COFFER DAM
Diaphragm Wall
Application
Coffer dams
Types of
Coffer Dams
Design features
of coffer dams
Leakage
Prevention
Economic
Height
2
CONTENTS
Diaphragm Wall
• Diaphragm Walls Are A Method Of Creating A Cast In-situ
Reinforced Concrete Retaining Wall Using The Slurry
Supported Trench Method. As Such, They Are Often
Known As Slurry Walls. However, The Term “Diaphragm
Walls”
• Standard Width Are 100-200 Mm For Cut Off Wall And
450-1200 Mm For Structural Member.
• Diaphragm Walls Provide A Water Tight Barrier And Are
Constructed With A Minimum Back Slope Subsidence.
• They Are Formed From Reinforced Concrete And Are
Constructed As Normal Cast-in-place Walls With Support,
Which Become Part Of The Main Structure.
APPLICATIONS
 As permanent and temporary foundation walls for deep basements.
 In earth retention schemes for highway and tunnel projects.
 As permanent walls for deep shafts for tunnel access.
 As permanent cut-off walls through the core of earth dams.
 In congested areas for retention systems and permanent foundation walls.
 Deep ground water barriers through and under dams.
Construction Of Diaphragm Wall
5
Cofferdam for bridge foundations
COFFERDAMS
DEFINITION
 Cofferdams are temporary enclosures to keep out water and soil so
as to permit dewatering and construction of the permanent facility
(structure) in the dry.
 Its temporary structure which is built in a river, lake etc. to
remove water from an area and make it possible to carry on the
construction work under reasonably dry conditions.
 Meaning of Coffer Dam : Coffer = Box
 Cofferdams are usually required for projects such as dams, docks
and construction of bridge piers and abutments etc.
8
9
 watertight.
 Materials – earth , timber , steel & concrete.
 Constructed at site of work.
 Depend- depth , soil condition , difference in water level,
availability of materials.
 total cost of construction, maintenance and pumping is
minimum.
 Stable against bursting, overturning and sliding, under the floods
and waves.
How it is?
When it is?
 To facilitate pile driving operations.
 To place grillage & raft foundations.
 To construct foundations of piers & abutments of bridges, dams, docks
etc.
 To provide a working platform for foundations when water is meet with it.
 To retain Soil & Water.
 Can be used as either Temporary or Permanent.
 Main purpose is to provide dry working area for workers.
10
 Civil Engineering: Underground Car Parking, Foundation,
Basement Construction
 Transport Engineering: Bridge Pier, Support Walls, Ramps,
Ground Water Retention, Tunnel Work etc.
 Water Engineering: Weirs, Culverts, Flood Protection Walls, Scour
Protection Walls, Securing Embankment etc.
 Port Construction: Dock Works, Jetty Works etc.
11
TYPES OF COFFER DAM
1.Earth fill cofferdams - mainly for low level water
2.Rock fill cofferdams
3.Timber Crib or rock filled crib cofferdams - Construction on
land and than floated into place, which is also known as Gravity Dam
4.Braced / Sheet Pile Coffer Dam- Consisting of Sheet Piles,
mainly used in shallow water depth
(i). Single wall coffer dams
(ii). Double wall coffer dams
(iii). Cellular cofferdams
12
It is constructed in places where the depth of water is not much, say
1.3 to 1.8 m.
The earth bank is carried about one meter above the water level.
The top width of the bank should not be less than 1 mtr. and the side
slopes in a vary from 1 : 1 to 1 : 2.
The earth embankment should be built from a mixture of clay and
sand or clay and gravel.
In order to prevent the embankment from scouring due to the action
of water, side slopes of the bank on water side should be pitched with
rubble boulders.
EARTH FILL COFFERDAMS
1. EARTH FILL COFFERDAMS 14
120to150
cm
15
16
17
ROCK FILL COFFERDAMS
2. ROCK FILL COFFERDAMS 18
 If the depth of water to be retained by the embankment
of cofferdam is of order of 3 m .
 Stone or rubble is used for the embankment.
 This construction is adopted only if the stone is easily
available in the nearby areas.
 The stones are assembled in the required shape of the
embankment and the voids are partially filled with earth
and stone-chips.
 On the waterside, the rock fill is to be provided with an
impervious layer of earth.
19
20
21
22
23
24
25
26
1. SINGLE WALLED COFFER DAM
27
 Area to be enclosed is small and the depth of water is
more 4.5 to 6 m.
Timber piles known as guide piles are first driven deep
into the firm ground below the river bed.
spacing of the piles may vary between 1.8 to 4.5 m.
Longitudinal runners called Wales are then bolted to the
guide.
4. SHEET PILE COFFERDAM
28
Steel or wooden sheet piles are then driven into the river
bed along the Wales and are secured to the Wales by bolts.
 The sheets on the two faces are braced by trussed
arrangement of struts. This helps in increasing the stability
of walls against the water pressure.
Half-filled bags of sand stacked on the inside and the
outside faces of the sheets help in increasing the stability of
cofferdam.
After the cofferdam is constructed, the water in the enclosed
area is pumped out and the construction work is taken up.
29
30
31
32
DOUBLE WALLED COFFERDAMS
 Double-walled cofferdam is provided to enclose a larger area.
Its construction is essentially the same as that of a single-walled
cofferdam except that in place of one wall, a pair of walls with a
gap in between is used all along the boundary of the space to be
enclosed.
This type of cofferdam can be used in depth of water up to 12 m.
- The double wall cofferdams are of two types:
(I) Ohio – river type cofferdams
(ii) Timber or steel sheeting cofferdams
DOUBLE WALL COFFERDAM
35
36
Timber Sheet Pile
 Timber sheet pile were extensively
used for cofferdam when depth of
water is about 6 to 10 m.
 It can be gradually replaced with
steel pile.
 It can only be used for small
depth since no deep piling in
37
Timber or steel sheeting cofferdams
39
Timber pile cofferdam
steel pile cofferdam
41
TIMBER CRIB OR ROCK FILLED CRIB
COFFERDAMS
 Constructed on land and floated into place
 It consists of a unit or a cell open at the bottom and
having the framework of horizontal timber members.
 Hollow space formed are then filled with rock or
gravel
 Depth of water – 10 to 20 m
 Used for wide excavation and rocky river bottoms
42
3. TIMBER CRIB OR ROCK FILLED CRIB
COFFERDAMS 43
44
OHIO RIVER TYPE COFFERDAM
Ohio river in USA.
Used in hard & soft bed (no erosion).
Unsuitable in deep water & swift flow.
Construction
Wales fixed at 1.50m vertically.
Wale joints, double vertical planks are provided.
Tie rods threaded & cross braces fixed.
Fixes sheet piles.
Beams (inside & outside)
Removing safely.
45
46
47
49
50
51
52
CELLULAR COFFERDAMS
- The cellular cofferdams are mostly used for dewatering
large areas , where the depth of water may be 19 to 21 m.
- Mostly used the construction of marine structures like
Dams, Locks etc.
- The two common shapes of the cellular cofferdam are:
(i) Circular type
(ii) Diaphragm type
54
Circular type cellular cofferdam:
