POWELL STREET URBAN DESIGN PLAN
F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
3P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
Acknowledgements
City of Emeryville
1333 Park Avenue
Emeryville, CA 94608-3517
Office of the City Manager/Emeryville Redevelopment Agency
Patrick D. O’Keeffe, City Manager/Agency Executive Director
Planning and Building Department
Charles S. Bryant (AICP), Director
Public Works Department
Maurice Kaufman, Public Works Director
Department of Economic Development and Housing
Helen Bean, Director
Michelle De Guzman, Community Economic Development Coordinator
Wallace Roberts & Todd, LLC – San Francisco
James K. Stickley, ASLA, Principal
John R. Gibbs, ASLA, Project Manager / Landscape Architect
Julie Peng, Landscape Architect
Dan Affleck, Landscape Designer
Adopted April 5th, 2011, by vote of the Emeryville City Council
4P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
Table of Contents
Project Approach.........................................................................................................5
Existing Conditions.....................................................................................................6
Site Photos.........................................................................................................6
Aerial Photo and Survey...................................................................................8
ProjectOverview..........................................................................................................7
Phase 1: Multi-Modal Improvements.......................................................................12
Phase 2: Civic Identity................................................................................................16
Phase3: TransitIdentity...............................................................................................23
Supplemental Information........................................................................................26
StreetSections.................................................................................................26
Project Concept Precedents...........................................................................28
Art Elements...................................................................................................29
Bicycle and Pedestrian Safety.........................................................................30
Gateway Parcel Massing Study......................................................................31
AC Transit Route Map....................................................................................32
Transit Network Summary..............................................................................33
General Plan Diagrams...................................................................................34 Powell Street as it currently exists- a vast auto-oriented corridor leading into the city.
5P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
Market Place
Expansion
Transit
Center
BRE
Development Area
South Bayfront
Site B
Market Place
Expansion
Powell Street Urban
Design Project Study Area
Shellmound Design
Guidelines Study
Powell Street Urban
Design Project Study Area BAY TRAIL
BAYTRAIL
East Shore State Park
PROJECT APPROACH
Conceptual Design Narrative
Project Guiding Principles
The General Plan offers street designations and level of service criteria that•
balance -if not favor- pedestrian, bicycle, and transit mobility. The Plan further
articulates a vision for connectivity, revitalization, and sustainability.
The corridor has been extensively studied. Project designers should incorporate•
the recommendations of previous authors including the UC Berkeley Traffic
Safety Study. The design should embody the objectives of a “complete street.”
The corridor serves as a significant point of welcome to the City for residents,•
freeway passerbyes, and regional shoppers. As a gateway, it should effectively
announce and characterize Emeryville’s quality of life.
In order to provide optimal pedestrian/bicycle/transit circulation and civic•
beautification without reducing vehicle travel lanes, the corridor can be
widened into the adjacent parcels when redesign of those uses is appropriate.
The number of travel lanes on Powell will not change.
Regional and City residents should gain improved pedestrian and bicycle access•
to waterfront open space resources via the Bay Trail and other conenctions.
The project should promote the revitalization of private properties and stimulate•
reinvestment/redevelopment.
The Powell / Shellmound District is an emerging, mixed-use urban•
neighborhood. A finer grain mix of green space, neighborhood serving retail,
and pedestrian access is increasingly appropriate.
Overall Design Objectives
Identify clear project phases that address near term multi-modal improvements (0-5 years) and a long term vision (8-•
15 years). Each phase should maximize improvement to pedestrian, bicycle, and transit functions.
Create a distinctive sense of place that makes legible the design principles and builds a positive civic gateway.•
Connect the City’s inland neighborhoods to the Bay and extensive waterfront open space via substantial sidewalk/•
multi-use path connectors.
Prescribe a street geometry where curbs, gutters, and crosswalks each contribute to a clear and regularized•
aesthetic. Compress vehicle-oriented layout such as curb radii, lane width, and speed to acceptable minimums to
maintain function while improving pedestrian safety and access.
Add crosswalks and configure with center median pedestrian refuges.•
Treat stormwater runoff to remove pollutants before discharge to Bay.•
Configure new building edges and massing to best address issues of height, transparency, street animation, and•
entry.
