RAJASTHAN RAJY A VIDYUT PRASARAN NIGAM LIMITED
~e
[Corporate Identity Number(CIN) U40109RJ2000SGCOl6485j(AN [SO9001:2015CertifiedCompany)
I~/
I
Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)

? GST No.: 08AABCR8312AIZT1 PAN No.: AABCR8312A
OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting)e
SLOe-Building, Ajmer Road, Heerapura, Jaipur-302024
Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea((iJ.rvon.co.in
No.RVPN/SE(EA)IXENIREOSA/20 19-20/0. ?.<::J ~ ""1 Jaipur, dated: Cf I~::LC'")-c
FINALIZED RE-DSM ACCOUNT STATEMENT (Intra- State Deviation Chan:;es}
Issued to QCA: Issued for PSS: GIL Account:
RECONNECTENERGYSOLUTIONSPRIYATELIMITED PSS_132KY_DALOT_33KY_DALOT 1558006
(SLDCRenewableEnergyDSM FWld)
Address: SAPCODE: 1010903
1ST.NO IS.KRISHIKSARYODAYAFOUNDATION. Corresl!ondance Address of QCA: SAP Document No.:
OLDAIRPORTROAD.BANGALORE. 6340006168
Bengaluru(Bangalore)Urban,Kamataka RE Connect Energy Solution Pvt Ltd.,
PostalCod,: 560008 173 , A Sector, Scheme No. 54, Indore Issuinl: Date:
GSTNo.: 29AAFCR0074H3ZA MP-452010
AAFCR0074H (mithun. dube:!@reconnectenerg):.com)
19.03.2020
PAN No.:
Duration Description
RE DSM Intra-State
S.No. Deviation Charges*
1. 01.08.2019·31.08.2019
Final RE DSM Account Statement issued after rectifications (if applicable) in RE DSM
-1,22,737
Statement issued on dt. 14.11,2019
*: (+) & (_)means receivablefrom and payable to state deviation pool respectively(in Rupees), Valuesare rounded offto the nearest integer using Gaussian rounding.
Net Amount Payable by the QCA Net Amount Payable by the QCA (In Words)
n,22,737/- Rupees One Lakh Twenty Two Thousand Seven Hundred Thirty Seven Only
Remarks (if anl:l:
I. RE INTER-STATE Deviation Charges Account not issued as Inter State Rated capacity is zero for this PSS.
DUE DATE OF PAYMENT
FORTHEQCA
- ~~
17.04.2020
(J'""'riD'l
{i.e; 30 days from the date 0/issue 0/this
Executive Engineer (EA),
Statement) RVPN Jaiour
Please Note:-
1.The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make
payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund
(Alc No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior
Accounts Officer (LD), RVPN, Jaipur.
2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any.
3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in)
for accounting and to this office for information.
4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order
dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest@0.04%perday.
Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and
Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt.
27.10.2019, in case the payment is not made even after a lapse of 60 days from issuance of final DSM account, the
process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations.
~r
Superinten g g neer (Energy Accounting)
RVPN, Jaipur
Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action.
A~(Superintending Engineer (Energy Accounting)
RVPN, Jaipur
i
{8
RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED
[CorporateIdentityNumber(CIN) U40109RJ2000SGCOl6485j(AN ISO90012015Certified Company)
Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)
GST No.: 08AABCR8312AIZT, PAN No.: AABCR8312A
OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting)
~
SLDC-Building, Ajmer Road, Heerapura, Jaipur-302024
Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ealalrvpn.co.in
No.RVPN/SE(EA)IXENIREDSA/2019-201 D. ~/3a Jaipur, dated:  ~  ~'""l.;u
FINALIZED RE-DSM ACCOUNT STATEMENT !Intra- State Deviation Char&es}
Issued to QCA: Issued for PSS: GIL Account:
RECONNECTENERGYSOLUTIONSPRIVATELIMITED PSS_132KV_DALOT_KANGARH 1558006
(SLDC RenewableEnergyDSM Fund)
Address: SAPCODE: 1010904
1ST,NO IS,KRISHIKSARVODAYAFOUNDATION, Corresl!ondance Address of QCA: SAP Document No.:
OLDAIRPORTROAD,BANGALORE, 6340006/61
Bengaluru(Bangalore)Urban,Kamataka RE Connect Energy Solution Pvt Ltd.,
PostalCode:560008 173 , A Sector, Scheme No. 54, Indore Issuin& Date:
GSTNo.: 29AAFCR0074H3ZA MP-452010
(mithun.dubex@reconnectenerg):.com) 19.03.2020
PAN No.: AAFCR0074H
Description
RE DSM Intra-State
S.No. Duration Deviation Charges*
1. 01.08.2019·31.08.2019
Final RE DSM Account Statement issued after rectifications (if applicable) in RE DSM
-2,31,564Statement issued on dt. 14.11.2019.
*: (+) & (_)means receivablefrom and payable to state deviation pool respectively(in Rupees). Valuesare rounded offto the nearest integer using Gaussian rounding.
Net Amount Payable by the QCA Net Amount Payable by the QCA (In Words)
fl,31,564/- Rupees Two Lakhs Thirty One Thousand Five Hundred Sixty Four Only
Remarks !if anx}:
I. RE INTER-STATE Deviation Charges Account not issued as Inter State Rated capacity is zero for this PSS.
DUE DATE OF PAYMENT
FORTHEQCA
~ f'>r-rrn-17.04.2020
(i.e.30 days/rom the date of issue of this
Executive Engineer (EA),
Statement) RVPN. Jaipur
Please Note:-
I. The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make
payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund
(Alc No. 37534869390, IFSCIRTGS code: SBIN0031 026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior
Accounts Officer (LD), RVPN, Jaipur.
2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any.
3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in)
for accounting and to this office for information.
4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order
dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest@0.04%perday.
Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and
Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt.
27.10.2019, in case the payment is not made even after a lapse of 60 days from issuance of final DSM account, the
process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations.
superinte~~ccounting)
RVPN, Jaipur
Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action.
S'''ri''''~~''::''".'')RVPN, Jaipur
,vo;;c~ RAJASTHAN RAJY A VIDYUT PRASARAN NIGAM LIMITED
-...~~~~ [CorporateIdentity Number(CIN) U40109RJ2000SGCO16485J(AN ISO9001:2015CertifiedCompany)
r,~ ..
Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)II~ .
~ ii
GST No.: 08AABCR8312AIZT, PAN No.: AABCR8312A
W OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting)
SLOC-Building, Ajmer Road, Heerapura, Jaipur-302024
Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea@}rvpn.co.in
No.RVPN/SE(EA)IXENIREOSA/2019-20/0. ~'7<39 Jaipur, dated: "1~I f')...e::2-0
FINALIZED RE-DSM ACCOUNT STATEMENT (Intra- State Deviation Charzes)
Issued to QCA: Issued for PSS: GIL Account:
RECONNECTEJERGYSOLUTIONSPRIVATELIMITED PSS_132KV_KOLAYAT_RAYS 1558006
(SLDC RenewableEnergyDSM Fund)
Address: SAPCODE: 1010906
1ST.NO IS,KRISHIKSARVODAYAFOUNDATION. Corres(!ondance Address of QCA: SAP Document No.:
OLDAIRPORTROAD.BANGALORE. 634000611-0
Bengaluru (Bangalore)Urban,Kamataka RE Connect Energy Solution Pvt Ltd.,
PoslalCode:560008 173 , A Sector, Scheme No. 54, Indore Issuinl: Date:
GSTNo.: 29AAFCR0074H3ZA MP-452010
AAFCR0074H (mithun.dubex@reconnectenergx.com) 19.03.2020
PAN No.:
Duration Description
RE DSM Intra-State
S.No. Deviation Charges*
l. 01.08.20I9-31.08.2019
Final RE DSM AccountStatementissued afterrectifications(if applicable)in RE DSM
-76,422Statementissuedon dt. 14.11.2019
*: (+) & (-) means receivablefrom and payable to state deviation pool respectively(in Rupees), Valuesare rounded off to the nearest integer using Gaussian rounding.
Net Amount Payable by the QCA Net Amount Payable by the QCA (In Words)
f76,422/- Rupees Seventy Six Thousand Four Hundred Twenty Two Only
Remarks (if anl:l:
1. RE INTER-STATE Deviation Charges Account not issued as Inter State Rated capacity is zero for this PSS.
DUE DATE OF PAYMENT
FORTHEQCA
~~~17.04.2020
(i.e. 30 days from the date of issue of this
Executive Engineer (EA),
Statement) RVPN. Jaiour
Please Note:-
I. The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make
payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund
(Nc No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior
Accounts Officer (LD), RVPN, Jaipur.
2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any.
3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in)
for accounting and to this office for information.
4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order
dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest@0.04%perday.
Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and
Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt.
27.10.2019, in case the payment is not made even after a lapse of 60 days from issuance of final DSM account, the
process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations.
superint~·~yCounting)
RVPN, Jaipur
Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action.
superinte~~e~ l:counting)
RVPN, Jaipur
--- ----- -- - ---------------------------------
RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED
M ~~ [CorporateIdentityNumber(CIN) U40109RJ2000SGCO16485](ANISO9001.2015CertifiedCompany)
~ Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)
~
GSTNo.: 08AABCR8312AIZT, PAN No.: AABCR8312A
OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting)
SLDC-Building, Ajmer Road, Heerapura, Jaipur-302024
Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea({i!rvpn.co.in
No.RVPN/SE(EA)IXENIREDSA12019-201 D. ?..~40 Jaipur, dated:  q' !3'~2..0
FINALIZED RE-DSM ACCOUNT STATEMENT (Intra- State Deviation Charges)
Issued to QCA: Issued for PSS: GIL Account:
RECONNECTENERGYSOLUTIONSPRIVATELIMITED PSS_132KV_NOKHADHAIYA_3No_33KV 1558006
(SLDC RenewableEnergyDSM Fund)
Address: SAPCODE: 1010907
1ST.NO IS,KRISHIKSARVODAYAFOUNDATION, Corresl!ondance Address of QCA: SAP Document No.:
OLDAIRPORTROAD,BANGALORE, 634000 6 I 'Jf-I
Bengaluru(Bangalore)Urban,Karnataka RE Connect Energy Solution Pvt Ltd.,
Postal!:;ode:560008 173 , A Sector, Scheme No. 54, Indore Issuinl: Date:
GSTNo.: 29AAFCR0074H3ZA MP-452010
(mithun. dubey@reconnectenergy.com) 19.03.2020
PAN No.: AAFCR0074H
Description
RE DSM Intra-State
S.No. Duration Deviation Charges*
1. 01.08.2019·31.08.20I9
FinalRE DSM AccountStatementissuedafter rectifications(if applicable)in RE DSM
-13,223Statement issued on dt. 14_11.2019.
"': (+) & (_)means receivablefrom and payable to state deviation pool respectively(in Rupees). Valuesare rounded eff te the nearest integer using Gaussian rounding.
Net Amount Payable by the QCA Net Amount Payable by the QCA (In Words)
U3,223/- Rupees Thirteen Thousand Two Hundred Twenty Three Only
Remarks (if anl:l:
I. RE INTER-STATE Deviation Charges Account issued separately for this PSS.
DUE DATE OF PAYMENT
FORTHEQCA
~{}'m1
17.04.2020
(i.e. 30 days from the date of issue of this
Executive Engineer (EA),
Statement) RVPN. Jainur
Please Note:-
1.The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make
payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund
(Nc No.3 7534869390, IFSCIRTGS code: SBlN0031 026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior
Accounts Officer (LD), RVPN, Jaipur.
2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any.
3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in)
for accounting and to this office for information.
4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order
dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest@0.04%perday.
Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and
Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt.
27.10.2019, in case the payment is not made even after a lapse of60 days from issuance of final DSM account, the
process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations.
S'P'ri,,,~~r.:".,g)
RVPN, Jaipur
Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action.
superintend~~ACunting)
RVPN, Jaipur
~v;,";,~
RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED
[CorporateIdentityNumber(CIN) U40109RJ2000SGCO16485](AN ISO9001.2015CertifiedCompany)
,v-: ~ Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)!(1IV-::
~ .' GSTNo.: 08AABCR8312AIZT, PAN No.: AABCR8312A
I OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting)
I SLDC-Building, Ajmer Road, Heerapura, Jaipur-302024
Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ealalrvpn.co.in
No.RVPN/SE(EA)IXENIREDSA/2019-201 D. -::t..'?4J Jaipur, dated: 91n/~~
FINALIZED RE-DSM ACCOUNT STATEMENT (Intra- State Deviation Charl:es)
Issued to QCA: Issued for PSS: GILAccouut:
RECONNECTENERGYSOLUTIONSPRIVATELIMITED PSS_132KV_OSIAN_2No_33KV 1558006
(SLOCRenewableEnergyOSM Fund)
Address: SAPCODE: 1010908
1ST.NO IS, KRISHIKSARVODAYAFOUNDATION, Corresl!ondance Address of QCA: SAP Document No.:
OLDAIRPORTROAD,BANGALORE, 634000 6I '12-
Bengaluru(Bangalore)Urban,Karnataka RE Connect Energy Solution Pvt Ltd.,
Postal!:I!!!e:560008 173 , A Sector, Scheme No. 54, Indore Issuinl: Date:
GSTNo.: 29AAFCR0074H3ZA MP-452010
(mithun. dubey@reconnectenergy.com) 19.03.2020
PAN No.: AAFCR0074H
Description
RE DSM Intra-State
S.No. Duration Deviation Charges*
1. 01.08.2019-31.08.2019
Final RE DSM AccountStatementissued afterrectifications(if applicable)in RE DSM
-4,318Statementissuedon dt. 14.11.2019
*: (+) & H means receivable from and payable to state deviation pool respectively (in Rupees). Values are rounded off to the nearest integer using Gaussian rounding.
Net Amount Payable by the QCA Net Amount Payable by the QCA (In Words)
N,31S/- Rupees Four Thousand Three Hundred Eighteen Only
Remarks {if any}:
1. RE INTER-STATE Deviation Charges Account issued separately for this PSS.
DUE DATE OF PAYMENT
FORTHEQCA
~~n-Y17.04.2020
(i.e. 30 days from the date of issue of this
Executive Engineer (EA),
Statement) RVPN. Jaiour
Please Note:-
I.The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make
payments within 30 (thirty) days i.e, up to the above mentioned due date of payment into the "RE Generators State DPA Fund
(Alc No. 37534869390, IFSCIRTGS code: SBIN003 1026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior
Accounts Officer (LO), RVPN, Jaipur,
2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any.
3. Payment detail intimation should be furnished to Senior Accounts Officer (LO), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in)
for accounting and to this office for information.
4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order
dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest@0.04%perday.
Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and
Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt.
27. 10.2019, in case the payment is not made even after a lapse of 60 days from issuance of final DSM account, the
process to invoke BG shall be initiated besides any other action as per permissible law/Regulations.
S''''ri"~ r.;.EJa""""gjRVPN, Jaipur
Copy forwarded to the Senior Accounts Officer (LO), RVPN, Jaipur for information and necessary action.
S.~~)upermten ng n meer (Energy Accounting)
RVPN, Jaipur
~'=~~
RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED
'" ~ [CorporateIdentityNumber(CIN) U40I09RJ2000SGCOI6485](AN ISO9001.2015CertifiedCompany)
~ -, Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)
:,
,
W
GST No.: 08AABCR8312AIZT, PAN No.: AABCR8312A
"1
OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting)
SLDC-Building, Ajmer Road, Heerapura, Jaipur-302024
Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ealalrvon.co.in
No.RVPN/SE(EA)IXENIREDSAl2019-201 D. ~"74")_- Jaipur, dated: ~)gl~")...o
FINALIZED RE-DSM ACCOUNT STATEMENT {Intra- State Deviation Chara:es}
Issued to QCA: Issued for PSS: GIL Account:
RECONNECTENERGYSOLUTIONSPRIVATELIMITED PSS_I32KV_POKARAN_2NO_33KV 1558006
(SLDCRenewableEnergyDSM Fund)
Address: SAPCODE: 1010909
1ST.NO IS. KRISHIKSARVODAYAFOUNDATION, Corresl!ondance Address of QCA: SAP Document No.:
OLDAIRPORTROAD,BANGALORE. 634000 61'fJ
Bengaluru(Bangalore) Urban,Kamataka RE Connect Energy Solution Pvt Ltd.,
PostalCode:560008 173 , A Sector, Scheme No. 54, Indore Issuing Date:
GSTNo.: 29AAFCR0074H3ZA MP-452010
(mithun.dube:,:@reconnectenerg:,:.com)
19.03.2020
PAN No.: AAFCR0074H
Description
RE DSM Intra-State
S.No. Duration Deviation Charges*
1. 01.08.2019-31.08.2019
Final RE DSM AccountStatementissued afterrectifications(if applicable)in RE DSM
-24,480Statementissuedon dt. 14,11.2019
*: (+) & (_)means receivable from and payable to state deviation pool respectively (in Rupees). Values are rounded orr to the nearest integer using Gaussian rounding.
Net Amount Payable by the QCA Net Amount Payable by the QCA (In Words)
f24,480/- Rupees Twenty Four Thousand Four Hundred Eighty Only
Remarks (if an);):
I. RE INTER-STATE Deviation Charges Account issued separately for this PSS.
DUE DATE OF PAYMENT
FORTHEQCA
crr-h, ~ ryy;
17.04.2020
(i.e.30 days from the dllte of issue of thls
Executive Engineer (EA),
Statement) RVPN Jaiour
Please Note:-
I. The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make
payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund
(Alc No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior
Accounts Officer (LD), RVPN, Jaipur.
2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any.
3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in)
for accounting and to this office for information.
4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order
dt.27.09.20l9 otherwise the defaulting QCA shall have to pay simple interest@0.04%perday.
Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and
Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt.
27.10.2019, in case the payment is not made even after a lapse of60 days from issuance of final DSM account, the
process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations.
s.",;",~~C".,)RVPN, Jaipur
Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action.
s.P,ri.".J.t.!ler...;:, un".,)
RVPN, Jaipur
I
~~~~~
RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED
[Corporate Identity Number (CIN) U40 I09RJ2000SGCO I6485] (AN ISO 9001. 2015 Certified Company)
Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)
z GST No.: 08AABCR8312AIZT, PAN No.: AABCR8312A
OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting)
SLOC-Building, Ajmer Road, Heerapura, Jaipur-302024
Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.earcsrvon.co.in
No.RVPN/SE(EA)IXEN/REOSA/20 19-20/0. ":t."743- Jaipur, dated: ,,' s,,~').{)
FINALIZED RE-DSM ACCOUNT STATEMENT {Intra- State Deviation Char&es}
Issued to QCA: Issued for PSS: GIL Account:
RECONNECTENERGYSOLUTIONSPRIVATELIMITED PSS_132KV_PS3_8NO_33KV 1558006
(SLOCRenewableEnergyOSMFund)
Address: SAPCODE: 1010913
1ST.NO15.KRISHIKSARVODAYAFOUNDATION. Corresuondance Address of QCA: SAP Document No.:
OLDAIRPORTROAD.BANGALORE. 634000 6 I "14-
Bengaluru(Bangalore)Urban,Karnataka RE Connect Energy Solution Pvt Ltd.,
PostalCode:560008 173, A Sector, Scheme No. 54, Indore Issuin& Date:
GSTNo.: 29AAFCR0074H3ZA MP-452010
(mithun.dubex@reconnectenerg)C.com) 19.03.2020
PAN No.: AAFCR0074H
Duration Description
RE DSM Intra-State
S.No. Deviation Charges*
1. 01.08.2019-31.08.2019
Final RE DSM AccountStatementissuedafter rectifications(if applicable)in RE DSM
-1,38,151Statementissuedondt 14.11.2019
*: (+) & f-) means receivablefrom and payable to state deviation pool respectively(in Rupees). Valuesare rounded offto the nearest integer using Gaussian rounding.
NetAmountPayableby the QCA Net Amount Payable by the QCA (In Words)
n,38,1511- Rupees One Lakh Thirty Eight Thousand One Hundred Fifty One Only
Remarks {ifanx}:
1. RE INTER-STATE Deviation Charges Account issued separately for this PSS.
DUEDATEOF PAYMENT
FORTHEQCA
~ ~,.-yi)17.04.2020
(ie. 30 days from the dale of issue of this
Executive Engineer (EA),
Statement) RVPN. Jainur
Please Note:-
I. The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make
payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund
(Alc No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior
Accounts Officer (LD), RVPN, Jaipur.
2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any.
3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in)
for accounting and to this office for information.
4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order
dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest @0.04% per day.
Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and
Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt.
27.10.2019, in case the payment is not made even after a lapse of60 days from issuance of final DSM account, the
process to invoke BG shall be initiated besides any other action as per permissible law/Regulations,
superinte~~nrrgr:counting)
RVPN, Jaipur
Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action.
superinten~et!rcounting)
RVPN, Jaipur
,~..,,,,;;
I
RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED
[Corporate Identity Number (CIN) U40109RJ2000SGC016485] (AN ISO 9001.2015 Certified Company)
~. I Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)
~ GST No.: 08AABCR8312AIZT, PAN No.: AABCR8312A
OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting)
SLDC-Building, Ajmer Road, Heerapura, Jaipur-302024
Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea@,rvpn.co.in
No.RVPN/SE(EA)!XENIREDSA/20 19-201D. :t"74L1 Jaipur, dated:
~'!1'~'}-OFINALIZED RE-DSM ACCOUNT STATItMENT {Intra- State Deviation CharJ:es)

