SlideShare une entreprise Scribd logo
1  sur  23
Télécharger pour lire hors ligne
ETIS Business Intelligence & Data Warehousing Working Group, Athens
                                                                                         1




BI GOVERNANCE
MODELS & STRATEGIES
                 David M. Walker
April 15, 2010   Data Management & Warehousing
Straw Poll – What can you do?
2


      Is your BI programme allowed to define
       organisational structures outside the company
       programme and project norms?
      Does your IT organisation have an effective change

       management process?
      Are your business users really ready and prepared

       to change their working practices in order to adopt
       BI and facilitate its production?


    ETIS Business Intelligence & Data Warehousing Working Group, Athens   April 15, 2010
What is governance?
3


        BI governance, like other governance subjects, is the
         responsibility of the board and executives.
        It is not an isolated discipline or activity, but rather is
         integral to IT and enterprise governance.
        It consists of the leadership and organizational
         structures and processes that ensure that the enterprise’s
         BI solution sustains and extends the enterprise’s
         strategies and objectives.
        Critical to the success of these structures and processes
         is effective communication among all parties based on
         constructive relationships, a common language and a
         shared commitment to addressing the issues.
    Derived from “Board Briefing On Governance” by the IT Governance Institute (http://www.isaca.org)
    ETIS Business Intelligence & Data Warehousing Working Group, Athens                                 April 15, 2010
BI Governance Framework
4




                                                       Provide
                                                       Direction

           Set Objectives                                                       BI Activities
       • BI is aligned with the                                           • Increase automation in the
       business                                                           delivery of information
       • BI enables the business and                                      (make the business effective)
       maximises benefits                                                 • Decrease cost of providing
       • BI resources are used
                                                       Compare            information (make the
       responsibly                                                        enterprise efficient)
       • BI related risks are                                             • Manage risks (security,
       managed responsibly                                                reliability and compliance)



                                                       Measure
                                                     Performance

      Derived from “Board Briefing On Governance”
      by the IT Governance Institute (http://www.isaca.org)
    ETIS Business Intelligence & Data Warehousing Working Group, Athens                            April 15, 2010
Components of Governance
5




           Executive                                                  Steering
                                                                     Committee




         Programme                                   User Forums
                                                                    Programme
                                                                    Management
                                                                                   Certification
                                                                                   Committees




             Project                                 Exploitation
                                                       Teams
                                                                      Project
                                                                    Management
                                                                                  Implementation
                                                                                      Teams



                                                                       Data
             Process                 Data Model      Data Quality    Warehouse
                                                                    Development
                                                                                  Data Lifecycle     Data Security




    ETIS Business Intelligence & Data Warehousing Working Group, Athens                            April 15, 2010
Executive
6


        Steering Committee
           The steering committee ensures that the BI development is aligned
            with the business objectives.
           Monitoring ensures that the programme is delivering the right
            projects at the right time and at fair value.
           By setting the principles and policies the steering committee can
            control the direction that the development goes in and maintains
            an enterprise wide business perspective for the data warehouse.
           The steering committee is also the centre of communication. It
            takes input from the user forums and the certification committee as
            to what is needed. In return the committee manages the
            expectations of both the business and IT departments as to what
            is possible.

    ETIS Business Intelligence & Data Warehousing Working Group, Athens   April 15, 2010
Programme
7

        Programme Management
             Programme management is the co-ordinated management of a portfolio of
              projects to achieve a set of business objectives. It delivers the co-ordinated
              support, planning, prioritisation and monitoring of projects to meet changing
              business needs. To achieve the business objectives the programme manager
              defines a series of projects with quantifiable benefits that together will meet the
              long-term objectives of the organisation.
        User Forums
             The programme needs a number of user forums that involve end users, subject
              matter specialists and staff from the exploitation teams. These forums are useful
              to allow various teams to express their issues and aspirations for the system
        Certification Committee
             A number of groups within the organisation will also assess the data warehouse
              to ensure that it is fit for purpose. These groups can either be consulted
              individually or brought together as a committee to advise the programme.
             Examples: Audit, Regulatory & Compliance, IT Strategy & Architecture, Security


    ETIS Business Intelligence & Data Warehousing Working Group, Athens              April 15, 2010
Project
8

        Project Management
             The project management takes responsibility for the delivery of an individual
              project within the scope of the programme
        Implementation Team
             The implementation teams are the group of people that will develop, deploy
              and maintain the system.
             Typical roles for the teams will include: Technical Architect, Data Modeler,
              Metadata Administrator, ETL Developers, Front End Tool/Report Developer,
              Systems Database & Network Administrators
        Exploitation Team
             The exploitation team are focused on ensuring that the business is extracting the
              most value from the solution. Exploitation teams work on the current version of
              the system to help the business use the current system and develop new
              requirements to exploit the system further.
             Typical roles for the teams will include: Business Analysts, Business Requirements
              Specialist, Technical Author/Documentation Specialist, Trainer, End User Support
              Specialist, Communications Specialist, etc.