Promote safe sidewalk conditions through the use of paving and signage which clearly delineates access zones for•
cyclist and pedestrians.
Provide a connection point from Powell Street to East Shore State Park.•
Project area and nearby development projects
6P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
EXISTING CONDITIONS PHOTOS
Sequential walk on the SOUTH side of Powell St, from Frontage Rd. walking east towards Shellmound St.
Sequential walk on the NORTH side of Powell Street, from Frontage Rd. walking east towards Christie Ave.
1.
6.
2.
7.
3.
8.
4.
9.
5.
10.
1.
6.
2.
7.
3.
8.
4.
9.
5.
10.
7P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
EXISTING CONDITIONS PHOTOS
View of Powell St. and Christie Ave. looking west
View of historic map describing irregular and unique pattern of the city grid
that formed over time.
Ground level view of Powell St. Emeryville Crescent at Powell St. and Frontage Rd.
8P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
EXISTING CONDITIONS AERIAL AND SURVEY 0 40’ 80’ 160’
9P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
PROJECT OVERVIEW
Phase 1:
Multi-Modal Improvements
Reconfigure south side Powell Bay Trail/sidewalk and landscape to•
improve pedestrian/bicycle access from Shellmound to Frontage
Road. Greenway is public in character and beautifies the private retail
frontage.
Provide new Transbay bus stops for San Francisco/Emeryville•
communting, also available for use by Emery-Go-Round.
Provide various pedestrian and bicycle improvements including those•
identified by UC Berkeley Traffic Safety Study.
Phase 2:
Civic Identity
Create an enhanced pedestrian and bicycle path and landscape cor-•
ridor on the north side of Powell connecting Christie to the Frontage
Road.
Provide a center median of a sufficient size to include large trees,•
mounded soil above the water table, and other design features that
create a positive civic gateway feature.
Provide new crosswalk at Powell and Christie intersection.•
Create overlook to Emeryville Crescent and gateway to Eastshore•
State Park.
Phase 3:
Transit Vision
Provide dedicated transit access from the freeway off ramp through•
the Powell Christie intersection (remove stops at ramp locations).
Provide new crosswalk at Powell and freeway ramp intersection.•
Configure Powell Frontage intersection to allow bus only left turn•
access to bridge. Prevent illegal vehicle access through use of hydraulic
bollard, signage, and raised, mountable curb.
Create an enhanced pedestrian and bicycle path and landscape•
corridor on the south side of Powell to mirror the north side.
10P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
LANE ADDED
BRIDGE WIDENED
BAY TRAIL
EXISTING CONDITIONS
PHASE 1
BAY TRAIL BAY TRAIL
BAY TRAIL
DENNY’S
POWELL ST. PLAZA
HOTEL
I-80 OVERPASS
GAS
STATION
LA-Z- BOY
POWELL ST.
CHRISTIEAVE.
FRONTAGERD.
DENNY’S
POWELL ST. PLAZA
HOTEL
I-80 OVERPASS
GAS
STATION
LA-Z- BOY
POWELL ST.
CHRISTIEAVE.
FRONTAGERD.
New
Pedestrian
Signal
EXISTING AND PHASE 1 DIAGRAM
I-80 OVERPASS
New Crosswalk
Tighten RadiusArt Opportunity Zone
Art Opportunity Zone
New Bus Sop Extend Median into Crosswalk to
Provide Pedestrian Refuge
Straighten Crosswalk
Straighten SidewalkNew Bus Stop
11P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
PHASE 1 SUMMARY OF CHANGES
Phase 1: Multi-Modal Improvements
Pedestrian and Bicycle Transit Vehicle Image and Atmosphere
Straighten Class I path on south side•
at Powell Plaza and I-80 underpass
from Frontage Rd. to Shellmound
Ave.
Improve visibility of Bay Trail on south•
side as important connection to the
waterfront.
Improve visibility and crossing safety•
at ramp crossings on south side (I-80
eastbound and westbound).
Improve safety at I-80 on ramp near•
Denny’s by tightening radius and
planting the area.
Improve pedestrian crossing of•
Frontage Rd. on north side by
installing pedestrian signal phase on
right turn lanes.
