RAJASTHAN RAJY A VIDYUT PRASARAN NIGAM LIMITED
~e
[Corporate Identity Number(CIN) U40109RJ2000SGCOl6485j(AN [SO9001:2015CertifiedCompany)
I~/
I
Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)
? GST No.: 08AABCR8312AIZT1 PAN No.: AABCR8312A
OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting)e
SLOe-Building, Ajmer Road, Heerapura, Jaipur-302024
Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea((iJ.rvon.co.in
No.RVPN/SE(EA)IXENIREOSA/20 19-20/0. ?.<::J ~ ""1 Jaipur, dated: Cf I~::LC'")-c
FINALIZED RE-DSM ACCOUNT STATEMENT (Intra- State Deviation Chan:;es}
Issued to QCA: Issued for PSS: GIL Account:
RECONNECTENERGYSOLUTIONSPRIYATELIMITED PSS_132KY_DALOT_33KY_DALOT 1558006
(SLDCRenewableEnergyDSM FWld)
Address: SAPCODE: 1010903
1ST.NO IS.KRISHIKSARYODAYAFOUNDATION. Corresl!ondance Address of QCA: SAP Document No.:
OLDAIRPORTROAD.BANGALORE. 6340006168
Bengaluru(Bangalore)Urban,Kamataka RE Connect Energy Solution Pvt Ltd.,
PostalCod,: 560008 173 , A Sector, Scheme No. 54, Indore Issuinl: Date:
GSTNo.: 29AAFCR0074H3ZA MP-452010
AAFCR0074H (mithun. dube:!@reconnectenerg):.com)
19.03.2020
PAN No.:
Duration Description
RE DSM Intra-State
S.No. Deviation Charges*
1. 01.08.2019·31.08.2019
Final RE DSM Account Statement issued after rectifications (if applicable) in RE DSM
-1,22,737
Statement issued on dt. 14.11,2019
*: (+) & (_)means receivablefrom and payable to state deviation pool respectively(in Rupees), Valuesare rounded offto the nearest integer using Gaussian rounding.
Net Amount Payable by the QCA Net Amount Payable by the QCA (In Words)
n,22,737/- Rupees One Lakh Twenty Two Thousand Seven Hundred Thirty Seven Only
Remarks (if anl:l:
I. RE INTER-STATE Deviation Charges Account not issued as Inter State Rated capacity is zero for this PSS.
DUE DATE OF PAYMENT
FORTHEQCA
- ~~
17.04.2020
(J'""'riD'l
{i.e; 30 days from the date 0/issue 0/this
Executive Engineer (EA),
Statement) RVPN Jaiour
Please Note:-
1.The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make
payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund
(Alc No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior
Accounts Officer (LD), RVPN, Jaipur.
2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any.
3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in)
for accounting and to this office for information.
4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order
dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest@0.04%perday.
Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and
Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt.
27.10.2019, in case the payment is not made even after a lapse of 60 days from issuance of final DSM account, the
process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations.
~r
Superinten g g neer (Energy Accounting)
RVPN, Jaipur
Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action.
A~(Superintending Engineer (Energy Accounting)
RVPN, Jaipur
2. i
{8
RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED
[CorporateIdentityNumber(CIN) U40109RJ2000SGCOl6485j(AN ISO90012015Certified Company)
Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)
GST No.: 08AABCR8312AIZT, PAN No.: AABCR8312A
OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting)
~
SLDC-Building, Ajmer Road, Heerapura, Jaipur-302024
Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ealalrvpn.co.in
No.RVPN/SE(EA)IXENIREDSA/2019-201 D. ~/3a Jaipur, dated: ~ ~'""l.;u
FINALIZED RE-DSM ACCOUNT STATEMENT !Intra- State Deviation Char&es}
Issued to QCA: Issued for PSS: GIL Account:
RECONNECTENERGYSOLUTIONSPRIVATELIMITED PSS_132KV_DALOT_KANGARH 1558006
(SLDC RenewableEnergyDSM Fund)
Address: SAPCODE: 1010904
1ST,NO IS,KRISHIKSARVODAYAFOUNDATION, Corresl!ondance Address of QCA: SAP Document No.:
OLDAIRPORTROAD,BANGALORE, 6340006/61
Bengaluru(Bangalore)Urban,Kamataka RE Connect Energy Solution Pvt Ltd.,
PostalCode:560008 173 , A Sector, Scheme No. 54, Indore Issuin& Date:
GSTNo.: 29AAFCR0074H3ZA MP-452010
(mithun.dubex@reconnectenerg):.com) 19.03.2020
PAN No.: AAFCR0074H
Description
RE DSM Intra-State
S.No. Duration Deviation Charges*
1. 01.08.2019·31.08.2019
Final RE DSM Account Statement issued after rectifications (if applicable) in RE DSM
-2,31,564Statement issued on dt. 14.11.2019.
*: (+) & (_)means receivablefrom and payable to state deviation pool respectively(in Rupees). Valuesare rounded offto the nearest integer using Gaussian rounding.
Net Amount Payable by the QCA Net Amount Payable by the QCA (In Words)
fl,31,564/- Rupees Two Lakhs Thirty One Thousand Five Hundred Sixty Four Only
Remarks !if anx}:
I. RE INTER-STATE Deviation Charges Account not issued as Inter State Rated capacity is zero for this PSS.
DUE DATE OF PAYMENT
FORTHEQCA
~ f'>r-rrn-17.04.2020
(i.e.30 days/rom the date of issue of this
Executive Engineer (EA),
Statement) RVPN. Jaipur
Please Note:-
I. The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make
payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund
(Alc No. 37534869390, IFSCIRTGS code: SBIN0031 026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior
Accounts Officer (LD), RVPN, Jaipur.
2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any.
3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in)
for accounting and to this office for information.
4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order
dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest@0.04%perday.
Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and
Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt.
27.10.2019, in case the payment is not made even after a lapse of 60 days from issuance of final DSM account, the
process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations.
superinte~~ccounting)
RVPN, Jaipur
Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action.
S'''ri''''~~''::''".'')RVPN, Jaipur
3. ,vo;;c~ RAJASTHAN RAJY A VIDYUT PRASARAN NIGAM LIMITED
-...~~~~ [CorporateIdentity Number(CIN) U40109RJ2000SGCO16485J(AN ISO9001:2015CertifiedCompany)
r,~ ..
Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)II~ .
~ ii
GST No.: 08AABCR8312AIZT, PAN No.: AABCR8312A
W OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting)
SLOC-Building, Ajmer Road, Heerapura, Jaipur-302024
Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea@}rvpn.co.in
No.RVPN/SE(EA)IXENIREOSA/2019-20/0. ~'7<39 Jaipur, dated: "1~I f')...e::2-0
FINALIZED RE-DSM ACCOUNT STATEMENT (Intra- State Deviation Charzes)
Issued to QCA: Issued for PSS: GIL Account:
RECONNECTEJERGYSOLUTIONSPRIVATELIMITED PSS_132KV_KOLAYAT_RAYS 1558006
(SLDC RenewableEnergyDSM Fund)
Address: SAPCODE: 1010906
1ST.NO IS,KRISHIKSARVODAYAFOUNDATION. Corres(!ondance Address of QCA: SAP Document No.:
OLDAIRPORTROAD.BANGALORE. 634000611-0
Bengaluru (Bangalore)Urban,Kamataka RE Connect Energy Solution Pvt Ltd.,
PoslalCode:560008 173 , A Sector, Scheme No. 54, Indore Issuinl: Date:
GSTNo.: 29AAFCR0074H3ZA MP-452010
AAFCR0074H (mithun.dubex@reconnectenergx.com) 19.03.2020
PAN No.:
Duration Description
RE DSM Intra-State
S.No. Deviation Charges*
l. 01.08.20I9-31.08.2019
Final RE DSM AccountStatementissued afterrectifications(if applicable)in RE DSM
-76,422Statementissuedon dt. 14.11.2019
*: (+) & (-) means receivablefrom and payable to state deviation pool respectively(in Rupees), Valuesare rounded off to the nearest integer using Gaussian rounding.
Net Amount Payable by the QCA Net Amount Payable by the QCA (In Words)
f76,422/- Rupees Seventy Six Thousand Four Hundred Twenty Two Only
Remarks (if anl:l:
1. RE INTER-STATE Deviation Charges Account not issued as Inter State Rated capacity is zero for this PSS.
DUE DATE OF PAYMENT
FORTHEQCA
~~~17.04.2020
(i.e. 30 days from the date of issue of this
Executive Engineer (EA),
Statement) RVPN. Jaiour
Please Note:-
I. The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make
payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund
(Nc No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior
Accounts Officer (LD), RVPN, Jaipur.
2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any.
3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in)
for accounting and to this office for information.
4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order
dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest@0.04%perday.
Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and
Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt.
27.10.2019, in case the payment is not made even after a lapse of 60 days from issuance of final DSM account, the
process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations.
superint~·~yCounting)
RVPN, Jaipur
Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action.
superinte~~e~ l:counting)
RVPN, Jaipur
4. --- ----- -- - ---------------------------------
RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED
M ~~ [CorporateIdentityNumber(CIN) U40109RJ2000SGCO16485](ANISO9001.2015CertifiedCompany)
~ Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)
~
GSTNo.: 08AABCR8312AIZT, PAN No.: AABCR8312A
OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting)
SLDC-Building, Ajmer Road, Heerapura, Jaipur-302024
Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea({i!rvpn.co.in
No.RVPN/SE(EA)IXENIREDSA12019-201 D. ?..~40 Jaipur, dated: q' !3'~2..0
FINALIZED RE-DSM ACCOUNT STATEMENT (Intra- State Deviation Charges)
Issued to QCA: Issued for PSS: GIL Account:
RECONNECTENERGYSOLUTIONSPRIVATELIMITED PSS_132KV_NOKHADHAIYA_3No_33KV 1558006
(SLDC RenewableEnergyDSM Fund)
Address: SAPCODE: 1010907
1ST.NO IS,KRISHIKSARVODAYAFOUNDATION, Corresl!ondance Address of QCA: SAP Document No.:
OLDAIRPORTROAD,BANGALORE, 634000 6 I 'Jf-I
Bengaluru(Bangalore)Urban,Karnataka RE Connect Energy Solution Pvt Ltd.,
Postal!:;ode:560008 173 , A Sector, Scheme No. 54, Indore Issuinl: Date:
GSTNo.: 29AAFCR0074H3ZA MP-452010
(mithun. dubey@reconnectenergy.com) 19.03.2020
PAN No.: AAFCR0074H
Description
RE DSM Intra-State
S.No. Duration Deviation Charges*
1. 01.08.2019·31.08.20I9
FinalRE DSM AccountStatementissuedafter rectifications(if applicable)in RE DSM
-13,223Statement issued on dt. 14_11.2019.
"': (+) & (_)means receivablefrom and payable to state deviation pool respectively(in Rupees). Valuesare rounded eff te the nearest integer using Gaussian rounding.