 The circular type of cellular cofferdam has the advantage that each
cell may be filled completely to the top before starting the
construction of the next cell without causing any distortion to the
shell of the cofferdam.
 Thus, when one cell is completely filled up with crushed stone,
broken bricks, gravel and sand. It can be used for placing crane or
other equipment required for the construction of other cells.
56
 In addition, each cell acts as a self-supporting independent unit
and in case one of the cells collapses due to scour or interlock
damage or some other reason, it does not produce any adverse
effect on the neighboring cells. It is found that the interlock
stresses reach their maximum permissible value when the
diameter of cell is about 21 meter.
 Hence in case, from design consideration it is necessary to have
effective width of the cofferdam more than 21 meter,
diaphragm type of cofferdam must be used.
57
58
59
60
61
62
63
Diaphragm type cellular cofferdam:
• This Consists of a series of arcs of steel sheet piles connected as
shown in the image.
• The straight diaphragm wails are connected to each other by steel
piles arranged in the form of arches on either sides.
• The radius of the connecting arcs is generally made equal to the
distance between the straight diaphragm walls.
64
65
• After the cells are driven to the required depth, they are filled with earth,
sand, gravel or other filling material. In this type of cofferdam, as the
diaphragm which separates the two cells is a straight wall, it is
necessary to fill adjacent cells at approximately the same rate.
• If this is not done, the unbalanced pressure from the fill will distort the
diaphragm (cross-walls) which may result in the failure of the
interlocks.
• In this respect, the circular type cofferdam has the advantage over the
diaphragm type cofferdam because in the former, it is not necessary to fill
the adjacent cells at the same time.
66
67
68
 These are actually small concrete dams and they have been used
economically on many jobs.
The framework usually consist of pre cast R.C.C piles and sheets.
 The pre cast R.C.C sheet piles are provided with suitable edges
and they are driven in a similar manner to steel sheet piles.
 The main disadvantage of this cofferdam is that it is costly. But
when it is to be incorporated as a part of permanent structure it
proves to be economical.
CONCRETE COFFERDAM
69
MOVABLE OR SUSPENDED
COFFERDAMS
 Where there are numbers of repetition work in
under water foundations ,such as in the piers
of multi span river bridges , it is economical to
design the cofferdams to be moved as a single
unit from one foundation to another.
70
71
72
Water may leak through the underground flow of water or through the
piling sheet of the cofferdam. The following measures can be adopted
to prevent leakages in cofferdam.
1.Water entering the dewatered area through fissures or cracks in the
rocks can be stopped by grouting the fissures by cement grout.
2. Clay or mixture of clay and sand can be dumped in form of beams
both on inside and outside faces of the cofferdam.
3. Cracks or fine joints or nail holes in the sheet piles should be closed
using bitumen or cement mortar.
LEAKAGE PREVENTION IN COFFERDAMS
73
4. If a lot of leakages is taking place and no measures stated above
have been to control it, the water face of the cofferdam may be
completely covered with canvass coated with tar or tarpaulin.
5. In case of double-walled cofferdams leakage is generally because of
insufficient compaction of the filling material. In this case, measures to
control seepage through filling material should be adopted.
6. Sufficient grease applied at interlocks of sheet piles also helps check
leakage of water.
DESIGN FEATURES OF COFFERDAMS
 The design of a cofferdam depends on various factors such as.
(i) Hydrostatic head of Water
(ii) Dimensions of the area to be covered by the cofferdams
(iii) Subsoil conditions
(iv) Fluctuations of outside water level
(v) Possibility of erosion
(vi) Presence of ice
74
 A purely theoretically designed cofferdam may fail for
factors unaccounted in its design.
 Therefore ,become necessary to combine practical
knowledge or experience with the theoretical aspects in the
design of a cofferdam.
 For width and Depth of cofferdam :
for H < 3 m, W = H
H > 3 m, W = 3 + 1/3*(H - 3)
Where, W = Width of cofferdam in metres
H = Height of water above river bed in metres
75
Economic Height of Coffer Dam
1.Depth of Water
 Low depth => Earthen Dam
 High Depth => Sheet Pile Coffer Dam
2.Current and nature of flowering of Sheet Pile
 High Current => Sheet Pile Coffer Dam (Higher Seepage Control
Capacity)
 Low Current => Earthen or any other Dam (Less Seepage Control
Capacity)
76
The maximum height of cofferdam for which its total cost is minimums
known as the most economic height of cofferdam.
3.Type and Period of Work
 Short Duration Work => Timber Dam
 Long Duration work => Sheet Pile Coffer Dam
4.High and Low Tide Level of Reservoir
 Sheet Pile must have top level slightly higher than that of the HTL.
So that even in extreme case water can not over top the coffer dam, to
achieve the dry working through out the season.
77
78
Extra chees & knowledge
good for body… 
TRADITIONAL SHEET PILESHAPES
LARSON UTYPESHEETPILES
Z SHAPED SHEETPILES
JOINTS IN SHEET PILING
CASE STYUDY
Burj AlArab
Cofferdam &Rigging
FirasAl Shalabi & SunnyMahajan
CE505
ProjectPresentation
1
Background
Dubai, UAE
The first 7 stars hotel in theworld
The start of Dubai’s new vision of attracting new
investments in areas outside the oilindustry.
If you want to book a night there it will cost you
around $2000
321 meters height from thesea.
8
6
Theconstruction
Two main phases:
The manmade Island (ourfocus)
The building
8
7
Building theisland
Temporary tube piles driven into sea bed
Temporary sheet piles and tierods driven
into sea bed to support boundary rocks
Sheet pilewall
8
8
Tubularpile
Rock armor
8
9
Permanentboundary rock bunds (rock armor) depositedon both sides of the sheet piles
No solid ground under the building just weak sand (up to 180 meters deep with no solid
ground). So it was decidedto go withfriction piles.
Sand fill
Building theisland
PermanentSHED units placed around the island to dissipate the action of waves and
protectit.
2M (6.5ft) diameter 43M (141ft) deep piles weredriven throughthe
island and seabed
Main buildingpiles 6
SHED units
91
92
93
Excavationsbegan in theislandto removethehydraulicfill
Acoffer dam was being built while excavating
2M (6.5 ft) thick concreteplug slab laid on the base of the island to prevent
the base from popping out because of the seapressure
Reinforced concreteretaining wallbuilt
Theconstruction of thebasement started
94
Concreteslab
Completed Island
Completed in threeyears
95
GAMMON INDIA LIMITED
CABLE -STAY BRIDGE SURAT
(EXCAVATION WORK)
96
Bracing welding work in progress
97
98
99
10
0
SHEET PILE COFFER DAM 10
1
10
2
103
104
PHOTO GALLERY OF COFFER DAM
105
10
6
10
7
11
8
12
1
122