Issued to QCA: Issued for PSS: GIL Account:
RECONNECT ENERGY SOLUTIONS PRIVATE LIMITED PSS_ I32KV _PS3 _WELSPUN 1558006
(SLDe Renewable Energy DSM Fund)
Address: SAP CODE: 1010914
1ST, NO 15, KRISHIK SARVODAYA FOUNDATION, Corresl!ondance Address of QCA: SAP Document No.:
OLD AIRPORT ROAD, BAN GALORE, 634000 6 11-r-Bengaiuru (Bangalore) Urban, Kamataka RE Connect Energy Solution Pvt Ltd.,
Postal Code: 560008 173 , A Sector, Scheme No. 54, Indore IssuinJ: Date:
GSTNo.: 29AAFCR0074H3ZA MP - 452010
(mithun.dubex@reconnectenergy.com)
19.03.2020
PAN No.: AAFCR0074H
Description
RE DSM Intra-State
S.No. Duration Deviation Charges*
1. 01.08.2019-31.08.2019
Final RE DSM AccountStatementissuedafter rectifications(if applicable)in RE DSM
-23,680
Statementissuedon dt. 14.11.2019
": (+) & (_)means receivablefrom and payable to state deviation pool respectively(in Rupees). Valuesare rounded off to the nearest integer using Gaussian rounding.
Net Amount Payable by the QCA Net Amount Payable by the QCA (In Words)
f23,680/- Rupees Twenty Three Thousand Six Hundred Eighty Only
Remarks {ifanl:):
1. RE INTER-STATE Deviation Charges Account issued separately for this PSS.
DUE DATE OF PAYMENT
FORTHEQCA
~{}..~
17.04.2020
(i.e. 30dtl}'s/rom the date of issue of this
Executive Engineer (EA),
Statement) RVPN. Jainur
Please Note:-
1.The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make
payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund
(A/c No. 37534869390, IFSCIRTGS code: SBIN003I026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior
Accounts Officer (LD), RVPN, Jaipur.
2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any.
3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldcrgrvpn.co.in)
for accounting and to this office for information.
4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order
dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest@0.04%perday.
Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and
Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt.
27.10.2019, in case the payment is not made even after a lapse of 60 days from issuance of final DSM account, the
process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations.
superint~~J~y Accounting)
RVPN, Jaipur
Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action.
~~-'~ Superintend g ngineer n~ Accounting)
RVPN, Jaipur
•
RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED
[CorporateIdentityNumber(CIN) U40I09RJ2000SGCO16485](AN ISO900I. 2015CertifiedCompany)
Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)
GST No.: 08AABCR8312A1ZT, PAN No.: AABCR8312A
OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting)
SLDC-Building, Ajrner Road, Heerapura, Jaipur-302024
Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea(adrvpn.co.in
No.RVPN/SE(EA)IXENIREDSA/20 19-201D. =<-«J4r Jaipur, dated:  ~  sll-O ').0
FINALIZED RE-DSM ACCOUNT STATEMENT (Intra- State Deviation Charl:;es}
Issued to QCA: Issued for PSS: GILAccount:
RECONNECTENERGYSOLUTIONSPRIVATELIMITED PSS~132KV_RAMGARH~RVUN_GTPP 1558006
(SLOCRenewableEnergyOSM Fund)
Address: SAPCODE: 1010915
1ST,NO 15.KRISHIKSARVODAYAFOUNDATION. Corresl!ondance Address of QCA: SAP Document No.:
OLDAIRPORTROAD.BANGALORE. 634000 6 I"':/-6
Bengalum(Bangalore)Urban.Karnataka RE Connect Energy Solution Pvt Ltd.,
Postal~ode: 560008 173 , A Sector, Scheme No. 54, Indore Issuinl:; Date:
GSTNo.: 29AAFCR0074H3ZA MP-452010
(mithun.dube:,:@reconnectenerg:,:.com) 19.03.2020
PAN No.: AAFCR0074H
S.No. Duration Description
RE DSM Intra-State
Deviation Charges*
I. 01.08.20I9-31.08.2019
FinalRE DSM AccountStatementissued afterrectifications(if applicable)in RE DSM
-5,067Statementissuedon dt. 14.11.2019.
"":(+) & (_)means receivablefrom and payable to state deviation pool respectively(in Rupees). Valuesare rounded offto the nearest integer using Gaussian rounding.
Net Amount Payable by the QCA Net Amount Payable by the QCA (In Words)
f5,067/- Rupees Five Thousand Sixty Seven Only
Remarks !if anI}:
I. RE INTER-STATE Deviation Charges Account issued separately for this PSS.
DUE DATE OF PAYMENT
FORTHEQCA
~~~17.04.2020
(ie.30 days from the dale oj issue of this
Executive Engineer (EA),
Slalement) RVPN Jaiour
Please Note:-
I. The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make
payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund
(Nc No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior
Accounts Officer (LD), RVPN, Jaipur.
2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any.
3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in)
for accounting and to this office for information.
4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order
dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest@0.04%perday.
Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and
Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt.
27.10.2019, in case the payment is not made even after a lapse of60 days from issuance of final DSM account, the
process to invoke BG shall be initiated besides any other action as per permissible law/Regulations,
S'P"I,,~~,~,ro'"ti'g)
RVPN, Jaipur
Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action.
superin~J ~e~~r1Y Accounting)
RVPN, Jaipur
I
RAJASTHAN RAJY A VIDYUT PRASARAN NIGAM LIMITED
'~ I [CorporateIdentttyNumber(CIN) U40109RJ2000SGC016485](AN ISO9001.2015CertifiedCompany)
~/
 '
Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)II .
 . GST No.: 08AABCR8312AIZT, PAN No.: AABCR8312A
OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting)
SLDC-Building, Ajmer Road, Heerapura, Jaipur-302024
Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea(ii?rvpn.co.in
No.RVPN/SE(EA)IXENIREDSA/2019-201 D. ~'rrt.-fk Jaipur, dated: 9l!s1;;u,~
FINALIZED RE-DSM ACCOUNT STATEMENT (Intra- State Deviation Char~es)
Issued to QCA: Issued for PSS: GILAccount:
RECONNECTENERGYSOLUTIONSPRIVATELIMITED PSS_I32KV_RANI_RANI 1558006
(SLOC RenewableEnergyOSM Fund)
Address: SAPCODE: 1010916
1ST,NO IS,KRISHIKSARVODAYAFOUNDATION, Corres(!ondance Address of QCA: SAP Document No.:
OLDAIRPORTROAD,BANGALORE, 634000 6/:}-'1-
Bengaluru(Bangalore)Urban,Kamataka RE Connect Energy Solution Pvt Ltd"
PostalCode: 560008 173 , A Sector, Scheme No, 54, Indore Issuin~ Date:
GSTNo.: 29AAFCR0074H3ZA MP - 452010
AAFCR0074H (mithun,dube)::@reconnectener~,com) 19.03.2020
PAN No.:
Duration Description
RE DSM Intra-State
S.No. Deviation Charges*
1. oL08,20I9·31,08,2019
FinalRE DSM AccountStatementissued afterrectifications(if applicable)in RE DSM
-29,152Statementissuedondt.14.11.2019
*: (+) & (_)meansreceivablefromand payableto state deviationpoolrespectively(in Rupees),Valuesare roundedoffto the nearest integerusingGaussianrounding.
Net Amount Payable by the QCA Net Amount Payable by the QCA (In Words)
~29,152/- Rupees Twenty Nine Thousand One Hundred Fifty Two Only
Remarks {if an)::}:
1. RE INTER-STATE Deviation Charges Account not issued as Inter State Rated capacity is zero for this PSS,
DUE DATE OF PAYMENT
FORTHEQCA
~{.},«Yi17.04.2020
(i.e. 30 days from the date of issue of this
Executive Engineer (EA),
Statement) RVPN Jaiour
Please Note:-
1.The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make
payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund
(Alc No, 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior
Accounts Officer (LD), RVPN, Jaipur,
2, The payment should be accompanied with details of statement against which the payment is made along with LPS, if any,
3, Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldcrgrvpn.co.in)
for accounting and to this office for information,
4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order
dt.27,09,2019 otherwise the defaulting QCA shall have to pay simple interest @0,04% per day,
Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and
Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt.
27.10.2019, in case the payment is not made even after a lapse of60 days from issuance of final DSM account, the
process to invoke BG shall be initiated besides any other action as per permissible law/Regulations.
s.~~~ Accounting)
RVPN, Jaipur
Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action,
superint~ ~~n!: Accounting)
RVPN, Jaipur
~
RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED
~--
[Corporate Identity Number (CIN) U40109RJ2000SGCOl648Sj (AN ISO 9001.2015 Certified Company)
!llIh- Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)
~ '!I GST No.: 08AABCR8312AIZT, PAN No.: AABCR8312A
OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting)
SLDC-Building, Ajmer Road, Heerapura, Jaipur-302024
Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea!alrvpn.co.in
No.RVPN/SE(EA)IXENIREDSA/20 19-201 D. ';;J.....,47 Jaipur, dated:  ~ 'l1')_o~
FINALIZED RE-DSM ACCOUNT STATEMENT {Intra- State Deviation Charr:es}
Issued to QCA: Issued for PSS: GILAccount:
RECONNECT ENERGY SOLUTIONS PRIVATE LIMITED PSS~132KV ~SANWREEJ~SANWREEJ 1558006
(SLDC Renewable Energy DSM Fund)
Address: SAP CODE: 1010917
1ST, NO IS, KRISHIK SARVODAYAFOUNDATION, Corresl!ondance Address of QCA: SAP Document No.:
OLD AIRPORT ROAD, BANGALORE, 634oo0611g
Bengaluru (Bangalore) Urban, Kamataka RE Connect Energy Solution Pvt Ltd.,
Postal Code: 560008 173, A Sector, Scheme No. 54, Indore Issuinr: Date:
GSTNo.: 29AAFCR0074H3ZA MP-452010
PAN No.: AAFCR0074H (mithun.dubey@reconnectenergy.com) 19.03.2020
S.No. Duration Description
RE DSM Intra-State
Deviation Charges*
1. 01.08.2019-31.08.2019
Final RE DSM AccountStatementissuedafter rectifications(if applicable)in RE DSM
-28,238Statementissued on dt. 14.11.2019
*: (+) & (_)means receivablefrom and payable to state deviation pool respectively(in Rupees). Valuesare rounded offto the nearest integer using Gaussian rounding.
Net Amount Payable by the QCA Net Amount Payable by the QCA (In Words)
~28,238/- Rupees Twenty Eight Thousand Two Hundred Thirty Eight Only
Remarks {ifan):}:
1. RE INTER-STATE Deviation Charges Account issued separately for this PSS.
DUE DATE OF PAYMENT
FORTHEQCA
~O-.~17.04.2020
(i.e. 30 days/rom the date 0/ issue of this
Executive Engineer (EA),
Statement) RVPN. Jaiour
Please Note:-
I. The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make
payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the .oREGenerators State DPA Fund
(Nc No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior
Accounts Officer (LD), RVPN, Jaipur.
2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any.
3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in)
for accounting and to this office for information.
4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order
dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest@0.04%perday.
Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and
Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt.
27.10.2019, in case the payment is not made even after a lapse of60 days from issuance of final DSM account, the
process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations.
superi~f.!eC-Accounting)
RVPN, Jaipur
Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action.
ISuperintending ngineer ergy Accounting)
RVPN, Jaipur
p~---~ RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED
[CorporateIdentityNumber(CIN) U40109RJ2000SGC016485](AN ISO90012015CertifiedCompany)
~:- '!1)
Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)
~- ? GSTNo.: 08AABCR8312AIZT, PAN No.: AABCR8312A
OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting)
SLDC-Building, Ajmer Road, Heerapura, Jaipur-302024
Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea@rvpn.co.in
No. RVPN/SE(EA )/xEN IRED SA/20 19-201 D. ';)_.:yy & Jaipur, dated: ~ )n} '-o?zJ
FINALIZED RE-DSM ACCOUNT STATEMENT (Intra- State Deviation Charl:es}
Issued to QCA: Issued for PSS: GILAccount:
RECONNECTENERGYSOLUTIONSPRIVATELIMITED PSS_132KV_SHEO_SUZLON 1558006
(SLOe RenewableEnergyDSM Fund)
Address: SAPCODE: 1010918
1ST,NO 15,KRISHIKSARVODAYAFOUNDATION, Corresl!ondance Address of QCA: SAP Document No.:
OLDAIRPORTROAD,BANGALORE. 634000 617-9
Bengaluru(Bangalore)Urban,Kamataka RE Connect Energy Solution Pvt Ltd.,
PostalC!!!!e:560008 173 , A Sector, Scheme No. 54, Indore Issuinl: Date:
GSTNo.: 29AAFCR0074H3ZA MP - 452010
AAFCR0074H (mithun.dube)::@reconnectenerg)::.com) 19.03.2020
PAN No.:
S.No. Duration Description
RE DSM Intra-State
Deviation Charges*
1. 01.08.2019·31.08.2019 FinalRE DSM AccountStatementissuedafter rectifications(if applicable)in RE DSM
-10,511Statementissuedon dt. 14.11.2019
*: (+) & (-) means receivablefrom and payable to state deviation pool respectively(in Rupees). Valuesare rounded off to the nearest integer usin&Gaussian rounding.
Net Amount Payable by the QCA Net Amount Payable by the QCA (In Words)
nO,5111- Rupees Ten Thousand Five Hundred Eleven Only
Remarks (if any}:
1. RE INTER-STATE Deviation Charges Account not issued as Inter State Rated capacity is zero for this PSS.
DUE DATE OF PAYMENT
FORTHEQCA
0'"Y"Yr> (~~17.04.2020
(i.e. 30 days/rom tlte date of issue of this
Executive Engineer (EA),
Slatement) RVPN Jaipur
Please Note:-
1. The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make
payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund
(Alc No. 37534869390, IFSCIRTGS code: SBIN003 1026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior
Accounts Officer (LD), RVPN, Jaipur.
2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any.
3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in)
for accounting and to this office for information.
4. QCAs shall have to deposit the amount within 30 days of the issue ofthis finalized DSM account as per RERC Order
dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest@0.04%perday.
Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and
Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt.
27.10.2019, in case the payment is not made even after a lapse of60 days from issuance of final DSM account, the
process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations.
super~~~nC Accounting)
RVPN, Jaipur
Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action.
superin~~gr:-ccounting)
RVPN, Jaipur
I
RAJASTHAN RAJY A VIDYUT PRASARAN NIGAM LIMITED
[CorporateIdentityNumber(CIN) U40109RJ2000SGC01648Sl(AN ISO90012015CertifiedCompany)
Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)
GST No.: 08AABCR8312AIZT, PAN No.: AABCR8312A
OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting)
SLDC-Building, Ajrner Road, Heerapura, Jaipur-302024
Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea@rvpn.co.in
No.RVPN/SE(EA)IXENIREDSA/2019-201 D. ~-:-r4_9 Jaipur, dated: ~~l:le~FINALIZED RE-DSM ACCOUNT STATEMENT (Intra- State Deviation CharJ:es)
Issued to QCA: Issued for PSS: GIL Account:
RECONNECTENERGYSOLUTIONSPRIVATELIMITED PSS_220KV_BADISID_3NO_33KV 1558006
(SLOCRenewableEnergyOSM Fund)
Address: SAPCODE: 1010921
1ST,NO 15,KRISHIKSARVODAYAFOUNDATION, Corresl!ondance Address of QCA: SAP Document No.:
OLDAIRPORTROAD,BANGALORE, 634000 6180
BengaIuru(Bangalore) Urban,Karnataka RE Connect Energy Solution Pvt Ltd"
PostalCode:560008 173 , A Sector, Scheme No. 54, Indore IssuinJ: Date:
GSTNo.: 29AAFCR0074H3ZA MP-452010
AAFCR0074H (mithun.dubex@reconnectenergy.com) 19.03.2020
PAN No.:
s.xe. Duration Description
RE DSM Intra-State
Deviation Charges*
I. 01.08.2019-31.08.2019 Final RE DSM AccountStatementissued afterrectifications(if applicable)in RE DSM
-53,215Statementissuedon dr. 14.11.2019
*: (+) & (-) means receivablefrom and payable to state deviation pool respectively(in Rupees). Valuesare rounded off to the nearest integer using Gaussian rounding.
Net Amount Payable by the QCA Net Amount Payable by the QCA (In Words)
f53,2 I5/- Rupees Fifty Three Thousand Two Hundred Fifteen Only
Remarks {if anl:}:
1. RE lNTER-ST ATE Deviation Charges Account issued separately for this PSS.
DUE DATE OF PAYMENT
FORTHEQCA
~~~17.04.2020
(i.e. 30 days from the date of issue of this
Executive Engineer (EA),
Statement) RVPN Jaiour
Please Note:-
I. The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make
payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund
(Alc No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior
Accounts Officer (LD), RVPN, Jaipur.
2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any.
3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldcrgrvpn.co.in)
for accounting and to this office for information.
4. QCAs shall have to deposit the amount within 30 days of the issue ofthis finalized DSM account as per RERC Order
dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest @0.04% per day.
Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and
Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt.
27.10.2019, in case the payment is not made even after a lapse of60 days from issuance of final DSM account, the
process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations.
su~e)::counting)
RVPN, Jaipur
Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action.
superidl~nCy Accounting)
RVPN, Jaipur
~~~
RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED
[CorporateIdentityNumber(CIN)U40109RJ2000SGCOI6485](ANISO9001.2015CertifiedCompany)

Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)
Ij GST No.: 08AABCR8312AIZT, PAN No.: AABCR8312A
OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting)
SLDC-Building, Ajmer Road, Heerapura, Jaipur-302024
Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea@rvpn.co.in
No.RVPN/SE(EA)IXENIREDSAI20 19-201D. ;).._~~'"'D Jaipur, dated: ~~f~'l.o
FINALIZED RE-DSM ACCOUNT STATEMENT (Intra- State Deviation Charj:;es)
Issued to QCA: Issued for PSS: GIL Account:
RECONNECTENERGYSOLUTIONSPRIVATELIMITED PSS_220KV_BADISID_TERRAFORM 1558006
(SLDCRenewableEnergyDSMFund)
Address: SAPCODE: 1010922
1ST,NO15,KRISHIKSARVODAYAFOUNDATION, Corres(!ondance Address of QCA: SAP Document No.:
OLDAIRPORTROAD,BANGALORE, 634000 618{
Bengaluru(Bangalore)Urban,Kamataka RE Connect Energy Solution Pvt Ltd.,
PostalCode:560008 173 , A Sector, SchemeNo. 54, Indore Issuinr: Date:
GSTNo.: 29AAFCR0074H3ZA MP-452010
PAN No.: AAFCR0074H (mithun.dubey@reconnectenergy.com) 19.03.2020
S.No. Duration Description
RE DSM Intra-State
Deviation Charges*
1. 01.08.2019·31.08.2019 FinalRE DSM AccountStatementissued afterrectifications(if applicable)in RE DSM
-72,323Statementissuedon dt. 14.11.2019.
*: (+) & (-) means receivablefrom and payable to state deviation pool respectively(in Rupees). Valuesare rounded off to the nearest integer using Gaussian rounding.
NetAmountPayableby the QCA Net Amount Payable by the QCA (In Words)
~72,323/- Rupees Seventy Two Thousand Three Hundred Twenty Three Only
Remarks (if any}:
1. RE INTER-STATE Deviation Charges Account not issued as Inter State Rated capacity is zero for this PSS.
DUEDATEOF PAYMENT
FORTHEQCA
0""Y"Y'n (}, r-.-Y;
17.04.2020
(i.e. 30 days/rom the dateof issue of this Executive Engineer (EA),
Statement) RVPN. Jaipur
Please Note:-
1.The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make
payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund
(Alc No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior
Accounts Officer (LD), RVPN, Jaipur,
2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any.
3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in)
for accounting and to this office for information.
4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order
dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest@0.04%perday.
Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and
Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt.
27.10.2019, in case the payment is not made even after a lapse of 60 days from issuance of final DSM account, the
process to invoke BG shall be initiated besides any other action as per permissible law/Regulations,
S"",,",~~~1-~~J1b~~;A"'"'"")RVPN, Jaipur
Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action.
supe~~rW(gy Accounting)
RVPN, Jaipur
I
RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED
[CorporateIdentityNumber(CIN)U40109RJ2000SGCOl648Sj(AN ISO9001:2015CertifiedCompany)

Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)
~
GST No.: 08AABCR8312A1ZT, PAN No.: AABCR8312A
OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting)
SLDC-Building, Ajmer Road, Heerapura, Jaipur-302024
Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea@rvpn.co.in
No.RVPN/SE(EA)IXENIREDSAI2019-201 D. ~/s-J Jaipur, dated: ~?d)0
FINALIZED RE-DSM ACCOUNT STATEMENT (Intra- State Deviation Charl:es}
Issued to QCA: Issued for PSS: GIL Account:
RECONNECTENERGYSOLUTIONSPRIVATELIMITED PSS_220KV_BALOTRA_BALOTRA 1558006
(SLDCRenewableEnergyDSMFund)
Address: SAPCODE: 1010924
1ST,NO15,KRISHIKSARVODAYAFOUNDATION, Corresl!ondance Address of QCA: SAP Document No.:
OLDAIRPORTROAD,BANGALORE, 634000 6Is2-
Bengaluru(Bangalore)Urban,Karnataka RE Connect Energy Solution Pvt Ltd.,
PostalCode:560008 173 , A Sector, SchemeNo. 54, Indore Issuing Date:
GSTNo.: 29AAFCR0074H3ZA MP-452010
PAN No.: AAFCR0074H (mithun.dubex@reconnectenergy.com) 19.03.2020
S.No. Duration Description
RE DSM Intra-State
Deviation Charges*
1. 01.08.2019-31.08.2019 FinalRE DSM AccountStatementissued after rectifications(if applicable)in RE DSM
-2,709Statementissuedon dt. 14.11.2019.
"': (+) & (-) means receivablefrom and payable to state deviation pool respectively(in Rupees), Valuesare rounded off to the nearest integer using Gaussian rounding.
NetAmountPayableby the QCA Net Amount Payable by the QCA (In Words)
t2,709/- Rupees Two Thousand Seven Hundred Nine Only
Remarks (if aDl:):
I. RE INTER-STATE Deviation Charges Account issued separately for this PSS.
DUEDATEOF PAYMENT
FORTHEQCA
~(),~17.04.2020
(i.e. 30 days/rom the date of issue of this Executive Engineer (EA),
Statement) RVPN. Jaipur
Please Note:-
I. The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make
payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund
(Alc No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior
Accounts Officer (LD), RVPN, Jaipur.
2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any.
3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in)
for accounting and to this office for information.
4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order
dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest@0.04%perday.
Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and
Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt.
27.10.2019, in case the payment is not made even after a lapse of 60 days from issuance of final DSM account, the
process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations.
superint~J:~counting)
RVPN, Jaipur
Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action.
S""ri"".dJ~J :~,".t;.~RVPN, Jaipur
I
RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED
[Corporate Identity Number (CIN) U40109RJ2000SGCOl6485j (AN ISO 90012015 Certified Company)
Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)
GST No.: 08AABCR8312AIZT, PAN No.: AABCR8312A
OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting)
SLDC-Building, Ajmer Road, Heerapura, Jaipur-302024
Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea@rvpn.co.in
No.RVPN/SE(EA)IXENIREDSAI2019-201 D. ~ ry'S:"2--- Jaipur, dated:  ~ 'sl-.:;u,?:Q
FINALIZED RE-DSM ACCOUNT STATEMENT (Intra- State Deviation Charl:;es)
Issued to QCA: Issued for PSS: GIL Account:
RECONNECT ENERGY SOLUTIONS PRlV ATE LIMITED PSS~220KV ~BAP~14NO~33KV 1558006
(SLDC Renewable Energy DSM Fund)
Address: SAP CODE: 1010925
1ST, NO 15. KRISHIK SARVODAYA FOUNDATION, Corres(!ondance Address of QCA: SAP Document No.:
OLD AIRPORT ROAD, BANGALORE, 634000 bIg ~
Bengaluru (Bangalore) Urban, Karnataka RE Connect Energy Solution Pvt Ltd"
Postal Code: 560008 173 , A Sector, SchemeNo, 54, Indore Issuing Date:
GSTNo.: 29AAFCR0074H3ZA MP-452010
PAN No.: AAFCR0074H (mithun.dube)l@reconnectenergy.com) 19.03.2020
S.No. Duration Description
RE DSM Intra-State
Deviation Charges*
1. 01.08.2019-31.08.2019
Final RE DSM AccountStatementissued afterrectifications(if applicable)in RE DSM
-86,420Statementissuedon dt. 14.11.2019
"":(+) & (-) means receivablefrom and payable to state deviation pool respectively(in Rupees). Valuesare rounded offto the nearest integer using Gaussian rounding.
Net Amount Payable by the QCA Net Amount Payable by the QCA (In Words)
~86,420/- Rupees Eighty Six Thousand Four Hundred Twenty Only
Remarks (if an)::}:
I. RE INTER-STATE Deviation Charges Account issued separately for this PSS.
DUE DATE OF PAYMENT
FORTHEQCA
o'Y'YYl (1,.,..;;17.04.2020
(i.e.30 days from the date of issue of this Executive Engineer (EA),
Statement) RVPN Jaiour
Please Note:-
I. The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make
payments within 30 (thirty) days i.e, up to the above mentioned due date of payment into the "RE Generators State DPA Fund
(Alc No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior
Accounts Officer (LD), RVPN, Jaipur.
2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any.
3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in)
for accounting and to this office for information.
4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order
dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest@0.04%perday.
Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and
Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt,
27.10.2019, in case the payment is not made even after a lapse of60 days from issuance of final DSM account, the
process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations.
superin~~:e::ccounting)
RVPN, Jaipur
Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action.
S''''ri.~!Q~.h"",",,,,,,)RVPN, Jaipur
~~!~
RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED
[CorporateIdentityNumber(CIN):U40109RJ2000SGC016485](ANISO9001:2015CertifiedCompany)
, , '~
Regd, Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in). )
1) GST No.: 08AABCR8312AIZT, PAN No,: AABCR8312A
OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting)
SLDC-Building, Ajmer Road, Heerapura, Jaipur-302024
Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea@rvpn.co,in
No.RVPN/SE(EA)IXENIREDSA/20 19-201D. ~~~~ Jaipur, dated: ~ g1).o');D
FINALIZED RE-DSM ACCOUNT STATEMENT {Intra- State Deviation Charl::es)
Issued to QCA: Issued for PSS: GIL Account:
RECONNECTENERGYSOLUTIONSPRIVATELIMITED PSS_220KV_BAP_MAHINDRA 1558006
(SLDCRenewableEnergyDSMFund)
Address: SAPCODE: 1010926
1ST.NO15.KRISHIKSARVODAYAFOUNDATION. Corres(!ondance Address of QCA: SAP Document No.:
OLDAIRPORTROAD.BANGALORE. 634000 6 184-
Bengalum(Bangalore)urban.Karnataka RE Connect Energy Solution Pvt Ltd.,
PostalCode:560008 173, A Sector, SchemeNo. 54, Indore Issuing Date:
GSTNo.: 29AAFCR0074H3ZA MP-452010
PAN No.: AAFCR0074H (mithun.dubex@reconnectenergx.com) 19.03.2020
S.No. Duration Description
RE DSM Intra-State
Deviation Charges*
1. 01.08.2019-31.08.2019 FinalRE DSM AccountStatementissued afterrectifications(if applicable)in RE DSM
-33,064Statementissuedon dt. 14.11.2019
*: (+) & (-) means receivable from and payable to state deviation pool respectively (in Rupees). Values are rounded off to the nearest integer using Gaussian rounding.
NetAmountPayablebythe QCA Net Amount Payable by the QCA (In Words)
t33,064/- Rupees Thirty Three Thousand Sixty Four Only
Remarks {ifany}:
I. RE INTER-STATE Deviation Charges Account issued separately for this PSS.
DUEDATEOF PAYMENT
FORTHEQCA
~(hrrn17.04.2020
{i:e: 30 daysfrom the date of issue of this Executive Engineer (EA),
Statement) RVPN. Jaiour
Please Note:-
1.The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make
payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund
(Alc No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior
Accounts Officer (LD), RVPN, Jaipur.
2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any.
3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in)
for accounting and to this office for information.
4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order
dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest@0.04%perday.
Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and
Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt.
27.10.2019, in case the payment is not made even after a lapse of60 days from issuance of final DSM account, the
process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations.
~~~JSuperintending Engineer (Energy Accounting)
RVPN, Jaipur
Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action.
S'P"lnt.~ e~fA'W".,g)RVPN, Jaipur
RAJASTHAN RAJY A VIDYUT PRASARAN NIGAM LIMITED
[Corporate Identity Number (CIN) U40109RJ2000SGCO I6485j (AN ISO 9001: 2015 Certified Company)
Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)
GST No.: 08AABCR8312AIZT, PAN No.: AABCR8312A
OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting)
SLDC-Building, Ajmer Road, Heerapura, Jaipur-302024
Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea@rvpn.co.in
No.RVPN/SE(EA)IXENIREDSA!2019-201 D. ~'1.stJ Jaipur, dated: <1 'U~~FINALIZED RE-DSM ACCOUNT STATEMENT (Intra- State Deviation CharKes) I
Issued to QCA: Issued for PSS: GIL Account:
RECONNECT ENERGY SOLUTIONS PRIVATE LIMITED PSS_220KV _BHADLA_5No_33KV 1558006
(SLDC Renewable Energy DSM Fund)
Address: SAP CODE: 1010927
1ST, NO 15, KRISHIK SARVODAY A FOUNDATION. Corresl!ondance Address of QCA: SAP Document No.:
OLD AIRPORT ROAD, BANGALORE, 634000618 S
Bengaluru (Bangalore) Urban, Kamataka RE Connect Energy Solution Pvt Ltd.,
Postal Code: 560008 173 , A Sector, Scheme No. 54, Indore Issuing Date:
GSTNo.: 29AAFCR0074H3ZA MP-452010
PAN No.: AAFCR0074H (mithun.dubey@reconnectenergy.com) 19.03.2020
S.No. Duration Description
RE DSM Intra-State
Deviation Charges*
1. 01.08.2019-31.08.2019
Final RE DSM AccountStatementissued afterrectifications(if applicable)in RE DSM
-72,224Statementissuedon dr. 14.11.2019
It: (+) & (_)means receivablefrom and payable to state deviation pool respectively(in Rupees). Valuesare rounded offto the nearest integer using Gaussian rounding.
Net Amount Payable by the QCA Net Amount Payable by the QCA (In Words)
~72,224/- Rupees Seventy Two Thousand Two Hundred Twenty Four Only
Remarks (if an:!:):
l. RE lNTER-STATE Deviation Charges Account not issued as Inter State Rated capacity is zero for this PSS.
DUE DATE OF PAYMENT
FORTHEQCA
~r:h~17.04.2020
{i:e:30 days/rom the date of issue of this Executive Engineer (EA),
Statement) RVPN. Jaipur
Please Note:-
l.The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make
payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund
(Alc No. 37534869390, IFSCIRTGS code: SBlN0031026, Bank: SBJ,Collectrate Branch, JAIPUR) maintained by Senior
Accounts Officer (LD), RVPN, Jaipur.
2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any.
3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in)
for accounting and to this office for information.
4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order
dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest @0.04% per day.
Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and
Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt.
27.10.2019, in case the payment is not made even after a lapse of 60 days from issuance of final DSM account, the
process to invoke BG shall be initiated besides any other action as per permissible law/Regulations,
S"",~~~.J: Accounting)
RVPN, Jaipur
Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action.
~41h~Superintending Engineer (Energy Accounting)
RVPN, Jaipur
!
RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED
,
[CorporateIdentityNumber(CIN)U40109RJ2000SGC016485j(AN ISO90012015CertifiedCompany)
I
Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)
~ ;?i GST No.: 08AABCR8312AIZT, PAN No.: AABCR8312A
OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting)
SLDC-Building, Ajmer Road, Heerapura, Jaipur-302024
Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea@rvpn.co.in
No. RVPN/SE(EA)!XENIRED SA/20 19-201 D. '"::J..__~~ Jaipur, dated: 9.31~?e)FINALIZED RE-DSM ACCOUNT STATEMENT {Intra- State Deviation Char"es)
Issued to QCA: Issued for PSS: GIL Account:
RECONNECTENERGYSOLUTIONSPRIVATELIMITED PSS_220KV_BHAWAD_SNCA 1558006
(SLDCRenewableEnergyDSMFund)
Address: SAPCODE: 1010928
1ST,NO15,KRISHIKSARVODAYAFOUNDATION, Corres[!ondance Address of QCA: SAP Document No.:
OLDAIRPORTROAD,BANGALORE, 634000 -6 18-6
Bengaluru(Bangalore)Urban,Karnataka RE Connect Energy Solution Pvt Ltd.,
PostalCode:560008 173 , A Sector, SchemeNo. 54, Indore Issuin" Date:
GSTNo.: 29AAFCR0074H3ZA MP-452010
PAN No.: AAFCR0074H (mithun.dubex@reconnectenerg~{com) 19.03.2020
S.No. Duration Description
RE DSM Intra-State
Deviation Charges*
1. 01.08.2019-3.08.2019
Final RE DSM AccountStatementissued afterrectifications(if applicable)in RE DSM
-17,985Statementissuedon dt. 14.11.2019
": (+) & (-) means receivablefrom and payable to state deviation pool respectively(in Rupees). Valuesare rounded offto the nearest integer using Gaussian rounding.
NetAmountPayableby the QCA Net Amount Payable by the QCA (In Words)
U7,985/- Rupees Seventeen Thousand Nine Hundred Eighty Five Only
Remarks {ifanx):
1. RE INTER-STATE Deviation Charges Account not issued as Inter State Rated capacity is zero for this PSS.
DUEDATEOF PAYMENT
FORTHEQCA
oYYn ~ri'.17.04.2020
(i.e. 30 days/rom the date of issue of tnis
Executive Engineer (EA),
Statement) RVPN. Jaipur
Please Note:-
1.The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make
payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund
(Alc No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior
Accounts Officer (LD), RVPN, Jaipur.
2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any.
3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in)
for accounting and to this office for information.
4. QCAs shall have to deposit the amount within 30 days of the issue ofthis finalized DSM account as per RERC Order
dt.27.09.20l9 otherwise the defaulting QCA shall have to pay simple interest@0.04% per day.
Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and
Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt.
27.10.2019, in case the payment is not made even after a lapse of 60 days from issuance of final DSM account, the
process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations.
S . ~~£ A lng)upermten mg ngmee nergy ccountmg
RVPN, Jaipur
Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action.
~~J~
Superintending Engineer ~ergy Accounting)
RVPN, Jaipur
.~~
RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED
t
[CorporateIdentity Number(CIN)U40I09RJ2000SGCO16485](AN ISO90012015Certified Company)
{i !r' Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)