Improve Bay Trail connection to•
Shellmound Ave. at Hotel parking lot.
Extend median into crosswalk to•
provide pedestrian refuge.
Provide striping, special paving and•
signage to clearly seperate bike and
pedestrian traffic appropriate to path
width.
Provide interim stops for AC Transit•
Transbay busses. Inbound bus stop is
at off ramp location. Bus would pull
out of traffic per Caltrans. Outbound
is off Frontage Rd.
Highlight shelters with•
contemporary design, lighting, and
proximity to sidewalk connection.
Consider sponsorship of interim•
shelters by businesses and arts
groups.
Powell St.-Frontage Rd:
Add new approach (one-way•
northbound, left and thru) for
traffic from eastbound I-80 off
ramp left-turns.
Add new phase to signal timing•
at intersection.
Powell-I-80 off ramps:
Signal operation/phasing to•
remain the same, but adjust
timings parameters.
Powell-Christie:
Change existing westbound•
bridge approach by adding left-
turn lane.
Modify eastbound bridge to•
accommodate Bay Street garage
entry.
Adjust timings parameters of•
signal operation/phasing.
Create new landscape treatment•
for south side Powell St. that
compliments both civic and retail
improvement goals.
Provide lighting and/or art•
features to convey Bay Trail
connection from Christie Ave. to
Frontage Rd. on south side.
Indicates Project Recommended by UC Berkeley Pedestrian and Bicycle Safety Evalua-
tion for the the City of Emeryville at Four Intersections. These Projects are the Current
Subject of The Bike and Pedestrian Safety Improvement Project by the City of Emeryville
Department of Public Works.
12P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
PHASE 1: MULTI-MODAL IMPROVEMENTS
Southeast corner of Powell St. and Christie Ave. existing condition Southeast corner of Powell St. and Christie Ave. Phase 1 condition
View of lighted path under Interstate 80
13P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
PHASE 1: MULTI-MODAL IMPROVEMENTS
14P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
PHASE 1: MULTI-MODAL IMPROVEMENTS
View of proposed bus stop at corner of Powell St. and I-80 off ramp
15P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
PHASE 1: MULTI-MODAL IMPROVEMENTS
DENNY’S
I-80
OVERPASS
POWELL ST.
PLAZA
POWELL ST.
GAS
STATION
LA-Z-
BOY
CHRISTIEAVE.
FRONTAGERD
16P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
NEW RAMP CONNECTOR
NEW CENTRAL BUS SHELTER
BUS ONLY LEFT TURN
PHASE 2
PHASE 3
BAY TRAIL
BAY TRAIL
BAY TRAIL
BAY TRAIL
POWELL ST. PLAZA
HOTELI-80 OVERPASS
LA-Z- BOY
POWELL ST.
CHRISTIEAVE.
FRONTAGERD.
HOTEL
I-80 OVERPASS
LA-Z- BOY
POWELL ST.
CHRISTIEAVE.
FRONTAGERD.
PHASE 2 AND 3 DIAGRAM
Straighten North Sidewalk
Straighten South Sidewalk
Add Crosswalk
Add Crosswalk
Re-align Crosswalk
I-80 OVERPASS
I-80 OVERPASS
Art Opportunity Zone
17P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
Pedestrian and Bicycle Transit Vehicle Image and Atmosphere
Create new multi-use path and•
Class I bicycle facility on north
side of Powell St.
Create new center median with•
pedestrian refuge to improve
crossing of Powell St. at Christie
Ave.
Add new crosswalk on Powell•
St. at I-80 off ramps.
Modify curb and radius on•
northeast corner to provide
new crosswalk at Powell St/
Christie Ave. intersection.
Provide striping, special paving•
and signage to clearly seperate
bicycle and pedestrian traffic
appropriate to path width.
Provide on-going improvement•
to existing operations.
Improve eastbound I-80•
off ramp and Powell St.
intersection. Redirect left
turn traffic away under
overpass and to Powell St.-
Frontage Rd.intersection.
Restripe westbound lanes on•
Powell St. from Christie Ave.
to Frontage Rd.
Create major new civic•
identity from landscape
treatments on north side
and center median.
Add new decorative light•
fixtures to north and south
side of Powell St.