More Related Content

What's hot (20)

Deck slab bridge
Deck slab bridgeDeck slab bridge
Deck slab bridge
 
Pile Foundations
Pile FoundationsPile Foundations
Pile Foundations
 
Retaining wall
 Retaining wall  Retaining wall
Retaining wall
 
Shear wall ppt
Shear wall ppt Shear wall ppt
Shear wall ppt
 
Construction of diaphragm wall
Construction of diaphragm wallConstruction of diaphragm wall
Construction of diaphragm wall
 
TALL BUILDINGS
TALL BUILDINGSTALL BUILDINGS
TALL BUILDINGS
 
4. COFFERDAM (ACE) 2160601 GTU
4. COFFERDAM (ACE) 2160601 GTU4. COFFERDAM (ACE) 2160601 GTU
4. COFFERDAM (ACE) 2160601 GTU
 
Combined footing 1-1-18
Combined footing 1-1-18Combined footing 1-1-18
Combined footing 1-1-18
 
Coffer dam and its type
Coffer dam and its typeCoffer dam and its type
Coffer dam and its type
 
Bearing capacity of shallow foundations by abhishek sharma
Bearing capacity of shallow foundations by abhishek sharma Bearing capacity of shallow foundations by abhishek sharma
Bearing capacity of shallow foundations by abhishek sharma
 
Diaphragm wall
Diaphragm wallDiaphragm wall
Diaphragm wall
 
Limit state method
Limit state methodLimit state method
Limit state method
 
Framed structures
Framed structures Framed structures
Framed structures
 
Deep foundation
Deep foundationDeep foundation
Deep foundation
 
Types of Retaining walls..
Types of Retaining walls..Types of Retaining walls..
Types of Retaining walls..
 