? GSTNo.: 08AABCR8312A1ZT, PAN No.: AABCR8312A~
OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting)
SLDC-Building, Ajmer Road, Heerapura, Jaipur-302024
Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea@rvpn.co.in
No.RVPN/SE(EA)IXENIREDSAI20 19-201 D. -;2._..-,s;t Jaipur, dated: t~lg-,?o~
FINALIZED RE-DSM ACCOUNT STATEMENT (Intra- State Deviation CharKes)
Issued to QCA: Issued for PSS: GIL Account:
RECONNECTENERGYSOLUTIONSPRlVATELIMITED PSS_220KV_GAJNER_8NO_33KV 1558006
(SLDCRenewableEnergyDSMFund)
Address: SAPCODE: 1010929
1ST,NOIS,KRISHIKSARVODAYAFOUNDATION, Corres(!ondance Address of QCA: SAP Document No.:
OLDAIRPORTROAD,BANGALORE, 634000 6 187-Bengaluru(Bangalore)Urban,Kamataka RE Connect Energy Solution Pvt Ltd.,
PostalCode:560008 173, A Sector, SchemeNo. 54, Indore IssuinK Date:
GSTNo.: 29AAFCR0074H3ZA MP-452010
PAN No.: AAFCR0074H (mithun.dube)C@reconnectenerg)C.com) 19.03.2020
S.No. Duration Description
RE DSM Intra-State
Deviation Charges*
1. 01.08.2019-31.08.2019 FinalRE DSM AccountStatementissued after rectifications(if applicable)in RE DSM
-1,39,065Statementissuedondt.14.11.2019
OIl: (+) & (_)means receivablefrom and payable to state deviation pool respectively(in Rupees), Valuesare rounded off to the nearest integer using Gaussian rounding.
NetAmountPayableby the QCA Net Amount Payable by the QCA (In Words)
n,39,065/- Rupees One Lakh Thirty Nine Thousand Sixty Five Only
Remarks {ifanl:}:
1. RE INTER-STATE Deviation Charges Account issued separately for this PSS.
DUEDATEOF PAYMENT
FORTHEQCA
Orrn Q,~17.04.2020
(i.e. 30 days from the date of issue of this Executive Engineer (EA),
Statement) RVPN. Jaiour
Please Note:-
1.The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make
payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund
(A/c No. 37534869390, IFSCIRTGS code: SBIN0031026,Bank: SBl, Collectrate Branch, JAIPUR) maintained by Senior
Accounts Officer (LD), RVPN, Jaipur.
2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any.
3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in)
for accounting and to this office for information.
4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order
dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest@0.04%perday.
Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and
Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt.
27.10.2019, in case the payment is not made even after a lapse of60 days from issuance of final DSM account, the
process to invoke BG shall be initiated besides any other action as per permissible law/Regulations,
superi~~e'Accounting)
RVPN, Jaipur
Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action.
superi~ ~e[gy Accounting)
RVPN, Jaipur
RAJASTHAN RAJY A VIDYUT PRASARAN NIGAM LIMITED
A<;
[Corporate Identity Number (CIN) U40109RJ2000SGC016485] (AN ISO 9001: 2015 Certified Company)
Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)
~ V GST No.: 08AABCR8312AIZT, PAN No.: AABCR8312A
OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting)
SLOC-Building, Ajmer Road, Heerapura, Jaipur-302024
Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea(Zilrvpn.co.in
No.RVPN/SE(EA)/xENIREOSA/2019-20/0. Q"7S7 Jaipur, dated:  ~  &!:).-O"")0
FINALIZED RE-DSM ACCOUNT STATEMENT (Intra- State Deviation Charl:es}
Issued to QCA: Issued for PSS: GILAccount:
RECONNECT ENERGY SOLUTIONS PRIVATE LIMITED PSS_220KV _GAJNR_MAHINDRA_SUSTEN 1558006
(SLDe Renewable Energy DSM Fund)
Address: SAP CODE: 1010930
1ST, NO 15. KRISHIK SARVODA YA FOUNDATION, Corres[!ondance Address of QCA: SAP Document No.:
OLD AIRPORT ROAD, BANGALORE, 634000 6 (g~
BengaIuru (Bangalore) Urban, Kamataka RE Connect Energy Solution Pvt Ltd.,
Postal Code: 560008 173, A Sector, Scheme No. 54, Indore Issuing Date:
GSTNo.: 29AAFCR0074H3ZA MP - 452010
PAN No.: AAFCR0074H (mithun.dubey@reconnectenergy.com) 19.03.2020
S.No. Duration Description
RE DSM Intra-State
Deviation Charges*
1. 01.08.2019-31.08.2019
Final RE DSM AccountStatementissued after rectifications(if applicable)in RE DSM
-86,201Statementissuedondt.14.11.2019
": (+) & (-) means receivable from and payable to state deviation pool respectively (in Rupees), Values are rounded off to the nearest integer using Gaussian rounding.
Net Amount Payable by the QCA Net Amount Payable by the QCA (In Words)
~86,201/- Rupees Eighty Six Thousand Two Hundred One Only
Remarks {ifan):}:
I. RE INTER-STATE Deviation Charges Account not issued as Inter State Rated capacity is zero for this PSS.
DUE DATE OF PAYMENT
FORTHEQCA
o-rr-n t1rr=;:;17.04.2020
(i.e. 30 days from the date of issue of this
Executive Engineer (EA),
Statement) RVPN. Jaipur
Please Note:-
I. The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make
payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund
(Alc No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior
Accounts Officer (LO), RVPN, Jaipur.
2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any.
3. Payment detail intimation should be furnished to Senior Accounts Officer (LO), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in)
for accounting and to this office for information.
4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order
dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest@0.04%perday.
Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and
Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt.
27.10.2019, in case the payment is not made even after a lapse of60 days from issuance of final DSM account, the
process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations.
super~~~Jrgy Accounting)
RVPN, Jaipur
Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action.
S""'ri.~~~tO""H")RVPN, Jaipur
I RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED
j,£
.~ [CorporateIdentityNumber(CIN) U40109RJ2000SGCOl6485j(AN ISO90012015CertifiedCompany)
!~b Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)
~ I ~
) GSTNo.: 08AABCR8312AIZT, PAN No.: AABCR8312A~
OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting)
SLDC-Building, Ajrner Road, Heerapura, Jaipur-302024
Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea@rvpn.co.in
No.RVPN/SE(EA)!XENfREDSA/20 19-201D. ";;2_~~ Jaipur, dated: ~ '~~!>-Oo::m
FINALIZED RE-DSM ACCOUNT STATEMENT {Intra- State Deviation Chaq:;es}
Issued to QCA: Issued for PSS: GILAccount:
RECONNECTENERGYSOLUTIONSPRIVATELIMITED PSS_220KV_GULABPURA_GULABPURA 1558006
(SLDC RenewableEnergyDSM Fund)
Address: SAPCODE: 1010931
1ST,NO 15,KRISHIKSARVODAYAFOUNDATION, Corres(!ondance Address of QCA: SAP Document No.:
OLDAIRPORTROAD,BANGALORE. 634000 6 Igg
Bengaluru(Bangalore) Urban,Karnataka RE Connect Energy Solution Pvt Ltd.,
PostalCode: 560008 173 , A Sector, Scheme No. 54, Indore Issuinl: Date:
GSTNo.: 29AAFCR0074H3ZA MP-452010
AAFCR0074H (mithun.dubex@reconnectenergx.com) 19.03.2020
PAN No.:
S.No. Duration Description
RE DSM Intra-State
Deviation Charges*
1. 01.08.2019-31.08.20I9 Final RE DSM AccountStatementissued afterrectifications(if applicable)in RE DSM
-7,508Statementissuedon dt. 14.11.2019
-: (+) & (-) meansreceivablefromand payableto state deviationpoolrespectively(inRupees).Valuesare roundedoffto the nearestintegerusingGaussianrounding.
Net Amount Payable by the QCA Net Amount Payable by the QCA (In Words)
f7,508/- Rupees Seven Thousand Five Hundred Eight Only
Remarks {if an:::}:
1. RE INTER-STATE Deviation Charges Account issued separately for this PSS.
DUE DATE OF PAYMENT
FORTHEQCA
Oy~~~
17.04.2020
{i:e: 30 days/rom the date of issue of this
Executive Engineer (EA),
Statement) RVPN Jainur
Please Note:-
1. The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make
payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund
(A/c No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior
Accounts Officer (LD), RVPN, Jaipur.
2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any.
3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in)
for accounting and to this office for information.
4. QCAs shall have to deposit the amount within 30 days of the issue ofthis finalized DSM account as per RERC Order
dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest@0.04%per day.
Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and
Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt.
27.10.2019, in case the payment is not made even after a lapse of60 days from issuance of final DSM account, the
process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations.
S"P,,~~,C,"".ti.~RVPN, Jaipur
Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action.
S""ri"t?tf.l.~y c.;RVPN, Jaipur
~~"~
RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED
£.-:-:.. .... ;~fJ) [CorporateIdentityNumber(CIN)U40I09RJ2000SGCO164851(AN ISO900I. 2015CertifiedCompany)
'li  I Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)!i
 i/ GSTNo.: 08AABCR8312AIZT, PAN No.: AABCR8312A
OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting)
SLDC-Building, Ajmer Road, Heerapura, Jaipur-302024
Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea(Q!rvpn.co.in
No.RVPN/SE(EA)IXENIREDSA12019-201 D. 'Z.7st; Jaipur, dated: ~ ~f.).c?O
FINALIZED RE-DSM ACCOUNT STATEMENT (Intra- State Deviation Charges} I
Issued to QCA: Issued for PSS: GILAccount:
RECONNECTENERGYSOLUTIONSPRlVATELIMITED PSS_220KV_KANASAR_2NO_33KV 1558006
(SLDCRenewableEnergyDSMFund)
Address: SAPCODE: 1010932
1ST,NO15,KRISHIKSARVODAYAFOUNDATION, Corresuondance Address of QCA: SAP Document No.:
OLDAIRPORTROAD,BANGALORE, 634000 6 (3D
Bengaluru(Bangalore)Urban,Karnataka RE Connect Energy Solution Pvt Ltd.,
PostalCode:560008 173 , A Sector, SchemeNo. 54, Indore Issuing Date:
GSTNo.: 29AAFCR0074H3ZA MP-452010
PAN No.: AAFCR0074H (mithun.dubex@reconnectenergx·com) 19.03.2020
S.No. Duration Description
RE DSM Intra-State
Deviation Charges*
1. 01.08.2019-31.08.2019
FinalRE DSM AccountStatementissuedafter rectifications(if applicable)in RE DSM
-85,974Statementissuedon dt. 14.11.2019
*: (+) & (-)means receivable from and payable to state deviation pool respectively (in Rupees). Values are rounded off to the nearest integer using Gaussian rounding.
NetAmountPayableby the QCA Net Amount Payable by the QCA (In Words)
~85,974/- Rupees Eighty Five Thousand Nine Hundred Seventy Four Only
Remarks {ifany}:
I. RE INTER-STATE Deviation Charges Account not issued as Inter State Rated capacity is zero for this PSS.
DUEDATEOF PAYMENT
FORTHEQCA
~iJ,wn17.04.2020
(i.e. 30 days from the date of issue of this
Executive Engineer (EA),
Statement) RVPN Jaipur
Please Note:-
I. The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make
payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund
(Alc No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior
Accounts Officer (LD), RVPN, Jaipur.
2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any.
3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in)
for accounting and to this office for information.
4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order
dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest @0.04% per day.
Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and
Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt.
27.10.2019, in case the payment is not made even after a lapse of 60 days from issuance of final DSM account, the
process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations.
S""'ri"r.dl~AttO""""g)
RVPN, Jaipur
Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action.
superin~~~Accounting)
RVPN, Jaipur
-:::.~::-.. RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED
~ .. [CorporateIdentityNumber(CIN) U40109RJ2000SGC016485](AN ISO9001:2015CertifiedCompany)
Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)
 ,, GST No.: 08AABCR8312AIZT, PAN No.: AABCR8312A
OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting)
SLDC-Building, Ajrner Road, Heerapura, Jaipur-302024
Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea@rvpn.co.in
No.RVPN/SE(EA)IXENIREDSA/20 19-201D. ?-.._~bO Jaipur, dated: '0'~1~wFINALIZED RE-DSM ACCOUNT STATEMENT (Intra- State Deviation Charl:;es) I
Issued to QCA: Issued for PSS: GIL Account:
RECONNECTENERGYSOLUTIONSPRlVATELIMITED PSS_220KV_KANASAR_SP_pv 1558006
(SLDC RenewableEnergyDSM Fund)
Address: SAPCODE: 1010933
1ST.NO IS. KRISHIKSARVODAYAFOUNDATION. Corresl!ondance Address of QCA: SAP Document No.:
OLDAIRPORTROAD.BANGALORE. 634000 (; 13[
Bengaluru(Bangalore)Urban.Karnataka RE Connect Energy Solution Pvt Ltd.,
PostalCode: 560008 173 , A Sector, Scheme No. 54, Indore Issuinl:; Date:
GSTNo.: 29AAFCR0074H3ZA MP-452010
PAN No.: AAFCR0074H (mithun. dubex@reconnectenergx.com) 19.03.2020
S.No. Duration Description
RE DSM Intra-State
Deviation Charges*
1. 01.08.2019-31.08.2019 Final RE DSM AccountStatementissued afterrectifications(if applicable)in RE DSM
-55,522Statementissuedon dt. 14.11.2019
*: (+) & (-) means receivablefrom and payable to state deviation pool respectively(in Rupees). Valuesare rounded off to the nearest integer using Gaussian rounding.
Net Amount Payable by the QCA Net Amount Payable by the QCA (In Words)
~55,522/- Rupees Fifty Five Thousand Five Hundred Twenty Two Only
Remarks (if anxl:
1. RE INTER-STATE Deviation Charges Account not issued as Inter State Rated capacity is zero for this PSS.
DUE DATE OF PAYMENT
FORTHEQCA
~(},,~17.04.2020
(i.e. 30 days/rom the date of issue of this
Executive Engineer (EA),
Statement) RVPN Jainur
Please Note:-
I. The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make
payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund
(Alc No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior
Accounts Officer (LD), RVPN, Jaipur.
2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any.
3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in)
for accounting and to this office for information.
4. QCAs shall have to deposit the amount within 30 days of the issue ofthis finalized DSM account as per RERC Order
dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest@0.04%per day.
Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and
Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt.
27.10.2019, in case the payment is not made even after a lapse of60 days from issuance of final DSM account, the
process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations.
Supe en i ngineer ( ~J::ounting)
RVPN, Jaipur
Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action.
S"p'ri""~L,, ou nting)
RVPN, Jaipur
RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED
[CorporateIdentityNumber(CIN) U40109RJ2000SGC016485](ANISO9001.2015CertifiedCompany)
Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)
GST No.: 08AABCR8312AIZT, PAN No.: AABCR8312A
OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting)
SLDC-Building, Ajrner Road, Heerapura, Jaipur-302024
Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ealalrvpn.co.in
No.RVPN/SE(EA)IXENIREDSA/20 19-201D. ~~61 Jaipur, dated: ',~,~?OFINALIZED RE-DSM ACCOUNT STATEMENT {Intra- State Deviation Char~esl
Issued to QCA: Issued for PSS: GIL Account:
RECONNECTENERGYSOLUTIONSPRIVATELIMITED PSS~220KV~KHINWSAR~KHINWSAR 1558006
(SLDCRenewableEnergyDSMFund)
Address: SAPCODE: 1010934
1ST.NO15.KRISHIKSARVODAYAFOUNDATION. Corres[!ondance Address of QCA: SAP Document No.:
OLDAIRPORTROAD,BANGALORE. 634000 6 192-
Bengaluru(Bangalore)Urban,Kamataka RE Connect Energy Solution Pvt Ltd.,
PostalCode:560008 173 , A Sector, Scheme No. 54, Indore Issuin~ Date:
GSTNo.: 29AAFCR0074H3ZA MP-452010
PAN No.: AAFCR0074H (mithun.dubey@reconnectenerg)C.com) 19.03.2020
S.No. Duration Description
RE DSM Intra-State
Deviation Charges*
1. 0108.2019-31.08.2019 Final RE DSM AccountStatementissuedafterrectifications(if applicable)in RE DSM
-6,602Statementissuedon dt. 14.11,2019
-: (+) & (-) means receivablefrom and payable to state deviation pool respectively(in Rupees), Valuesare rounded off to the nearest integer using Gaussian rounding.
NetAmountPayableby the QCA Net Amount Payable by the QCA (In Words)
f6,602/- Rupees Six Thousand Six Hundred Two Only
Remarks (if anl:l:
1. RE INTER-STATE Deviation Charges Account not issued as Inter State Rated capacity is zero for this PSS.
DUEDATEOF PAYMENT
FORTHEQCA
~(1rm17.04.2020
(i.e. 30 days/rom the date of issue of this
Executive Engineer (EA),
Statement) RVPN. Jainur
Please Note:-
1.The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make
payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund
(Alc No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior
Accounts Officer (LD), RVPN, Jaipur.
2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any.
3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in)
for accounting and to this office for information.
4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order
dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest@0.04%perday.
Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and
Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt.
27.10.2019, in case the payment is not made even after a lapse of60 days from issuance of final DSM account, the
process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations.
supe~n~Accounting)
RVPN, Jaipur
Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action.
~~ -Superi tend g Engineer (~g~ Accounting)
RVPN, Jaipur
RAJASTHAN RAJY A VIDYUT PRASARAN NIGAM LIMITED
[CorporateIdentityNumber(CIN) U40109RJ2000SGCO16485J(AN ISO9001.2015CertifiedCompany)
 Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)
~ ;! GST No.: 08AABCR8312AIZT, PAN No.: AABCR8312A
OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting)
SLDC-Building, Ajmer Road, Heerapura, Jaipur-302024
Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea(a2rvpn.co.in
No.RVPN/SE(EA)IXENIREDSA/2019-201 D. 'a_'1b~ Jaipur, dated: ~~~?-O
FINALIZED RE-DSM ACCOUNT STATEMENT {Intra- State Deviation Char~es)
Issued to QCA: Issued for PSS: GIL Account:
RECONNECTENERGYSOLUTIONSPRIVATELIMITED PSS_220KV_PRATAPGARH_DEVGARH 1558006
(SLDCRenewableEnergyDSMFund)
Address: SAPCODE: 1010935
1ST.NO15.KRISHIKSARVODAYAFOUNDATION. Corresl!ondance Address of QCA: SAP Document No.:
OLDAIRPORTROAD.BANGALORE. 634000 6 f ~ .5
Bengaluru(Bangalore)Urban.Kamataka RE Connect Energy Solution Pvt Ltd.,
PostalCode:560008 173 , A Sector, Scheme No. 54, Indore Issuin~ Date:
GSTNo.: 29AAFCR0074H3ZA MP - 452010
PAN No.: AAFCR0074H (mithun.dubex@reconnectenergy.com) 19.03.2020
S.No. Duration Description
RE DSM Intra-State
Deviation Charges*
1. 01.08.2019-31.08.2019
Final RE DSM AccountStatementissuedafter rectifications(if applicable)in RE DSM
-2,48,958Statementissuedondt.14.11.2019
*: (+) & (-) means receivablefrom and payable to state deviation pool respectively(in Rupees). Valuesare rounded offto the nearest integer using Gaussian rounding.
NetAmountPayableby the QCA Net Amount Payable by the QCA (In Words)
n,48,958/- Rupees Two Lakhs Forty Eight Thousand Nine Hundred Fifty Eight Only
Remarks {ifanx}:
I. RE INTER-STATE Deviation Charges Account not issued as Inter State Rated capacity is zero for this PSS.
DUEDATEOF PAYMENT
FORTHEQCA
~~ry-r17.04.2020
(i.e. 30 days/rom the date of issue of this
Executive Engineer (EA),
Statement) RVPN. Jainur
Please Note:-
I. The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make
payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund
(Alc No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBJ,Collectrate Branch, JAIPUR) maintained by Senior
Accounts Officer (LD), RVPN, Jaipur.
2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any.
3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in)
for accounting and to this office for information.
4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order
dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest@0.04%per day.
Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and
Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt.
27.10.2019, in case the payment is not made even after a lapse of 60 days from issuance of final DSM account, the
process to invoke BG shall be initiated besides any other action as per permissible law/Regulations.
superi~~~nJ.gy Accounting)
RVPN, Jaipur
Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action.
superint~~~[counting)
RVPN, Jaipur
t!i};"'i;;~ I
RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED
[Corporate Identity Number (CIN) U40109RJ2000SGCO 16485J (AN ISO 9001. 2015 Certified Company)
I
Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)II
i~
; GST No.: 08AABCR8312AIZT, PAN No.: AABCR8312A
OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting)
SLDC-Building, Ajmer Road, Heerapura, Jaipur-302024
Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.e<l@r"2_n.co.in
No.RVPN/SE(EA)!XENIREDSA/20 19-201D. ~..,63 Jaipur, dated: :l~1~'U)
FINALIZED RE-DSM ACCOUNT STATEMENT (Intra- State Deviation Char&es}
Issued to QCA: Issued for PSS: GIL Account:
RECONNECT ENERGY SOLUTIONS PRIVATE LIM[TED PSS_220KV _PRT APGRH_ WELSPUN_TATA 1558006
(SLDC Renewable Energy DSM Fund)
Address: SAP CODE: [0[0936
1ST, NO 15, KRISHIK SARVODAY A FOUNDATION, Corresl!ondance Address of QCA: SAP Document No.:
OLD AIRPORT ROAD, BAN GALORE, 634000 -61..94-
Bengaluru (Bangalore) Urban, Karnataka RE Connect Energy Solution Pvt Ltd.,
Postal Code: 560008 173, A Sector, Scheme No. 54, Indore Issuinl/:Date:
GSTNo.: 29AAFCR0074H3ZA MP-452010
PAN No.: AAFCR0074H (mithun.dubey@reconnectenergy.com) 19.03.2020
S.No. Duration Description
RE DSM Intra-State
Deviation Charges*
1. 0108.2019·31.08.2019
Final RE DSM AccountStatementissuedafter rectifications(if applicable)in RE DSM
-87,138Statementissuedon dt. 14.11.2019
*: (+) & (-) means receivablefrom and payable to state deviation pool respectively(in Rupees). Valuesare rounded off to the nearest integer using Gaussian rounding.
Net Amount Payable by the QCA Net Amount Payable by the QCA (In Words)
f87,138/- Rupees Eighty Seven Thousand One Hundred Thirty Eight Only
Remarks (if any}:
1. RE INTER-STATE Deviation Charges Account not issued as Inter State Rated capacity is zero for this PSS.
DUE DATE OF PAYMENT
FORTHEQCA
~(hrrn17.04.2020
(i.e. 30daJ'sjrom tire date ofissueoftlris Executive Engineer (EA),
Statement) RVPN. Jaipur
Please Note:·
I. The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make
payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund
(Alc No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior
Accounts Officer (LD), RVPN, Jaipur.
2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any.
3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in)
for accounting and to this office for information.
4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order
dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest @0.04% per day.
Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and
Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt.
27.10.2019, in case the payment is not made even after a lapse of60 days from issuance of final DSM account, the
process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations.
superi~~J~~-Accounting)
RVPN, Jaipur
Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action.
S""'ri","~.~~.ct;.g)
RVPN, Jaipur
I!!}/'iil';'~
RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED
[CorporateIdentity Number(CIN) U40109RJ2000SGCO16485](AN ISO9001.2015CertifiedCompany)
i!lI ~- Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)
 ,!
GST No.: 08AABCR8312AIZT, PAN No.: AABCR8312A~
OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting)
SLDC-Building, Ajmer Road, Heerapura, Jaipur-302024
Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea@rvpn.co.in
No.RVPN/SE(EA)IXENIREDSA/20 19-201D. ':l._764 Jaipur, dated: t~~'~~FINALIZED RE-DSM ACCOUNT STATEMENT (Intra- State Deviation Chara:;es)
Issued to QCA: Issued for PSS: GIL Account:
RECONNECTENERGYSOLUTIONSPRIVATELIMITED PSS_220KV_TlNWARI_3NO_33KV 1558006
(SLOCRenewableEnergyOSM Fund)
Address: SAPCODE: 1010937
1ST.NO 15.KRISHIKSARVODAYAFOUNDATION, Corresl2ondance Address of QCA: SAP Document No.:
OLDAIRPORTROAD.BANGALORE, 634000619r
Bengaluru(Bangalore)Urban,Karnataka RE Connect Energy Solution Pvt Ltd.,
PostalCode: 560008 173 , A Sector, Scheme No. 54, Indore Issuina:; Date:
GSTNo.: 29AAFCR0074H3ZA MP-452010
PAN No.: AAFCR0074H (mithun.dubey@reconnectenergy.com) 19.03.2020
S.No. Duration Description
RE DSM Intra-State
Deviation Charges*
1. 01.08.2019-31.08.2019 FinalRE DSM AccountStatementissued after rectifications(if applicable)in RE DSM
-9,730Statementissuedondt.14.11.2019.
*: (+) & (-)means receivablefrom and payable to state deviation pool respectively(in Rupees). Valuesare rounded off to the nearest integer using Gaussian rounding.
Net Amount Payable by the QCA Net Amount Payable by the QCA (In Words)
f9,730/- Rupees Nine Thousand Seven Hundred Thirty Only
Remarks (if any):
1. RE INTER-STATE Deviation Charges Account issued separately for this PSS.
DUE DATE OF PAYMENT
FORTHEQCA
~().._n-=n17.04.2020
(i.e. 30 daysfrom the date of issue of this Executive Engineer (EA),
Statement) RVPN. Jaipur
Please Note:-
I. The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make
payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund
(Alc No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: S8I, Collectrate Branch, JAIPUR) maintained by Senior
Accounts Officer (LD), RVPN, Jaipur.
2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any.
3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in)
for accounting and to this office for information.
4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order
dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest@0.04%perday.
Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and
Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt.
27.10.2019, in case the payment is not made even after a lapse of60 days from issuance of final DSM account, the
process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations.
S",,".a.A~.J:,"".tI"1RVPN, Jaipur
Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action.
S"""''''~~~;'"""tI''1RVPN, Jaipur
I
RAJASTHAN RAJY A VIDYUT PRASARAN NIGAM LIMITED
[CorporateIdentityNumber(CIN) U40109RJ2000SGCOI6485] (AN ISO 9001 2015 CertifiedCompany)
Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)
GST No.: 08AABCR8312AIZT, PAN No.: AABCR8312A
OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting)
SLDC-Building, Ajmer Road, Heerapura, Jaipur-302024
Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea@rvpn.co.in
No. RVPN/SE(EA)IXENIRED SA/20 19-201D. ?-'Tb-S- Jaipur, dated: ,,,1!l1~~
FINALIZED RE-DSM ACCOUNT STATEMENT (Intra- State Deviation CharJ:;es}
Issued to QCA: Issued for PSS: GIL Account:
RECONNECTENERGYSOLUTIONSPRIVATELIMITED PSS_400KV_AKAL_AKAL 1558006
(SLOC RenewableEnergyOSM Fund)
Address: SAPCODE: 1010938
1ST,NO 15,KRISHIKSARVODAYAFOUNDATION, Corresl!ondance Address of QCA: SAP Document No.:
OLDAIRPORTROAD.BANGALORE, 634000 61~6
Bengaluru(Bangalore)Urban.Karnataka RE Connect Energy Solution Pvt Ltd.,
PostalCode: 560008 173 , A Sector, Scheme No. 54, Indore IssuinJ:; Date:
GSTNo.: 29AAFCR0074H3ZA MP - 452010
PAN No.: AAFCR0074H (mithun. dubey@reconnectenergy.com) 19.03.2020
S.No. Duration Description
RE DSM Intra-State
Deviation Charges*
l. 01.08.2019-31.08.2019 Final RE DSM AccountStatementissued afterrectifications(if applicable)in RE DSM
-4,17,622Statementissuedon dt. 14.11.2019
*: (+) & (-)means receivablefrom and payable to state deviation poolrespectively(in Rupees). Valuesare rounded offto the nearest integer using Gaussian rounding.
Net Amount Payable by the QCA Net Amount Payable by the QCA (In Words)
U,17,622/- Rupees Four Lakhs Seventeen Thousand Six Hundred Twenty Two Only
Remarks (if any):
1. RE INTER-STATE Deviation Charges Account not issued as Inter State Rated capacity is zero for this PSS.
DUE DATE OF PAYMENT
FORTHEQCA
~(},rYh17.04.2020
(Le: 30 days/rom the date of issue of this
Executive Engineer (EA),
Statement) RVPN. Jaipur
Please Note:-
I. The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make
payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund
(Nc No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior
Accounts Officer (LD), RVPN, Jaipur.
2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any.
3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in)
for accounting and to this office for information.
4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order
dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest @0.04% per day.
Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and
Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt.
27.10.2019, in case the payment is not made even after a lapse of 60 days from issuance of final DSM account, the
process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations.
S""rl.,,~~C'''H.g)
RVPN, Jaipur
Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action.
superinte~~£:'ccounting)
RVPN, Jaipur
Rajasthan SLDC - RE DSM Statement -August 2019
Rajasthan SLDC - RE DSM Statement -August 2019
Rajasthan SLDC - RE DSM Statement -August 2019
Rajasthan SLDC - RE DSM Statement -August 2019
Rajasthan SLDC - RE DSM Statement -August 2019
Rajasthan SLDC - RE DSM Statement -August 2019
Rajasthan SLDC - RE DSM Statement -August 2019
Rajasthan SLDC - RE DSM Statement -August 2019
Rajasthan SLDC - RE DSM Statement -August 2019
Rajasthan SLDC - RE DSM Statement -August 2019
Rajasthan SLDC - RE DSM Statement -August 2019
Rajasthan SLDC - RE DSM Statement -August 2019
Rajasthan SLDC - RE DSM Statement -August 2019
Rajasthan SLDC - RE DSM Statement -August 2019
Rajasthan SLDC - RE DSM Statement -August 2019
Rajasthan SLDC - RE DSM Statement -August 2019
Rajasthan SLDC - RE DSM Statement -August 2019
Rajasthan SLDC - RE DSM Statement -August 2019
Rajasthan SLDC - RE DSM Statement -August 2019
Rajasthan SLDC - RE DSM Statement -August 2019
Rajasthan SLDC - RE DSM Statement -August 2019
Rajasthan SLDC - RE DSM Statement -August 2019
Rajasthan SLDC - RE DSM Statement -August 2019
Rajasthan SLDC - RE DSM Statement -August 2019
Rajasthan SLDC - RE DSM Statement -August 2019
Rajasthan SLDC - RE DSM Statement -August 2019
Rajasthan SLDC - RE DSM Statement -August 2019
Rajasthan SLDC - RE DSM Statement -August 2019
Rajasthan SLDC - RE DSM Statement -August 2019
Rajasthan SLDC - RE DSM Statement -August 2019
Rajasthan SLDC - RE DSM Statement -August 2019
Rajasthan SLDC - RE DSM Statement -August 2019
Rajasthan SLDC - RE DSM Statement -August 2019
Rajasthan SLDC - RE DSM Statement -August 2019
Rajasthan SLDC - RE DSM Statement -August 2019
Rajasthan SLDC - RE DSM Statement -August 2019
Rajasthan SLDC - RE DSM Statement -August 2019
Rajasthan SLDC - RE DSM Statement -August 2019
Rajasthan SLDC - RE DSM Statement -August 2019
Rajasthan SLDC - RE DSM Statement -August 2019
Rajasthan SLDC - RE DSM Statement -August 2019
Rajasthan SLDC - RE DSM Statement -August 2019
Rajasthan SLDC - RE DSM Statement -August 2019
Rajasthan SLDC - RE DSM Statement -August 2019
Rajasthan SLDC - RE DSM Statement -August 2019
Rajasthan SLDC - RE DSM Statement -August 2019
Rajasthan SLDC - RE DSM Statement -August 2019