    ETIS Business Intelligence & Data Warehousing Working Group, Athens              April 15, 2010
Processes
9



    Data Model                                                    Data Quality
        The use of uniform techniques for data capture,              Methodical investigation into Data Quality,
         preventing duplication of data and greater consistency        maximising the likelihood of discovering Issues
         in the Transactional Repository.                              before they become mission critical.
        Ensure that best practice Data Modelling patterns are        Standardised measurement of Data Quality
         followed, and that the Data Model is extensible and           ensuring better understanding of the scale of the
         maintainable
                                                                       overall problem, and giving visibility to the decision
        Improved ad-hoc query performance for the users of            making process.
         the system, allowing for closer to speed of thought
         analysis.                                                    Standardised Processes to help in the timely
                                                                       resolution of Data Quality Issues
        Improved performance for inbound and outbound data
         loading from Source Systems, through Staging and the
         Transactional Repository, and into the Data Marts.
        Lower costs of development and maintenance, through
         a more robust model and a standardised approach to
         change.
        Consistent answers to User queries, and making
         misinterpretation of results more difficult.


    ETIS Business Intelligence & Data Warehousing Working Group, Athens                                      April 15, 2010
Processes
10



     Data Lifecycle                                          Data Security

         Considered in terms of                                 Considered in terms of
                                                                    Architecture
              Capacity
                                                                    Data Lifecycle
              Performance
                                                                    Business Unit Requirements
              Historical Reporting
                                                                    Compliance
              Regulation                                           Company Policy
              Archive                                              Business Intelligence
              Backup and Restoration                                Personnel
                                                                    Business Intelligence Mission




     ETIS Business Intelligence & Data Warehousing Working Group, Athens                April 15, 2010
Processes
11



     Data Warehouse Development                               Data Warehouse Development

       Requirements                                             ETL
                                                                    Analysis,   Design, Build
       Enhancements
                                                                 Reporting
       Issues
                                                                    Analysis,   Design, Build
       Change
                                                               Testing
            Sources
                                                               Implementation
            Outputs
                                                               Training


     ETIS Business Intelligence & Data Warehousing Working Group, Athens               April 15, 2010
Fitting it together
12


         Understand what is required
             Executive,         Programme, Project, Processes
         Understand who is required
             Roles      and Responsibilities derived from above
         Understand what is achievable
             The     answers to the straw poll will guide you


         Put them all together in an organisational
          framework
          ETIS Business Intelligence & Data Warehousing Working Group, Athens   April 15, 2010
Creating a successful framework
13


         Whatever governance model is selected for an
          organisation it has to deliver certain key factors:
            It   has to be institutional
                The   governance model must be part of the organisational
                  structure of the business
            It   has to act by consent
                Strategies,
                           priorities and outcomes as a result need to be
                  acknowledged, accepted and respected
            It   has to promote the adoption of BI as a business tool
                By  providing a vision, roadmap, strategy and clear
                  communication about what BI can give the business

     ETIS Business Intelligence & Data Warehousing Working Group, Athens   April 15, 2010
Organisational Models
14


         IT Owned Programme
            IT
              acts as a service provider to business
            Most commonly used organisational model

         Federated Team
            IT& Business Units create teams
            Focused on value delivery for the business units

         Business Intelligence Competency Centre (BICC)
            Joint
                 venture between business and IT
            One department that represents Business Intelligence

     ETIS Business Intelligence & Data Warehousing Working Group, Athens   April 15, 2010
IT Owned Programme
15



     Pros                                                    Cons

       Understand the                                         Can be disconnected
        technologies                                            from business priorities
       Independent arbitrator                                 Can struggle to get
        between business units                                  funding from the
                                                                business
                                                               Only works where IT is

                                                                respected

     ETIS Business Intelligence & Data Warehousing Working Group, Athens         April 15, 2010
Successful Governance – IT Owned
16


         Global Banking
            Key      Roles
                CIO who understands ‘Agile’ methodologies
                BI Manager and business analyst team leaders that
                 understand exactly what is needed
            Major       Outcomes
                BIis highly responsive to business needs
                Change & re-factoring are a way of life




     ETIS Business Intelligence & Data Warehousing Working Group, Athens   April 15, 2010
Federated
17



     Pros                                                    Cons

       Very close to the                                      Can lack an overall
        business                                                architecture
       Delivery fit-for-                                      Can result in
        purpose                                                 duplication
       Can be virtualised




     ETIS Business Intelligence & Data Warehousing Working Group, Athens       April 15, 2010
Successful Governance - Federated
18


         Global Manufacturer
            Key     Roles
                CEO  aligns entire business along well defined business
                 processes and appoints process owners
                CIO aligns entire IT organisation to the processes

            Major       Outcomes
                Tight alignment and integration of
                 Business Process, Operational & BI systems
                Each process has BI systems that exactly meet their needs
                No global data warehouse


     ETIS Business Intelligence & Data Warehousing Working Group, Athens   April 15, 2010
BICC
19



     Pros                                                    Cons

       Close to the business                                  Can be difficult to set
       Cohesive technical                                      up in some companies
        architecture                                           Can become detached

       Can be virtualised                                      from IT and the
                                                                Business
                                                               Virtual teams often

                                                                drift apart

     ETIS Business Intelligence & Data Warehousing Working Group, Athens        April 15, 2010
Successful Governance - BICC
20


         European Retailer
            Key       Roles
                IT   run by Chief Technology Officer (CTO)
                          Controls all operational systems
                BI   run by Chief Information Office (CIO)
                          Controls all BI systems
            Major          Outcomes
                A BICC run at the executive level
                Every business function engaged and committed to using BI




     ETIS Business Intelligence & Data Warehousing Working Group, Athens   April 15, 2010
Governance Deployment
21


         Develop the vision, strategy and priorities for business
          intelligence
         Establish the organisational framework that
             Will  work within your organisation
             Is cost-effective in delivering business intelligence