Foundation
FoundationFoundation
Foundation
 
Retrofitting of concrete structure
Retrofitting of concrete structureRetrofitting of concrete structure
Retrofitting of concrete structure
 
Foundation
FoundationFoundation
Foundation
 
Caissons
Caissons Caissons
Caissons
 
Retaining Walls
Retaining WallsRetaining Walls
Retaining Walls
 

Similar to BCT- Module 5 a coffer-dam (Part_2)

Chapter 2 coffer-dam
Chapter 2 coffer-damChapter 2 coffer-dam
Chapter 2 coffer-damKHUSHBU SHAH
 
types of coffer dam
types of coffer dam types of coffer dam
types of coffer dam VINAY PATEL
 
caissons and cofferdam in substructure construction
caissons and cofferdam in substructure constructioncaissons and cofferdam in substructure construction
caissons and cofferdam in substructure constructionChinnuNinan
 
Cofferdam_ppt.pptx
Cofferdam_ppt.pptxCofferdam_ppt.pptx
Cofferdam_ppt.pptxJackRider12
 
cofferdam-150424121052-conversion-gate01.pptx
cofferdam-150424121052-conversion-gate01.pptxcofferdam-150424121052-conversion-gate01.pptx
cofferdam-150424121052-conversion-gate01.pptxssuser23e4af
 
First assignment group (2) presentation.pdf
First assignment group (2) presentation.pdfFirst assignment group (2) presentation.pdf
First assignment group (2) presentation.pdfSalamudinSadat1
 
1619929813526_College Deep Well Foundation Project.pptx
1619929813526_College Deep Well Foundation Project.pptx1619929813526_College Deep Well Foundation Project.pptx
1619929813526_College Deep Well Foundation Project.pptxAkshayGhorpade19
 
Coffer dams
Coffer damsCoffer dams
Coffer damsJNTUK
 
Pile Foundation by Pratik Solanki (tes.google.com/site/infodiplomacivil/)
Pile Foundation by Pratik Solanki (tes.google.com/site/infodiplomacivil/)Pile Foundation by Pratik Solanki (tes.google.com/site/infodiplomacivil/)
Pile Foundation by Pratik Solanki (tes.google.com/site/infodiplomacivil/)Pratik Solanki
 
ALL ABOUT DEEP FOUNDATIONS
ALL ABOUT DEEP FOUNDATIONSALL ABOUT DEEP FOUNDATIONS
ALL ABOUT DEEP FOUNDATIONSjagrutib22
 
underwater-construction-5651f4bb8b92f.pptx
underwater-construction-5651f4bb8b92f.pptxunderwater-construction-5651f4bb8b92f.pptx
underwater-construction-5651f4bb8b92f.pptxJayachandran68
 
Aravind B RGUKT Basar
Aravind B RGUKT BasarAravind B RGUKT Basar
Aravind B RGUKT BasarARAVINDBORRA1
 

Similar to BCT- Module 5 a coffer-dam (Part_2) (20)

Chapter 2 coffer-dam
Chapter 2 coffer-damChapter 2 coffer-dam
Chapter 2 coffer-dam
 
types of coffer dam
types of coffer dam types of coffer dam
types of coffer dam
 
caissons and cofferdam in substructure construction
caissons and cofferdam in substructure constructioncaissons and cofferdam in substructure construction
caissons and cofferdam in substructure construction
 
Cofferdam_ppt.pptx
Cofferdam_ppt.pptxCofferdam_ppt.pptx
Cofferdam_ppt.pptx
 
cofferdam-150424121052-conversion-gate01.pptx
cofferdam-150424121052-conversion-gate01.pptxcofferdam-150424121052-conversion-gate01.pptx
cofferdam-150424121052-conversion-gate01.pptx
 
Chapter 3 caisson
Chapter 3 caissonChapter 3 caisson
Chapter 3 caisson
 
First assignment group (2) presentation.pdf
First assignment group (2) presentation.pdfFirst assignment group (2) presentation.pdf
First assignment group (2) presentation.pdf
 
Coffer dams types
Coffer dams  typesCoffer dams  types
Coffer dams types
 
1619929813526_College Deep Well Foundation Project.pptx
1619929813526_College Deep Well Foundation Project.pptx1619929813526_College Deep Well Foundation Project.pptx
1619929813526_College Deep Well Foundation Project.pptx
 