Net Amount Payable by the QCA Net Amount Payable by the QCA (In Words)
U3,223/- Rupees Thirteen Thousand Two Hundred Twenty Three Only
Remarks (if anl:l:
I. RE INTER-STATE Deviation Charges Account issued separately for this PSS.
DUE DATE OF PAYMENT
FORTHEQCA
~{}'m1
17.04.2020
(i.e. 30 days from the date of issue of this
Executive Engineer (EA),
Statement) RVPN. Jainur
Please Note:-
1.The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make
payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund
(Nc No.3 7534869390, IFSCIRTGS code: SBlN0031 026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior
Accounts Officer (LD), RVPN, Jaipur.
2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any.
3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in)
for accounting and to this office for information.
4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order
dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest@0.04%perday.
Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and
Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt.
27.10.2019, in case the payment is not made even after a lapse of60 days from issuance of final DSM account, the
process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations.
S'P'ri,,,~~r.:".,g)
RVPN, Jaipur
Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action.
superintend~~ACunting)
RVPN, Jaipur
5. ~v;,";,~
RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED
[CorporateIdentityNumber(CIN) U40109RJ2000SGCO16485](AN ISO9001.2015CertifiedCompany)
,v-: ~ Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)!(1IV-::
~ .' GSTNo.: 08AABCR8312AIZT, PAN No.: AABCR8312A
I OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting)
I SLDC-Building, Ajmer Road, Heerapura, Jaipur-302024
Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ealalrvpn.co.in
No.RVPN/SE(EA)IXENIREDSA/2019-201 D. -::t..'?4J Jaipur, dated: 91n/~~
FINALIZED RE-DSM ACCOUNT STATEMENT (Intra- State Deviation Charl:es)
Issued to QCA: Issued for PSS: GILAccouut:
RECONNECTENERGYSOLUTIONSPRIVATELIMITED PSS_132KV_OSIAN_2No_33KV 1558006
(SLOCRenewableEnergyOSM Fund)
Address: SAPCODE: 1010908
1ST.NO IS, KRISHIKSARVODAYAFOUNDATION, Corresl!ondance Address of QCA: SAP Document No.:
OLDAIRPORTROAD,BANGALORE, 634000 6I '12-
Bengaluru(Bangalore)Urban,Karnataka RE Connect Energy Solution Pvt Ltd.,
Postal!:I!!!e:560008 173 , A Sector, Scheme No. 54, Indore Issuinl: Date:
GSTNo.: 29AAFCR0074H3ZA MP-452010
(mithun. dubey@reconnectenergy.com) 19.03.2020
PAN No.: AAFCR0074H
Description
RE DSM Intra-State
S.No. Duration Deviation Charges*
1. 01.08.2019-31.08.2019
Final RE DSM AccountStatementissued afterrectifications(if applicable)in RE DSM
-4,318Statementissuedon dt. 14.11.2019
*: (+) & H means receivable from and payable to state deviation pool respectively (in Rupees). Values are rounded off to the nearest integer using Gaussian rounding.
Net Amount Payable by the QCA Net Amount Payable by the QCA (In Words)
N,31S/- Rupees Four Thousand Three Hundred Eighteen Only
Remarks {if any}:
1. RE INTER-STATE Deviation Charges Account issued separately for this PSS.
DUE DATE OF PAYMENT
FORTHEQCA
~~n-Y17.04.2020
(i.e. 30 days from the date of issue of this
Executive Engineer (EA),
Statement) RVPN. Jaiour
Please Note:-
I.The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make
payments within 30 (thirty) days i.e, up to the above mentioned due date of payment into the "RE Generators State DPA Fund
(Alc No. 37534869390, IFSCIRTGS code: SBIN003 1026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior
Accounts Officer (LO), RVPN, Jaipur,
2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any.
3. Payment detail intimation should be furnished to Senior Accounts Officer (LO), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in)
for accounting and to this office for information.
4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order
dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest@0.04%perday.
Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and
Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt.
27. 10.2019, in case the payment is not made even after a lapse of 60 days from issuance of final DSM account, the
process to invoke BG shall be initiated besides any other action as per permissible law/Regulations.
S''''ri"~ r.;.EJa""""gjRVPN, Jaipur
Copy forwarded to the Senior Accounts Officer (LO), RVPN, Jaipur for information and necessary action.
S.~~)upermten ng n meer (Energy Accounting)
RVPN, Jaipur
6. ~'=~~
RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED
'" ~ [CorporateIdentityNumber(CIN) U40I09RJ2000SGCOI6485](AN ISO9001.2015CertifiedCompany)
~ -, Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)
:,
,
W
GST No.: 08AABCR8312AIZT, PAN No.: AABCR8312A
"1
OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting)
SLDC-Building, Ajmer Road, Heerapura, Jaipur-302024
Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ealalrvon.co.in
No.RVPN/SE(EA)IXENIREDSAl2019-201 D. ~"74")_- Jaipur, dated: ~)gl~")...o
FINALIZED RE-DSM ACCOUNT STATEMENT {Intra- State Deviation Chara:es}
Issued to QCA: Issued for PSS: GIL Account:
RECONNECTENERGYSOLUTIONSPRIVATELIMITED PSS_I32KV_POKARAN_2NO_33KV 1558006
(SLDCRenewableEnergyDSM Fund)
Address: SAPCODE: 1010909
1ST.NO IS. KRISHIKSARVODAYAFOUNDATION, Corresl!ondance Address of QCA: SAP Document No.:
OLDAIRPORTROAD,BANGALORE. 634000 61'fJ
Bengaluru(Bangalore) Urban,Kamataka RE Connect Energy Solution Pvt Ltd.,
PostalCode:560008 173 , A Sector, Scheme No. 54, Indore Issuing Date:
GSTNo.: 29AAFCR0074H3ZA MP-452010
(mithun.dube:,:@reconnectenerg:,:.com)
19.03.2020
PAN No.: AAFCR0074H
Description
RE DSM Intra-State
S.No. Duration Deviation Charges*
1. 01.08.2019-31.08.2019
Final RE DSM AccountStatementissued afterrectifications(if applicable)in RE DSM
-24,480Statementissuedon dt. 14,11.2019
*: (+) & (_)means receivable from and payable to state deviation pool respectively (in Rupees). Values are rounded orr to the nearest integer using Gaussian rounding.
Net Amount Payable by the QCA Net Amount Payable by the QCA (In Words)
f24,480/- Rupees Twenty Four Thousand Four Hundred Eighty Only
Remarks (if an);):
I. RE INTER-STATE Deviation Charges Account issued separately for this PSS.
DUE DATE OF PAYMENT
FORTHEQCA
crr-h, ~ ryy;
17.04.2020
(i.e.30 days from the dllte of issue of thls
Executive Engineer (EA),
Statement) RVPN Jaiour
Please Note:-
I. The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make
payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund
(Alc No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior
Accounts Officer (LD), RVPN, Jaipur.
2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any.
3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in)
for accounting and to this office for information.
4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order
dt.27.09.20l9 otherwise the defaulting QCA shall have to pay simple interest@0.04%perday.
Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and
Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt.
27.10.2019, in case the payment is not made even after a lapse of60 days from issuance of final DSM account, the
process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations.
s.",;",~~C".,)RVPN, Jaipur
Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action.
s.P,ri.".J.t.!ler...;:, un".,)
RVPN, Jaipur
7. I
~~~~~
RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED
[Corporate Identity Number (CIN) U40 I09RJ2000SGCO I6485] (AN ISO 9001. 2015 Certified Company)
Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)
z GST No.: 08AABCR8312AIZT, PAN No.: AABCR8312A
OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting)
SLOC-Building, Ajmer Road, Heerapura, Jaipur-302024
Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.earcsrvon.co.in
No.RVPN/SE(EA)IXEN/REOSA/20 19-20/0. ":t."743- Jaipur, dated: ,,' s,,~').{)
FINALIZED RE-DSM ACCOUNT STATEMENT {Intra- State Deviation Char&es}
Issued to QCA: Issued for PSS: GIL Account:
RECONNECTENERGYSOLUTIONSPRIVATELIMITED PSS_132KV_PS3_8NO_33KV 1558006
(SLOCRenewableEnergyOSMFund)
Address: SAPCODE: 1010913
1ST.NO15.KRISHIKSARVODAYAFOUNDATION. Corresuondance Address of QCA: SAP Document No.:
OLDAIRPORTROAD.BANGALORE. 634000 6 I "14-
Bengaluru(Bangalore)Urban,Karnataka RE Connect Energy Solution Pvt Ltd.,
PostalCode:560008 173, A Sector, Scheme No. 54, Indore Issuin& Date:
GSTNo.: 29AAFCR0074H3ZA MP-452010
(mithun.dubex@reconnectenerg)C.com) 19.03.2020
PAN No.: AAFCR0074H
Duration Description
RE DSM Intra-State
S.No. Deviation Charges*
1. 01.08.2019-31.08.2019
Final RE DSM AccountStatementissuedafter rectifications(if applicable)in RE DSM
-1,38,151Statementissuedondt 14.11.2019
*: (+) & f-) means receivablefrom and payable to state deviation pool respectively(in Rupees). Valuesare rounded offto the nearest integer using Gaussian rounding.
NetAmountPayableby the QCA Net Amount Payable by the QCA (In Words)
n,38,1511- Rupees One Lakh Thirty Eight Thousand One Hundred Fifty One Only
Remarks {ifanx}:
1. RE INTER-STATE Deviation Charges Account issued separately for this PSS.
DUEDATEOF PAYMENT
FORTHEQCA
~ ~,.-yi)17.04.2020
(ie. 30 days from the dale of issue of this
Executive Engineer (EA),
Statement) RVPN. Jainur
Please Note:-
I. The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make
payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund
(Alc No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior
Accounts Officer (LD), RVPN, Jaipur.
2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any.
3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in)
for accounting and to this office for information.
4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order
dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest @0.04% per day.
Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and
Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt.
27.10.2019, in case the payment is not made even after a lapse of60 days from issuance of final DSM account, the
process to invoke BG shall be initiated besides any other action as per permissible law/Regulations,
superinte~~nrrgr:counting)
RVPN, Jaipur
Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action.
superinten~et!rcounting)
RVPN, Jaipur
8. ,~..,,,,;;
I
RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED
[Corporate Identity Number (CIN) U40109RJ2000SGC016485] (AN ISO 9001.2015 Certified Company)
~. I Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)
~ GST No.: 08AABCR8312AIZT, PAN No.: AABCR8312A
OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting)
SLDC-Building, Ajmer Road, Heerapura, Jaipur-302024
Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea@,rvpn.co.in
No.RVPN/SE(EA)!XENIREDSA/20 19-201D. :t"74L1 Jaipur, dated:
~'!1'~'}-OFINALIZED RE-DSM ACCOUNT STATItMENT {Intra- State Deviation CharJ:es)
Issued to QCA: Issued for PSS: GIL Account:
RECONNECT ENERGY SOLUTIONS PRIVATE LIMITED PSS_ I32KV _PS3 _WELSPUN 1558006
(SLDe Renewable Energy DSM Fund)
Address: SAP CODE: 1010914
1ST, NO 15, KRISHIK SARVODAYA FOUNDATION, Corresl!ondance Address of QCA: SAP Document No.:
OLD AIRPORT ROAD, BAN GALORE, 634000 6 11-r-Bengaiuru (Bangalore) Urban, Kamataka RE Connect Energy Solution Pvt Ltd.,
Postal Code: 560008 173 , A Sector, Scheme No. 54, Indore IssuinJ: Date:
GSTNo.: 29AAFCR0074H3ZA MP - 452010
(mithun.dubex@reconnectenergy.com)
19.03.2020
PAN No.: AAFCR0074H
Description
RE DSM Intra-State
S.No. Duration Deviation Charges*
1. 01.08.2019-31.08.2019
Final RE DSM AccountStatementissuedafter rectifications(if applicable)in RE DSM
-23,680
Statementissuedon dt. 14.11.2019
": (+) & (_)means receivablefrom and payable to state deviation pool respectively(in Rupees). Valuesare rounded off to the nearest integer using Gaussian rounding.