             Makes effective use of the policy and procedures

             Can resource the roles and responsibilities

             Does not become an end unto itself




          ETIS Business Intelligence & Data Warehousing Working Group, Athens   April 15, 2010
Maintaining Governance
22


         Once deployed governance must
            Manage    the on-going development for on-time on
             budget development
            Ensure that there is sufficient on-going funding

            Deliver value for money

            Adapt to change in the business priorities and the
             organisational structure
            Evolve in such a way as to always be an invisible
             support rather than a visible obstruction

     ETIS Business Intelligence & Data Warehousing Working Group, Athens   April 15, 2010
Finally remember …
23


       Good governance is about creating an environment
        that delivers value-for-money solutions that meet the
        business need.
       Developing documentation, processes and formality
        without a positive organizational culture where
        understanding, discipline and skill are regarded as
        virtues in teams that have leaders with strong
        technical skills, initiative, communications skills and
        personal authority will not deliver the required
        value.

     ETIS Business Intelligence & Data Warehousing Working Group, Athens   April 15, 2010

Contenu connexe

Tendances

What is the Value of Mature Enterprise Architecture TOGAF
What is the Value of Mature Enterprise Architecture TOGAFWhat is the Value of Mature Enterprise Architecture TOGAF
What is the Value of Mature Enterprise Architecture TOGAFxavblai
 
Enterprise Data Management Framework Overview
Enterprise Data Management Framework OverviewEnterprise Data Management Framework Overview
Enterprise Data Management Framework OverviewJohn Bao Vuu
 
Basics of BI and Data Management (Summary).pdf
Basics of BI and Data Management (Summary).pdfBasics of BI and Data Management (Summary).pdf
Basics of BI and Data Management (Summary).pdfamorshed
 
How to Strengthen Enterprise Data Governance with Data Quality
How to Strengthen Enterprise Data Governance with Data QualityHow to Strengthen Enterprise Data Governance with Data Quality
How to Strengthen Enterprise Data Governance with Data QualityDATAVERSITY
 
Wallchart - Data Warehouse Documentation Roadmap
Wallchart - Data Warehouse Documentation RoadmapWallchart - Data Warehouse Documentation Roadmap
Wallchart - Data Warehouse Documentation RoadmapDavid Walker
 
How to Build & Sustain a Data Governance Operating Model
How to Build & Sustain a Data Governance Operating Model How to Build & Sustain a Data Governance Operating Model
How to Build & Sustain a Data Governance Operating Model DATUM LLC
 
Enterprise Architecture vs. Data Architecture
Enterprise Architecture vs. Data ArchitectureEnterprise Architecture vs. Data Architecture
Enterprise Architecture vs. Data ArchitectureDATAVERSITY
 
The Role of Data Governance in a Data Strategy
The Role of Data Governance in a Data StrategyThe Role of Data Governance in a Data Strategy
The Role of Data Governance in a Data StrategyDATAVERSITY
 
Glossaries, Dictionaries, and Catalogs Result in Data Governance
Glossaries, Dictionaries, and Catalogs Result in Data GovernanceGlossaries, Dictionaries, and Catalogs Result in Data Governance
Glossaries, Dictionaries, and Catalogs Result in Data GovernanceDATAVERSITY
 
Data Architecture for Data Governance
Data Architecture for Data GovernanceData Architecture for Data Governance
Data Architecture for Data GovernanceDATAVERSITY
 
Data Governance Takes a Village (So Why is Everyone Hiding?)
Data Governance Takes a Village (So Why is Everyone Hiding?)Data Governance Takes a Village (So Why is Everyone Hiding?)
Data Governance Takes a Village (So Why is Everyone Hiding?)DATAVERSITY
 
Gathering And Documenting Your Bi Business Requirements
Gathering And Documenting Your Bi Business RequirementsGathering And Documenting Your Bi Business Requirements
Gathering And Documenting Your Bi Business RequirementsWynyard Group
 
RWDG Slides: Three Approaches to Data Stewardship
RWDG Slides: Three Approaches to Data StewardshipRWDG Slides: Three Approaches to Data Stewardship
RWDG Slides: Three Approaches to Data StewardshipDATAVERSITY
 
Business Drivers Behind Data Governance
Business Drivers Behind Data GovernanceBusiness Drivers Behind Data Governance
Business Drivers Behind Data GovernancePrecisely
 
TOGAF Certification
TOGAF Certification TOGAF Certification
TOGAF Certification Miguel Vilaca
 
Capability Model_Data Governance
Capability Model_Data GovernanceCapability Model_Data Governance
Capability Model_Data GovernanceSteve Novak
 
Enterprise Architecture vs. Data Architecture
Enterprise Architecture vs. Data ArchitectureEnterprise Architecture vs. Data Architecture
Enterprise Architecture vs. Data ArchitectureDATAVERSITY
 
Activate Data Governance Using the Data Catalog
Activate Data Governance Using the Data CatalogActivate Data Governance Using the Data Catalog
Activate Data Governance Using the Data CatalogDATAVERSITY
 
Data Governance
Data GovernanceData Governance
Data GovernanceRob Lux
 

Tendances (20)

What is the Value of Mature Enterprise Architecture TOGAF
What is the Value of Mature Enterprise Architecture TOGAFWhat is the Value of Mature Enterprise Architecture TOGAF
What is the Value of Mature Enterprise Architecture TOGAF
 
Enterprise Data Management Framework Overview
Enterprise Data Management Framework OverviewEnterprise Data Management Framework Overview
Enterprise Data Management Framework Overview
 