Contenu connexe

Similaire à Rajasthan SLDC - RE DSM Statement -August 2019

Procedural Aspects under Service Tax
Procedural Aspects under Service TaxProcedural Aspects under Service Tax
Procedural Aspects under Service TaxRaj Khona
 
CDA-Kidapawan Extension Office 2019 accomplishment report
CDA-Kidapawan Extension Office 2019 accomplishment reportCDA-Kidapawan Extension Office 2019 accomplishment report
CDA-Kidapawan Extension Office 2019 accomplishment reportJezzaLhorUtlang
 
Major Announcements by GST Council in 31st Meeting on 22th Dec
Major Announcements by GST Council in 31st Meeting on 22th DecMajor Announcements by GST Council in 31st Meeting on 22th Dec
Major Announcements by GST Council in 31st Meeting on 22th DecCA PRADEEP GOYAL
 
Lunawat Bulletin June 2017
Lunawat Bulletin   June  2017Lunawat Bulletin   June  2017
Lunawat Bulletin June 2017CA. Pramod Jain
 
Lunawat Bulletin March 2017
Lunawat Bulletin   March 2017Lunawat Bulletin   March 2017
Lunawat Bulletin March 2017CA. Pramod Jain
 
Corporate Compliance Calendar June 2020
Corporate Compliance Calendar   June 2020Corporate Compliance Calendar   June 2020
Corporate Compliance Calendar June 2020Lalit Rajput
 
Recent changes in GST
Recent changes in GST Recent changes in GST
Recent changes in GST Gayathri Menon
 
May Monthly Newsletter- N Pahilwani and Associates
May Monthly Newsletter- N Pahilwani and AssociatesMay Monthly Newsletter- N Pahilwani and Associates
May Monthly Newsletter- N Pahilwani and AssociatesNitin Pahilwani
 
Lunawat Bulletin April 2017
Lunawat Bulletin   April 2017Lunawat Bulletin   April 2017
Lunawat Bulletin April 2017CA. Pramod Jain
 
Part 11- GST - REturn & AMP Refunds
Part 11- GST - REturn & AMP Refunds Part 11- GST - REturn & AMP Refunds
Part 11- GST - REturn & AMP Refunds Hina juyal
 
gst compliances and returns
gst compliances and returns gst compliances and returns
gst compliances and returns Narayan Lodha
 
GST returns - law and procedure. By DK Bholusaria
GST returns - law and procedure. By DK BholusariaGST returns - law and procedure. By DK Bholusaria
GST returns - law and procedure. By DK BholusariaDK Bholusaria
 
GST PRESENTATION.pptx
GST PRESENTATION.pptxGST PRESENTATION.pptx
GST PRESENTATION.pptxKeshavLakhina
 
Lunawat Bulletin January 2017
Lunawat Bulletin   January 2017Lunawat Bulletin   January 2017
Lunawat Bulletin January 2017CA. Pramod Jain
 

Similaire à Rajasthan SLDC - RE DSM Statement -August 2019 (20)

Pdf servlet
Pdf servletPdf servlet
Pdf servlet
 
Procedural Aspects under Service Tax
Procedural Aspects under Service TaxProcedural Aspects under Service Tax
Procedural Aspects under Service Tax
 
E invoicing under gst- latest
E invoicing under gst- latestE invoicing under gst- latest
E invoicing under gst- latest
 
FORM GASTR-8
FORM GASTR-8FORM GASTR-8
FORM GASTR-8
 
CDA-Kidapawan Extension Office 2019 accomplishment report
CDA-Kidapawan Extension Office 2019 accomplishment reportCDA-Kidapawan Extension Office 2019 accomplishment report
CDA-Kidapawan Extension Office 2019 accomplishment report
 
Major Announcements by GST Council in 31st Meeting on 22th Dec
Major Announcements by GST Council in 31st Meeting on 22th DecMajor Announcements by GST Council in 31st Meeting on 22th Dec
Major Announcements by GST Council in 31st Meeting on 22th Dec
 
Lunawat Bulletin June 2017
Lunawat Bulletin   June  2017Lunawat Bulletin   June  2017
Lunawat Bulletin June 2017
 
Lunawat Bulletin March 2017
Lunawat Bulletin   March 2017Lunawat Bulletin   March 2017
Lunawat Bulletin March 2017
 
Returns
ReturnsReturns
Returns
 
Corporate Compliance Calendar June 2020
Corporate Compliance Calendar   June 2020Corporate Compliance Calendar   June 2020
Corporate Compliance Calendar June 2020
 
Recent changes in GST
Recent changes in GST Recent changes in GST
Recent changes in GST
 
GSTR 3B Return Filing Process
GSTR 3B Return Filing ProcessGSTR 3B Return Filing Process
GSTR 3B Return Filing Process
 
May Monthly Newsletter- N Pahilwani and Associates
May Monthly Newsletter- N Pahilwani and AssociatesMay Monthly Newsletter- N Pahilwani and Associates
May Monthly Newsletter- N Pahilwani and Associates
 
M/s Subhash Singh
M/s Subhash SinghM/s Subhash Singh
M/s Subhash Singh
 
Lunawat Bulletin April 2017
Lunawat Bulletin   April 2017Lunawat Bulletin   April 2017
Lunawat Bulletin April 2017
 
Part 11- GST - REturn & AMP Refunds
Part 11- GST - REturn & AMP Refunds Part 11- GST - REturn & AMP Refunds
Part 11- GST - REturn & AMP Refunds
 
gst compliances and returns
gst compliances and returns gst compliances and returns
gst compliances and returns
 
GST returns - law and procedure. By DK Bholusaria
GST returns - law and procedure. By DK BholusariaGST returns - law and procedure. By DK Bholusaria
GST returns - law and procedure. By DK Bholusaria
 
GST PRESENTATION.pptx
GST PRESENTATION.pptxGST PRESENTATION.pptx
GST PRESENTATION.pptx
 
Lunawat Bulletin January 2017
Lunawat Bulletin   January 2017Lunawat Bulletin   January 2017
Lunawat Bulletin January 2017
 

Plus de Das A. K.

Rajasthan SLDC - RE DSM Statement -Jan 2020
Rajasthan SLDC - RE DSM Statement -Jan 2020Rajasthan SLDC - RE DSM Statement -Jan 2020
Rajasthan SLDC - RE DSM Statement -Jan 2020Das A. K.
 
Actual Penalty and Deviation Settlement Mechanism (DSM) Penalty in Interstate...
Actual Penalty and Deviation Settlement Mechanism (DSM) Penalty in Interstate...Actual Penalty and Deviation Settlement Mechanism (DSM) Penalty in Interstate...
Actual Penalty and Deviation Settlement Mechanism (DSM) Penalty in Interstate...Das A. K.
 
Statement Showing the RE DSM (Rajasthan SLDC) for the month of November-2019 ...
Statement Showing the RE DSM (Rajasthan SLDC) for the month of November-2019 ...Statement Showing the RE DSM (Rajasthan SLDC) for the month of November-2019 ...
Statement Showing the RE DSM (Rajasthan SLDC) for the month of November-2019 ...Das A. K.
 
Draft - Rajasthan - SLDC - Deviation Settlement Account (DSM) statement Octob...
Draft - Rajasthan - SLDC - Deviation Settlement Account (DSM) statement Octob...Draft - Rajasthan - SLDC - Deviation Settlement Account (DSM) statement Octob...
Draft - Rajasthan - SLDC - Deviation Settlement Account (DSM) statement Octob...Das A. K.
 
Gujarat SLDC - STATE DEVIATION SETTLEMENT ACCOUNT FOR THE WEEK 29-Jul-2019 ...
Gujarat SLDC - STATE DEVIATION SETTLEMENT ACCOUNT  FOR THE WEEK  29-Jul-2019 ...Gujarat SLDC - STATE DEVIATION SETTLEMENT ACCOUNT  FOR THE WEEK  29-Jul-2019 ...
Gujarat SLDC - STATE DEVIATION SETTLEMENT ACCOUNT FOR THE WEEK 29-Jul-2019 ...Das A. K.
 
MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019
MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019
MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019Das A. K.
 
Adjudication of dispute regarding RERC (Forecasting, Scheduling, Deviation Se...
Adjudication of dispute regarding RERC (Forecasting, Scheduling, Deviation Se...Adjudication of dispute regarding RERC (Forecasting, Scheduling, Deviation Se...
Adjudication of dispute regarding RERC (Forecasting, Scheduling, Deviation Se...Das A. K.
 
MP-SLDC-DSM Account of Wind and Solar PSS for April, 2019
MP-SLDC-DSM Account of Wind and Solar PSS for April, 2019MP-SLDC-DSM Account of Wind and Solar PSS for April, 2019
MP-SLDC-DSM Account of Wind and Solar PSS for April, 2019Das A. K.
 
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019Das A. K.
 
Rajasthan SLDC - Statement Showing the RE DSM for the month of October-2018 Q...
Rajasthan SLDC - Statement Showing the RE DSM for the month of October-2018 Q...Rajasthan SLDC - Statement Showing the RE DSM for the month of October-2018 Q...
Rajasthan SLDC - Statement Showing the RE DSM for the month of October-2018 Q...Das A. K.
 
Rajasthan SLDC - Statement Showing the RE DSM for the month of November-2018 ...
Rajasthan SLDC - Statement Showing the RE DSM for the month of November-2018 ...Rajasthan SLDC - Statement Showing the RE DSM for the month of November-2018 ...
Rajasthan SLDC - Statement Showing the RE DSM for the month of November-2018 ...Das A. K.
 
Rajasthan SLDC - Statement Showing the RE DSM for the month of December-2018 ...
Rajasthan SLDC - Statement Showing the RE DSM for the month of December-2018 ...Rajasthan SLDC - Statement Showing the RE DSM for the month of December-2018 ...
Rajasthan SLDC - Statement Showing the RE DSM for the month of December-2018 ...Das A. K.
 
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of Febru...
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of Febru...MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of Febru...
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of Febru...Das A. K.
 
MP_SLDC_RE_DSM_from-01-01-2019-to-31-01-2019_daily
MP_SLDC_RE_DSM_from-01-01-2019-to-31-01-2019_dailyMP_SLDC_RE_DSM_from-01-01-2019-to-31-01-2019_daily
MP_SLDC_RE_DSM_from-01-01-2019-to-31-01-2019_dailyDas A. K.
 
normalized parametric model for wind turbine power curve
normalized parametric model for wind turbine power curvenormalized parametric model for wind turbine power curve
normalized parametric model for wind turbine power curveDas A. K.
 
CW / 18587 / 2018 INDIAN WIND POWER ASSOCIATION (RAJASTHAN STATE COUNCIL) Vs....
CW / 18587 / 2018 INDIAN WIND POWER ASSOCIATION (RAJASTHAN STATE COUNCIL) Vs....CW / 18587 / 2018 INDIAN WIND POWER ASSOCIATION (RAJASTHAN STATE COUNCIL) Vs....
CW / 18587 / 2018 INDIAN WIND POWER ASSOCIATION (RAJASTHAN STATE COUNCIL) Vs....Das A. K.
 
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges) 11 m...
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges) 11 m...Mock RE - Gujarat State Deviation Settlement Account (Deviation charges) 11 m...
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges) 11 m...Das A. K.
 
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges)
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges)Mock RE - Gujarat State Deviation Settlement Account (Deviation charges)
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges)Das A. K.
 
Revised Rajasthan DSM Penalty for September 2018 (uploaded on 1st May 2019)
Revised Rajasthan DSM Penalty for September 2018 (uploaded on 1st May 2019)Revised Rajasthan DSM Penalty for September 2018 (uploaded on 1st May 2019)
Revised Rajasthan DSM Penalty for September 2018 (uploaded on 1st May 2019)Das A. K.
 