Net Amount Payable by the QCA Net Amount Payable by the QCA (In Words)
f23,680/- Rupees Twenty Three Thousand Six Hundred Eighty Only
Remarks {ifanl:):
1. RE INTER-STATE Deviation Charges Account issued separately for this PSS.
DUE DATE OF PAYMENT
FORTHEQCA
~{}..~
17.04.2020
(i.e. 30dtl}'s/rom the date of issue of this
Executive Engineer (EA),
Statement) RVPN. Jainur
Please Note:-
1.The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make
payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund
(A/c No. 37534869390, IFSCIRTGS code: SBIN003I026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior
Accounts Officer (LD), RVPN, Jaipur.
2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any.
3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldcrgrvpn.co.in)
for accounting and to this office for information.
4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order
dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest@0.04%perday.
Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and
Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt.
27.10.2019, in case the payment is not made even after a lapse of 60 days from issuance of final DSM account, the
process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations.
superint~~J~y Accounting)
RVPN, Jaipur
Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action.
~~-'~ Superintend g ngineer n~ Accounting)
RVPN, Jaipur
9. •
RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED
[CorporateIdentityNumber(CIN) U40I09RJ2000SGCO16485](AN ISO900I. 2015CertifiedCompany)
Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)
GST No.: 08AABCR8312A1ZT, PAN No.: AABCR8312A
OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting)
SLDC-Building, Ajrner Road, Heerapura, Jaipur-302024
Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea(adrvpn.co.in
No.RVPN/SE(EA)IXENIREDSA/20 19-201D. =<-«J4r Jaipur, dated: ~ sll-O ').0
FINALIZED RE-DSM ACCOUNT STATEMENT (Intra- State Deviation Charl:;es}
Issued to QCA: Issued for PSS: GILAccount:
RECONNECTENERGYSOLUTIONSPRIVATELIMITED PSS~132KV_RAMGARH~RVUN_GTPP 1558006
(SLOCRenewableEnergyOSM Fund)
Address: SAPCODE: 1010915
1ST,NO 15.KRISHIKSARVODAYAFOUNDATION. Corresl!ondance Address of QCA: SAP Document No.:
OLDAIRPORTROAD.BANGALORE. 634000 6 I"':/-6
Bengalum(Bangalore)Urban.Karnataka RE Connect Energy Solution Pvt Ltd.,
Postal~ode: 560008 173 , A Sector, Scheme No. 54, Indore Issuinl:; Date:
GSTNo.: 29AAFCR0074H3ZA MP-452010
(mithun.dube:,:@reconnectenerg:,:.com) 19.03.2020
PAN No.: AAFCR0074H
S.No. Duration Description
RE DSM Intra-State
Deviation Charges*
I. 01.08.20I9-31.08.2019
FinalRE DSM AccountStatementissued afterrectifications(if applicable)in RE DSM
-5,067Statementissuedon dt. 14.11.2019.
"":(+) & (_)means receivablefrom and payable to state deviation pool respectively(in Rupees). Valuesare rounded offto the nearest integer using Gaussian rounding.
Net Amount Payable by the QCA Net Amount Payable by the QCA (In Words)
f5,067/- Rupees Five Thousand Sixty Seven Only
Remarks !if anI}:
I. RE INTER-STATE Deviation Charges Account issued separately for this PSS.
DUE DATE OF PAYMENT
FORTHEQCA
~~~17.04.2020
(ie.30 days from the dale oj issue of this
Executive Engineer (EA),
Slalement) RVPN Jaiour
Please Note:-
I. The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make
payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund
(Nc No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior
Accounts Officer (LD), RVPN, Jaipur.
2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any.
3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in)
for accounting and to this office for information.
4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order
dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest@0.04%perday.
Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and
Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt.
27.10.2019, in case the payment is not made even after a lapse of60 days from issuance of final DSM account, the
process to invoke BG shall be initiated besides any other action as per permissible law/Regulations,
S'P"I,,~~,~,ro'"ti'g)
RVPN, Jaipur
Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action.
superin~J ~e~~r1Y Accounting)
RVPN, Jaipur
10. I
RAJASTHAN RAJY A VIDYUT PRASARAN NIGAM LIMITED
'~ I [CorporateIdentttyNumber(CIN) U40109RJ2000SGC016485](AN ISO9001.2015CertifiedCompany)
~/
'
Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)II .
. GST No.: 08AABCR8312AIZT, PAN No.: AABCR8312A
OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting)
SLDC-Building, Ajmer Road, Heerapura, Jaipur-302024
Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea(ii?rvpn.co.in
No.RVPN/SE(EA)IXENIREDSA/2019-201 D. ~'rrt.-fk Jaipur, dated: 9l!s1;;u,~
FINALIZED RE-DSM ACCOUNT STATEMENT (Intra- State Deviation Char~es)
Issued to QCA: Issued for PSS: GILAccount:
RECONNECTENERGYSOLUTIONSPRIVATELIMITED PSS_I32KV_RANI_RANI 1558006
(SLOC RenewableEnergyOSM Fund)
Address: SAPCODE: 1010916
1ST,NO IS,KRISHIKSARVODAYAFOUNDATION, Corres(!ondance Address of QCA: SAP Document No.:
OLDAIRPORTROAD,BANGALORE, 634000 6/:}-'1-
Bengaluru(Bangalore)Urban,Kamataka RE Connect Energy Solution Pvt Ltd"
PostalCode: 560008 173 , A Sector, Scheme No, 54, Indore Issuin~ Date:
GSTNo.: 29AAFCR0074H3ZA MP - 452010
AAFCR0074H (mithun,dube)::@reconnectener~,com) 19.03.2020
PAN No.:
Duration Description
RE DSM Intra-State
S.No. Deviation Charges*
1. oL08,20I9·31,08,2019
FinalRE DSM AccountStatementissued afterrectifications(if applicable)in RE DSM
-29,152Statementissuedondt.14.11.2019
*: (+) & (_)meansreceivablefromand payableto state deviationpoolrespectively(in Rupees),Valuesare roundedoffto the nearest integerusingGaussianrounding.
Net Amount Payable by the QCA Net Amount Payable by the QCA (In Words)
~29,152/- Rupees Twenty Nine Thousand One Hundred Fifty Two Only
Remarks {if an)::}:
1. RE INTER-STATE Deviation Charges Account not issued as Inter State Rated capacity is zero for this PSS,
DUE DATE OF PAYMENT
FORTHEQCA
~{.},«Yi17.04.2020
(i.e. 30 days from the date of issue of this
Executive Engineer (EA),
Statement) RVPN Jaiour
Please Note:-
1.The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make
payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund
(Alc No, 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior
Accounts Officer (LD), RVPN, Jaipur,
2, The payment should be accompanied with details of statement against which the payment is made along with LPS, if any,
3, Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldcrgrvpn.co.in)
for accounting and to this office for information,
4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order
dt.27,09,2019 otherwise the defaulting QCA shall have to pay simple interest @0,04% per day,
Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and
Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt.
27.10.2019, in case the payment is not made even after a lapse of60 days from issuance of final DSM account, the
process to invoke BG shall be initiated besides any other action as per permissible law/Regulations.
s.~~~ Accounting)
RVPN, Jaipur
Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action,
superint~ ~~n!: Accounting)
RVPN, Jaipur
11. ~
RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED
~--
[Corporate Identity Number (CIN) U40109RJ2000SGCOl648Sj (AN ISO 9001.2015 Certified Company)
!llIh- Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)
~ '!I GST No.: 08AABCR8312AIZT, PAN No.: AABCR8312A
OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting)
SLDC-Building, Ajmer Road, Heerapura, Jaipur-302024
Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea!alrvpn.co.in
No.RVPN/SE(EA)IXENIREDSA/20 19-201 D. ';;J.....,47 Jaipur, dated: ~ 'l1')_o~
FINALIZED RE-DSM ACCOUNT STATEMENT {Intra- State Deviation Charr:es}
Issued to QCA: Issued for PSS: GILAccount:
RECONNECT ENERGY SOLUTIONS PRIVATE LIMITED PSS~132KV ~SANWREEJ~SANWREEJ 1558006
(SLDC Renewable Energy DSM Fund)
Address: SAP CODE: 1010917
1ST, NO IS, KRISHIK SARVODAYAFOUNDATION, Corresl!ondance Address of QCA: SAP Document No.:
OLD AIRPORT ROAD, BANGALORE, 634oo0611g
Bengaluru (Bangalore) Urban, Kamataka RE Connect Energy Solution Pvt Ltd.,
Postal Code: 560008 173, A Sector, Scheme No. 54, Indore Issuinr: Date:
GSTNo.: 29AAFCR0074H3ZA MP-452010
PAN No.: AAFCR0074H (mithun.dubey@reconnectenergy.com) 19.03.2020
S.No. Duration Description
RE DSM Intra-State
Deviation Charges*
1. 01.08.2019-31.08.2019
Final RE DSM AccountStatementissuedafter rectifications(if applicable)in RE DSM
-28,238Statementissued on dt. 14.11.2019
*: (+) & (_)means receivablefrom and payable to state deviation pool respectively(in Rupees). Valuesare rounded offto the nearest integer using Gaussian rounding.
Net Amount Payable by the QCA Net Amount Payable by the QCA (In Words)
~28,238/- Rupees Twenty Eight Thousand Two Hundred Thirty Eight Only
Remarks {ifan):}:
1. RE INTER-STATE Deviation Charges Account issued separately for this PSS.
DUE DATE OF PAYMENT
FORTHEQCA
~O-.~17.04.2020
(i.e. 30 days/rom the date 0/ issue of this
Executive Engineer (EA),
Statement) RVPN. Jaiour
Please Note:-
I. The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make
payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the .oREGenerators State DPA Fund
(Nc No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior
Accounts Officer (LD), RVPN, Jaipur.
2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any.
3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in)
for accounting and to this office for information.
4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order
dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest@0.04%perday.
Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and
Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt.
