powerdown Server Powerdown Clients Policies set on server
  • 15. 15 of 20 ICTF 2010 (Green desktop computing) Datasynergy Systems Powerman 5 Power Manager • Activity Based Monitoring • Easy Group Policy based configuration • Client – Server application AD Container Active Directory Policies Powerman Management Server Manage Reports Manage: Workstations – Powerman
  • 16. 16 of 20 ICTF 2010 (Green desktop computing) Identify Monitor Establish Policies Manage Communicate The Strategy: 4 – Establish Policies
  • 17. 17 of 20 ICTF 2010 (Green desktop computing) Establish Policies & Guidelines Infrastructure services • Citrix based server virtualisation • Storage virtualisation and consolidation Desktop policies • Hibernate when inactive • Promote remote working • Tie in remote working with OUCS WOL • Virtual desktop delivery • Reuse low spec computers • Printer consolidation and management
  • 18. 18 of 20 ICTF 2010 (Green desktop computing) The Future • User education • Shared knowledge and initiative • Increase and consolidate server virtualisation • Aim for the best of all worlds • Reduce our Monthly Energy Bill (£15,000) Open Source In houseCommercial
  • 19. 19 of 20 ICTF 2010 (Green desktop computing) 1. Manage Expectations! • Reduce our Energy Bill (£15,000pm) • ICT contribution: <<10% probably <£800pm • Potential “Saving”: “only” £200pm (<2%) 2. Beware of “Responsibility Creep” • What is consuming the power? • Just because it is “controlled” by computer software does not necessarily mean it’s an IT Problem! Two Warnings
  • 20. 20 of 20 ICTF 2010 (Green desktop computing) Useful Contacts •Data Synergy (PowerMan): geofft@datasynergy.co.uk http://www.datasynergy.co.uk/ •OUCS Green Team: greenit@oucs.ox.ac.uk http://www.oucs.ox.ac.uk/greenit/ • OUED Online: philip.pike@oued.ox.ac.uk http://ionenterprise1.survey.ox.ac.uk/ion/ •Qubic Group plc (PC Power Down): Luke.Norris@pcpowerdown.com http://www.pcpowerdown.com/ •Jonathan.moffett@ashmus.ox.ac.uk (“management/policy stuff”) •Anjanesh.babu@ashmus.ox.ac.uk (“technical/really useful stuff”) Contacts Ashmolean Contacts

Editor's Notes

  1. Ashmolean found 1683 Art &amp; Archaeology collections moved Cockrell Building 1845 New building opened 2009 replacing 1908 “sheds”
  2. Building: No. of Public Galleries:67 No. of Offices/Labs/Work Areas:82 No. of Stores:25 Over 170 locations Maybe 500,000 to 600,000 objects (of one sort or another)
  3. More Background Information: Human Resources: Full-time Staff:169 Part-time Staff:86 (including VSAs) Volunteers &amp; Interns:26 (varies) Potentially up to 250 “workers” No students, the Ashmolean is on track to have 1 million visitors in the first 12 months since it reopened.
  4. Our Green IT strategy revolves around a iterative/cyclical process: Monitor what is going on in terms of overall picture energy consumption Identify what is consuming what energy Manage the equipment and the Users Establish policies and guidelines and maybe set a few targets We will then continue to refine, adapt and change change as appropriate.
  5. One of the services that we’ve plumbed into is the Estates Directorate’s Electricity Meters web site [Only available on the University network] This allows us to see how much power is being consumed Through various links gets us to a graph like this. Peaks … during the day … a lot of stuff going on … as expected Troughs … during the night … not a lot … as one would hope
  6. We are also plugging into the University’s Green IT initiative, in particular the network Monitoring Service This allows us to see what is active on the network and when. This chart is just workstations, i.e. laptops and desktop systems Again, peaks and troughs, although … … as can be seen quite a few are being left on overnight. This chart excludes servers, switches, and UPS Also, networked printers We have found about 30 of these being left on over night Also, does NOT include items not plugged into the network (e.g scanners and other printers)
  7. We have just begun using Powerman software This allows us to monitor the activity of individual workstations This will help build up a picture of how users use their laptop or desktop system aka “Activity Profiles”
  8. Also rolling out PC Power down This is software that switches computers off and on at pre-determined times But clients check with the server each hour, so we can build up a picture of how many machines are actually “on” at any one time. The aim is to reach zero at times of “total inactivity” Not sure of the significance of negative numbers
  9. As we build up a picture of power consumption we can then identify what the specific items are, and then see we can introduce some form of control