Dams
DamsDams
Dams
 
Dams
DamsDams
Dams
 
Well Foundation
Well FoundationWell Foundation
Well Foundation
 
Coffer dams
Coffer damsCoffer dams
Coffer dams
 
Cofferdam
CofferdamCofferdam
Cofferdam
 
Earthen dam
Earthen damEarthen dam
Earthen dam
 
Pile Foundation by Pratik Solanki (tes.google.com/site/infodiplomacivil/)
Pile Foundation by Pratik Solanki (tes.google.com/site/infodiplomacivil/)Pile Foundation by Pratik Solanki (tes.google.com/site/infodiplomacivil/)
Pile Foundation by Pratik Solanki (tes.google.com/site/infodiplomacivil/)
 
ALL ABOUT DEEP FOUNDATIONS
ALL ABOUT DEEP FOUNDATIONSALL ABOUT DEEP FOUNDATIONS
ALL ABOUT DEEP FOUNDATIONS
 
underwater-construction-5651f4bb8b92f.pptx
underwater-construction-5651f4bb8b92f.pptxunderwater-construction-5651f4bb8b92f.pptx
underwater-construction-5651f4bb8b92f.pptx
 
Aravind B RGUKT Basar
Aravind B RGUKT BasarAravind B RGUKT Basar
Aravind B RGUKT Basar
 
pile wall
pile wallpile wall
pile wall
 

More from Shree Swami atmanand saraswati inst. of technology, surat

More from Shree Swami atmanand saraswati inst. of technology, surat (20)

INFRASTRUCTURE FOR SMART CITIES_MOD 2_planning for smart cities
INFRASTRUCTURE FOR SMART CITIES_MOD 2_planning for smart citiesINFRASTRUCTURE FOR SMART CITIES_MOD 2_planning for smart cities
INFRASTRUCTURE FOR SMART CITIES_MOD 2_planning for smart cities
 
INFRASTRUCTURE FOR SMART CITIES_MOD 3_Intelligent transport systems
INFRASTRUCTURE FOR SMART CITIES_MOD 3_Intelligent transport systemsINFRASTRUCTURE FOR SMART CITIES_MOD 3_Intelligent transport systems
INFRASTRUCTURE FOR SMART CITIES_MOD 3_Intelligent transport systems
 
Sem 5 mod-1 disaster management introduction (CIVIL, ELE, MECH, EC, COMP)
Sem 5 mod-1 disaster management introduction (CIVIL, ELE, MECH, EC, COMP)Sem 5 mod-1 disaster management introduction (CIVIL, ELE, MECH, EC, COMP)
Sem 5 mod-1 disaster management introduction (CIVIL, ELE, MECH, EC, COMP)
 
BCT Mod 4 demolition of structure (Updated)
BCT Mod 4 demolition of structure (Updated)BCT Mod 4 demolition of structure (Updated)
BCT Mod 4 demolition of structure (Updated)
 
MOD 3 CONSTRUCTION ECONOMICS (UPDATED)
MOD 3 CONSTRUCTION ECONOMICS (UPDATED)MOD 3 CONSTRUCTION ECONOMICS (UPDATED)
MOD 3 CONSTRUCTION ECONOMICS (UPDATED)
 
MODULE 2 PROJECT ORGANIZATION (updated)
MODULE 2 PROJECT ORGANIZATION (updated)MODULE 2 PROJECT ORGANIZATION (updated)
MODULE 2 PROJECT ORGANIZATION (updated)
 
BCT - Module 5 special work
BCT - Module 5 special workBCT - Module 5 special work
BCT - Module 5 special work
 
Module :- 8 Job layout (PART 2)
Module :- 8 Job layout (PART 2)Module :- 8 Job layout (PART 2)
Module :- 8 Job layout (PART 2)
 
Module :- 8 material management
Module :- 8 material managementModule :- 8 material management
Module :- 8 material management
 
Module :-5 project scheduling and resource levelling
Module :-5 project scheduling and resource levellingModule :-5 project scheduling and resource levelling
Module :-5 project scheduling and resource levelling
 
Mod 3 construction economics
Mod 3 construction economicsMod 3 construction economics
Mod 3 construction economics
 
MODULE 2 project organization
MODULE 2 project organizationMODULE 2 project organization
MODULE 2 project organization
 
MODULE 1 Introduction to Construction Management
MODULE 1 Introduction to Construction ManagementMODULE 1 Introduction to Construction Management
MODULE 1 Introduction to Construction Management
 
Che 10 engineering fundamental
Che  10 engineering fundamentalChe  10 engineering fundamental
Che 10 engineering fundamental
 
Chapter 9 introduction to construction equipments
Chapter  9 introduction to construction equipmentsChapter  9 introduction to construction equipments
Chapter 9 introduction to construction equipments
 
CHE :- 6 form work (MODULE 3)
CHE :- 6 form work (MODULE 3)CHE :- 6 form work (MODULE 3)
CHE :- 6 form work (MODULE 3)
 
Ch 5 b remote sensing
Ch 5 b remote sensingCh 5 b remote sensing
Ch 5 b remote sensing
 
Ch 5 a gps
Ch 5 a gpsCh 5 a gps
Ch 5 a gps
 
Ch 5 levelling
Ch 5 levellingCh 5 levelling
Ch 5 levelling
 
Ch 8 building planning
Ch 8 building planningCh 8 building planning
Ch 8 building planning
 