27.10.2019, in case the payment is not made even after a lapse of60 days from issuance of final DSM account, the
process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations.
superi~f.!eC-Accounting)
RVPN, Jaipur
Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action.
ISuperintending ngineer ergy Accounting)
RVPN, Jaipur
12. p~---~ RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED
[CorporateIdentityNumber(CIN) U40109RJ2000SGC016485](AN ISO90012015CertifiedCompany)
~:- '!1)
Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)
~- ? GSTNo.: 08AABCR8312AIZT, PAN No.: AABCR8312A
OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting)
SLDC-Building, Ajmer Road, Heerapura, Jaipur-302024
Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea@rvpn.co.in
No. RVPN/SE(EA )/xEN IRED SA/20 19-201 D. ';)_.:yy & Jaipur, dated: ~ )n} '-o?zJ
FINALIZED RE-DSM ACCOUNT STATEMENT (Intra- State Deviation Charl:es}
Issued to QCA: Issued for PSS: GILAccount:
RECONNECTENERGYSOLUTIONSPRIVATELIMITED PSS_132KV_SHEO_SUZLON 1558006
(SLOe RenewableEnergyDSM Fund)
Address: SAPCODE: 1010918
1ST,NO 15,KRISHIKSARVODAYAFOUNDATION, Corresl!ondance Address of QCA: SAP Document No.:
OLDAIRPORTROAD,BANGALORE. 634000 617-9
Bengaluru(Bangalore)Urban,Kamataka RE Connect Energy Solution Pvt Ltd.,
PostalC!!!!e:560008 173 , A Sector, Scheme No. 54, Indore Issuinl: Date:
GSTNo.: 29AAFCR0074H3ZA MP - 452010
AAFCR0074H (mithun.dube)::@reconnectenerg)::.com) 19.03.2020
PAN No.:
S.No. Duration Description
RE DSM Intra-State
Deviation Charges*
1. 01.08.2019·31.08.2019 FinalRE DSM AccountStatementissuedafter rectifications(if applicable)in RE DSM
-10,511Statementissuedon dt. 14.11.2019
*: (+) & (-) means receivablefrom and payable to state deviation pool respectively(in Rupees). Valuesare rounded off to the nearest integer usin&Gaussian rounding.
Net Amount Payable by the QCA Net Amount Payable by the QCA (In Words)
nO,5111- Rupees Ten Thousand Five Hundred Eleven Only
Remarks (if any}:
1. RE INTER-STATE Deviation Charges Account not issued as Inter State Rated capacity is zero for this PSS.
DUE DATE OF PAYMENT
FORTHEQCA
0'"Y"Yr> (~~17.04.2020
(i.e. 30 days/rom tlte date of issue of this
Executive Engineer (EA),
Slatement) RVPN Jaipur
Please Note:-
1. The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make
payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund
(Alc No. 37534869390, IFSCIRTGS code: SBIN003 1026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior
Accounts Officer (LD), RVPN, Jaipur.
2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any.
3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in)
for accounting and to this office for information.
4. QCAs shall have to deposit the amount within 30 days of the issue ofthis finalized DSM account as per RERC Order
dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest@0.04%perday.
Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and
Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt.
27.10.2019, in case the payment is not made even after a lapse of60 days from issuance of final DSM account, the
process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations.
super~~~nC Accounting)
RVPN, Jaipur
Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action.
superin~~gr:-ccounting)
RVPN, Jaipur
13. I
RAJASTHAN RAJY A VIDYUT PRASARAN NIGAM LIMITED
[CorporateIdentityNumber(CIN) U40109RJ2000SGC01648Sl(AN ISO90012015CertifiedCompany)
Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)
GST No.: 08AABCR8312AIZT, PAN No.: AABCR8312A
OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting)
SLDC-Building, Ajrner Road, Heerapura, Jaipur-302024
Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea@rvpn.co.in
No.RVPN/SE(EA)IXENIREDSA/2019-201 D. ~-:-r4_9 Jaipur, dated: ~~l:le~FINALIZED RE-DSM ACCOUNT STATEMENT (Intra- State Deviation CharJ:es)
Issued to QCA: Issued for PSS: GIL Account:
RECONNECTENERGYSOLUTIONSPRIVATELIMITED PSS_220KV_BADISID_3NO_33KV 1558006
(SLOCRenewableEnergyOSM Fund)
Address: SAPCODE: 1010921
1ST,NO 15,KRISHIKSARVODAYAFOUNDATION, Corresl!ondance Address of QCA: SAP Document No.:
OLDAIRPORTROAD,BANGALORE, 634000 6180
BengaIuru(Bangalore) Urban,Karnataka RE Connect Energy Solution Pvt Ltd"
PostalCode:560008 173 , A Sector, Scheme No. 54, Indore IssuinJ: Date:
GSTNo.: 29AAFCR0074H3ZA MP-452010
AAFCR0074H (mithun.dubex@reconnectenergy.com) 19.03.2020
PAN No.:
s.xe. Duration Description
RE DSM Intra-State
Deviation Charges*
I. 01.08.2019-31.08.2019 Final RE DSM AccountStatementissued afterrectifications(if applicable)in RE DSM
-53,215Statementissuedon dr. 14.11.2019
*: (+) & (-) means receivablefrom and payable to state deviation pool respectively(in Rupees). Valuesare rounded off to the nearest integer using Gaussian rounding.
Net Amount Payable by the QCA Net Amount Payable by the QCA (In Words)
f53,2 I5/- Rupees Fifty Three Thousand Two Hundred Fifteen Only
Remarks {if anl:}:
1. RE lNTER-ST ATE Deviation Charges Account issued separately for this PSS.
DUE DATE OF PAYMENT
FORTHEQCA
~~~17.04.2020
(i.e. 30 days from the date of issue of this
Executive Engineer (EA),
Statement) RVPN Jaiour
Please Note:-
I. The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make
payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund
(Alc No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior
Accounts Officer (LD), RVPN, Jaipur.
2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any.
3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldcrgrvpn.co.in)
for accounting and to this office for information.
4. QCAs shall have to deposit the amount within 30 days of the issue ofthis finalized DSM account as per RERC Order
dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest @0.04% per day.
Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and
Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt.
27.10.2019, in case the payment is not made even after a lapse of60 days from issuance of final DSM account, the
process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations.
su~e)::counting)
RVPN, Jaipur
Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action.
superidl~nCy Accounting)
RVPN, Jaipur
14. ~~~
RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED
[CorporateIdentityNumber(CIN)U40109RJ2000SGCOI6485](ANISO9001.2015CertifiedCompany)
Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)
Ij GST No.: 08AABCR8312AIZT, PAN No.: AABCR8312A
OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting)
SLDC-Building, Ajmer Road, Heerapura, Jaipur-302024
Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea@rvpn.co.in
No.RVPN/SE(EA)IXENIREDSAI20 19-201D. ;).._~~'"'D Jaipur, dated: ~~f~'l.o
FINALIZED RE-DSM ACCOUNT STATEMENT (Intra- State Deviation Charj:;es)
Issued to QCA: Issued for PSS: GIL Account:
RECONNECTENERGYSOLUTIONSPRIVATELIMITED PSS_220KV_BADISID_TERRAFORM 1558006
(SLDCRenewableEnergyDSMFund)
Address: SAPCODE: 1010922
1ST,NO15,KRISHIKSARVODAYAFOUNDATION, Corres(!ondance Address of QCA: SAP Document No.:
OLDAIRPORTROAD,BANGALORE, 634000 618{
Bengaluru(Bangalore)Urban,Kamataka RE Connect Energy Solution Pvt Ltd.,
PostalCode:560008 173 , A Sector, SchemeNo. 54, Indore Issuinr: Date:
GSTNo.: 29AAFCR0074H3ZA MP-452010
PAN No.: AAFCR0074H (mithun.dubey@reconnectenergy.com) 19.03.2020
S.No. Duration Description
RE DSM Intra-State
Deviation Charges*
1. 01.08.2019·31.08.2019 FinalRE DSM AccountStatementissued afterrectifications(if applicable)in RE DSM
-72,323Statementissuedon dt. 14.11.2019.
*: (+) & (-) means receivablefrom and payable to state deviation pool respectively(in Rupees). Valuesare rounded off to the nearest integer using Gaussian rounding.
NetAmountPayableby the QCA Net Amount Payable by the QCA (In Words)
~72,323/- Rupees Seventy Two Thousand Three Hundred Twenty Three Only
Remarks (if any}:
1. RE INTER-STATE Deviation Charges Account not issued as Inter State Rated capacity is zero for this PSS.
DUEDATEOF PAYMENT
FORTHEQCA
0""Y"Y'n (}, r-.-Y;
17.04.2020
(i.e. 30 days/rom the dateof issue of this Executive Engineer (EA),
Statement) RVPN. Jaipur
Please Note:-
1.The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make
payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund
(Alc No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior
Accounts Officer (LD), RVPN, Jaipur,
2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any.
3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in)
for accounting and to this office for information.
4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order
dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest@0.04%perday.
Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and
Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt.
27.10.2019, in case the payment is not made even after a lapse of 60 days from issuance of final DSM account, the
process to invoke BG shall be initiated besides any other action as per permissible law/Regulations,
S"",,",~~~1-~~J1b~~;A"'"'"")RVPN, Jaipur
Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action.
supe~~rW(gy Accounting)
RVPN, Jaipur
15. I
RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED
[CorporateIdentityNumber(CIN)U40109RJ2000SGCOl648Sj(AN ISO9001:2015CertifiedCompany)
Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)
~
GST No.: 08AABCR8312A1ZT, PAN No.: AABCR8312A
OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting)
SLDC-Building, Ajmer Road, Heerapura, Jaipur-302024
Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea@rvpn.co.in
No.RVPN/SE(EA)IXENIREDSAI2019-201 D. ~/s-J Jaipur, dated: ~?d)0
FINALIZED RE-DSM ACCOUNT STATEMENT (Intra- State Deviation Charl:es}
Issued to QCA: Issued for PSS: GIL Account:
RECONNECTENERGYSOLUTIONSPRIVATELIMITED PSS_220KV_BALOTRA_BALOTRA 1558006
(SLDCRenewableEnergyDSMFund)
Address: SAPCODE: 1010924
1ST,NO15,KRISHIKSARVODAYAFOUNDATION, Corresl!ondance Address of QCA: SAP Document No.:
OLDAIRPORTROAD,BANGALORE, 634000 6Is2-
Bengaluru(Bangalore)Urban,Karnataka RE Connect Energy Solution Pvt Ltd.,
PostalCode:560008 173 , A Sector, SchemeNo. 54, Indore Issuing Date:
GSTNo.: 29AAFCR0074H3ZA MP-452010
PAN No.: AAFCR0074H (mithun.dubex@reconnectenergy.com) 19.03.2020
S.No. Duration Description
RE DSM Intra-State
Deviation Charges*
1. 01.08.2019-31.08.2019 FinalRE DSM AccountStatementissued after rectifications(if applicable)in RE DSM
-2,709Statementissuedon dt. 14.11.2019.