Create opportunities for•
more public art on new
paths to celebrate and
interpret the unique culture
of Emeryville.
Create overlook at•
Emeryville Crescent to
reconnect city to Bay
and serve as gateway to
Eastshore Park.
Pedestrian and Bicycle Transit Vehicle Image and Atmosphere
Create new Bay Trail/multi-•
use path on newly-landscaped
south side of Powell connecting
Shellmound St. to Bay.
Create new center median with•
pedestrian refuge to improve
crossing of Powell St. at Christie
Ave.
Provide striping, special paving•
and signage to clearly seperate
bicycle and pedestrian traffic
appropriate to path width.
Provide dedicated transit•
only lanes and center median
station as civic marker and
signature gateway feature.
Modify signal timing at•
Powell St. and Christie Ave. to
prioritize bus movements over
private vehicles.
Provide bus only lane for•
westbound I-80 on ramp from
Powell St.
Restripe eastbound lanes on•
Powell from Frontage Road
to Christie Ave.
Prevent illegal westbound•
I-80 onramp access with
flexible posts and a hydraulic
bollard.
Integrate public art into•
new transit shelter design
through dynamic graphic
media, lighting, color, and or
form.
Complete civic identity•
through landscape
treatments on south side
to match north. Reinstall
decorative lights from
Phase 2.
PHASE 2 AND 3 SUMMARY OF CHANGES
Phase 2: Civic Identity
Phase 3: Transit Vision
18P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
PHASE 2: CIVIC IDENTITY
Existing condition
Southeast corner of Powell St. and Christie Ave. Phase 2 condition
View illustrating the landforms proposed for the Phase 2 median
Southeast corner of Powell St. and Christie Ave. Phase 1 condition
19P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
PHASE 2: CIVIC IDENTITY
20P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
PHASE 2: CIVIC IDENTITY
View of proposed Bay Trail Overlook At Emeryville Crescent (Powell St. and Frontage Rd.)
View of existing location
21P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
PHASE 2: CIVIC IDENTITY
I-80
OVERPASS
POWELL ST.
PLAZA
NEW
DEVELOPMENT
PARCEL
POWELL ST.
LA-Z-
BOY
CHRISTIEAVE.
FRONTAGERD
22P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
Existing condition
Southeast corner of Powell St. and Christie Ave. Phase 2 condition Southeast corner of Powell St. and Christie Ave. Phase 3 condition
Northeast corner of Powell St. and Christie Ave. Phase 3 condition
PHASE 2: CIVIC IDENTITY
23P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
PHASE 3: TRANSIT IDENTITY
24P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
PHASE 3: TRANSIT IDENTITY
View of reconfigured Bay Trail connection to crescent overlook and special bus only ramp access
25P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
PHASE 3: TRANSIT IDENTITY
I-80
OVERPASS
NEW
DEVELOPMENT
PARCEL
NEW
DEVELOPMENT
PARCEL
POWELL ST.
LA-Z-
BOY
CHRISTIEAVE.
FRONTAGERD.
26P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
Median SidewalkSidewalk
10.5’ 10’10.5’ 10’ 10’ 12’ 6’10’10.5’10.5’10’.510’7’ 13’
Existing Condition Powell St. Section
Phase 1 Powell St. Section
Median SidewalkSidewalk
10’ 10’10’ 10’ 10’ 12’ 6’10’10’10’10’10’7’ 13’
POWELL STREET CROSS SECTIONS
LOOKING WEST TOWARDS FREEWAY
27P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
POWELL STREET CROSS SECTIONS
P H A S E 2 P O W E L L S T S E C T I O N
Phase 3 Powell St. Section
Phase 2 Powell St. Section
Bus Shelter SidewalkSidewalk
11’56’ 11’ 11’ 11’ 8’11’11’ 11’ 11’ 11’8’ 15’15’ 20’20’
P H A S E 2 P O W E LLL LLLLLLL S T S ES C T I O N
30’
Median SidewalkSidewalk
11’10.5’10’.510.5’10.5’10.5’10’7’ 13’ 11’ 11’ 11’ 8’ 15’ 20’
LOOKING WEST TOWARDS FREEWAY
28P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
SUPPLEMENTAL INFORMATION
PROJECT CONCEPT PRECEDENTS
Station canopy- Lyon, France Transit boulevard- San Francisco, CA
BRT station- Eugene, OregonGrand civic boulevard, Champs Elysees- Paris, France Civic station design- Liege, Belgium
29P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
SUPPLEMENTAL INFORMATION
ART ELEMENTS
The Powell Street corridor provides opportunities for art installations and lighting elements
that can function as a gateway to the city and an expression of the unique character of
Emeryville. This page shows interesting examples from other cities.