Recently uploaded

How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17Celine George
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...ZurliaSoop
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxVishalSingh1417
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...Poonam Aher Patil
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.pptRamjanShidvankar
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptxMaritesTamaniVerdade
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxheathfieldcps1
 
Dyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptxDyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptxcallscotland1987
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxAreebaZafar22
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSCeline George
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17Celine George
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 

Recently uploaded (20)

How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Dyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptxDyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptx
 
Asian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptxAsian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptx
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 

BCT- Module 5 a coffer-dam (Part_2)

  • 2. Diaphragm Wall Application Coffer dams Types of Coffer Dams Design features of coffer dams Leakage Prevention Economic Height 2 CONTENTS
  • 3. Diaphragm Wall • Diaphragm Walls Are A Method Of Creating A Cast In-situ Reinforced Concrete Retaining Wall Using The Slurry Supported Trench Method. As Such, They Are Often Known As Slurry Walls. However, The Term “Diaphragm Walls” • Standard Width Are 100-200 Mm For Cut Off Wall And 450-1200 Mm For Structural Member. • Diaphragm Walls Provide A Water Tight Barrier And Are Constructed With A Minimum Back Slope Subsidence. • They Are Formed From Reinforced Concrete And Are Constructed As Normal Cast-in-place Walls With Support, Which Become Part Of The Main Structure.
  • 4. APPLICATIONS  As permanent and temporary foundation walls for deep basements.  In earth retention schemes for highway and tunnel projects.  As permanent walls for deep shafts for tunnel access.  As permanent cut-off walls through the core of earth dams.  In congested areas for retention systems and permanent foundation walls.  Deep ground water barriers through and under dams.
  • 6.
  • 7. Cofferdam for bridge foundations COFFERDAMS
  • 8. DEFINITION  Cofferdams are temporary enclosures to keep out water and soil so as to permit dewatering and construction of the permanent facility (structure) in the dry.  Its temporary structure which is built in a river, lake etc. to remove water from an area and make it possible to carry on the construction work under reasonably dry conditions.  Meaning of Coffer Dam : Coffer = Box  Cofferdams are usually required for projects such as dams, docks and construction of bridge piers and abutments etc. 8
  • 9. 9  watertight.  Materials – earth , timber , steel & concrete.  Constructed at site of work.  Depend- depth , soil condition , difference in water level, availability of materials.  total cost of construction, maintenance and pumping is minimum.  Stable against bursting, overturning and sliding, under the floods and waves. How it is?
  • 10. When it is?  To facilitate pile driving operations.  To place grillage & raft foundations.  To construct foundations of piers & abutments of bridges, dams, docks etc.  To provide a working platform for foundations when water is meet with it.  To retain Soil & Water.  Can be used as either Temporary or Permanent.  Main purpose is to provide dry working area for workers. 10
  • 11.  Civil Engineering: Underground Car Parking, Foundation, Basement Construction  Transport Engineering: Bridge Pier, Support Walls, Ramps, Ground Water Retention, Tunnel Work etc.  Water Engineering: Weirs, Culverts, Flood Protection Walls, Scour Protection Walls, Securing Embankment etc.  Port Construction: Dock Works, Jetty Works etc. 11
  • 12. TYPES OF COFFER DAM 1.Earth fill cofferdams - mainly for low level water 2.Rock fill cofferdams 3.Timber Crib or rock filled crib cofferdams - Construction on land and than floated into place, which is also known as Gravity Dam 4.Braced / Sheet Pile Coffer Dam- Consisting of Sheet Piles, mainly used in shallow water depth (i). Single wall coffer dams (ii). Double wall coffer dams (iii). Cellular cofferdams 12
  • 13. It is constructed in places where the depth of water is not much, say 1.3 to 1.8 m. The earth bank is carried about one meter above the water level. The top width of the bank should not be less than 1 mtr. and the side slopes in a vary from 1 : 1 to 1 : 2. The earth embankment should be built from a mixture of clay and sand or clay and gravel. In order to prevent the embankment from scouring due to the action of water, side slopes of the bank on water side should be pitched with rubble boulders. EARTH FILL COFFERDAMS
  • 14. 1. EARTH FILL COFFERDAMS 14 120to150 cm
  • 15. 15
  • 16. 16
  • 18. 2. ROCK FILL COFFERDAMS 18