"': (+) & (-) means receivablefrom and payable to state deviation pool respectively(in Rupees), Valuesare rounded off to the nearest integer using Gaussian rounding.
NetAmountPayableby the QCA Net Amount Payable by the QCA (In Words)
t2,709/- Rupees Two Thousand Seven Hundred Nine Only
Remarks (if aDl:):
I. RE INTER-STATE Deviation Charges Account issued separately for this PSS.
DUEDATEOF PAYMENT
FORTHEQCA
~(),~17.04.2020
(i.e. 30 days/rom the date of issue of this Executive Engineer (EA),
Statement) RVPN. Jaipur
Please Note:-
I. The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make
payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund
(Alc No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior
Accounts Officer (LD), RVPN, Jaipur.
2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any.
3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in)
for accounting and to this office for information.
4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order
dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest@0.04%perday.
Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and
Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt.
27.10.2019, in case the payment is not made even after a lapse of 60 days from issuance of final DSM account, the
process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations.
superint~J:~counting)
RVPN, Jaipur
Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action.
S""ri"".dJ~J :~,".t;.~RVPN, Jaipur
16. I
RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED
[Corporate Identity Number (CIN) U40109RJ2000SGCOl6485j (AN ISO 90012015 Certified Company)
Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)
GST No.: 08AABCR8312AIZT, PAN No.: AABCR8312A
OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting)
SLDC-Building, Ajmer Road, Heerapura, Jaipur-302024
Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea@rvpn.co.in
No.RVPN/SE(EA)IXENIREDSAI2019-201 D. ~ ry'S:"2--- Jaipur, dated: ~ 'sl-.:;u,?:Q
FINALIZED RE-DSM ACCOUNT STATEMENT (Intra- State Deviation Charl:;es)
Issued to QCA: Issued for PSS: GIL Account:
RECONNECT ENERGY SOLUTIONS PRlV ATE LIMITED PSS~220KV ~BAP~14NO~33KV 1558006
(SLDC Renewable Energy DSM Fund)
Address: SAP CODE: 1010925
1ST, NO 15. KRISHIK SARVODAYA FOUNDATION, Corres(!ondance Address of QCA: SAP Document No.:
OLD AIRPORT ROAD, BANGALORE, 634000 bIg ~
Bengaluru (Bangalore) Urban, Karnataka RE Connect Energy Solution Pvt Ltd"
Postal Code: 560008 173 , A Sector, SchemeNo, 54, Indore Issuing Date:
GSTNo.: 29AAFCR0074H3ZA MP-452010
PAN No.: AAFCR0074H (mithun.dube)l@reconnectenergy.com) 19.03.2020
S.No. Duration Description
RE DSM Intra-State
Deviation Charges*
1. 01.08.2019-31.08.2019
Final RE DSM AccountStatementissued afterrectifications(if applicable)in RE DSM
-86,420Statementissuedon dt. 14.11.2019
"":(+) & (-) means receivablefrom and payable to state deviation pool respectively(in Rupees). Valuesare rounded offto the nearest integer using Gaussian rounding.
Net Amount Payable by the QCA Net Amount Payable by the QCA (In Words)
~86,420/- Rupees Eighty Six Thousand Four Hundred Twenty Only
Remarks (if an)::}:
I. RE INTER-STATE Deviation Charges Account issued separately for this PSS.
DUE DATE OF PAYMENT
FORTHEQCA
o'Y'YYl (1,.,..;;17.04.2020
(i.e.30 days from the date of issue of this Executive Engineer (EA),
Statement) RVPN Jaiour
Please Note:-
I. The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make
payments within 30 (thirty) days i.e, up to the above mentioned due date of payment into the "RE Generators State DPA Fund
(Alc No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior
Accounts Officer (LD), RVPN, Jaipur.
2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any.
3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in)
for accounting and to this office for information.
4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order
dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest@0.04%perday.
Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and
Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt,
27.10.2019, in case the payment is not made even after a lapse of60 days from issuance of final DSM account, the
process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations.
superin~~:e::ccounting)
RVPN, Jaipur
Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action.
S''''ri.~!Q~.h"",",,,,,,)RVPN, Jaipur
17. ~~!~
RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED
[CorporateIdentityNumber(CIN):U40109RJ2000SGC016485](ANISO9001:2015CertifiedCompany)
, , '~
Regd, Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in). )
1) GST No.: 08AABCR8312AIZT, PAN No,: AABCR8312A
OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting)
SLDC-Building, Ajmer Road, Heerapura, Jaipur-302024
Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea@rvpn.co,in
No.RVPN/SE(EA)IXENIREDSA/20 19-201D. ~~~~ Jaipur, dated: ~ g1).o');D
FINALIZED RE-DSM ACCOUNT STATEMENT {Intra- State Deviation Charl::es)
Issued to QCA: Issued for PSS: GIL Account:
RECONNECTENERGYSOLUTIONSPRIVATELIMITED PSS_220KV_BAP_MAHINDRA 1558006
(SLDCRenewableEnergyDSMFund)
Address: SAPCODE: 1010926
1ST.NO15.KRISHIKSARVODAYAFOUNDATION. Corres(!ondance Address of QCA: SAP Document No.:
OLDAIRPORTROAD.BANGALORE. 634000 6 184-
Bengalum(Bangalore)urban.Karnataka RE Connect Energy Solution Pvt Ltd.,
PostalCode:560008 173, A Sector, SchemeNo. 54, Indore Issuing Date:
GSTNo.: 29AAFCR0074H3ZA MP-452010
PAN No.: AAFCR0074H (mithun.dubex@reconnectenergx.com) 19.03.2020
S.No. Duration Description
RE DSM Intra-State
Deviation Charges*
1. 01.08.2019-31.08.2019 FinalRE DSM AccountStatementissued afterrectifications(if applicable)in RE DSM
-33,064Statementissuedon dt. 14.11.2019
*: (+) & (-) means receivable from and payable to state deviation pool respectively (in Rupees). Values are rounded off to the nearest integer using Gaussian rounding.
NetAmountPayablebythe QCA Net Amount Payable by the QCA (In Words)
t33,064/- Rupees Thirty Three Thousand Sixty Four Only
Remarks {ifany}:
I. RE INTER-STATE Deviation Charges Account issued separately for this PSS.
DUEDATEOF PAYMENT
FORTHEQCA
~(hrrn17.04.2020
{i:e: 30 daysfrom the date of issue of this Executive Engineer (EA),
Statement) RVPN. Jaiour
Please Note:-
1.The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make
payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund
(Alc No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior
Accounts Officer (LD), RVPN, Jaipur.
2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any.
3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in)
for accounting and to this office for information.
4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order
dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest@0.04%perday.
Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and
Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt.
27.10.2019, in case the payment is not made even after a lapse of60 days from issuance of final DSM account, the
process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations.
~~~JSuperintending Engineer (Energy Accounting)
RVPN, Jaipur
Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action.
S'P"lnt.~ e~fA'W".,g)RVPN, Jaipur
18. RAJASTHAN RAJY A VIDYUT PRASARAN NIGAM LIMITED
[Corporate Identity Number (CIN) U40109RJ2000SGCO I6485j (AN ISO 9001: 2015 Certified Company)
Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)
GST No.: 08AABCR8312AIZT, PAN No.: AABCR8312A
OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting)
SLDC-Building, Ajmer Road, Heerapura, Jaipur-302024
Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea@rvpn.co.in
No.RVPN/SE(EA)IXENIREDSA!2019-201 D. ~'1.stJ Jaipur, dated: <1 'U~~FINALIZED RE-DSM ACCOUNT STATEMENT (Intra- State Deviation CharKes) I
Issued to QCA: Issued for PSS: GIL Account:
RECONNECT ENERGY SOLUTIONS PRIVATE LIMITED PSS_220KV _BHADLA_5No_33KV 1558006
(SLDC Renewable Energy DSM Fund)
Address: SAP CODE: 1010927
1ST, NO 15, KRISHIK SARVODAY A FOUNDATION. Corresl!ondance Address of QCA: SAP Document No.:
OLD AIRPORT ROAD, BANGALORE, 634000618 S
Bengaluru (Bangalore) Urban, Kamataka RE Connect Energy Solution Pvt Ltd.,
Postal Code: 560008 173 , A Sector, Scheme No. 54, Indore Issuing Date:
GSTNo.: 29AAFCR0074H3ZA MP-452010
PAN No.: AAFCR0074H (mithun.dubey@reconnectenergy.com) 19.03.2020
S.No. Duration Description
RE DSM Intra-State
Deviation Charges*
1. 01.08.2019-31.08.2019
Final RE DSM AccountStatementissued afterrectifications(if applicable)in RE DSM
-72,224Statementissuedon dr. 14.11.2019
It: (+) & (_)means receivablefrom and payable to state deviation pool respectively(in Rupees). Valuesare rounded offto the nearest integer using Gaussian rounding.
Net Amount Payable by the QCA Net Amount Payable by the QCA (In Words)
~72,224/- Rupees Seventy Two Thousand Two Hundred Twenty Four Only
Remarks (if an:!:):
l. RE lNTER-STATE Deviation Charges Account not issued as Inter State Rated capacity is zero for this PSS.
DUE DATE OF PAYMENT
FORTHEQCA
~r:h~17.04.2020
{i:e:30 days/rom the date of issue of this Executive Engineer (EA),
Statement) RVPN. Jaipur
Please Note:-
l.The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make
payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund
(Alc No. 37534869390, IFSCIRTGS code: SBlN0031026, Bank: SBJ,Collectrate Branch, JAIPUR) maintained by Senior
Accounts Officer (LD), RVPN, Jaipur.
2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any.
3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in)
for accounting and to this office for information.
4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order
dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest @0.04% per day.
Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and
Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt.
27.10.2019, in case the payment is not made even after a lapse of 60 days from issuance of final DSM account, the
process to invoke BG shall be initiated besides any other action as per permissible law/Regulations,
S"",~~~.J: Accounting)
RVPN, Jaipur
Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action.
~41h~Superintending Engineer (Energy Accounting)
RVPN, Jaipur
19. !
RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED
,
[CorporateIdentityNumber(CIN)U40109RJ2000SGC016485j(AN ISO90012015CertifiedCompany)
I
Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)
~ ;?i GST No.: 08AABCR8312AIZT, PAN No.: AABCR8312A
OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting)
SLDC-Building, Ajmer Road, Heerapura, Jaipur-302024
Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea@rvpn.co.in
No. RVPN/SE(EA)!XENIRED SA/20 19-201 D. '"::J..__~~ Jaipur, dated: 9.31~?e)FINALIZED RE-DSM ACCOUNT STATEMENT {Intra- State Deviation Char"es)
Issued to QCA: Issued for PSS: GIL Account:
RECONNECTENERGYSOLUTIONSPRIVATELIMITED PSS_220KV_BHAWAD_SNCA 1558006
(SLDCRenewableEnergyDSMFund)
Address: SAPCODE: 1010928
1ST,NO15,KRISHIKSARVODAYAFOUNDATION, Corres[!ondance Address of QCA: SAP Document No.:
OLDAIRPORTROAD,BANGALORE, 634000 -6 18-6
Bengaluru(Bangalore)Urban,Karnataka RE Connect Energy Solution Pvt Ltd.,
PostalCode:560008 173 , A Sector, SchemeNo. 54, Indore Issuin" Date:
GSTNo.: 29AAFCR0074H3ZA MP-452010
PAN No.: AAFCR0074H (mithun.dubex@reconnectenerg~{com) 19.03.2020
S.No. Duration Description
RE DSM Intra-State
Deviation Charges*
1. 01.08.2019-3.08.2019
Final RE DSM AccountStatementissued afterrectifications(if applicable)in RE DSM
-17,985Statementissuedon dt. 14.11.2019
": (+) & (-) means receivablefrom and payable to state deviation pool respectively(in Rupees). Valuesare rounded offto the nearest integer using Gaussian rounding.