30P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.SUPPLEMENTAL INFORMATION
BICYCLE AND PEDESTRIAN SAFETY
Signage and striping can clearly direct the flow of traffic and prevent conflict between
cylists and pedestrians, as seen in these examples.
31P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
Massing and Form Description
Building Form/Edges: Flexible frontage massing with potential•
entries and varying degrees of transparency. (i.e. de Young
Museum)
FAR shown above 3.5 - 5.0•
Massing and Form Description
Building Form/Edges: Consistent frontage massing and•
architecture with entry positioned at corner and Christie. Towers
are symmetrical to the North and South of Powell St.
FAR shown above 3.5-5.0•
Massing and Form Description
Building Form/Edges: Two separate masses are appropriate on•
Powell, shown as a tower and 5-story building, with a plaza
between and accessed from Powell Street and the site interior.
Each building should engage the street with high transparency.
Event venue type uses would contribute to the theme of
commerce.
Scheme shows a second tower to test mass and FAR•
FAR shown above 4.5-6.0•
SUPPLEMENTAL INFORMATION
GATEWAY PARCEL MASSING STUDY
ChristieAve
Powell St
Powell St Powell St
ChristieAve
ChristieAve
Potential Programming
Mixed-use with residential, office/commercial, cultural venue•
Ground floor retail facing Christie Ave.•
Assumes realigned Christie Way•
Potential Programming
Mixed-use with residential, office/commercial•
Ground floor retail facing Christie Ave•
Assumes realigned Christie Way• Potential Programming
Mixed-use with residential, office/commercial, cultural/event venue•
Exhibition space, conference center may be appropriate•
Ground floor retail facing Christie Ave•
Assumes realigned Christie Way•
32P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
SUPPLEMENTAL INFORMATION
AC TRANSIT ROUTE MAP SOURCE: www.actransit.org
33P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
C
J
Z
F
57
EM
J
C
Z
F
57
EM Emery-Go-Round
(local service)
Bus Line Designations
Transbay Service
Late Night
(last trip midnight)
Commute Hour Service
(no midday or night service)
Commute Hour Service
(no midday or night service)
Transbay Service
SUPPLEMENTAL INFORMATION
TRANSIT NETWORK SUMMARY
34P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
High Density Residential
Medium-High Density Residential
Medium Density Residential
Mixed Use with Residential
Mixed Use with Non-Residential
Office/Technology
Industrial
Public
Marina
Park/Open Space
Other Park Opportunity
Regional Retail Overlay
Neighborhood Retail Overlay
Neighborhood Center
Major Hub
Transit Center
TransitCent
er
1/4
M
ile
1/4
Mile
FRONTAGEROAD
EASTSHOREFREEWAY
INTERSTATE80
LACOSTEST
65TH ST
CHRISTIEAVE
53RD
ST
HOLLISST
HARUFF ST
OVERLANDAVE
54TH ST
55TH ST
BEAUDRYST
POWELL ST
59TH ST
61ST ST
62ND ST
63RD ST
HOLLISST
DOYLE
ST
VALLEJOST
64TH
ST
VALLEJOST
OCEAN AVE
65TH ST
67TH ST
66TH ST
SHERWIN AVE
HALLECKST
HUBBARDST
HORTONST
HOLDENST
EMERY
ST
WATTSST
HARLANST
HAVENST
45TH ST
PARK AVE
43RD ST
41ST
ST
45TH ST
47TH ST
ESSEXST
SALEMST
SALEM
ST
46TH ST
45TH ST
44TH ST
43RD ST
42ND ST
41ST ST
40TH ST.
YERBA BUENA AVE
39TH ST.