Revised Rajasthan DSM Penalty for June 2018 (uploaded on 1st May 2019)
Revised Rajasthan DSM Penalty for June 2018 (uploaded on 1st May 2019)Revised Rajasthan DSM Penalty for June 2018 (uploaded on 1st May 2019)
Revised Rajasthan DSM Penalty for June 2018 (uploaded on 1st May 2019)Das A. K.
 

Plus de Das A. K. (20)

Rajasthan SLDC - RE DSM Statement -Jan 2020
Rajasthan SLDC - RE DSM Statement -Jan 2020Rajasthan SLDC - RE DSM Statement -Jan 2020
Rajasthan SLDC - RE DSM Statement -Jan 2020
 
Actual Penalty and Deviation Settlement Mechanism (DSM) Penalty in Interstate...
Actual Penalty and Deviation Settlement Mechanism (DSM) Penalty in Interstate...Actual Penalty and Deviation Settlement Mechanism (DSM) Penalty in Interstate...
Actual Penalty and Deviation Settlement Mechanism (DSM) Penalty in Interstate...
 
Statement Showing the RE DSM (Rajasthan SLDC) for the month of November-2019 ...
Statement Showing the RE DSM (Rajasthan SLDC) for the month of November-2019 ...Statement Showing the RE DSM (Rajasthan SLDC) for the month of November-2019 ...
Statement Showing the RE DSM (Rajasthan SLDC) for the month of November-2019 ...
 
Draft - Rajasthan - SLDC - Deviation Settlement Account (DSM) statement Octob...
Draft - Rajasthan - SLDC - Deviation Settlement Account (DSM) statement Octob...Draft - Rajasthan - SLDC - Deviation Settlement Account (DSM) statement Octob...
Draft - Rajasthan - SLDC - Deviation Settlement Account (DSM) statement Octob...
 
Gujarat SLDC - STATE DEVIATION SETTLEMENT ACCOUNT FOR THE WEEK 29-Jul-2019 ...
Gujarat SLDC - STATE DEVIATION SETTLEMENT ACCOUNT  FOR THE WEEK  29-Jul-2019 ...Gujarat SLDC - STATE DEVIATION SETTLEMENT ACCOUNT  FOR THE WEEK  29-Jul-2019 ...
Gujarat SLDC - STATE DEVIATION SETTLEMENT ACCOUNT FOR THE WEEK 29-Jul-2019 ...
 
MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019
MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019
MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019
 
Adjudication of dispute regarding RERC (Forecasting, Scheduling, Deviation Se...
Adjudication of dispute regarding RERC (Forecasting, Scheduling, Deviation Se...Adjudication of dispute regarding RERC (Forecasting, Scheduling, Deviation Se...
Adjudication of dispute regarding RERC (Forecasting, Scheduling, Deviation Se...
 
MP-SLDC-DSM Account of Wind and Solar PSS for April, 2019
MP-SLDC-DSM Account of Wind and Solar PSS for April, 2019MP-SLDC-DSM Account of Wind and Solar PSS for April, 2019
MP-SLDC-DSM Account of Wind and Solar PSS for April, 2019
 
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
 
Rajasthan SLDC - Statement Showing the RE DSM for the month of October-2018 Q...
Rajasthan SLDC - Statement Showing the RE DSM for the month of October-2018 Q...Rajasthan SLDC - Statement Showing the RE DSM for the month of October-2018 Q...
Rajasthan SLDC - Statement Showing the RE DSM for the month of October-2018 Q...
 
Rajasthan SLDC - Statement Showing the RE DSM for the month of November-2018 ...
Rajasthan SLDC - Statement Showing the RE DSM for the month of November-2018 ...Rajasthan SLDC - Statement Showing the RE DSM for the month of November-2018 ...
Rajasthan SLDC - Statement Showing the RE DSM for the month of November-2018 ...
 
Rajasthan SLDC - Statement Showing the RE DSM for the month of December-2018 ...
Rajasthan SLDC - Statement Showing the RE DSM for the month of December-2018 ...Rajasthan SLDC - Statement Showing the RE DSM for the month of December-2018 ...
Rajasthan SLDC - Statement Showing the RE DSM for the month of December-2018 ...
 
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of Febru...
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of Febru...MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of Febru...
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of Febru...
 
MP_SLDC_RE_DSM_from-01-01-2019-to-31-01-2019_daily
MP_SLDC_RE_DSM_from-01-01-2019-to-31-01-2019_dailyMP_SLDC_RE_DSM_from-01-01-2019-to-31-01-2019_daily
MP_SLDC_RE_DSM_from-01-01-2019-to-31-01-2019_daily
 
normalized parametric model for wind turbine power curve
normalized parametric model for wind turbine power curvenormalized parametric model for wind turbine power curve
normalized parametric model for wind turbine power curve
 
CW / 18587 / 2018 INDIAN WIND POWER ASSOCIATION (RAJASTHAN STATE COUNCIL) Vs....
CW / 18587 / 2018 INDIAN WIND POWER ASSOCIATION (RAJASTHAN STATE COUNCIL) Vs....CW / 18587 / 2018 INDIAN WIND POWER ASSOCIATION (RAJASTHAN STATE COUNCIL) Vs....
CW / 18587 / 2018 INDIAN WIND POWER ASSOCIATION (RAJASTHAN STATE COUNCIL) Vs....
 
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges) 11 m...
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges) 11 m...Mock RE - Gujarat State Deviation Settlement Account (Deviation charges) 11 m...
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges) 11 m...
 
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges)
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges)Mock RE - Gujarat State Deviation Settlement Account (Deviation charges)
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges)
 
Revised Rajasthan DSM Penalty for September 2018 (uploaded on 1st May 2019)
Revised Rajasthan DSM Penalty for September 2018 (uploaded on 1st May 2019)Revised Rajasthan DSM Penalty for September 2018 (uploaded on 1st May 2019)
Revised Rajasthan DSM Penalty for September 2018 (uploaded on 1st May 2019)
 
Revised Rajasthan DSM Penalty for June 2018 (uploaded on 1st May 2019)
Revised Rajasthan DSM Penalty for June 2018 (uploaded on 1st May 2019)Revised Rajasthan DSM Penalty for June 2018 (uploaded on 1st May 2019)
Revised Rajasthan DSM Penalty for June 2018 (uploaded on 1st May 2019)
 

Dernier

Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024
Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024
Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024thyngster
 
9711147426✨Call In girls Gurgaon Sector 31. SCO 25 escort service
9711147426✨Call In girls Gurgaon Sector 31. SCO 25 escort service9711147426✨Call In girls Gurgaon Sector 31. SCO 25 escort service
9711147426✨Call In girls Gurgaon Sector 31. SCO 25 escort servicejennyeacort
 
Multiple time frame trading analysis -brianshannon.pdf
Multiple time frame trading analysis -brianshannon.pdfMultiple time frame trading analysis -brianshannon.pdf
Multiple time frame trading analysis -brianshannon.pdfchwongval
 
Statistics, Data Analysis, and Decision Modeling, 5th edition by James R. Eva...
Statistics, Data Analysis, and Decision Modeling, 5th edition by James R. Eva...Statistics, Data Analysis, and Decision Modeling, 5th edition by James R. Eva...
Statistics, Data Analysis, and Decision Modeling, 5th edition by James R. Eva...ssuserf63bd7
 
NLP Data Science Project Presentation:Predicting Heart Disease with NLP Data ...
NLP Data Science Project Presentation:Predicting Heart Disease with NLP Data ...NLP Data Science Project Presentation:Predicting Heart Disease with NLP Data ...
NLP Data Science Project Presentation:Predicting Heart Disease with NLP Data ...Boston Institute of Analytics
 
Data Factory in Microsoft Fabric (MsBIP #82)
Data Factory in Microsoft Fabric (MsBIP #82)Data Factory in Microsoft Fabric (MsBIP #82)
Data Factory in Microsoft Fabric (MsBIP #82)Cathrine Wilhelmsen
 
Student Profile Sample report on improving academic performance by uniting gr...
Student Profile Sample report on improving academic performance by uniting gr...Student Profile Sample report on improving academic performance by uniting gr...
Student Profile Sample report on improving academic performance by uniting gr...Seán Kennedy
 
modul pembelajaran robotic Workshop _ by Slidesgo.pptx
modul pembelajaran robotic Workshop _ by Slidesgo.pptxmodul pembelajaran robotic Workshop _ by Slidesgo.pptx
modul pembelajaran robotic Workshop _ by Slidesgo.pptxaleedritatuxx
 
Identifying Appropriate Test Statistics Involving Population Mean
Identifying Appropriate Test Statistics Involving Population MeanIdentifying Appropriate Test Statistics Involving Population Mean
Identifying Appropriate Test Statistics Involving Population MeanMYRABACSAFRA2
 
Top 5 Best Data Analytics Courses In Queens
Top 5 Best Data Analytics Courses In QueensTop 5 Best Data Analytics Courses In Queens
Top 5 Best Data Analytics Courses In Queensdataanalyticsqueen03
 
办美国阿肯色大学小石城分校毕业证成绩单pdf电子版制作修改#真实留信入库#永久存档#真实可查#diploma#degree
办美国阿肯色大学小石城分校毕业证成绩单pdf电子版制作修改#真实留信入库#永久存档#真实可查#diploma#degree办美国阿肯色大学小石城分校毕业证成绩单pdf电子版制作修改#真实留信入库#永久存档#真实可查#diploma#degree
办美国阿肯色大学小石城分校毕业证成绩单pdf电子版制作修改#真实留信入库#永久存档#真实可查#diploma#degreeyuu sss
 
RABBIT: A CLI tool for identifying bots based on their GitHub events.
RABBIT: A CLI tool for identifying bots based on their GitHub events.RABBIT: A CLI tool for identifying bots based on their GitHub events.
RABBIT: A CLI tool for identifying bots based on their GitHub events.natarajan8993
 
NO1 Certified Black Magic Specialist Expert Amil baba in Lahore Islamabad Raw...
NO1 Certified Black Magic Specialist Expert Amil baba in Lahore Islamabad Raw...NO1 Certified Black Magic Specialist Expert Amil baba in Lahore Islamabad Raw...
NO1 Certified Black Magic Specialist Expert Amil baba in Lahore Islamabad Raw...Amil Baba Dawood bangali
 
原版1:1定制南十字星大学毕业证(SCU毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制南十字星大学毕业证(SCU毕业证)#文凭成绩单#真实留信学历认证永久存档原版1:1定制南十字星大学毕业证(SCU毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制南十字星大学毕业证(SCU毕业证)#文凭成绩单#真实留信学历认证永久存档208367051
 
Predicting Salary Using Data Science: A Comprehensive Analysis.pdf
Predicting Salary Using Data Science: A Comprehensive Analysis.pdfPredicting Salary Using Data Science: A Comprehensive Analysis.pdf
Predicting Salary Using Data Science: A Comprehensive Analysis.pdfBoston Institute of Analytics
 
Predictive Analysis for Loan Default Presentation : Data Analysis Project PPT
Predictive Analysis for Loan Default  Presentation : Data Analysis Project PPTPredictive Analysis for Loan Default  Presentation : Data Analysis Project PPT
Predictive Analysis for Loan Default Presentation : Data Analysis Project PPTBoston Institute of Analytics
 
专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改
专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改
专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改yuu sss
 
Vision, Mission, Goals and Objectives ppt..pptx
Vision, Mission, Goals and Objectives ppt..pptxVision, Mission, Goals and Objectives ppt..pptx
Vision, Mission, Goals and Objectives ppt..pptxellehsormae
 
Minimizing AI Hallucinations/Confabulations and the Path towards AGI with Exa...
Minimizing AI Hallucinations/Confabulations and the Path towards AGI with Exa...Minimizing AI Hallucinations/Confabulations and the Path towards AGI with Exa...
Minimizing AI Hallucinations/Confabulations and the Path towards AGI with Exa...Thomas Poetter
 

Dernier (20)

Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024
Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024
Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024
 
9711147426✨Call In girls Gurgaon Sector 31. SCO 25 escort service
9711147426✨Call In girls Gurgaon Sector 31. SCO 25 escort service9711147426✨Call In girls Gurgaon Sector 31. SCO 25 escort service
9711147426✨Call In girls Gurgaon Sector 31. SCO 25 escort service
 
Multiple time frame trading analysis -brianshannon.pdf
Multiple time frame trading analysis -brianshannon.pdfMultiple time frame trading analysis -brianshannon.pdf
Multiple time frame trading analysis -brianshannon.pdf
 
Deep Generative Learning for All - The Gen AI Hype (Spring 2024)
Deep Generative Learning for All - The Gen AI Hype (Spring 2024)Deep Generative Learning for All - The Gen AI Hype (Spring 2024)
Deep Generative Learning for All - The Gen AI Hype (Spring 2024)
 
Statistics, Data Analysis, and Decision Modeling, 5th edition by James R. Eva...
Statistics, Data Analysis, and Decision Modeling, 5th edition by James R. Eva...Statistics, Data Analysis, and Decision Modeling, 5th edition by James R. Eva...
Statistics, Data Analysis, and Decision Modeling, 5th edition by James R. Eva...
 
NLP Data Science Project Presentation:Predicting Heart Disease with NLP Data ...
NLP Data Science Project Presentation:Predicting Heart Disease with NLP Data ...NLP Data Science Project Presentation:Predicting Heart Disease with NLP Data ...
NLP Data Science Project Presentation:Predicting Heart Disease with NLP Data ...
 
Data Factory in Microsoft Fabric (MsBIP #82)
Data Factory in Microsoft Fabric (MsBIP #82)Data Factory in Microsoft Fabric (MsBIP #82)
Data Factory in Microsoft Fabric (MsBIP #82)
 
Student Profile Sample report on improving academic performance by uniting gr...
Student Profile Sample report on improving academic performance by uniting gr...Student Profile Sample report on improving academic performance by uniting gr...
Student Profile Sample report on improving academic performance by uniting gr...
 
modul pembelajaran robotic Workshop _ by Slidesgo.pptx
modul pembelajaran robotic Workshop _ by Slidesgo.pptxmodul pembelajaran robotic Workshop _ by Slidesgo.pptx
modul pembelajaran robotic Workshop _ by Slidesgo.pptx
 
Identifying Appropriate Test Statistics Involving Population Mean
Identifying Appropriate Test Statistics Involving Population MeanIdentifying Appropriate Test Statistics Involving Population Mean
Identifying Appropriate Test Statistics Involving Population Mean
 
Top 5 Best Data Analytics Courses In Queens
Top 5 Best Data Analytics Courses In QueensTop 5 Best Data Analytics Courses In Queens
Top 5 Best Data Analytics Courses In Queens
 
办美国阿肯色大学小石城分校毕业证成绩单pdf电子版制作修改#真实留信入库#永久存档#真实可查#diploma#degree
办美国阿肯色大学小石城分校毕业证成绩单pdf电子版制作修改#真实留信入库#永久存档#真实可查#diploma#degree办美国阿肯色大学小石城分校毕业证成绩单pdf电子版制作修改#真实留信入库#永久存档#真实可查#diploma#degree
办美国阿肯色大学小石城分校毕业证成绩单pdf电子版制作修改#真实留信入库#永久存档#真实可查#diploma#degree
 
RABBIT: A CLI tool for identifying bots based on their GitHub events.
RABBIT: A CLI tool for identifying bots based on their GitHub events.RABBIT: A CLI tool for identifying bots based on their GitHub events.
RABBIT: A CLI tool for identifying bots based on their GitHub events.
 
NO1 Certified Black Magic Specialist Expert Amil baba in Lahore Islamabad Raw...
NO1 Certified Black Magic Specialist Expert Amil baba in Lahore Islamabad Raw...NO1 Certified Black Magic Specialist Expert Amil baba in Lahore Islamabad Raw...
NO1 Certified Black Magic Specialist Expert Amil baba in Lahore Islamabad Raw...
 
原版1:1定制南十字星大学毕业证(SCU毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制南十字星大学毕业证(SCU毕业证)#文凭成绩单#真实留信学历认证永久存档原版1:1定制南十字星大学毕业证(SCU毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制南十字星大学毕业证(SCU毕业证)#文凭成绩单#真实留信学历认证永久存档
 
Predicting Salary Using Data Science: A Comprehensive Analysis.pdf
Predicting Salary Using Data Science: A Comprehensive Analysis.pdfPredicting Salary Using Data Science: A Comprehensive Analysis.pdf
Predicting Salary Using Data Science: A Comprehensive Analysis.pdf
 
Predictive Analysis for Loan Default Presentation : Data Analysis Project PPT
Predictive Analysis for Loan Default  Presentation : Data Analysis Project PPTPredictive Analysis for Loan Default  Presentation : Data Analysis Project PPT
Predictive Analysis for Loan Default Presentation : Data Analysis Project PPT
 
专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改
专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改
专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改
 
Vision, Mission, Goals and Objectives ppt..pptx
Vision, Mission, Goals and Objectives ppt..pptxVision, Mission, Goals and Objectives ppt..pptx
Vision, Mission, Goals and Objectives ppt..pptx
 
Minimizing AI Hallucinations/Confabulations and the Path towards AGI with Exa...
Minimizing AI Hallucinations/Confabulations and the Path towards AGI with Exa...Minimizing AI Hallucinations/Confabulations and the Path towards AGI with Exa...
Minimizing AI Hallucinations/Confabulations and the Path towards AGI with Exa...
 