NetAmountPayableby the QCA Net Amount Payable by the QCA (In Words)
U7,985/- Rupees Seventeen Thousand Nine Hundred Eighty Five Only
Remarks {ifanx):
1. RE INTER-STATE Deviation Charges Account not issued as Inter State Rated capacity is zero for this PSS.
DUEDATEOF PAYMENT
FORTHEQCA
oYYn ~ri'.17.04.2020
(i.e. 30 days/rom the date of issue of tnis
Executive Engineer (EA),
Statement) RVPN. Jaipur
Please Note:-
1.The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make
payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund
(Alc No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior
Accounts Officer (LD), RVPN, Jaipur.
2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any.
3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in)
for accounting and to this office for information.
4. QCAs shall have to deposit the amount within 30 days of the issue ofthis finalized DSM account as per RERC Order
dt.27.09.20l9 otherwise the defaulting QCA shall have to pay simple interest@0.04% per day.
Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and
Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt.
27.10.2019, in case the payment is not made even after a lapse of 60 days from issuance of final DSM account, the
process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations.
S . ~~£ A lng)upermten mg ngmee nergy ccountmg
RVPN, Jaipur
Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action.
~~J~
Superintending Engineer ~ergy Accounting)
RVPN, Jaipur
20. .~~
RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED
t
[CorporateIdentity Number(CIN)U40I09RJ2000SGCO16485](AN ISO90012015Certified Company)
{i !r' Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)
? GSTNo.: 08AABCR8312A1ZT, PAN No.: AABCR8312A~
OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting)
SLDC-Building, Ajmer Road, Heerapura, Jaipur-302024
Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea@rvpn.co.in
No.RVPN/SE(EA)IXENIREDSAI20 19-201 D. -;2._..-,s;t Jaipur, dated: t~lg-,?o~
FINALIZED RE-DSM ACCOUNT STATEMENT (Intra- State Deviation CharKes)
Issued to QCA: Issued for PSS: GIL Account:
RECONNECTENERGYSOLUTIONSPRlVATELIMITED PSS_220KV_GAJNER_8NO_33KV 1558006
(SLDCRenewableEnergyDSMFund)
Address: SAPCODE: 1010929
1ST,NOIS,KRISHIKSARVODAYAFOUNDATION, Corres(!ondance Address of QCA: SAP Document No.:
OLDAIRPORTROAD,BANGALORE, 634000 6 187-Bengaluru(Bangalore)Urban,Kamataka RE Connect Energy Solution Pvt Ltd.,
PostalCode:560008 173, A Sector, SchemeNo. 54, Indore IssuinK Date:
GSTNo.: 29AAFCR0074H3ZA MP-452010
PAN No.: AAFCR0074H (mithun.dube)C@reconnectenerg)C.com) 19.03.2020
S.No. Duration Description
RE DSM Intra-State
Deviation Charges*
1. 01.08.2019-31.08.2019 FinalRE DSM AccountStatementissued after rectifications(if applicable)in RE DSM
-1,39,065Statementissuedondt.14.11.2019
OIl: (+) & (_)means receivablefrom and payable to state deviation pool respectively(in Rupees), Valuesare rounded off to the nearest integer using Gaussian rounding.
NetAmountPayableby the QCA Net Amount Payable by the QCA (In Words)
n,39,065/- Rupees One Lakh Thirty Nine Thousand Sixty Five Only
Remarks {ifanl:}:
1. RE INTER-STATE Deviation Charges Account issued separately for this PSS.
DUEDATEOF PAYMENT
FORTHEQCA
Orrn Q,~17.04.2020
(i.e. 30 days from the date of issue of this Executive Engineer (EA),
Statement) RVPN. Jaiour
Please Note:-
1.The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make
payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund
(A/c No. 37534869390, IFSCIRTGS code: SBIN0031026,Bank: SBl, Collectrate Branch, JAIPUR) maintained by Senior
Accounts Officer (LD), RVPN, Jaipur.
2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any.
3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in)
for accounting and to this office for information.
4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order
dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest@0.04%perday.
Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and
Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt.
27.10.2019, in case the payment is not made even after a lapse of60 days from issuance of final DSM account, the
process to invoke BG shall be initiated besides any other action as per permissible law/Regulations,
superi~~e'Accounting)
RVPN, Jaipur
Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action.
superi~ ~e[gy Accounting)
RVPN, Jaipur
21. RAJASTHAN RAJY A VIDYUT PRASARAN NIGAM LIMITED
A<;
[Corporate Identity Number (CIN) U40109RJ2000SGC016485] (AN ISO 9001: 2015 Certified Company)
Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)
~ V GST No.: 08AABCR8312AIZT, PAN No.: AABCR8312A
OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting)
SLOC-Building, Ajmer Road, Heerapura, Jaipur-302024
Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea(Zilrvpn.co.in
No.RVPN/SE(EA)/xENIREOSA/2019-20/0. Q"7S7 Jaipur, dated: ~ &!:).-O"")0
FINALIZED RE-DSM ACCOUNT STATEMENT (Intra- State Deviation Charl:es}
Issued to QCA: Issued for PSS: GILAccount:
RECONNECT ENERGY SOLUTIONS PRIVATE LIMITED PSS_220KV _GAJNR_MAHINDRA_SUSTEN 1558006
(SLDe Renewable Energy DSM Fund)
Address: SAP CODE: 1010930
1ST, NO 15. KRISHIK SARVODA YA FOUNDATION, Corres[!ondance Address of QCA: SAP Document No.:
OLD AIRPORT ROAD, BANGALORE, 634000 6 (g~
BengaIuru (Bangalore) Urban, Kamataka RE Connect Energy Solution Pvt Ltd.,
Postal Code: 560008 173, A Sector, Scheme No. 54, Indore Issuing Date:
GSTNo.: 29AAFCR0074H3ZA MP - 452010
PAN No.: AAFCR0074H (mithun.dubey@reconnectenergy.com) 19.03.2020
S.No. Duration Description
RE DSM Intra-State
Deviation Charges*
1. 01.08.2019-31.08.2019
Final RE DSM AccountStatementissued after rectifications(if applicable)in RE DSM
-86,201Statementissuedondt.14.11.2019
": (+) & (-) means receivable from and payable to state deviation pool respectively (in Rupees), Values are rounded off to the nearest integer using Gaussian rounding.
Net Amount Payable by the QCA Net Amount Payable by the QCA (In Words)
~86,201/- Rupees Eighty Six Thousand Two Hundred One Only
Remarks {ifan):}:
I. RE INTER-STATE Deviation Charges Account not issued as Inter State Rated capacity is zero for this PSS.
DUE DATE OF PAYMENT
FORTHEQCA
o-rr-n t1rr=;:;17.04.2020
(i.e. 30 days from the date of issue of this
Executive Engineer (EA),
Statement) RVPN. Jaipur
Please Note:-
I. The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make
payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund
(Alc No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior
Accounts Officer (LO), RVPN, Jaipur.
2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any.
3. Payment detail intimation should be furnished to Senior Accounts Officer (LO), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in)
for accounting and to this office for information.
4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order
dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest@0.04%perday.
Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and
Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt.
27.10.2019, in case the payment is not made even after a lapse of60 days from issuance of final DSM account, the
process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations.
super~~~Jrgy Accounting)
RVPN, Jaipur
Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action.
S""'ri.~~~tO""H")RVPN, Jaipur
22. I RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED
j,£
.~ [CorporateIdentityNumber(CIN) U40109RJ2000SGCOl6485j(AN ISO90012015CertifiedCompany)
!~b Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)
~ I ~
) GSTNo.: 08AABCR8312AIZT, PAN No.: AABCR8312A~
OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting)
SLDC-Building, Ajrner Road, Heerapura, Jaipur-302024
Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea@rvpn.co.in
No.RVPN/SE(EA)!XENfREDSA/20 19-201D. ";;2_~~ Jaipur, dated: ~ '~~!>-Oo::m
FINALIZED RE-DSM ACCOUNT STATEMENT {Intra- State Deviation Chaq:;es}
Issued to QCA: Issued for PSS: GILAccount:
RECONNECTENERGYSOLUTIONSPRIVATELIMITED PSS_220KV_GULABPURA_GULABPURA 1558006
(SLDC RenewableEnergyDSM Fund)
Address: SAPCODE: 1010931
1ST,NO 15,KRISHIKSARVODAYAFOUNDATION, Corres(!ondance Address of QCA: SAP Document No.:
OLDAIRPORTROAD,BANGALORE. 634000 6 Igg
Bengaluru(Bangalore) Urban,Karnataka RE Connect Energy Solution Pvt Ltd.,
PostalCode: 560008 173 , A Sector, Scheme No. 54, Indore Issuinl: Date:
GSTNo.: 29AAFCR0074H3ZA MP-452010
AAFCR0074H (mithun.dubex@reconnectenergx.com) 19.03.2020
PAN No.:
S.No. Duration Description
RE DSM Intra-State
Deviation Charges*
1. 01.08.2019-31.08.20I9 Final RE DSM AccountStatementissued afterrectifications(if applicable)in RE DSM
-7,508Statementissuedon dt. 14.11.2019
-: (+) & (-) meansreceivablefromand payableto state deviationpoolrespectively(inRupees).Valuesare roundedoffto the nearestintegerusingGaussianrounding.
Net Amount Payable by the QCA Net Amount Payable by the QCA (In Words)
f7,508/- Rupees Seven Thousand Five Hundred Eight Only
Remarks {if an:::}:
1. RE INTER-STATE Deviation Charges Account issued separately for this PSS.
DUE DATE OF PAYMENT
FORTHEQCA
Oy~~~
17.04.2020
{i:e: 30 days/rom the date of issue of this
Executive Engineer (EA),
Statement) RVPN Jainur
Please Note:-
1. The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make
payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund
(A/c No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior
Accounts Officer (LD), RVPN, Jaipur.
2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any.
3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in)
for accounting and to this office for information.
4. QCAs shall have to deposit the amount within 30 days of the issue ofthis finalized DSM account as per RERC Order
dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest@0.04%per day.
Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and
Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt.
27.10.2019, in case the payment is not made even after a lapse of60 days from issuance of final DSM account, the
process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations.