Basics of BI and Data Management (Summary).pdf
Basics of BI and Data Management (Summary).pdfBasics of BI and Data Management (Summary).pdf
Basics of BI and Data Management (Summary).pdf
 
How to Strengthen Enterprise Data Governance with Data Quality
How to Strengthen Enterprise Data Governance with Data QualityHow to Strengthen Enterprise Data Governance with Data Quality
How to Strengthen Enterprise Data Governance with Data Quality
 
Wallchart - Data Warehouse Documentation Roadmap
Wallchart - Data Warehouse Documentation RoadmapWallchart - Data Warehouse Documentation Roadmap
Wallchart - Data Warehouse Documentation Roadmap
 
How to Build & Sustain a Data Governance Operating Model
How to Build & Sustain a Data Governance Operating Model How to Build & Sustain a Data Governance Operating Model
How to Build & Sustain a Data Governance Operating Model
 
Enterprise Architecture vs. Data Architecture
Enterprise Architecture vs. Data ArchitectureEnterprise Architecture vs. Data Architecture
Enterprise Architecture vs. Data Architecture
 
The Role of Data Governance in a Data Strategy
The Role of Data Governance in a Data StrategyThe Role of Data Governance in a Data Strategy
The Role of Data Governance in a Data Strategy
 
Glossaries, Dictionaries, and Catalogs Result in Data Governance
Glossaries, Dictionaries, and Catalogs Result in Data GovernanceGlossaries, Dictionaries, and Catalogs Result in Data Governance
Glossaries, Dictionaries, and Catalogs Result in Data Governance
 
Security review using SABSA
Security review using SABSASecurity review using SABSA
Security review using SABSA
 
Data Architecture for Data Governance
Data Architecture for Data GovernanceData Architecture for Data Governance
Data Architecture for Data Governance
 
Data Governance Takes a Village (So Why is Everyone Hiding?)
Data Governance Takes a Village (So Why is Everyone Hiding?)Data Governance Takes a Village (So Why is Everyone Hiding?)
Data Governance Takes a Village (So Why is Everyone Hiding?)
 
Gathering And Documenting Your Bi Business Requirements
Gathering And Documenting Your Bi Business RequirementsGathering And Documenting Your Bi Business Requirements
Gathering And Documenting Your Bi Business Requirements
 
RWDG Slides: Three Approaches to Data Stewardship
RWDG Slides: Three Approaches to Data StewardshipRWDG Slides: Three Approaches to Data Stewardship
RWDG Slides: Three Approaches to Data Stewardship
 
Business Drivers Behind Data Governance
Business Drivers Behind Data GovernanceBusiness Drivers Behind Data Governance
Business Drivers Behind Data Governance
 
TOGAF Certification
TOGAF Certification TOGAF Certification
TOGAF Certification
 
Capability Model_Data Governance
Capability Model_Data GovernanceCapability Model_Data Governance
Capability Model_Data Governance
 
Enterprise Architecture vs. Data Architecture
Enterprise Architecture vs. Data ArchitectureEnterprise Architecture vs. Data Architecture
Enterprise Architecture vs. Data Architecture
 
Activate Data Governance Using the Data Catalog
Activate Data Governance Using the Data CatalogActivate Data Governance Using the Data Catalog
Activate Data Governance Using the Data Catalog
 
Data Governance
Data GovernanceData Governance
Data Governance
 

Similaire à ETIS10 - BI Governance Models & Strategies - Presentation

Services & Solutions
Services & SolutionsServices & Solutions
Services & SolutionsAitent
 
Expert Webinar Series: SharePoint Governance - Managing Content Sprawl
Expert Webinar Series:  SharePoint Governance - Managing Content SprawlExpert Webinar Series:  SharePoint Governance - Managing Content Sprawl
Expert Webinar Series: SharePoint Governance - Managing Content Sprawlmartingarland
 
EBI Presentation 2011
EBI Presentation 2011 EBI Presentation 2011
EBI Presentation 2011 Rod Kimber
 
Pariveda ECM Patterns for Large Enterprises - chicago
Pariveda   ECM Patterns for Large Enterprises - chicagoPariveda   ECM Patterns for Large Enterprises - chicago
Pariveda ECM Patterns for Large Enterprises - chicagomsteinbergtx
 
iTaNGO Workshop Presentation
iTaNGO Workshop Presentation iTaNGO Workshop Presentation
iTaNGO Workshop Presentation iTaNGOproject
 
B13 Driving Business Intelligence John Robson
B13 Driving Business Intelligence John RobsonB13 Driving Business Intelligence John Robson
B13 Driving Business Intelligence John RobsonProvoke Solutions
 
Application Lifecycle Management & VSTS
Application Lifecycle Management & VSTSApplication Lifecycle Management & VSTS
Application Lifecycle Management & VSTSMicrosoft Iceland
 
B13 Driving Business Intelligence
B13 Driving Business IntelligenceB13 Driving Business Intelligence
B13 Driving Business IntelligenceJohnRobson
 
BI Readiness by FMT
BI Readiness by FMTBI Readiness by FMT
BI Readiness by FMTMark West
 
Key Ingredient - ITSM Academy Webinar
Key Ingredient - ITSM Academy WebinarKey Ingredient - ITSM Academy Webinar
Key Ingredient - ITSM Academy WebinarITSM Academy, Inc.
 