Rajasthan SLDC - RE DSM Statement -August 2019

  • 1. ~~ I RAJASTHAN RAJY A VIDYUT PRASARAN NIGAM LIMITED ~e [Corporate Identity Number(CIN) U40109RJ2000SGCOl6485j(AN [SO9001:2015CertifiedCompany) I~/ I Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in) ? GST No.: 08AABCR8312AIZT1 PAN No.: AABCR8312A OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting)e SLOe-Building, Ajmer Road, Heerapura, Jaipur-302024 Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea((iJ.rvon.co.in No.RVPN/SE(EA)IXENIREOSA/20 19-20/0. ?.<::J ~ ""1 Jaipur, dated: Cf I~::LC'")-c FINALIZED RE-DSM ACCOUNT STATEMENT (Intra- State Deviation Chan:;es} Issued to QCA: Issued for PSS: GIL Account: RECONNECTENERGYSOLUTIONSPRIYATELIMITED PSS_132KY_DALOT_33KY_DALOT 1558006 (SLDCRenewableEnergyDSM FWld) Address: SAPCODE: 1010903 1ST.NO IS.KRISHIKSARYODAYAFOUNDATION. Corresl!ondance Address of QCA: SAP Document No.: OLDAIRPORTROAD.BANGALORE. 6340006168 Bengaluru(Bangalore)Urban,Kamataka RE Connect Energy Solution Pvt Ltd., PostalCod,: 560008 173 , A Sector, Scheme No. 54, Indore Issuinl: Date: GSTNo.: 29AAFCR0074H3ZA MP-452010 AAFCR0074H (mithun. dube:!@reconnectenerg):.com) 19.03.2020 PAN No.: Duration Description RE DSM Intra-State S.No. Deviation Charges* 1. 01.08.2019·31.08.2019 Final RE DSM Account Statement issued after rectifications (if applicable) in RE DSM -1,22,737 Statement issued on dt. 14.11,2019 *: (+) & (_)means receivablefrom and payable to state deviation pool respectively(in Rupees), Valuesare rounded offto the nearest integer using Gaussian rounding. Net Amount Payable by the QCA Net Amount Payable by the QCA (In Words) n,22,737/- Rupees One Lakh Twenty Two Thousand Seven Hundred Thirty Seven Only Remarks (if anl:l: I. RE INTER-STATE Deviation Charges Account not issued as Inter State Rated capacity is zero for this PSS. DUE DATE OF PAYMENT FORTHEQCA - ~~ 17.04.2020 (J'""'riD'l {i.e; 30 days from the date 0/issue 0/this Executive Engineer (EA), Statement) RVPN Jaiour Please Note:- 1.The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund (Alc No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior Accounts Officer (LD), RVPN, Jaipur. 2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any. 3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in) for accounting and to this office for information. 4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest@0.04%perday. Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt. 27.10.2019, in case the payment is not made even after a lapse of 60 days from issuance of final DSM account, the process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations. ~r Superinten g g neer (Energy Accounting) RVPN, Jaipur Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action. A~(Superintending Engineer (Energy Accounting) RVPN, Jaipur
  • 2. i {8 RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED [CorporateIdentityNumber(CIN) U40109RJ2000SGCOl6485j(AN ISO90012015Certified Company) Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in) GST No.: 08AABCR8312AIZT, PAN No.: AABCR8312A OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting) ~ SLDC-Building, Ajmer Road, Heerapura, Jaipur-302024 Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ealalrvpn.co.in No.RVPN/SE(EA)IXENIREDSA/2019-201 D. ~/3a Jaipur, dated: ~ ~'""l.;u FINALIZED RE-DSM ACCOUNT STATEMENT !Intra- State Deviation Char&es} Issued to QCA: Issued for PSS: GIL Account: RECONNECTENERGYSOLUTIONSPRIVATELIMITED PSS_132KV_DALOT_KANGARH 1558006 (SLDC RenewableEnergyDSM Fund) Address: SAPCODE: 1010904 1ST,NO IS,KRISHIKSARVODAYAFOUNDATION, Corresl!ondance Address of QCA: SAP Document No.: OLDAIRPORTROAD,BANGALORE, 6340006/61 Bengaluru(Bangalore)Urban,Kamataka RE Connect Energy Solution Pvt Ltd., PostalCode:560008 173 , A Sector, Scheme No. 54, Indore Issuin& Date: GSTNo.: 29AAFCR0074H3ZA MP-452010 (mithun.dubex@reconnectenerg):.com) 19.03.2020 PAN No.: AAFCR0074H Description RE DSM Intra-State S.No. Duration Deviation Charges* 1. 01.08.2019·31.08.2019 Final RE DSM Account Statement issued after rectifications (if applicable) in RE DSM -2,31,564Statement issued on dt. 14.11.2019. *: (+) & (_)means receivablefrom and payable to state deviation pool respectively(in Rupees). Valuesare rounded offto the nearest integer using Gaussian rounding. Net Amount Payable by the QCA Net Amount Payable by the QCA (In Words) fl,31,564/- Rupees Two Lakhs Thirty One Thousand Five Hundred Sixty Four Only Remarks !if anx}: I. RE INTER-STATE Deviation Charges Account not issued as Inter State Rated capacity is zero for this PSS. DUE DATE OF PAYMENT FORTHEQCA ~ f'>r-rrn-17.04.2020 (i.e.30 days/rom the date of issue of this Executive Engineer (EA), Statement) RVPN. Jaipur Please Note:- I. The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund (Alc No. 37534869390, IFSCIRTGS code: SBIN0031 026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior Accounts Officer (LD), RVPN, Jaipur. 2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any. 3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in) for accounting and to this office for information. 4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest@0.04%perday. Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt. 27.10.2019, in case the payment is not made even after a lapse of 60 days from issuance of final DSM account, the process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations. superinte~~ccounting) RVPN, Jaipur Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action. S'''ri''''~~''::''".'')RVPN, Jaipur
  • 3. ,vo;;c~ RAJASTHAN RAJY A VIDYUT PRASARAN NIGAM LIMITED -...~~~~ [CorporateIdentity Number(CIN) U40109RJ2000SGCO16485J(AN ISO9001:2015CertifiedCompany) r,~ .. Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)II~ . ~ ii GST No.: 08AABCR8312AIZT, PAN No.: AABCR8312A W OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting) SLOC-Building, Ajmer Road, Heerapura, Jaipur-302024 Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea@}rvpn.co.in No.RVPN/SE(EA)IXENIREOSA/2019-20/0. ~'7<39 Jaipur, dated: "1~I f')...e::2-0 FINALIZED RE-DSM ACCOUNT STATEMENT (Intra- State Deviation Charzes) Issued to QCA: Issued for PSS: GIL Account: RECONNECTEJERGYSOLUTIONSPRIVATELIMITED PSS_132KV_KOLAYAT_RAYS 1558006 (SLDC RenewableEnergyDSM Fund) Address: SAPCODE: 1010906 1ST.NO IS,KRISHIKSARVODAYAFOUNDATION. Corres(!ondance Address of QCA: SAP Document No.: OLDAIRPORTROAD.BANGALORE. 634000611-0 Bengaluru (Bangalore)Urban,Kamataka RE Connect Energy Solution Pvt Ltd., PoslalCode:560008 173 , A Sector, Scheme No. 54, Indore Issuinl: Date: GSTNo.: 29AAFCR0074H3ZA MP-452010 AAFCR0074H (mithun.dubex@reconnectenergx.com) 19.03.2020 PAN No.: Duration Description RE DSM Intra-State S.No. Deviation Charges* l. 01.08.20I9-31.08.2019 Final RE DSM AccountStatementissued afterrectifications(if applicable)in RE DSM -76,422Statementissuedon dt. 14.11.2019 *: (+) & (-) means receivablefrom and payable to state deviation pool respectively(in Rupees), Valuesare rounded off to the nearest integer using Gaussian rounding. Net Amount Payable by the QCA Net Amount Payable by the QCA (In Words) f76,422/- Rupees Seventy Six Thousand Four Hundred Twenty Two Only Remarks (if anl:l: 1. RE INTER-STATE Deviation Charges Account not issued as Inter State Rated capacity is zero for this PSS. DUE DATE OF PAYMENT FORTHEQCA ~~~17.04.2020 (i.e. 30 days from the date of issue of this Executive Engineer (EA), Statement) RVPN. Jaiour Please Note:- I. The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund (Nc No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior Accounts Officer (LD), RVPN, Jaipur. 2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any. 3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in) for accounting and to this office for information. 4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest@0.04%perday. Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt. 27.10.2019, in case the payment is not made even after a lapse of 60 days from issuance of final DSM account, the process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations. superint~·~yCounting) RVPN, Jaipur Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action. superinte~~e~ l:counting) RVPN, Jaipur
  • 4. --- ----- -- - --------------------------------- RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED M ~~ [CorporateIdentityNumber(CIN) U40109RJ2000SGCO16485](ANISO9001.2015CertifiedCompany) ~ Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in) ~ GSTNo.: 08AABCR8312AIZT, PAN No.: AABCR8312A OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting) SLDC-Building, Ajmer Road, Heerapura, Jaipur-302024 Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea({i!rvpn.co.in No.RVPN/SE(EA)IXENIREDSA12019-201 D. ?..~40 Jaipur, dated: q' !3'~2..0 FINALIZED RE-DSM ACCOUNT STATEMENT (Intra- State Deviation Charges) Issued to QCA: Issued for PSS: GIL Account: RECONNECTENERGYSOLUTIONSPRIVATELIMITED PSS_132KV_NOKHADHAIYA_3No_33KV 1558006 (SLDC RenewableEnergyDSM Fund) Address: SAPCODE: 1010907 1ST.NO IS,KRISHIKSARVODAYAFOUNDATION, Corresl!ondance Address of QCA: SAP Document No.: OLDAIRPORTROAD,BANGALORE, 634000 6 I 'Jf-I Bengaluru(Bangalore)Urban,Karnataka RE Connect Energy Solution Pvt Ltd., Postal!:;ode:560008 173 , A Sector, Scheme No. 54, Indore Issuinl: Date: GSTNo.: 29AAFCR0074H3ZA MP-452010 (mithun. dubey@reconnectenergy.com) 19.03.2020 PAN No.: AAFCR0074H Description RE DSM Intra-State S.No. Duration Deviation Charges* 1. 01.08.2019·31.08.20I9 FinalRE DSM AccountStatementissuedafter rectifications(if applicable)in RE DSM -13,223Statement issued on dt. 14_11.2019. "': (+) & (_)means receivablefrom and payable to state deviation pool respectively(in Rupees). Valuesare rounded eff te the nearest integer using Gaussian rounding. Net Amount Payable by the QCA Net Amount Payable by the QCA (In Words) U3,223/- Rupees Thirteen Thousand Two Hundred Twenty Three Only Remarks (if anl:l: I. RE INTER-STATE Deviation Charges Account issued separately for this PSS. DUE DATE OF PAYMENT FORTHEQCA ~{}'m1 17.04.2020 (i.e. 30 days from the date of issue of this Executive Engineer (EA), Statement) RVPN. Jainur Please Note:- 1.The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund (Nc No.3 7534869390, IFSCIRTGS code: SBlN0031 026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior Accounts Officer (LD), RVPN, Jaipur. 2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any. 3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in) for accounting and to this office for information. 4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest@0.04%perday. Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt. 27.10.2019, in case the payment is not made even after a lapse of60 days from issuance of final DSM account, the process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations. S'P'ri,,,~~r.:".,g) RVPN, Jaipur Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action. superintend~~ACunting) RVPN, Jaipur
  • 5. ~v;,";,~ RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED [CorporateIdentityNumber(CIN) U40109RJ2000SGCO16485](AN ISO9001.2015CertifiedCompany) ,v-: ~ Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)!(1IV-:: ~ .' GSTNo.: 08AABCR8312AIZT, PAN No.: AABCR8312A I OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting) I SLDC-Building, Ajmer Road, Heerapura, Jaipur-302024 Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ealalrvpn.co.in No.RVPN/SE(EA)IXENIREDSA/2019-201 D. -::t..'?4J Jaipur, dated: 91n/~~ FINALIZED RE-DSM ACCOUNT STATEMENT (Intra- State Deviation Charl:es) Issued to QCA: Issued for PSS: GILAccouut: RECONNECTENERGYSOLUTIONSPRIVATELIMITED PSS_132KV_OSIAN_2No_33KV 1558006 (SLOCRenewableEnergyOSM Fund) Address: SAPCODE: 1010908 1ST.NO IS, KRISHIKSARVODAYAFOUNDATION, Corresl!ondance Address of QCA: SAP Document No.: OLDAIRPORTROAD,BANGALORE, 634000 6I '12- Bengaluru(Bangalore)Urban,Karnataka RE Connect Energy Solution Pvt Ltd., Postal!:I!!!e:560008 173 , A Sector, Scheme No. 54, Indore Issuinl: Date: GSTNo.: 29AAFCR0074H3ZA MP-452010 (mithun. dubey@reconnectenergy.com) 19.03.2020 PAN No.: AAFCR0074H Description RE DSM Intra-State S.No. Duration Deviation Charges* 1. 01.08.2019-31.08.2019 Final RE DSM AccountStatementissued afterrectifications(if applicable)in RE DSM -4,318Statementissuedon dt. 14.11.2019 *: (+) & H means receivable from and payable to state deviation pool respectively (in Rupees). Values are rounded off to the nearest integer using Gaussian rounding. Net Amount Payable by the QCA Net Amount Payable by the QCA (In Words) N,31S/- Rupees Four Thousand Three Hundred Eighteen Only Remarks {if any}: 1. RE INTER-STATE Deviation Charges Account issued separately for this PSS. DUE DATE OF PAYMENT FORTHEQCA ~~n-Y17.04.2020 (i.e. 30 days from the date of issue of this Executive Engineer (EA), Statement) RVPN. Jaiour Please Note:- I.The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make payments within 30 (thirty) days i.e, up to the above mentioned due date of payment into the "RE Generators State DPA Fund (Alc No. 37534869390, IFSCIRTGS code: SBIN003 1026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior Accounts Officer (LO), RVPN, Jaipur, 2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any. 3. Payment detail intimation should be furnished to Senior Accounts Officer (LO), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in) for accounting and to this office for information. 4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest@0.04%perday. Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt. 27. 10.2019, in case the payment is not made even after a lapse of 60 days from issuance of final DSM account, the process to invoke BG shall be initiated besides any other action as per permissible law/Regulations. S''''ri"~ r.;.EJa""""gjRVPN, Jaipur Copy forwarded to the Senior Accounts Officer (LO), RVPN, Jaipur for information and necessary action. S.~~)upermten ng n meer (Energy Accounting) RVPN, Jaipur
  • 6. ~'=~~ RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED '" ~ [CorporateIdentityNumber(CIN) U40I09RJ2000SGCOI6485](AN ISO9001.2015CertifiedCompany) ~ -, Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in) :, , W GST No.: 08AABCR8312AIZT, PAN No.: AABCR8312A "1 OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting) SLDC-Building, Ajmer Road, Heerapura, Jaipur-302024 Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ealalrvon.co.in No.RVPN/SE(EA)IXENIREDSAl2019-201 D. ~"74")_- Jaipur, dated: ~)gl~")...o FINALIZED RE-DSM ACCOUNT STATEMENT {Intra- State Deviation Chara:es} Issued to QCA: Issued for PSS: GIL Account: RECONNECTENERGYSOLUTIONSPRIVATELIMITED PSS_I32KV_POKARAN_2NO_33KV 1558006 (SLDCRenewableEnergyDSM Fund) Address: SAPCODE: 1010909 1ST.NO IS. KRISHIKSARVODAYAFOUNDATION, Corresl!ondance Address of QCA: SAP Document No.: OLDAIRPORTROAD,BANGALORE. 634000 61'fJ Bengaluru(Bangalore) Urban,Kamataka RE Connect Energy Solution Pvt Ltd., PostalCode:560008 173 , A Sector, Scheme No. 54, Indore Issuing Date: GSTNo.: 29AAFCR0074H3ZA MP-452010 (mithun.dube:,:@reconnectenerg:,:.com) 19.03.2020 PAN No.: AAFCR0074H Description RE DSM Intra-State S.No. Duration Deviation Charges* 1. 01.08.2019-31.08.2019 Final RE DSM AccountStatementissued afterrectifications(if applicable)in RE DSM -24,480Statementissuedon dt. 14,11.2019 *: (+) & (_)means receivable from and payable to state deviation pool respectively (in Rupees). Values are rounded orr to the nearest integer using Gaussian rounding. Net Amount Payable by the QCA Net Amount Payable by the QCA (In Words) f24,480/- Rupees Twenty Four Thousand Four Hundred Eighty Only Remarks (if an);): I. RE INTER-STATE Deviation Charges Account issued separately for this PSS. DUE DATE OF PAYMENT FORTHEQCA crr-h, ~ ryy; 17.04.2020 (i.e.30 days from the dllte of issue of thls Executive Engineer (EA), Statement) RVPN Jaiour Please Note:- I. The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund (Alc No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior Accounts Officer (LD), RVPN, Jaipur. 2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any. 3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in) for accounting and to this office for information. 4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order dt.27.09.20l9 otherwise the defaulting QCA shall have to pay simple interest@0.04%perday. Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt. 27.10.2019, in case the payment is not made even after a lapse of60 days from issuance of final DSM account, the process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations. s.",;",~~C".,)RVPN, Jaipur Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action. s.P,ri.".J.t.!ler...;:, un".,) RVPN, Jaipur
  • 7. I ~~~~~ RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED [Corporate Identity Number (CIN) U40 I09RJ2000SGCO I6485] (AN ISO 9001. 2015 Certified Company) Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in) z GST No.: 08AABCR8312AIZT, PAN No.: AABCR8312A OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting) SLOC-Building, Ajmer Road, Heerapura, Jaipur-302024 Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.earcsrvon.co.in No.RVPN/SE(EA)IXEN/REOSA/20 19-20/0. ":t."743- Jaipur, dated: ,,' s,,~').{) FINALIZED RE-DSM ACCOUNT STATEMENT {Intra- State Deviation Char&es} Issued to QCA: Issued for PSS: GIL Account: RECONNECTENERGYSOLUTIONSPRIVATELIMITED PSS_132KV_PS3_8NO_33KV 1558006 (SLOCRenewableEnergyOSMFund) Address: SAPCODE: 1010913 1ST.NO15.KRISHIKSARVODAYAFOUNDATION. Corresuondance Address of QCA: SAP Document No.: OLDAIRPORTROAD.BANGALORE. 634000 6 I "14- Bengaluru(Bangalore)Urban,Karnataka RE Connect Energy Solution Pvt Ltd., PostalCode:560008 173, A Sector, Scheme No. 54, Indore Issuin& Date: GSTNo.: 29AAFCR0074H3ZA MP-452010 (mithun.dubex@reconnectenerg)C.com) 19.03.2020 PAN No.: AAFCR0074H Duration Description RE DSM Intra-State S.No. Deviation Charges* 1. 01.08.2019-31.08.2019 Final RE DSM AccountStatementissuedafter rectifications(if applicable)in RE DSM -1,38,151Statementissuedondt 14.11.2019 *: (+) & f-) means receivablefrom and payable to state deviation pool respectively(in Rupees). Valuesare rounded offto the nearest integer using Gaussian rounding. NetAmountPayableby the QCA Net Amount Payable by the QCA (In Words) n,38,1511- Rupees One Lakh Thirty Eight Thousand One Hundred Fifty One Only Remarks {ifanx}: 1. RE INTER-STATE Deviation Charges Account issued separately for this PSS. DUEDATEOF PAYMENT FORTHEQCA ~ ~,.-yi)17.04.2020 (ie. 30 days from the dale of issue of this Executive Engineer (EA), Statement) RVPN. Jainur Please Note:- I. The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund (Alc No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior Accounts Officer (LD), RVPN, Jaipur. 2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any. 3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in) for accounting and to this office for information. 4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest @0.04% per day. Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt. 27.10.2019, in case the payment is not made even after a lapse of60 days from issuance of final DSM account, the process to invoke BG shall be initiated besides any other action as per permissible law/Regulations, superinte~~nrrgr:counting) RVPN, Jaipur Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action. superinten~et!rcounting) RVPN, Jaipur
  • 8. ,~..,,,,;; I RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED [Corporate Identity Number (CIN) U40109RJ2000SGC016485] (AN ISO 9001.2015 Certified Company) ~. I Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in) ~ GST No.: 08AABCR8312AIZT, PAN No.: AABCR8312A OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting) SLDC-Building, Ajmer Road, Heerapura, Jaipur-302024 Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea@,rvpn.co.in No.RVPN/SE(EA)!XENIREDSA/20 19-201D. :t"74L1 Jaipur, dated: ~'!1'~'}-OFINALIZED RE-DSM ACCOUNT STATItMENT {Intra- State Deviation CharJ:es) Issued to QCA: Issued for PSS: GIL Account: RECONNECT ENERGY SOLUTIONS PRIVATE LIMITED PSS_ I32KV _PS3 _WELSPUN 1558006 (SLDe Renewable Energy DSM Fund) Address: SAP CODE: 1010914 1ST, NO 15, KRISHIK SARVODAYA FOUNDATION, Corresl!ondance Address of QCA: SAP Document No.: OLD AIRPORT ROAD, BAN GALORE, 634000 6 11-r-Bengaiuru (Bangalore) Urban, Kamataka RE Connect Energy Solution Pvt Ltd., Postal Code: 560008 173 , A Sector, Scheme No. 54, Indore IssuinJ: Date: GSTNo.: 29AAFCR0074H3ZA MP - 452010 (mithun.dubex@reconnectenergy.com) 19.03.2020 PAN No.: AAFCR0074H Description RE DSM Intra-State S.No. Duration Deviation Charges* 1. 01.08.2019-31.08.2019 Final RE DSM AccountStatementissuedafter rectifications(if applicable)in RE DSM -23,680 Statementissuedon dt. 14.11.2019 ": (+) & (_)means receivablefrom and payable to state deviation pool respectively(in Rupees). Valuesare rounded off to the nearest integer using Gaussian rounding. Net Amount Payable by the QCA Net Amount Payable by the QCA (In Words) f23,680/- Rupees Twenty Three Thousand Six Hundred Eighty Only Remarks {ifanl:): 1. RE INTER-STATE Deviation Charges Account issued separately for this PSS. DUE DATE OF PAYMENT FORTHEQCA ~{}..~ 17.04.2020 (i.e. 30dtl}'s/rom the date of issue of this Executive Engineer (EA), Statement) RVPN. Jainur Please Note:- 1.The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund (A/c No. 37534869390, IFSCIRTGS code: SBIN003I026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior Accounts Officer (LD), RVPN, Jaipur. 2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any. 3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldcrgrvpn.co.in) for accounting and to this office for information. 4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest@0.04%perday. Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt. 27.10.2019, in case the payment is not made even after a lapse of 60 days from issuance of final DSM account, the process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations. superint~~J~y Accounting) RVPN, Jaipur Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action. ~~-'~ Superintend g ngineer n~ Accounting) RVPN, Jaipur
  • 9. • RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED [CorporateIdentityNumber(CIN) U40I09RJ2000SGCO16485](AN ISO900I. 2015CertifiedCompany) Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in) GST No.: 08AABCR8312A1ZT, PAN No.: AABCR8312A OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting) SLDC-Building, Ajrner Road, Heerapura, Jaipur-302024 Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea(adrvpn.co.in No.RVPN/SE(EA)IXENIREDSA/20 19-201D. =<-«J4r Jaipur, dated: ~ sll-O ').0 FINALIZED RE-DSM ACCOUNT STATEMENT (Intra- State Deviation Charl:;es} Issued to QCA: Issued for PSS: GILAccount: RECONNECTENERGYSOLUTIONSPRIVATELIMITED PSS~132KV_RAMGARH~RVUN_GTPP 1558006 (SLOCRenewableEnergyOSM Fund) Address: SAPCODE: 1010915 1ST,NO 15.KRISHIKSARVODAYAFOUNDATION. Corresl!ondance Address of QCA: SAP Document No.: OLDAIRPORTROAD.BANGALORE. 634000 6 I"':/-6 Bengalum(Bangalore)Urban.Karnataka RE Connect Energy Solution Pvt Ltd., Postal~ode: 560008 173 , A Sector, Scheme No. 54, Indore Issuinl:; Date: GSTNo.: 29AAFCR0074H3ZA MP-452010 (mithun.dube:,:@reconnectenerg:,:.com) 19.03.2020 PAN No.: AAFCR0074H S.No. Duration Description RE DSM Intra-State Deviation Charges* I. 01.08.20I9-31.08.2019 FinalRE DSM AccountStatementissued afterrectifications(if applicable)in RE DSM -5,067Statementissuedon dt. 14.11.2019. "":(+) & (_)means receivablefrom and payable to state deviation pool respectively(in Rupees). Valuesare rounded offto the nearest integer using Gaussian rounding. Net Amount Payable by the QCA Net Amount Payable by the QCA (In Words) f5,067/- Rupees Five Thousand Sixty Seven Only Remarks !if anI}: I. RE INTER-STATE Deviation Charges Account issued separately for this PSS. DUE DATE OF PAYMENT FORTHEQCA ~~~17.04.2020 (ie.30 days from the dale oj issue of this Executive Engineer (EA), Slalement) RVPN Jaiour Please Note:- I. The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund (Nc No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior Accounts Officer (LD), RVPN, Jaipur. 2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any. 3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in) for accounting and to this office for information. 4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest@0.04%perday. Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt. 27.10.2019, in case the payment is not made even after a lapse of60 days from issuance of final DSM account, the process to invoke BG shall be initiated besides any other action as per permissible law/Regulations, S'P"I,,~~,~,ro'"ti'g) RVPN, Jaipur Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action. superin~J ~e~~r1Y Accounting) RVPN, Jaipur
  • 10. I RAJASTHAN RAJY A VIDYUT PRASARAN NIGAM LIMITED '~ I [CorporateIdentttyNumber(CIN) U40109RJ2000SGC016485](AN ISO9001.2015CertifiedCompany) ~/ ' Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)II . . GST No.: 08AABCR8312AIZT, PAN No.: AABCR8312A OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting) SLDC-Building, Ajmer Road, Heerapura, Jaipur-302024 Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea(ii?rvpn.co.in No.RVPN/SE(EA)IXENIREDSA/2019-201 D. ~'rrt.-fk Jaipur, dated: 9l!s1;;u,~ FINALIZED RE-DSM ACCOUNT STATEMENT (Intra- State Deviation Char~es) Issued to QCA: Issued for PSS: GILAccount: RECONNECTENERGYSOLUTIONSPRIVATELIMITED PSS_I32KV_RANI_RANI 1558006 (SLOC RenewableEnergyOSM Fund) Address: SAPCODE: 1010916 1ST,NO IS,KRISHIKSARVODAYAFOUNDATION, Corres(!ondance Address of QCA: SAP Document No.: OLDAIRPORTROAD,BANGALORE, 634000 6/:}-'1- Bengaluru(Bangalore)Urban,Kamataka RE Connect Energy Solution Pvt Ltd" PostalCode: 560008 173 , A Sector, Scheme No, 54, Indore Issuin~ Date: GSTNo.: 29AAFCR0074H3ZA MP - 452010 AAFCR0074H (mithun,dube)::@reconnectener~,com) 19.03.2020 PAN No.: Duration Description RE DSM Intra-State S.No. Deviation Charges* 1. oL08,20I9·31,08,2019 FinalRE DSM AccountStatementissued afterrectifications(if applicable)in RE DSM -29,152Statementissuedondt.14.11.2019 *: (+) & (_)meansreceivablefromand payableto state deviationpoolrespectively(in Rupees),Valuesare roundedoffto the nearest integerusingGaussianrounding. Net Amount Payable by the QCA Net Amount Payable by the QCA (In Words) ~29,152/- Rupees Twenty Nine Thousand One Hundred Fifty Two Only Remarks {if an)::}: 1. RE INTER-STATE Deviation Charges Account not issued as Inter State Rated capacity is zero for this PSS, DUE DATE OF PAYMENT FORTHEQCA ~{.},«Yi17.04.2020 (i.e. 30 days from the date of issue of this Executive Engineer (EA), Statement) RVPN Jaiour Please Note:- 1.The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund (Alc No, 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior Accounts Officer (LD), RVPN, Jaipur, 2, The payment should be accompanied with details of statement against which the payment is made along with LPS, if any, 3, Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldcrgrvpn.co.in) for accounting and to this office for information, 4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order dt.27,09,2019 otherwise the defaulting QCA shall have to pay simple interest @0,04% per day, Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt. 27.10.2019, in case the payment is not made even after a lapse of60 days from issuance of final DSM account, the process to invoke BG shall be initiated besides any other action as per permissible law/Regulations. s.~~~ Accounting) RVPN, Jaipur Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action, superint~ ~~n!: Accounting) RVPN, Jaipur