  • 19.  If the depth of water to be retained by the embankment of cofferdam is of order of 3 m .  Stone or rubble is used for the embankment.  This construction is adopted only if the stone is easily available in the nearby areas.  The stones are assembled in the required shape of the embankment and the voids are partially filled with earth and stone-chips.  On the waterside, the rock fill is to be provided with an impervious layer of earth. 19
  • 20. 20
  • 21. 21
  • 22. 22
  • 23. 23
  • 24. 24
  • 25. 25
  • 26. 26
  • 27. 1. SINGLE WALLED COFFER DAM 27  Area to be enclosed is small and the depth of water is more 4.5 to 6 m. Timber piles known as guide piles are first driven deep into the firm ground below the river bed. spacing of the piles may vary between 1.8 to 4.5 m. Longitudinal runners called Wales are then bolted to the guide. 4. SHEET PILE COFFERDAM
  • 28. 28 Steel or wooden sheet piles are then driven into the river bed along the Wales and are secured to the Wales by bolts.  The sheets on the two faces are braced by trussed arrangement of struts. This helps in increasing the stability of walls against the water pressure. Half-filled bags of sand stacked on the inside and the outside faces of the sheets help in increasing the stability of cofferdam. After the cofferdam is constructed, the water in the enclosed area is pumped out and the construction work is taken up.
  • 29. 29
  • 30. 30
  • 31. 31
  • 32. 32
  • 33. DOUBLE WALLED COFFERDAMS  Double-walled cofferdam is provided to enclose a larger area. Its construction is essentially the same as that of a single-walled cofferdam except that in place of one wall, a pair of walls with a gap in between is used all along the boundary of the space to be enclosed. This type of cofferdam can be used in depth of water up to 12 m. - The double wall cofferdams are of two types: (I) Ohio – river type cofferdams (ii) Timber or steel sheeting cofferdams
  • 35. 35
  • 36. 36
  • 37. Timber Sheet Pile  Timber sheet pile were extensively used for cofferdam when depth of water is about 6 to 10 m.  It can be gradually replaced with steel pile.  It can only be used for small depth since no deep piling in 37
  • 38. Timber or steel sheeting cofferdams
  • 41. 41
  • 42. TIMBER CRIB OR ROCK FILLED CRIB COFFERDAMS  Constructed on land and floated into place  It consists of a unit or a cell open at the bottom and having the framework of horizontal timber members.  Hollow space formed are then filled with rock or gravel  Depth of water – 10 to 20 m  Used for wide excavation and rocky river bottoms 42
  • 43. 3. TIMBER CRIB OR ROCK FILLED CRIB COFFERDAMS 43
  • 44. 44 OHIO RIVER TYPE COFFERDAM Ohio river in USA. Used in hard & soft bed (no erosion). Unsuitable in deep water & swift flow. Construction Wales fixed at 1.50m vertically. Wale joints, double vertical planks are provided. Tie rods threaded & cross braces fixed. Fixes sheet piles. Beams (inside & outside) Removing safely.
  • 45. 45
  • 46. 46
  • 47. 47
  • 48.
  • 49. 49
  • 50. 50
  • 51. 51
  • 52. 52
  • 53.
  • 54. CELLULAR COFFERDAMS - The cellular cofferdams are mostly used for dewatering large areas , where the depth of water may be 19 to 21 m. - Mostly used the construction of marine structures like Dams, Locks etc. - The two common shapes of the cellular cofferdam are: (i) Circular type (ii) Diaphragm type 54
  • 55. Circular type cellular cofferdam:  The circular type of cellular cofferdam has the advantage that each cell may be filled completely to the top before starting the construction of the next cell without causing any distortion to the shell of the cofferdam.  Thus, when one cell is completely filled up with crushed stone, broken bricks, gravel and sand. It can be used for placing crane or other equipment required for the construction of other cells.
  • 56. 56  In addition, each cell acts as a self-supporting independent unit and in case one of the cells collapses due to scour or interlock damage or some other reason, it does not produce any adverse effect on the neighboring cells. It is found that the interlock stresses reach their maximum permissible value when the diameter of cell is about 21 meter.  Hence in case, from design consideration it is necessary to have effective width of the cofferdam more than 21 meter, diaphragm type of cofferdam must be used.
  • 57. 57
  • 58. 58
  • 59. 59
  • 60. 60
  • 61. 61
  • 62. 62
  • 63. 63
  • 64. Diaphragm type cellular cofferdam: • This Consists of a series of arcs of steel sheet piles connected as shown in the image. • The straight diaphragm wails are connected to each other by steel piles arranged in the form of arches on either sides. • The radius of the connecting arcs is generally made equal to the distance between the straight diaphragm walls. 64
  • 65. 65 • After the cells are driven to the required depth, they are filled with earth, sand, gravel or other filling material. In this type of cofferdam, as the diaphragm which separates the two cells is a straight wall, it is necessary to fill adjacent cells at approximately the same rate. • If this is not done, the unbalanced pressure from the fill will distort the diaphragm (cross-walls) which may result in the failure of the interlocks. • In this respect, the circular type cofferdam has the advantage over the diaphragm type cofferdam because in the former, it is not necessary to fill the adjacent cells at the same time.
  • 66. 66
  • 67. 67