Ecm strategy outline
Ecm strategy outlineEcm strategy outline
Ecm strategy outlineJP Harris
 
Top 10 Imperatives for Leading a Successful IT Improvement Program
Top 10 Imperatives for Leading a Successful IT Improvement ProgramTop 10 Imperatives for Leading a Successful IT Improvement Program
Top 10 Imperatives for Leading a Successful IT Improvement ProgramCognizant
 
SharePoint quickstart
SharePoint quickstartSharePoint quickstart
SharePoint quickstartInfogain
 
How to implement measurements to drive value
How to implement measurements to drive valueHow to implement measurements to drive value
How to implement measurements to drive valueOMNINET USA
 
Frameworks For Predictability
Frameworks For PredictabilityFrameworks For Predictability
Frameworks For Predictabilitytlknecht
 
IT Enabled Higher Education
IT Enabled Higher EducationIT Enabled Higher Education
IT Enabled Higher EducationInfosys
 

Similaire à ETIS10 - BI Governance Models & Strategies - Presentation (20)

Services & Solutions
Services & SolutionsServices & Solutions
Services & Solutions
 
Expert Webinar Series: SharePoint Governance - Managing Content Sprawl
Expert Webinar Series:  SharePoint Governance - Managing Content SprawlExpert Webinar Series:  SharePoint Governance - Managing Content Sprawl
Expert Webinar Series: SharePoint Governance - Managing Content Sprawl
 
EBI Presentation 2011
EBI Presentation 2011 EBI Presentation 2011
EBI Presentation 2011
 
Pariveda ECM Patterns for Large Enterprises - chicago
Pariveda   ECM Patterns for Large Enterprises - chicagoPariveda   ECM Patterns for Large Enterprises - chicago
Pariveda ECM Patterns for Large Enterprises - chicago
 
Child Wear Ea Blueprint V0.7
Child Wear Ea Blueprint V0.7Child Wear Ea Blueprint V0.7
Child Wear Ea Blueprint V0.7
 
10.1.1.87.8236
10.1.1.87.823610.1.1.87.8236
10.1.1.87.8236
 
Intranet development
Intranet developmentIntranet development
Intranet development
 
iTaNGO Workshop Presentation
iTaNGO Workshop Presentation iTaNGO Workshop Presentation
iTaNGO Workshop Presentation
 
B13 Driving Business Intelligence John Robson
B13 Driving Business Intelligence John RobsonB13 Driving Business Intelligence John Robson
B13 Driving Business Intelligence John Robson
 
Application Lifecycle Management & VSTS
Application Lifecycle Management & VSTSApplication Lifecycle Management & VSTS
Application Lifecycle Management & VSTS
 
B13 Driving Business Intelligence
B13 Driving Business IntelligenceB13 Driving Business Intelligence
B13 Driving Business Intelligence
 
BI Readiness by FMT
BI Readiness by FMTBI Readiness by FMT
BI Readiness by FMT
 
Key Ingredient - ITSM Academy Webinar
Key Ingredient - ITSM Academy WebinarKey Ingredient - ITSM Academy Webinar
Key Ingredient - ITSM Academy Webinar
 
Ecm strategy outline
Ecm strategy outlineEcm strategy outline
Ecm strategy outline
 
Top 10 Imperatives for Leading a Successful IT Improvement Program
Top 10 Imperatives for Leading a Successful IT Improvement ProgramTop 10 Imperatives for Leading a Successful IT Improvement Program
Top 10 Imperatives for Leading a Successful IT Improvement Program
 
SharePoint quickstart
SharePoint quickstartSharePoint quickstart
SharePoint quickstart
 
How to implement measurements to drive value
How to implement measurements to drive valueHow to implement measurements to drive value
How to implement measurements to drive value
 
EA Governance
EA GovernanceEA Governance
EA Governance
 
Frameworks For Predictability
Frameworks For PredictabilityFrameworks For Predictability
Frameworks For Predictability
 
IT Enabled Higher Education
IT Enabled Higher EducationIT Enabled Higher Education
IT Enabled Higher Education
 

Plus de David Walker

Moving To MicroServices
Moving To MicroServicesMoving To MicroServices
Moving To MicroServicesDavid Walker
 
Big Data Week 2016 - Worldpay - Deploying Secure Clusters
Big Data Week 2016  - Worldpay - Deploying Secure ClustersBig Data Week 2016  - Worldpay - Deploying Secure Clusters
Big Data Week 2016 - Worldpay - Deploying Secure ClustersDavid Walker
 
Data Works Berlin 2018 - Worldpay - PCI Compliance
Data Works Berlin 2018 - Worldpay - PCI ComplianceData Works Berlin 2018 - Worldpay - PCI Compliance
Data Works Berlin 2018 - Worldpay - PCI ComplianceDavid Walker
 
Data Works Summit Munich 2017 - Worldpay - Multi Tenancy Clusters
Data Works Summit Munich 2017 - Worldpay - Multi Tenancy ClustersData Works Summit Munich 2017 - Worldpay - Multi Tenancy Clusters
Data Works Summit Munich 2017 - Worldpay - Multi Tenancy ClustersDavid Walker
 
Big Data Analytics 2017 - Worldpay - Empowering Payments
Big Data Analytics 2017  - Worldpay - Empowering PaymentsBig Data Analytics 2017  - Worldpay - Empowering Payments
Big Data Analytics 2017 - Worldpay - Empowering PaymentsDavid Walker
 
Data Driven Insurance Underwriting
Data Driven Insurance UnderwritingData Driven Insurance Underwriting
Data Driven Insurance UnderwritingDavid Walker
 