  • 11. ~ RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED ~-- [Corporate Identity Number (CIN) U40109RJ2000SGCOl648Sj (AN ISO 9001.2015 Certified Company) !llIh- Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in) ~ '!I GST No.: 08AABCR8312AIZT, PAN No.: AABCR8312A OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting) SLDC-Building, Ajmer Road, Heerapura, Jaipur-302024 Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea!alrvpn.co.in No.RVPN/SE(EA)IXENIREDSA/20 19-201 D. ';;J.....,47 Jaipur, dated: ~ 'l1')_o~ FINALIZED RE-DSM ACCOUNT STATEMENT {Intra- State Deviation Charr:es} Issued to QCA: Issued for PSS: GILAccount: RECONNECT ENERGY SOLUTIONS PRIVATE LIMITED PSS~132KV ~SANWREEJ~SANWREEJ 1558006 (SLDC Renewable Energy DSM Fund) Address: SAP CODE: 1010917 1ST, NO IS, KRISHIK SARVODAYAFOUNDATION, Corresl!ondance Address of QCA: SAP Document No.: OLD AIRPORT ROAD, BANGALORE, 634oo0611g Bengaluru (Bangalore) Urban, Kamataka RE Connect Energy Solution Pvt Ltd., Postal Code: 560008 173, A Sector, Scheme No. 54, Indore Issuinr: Date: GSTNo.: 29AAFCR0074H3ZA MP-452010 PAN No.: AAFCR0074H (mithun.dubey@reconnectenergy.com) 19.03.2020 S.No. Duration Description RE DSM Intra-State Deviation Charges* 1. 01.08.2019-31.08.2019 Final RE DSM AccountStatementissuedafter rectifications(if applicable)in RE DSM -28,238Statementissued on dt. 14.11.2019 *: (+) & (_)means receivablefrom and payable to state deviation pool respectively(in Rupees). Valuesare rounded offto the nearest integer using Gaussian rounding. Net Amount Payable by the QCA Net Amount Payable by the QCA (In Words) ~28,238/- Rupees Twenty Eight Thousand Two Hundred Thirty Eight Only Remarks {ifan):}: 1. RE INTER-STATE Deviation Charges Account issued separately for this PSS. DUE DATE OF PAYMENT FORTHEQCA ~O-.~17.04.2020 (i.e. 30 days/rom the date 0/ issue of this Executive Engineer (EA), Statement) RVPN. Jaiour Please Note:- I. The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the .oREGenerators State DPA Fund (Nc No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior Accounts Officer (LD), RVPN, Jaipur. 2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any. 3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in) for accounting and to this office for information. 4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest@0.04%perday. Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt. 27.10.2019, in case the payment is not made even after a lapse of60 days from issuance of final DSM account, the process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations. superi~f.!eC-Accounting) RVPN, Jaipur Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action. ISuperintending ngineer ergy Accounting) RVPN, Jaipur
  • 12. p~---~ RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED [CorporateIdentityNumber(CIN) U40109RJ2000SGC016485](AN ISO90012015CertifiedCompany) ~:- '!1) Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in) ~- ? GSTNo.: 08AABCR8312AIZT, PAN No.: AABCR8312A OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting) SLDC-Building, Ajmer Road, Heerapura, Jaipur-302024 Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea@rvpn.co.in No. RVPN/SE(EA )/xEN IRED SA/20 19-201 D. ';)_.:yy & Jaipur, dated: ~ )n} '-o?zJ FINALIZED RE-DSM ACCOUNT STATEMENT (Intra- State Deviation Charl:es} Issued to QCA: Issued for PSS: GILAccount: RECONNECTENERGYSOLUTIONSPRIVATELIMITED PSS_132KV_SHEO_SUZLON 1558006 (SLOe RenewableEnergyDSM Fund) Address: SAPCODE: 1010918 1ST,NO 15,KRISHIKSARVODAYAFOUNDATION, Corresl!ondance Address of QCA: SAP Document No.: OLDAIRPORTROAD,BANGALORE. 634000 617-9 Bengaluru(Bangalore)Urban,Kamataka RE Connect Energy Solution Pvt Ltd., PostalC!!!!e:560008 173 , A Sector, Scheme No. 54, Indore Issuinl: Date: GSTNo.: 29AAFCR0074H3ZA MP - 452010 AAFCR0074H (mithun.dube)::@reconnectenerg)::.com) 19.03.2020 PAN No.: S.No. Duration Description RE DSM Intra-State Deviation Charges* 1. 01.08.2019·31.08.2019 FinalRE DSM AccountStatementissuedafter rectifications(if applicable)in RE DSM -10,511Statementissuedon dt. 14.11.2019 *: (+) & (-) means receivablefrom and payable to state deviation pool respectively(in Rupees). Valuesare rounded off to the nearest integer usin&Gaussian rounding. Net Amount Payable by the QCA Net Amount Payable by the QCA (In Words) nO,5111- Rupees Ten Thousand Five Hundred Eleven Only Remarks (if any}: 1. RE INTER-STATE Deviation Charges Account not issued as Inter State Rated capacity is zero for this PSS. DUE DATE OF PAYMENT FORTHEQCA 0'"Y"Yr> (~~17.04.2020 (i.e. 30 days/rom tlte date of issue of this Executive Engineer (EA), Slatement) RVPN Jaipur Please Note:- 1. The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund (Alc No. 37534869390, IFSCIRTGS code: SBIN003 1026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior Accounts Officer (LD), RVPN, Jaipur. 2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any. 3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in) for accounting and to this office for information. 4. QCAs shall have to deposit the amount within 30 days of the issue ofthis finalized DSM account as per RERC Order dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest@0.04%perday. Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt. 27.10.2019, in case the payment is not made even after a lapse of60 days from issuance of final DSM account, the process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations. super~~~nC Accounting) RVPN, Jaipur Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action. superin~~gr:-ccounting) RVPN, Jaipur
  • 13. I RAJASTHAN RAJY A VIDYUT PRASARAN NIGAM LIMITED [CorporateIdentityNumber(CIN) U40109RJ2000SGC01648Sl(AN ISO90012015CertifiedCompany) Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in) GST No.: 08AABCR8312AIZT, PAN No.: AABCR8312A OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting) SLDC-Building, Ajrner Road, Heerapura, Jaipur-302024 Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea@rvpn.co.in No.RVPN/SE(EA)IXENIREDSA/2019-201 D. ~-:-r4_9 Jaipur, dated: ~~l:le~FINALIZED RE-DSM ACCOUNT STATEMENT (Intra- State Deviation CharJ:es) Issued to QCA: Issued for PSS: GIL Account: RECONNECTENERGYSOLUTIONSPRIVATELIMITED PSS_220KV_BADISID_3NO_33KV 1558006 (SLOCRenewableEnergyOSM Fund) Address: SAPCODE: 1010921 1ST,NO 15,KRISHIKSARVODAYAFOUNDATION, Corresl!ondance Address of QCA: SAP Document No.: OLDAIRPORTROAD,BANGALORE, 634000 6180 BengaIuru(Bangalore) Urban,Karnataka RE Connect Energy Solution Pvt Ltd" PostalCode:560008 173 , A Sector, Scheme No. 54, Indore IssuinJ: Date: GSTNo.: 29AAFCR0074H3ZA MP-452010 AAFCR0074H (mithun.dubex@reconnectenergy.com) 19.03.2020 PAN No.: s.xe. Duration Description RE DSM Intra-State Deviation Charges* I. 01.08.2019-31.08.2019 Final RE DSM AccountStatementissued afterrectifications(if applicable)in RE DSM -53,215Statementissuedon dr. 14.11.2019 *: (+) & (-) means receivablefrom and payable to state deviation pool respectively(in Rupees). Valuesare rounded off to the nearest integer using Gaussian rounding. Net Amount Payable by the QCA Net Amount Payable by the QCA (In Words) f53,2 I5/- Rupees Fifty Three Thousand Two Hundred Fifteen Only Remarks {if anl:}: 1. RE lNTER-ST ATE Deviation Charges Account issued separately for this PSS. DUE DATE OF PAYMENT FORTHEQCA ~~~17.04.2020 (i.e. 30 days from the date of issue of this Executive Engineer (EA), Statement) RVPN Jaiour Please Note:- I. The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund (Alc No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior Accounts Officer (LD), RVPN, Jaipur. 2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any. 3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldcrgrvpn.co.in) for accounting and to this office for information. 4. QCAs shall have to deposit the amount within 30 days of the issue ofthis finalized DSM account as per RERC Order dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest @0.04% per day. Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt. 27.10.2019, in case the payment is not made even after a lapse of60 days from issuance of final DSM account, the process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations. su~e)::counting) RVPN, Jaipur Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action. superidl~nCy Accounting) RVPN, Jaipur
  • 14. ~~~ RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED [CorporateIdentityNumber(CIN)U40109RJ2000SGCOI6485](ANISO9001.2015CertifiedCompany) Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in) Ij GST No.: 08AABCR8312AIZT, PAN No.: AABCR8312A OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting) SLDC-Building, Ajmer Road, Heerapura, Jaipur-302024 Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea@rvpn.co.in No.RVPN/SE(EA)IXENIREDSAI20 19-201D. ;).._~~'"'D Jaipur, dated: ~~f~'l.o FINALIZED RE-DSM ACCOUNT STATEMENT (Intra- State Deviation Charj:;es) Issued to QCA: Issued for PSS: GIL Account: RECONNECTENERGYSOLUTIONSPRIVATELIMITED PSS_220KV_BADISID_TERRAFORM 1558006 (SLDCRenewableEnergyDSMFund) Address: SAPCODE: 1010922 1ST,NO15,KRISHIKSARVODAYAFOUNDATION, Corres(!ondance Address of QCA: SAP Document No.: OLDAIRPORTROAD,BANGALORE, 634000 618{ Bengaluru(Bangalore)Urban,Kamataka RE Connect Energy Solution Pvt Ltd., PostalCode:560008 173 , A Sector, SchemeNo. 54, Indore Issuinr: Date: GSTNo.: 29AAFCR0074H3ZA MP-452010 PAN No.: AAFCR0074H (mithun.dubey@reconnectenergy.com) 19.03.2020 S.No. Duration Description RE DSM Intra-State Deviation Charges* 1. 01.08.2019·31.08.2019 FinalRE DSM AccountStatementissued afterrectifications(if applicable)in RE DSM -72,323Statementissuedon dt. 14.11.2019. *: (+) & (-) means receivablefrom and payable to state deviation pool respectively(in Rupees). Valuesare rounded off to the nearest integer using Gaussian rounding. NetAmountPayableby the QCA Net Amount Payable by the QCA (In Words) ~72,323/- Rupees Seventy Two Thousand Three Hundred Twenty Three Only Remarks (if any}: 1. RE INTER-STATE Deviation Charges Account not issued as Inter State Rated capacity is zero for this PSS. DUEDATEOF PAYMENT FORTHEQCA 0""Y"Y'n (}, r-.-Y; 17.04.2020 (i.e. 30 days/rom the dateof issue of this Executive Engineer (EA), Statement) RVPN. Jaipur Please Note:- 1.The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund (Alc No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior Accounts Officer (LD), RVPN, Jaipur, 2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any. 3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in) for accounting and to this office for information. 4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest@0.04%perday. Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt. 27.10.2019, in case the payment is not made even after a lapse of 60 days from issuance of final DSM account, the process to invoke BG shall be initiated besides any other action as per permissible law/Regulations, S"",,",~~~1-~~J1b~~;A"'"'"")RVPN, Jaipur Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action. supe~~rW(gy Accounting) RVPN, Jaipur
  • 15. I RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED [CorporateIdentityNumber(CIN)U40109RJ2000SGCOl648Sj(AN ISO9001:2015CertifiedCompany) Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in) ~ GST No.: 08AABCR8312A1ZT, PAN No.: AABCR8312A OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting) SLDC-Building, Ajmer Road, Heerapura, Jaipur-302024 Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea@rvpn.co.in No.RVPN/SE(EA)IXENIREDSAI2019-201 D. ~/s-J Jaipur, dated: ~?d)0 FINALIZED RE-DSM ACCOUNT STATEMENT (Intra- State Deviation Charl:es} Issued to QCA: Issued for PSS: GIL Account: RECONNECTENERGYSOLUTIONSPRIVATELIMITED PSS_220KV_BALOTRA_BALOTRA 1558006 (SLDCRenewableEnergyDSMFund) Address: SAPCODE: 1010924 1ST,NO15,KRISHIKSARVODAYAFOUNDATION, Corresl!ondance Address of QCA: SAP Document No.: OLDAIRPORTROAD,BANGALORE, 634000 6Is2- Bengaluru(Bangalore)Urban,Karnataka RE Connect Energy Solution Pvt Ltd., PostalCode:560008 173 , A Sector, SchemeNo. 54, Indore Issuing Date: GSTNo.: 29AAFCR0074H3ZA MP-452010 PAN No.: AAFCR0074H (mithun.dubex@reconnectenergy.com) 19.03.2020 S.No. Duration Description RE DSM Intra-State Deviation Charges* 1. 01.08.2019-31.08.2019 FinalRE DSM AccountStatementissued after rectifications(if applicable)in RE DSM -2,709Statementissuedon dt. 14.11.2019. "': (+) & (-) means receivablefrom and payable to state deviation pool respectively(in Rupees), Valuesare rounded off to the nearest integer using Gaussian rounding. NetAmountPayableby the QCA Net Amount Payable by the QCA (In Words) t2,709/- Rupees Two Thousand Seven Hundred Nine Only Remarks (if aDl:): I. RE INTER-STATE Deviation Charges Account issued separately for this PSS. DUEDATEOF PAYMENT FORTHEQCA ~(),~17.04.2020 (i.e. 30 days/rom the date of issue of this Executive Engineer (EA), Statement) RVPN. Jaipur Please Note:- I. The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund (Alc No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior Accounts Officer (LD), RVPN, Jaipur. 2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any. 3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in) for accounting and to this office for information. 4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest@0.04%perday. Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt. 27.10.2019, in case the payment is not made even after a lapse of 60 days from issuance of final DSM account, the process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations. superint~J:~counting) RVPN, Jaipur Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action. S""ri"".dJ~J :~,".t;.~RVPN, Jaipur
  • 16. I RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED [Corporate Identity Number (CIN) U40109RJ2000SGCOl6485j (AN ISO 90012015 Certified Company) Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in) GST No.: 08AABCR8312AIZT, PAN No.: AABCR8312A OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting) SLDC-Building, Ajmer Road, Heerapura, Jaipur-302024 Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea@rvpn.co.in No.RVPN/SE(EA)IXENIREDSAI2019-201 D. ~ ry'S:"2--- Jaipur, dated: ~ 'sl-.:;u,?:Q FINALIZED RE-DSM ACCOUNT STATEMENT (Intra- State Deviation Charl:;es) Issued to QCA: Issued for PSS: GIL Account: RECONNECT ENERGY SOLUTIONS PRlV ATE LIMITED PSS~220KV ~BAP~14NO~33KV 1558006 (SLDC Renewable Energy DSM Fund) Address: SAP CODE: 1010925 1ST, NO 15. KRISHIK SARVODAYA FOUNDATION, Corres(!ondance Address of QCA: SAP Document No.: OLD AIRPORT ROAD, BANGALORE, 634000 bIg ~ Bengaluru (Bangalore) Urban, Karnataka RE Connect Energy Solution Pvt Ltd" Postal Code: 560008 173 , A Sector, SchemeNo, 54, Indore Issuing Date: GSTNo.: 29AAFCR0074H3ZA MP-452010 PAN No.: AAFCR0074H (mithun.dube)l@reconnectenergy.com) 19.03.2020 S.No. Duration Description RE DSM Intra-State Deviation Charges* 1. 01.08.2019-31.08.2019 Final RE DSM AccountStatementissued afterrectifications(if applicable)in RE DSM -86,420Statementissuedon dt. 14.11.2019 "":(+) & (-) means receivablefrom and payable to state deviation pool respectively(in Rupees). Valuesare rounded offto the nearest integer using Gaussian rounding. Net Amount Payable by the QCA Net Amount Payable by the QCA (In Words) ~86,420/- Rupees Eighty Six Thousand Four Hundred Twenty Only Remarks (if an)::}: I. RE INTER-STATE Deviation Charges Account issued separately for this PSS. DUE DATE OF PAYMENT FORTHEQCA o'Y'YYl (1,.,..;;17.04.2020 (i.e.30 days from the date of issue of this Executive Engineer (EA), Statement) RVPN Jaiour Please Note:- I. The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make payments within 30 (thirty) days i.e, up to the above mentioned due date of payment into the "RE Generators State DPA Fund (Alc No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior Accounts Officer (LD), RVPN, Jaipur. 2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any. 3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in) for accounting and to this office for information. 4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest@0.04%perday. Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt, 27.10.2019, in case the payment is not made even after a lapse of60 days from issuance of final DSM account, the process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations. superin~~:e::ccounting) RVPN, Jaipur Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action. S''''ri.~!Q~.h"",",,,,,,)RVPN, Jaipur
  • 17. ~~!~ RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED [CorporateIdentityNumber(CIN):U40109RJ2000SGC016485](ANISO9001:2015CertifiedCompany) , , '~ Regd, Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in). ) 1) GST No.: 08AABCR8312AIZT, PAN No,: AABCR8312A OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting) SLDC-Building, Ajmer Road, Heerapura, Jaipur-302024 Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea@rvpn.co,in No.RVPN/SE(EA)IXENIREDSA/20 19-201D. ~~~~ Jaipur, dated: ~ g1).o');D FINALIZED RE-DSM ACCOUNT STATEMENT {Intra- State Deviation Charl::es) Issued to QCA: Issued for PSS: GIL Account: RECONNECTENERGYSOLUTIONSPRIVATELIMITED PSS_220KV_BAP_MAHINDRA 1558006 (SLDCRenewableEnergyDSMFund) Address: SAPCODE: 1010926 1ST.NO15.KRISHIKSARVODAYAFOUNDATION. Corres(!ondance Address of QCA: SAP Document No.: OLDAIRPORTROAD.BANGALORE. 634000 6 184- Bengalum(Bangalore)urban.Karnataka RE Connect Energy Solution Pvt Ltd., PostalCode:560008 173, A Sector, SchemeNo. 54, Indore Issuing Date: GSTNo.: 29AAFCR0074H3ZA MP-452010 PAN No.: AAFCR0074H (mithun.dubex@reconnectenergx.com) 19.03.2020 S.No. Duration Description RE DSM Intra-State Deviation Charges* 1. 01.08.2019-31.08.2019 FinalRE DSM AccountStatementissued afterrectifications(if applicable)in RE DSM -33,064Statementissuedon dt. 14.11.2019 *: (+) & (-) means receivable from and payable to state deviation pool respectively (in Rupees). Values are rounded off to the nearest integer using Gaussian rounding. NetAmountPayablebythe QCA Net Amount Payable by the QCA (In Words) t33,064/- Rupees Thirty Three Thousand Sixty Four Only Remarks {ifany}: I. RE INTER-STATE Deviation Charges Account issued separately for this PSS. DUEDATEOF PAYMENT FORTHEQCA ~(hrrn17.04.2020 {i:e: 30 daysfrom the date of issue of this Executive Engineer (EA), Statement) RVPN. Jaiour Please Note:- 1.The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund (Alc No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior Accounts Officer (LD), RVPN, Jaipur. 2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any. 3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in) for accounting and to this office for information. 4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest@0.04%perday. Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt. 27.10.2019, in case the payment is not made even after a lapse of60 days from issuance of final DSM account, the process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations. ~~~JSuperintending Engineer (Energy Accounting) RVPN, Jaipur Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action. S'P"lnt.~ e~fA'W".,g)RVPN, Jaipur
  • 18. RAJASTHAN RAJY A VIDYUT PRASARAN NIGAM LIMITED [Corporate Identity Number (CIN) U40109RJ2000SGCO I6485j (AN ISO 9001: 2015 Certified Company) Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in) GST No.: 08AABCR8312AIZT, PAN No.: AABCR8312A OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting) SLDC-Building, Ajmer Road, Heerapura, Jaipur-302024 Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea@rvpn.co.in No.RVPN/SE(EA)IXENIREDSA!2019-201 D. ~'1.stJ Jaipur, dated: <1 'U~~FINALIZED RE-DSM ACCOUNT STATEMENT (Intra- State Deviation CharKes) I Issued to QCA: Issued for PSS: GIL Account: RECONNECT ENERGY SOLUTIONS PRIVATE LIMITED PSS_220KV _BHADLA_5No_33KV 1558006 (SLDC Renewable Energy DSM Fund) Address: SAP CODE: 1010927 1ST, NO 15, KRISHIK SARVODAY A FOUNDATION. Corresl!ondance Address of QCA: SAP Document No.: OLD AIRPORT ROAD, BANGALORE, 634000618 S Bengaluru (Bangalore) Urban, Kamataka RE Connect Energy Solution Pvt Ltd., Postal Code: 560008 173 , A Sector, Scheme No. 54, Indore Issuing Date: GSTNo.: 29AAFCR0074H3ZA MP-452010 PAN No.: AAFCR0074H (mithun.dubey@reconnectenergy.com) 19.03.2020 S.No. Duration Description RE DSM Intra-State Deviation Charges* 1. 01.08.2019-31.08.2019 Final RE DSM AccountStatementissued afterrectifications(if applicable)in RE DSM -72,224Statementissuedon dr. 14.11.2019 It: (+) & (_)means receivablefrom and payable to state deviation pool respectively(in Rupees). Valuesare rounded offto the nearest integer using Gaussian rounding. Net Amount Payable by the QCA Net Amount Payable by the QCA (In Words) ~72,224/- Rupees Seventy Two Thousand Two Hundred Twenty Four Only Remarks (if an:!:): l. RE lNTER-STATE Deviation Charges Account not issued as Inter State Rated capacity is zero for this PSS. DUE DATE OF PAYMENT FORTHEQCA ~r:h~17.04.2020 {i:e:30 days/rom the date of issue of this Executive Engineer (EA), Statement) RVPN. Jaipur Please Note:- l.The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund (Alc No. 37534869390, IFSCIRTGS code: SBlN0031026, Bank: SBJ,Collectrate Branch, JAIPUR) maintained by Senior Accounts Officer (LD), RVPN, Jaipur. 2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any. 3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in) for accounting and to this office for information. 4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest @0.04% per day. Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt. 27.10.2019, in case the payment is not made even after a lapse of 60 days from issuance of final DSM account, the process to invoke BG shall be initiated besides any other action as per permissible law/Regulations, S"",~~~.J: Accounting) RVPN, Jaipur Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action. ~41h~Superintending Engineer (Energy Accounting) RVPN, Jaipur
  • 19. ! RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED , [CorporateIdentityNumber(CIN)U40109RJ2000SGC016485j(AN ISO90012015CertifiedCompany) I Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in) ~ ;?i GST No.: 08AABCR8312AIZT, PAN No.: AABCR8312A OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting) SLDC-Building, Ajmer Road, Heerapura, Jaipur-302024 Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea@rvpn.co.in No. RVPN/SE(EA)!XENIRED SA/20 19-201 D. '"::J..__~~ Jaipur, dated: 9.31~?e)FINALIZED RE-DSM ACCOUNT STATEMENT {Intra- State Deviation Char"es) Issued to QCA: Issued for PSS: GIL Account: RECONNECTENERGYSOLUTIONSPRIVATELIMITED PSS_220KV_BHAWAD_SNCA 1558006 (SLDCRenewableEnergyDSMFund) Address: SAPCODE: 1010928 1ST,NO15,KRISHIKSARVODAYAFOUNDATION, Corres[!ondance Address of QCA: SAP Document No.: OLDAIRPORTROAD,BANGALORE, 634000 -6 18-6 Bengaluru(Bangalore)Urban,Karnataka RE Connect Energy Solution Pvt Ltd., PostalCode:560008 173 , A Sector, SchemeNo. 54, Indore Issuin" Date: GSTNo.: 29AAFCR0074H3ZA MP-452010 PAN No.: AAFCR0074H (mithun.dubex@reconnectenerg~{com) 19.03.2020 S.No. Duration Description RE DSM Intra-State Deviation Charges* 1. 01.08.2019-3.08.2019 Final RE DSM AccountStatementissued afterrectifications(if applicable)in RE DSM -17,985Statementissuedon dt. 14.11.2019 ": (+) & (-) means receivablefrom and payable to state deviation pool respectively(in Rupees). Valuesare rounded offto the nearest integer using Gaussian rounding. NetAmountPayableby the QCA Net Amount Payable by the QCA (In Words) U7,985/- Rupees Seventeen Thousand Nine Hundred Eighty Five Only Remarks {ifanx): 1. RE INTER-STATE Deviation Charges Account not issued as Inter State Rated capacity is zero for this PSS. DUEDATEOF PAYMENT FORTHEQCA oYYn ~ri'.17.04.2020 (i.e. 30 days/rom the date of issue of tnis Executive Engineer (EA), Statement) RVPN. Jaipur Please Note:- 1.The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund (Alc No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior Accounts Officer (LD), RVPN, Jaipur. 2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any. 3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in) for accounting and to this office for information. 4. QCAs shall have to deposit the amount within 30 days of the issue ofthis finalized DSM account as per RERC Order dt.27.09.20l9 otherwise the defaulting QCA shall have to pay simple interest@0.04% per day. Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt. 27.10.2019, in case the payment is not made even after a lapse of 60 days from issuance of final DSM account, the process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations. S . ~~£ A lng)upermten mg ngmee nergy ccountmg RVPN, Jaipur Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action. ~~J~ Superintending Engineer ~ergy Accounting) RVPN, Jaipur