  10. But it must be remembered that electricity is used by many pieces of equipment, it’s not just IT stuff!
  11. The monitoring information allows us to “drill-down” to specific item: OMS provides us with a list of Mac addresses We use these to find the IP address and name on the OUCS IP Auditing page Then use our own IT Assets db to find what each item is and who is using it (and where it will be)
  12. Having identified the various energy consuming devices that are operating outside the normal working day, we can manage their use With workstations, the emphasis is not while users are in the Museum working, but rather when users are not present. Once upon a time when people went home, they just went home and had a “life” Nowadays, in our 24 x 7 society, a growing number of people like to do remote “working” outside “office” hours It is this change in working practice that is proving the greatest challenge
  13. We are currently using 3 “systems” … we want to find out what works best for us … be it just one, or a combination. There will be a cost implication eventually (licences), but at the moment, in this testing phase, we have an opportunity to experiment, for free. For Remote Access we use a combination of things, one part of which is FiDo I will leave it to others who are better qualified to talk about that … but Wake-up on Lan requires this option to be enabled on each computer
  14. One of the ways we are making sure computers are switched off is to use PC Powerdown This comes from PC Power Down who are part of the Qubic Group. About March they contacted me out of the blue. I put them on to Howard, and the result is we get to use their system for free for a year. Overview Client server based model Client software deployed via Group Policy Shutdown policy managed on server Hibernate option available : if hibernate not enabled , will go to standby Doesn’t yet work with Macs, but they are working on it. Doesn’t yet work with switching off printers, but they are working on that as well
  15. As I’ve said, we are beginning to investigate Powerman which is similar to PC Power Down However, it has the advantage that it “plugs-in” to Active Directory Overview Client server based application Power management through Group Policy add in IIS based web application Activity based reports and management Pros Does activity based power management Excellent reporting structure Easy installation and configuration Group policy based management Cons 24 hour lead time for new computers to show up Seems to have more features than PC Power down But, if all we want is to enforce computers to shutdown, then maybe PC Power Down is more suitable
  16. From the experience we are gaining, we are developing practical policies. For a policy to be of any value, it’s got to work! Consequently, I prefer a bottom-up approach to solving most “problems”, And, in an environment where technology is changing and improving, we need to be flexible What we think is a good idea now may not be appropriate later on … goal posts move, rules change!
  17. We are developing policies and guidelines for: Server virtualisation (we have 26, and we should reduce these) 19 Physical &amp;apos;mono role&amp;apos; servers ie one function one physical server Virtual Platform Production systems - 9 Virtual servers on 2 Physical servers - 3 virtual servers on 1 physical server (which is actually a standard dell optiplex 760 ) Virtualisation intention: consolidate more roles per physical machine Reduce Storage footprint by consolidating them virtually and spreading them around. Desktop virtualisation - 5 virtual desktops delivered via the web based controller. OS independent Remote working … people have to ask and get line manager’s approval Finally, it’s ok to have policies but they need to be communicated to users Have an all-staff maillist @ maillist.ox.ac.uk Also a Wiki
  18. The Future Users to be educated in “Green Ways” … to quote British Gas advert … “turned green” Share our knowledge/discoveries with others Try to get the best of all worlds … balance open source with commercial and stuff we develop in-house The ultimate aim is to keep the Finance Team and Funders happy, so reduce our Monthly Energy Bill (£15,000) But …
  19. Manage Expectations! Although there is a need to manage expectations … ICT contribution: much less than 10%, maybe £800. Potential savings, once Green IT in place, about a quarter of out contribution = £200 But that will be somewhere around 1-2% of monthly bill Beware of Responsibility Creep In the Ashmolean the greatest consumers of energy are: Air Handling System Lighting But both are “controlled” by computer software! Therefore, in the minds of some that means they must be IT Problems!
  20. Useful Contacts