Data Driven Insurance Underwriting (Dutch Language Version)
Data Driven Insurance Underwriting (Dutch Language Version)Data Driven Insurance Underwriting (Dutch Language Version)
Data Driven Insurance Underwriting (Dutch Language Version)David Walker
 
An introduction to data virtualization in business intelligence
An introduction to data virtualization in business intelligenceAn introduction to data virtualization in business intelligence
An introduction to data virtualization in business intelligenceDavid Walker
 
BI SaaS & Cloud Strategies for Telcos
BI SaaS & Cloud Strategies for TelcosBI SaaS & Cloud Strategies for Telcos
BI SaaS & Cloud Strategies for TelcosDavid Walker
 
Building an analytical platform
Building an analytical platformBuilding an analytical platform
Building an analytical platformDavid Walker
 
Data warehousing change in a challenging environment
Data warehousing change in a challenging environmentData warehousing change in a challenging environment
Data warehousing change in a challenging environmentDavid Walker
 
Building a data warehouse of call data records
Building a data warehouse of call data recordsBuilding a data warehouse of call data records
Building a data warehouse of call data recordsDavid Walker
 
Struggling with data management
Struggling with data managementStruggling with data management
Struggling with data managementDavid Walker
 
A linux mac os x command line interface
A linux mac os x command line interfaceA linux mac os x command line interface
A linux mac os x command line interfaceDavid Walker
 
Connections a life in the day of - david walker
Connections   a life in the day of - david walkerConnections   a life in the day of - david walker
Connections a life in the day of - david walkerDavid Walker
 
Conspectus data warehousing appliances – fad or future
Conspectus   data warehousing appliances – fad or futureConspectus   data warehousing appliances – fad or future
Conspectus data warehousing appliances – fad or futureDavid Walker
 
An introduction to social network data
An introduction to social network dataAn introduction to social network data
An introduction to social network dataDavid Walker
 
Using the right data model in a data mart
Using the right data model in a data martUsing the right data model in a data mart
Using the right data model in a data martDavid Walker
 
Implementing Netezza Spatial
Implementing Netezza SpatialImplementing Netezza Spatial
Implementing Netezza SpatialDavid Walker
 
Storage Characteristics Of Call Data Records In Column Store Databases
Storage Characteristics Of Call Data Records In Column Store DatabasesStorage Characteristics Of Call Data Records In Column Store Databases
Storage Characteristics Of Call Data Records In Column Store DatabasesDavid Walker
 

Plus de David Walker (20)

Moving To MicroServices
Moving To MicroServicesMoving To MicroServices
Moving To MicroServices
 
Big Data Week 2016 - Worldpay - Deploying Secure Clusters
Big Data Week 2016  - Worldpay - Deploying Secure ClustersBig Data Week 2016  - Worldpay - Deploying Secure Clusters
Big Data Week 2016 - Worldpay - Deploying Secure Clusters
 
Data Works Berlin 2018 - Worldpay - PCI Compliance
Data Works Berlin 2018 - Worldpay - PCI ComplianceData Works Berlin 2018 - Worldpay - PCI Compliance
Data Works Berlin 2018 - Worldpay - PCI Compliance
 
Data Works Summit Munich 2017 - Worldpay - Multi Tenancy Clusters
Data Works Summit Munich 2017 - Worldpay - Multi Tenancy ClustersData Works Summit Munich 2017 - Worldpay - Multi Tenancy Clusters
Data Works Summit Munich 2017 - Worldpay - Multi Tenancy Clusters
 
Big Data Analytics 2017 - Worldpay - Empowering Payments
Big Data Analytics 2017  - Worldpay - Empowering PaymentsBig Data Analytics 2017  - Worldpay - Empowering Payments
Big Data Analytics 2017 - Worldpay - Empowering Payments
 
Data Driven Insurance Underwriting
Data Driven Insurance UnderwritingData Driven Insurance Underwriting
Data Driven Insurance Underwriting
 
Data Driven Insurance Underwriting (Dutch Language Version)
Data Driven Insurance Underwriting (Dutch Language Version)Data Driven Insurance Underwriting (Dutch Language Version)
Data Driven Insurance Underwriting (Dutch Language Version)
 
An introduction to data virtualization in business intelligence
An introduction to data virtualization in business intelligenceAn introduction to data virtualization in business intelligence
An introduction to data virtualization in business intelligence
 
BI SaaS & Cloud Strategies for Telcos
BI SaaS & Cloud Strategies for TelcosBI SaaS & Cloud Strategies for Telcos
BI SaaS & Cloud Strategies for Telcos
 
Building an analytical platform
Building an analytical platformBuilding an analytical platform
Building an analytical platform
 
Data warehousing change in a challenging environment
Data warehousing change in a challenging environmentData warehousing change in a challenging environment
Data warehousing change in a challenging environment
 
Building a data warehouse of call data records
Building a data warehouse of call data recordsBuilding a data warehouse of call data records
Building a data warehouse of call data records
 
Struggling with data management
Struggling with data managementStruggling with data management
Struggling with data management
 
A linux mac os x command line interface
A linux mac os x command line interfaceA linux mac os x command line interface
A linux mac os x command line interface
 
Connections a life in the day of - david walker
Connections   a life in the day of - david walkerConnections   a life in the day of - david walker
Connections a life in the day of - david walker
 
Conspectus data warehousing appliances – fad or future
Conspectus   data warehousing appliances – fad or futureConspectus   data warehousing appliances – fad or future
Conspectus data warehousing appliances – fad or future
 
An introduction to social network data
An introduction to social network dataAn introduction to social network data
An introduction to social network data
 