  • 68. 68  These are actually small concrete dams and they have been used economically on many jobs. The framework usually consist of pre cast R.C.C piles and sheets.  The pre cast R.C.C sheet piles are provided with suitable edges and they are driven in a similar manner to steel sheet piles.  The main disadvantage of this cofferdam is that it is costly. But when it is to be incorporated as a part of permanent structure it proves to be economical. CONCRETE COFFERDAM
  • 69. 69
  • 70. MOVABLE OR SUSPENDED COFFERDAMS  Where there are numbers of repetition work in under water foundations ,such as in the piers of multi span river bridges , it is economical to design the cofferdams to be moved as a single unit from one foundation to another. 70
  • 71. 71
  • 72. 72 Water may leak through the underground flow of water or through the piling sheet of the cofferdam. The following measures can be adopted to prevent leakages in cofferdam. 1.Water entering the dewatered area through fissures or cracks in the rocks can be stopped by grouting the fissures by cement grout. 2. Clay or mixture of clay and sand can be dumped in form of beams both on inside and outside faces of the cofferdam. 3. Cracks or fine joints or nail holes in the sheet piles should be closed using bitumen or cement mortar. LEAKAGE PREVENTION IN COFFERDAMS
  • 73. 73 4. If a lot of leakages is taking place and no measures stated above have been to control it, the water face of the cofferdam may be completely covered with canvass coated with tar or tarpaulin. 5. In case of double-walled cofferdams leakage is generally because of insufficient compaction of the filling material. In this case, measures to control seepage through filling material should be adopted. 6. Sufficient grease applied at interlocks of sheet piles also helps check leakage of water.
  • 74. DESIGN FEATURES OF COFFERDAMS  The design of a cofferdam depends on various factors such as. (i) Hydrostatic head of Water (ii) Dimensions of the area to be covered by the cofferdams (iii) Subsoil conditions (iv) Fluctuations of outside water level (v) Possibility of erosion (vi) Presence of ice 74
  • 75.  A purely theoretically designed cofferdam may fail for factors unaccounted in its design.  Therefore ,become necessary to combine practical knowledge or experience with the theoretical aspects in the design of a cofferdam.  For width and Depth of cofferdam : for H < 3 m, W = H H > 3 m, W = 3 + 1/3*(H - 3) Where, W = Width of cofferdam in metres H = Height of water above river bed in metres 75
  • 76. Economic Height of Coffer Dam 1.Depth of Water  Low depth => Earthen Dam  High Depth => Sheet Pile Coffer Dam 2.Current and nature of flowering of Sheet Pile  High Current => Sheet Pile Coffer Dam (Higher Seepage Control Capacity)  Low Current => Earthen or any other Dam (Less Seepage Control Capacity) 76 The maximum height of cofferdam for which its total cost is minimums known as the most economic height of cofferdam.
  • 77. 3.Type and Period of Work  Short Duration Work => Timber Dam  Long Duration work => Sheet Pile Coffer Dam 4.High and Low Tide Level of Reservoir  Sheet Pile must have top level slightly higher than that of the HTL. So that even in extreme case water can not over top the coffer dam, to achieve the dry working through out the season. 77
  • 78. 78 Extra chees & knowledge good for body… 
  • 82. JOINTS IN SHEET PILING
  • 83.
  • 85. Burj AlArab Cofferdam &Rigging FirasAl Shalabi & SunnyMahajan CE505 ProjectPresentation 1
  • 86. Background Dubai, UAE The first 7 stars hotel in theworld The start of Dubai’s new vision of attracting new investments in areas outside the oilindustry. If you want to book a night there it will cost you around $2000 321 meters height from thesea. 8 6
  • 87. Theconstruction Two main phases: The manmade Island (ourfocus) The building 8 7
  • 88. Building theisland Temporary tube piles driven into sea bed Temporary sheet piles and tierods driven into sea bed to support boundary rocks Sheet pilewall 8 8 Tubularpile
  • 89. Rock armor 8 9 Permanentboundary rock bunds (rock armor) depositedon both sides of the sheet piles No solid ground under the building just weak sand (up to 180 meters deep with no solid ground). So it was decidedto go withfriction piles. Sand fill Building theisland
  • 90. PermanentSHED units placed around the island to dissipate the action of waves and protectit. 2M (6.5ft) diameter 43M (141ft) deep piles weredriven throughthe island and seabed Main buildingpiles 6 SHED units
  • 91. 91
  • 92. 92
  • 93. 93
  • 94. Excavationsbegan in theislandto removethehydraulicfill Acoffer dam was being built while excavating 2M (6.5 ft) thick concreteplug slab laid on the base of the island to prevent the base from popping out because of the seapressure Reinforced concreteretaining wallbuilt Theconstruction of thebasement started 94 Concreteslab
  • 96. GAMMON INDIA LIMITED CABLE -STAY BRIDGE SURAT (EXCAVATION WORK) 96
  • 97. Bracing welding work in progress 97
  • 98. 98
  • 99. 99
  • 100. 10 0
  • 101. SHEET PILE COFFER DAM 10 1
  • 102. 10 2
  • 103. 103
  • 104. 104
  • 105. PHOTO GALLERY OF COFFER DAM 105
  • 106. 10 6
  • 107. 10 7
  • 108.
  • 109.
  • 110.
  • 111.
  • 112.
  • 113.
  • 114.
  • 115.
  • 116.
  • 117.
  • 118. 11 8
  • 119.
  • 120.
  • 121. 12 1
  • 122. 122