38TH ST
APGAR ST
36TH ST
37TH ST
PERALTA
WATTS
47TH ST
48TH ST
ADELINEST
SANPABLOAVE
HORTONST
POWELL ST
40TH ST
YERBA BUENA AVE
SANPABLOAVE
CHRISTIE
AVE
BEACHST
PEABODY
LN
MANDELAPK
W
Y
SHELLMOUNDST
ASHBY
AVE
W. MACARTHUR BLVD
SHELLMOUNDST
BAYST
INTERSTATE 580
STAN
FO
RD
AVE
CHIRONWAY
WAY
SHELLMOUND
0 600 1200 2400300
FEET
FIGURE 2-2
Land Use Diagram
2-11
S a n F r a n c i s c o B a y
BERKELEY
EMERYVILLE
OAKLAND
EMERYVILLE
OAKLAND
EMERYVILLE
Boat
Launching
Ramp
Fishing Pier
Windsurfing
Launch
FRONTAGEROAD
EASTSHOREFREEWAY
INTERSTATE80
LACOSTEST
65TH ST
CHRISTIEAVE
53RD
ST
HOLLISST
HARUFF ST
OVERLANDAVE
54TH ST
55TH ST
BEAUDRYST
POWELL ST
59TH ST
61ST ST
62ND ST
63RD ST
HOLLISST
DOYLE
ST
VALLEJOST
64TH
ST
VALLEJOST
OCEAN AVE
65TH ST
67TH ST
66TH ST
SHERWIN AVE
HALLECKST
HUBBARDST
HORTONST
HOLDENST
EMERY
ST
WATTSST
HARLANST
HAVENST
45TH ST
PARK AVE
43RD ST
41ST
ST
45TH ST
47TH ST
ESSEXST
SALEMST
SALEM
ST
46TH ST
45TH ST
44TH ST
43RD ST
42ND ST
41ST ST
40TH ST.
YERBA BUENA AVE
39TH ST.
38TH ST
APGAR ST
36TH ST
37TH ST
PERALTA
WATTS
47TH ST
48TH ST
ADELINEST
SANPABLOAVE
HORTONST
POWELL ST
40TH ST
YERBA BUENA AVE
SANPABLOAVE
CHRISTIE
AVE
BEACHST
PEABODY
LN
MANDELAPK
W
Y
SHELLMOUNDST
ASHBY
AVE
W. MACARTHUR BLVD
SHELLMOUNDST
BAYST
INTERSTATE 580
STAN
FO
RD
AVE
CHIRONWAY
WAY
SHELLMOUND
0 600 1200 2400300
FEET
MAXIMUM FLOOR AREA RATIOS
EMERYVILLE GENERAL PLAN
Notes: Maximum FAR may not be attainable
on all sites given development standards
in the Zoning Ordinance.
Bonus FAR is discretionary and will be
awarded only after developers
demonstrate that projects meet
community goals.
* FARs are established by Planned Unit
Developments (PUDs) and do not
include parking in the calculations.
Floor Area Ratio (FAR)
Base/with Bonus
3.0/
4.0
3.0/
4.0
4.0/
5.5
4.0/
5.5
1.5/
2.0
0.75/
1.25
0.75/
1.25
1.5/
2.0
5.5/
8.0
4.0/
5.5
5.5/
8.0
0.75/
1.25
3.0/
4.0
4.0/
5.5
2.3*
0.75/
1.25
1.0/
1.5
1.4*
0.75/
1.25
1.5/
2.0
3.0/
4.0
4.0/
5.54.0/
5.5
1.5/
2.0
1.5/
2.0 3.0/
4.0
0.75/
1.25
1.5/2.0
3.0/
4.0
1.5/
2.0
FIGURE 2-3
Maximum Floor Area Ratios
2-14
S a n F r a n c i s c o B a y
BERKELEY
EMERYVILLE
OAKLAND
EMERYVILLE
OAKLAND
EMERYVILLE
FRONTAGEROAD
EASTSHOREFREEWAY
INTERSTATE80
LACOSTEST
65TH ST
CHRISTIEAVE
53RD
ST
HOLLISST
HARUFF ST
OVERLANDAVE
54TH ST
55TH ST
BEAUDRYST
POWELL ST
59TH ST
61ST ST
62ND ST
63RD ST
HOLLISST
DOYLE
ST
VALLEJOST
64TH
ST
VALLEJOST
OCEAN AVE
65TH ST
67TH ST
66TH ST
SHERWIN AVE
HALLECKST
HUBBARDST
HORTONST
HOLDENST
EMERY
ST
WATTSST
HARLANST
HAVENST
45TH ST
PARK AVE
43RD ST
41ST
ST
45TH ST
47TH ST
ESSEXST
SALEMST
SALEM
ST
46TH ST
45TH ST
44TH ST
43RD ST
42ND ST
41ST ST
40TH ST.