Using the right data model in a data mart
Using the right data model in a data martUsing the right data model in a data mart
Using the right data model in a data mart
 
Implementing Netezza Spatial
Implementing Netezza SpatialImplementing Netezza Spatial
Implementing Netezza Spatial
 
Storage Characteristics Of Call Data Records In Column Store Databases
Storage Characteristics Of Call Data Records In Column Store DatabasesStorage Characteristics Of Call Data Records In Column Store Databases
Storage Characteristics Of Call Data Records In Column Store Databases
 

Dernier

How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?Antenna Manufacturer Coco
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Servicegiselly40
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxKatpro Technologies
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 

Dernier (20)

How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 

ETIS10 - BI Governance Models & Strategies - Presentation

  • 1. ETIS Business Intelligence & Data Warehousing Working Group, Athens 1 BI GOVERNANCE MODELS & STRATEGIES David M. Walker April 15, 2010 Data Management & Warehousing
  • 2. Straw Poll – What can you do? 2   Is your BI programme allowed to define organisational structures outside the company programme and project norms?   Does your IT organisation have an effective change management process?   Are your business users really ready and prepared to change their working practices in order to adopt BI and facilitate its production? ETIS Business Intelligence & Data Warehousing Working Group, Athens April 15, 2010
  • 3. What is governance? 3   BI governance, like other governance subjects, is the responsibility of the board and executives.   It is not an isolated discipline or activity, but rather is integral to IT and enterprise governance.   It consists of the leadership and organizational structures and processes that ensure that the enterprise’s BI solution sustains and extends the enterprise’s strategies and objectives.   Critical to the success of these structures and processes is effective communication among all parties based on constructive relationships, a common language and a shared commitment to addressing the issues. Derived from “Board Briefing On Governance” by the IT Governance Institute (http://www.isaca.org) ETIS Business Intelligence & Data Warehousing Working Group, Athens April 15, 2010
  • 4. BI Governance Framework 4 Provide Direction Set Objectives BI Activities • BI is aligned with the • Increase automation in the business delivery of information • BI enables the business and (make the business effective) maximises benefits • Decrease cost of providing • BI resources are used Compare information (make the responsibly enterprise efficient) • BI related risks are • Manage risks (security, managed responsibly reliability and compliance) Measure Performance Derived from “Board Briefing On Governance” by the IT Governance Institute (http://www.isaca.org) ETIS Business Intelligence & Data Warehousing Working Group, Athens April 15, 2010
  • 5. Components of Governance 5 Executive Steering Committee Programme User Forums Programme Management Certification Committees Project Exploitation Teams Project Management Implementation Teams Data Process Data Model Data Quality Warehouse Development Data Lifecycle Data Security ETIS Business Intelligence & Data Warehousing Working Group, Athens April 15, 2010
  • 6. Executive 6   Steering Committee   The steering committee ensures that the BI development is aligned with the business objectives.   Monitoring ensures that the programme is delivering the right projects at the right time and at fair value.   By setting the principles and policies the steering committee can control the direction that the development goes in and maintains an enterprise wide business perspective for the data warehouse.   The steering committee is also the centre of communication. It takes input from the user forums and the certification committee as to what is needed. In return the committee manages the expectations of both the business and IT departments as to what is possible. ETIS Business Intelligence & Data Warehousing Working Group, Athens April 15, 2010
  • 7. Programme 7   Programme Management   Programme management is the co-ordinated management of a portfolio of projects to achieve a set of business objectives. It delivers the co-ordinated support, planning, prioritisation and monitoring of projects to meet changing business needs. To achieve the business objectives the programme manager defines a series of projects with quantifiable benefits that together will meet the long-term objectives of the organisation.   User Forums   The programme needs a number of user forums that involve end users, subject matter specialists and staff from the exploitation teams. These forums are useful to allow various teams to express their issues and aspirations for the system   Certification Committee   A number of groups within the organisation will also assess the data warehouse to ensure that it is fit for purpose. These groups can either be consulted individually or brought together as a committee to advise the programme.   Examples: Audit, Regulatory & Compliance, IT Strategy & Architecture, Security ETIS Business Intelligence & Data Warehousing Working Group, Athens April 15, 2010
  • 8. Project 8   Project Management   The project management takes responsibility for the delivery of an individual project within the scope of the programme   Implementation Team   The implementation teams are the group of people that will develop, deploy and maintain the system.   Typical roles for the teams will include: Technical Architect, Data Modeler, Metadata Administrator, ETL Developers, Front End Tool/Report Developer, Systems Database & Network Administrators   Exploitation Team   The exploitation team are focused on ensuring that the business is extracting the most value from the solution. Exploitation teams work on the current version of the system to help the business use the current system and develop new requirements to exploit the system further.   Typical roles for the teams will include: Business Analysts, Business Requirements Specialist, Technical Author/Documentation Specialist, Trainer, End User Support Specialist, Communications Specialist, etc. ETIS Business Intelligence & Data Warehousing Working Group, Athens April 15, 2010