S"P,,~~,C,"".ti.~RVPN, Jaipur
Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action.
S""ri"t?tf.l.~y c.;RVPN, Jaipur
23. ~~"~
RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED
£.-:-:.. .... ;~fJ) [CorporateIdentityNumber(CIN)U40I09RJ2000SGCO164851(AN ISO900I. 2015CertifiedCompany)
'li I Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)!i
i/ GSTNo.: 08AABCR8312AIZT, PAN No.: AABCR8312A
OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting)
SLDC-Building, Ajmer Road, Heerapura, Jaipur-302024
Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea(Q!rvpn.co.in
No.RVPN/SE(EA)IXENIREDSA12019-201 D. 'Z.7st; Jaipur, dated: ~ ~f.).c?O
FINALIZED RE-DSM ACCOUNT STATEMENT (Intra- State Deviation Charges} I
Issued to QCA: Issued for PSS: GILAccount:
RECONNECTENERGYSOLUTIONSPRlVATELIMITED PSS_220KV_KANASAR_2NO_33KV 1558006
(SLDCRenewableEnergyDSMFund)
Address: SAPCODE: 1010932
1ST,NO15,KRISHIKSARVODAYAFOUNDATION, Corresuondance Address of QCA: SAP Document No.:
OLDAIRPORTROAD,BANGALORE, 634000 6 (3D
Bengaluru(Bangalore)Urban,Karnataka RE Connect Energy Solution Pvt Ltd.,
PostalCode:560008 173 , A Sector, SchemeNo. 54, Indore Issuing Date:
GSTNo.: 29AAFCR0074H3ZA MP-452010
PAN No.: AAFCR0074H (mithun.dubex@reconnectenergx·com) 19.03.2020
S.No. Duration Description
RE DSM Intra-State
Deviation Charges*
1. 01.08.2019-31.08.2019
FinalRE DSM AccountStatementissuedafter rectifications(if applicable)in RE DSM
-85,974Statementissuedon dt. 14.11.2019
*: (+) & (-)means receivable from and payable to state deviation pool respectively (in Rupees). Values are rounded off to the nearest integer using Gaussian rounding.
NetAmountPayableby the QCA Net Amount Payable by the QCA (In Words)
~85,974/- Rupees Eighty Five Thousand Nine Hundred Seventy Four Only
Remarks {ifany}:
I. RE INTER-STATE Deviation Charges Account not issued as Inter State Rated capacity is zero for this PSS.
DUEDATEOF PAYMENT
FORTHEQCA
~iJ,wn17.04.2020
(i.e. 30 days from the date of issue of this
Executive Engineer (EA),
Statement) RVPN Jaipur
Please Note:-
I. The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make
payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund
(Alc No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior
Accounts Officer (LD), RVPN, Jaipur.
2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any.
3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in)
for accounting and to this office for information.
4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order
dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest @0.04% per day.
Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and
Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt.
27.10.2019, in case the payment is not made even after a lapse of 60 days from issuance of final DSM account, the
process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations.
S""'ri"r.dl~AttO""""g)
RVPN, Jaipur
Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action.
superin~~~Accounting)
RVPN, Jaipur
24. -:::.~::-.. RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED
~ .. [CorporateIdentityNumber(CIN) U40109RJ2000SGC016485](AN ISO9001:2015CertifiedCompany)
Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)
,, GST No.: 08AABCR8312AIZT, PAN No.: AABCR8312A
OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting)
SLDC-Building, Ajrner Road, Heerapura, Jaipur-302024
Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea@rvpn.co.in
No.RVPN/SE(EA)IXENIREDSA/20 19-201D. ?-.._~bO Jaipur, dated: '0'~1~wFINALIZED RE-DSM ACCOUNT STATEMENT (Intra- State Deviation Charl:;es) I
Issued to QCA: Issued for PSS: GIL Account:
RECONNECTENERGYSOLUTIONSPRlVATELIMITED PSS_220KV_KANASAR_SP_pv 1558006
(SLDC RenewableEnergyDSM Fund)
Address: SAPCODE: 1010933
1ST.NO IS. KRISHIKSARVODAYAFOUNDATION. Corresl!ondance Address of QCA: SAP Document No.:
OLDAIRPORTROAD.BANGALORE. 634000 (; 13[
Bengaluru(Bangalore)Urban.Karnataka RE Connect Energy Solution Pvt Ltd.,
PostalCode: 560008 173 , A Sector, Scheme No. 54, Indore Issuinl:; Date:
GSTNo.: 29AAFCR0074H3ZA MP-452010
PAN No.: AAFCR0074H (mithun. dubex@reconnectenergx.com) 19.03.2020
S.No. Duration Description
RE DSM Intra-State
Deviation Charges*
1. 01.08.2019-31.08.2019 Final RE DSM AccountStatementissued afterrectifications(if applicable)in RE DSM
-55,522Statementissuedon dt. 14.11.2019
*: (+) & (-) means receivablefrom and payable to state deviation pool respectively(in Rupees). Valuesare rounded off to the nearest integer using Gaussian rounding.
Net Amount Payable by the QCA Net Amount Payable by the QCA (In Words)
~55,522/- Rupees Fifty Five Thousand Five Hundred Twenty Two Only
Remarks (if anxl:
1. RE INTER-STATE Deviation Charges Account not issued as Inter State Rated capacity is zero for this PSS.
DUE DATE OF PAYMENT
FORTHEQCA
~(},,~17.04.2020
(i.e. 30 days/rom the date of issue of this
Executive Engineer (EA),
Statement) RVPN Jainur
Please Note:-
I. The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make
payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund
(Alc No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior
Accounts Officer (LD), RVPN, Jaipur.
2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any.
3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in)
for accounting and to this office for information.
4. QCAs shall have to deposit the amount within 30 days of the issue ofthis finalized DSM account as per RERC Order
dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest@0.04%per day.
Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and
Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt.
27.10.2019, in case the payment is not made even after a lapse of60 days from issuance of final DSM account, the
process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations.
Supe en i ngineer ( ~J::ounting)
RVPN, Jaipur
Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action.
S"p'ri""~L,, ou nting)
RVPN, Jaipur
25. RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED
[CorporateIdentityNumber(CIN) U40109RJ2000SGC016485](ANISO9001.2015CertifiedCompany)
Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)
GST No.: 08AABCR8312AIZT, PAN No.: AABCR8312A
OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting)
SLDC-Building, Ajrner Road, Heerapura, Jaipur-302024
Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ealalrvpn.co.in
No.RVPN/SE(EA)IXENIREDSA/20 19-201D. ~~61 Jaipur, dated: ',~,~?OFINALIZED RE-DSM ACCOUNT STATEMENT {Intra- State Deviation Char~esl
Issued to QCA: Issued for PSS: GIL Account:
RECONNECTENERGYSOLUTIONSPRIVATELIMITED PSS~220KV~KHINWSAR~KHINWSAR 1558006
(SLDCRenewableEnergyDSMFund)
Address: SAPCODE: 1010934
1ST.NO15.KRISHIKSARVODAYAFOUNDATION. Corres[!ondance Address of QCA: SAP Document No.:
OLDAIRPORTROAD,BANGALORE. 634000 6 192-
Bengaluru(Bangalore)Urban,Kamataka RE Connect Energy Solution Pvt Ltd.,
PostalCode:560008 173 , A Sector, Scheme No. 54, Indore Issuin~ Date:
GSTNo.: 29AAFCR0074H3ZA MP-452010
PAN No.: AAFCR0074H (mithun.dubey@reconnectenerg)C.com) 19.03.2020
S.No. Duration Description
RE DSM Intra-State
Deviation Charges*
1. 0108.2019-31.08.2019 Final RE DSM AccountStatementissuedafterrectifications(if applicable)in RE DSM
-6,602Statementissuedon dt. 14.11,2019
-: (+) & (-) means receivablefrom and payable to state deviation pool respectively(in Rupees), Valuesare rounded off to the nearest integer using Gaussian rounding.
NetAmountPayableby the QCA Net Amount Payable by the QCA (In Words)
f6,602/- Rupees Six Thousand Six Hundred Two Only
Remarks (if anl:l:
1. RE INTER-STATE Deviation Charges Account not issued as Inter State Rated capacity is zero for this PSS.
DUEDATEOF PAYMENT
FORTHEQCA
~(1rm17.04.2020
(i.e. 30 days/rom the date of issue of this
Executive Engineer (EA),
Statement) RVPN. Jainur
Please Note:-
1.The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make
payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund
(Alc No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior
Accounts Officer (LD), RVPN, Jaipur.
2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any.
3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in)
for accounting and to this office for information.
4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order
dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest@0.04%perday.
Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and
Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt.
27.10.2019, in case the payment is not made even after a lapse of60 days from issuance of final DSM account, the
process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations.
supe~n~Accounting)
RVPN, Jaipur
Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action.
~~ -Superi tend g Engineer (~g~ Accounting)
RVPN, Jaipur
26. RAJASTHAN RAJY A VIDYUT PRASARAN NIGAM LIMITED
[CorporateIdentityNumber(CIN) U40109RJ2000SGCO16485J(AN ISO9001.2015CertifiedCompany)
Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)
~ ;! GST No.: 08AABCR8312AIZT, PAN No.: AABCR8312A
OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting)
SLDC-Building, Ajmer Road, Heerapura, Jaipur-302024
Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea(a2rvpn.co.in
No.RVPN/SE(EA)IXENIREDSA/2019-201 D. 'a_'1b~ Jaipur, dated: ~~~?-O
FINALIZED RE-DSM ACCOUNT STATEMENT {Intra- State Deviation Char~es)
Issued to QCA: Issued for PSS: GIL Account:
RECONNECTENERGYSOLUTIONSPRIVATELIMITED PSS_220KV_PRATAPGARH_DEVGARH 1558006
(SLDCRenewableEnergyDSMFund)
Address: SAPCODE: 1010935
1ST.NO15.KRISHIKSARVODAYAFOUNDATION. Corresl!ondance Address of QCA: SAP Document No.:
OLDAIRPORTROAD.BANGALORE. 634000 6 f ~ .5
Bengaluru(Bangalore)Urban.Kamataka RE Connect Energy Solution Pvt Ltd.,
PostalCode:560008 173 , A Sector, Scheme No. 54, Indore Issuin~ Date:
GSTNo.: 29AAFCR0074H3ZA MP - 452010
PAN No.: AAFCR0074H (mithun.dubex@reconnectenergy.com) 19.03.2020
S.No. Duration Description
RE DSM Intra-State
Deviation Charges*
1. 01.08.2019-31.08.2019
Final RE DSM AccountStatementissuedafter rectifications(if applicable)in RE DSM
-2,48,958Statementissuedondt.14.11.2019
*: (+) & (-) means receivablefrom and payable to state deviation pool respectively(in Rupees). Valuesare rounded offto the nearest integer using Gaussian rounding.