  • 20. .~~ RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED t [CorporateIdentity Number(CIN)U40I09RJ2000SGCO16485](AN ISO90012015Certified Company) {i !r' Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in) ? GSTNo.: 08AABCR8312A1ZT, PAN No.: AABCR8312A~ OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting) SLDC-Building, Ajmer Road, Heerapura, Jaipur-302024 Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea@rvpn.co.in No.RVPN/SE(EA)IXENIREDSAI20 19-201 D. -;2._..-,s;t Jaipur, dated: t~lg-,?o~ FINALIZED RE-DSM ACCOUNT STATEMENT (Intra- State Deviation CharKes) Issued to QCA: Issued for PSS: GIL Account: RECONNECTENERGYSOLUTIONSPRlVATELIMITED PSS_220KV_GAJNER_8NO_33KV 1558006 (SLDCRenewableEnergyDSMFund) Address: SAPCODE: 1010929 1ST,NOIS,KRISHIKSARVODAYAFOUNDATION, Corres(!ondance Address of QCA: SAP Document No.: OLDAIRPORTROAD,BANGALORE, 634000 6 187-Bengaluru(Bangalore)Urban,Kamataka RE Connect Energy Solution Pvt Ltd., PostalCode:560008 173, A Sector, SchemeNo. 54, Indore IssuinK Date: GSTNo.: 29AAFCR0074H3ZA MP-452010 PAN No.: AAFCR0074H (mithun.dube)C@reconnectenerg)C.com) 19.03.2020 S.No. Duration Description RE DSM Intra-State Deviation Charges* 1. 01.08.2019-31.08.2019 FinalRE DSM AccountStatementissued after rectifications(if applicable)in RE DSM -1,39,065Statementissuedondt.14.11.2019 OIl: (+) & (_)means receivablefrom and payable to state deviation pool respectively(in Rupees), Valuesare rounded off to the nearest integer using Gaussian rounding. NetAmountPayableby the QCA Net Amount Payable by the QCA (In Words) n,39,065/- Rupees One Lakh Thirty Nine Thousand Sixty Five Only Remarks {ifanl:}: 1. RE INTER-STATE Deviation Charges Account issued separately for this PSS. DUEDATEOF PAYMENT FORTHEQCA Orrn Q,~17.04.2020 (i.e. 30 days from the date of issue of this Executive Engineer (EA), Statement) RVPN. Jaiour Please Note:- 1.The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund (A/c No. 37534869390, IFSCIRTGS code: SBIN0031026,Bank: SBl, Collectrate Branch, JAIPUR) maintained by Senior Accounts Officer (LD), RVPN, Jaipur. 2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any. 3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in) for accounting and to this office for information. 4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest@0.04%perday. Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt. 27.10.2019, in case the payment is not made even after a lapse of60 days from issuance of final DSM account, the process to invoke BG shall be initiated besides any other action as per permissible law/Regulations, superi~~e'Accounting) RVPN, Jaipur Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action. superi~ ~e[gy Accounting) RVPN, Jaipur
  • 21. RAJASTHAN RAJY A VIDYUT PRASARAN NIGAM LIMITED A<; [Corporate Identity Number (CIN) U40109RJ2000SGC016485] (AN ISO 9001: 2015 Certified Company) Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in) ~ V GST No.: 08AABCR8312AIZT, PAN No.: AABCR8312A OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting) SLOC-Building, Ajmer Road, Heerapura, Jaipur-302024 Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea(Zilrvpn.co.in No.RVPN/SE(EA)/xENIREOSA/2019-20/0. Q"7S7 Jaipur, dated: ~ &!:).-O"")0 FINALIZED RE-DSM ACCOUNT STATEMENT (Intra- State Deviation Charl:es} Issued to QCA: Issued for PSS: GILAccount: RECONNECT ENERGY SOLUTIONS PRIVATE LIMITED PSS_220KV _GAJNR_MAHINDRA_SUSTEN 1558006 (SLDe Renewable Energy DSM Fund) Address: SAP CODE: 1010930 1ST, NO 15. KRISHIK SARVODA YA FOUNDATION, Corres[!ondance Address of QCA: SAP Document No.: OLD AIRPORT ROAD, BANGALORE, 634000 6 (g~ BengaIuru (Bangalore) Urban, Kamataka RE Connect Energy Solution Pvt Ltd., Postal Code: 560008 173, A Sector, Scheme No. 54, Indore Issuing Date: GSTNo.: 29AAFCR0074H3ZA MP - 452010 PAN No.: AAFCR0074H (mithun.dubey@reconnectenergy.com) 19.03.2020 S.No. Duration Description RE DSM Intra-State Deviation Charges* 1. 01.08.2019-31.08.2019 Final RE DSM AccountStatementissued after rectifications(if applicable)in RE DSM -86,201Statementissuedondt.14.11.2019 ": (+) & (-) means receivable from and payable to state deviation pool respectively (in Rupees), Values are rounded off to the nearest integer using Gaussian rounding. Net Amount Payable by the QCA Net Amount Payable by the QCA (In Words) ~86,201/- Rupees Eighty Six Thousand Two Hundred One Only Remarks {ifan):}: I. RE INTER-STATE Deviation Charges Account not issued as Inter State Rated capacity is zero for this PSS. DUE DATE OF PAYMENT FORTHEQCA o-rr-n t1rr=;:;17.04.2020 (i.e. 30 days from the date of issue of this Executive Engineer (EA), Statement) RVPN. Jaipur Please Note:- I. The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund (Alc No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior Accounts Officer (LO), RVPN, Jaipur. 2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any. 3. Payment detail intimation should be furnished to Senior Accounts Officer (LO), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in) for accounting and to this office for information. 4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest@0.04%perday. Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt. 27.10.2019, in case the payment is not made even after a lapse of60 days from issuance of final DSM account, the process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations. super~~~Jrgy Accounting) RVPN, Jaipur Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action. S""'ri.~~~tO""H")RVPN, Jaipur
  • 22. I RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED j,£ .~ [CorporateIdentityNumber(CIN) U40109RJ2000SGCOl6485j(AN ISO90012015CertifiedCompany) !~b Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in) ~ I ~ ) GSTNo.: 08AABCR8312AIZT, PAN No.: AABCR8312A~ OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting) SLDC-Building, Ajrner Road, Heerapura, Jaipur-302024 Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea@rvpn.co.in No.RVPN/SE(EA)!XENfREDSA/20 19-201D. ";;2_~~ Jaipur, dated: ~ '~~!>-Oo::m FINALIZED RE-DSM ACCOUNT STATEMENT {Intra- State Deviation Chaq:;es} Issued to QCA: Issued for PSS: GILAccount: RECONNECTENERGYSOLUTIONSPRIVATELIMITED PSS_220KV_GULABPURA_GULABPURA 1558006 (SLDC RenewableEnergyDSM Fund) Address: SAPCODE: 1010931 1ST,NO 15,KRISHIKSARVODAYAFOUNDATION, Corres(!ondance Address of QCA: SAP Document No.: OLDAIRPORTROAD,BANGALORE. 634000 6 Igg Bengaluru(Bangalore) Urban,Karnataka RE Connect Energy Solution Pvt Ltd., PostalCode: 560008 173 , A Sector, Scheme No. 54, Indore Issuinl: Date: GSTNo.: 29AAFCR0074H3ZA MP-452010 AAFCR0074H (mithun.dubex@reconnectenergx.com) 19.03.2020 PAN No.: S.No. Duration Description RE DSM Intra-State Deviation Charges* 1. 01.08.2019-31.08.20I9 Final RE DSM AccountStatementissued afterrectifications(if applicable)in RE DSM -7,508Statementissuedon dt. 14.11.2019 -: (+) & (-) meansreceivablefromand payableto state deviationpoolrespectively(inRupees).Valuesare roundedoffto the nearestintegerusingGaussianrounding. Net Amount Payable by the QCA Net Amount Payable by the QCA (In Words) f7,508/- Rupees Seven Thousand Five Hundred Eight Only Remarks {if an:::}: 1. RE INTER-STATE Deviation Charges Account issued separately for this PSS. DUE DATE OF PAYMENT FORTHEQCA Oy~~~ 17.04.2020 {i:e: 30 days/rom the date of issue of this Executive Engineer (EA), Statement) RVPN Jainur Please Note:- 1. The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund (A/c No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior Accounts Officer (LD), RVPN, Jaipur. 2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any. 3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in) for accounting and to this office for information. 4. QCAs shall have to deposit the amount within 30 days of the issue ofthis finalized DSM account as per RERC Order dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest@0.04%per day. Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt. 27.10.2019, in case the payment is not made even after a lapse of60 days from issuance of final DSM account, the process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations. S"P,,~~,C,"".ti.~RVPN, Jaipur Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action. S""ri"t?tf.l.~y c.;RVPN, Jaipur
  • 23. ~~"~ RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED £.-:-:.. .... ;~fJ) [CorporateIdentityNumber(CIN)U40I09RJ2000SGCO164851(AN ISO900I. 2015CertifiedCompany) 'li I Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)!i i/ GSTNo.: 08AABCR8312AIZT, PAN No.: AABCR8312A OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting) SLDC-Building, Ajmer Road, Heerapura, Jaipur-302024 Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea(Q!rvpn.co.in No.RVPN/SE(EA)IXENIREDSA12019-201 D. 'Z.7st; Jaipur, dated: ~ ~f.).c?O FINALIZED RE-DSM ACCOUNT STATEMENT (Intra- State Deviation Charges} I Issued to QCA: Issued for PSS: GILAccount: RECONNECTENERGYSOLUTIONSPRlVATELIMITED PSS_220KV_KANASAR_2NO_33KV 1558006 (SLDCRenewableEnergyDSMFund) Address: SAPCODE: 1010932 1ST,NO15,KRISHIKSARVODAYAFOUNDATION, Corresuondance Address of QCA: SAP Document No.: OLDAIRPORTROAD,BANGALORE, 634000 6 (3D Bengaluru(Bangalore)Urban,Karnataka RE Connect Energy Solution Pvt Ltd., PostalCode:560008 173 , A Sector, SchemeNo. 54, Indore Issuing Date: GSTNo.: 29AAFCR0074H3ZA MP-452010 PAN No.: AAFCR0074H (mithun.dubex@reconnectenergx·com) 19.03.2020 S.No. Duration Description RE DSM Intra-State Deviation Charges* 1. 01.08.2019-31.08.2019 FinalRE DSM AccountStatementissuedafter rectifications(if applicable)in RE DSM -85,974Statementissuedon dt. 14.11.2019 *: (+) & (-)means receivable from and payable to state deviation pool respectively (in Rupees). Values are rounded off to the nearest integer using Gaussian rounding. NetAmountPayableby the QCA Net Amount Payable by the QCA (In Words) ~85,974/- Rupees Eighty Five Thousand Nine Hundred Seventy Four Only Remarks {ifany}: I. RE INTER-STATE Deviation Charges Account not issued as Inter State Rated capacity is zero for this PSS. DUEDATEOF PAYMENT FORTHEQCA ~iJ,wn17.04.2020 (i.e. 30 days from the date of issue of this Executive Engineer (EA), Statement) RVPN Jaipur Please Note:- I. The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund (Alc No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior Accounts Officer (LD), RVPN, Jaipur. 2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any. 3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in) for accounting and to this office for information. 4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest @0.04% per day. Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt. 27.10.2019, in case the payment is not made even after a lapse of 60 days from issuance of final DSM account, the process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations. S""'ri"r.dl~AttO""""g) RVPN, Jaipur Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action. superin~~~Accounting) RVPN, Jaipur
  • 24. -:::.~::-.. RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED ~ .. [CorporateIdentityNumber(CIN) U40109RJ2000SGC016485](AN ISO9001:2015CertifiedCompany) Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in) ,, GST No.: 08AABCR8312AIZT, PAN No.: AABCR8312A OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting) SLDC-Building, Ajrner Road, Heerapura, Jaipur-302024 Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea@rvpn.co.in No.RVPN/SE(EA)IXENIREDSA/20 19-201D. ?-.._~bO Jaipur, dated: '0'~1~wFINALIZED RE-DSM ACCOUNT STATEMENT (Intra- State Deviation Charl:;es) I Issued to QCA: Issued for PSS: GIL Account: RECONNECTENERGYSOLUTIONSPRlVATELIMITED PSS_220KV_KANASAR_SP_pv 1558006 (SLDC RenewableEnergyDSM Fund) Address: SAPCODE: 1010933 1ST.NO IS. KRISHIKSARVODAYAFOUNDATION. Corresl!ondance Address of QCA: SAP Document No.: OLDAIRPORTROAD.BANGALORE. 634000 (; 13[ Bengaluru(Bangalore)Urban.Karnataka RE Connect Energy Solution Pvt Ltd., PostalCode: 560008 173 , A Sector, Scheme No. 54, Indore Issuinl:; Date: GSTNo.: 29AAFCR0074H3ZA MP-452010 PAN No.: AAFCR0074H (mithun. dubex@reconnectenergx.com) 19.03.2020 S.No. Duration Description RE DSM Intra-State Deviation Charges* 1. 01.08.2019-31.08.2019 Final RE DSM AccountStatementissued afterrectifications(if applicable)in RE DSM -55,522Statementissuedon dt. 14.11.2019 *: (+) & (-) means receivablefrom and payable to state deviation pool respectively(in Rupees). Valuesare rounded off to the nearest integer using Gaussian rounding. Net Amount Payable by the QCA Net Amount Payable by the QCA (In Words) ~55,522/- Rupees Fifty Five Thousand Five Hundred Twenty Two Only Remarks (if anxl: 1. RE INTER-STATE Deviation Charges Account not issued as Inter State Rated capacity is zero for this PSS. DUE DATE OF PAYMENT FORTHEQCA ~(},,~17.04.2020 (i.e. 30 days/rom the date of issue of this Executive Engineer (EA), Statement) RVPN Jainur Please Note:- I. The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund (Alc No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior Accounts Officer (LD), RVPN, Jaipur. 2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any. 3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in) for accounting and to this office for information. 4. QCAs shall have to deposit the amount within 30 days of the issue ofthis finalized DSM account as per RERC Order dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest@0.04%per day. Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt. 27.10.2019, in case the payment is not made even after a lapse of60 days from issuance of final DSM account, the process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations. Supe en i ngineer ( ~J::ounting) RVPN, Jaipur Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action. S"p'ri""~L,, ou nting) RVPN, Jaipur
  • 25. RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED [CorporateIdentityNumber(CIN) U40109RJ2000SGC016485](ANISO9001.2015CertifiedCompany) Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in) GST No.: 08AABCR8312AIZT, PAN No.: AABCR8312A OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting) SLDC-Building, Ajrner Road, Heerapura, Jaipur-302024 Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ealalrvpn.co.in No.RVPN/SE(EA)IXENIREDSA/20 19-201D. ~~61 Jaipur, dated: ',~,~?OFINALIZED RE-DSM ACCOUNT STATEMENT {Intra- State Deviation Char~esl Issued to QCA: Issued for PSS: GIL Account: RECONNECTENERGYSOLUTIONSPRIVATELIMITED PSS~220KV~KHINWSAR~KHINWSAR 1558006 (SLDCRenewableEnergyDSMFund) Address: SAPCODE: 1010934 1ST.NO15.KRISHIKSARVODAYAFOUNDATION. Corres[!ondance Address of QCA: SAP Document No.: OLDAIRPORTROAD,BANGALORE. 634000 6 192- Bengaluru(Bangalore)Urban,Kamataka RE Connect Energy Solution Pvt Ltd., PostalCode:560008 173 , A Sector, Scheme No. 54, Indore Issuin~ Date: GSTNo.: 29AAFCR0074H3ZA MP-452010 PAN No.: AAFCR0074H (mithun.dubey@reconnectenerg)C.com) 19.03.2020 S.No. Duration Description RE DSM Intra-State Deviation Charges* 1. 0108.2019-31.08.2019 Final RE DSM AccountStatementissuedafterrectifications(if applicable)in RE DSM -6,602Statementissuedon dt. 14.11,2019 -: (+) & (-) means receivablefrom and payable to state deviation pool respectively(in Rupees), Valuesare rounded off to the nearest integer using Gaussian rounding. NetAmountPayableby the QCA Net Amount Payable by the QCA (In Words) f6,602/- Rupees Six Thousand Six Hundred Two Only Remarks (if anl:l: 1. RE INTER-STATE Deviation Charges Account not issued as Inter State Rated capacity is zero for this PSS. DUEDATEOF PAYMENT FORTHEQCA ~(1rm17.04.2020 (i.e. 30 days/rom the date of issue of this Executive Engineer (EA), Statement) RVPN. Jainur Please Note:- 1.The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund (Alc No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior Accounts Officer (LD), RVPN, Jaipur. 2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any. 3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in) for accounting and to this office for information. 4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest@0.04%perday. Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt. 27.10.2019, in case the payment is not made even after a lapse of60 days from issuance of final DSM account, the process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations. supe~n~Accounting) RVPN, Jaipur Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action. ~~ -Superi tend g Engineer (~g~ Accounting) RVPN, Jaipur
  • 26. RAJASTHAN RAJY A VIDYUT PRASARAN NIGAM LIMITED [CorporateIdentityNumber(CIN) U40109RJ2000SGCO16485J(AN ISO9001.2015CertifiedCompany) Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in) ~ ;! GST No.: 08AABCR8312AIZT, PAN No.: AABCR8312A OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting) SLDC-Building, Ajmer Road, Heerapura, Jaipur-302024 Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea(a2rvpn.co.in No.RVPN/SE(EA)IXENIREDSA/2019-201 D. 'a_'1b~ Jaipur, dated: ~~~?-O FINALIZED RE-DSM ACCOUNT STATEMENT {Intra- State Deviation Char~es) Issued to QCA: Issued for PSS: GIL Account: RECONNECTENERGYSOLUTIONSPRIVATELIMITED PSS_220KV_PRATAPGARH_DEVGARH 1558006 (SLDCRenewableEnergyDSMFund) Address: SAPCODE: 1010935 1ST.NO15.KRISHIKSARVODAYAFOUNDATION. Corresl!ondance Address of QCA: SAP Document No.: OLDAIRPORTROAD.BANGALORE. 634000 6 f ~ .5 Bengaluru(Bangalore)Urban.Kamataka RE Connect Energy Solution Pvt Ltd., PostalCode:560008 173 , A Sector, Scheme No. 54, Indore Issuin~ Date: GSTNo.: 29AAFCR0074H3ZA MP - 452010 PAN No.: AAFCR0074H (mithun.dubex@reconnectenergy.com) 19.03.2020 S.No. Duration Description RE DSM Intra-State Deviation Charges* 1. 01.08.2019-31.08.2019 Final RE DSM AccountStatementissuedafter rectifications(if applicable)in RE DSM -2,48,958Statementissuedondt.14.11.2019 *: (+) & (-) means receivablefrom and payable to state deviation pool respectively(in Rupees). Valuesare rounded offto the nearest integer using Gaussian rounding. NetAmountPayableby the QCA Net Amount Payable by the QCA (In Words) n,48,958/- Rupees Two Lakhs Forty Eight Thousand Nine Hundred Fifty Eight Only Remarks {ifanx}: I. RE INTER-STATE Deviation Charges Account not issued as Inter State Rated capacity is zero for this PSS. DUEDATEOF PAYMENT FORTHEQCA ~~ry-r17.04.2020 (i.e. 30 days/rom the date of issue of this Executive Engineer (EA), Statement) RVPN. Jainur Please Note:- I. The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund (Alc No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBJ,Collectrate Branch, JAIPUR) maintained by Senior Accounts Officer (LD), RVPN, Jaipur. 2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any. 3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in) for accounting and to this office for information. 4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest@0.04%per day. Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt. 27.10.2019, in case the payment is not made even after a lapse of 60 days from issuance of final DSM account, the process to invoke BG shall be initiated besides any other action as per permissible law/Regulations. superi~~~nJ.gy Accounting) RVPN, Jaipur Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action. superint~~~[counting) RVPN, Jaipur
  • 27. t!i};"'i;;~ I RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED [Corporate Identity Number (CIN) U40109RJ2000SGCO 16485J (AN ISO 9001. 2015 Certified Company) I Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)II i~ ; GST No.: 08AABCR8312AIZT, PAN No.: AABCR8312A OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting) SLDC-Building, Ajmer Road, Heerapura, Jaipur-302024 Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.e<l@r"2_n.co.in No.RVPN/SE(EA)!XENIREDSA/20 19-201D. ~..,63 Jaipur, dated: :l~1~'U) FINALIZED RE-DSM ACCOUNT STATEMENT (Intra- State Deviation Char&es} Issued to QCA: Issued for PSS: GIL Account: RECONNECT ENERGY SOLUTIONS PRIVATE LIM[TED PSS_220KV _PRT APGRH_ WELSPUN_TATA 1558006 (SLDC Renewable Energy DSM Fund) Address: SAP CODE: [0[0936 1ST, NO 15, KRISHIK SARVODAY A FOUNDATION, Corresl!ondance Address of QCA: SAP Document No.: OLD AIRPORT ROAD, BAN GALORE, 634000 -61..94- Bengaluru (Bangalore) Urban, Karnataka RE Connect Energy Solution Pvt Ltd., Postal Code: 560008 173, A Sector, Scheme No. 54, Indore Issuinl/:Date: GSTNo.: 29AAFCR0074H3ZA MP-452010 PAN No.: AAFCR0074H (mithun.dubey@reconnectenergy.com) 19.03.2020 S.No. Duration Description RE DSM Intra-State Deviation Charges* 1. 0108.2019·31.08.2019 Final RE DSM AccountStatementissuedafter rectifications(if applicable)in RE DSM -87,138Statementissuedon dt. 14.11.2019 *: (+) & (-) means receivablefrom and payable to state deviation pool respectively(in Rupees). Valuesare rounded off to the nearest integer using Gaussian rounding. Net Amount Payable by the QCA Net Amount Payable by the QCA (In Words) f87,138/- Rupees Eighty Seven Thousand One Hundred Thirty Eight Only Remarks (if any}: 1. RE INTER-STATE Deviation Charges Account not issued as Inter State Rated capacity is zero for this PSS. DUE DATE OF PAYMENT FORTHEQCA ~(hrrn17.04.2020 (i.e. 30daJ'sjrom tire date ofissueoftlris Executive Engineer (EA), Statement) RVPN. Jaipur Please Note:· I. The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund (Alc No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior Accounts Officer (LD), RVPN, Jaipur. 2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any. 3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in) for accounting and to this office for information. 4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest @0.04% per day. Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt. 27.10.2019, in case the payment is not made even after a lapse of60 days from issuance of final DSM account, the process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations. superi~~J~~-Accounting) RVPN, Jaipur Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action. S""'ri","~.~~.ct;.g) RVPN, Jaipur
  • 28. I!!}/'iil';'~ RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED [CorporateIdentity Number(CIN) U40109RJ2000SGCO16485](AN ISO9001.2015CertifiedCompany) i!lI ~- Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in) ,! GST No.: 08AABCR8312AIZT, PAN No.: AABCR8312A~ OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting) SLDC-Building, Ajmer Road, Heerapura, Jaipur-302024 Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea@rvpn.co.in No.RVPN/SE(EA)IXENIREDSA/20 19-201D. ':l._764 Jaipur, dated: t~~'~~FINALIZED RE-DSM ACCOUNT STATEMENT (Intra- State Deviation Chara:;es) Issued to QCA: Issued for PSS: GIL Account: RECONNECTENERGYSOLUTIONSPRIVATELIMITED PSS_220KV_TlNWARI_3NO_33KV 1558006 (SLOCRenewableEnergyOSM Fund) Address: SAPCODE: 1010937 1ST.NO 15.KRISHIKSARVODAYAFOUNDATION, Corresl2ondance Address of QCA: SAP Document No.: OLDAIRPORTROAD.BANGALORE, 634000619r Bengaluru(Bangalore)Urban,Karnataka RE Connect Energy Solution Pvt Ltd., PostalCode: 560008 173 , A Sector, Scheme No. 54, Indore Issuina:; Date: GSTNo.: 29AAFCR0074H3ZA MP-452010 PAN No.: AAFCR0074H (mithun.dubey@reconnectenergy.com) 19.03.2020 S.No. Duration Description RE DSM Intra-State Deviation Charges* 1. 01.08.2019-31.08.2019 FinalRE DSM AccountStatementissued after rectifications(if applicable)in RE DSM -9,730Statementissuedondt.14.11.2019. *: (+) & (-)means receivablefrom and payable to state deviation pool respectively(in Rupees). Valuesare rounded off to the nearest integer using Gaussian rounding. Net Amount Payable by the QCA Net Amount Payable by the QCA (In Words) f9,730/- Rupees Nine Thousand Seven Hundred Thirty Only Remarks (if any): 1. RE INTER-STATE Deviation Charges Account issued separately for this PSS. DUE DATE OF PAYMENT FORTHEQCA ~().._n-=n17.04.2020 (i.e. 30 daysfrom the date of issue of this Executive Engineer (EA), Statement) RVPN. Jaipur Please Note:- I. The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund (Alc No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: S8I, Collectrate Branch, JAIPUR) maintained by Senior Accounts Officer (LD), RVPN, Jaipur. 2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any. 3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in) for accounting and to this office for information. 4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest@0.04%perday. Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt. 27.10.2019, in case the payment is not made even after a lapse of60 days from issuance of final DSM account, the process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations. S",,".a.A~.J:,"".tI"1RVPN, Jaipur Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action. S"""''''~~~;'"""tI''1RVPN, Jaipur
  • 29. I RAJASTHAN RAJY A VIDYUT PRASARAN NIGAM LIMITED [CorporateIdentityNumber(CIN) U40109RJ2000SGCOI6485] (AN ISO 9001 2015 CertifiedCompany) Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in) GST No.: 08AABCR8312AIZT, PAN No.: AABCR8312A OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting) SLDC-Building, Ajmer Road, Heerapura, Jaipur-302024 Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea@rvpn.co.in No. RVPN/SE(EA)IXENIRED SA/20 19-201D. ?-'Tb-S- Jaipur, dated: ,,,1!l1~~ FINALIZED RE-DSM ACCOUNT STATEMENT (Intra- State Deviation CharJ:;es} Issued to QCA: Issued for PSS: GIL Account: RECONNECTENERGYSOLUTIONSPRIVATELIMITED PSS_400KV_AKAL_AKAL 1558006 (SLOC RenewableEnergyOSM Fund) Address: SAPCODE: 1010938 1ST,NO 15,KRISHIKSARVODAYAFOUNDATION, Corresl!ondance Address of QCA: SAP Document No.: OLDAIRPORTROAD.BANGALORE, 634000 61~6 Bengaluru(Bangalore)Urban.Karnataka RE Connect Energy Solution Pvt Ltd., PostalCode: 560008 173 , A Sector, Scheme No. 54, Indore IssuinJ:; Date: GSTNo.: 29AAFCR0074H3ZA MP - 452010 PAN No.: AAFCR0074H (mithun. dubey@reconnectenergy.com) 19.03.2020 S.No. Duration Description RE DSM Intra-State Deviation Charges* l. 01.08.2019-31.08.2019 Final RE DSM AccountStatementissued afterrectifications(if applicable)in RE DSM -4,17,622Statementissuedon dt. 14.11.2019 *: (+) & (-)means receivablefrom and payable to state deviation poolrespectively(in Rupees). Valuesare rounded offto the nearest integer using Gaussian rounding. Net Amount Payable by the QCA Net Amount Payable by the QCA (In Words) U,17,622/- Rupees Four Lakhs Seventeen Thousand Six Hundred Twenty Two Only Remarks (if any): 1. RE INTER-STATE Deviation Charges Account not issued as Inter State Rated capacity is zero for this PSS. DUE DATE OF PAYMENT FORTHEQCA ~(},rYh17.04.2020 (Le: 30 days/rom the date of issue of this Executive Engineer (EA), Statement) RVPN. Jaipur Please Note:- I. The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund (Nc No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior Accounts Officer (LD), RVPN, Jaipur. 2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any. 3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in) for accounting and to this office for information. 4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest @0.04% per day. Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt. 27.10.2019, in case the payment is not made even after a lapse of 60 days from issuance of final DSM account, the process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations. S""rl.,,~~C'''H.g) RVPN, Jaipur Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action. superinte~~£:'ccounting) RVPN, Jaipur