  • 9. Processes 9 Data Model Data Quality   The use of uniform techniques for data capture,   Methodical investigation into Data Quality, preventing duplication of data and greater consistency maximising the likelihood of discovering Issues in the Transactional Repository. before they become mission critical.   Ensure that best practice Data Modelling patterns are   Standardised measurement of Data Quality followed, and that the Data Model is extensible and ensuring better understanding of the scale of the maintainable overall problem, and giving visibility to the decision   Improved ad-hoc query performance for the users of making process. the system, allowing for closer to speed of thought analysis.   Standardised Processes to help in the timely resolution of Data Quality Issues   Improved performance for inbound and outbound data loading from Source Systems, through Staging and the Transactional Repository, and into the Data Marts.   Lower costs of development and maintenance, through a more robust model and a standardised approach to change.   Consistent answers to User queries, and making misinterpretation of results more difficult. ETIS Business Intelligence & Data Warehousing Working Group, Athens April 15, 2010
  • 10. Processes 10 Data Lifecycle Data Security   Considered in terms of   Considered in terms of   Architecture   Capacity   Data Lifecycle   Performance   Business Unit Requirements   Historical Reporting   Compliance   Regulation   Company Policy   Archive   Business Intelligence   Backup and Restoration Personnel   Business Intelligence Mission ETIS Business Intelligence & Data Warehousing Working Group, Athens April 15, 2010
  • 11. Processes 11 Data Warehouse Development Data Warehouse Development   Requirements   ETL   Analysis, Design, Build   Enhancements   Reporting   Issues   Analysis, Design, Build   Change   Testing   Sources   Implementation   Outputs   Training ETIS Business Intelligence & Data Warehousing Working Group, Athens April 15, 2010
  • 12. Fitting it together 12   Understand what is required   Executive, Programme, Project, Processes   Understand who is required   Roles and Responsibilities derived from above   Understand what is achievable   The answers to the straw poll will guide you   Put them all together in an organisational framework ETIS Business Intelligence & Data Warehousing Working Group, Athens April 15, 2010
  • 13. Creating a successful framework 13   Whatever governance model is selected for an organisation it has to deliver certain key factors:   It has to be institutional   The governance model must be part of the organisational structure of the business   It has to act by consent   Strategies, priorities and outcomes as a result need to be acknowledged, accepted and respected   It has to promote the adoption of BI as a business tool   By providing a vision, roadmap, strategy and clear communication about what BI can give the business ETIS Business Intelligence & Data Warehousing Working Group, Athens April 15, 2010
  • 14. Organisational Models 14   IT Owned Programme   IT acts as a service provider to business   Most commonly used organisational model   Federated Team   IT& Business Units create teams   Focused on value delivery for the business units   Business Intelligence Competency Centre (BICC)   Joint venture between business and IT   One department that represents Business Intelligence ETIS Business Intelligence & Data Warehousing Working Group, Athens April 15, 2010
  • 15. IT Owned Programme 15 Pros Cons   Understand the   Can be disconnected technologies from business priorities   Independent arbitrator   Can struggle to get between business units funding from the business   Only works where IT is respected ETIS Business Intelligence & Data Warehousing Working Group, Athens April 15, 2010
  • 16. Successful Governance – IT Owned 16   Global Banking   Key Roles   CIO who understands ‘Agile’ methodologies   BI Manager and business analyst team leaders that understand exactly what is needed   Major Outcomes   BIis highly responsive to business needs   Change & re-factoring are a way of life ETIS Business Intelligence & Data Warehousing Working Group, Athens April 15, 2010
  • 17. Federated 17 Pros Cons   Very close to the   Can lack an overall business architecture   Delivery fit-for-   Can result in purpose duplication   Can be virtualised ETIS Business Intelligence & Data Warehousing Working Group, Athens April 15, 2010
  • 18. Successful Governance - Federated 18   Global Manufacturer   Key Roles   CEO aligns entire business along well defined business processes and appoints process owners   CIO aligns entire IT organisation to the processes   Major Outcomes   Tight alignment and integration of Business Process, Operational & BI systems   Each process has BI systems that exactly meet their needs   No global data warehouse ETIS Business Intelligence & Data Warehousing Working Group, Athens April 15, 2010
  • 19. BICC 19 Pros Cons   Close to the business   Can be difficult to set   Cohesive technical up in some companies architecture   Can become detached   Can be virtualised from IT and the Business   Virtual teams often drift apart ETIS Business Intelligence & Data Warehousing Working Group, Athens April 15, 2010
  • 20. Successful Governance - BICC 20   European Retailer   Key Roles   IT run by Chief Technology Officer (CTO)   Controls all operational systems   BI run by Chief Information Office (CIO)   Controls all BI systems   Major Outcomes   A BICC run at the executive level   Every business function engaged and committed to using BI ETIS Business Intelligence & Data Warehousing Working Group, Athens April 15, 2010
  • 21. Governance Deployment 21   Develop the vision, strategy and priorities for business intelligence   Establish the organisational framework that   Will work within your organisation   Is cost-effective in delivering business intelligence   Makes effective use of the policy and procedures   Can resource the roles and responsibilities   Does not become an end unto itself ETIS Business Intelligence & Data Warehousing Working Group, Athens April 15, 2010
  • 22. Maintaining Governance 22   Once deployed governance must   Manage the on-going development for on-time on budget development   Ensure that there is sufficient on-going funding   Deliver value for money   Adapt to change in the business priorities and the organisational structure   Evolve in such a way as to always be an invisible support rather than a visible obstruction ETIS Business Intelligence & Data Warehousing Working Group, Athens April 15, 2010
  • 23. Finally remember … 23   Good governance is about creating an environment that delivers value-for-money solutions that meet the business need.   Developing documentation, processes and formality without a positive organizational culture where understanding, discipline and skill are regarded as virtues in teams that have leaders with strong technical skills, initiative, communications skills and personal authority will not deliver the required value. ETIS Business Intelligence & Data Warehousing Working Group, Athens April 15, 2010