NetAmountPayableby the QCA Net Amount Payable by the QCA (In Words)
n,48,958/- Rupees Two Lakhs Forty Eight Thousand Nine Hundred Fifty Eight Only
Remarks {ifanx}:
I. RE INTER-STATE Deviation Charges Account not issued as Inter State Rated capacity is zero for this PSS.
DUEDATEOF PAYMENT
FORTHEQCA
~~ry-r17.04.2020
(i.e. 30 days/rom the date of issue of this
Executive Engineer (EA),
Statement) RVPN. Jainur
Please Note:-
I. The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make
payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund
(Alc No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBJ,Collectrate Branch, JAIPUR) maintained by Senior
Accounts Officer (LD), RVPN, Jaipur.
2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any.
3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in)
for accounting and to this office for information.
4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order
dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest@0.04%per day.
Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and
Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt.
27.10.2019, in case the payment is not made even after a lapse of 60 days from issuance of final DSM account, the
process to invoke BG shall be initiated besides any other action as per permissible law/Regulations.
superi~~~nJ.gy Accounting)
RVPN, Jaipur
Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action.
superint~~~[counting)
RVPN, Jaipur
27. t!i};"'i;;~ I
RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED
[Corporate Identity Number (CIN) U40109RJ2000SGCO 16485J (AN ISO 9001. 2015 Certified Company)
I
Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)II
i~
; GST No.: 08AABCR8312AIZT, PAN No.: AABCR8312A
OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting)
SLDC-Building, Ajmer Road, Heerapura, Jaipur-302024
Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.e<l@r"2_n.co.in
No.RVPN/SE(EA)!XENIREDSA/20 19-201D. ~..,63 Jaipur, dated: :l~1~'U)
FINALIZED RE-DSM ACCOUNT STATEMENT (Intra- State Deviation Char&es}
Issued to QCA: Issued for PSS: GIL Account:
RECONNECT ENERGY SOLUTIONS PRIVATE LIM[TED PSS_220KV _PRT APGRH_ WELSPUN_TATA 1558006
(SLDC Renewable Energy DSM Fund)
Address: SAP CODE: [0[0936
1ST, NO 15, KRISHIK SARVODAY A FOUNDATION, Corresl!ondance Address of QCA: SAP Document No.:
OLD AIRPORT ROAD, BAN GALORE, 634000 -61..94-
Bengaluru (Bangalore) Urban, Karnataka RE Connect Energy Solution Pvt Ltd.,
Postal Code: 560008 173, A Sector, Scheme No. 54, Indore Issuinl/:Date:
GSTNo.: 29AAFCR0074H3ZA MP-452010
PAN No.: AAFCR0074H (mithun.dubey@reconnectenergy.com) 19.03.2020
S.No. Duration Description
RE DSM Intra-State
Deviation Charges*
1. 0108.2019·31.08.2019
Final RE DSM AccountStatementissuedafter rectifications(if applicable)in RE DSM
-87,138Statementissuedon dt. 14.11.2019
*: (+) & (-) means receivablefrom and payable to state deviation pool respectively(in Rupees). Valuesare rounded off to the nearest integer using Gaussian rounding.
Net Amount Payable by the QCA Net Amount Payable by the QCA (In Words)
f87,138/- Rupees Eighty Seven Thousand One Hundred Thirty Eight Only
Remarks (if any}:
1. RE INTER-STATE Deviation Charges Account not issued as Inter State Rated capacity is zero for this PSS.
DUE DATE OF PAYMENT
FORTHEQCA
~(hrrn17.04.2020
(i.e. 30daJ'sjrom tire date ofissueoftlris Executive Engineer (EA),
Statement) RVPN. Jaipur
Please Note:·
I. The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make
payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund
(Alc No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior
Accounts Officer (LD), RVPN, Jaipur.
2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any.
3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in)
for accounting and to this office for information.
4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order
dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest @0.04% per day.
Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and
Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt.
27.10.2019, in case the payment is not made even after a lapse of60 days from issuance of final DSM account, the
process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations.
superi~~J~~-Accounting)
RVPN, Jaipur
Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action.
S""'ri","~.~~.ct;.g)
RVPN, Jaipur
28. I!!}/'iil';'~
RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED
[CorporateIdentity Number(CIN) U40109RJ2000SGCO16485](AN ISO9001.2015CertifiedCompany)
i!lI ~- Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)
,!
GST No.: 08AABCR8312AIZT, PAN No.: AABCR8312A~
OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting)
SLDC-Building, Ajmer Road, Heerapura, Jaipur-302024
Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea@rvpn.co.in
No.RVPN/SE(EA)IXENIREDSA/20 19-201D. ':l._764 Jaipur, dated: t~~'~~FINALIZED RE-DSM ACCOUNT STATEMENT (Intra- State Deviation Chara:;es)
Issued to QCA: Issued for PSS: GIL Account:
RECONNECTENERGYSOLUTIONSPRIVATELIMITED PSS_220KV_TlNWARI_3NO_33KV 1558006
(SLOCRenewableEnergyOSM Fund)
Address: SAPCODE: 1010937
1ST.NO 15.KRISHIKSARVODAYAFOUNDATION, Corresl2ondance Address of QCA: SAP Document No.:
OLDAIRPORTROAD.BANGALORE, 634000619r
Bengaluru(Bangalore)Urban,Karnataka RE Connect Energy Solution Pvt Ltd.,
PostalCode: 560008 173 , A Sector, Scheme No. 54, Indore Issuina:; Date:
GSTNo.: 29AAFCR0074H3ZA MP-452010
PAN No.: AAFCR0074H (mithun.dubey@reconnectenergy.com) 19.03.2020
S.No. Duration Description
RE DSM Intra-State
Deviation Charges*
1. 01.08.2019-31.08.2019 FinalRE DSM AccountStatementissued after rectifications(if applicable)in RE DSM
-9,730Statementissuedondt.14.11.2019.
*: (+) & (-)means receivablefrom and payable to state deviation pool respectively(in Rupees). Valuesare rounded off to the nearest integer using Gaussian rounding.
Net Amount Payable by the QCA Net Amount Payable by the QCA (In Words)
f9,730/- Rupees Nine Thousand Seven Hundred Thirty Only
Remarks (if any):
1. RE INTER-STATE Deviation Charges Account issued separately for this PSS.
DUE DATE OF PAYMENT
FORTHEQCA
~().._n-=n17.04.2020
(i.e. 30 daysfrom the date of issue of this Executive Engineer (EA),
Statement) RVPN. Jaipur
Please Note:-
I. The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make
payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund
(Alc No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: S8I, Collectrate Branch, JAIPUR) maintained by Senior
Accounts Officer (LD), RVPN, Jaipur.
2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any.
3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in)
for accounting and to this office for information.
4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order
dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest@0.04%perday.
Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and
Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt.
27.10.2019, in case the payment is not made even after a lapse of60 days from issuance of final DSM account, the
process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations.
S",,".a.A~.J:,"".tI"1RVPN, Jaipur
Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action.
S"""''''~~~;'"""tI''1RVPN, Jaipur
29. I
RAJASTHAN RAJY A VIDYUT PRASARAN NIGAM LIMITED
[CorporateIdentityNumber(CIN) U40109RJ2000SGCOI6485] (AN ISO 9001 2015 CertifiedCompany)
Regd. Office: Vidyut Bhawan, Jyoti Nagar, Jaipur (www.rvpn.co.in)
GST No.: 08AABCR8312AIZT, PAN No.: AABCR8312A
OFFICE OF THE SUPERINTENDING ENGINEER (Energy Accounting)
SLDC-Building, Ajmer Road, Heerapura, Jaipur-302024
Telephone: +91-141-2251747, 2251764; Fax No. 0141-2251646; email: se.ea@rvpn.co.in
No. RVPN/SE(EA)IXENIRED SA/20 19-201D. ?-'Tb-S- Jaipur, dated: ,,,1!l1~~
FINALIZED RE-DSM ACCOUNT STATEMENT (Intra- State Deviation CharJ:;es}
Issued to QCA: Issued for PSS: GIL Account:
RECONNECTENERGYSOLUTIONSPRIVATELIMITED PSS_400KV_AKAL_AKAL 1558006
(SLOC RenewableEnergyOSM Fund)
Address: SAPCODE: 1010938
1ST,NO 15,KRISHIKSARVODAYAFOUNDATION, Corresl!ondance Address of QCA: SAP Document No.:
OLDAIRPORTROAD.BANGALORE, 634000 61~6
Bengaluru(Bangalore)Urban.Karnataka RE Connect Energy Solution Pvt Ltd.,
PostalCode: 560008 173 , A Sector, Scheme No. 54, Indore IssuinJ:; Date:
GSTNo.: 29AAFCR0074H3ZA MP - 452010
PAN No.: AAFCR0074H (mithun. dubey@reconnectenergy.com) 19.03.2020
S.No. Duration Description
RE DSM Intra-State
Deviation Charges*
l. 01.08.2019-31.08.2019 Final RE DSM AccountStatementissued afterrectifications(if applicable)in RE DSM
-4,17,622Statementissuedon dt. 14.11.2019
*: (+) & (-)means receivablefrom and payable to state deviation poolrespectively(in Rupees). Valuesare rounded offto the nearest integer using Gaussian rounding.
Net Amount Payable by the QCA Net Amount Payable by the QCA (In Words)
U,17,622/- Rupees Four Lakhs Seventeen Thousand Six Hundred Twenty Two Only
Remarks (if any):
1. RE INTER-STATE Deviation Charges Account not issued as Inter State Rated capacity is zero for this PSS.
DUE DATE OF PAYMENT
FORTHEQCA
~(},rYh17.04.2020
(Le: 30 days/rom the date of issue of this
Executive Engineer (EA),
Statement) RVPN. Jaipur
Please Note:-
I. The constituents, which have to pay the Deviation Settlement charges as indicated in the statement, are requested to make
payments within 30 (thirty) days i.e. up to the above mentioned due date of payment into the "RE Generators State DPA Fund
(Nc No. 37534869390, IFSCIRTGS code: SBIN0031026, Bank: SBI, Collectrate Branch, JAIPUR) maintained by Senior
Accounts Officer (LD), RVPN, Jaipur.
2. The payment should be accompanied with details of statement against which the payment is made along with LPS, if any.
3. Payment detail intimation should be furnished to Senior Accounts Officer (LD), RVPN, Jaipur (email id: sr.ao.sldc@rvpn.co.in)
for accounting and to this office for information.
4. QCAs shall have to deposit the amount within 30 days of the issue of this finalized DSM account as per RERC Order
dt.27.09.2019 otherwise the defaulting QCA shall have to pay simple interest @0.04% per day.
Notice: As per Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and
Related Matter of Solar and Wind Generation Sources) Regulations, 2017 and its amended procedure dt.
27.10.2019, in case the payment is not made even after a lapse of 60 days from issuance of final DSM account, the
process to invoke BG shall be initiated besides any other action as per permissible lawlRegulations.
S""rl.,,~~C'''H.g)
RVPN, Jaipur
Copy forwarded to the Senior Accounts Officer (LD), RVPN, Jaipur for information and necessary action.
superinte~~£:'ccounting)