YERBA BUENA AVE
39TH ST.
38TH ST
APGAR ST
36TH ST
37TH ST
PERALTA
WATTS
47TH ST
48TH ST
ADELINEST
SANPABLOAVE
HORTONST
POWELL ST
40TH ST
YERBA BUENA AVE
SANPABLOAVE
CHRISTIE
AVE
BEACHST
PEABODY
LN
MANDELAPK
W
Y
SHELLMOUNDST
ASHBY
AVE
W. MACARTHUR BLVD
SHELLMOUNDST
BAYST
INTERSTATE 580
STAN
FO
RD
AVE
CHIRONWAY
WAY
SHELLMOUND
0 600 1200 2400300
FEET
AREAS OF CHANGE AND STABILITY
EMERYVILLE GENERAL PLAN
Areas of Potential Change
Master Plan Areas
Areas of Stability
To Bay Bridge
2-5
FIGURE 2-1
Areas of Change and Stability– 2009
S a n F r a n c i s c o B a y
Transit Center
Transit Center
BERKELEY
EMERYVILLE
OAKLAND
EMERYVILLE
OAKLAND
EMERYVILLE
Boat
Launching
Ramp
Fishing Pier
Windsurfing
Launch
0 600 1200 2400300
FEET
Amtrak
Station
Emery
Secondary
School
Emeryville
Marketplace
Approved
Civic
Center
Anna Yates
Elementary
School
Center for
Community Life
(proposed)
TransitCen
ter
FRONTAGEROAD
EASTSHOREFREEWAY
SHELLMOUND
ST
INTERSTATE80
LACOSTEST
65TH ST
CHRISTIEAVE
53RD
ST
HOLLIS
ST
HARUFF ST
OVERLANDAVE
54TH
ST
55TH ST
BEAUDRY
ST
DOYLE
ST
POWELL
ST
59TH ST
61ST
ST
62ND
ST
63RD
ST
HOLLIS
ST
DOYLE
ST
VALLEJO
ST
64TH
ST
VALLEJO
ST
OCEAN
AVE
65TH
ST
67TH
ST
66TH
ST
SHERWIN
ST
HALLECK
ST
HUBBARD
ST
ST
HOLDEN
EMERY
ST
WATTSST
HARLANST
HAVENST
ST
45TH
PARK AVE
43RD ST
45TH ST
47TH ST
SALEMST.
46TH ST.
45TH ST.
44TH ST.
43RD ST.
42ND
ST.
41ST
ST.
40TH ST.
YERBA BUENA AVE
39TH
ST.
38TH ST.
APGAR ST.
36TH
ST.
37TH ST.
PERALTA
ST.
MAGNOLIA
ST.
47TH
ST
48TH ST
ADELINE
ST
SANPABLO
AVE
HORTON
ST
POWELL ST
40TH
ST
YERBA BUENA AVE.
CHRISTIEA
VE
CHIRON
WAY
PEABODY RD
MANDELAPKW
Y
SHELLMOUNDST
SANPABLO
AVE
64TH
ST
INTERSTATE 80
ASH
BY
AVE
W.MACARTHUR BLVD
Neighborhood Center
Activity Nodes
Neighborhood Retail Overlay
Regional Retail
Residential
Mixed Use
Industrial
Major Street
Large Park
Greenway
Existing Bike/Ped. Crossing
Potential Bike/Ped. Crossing
Freeway
Gateway
Core
CITY STRUCTURE
EMERYVILLE GENERAL PLAN
FIGURE 5-1
City Structure
5-4
SUPPLEMENTAL INFORMATION
GENERAL PLAN DIAGRAMS
SOURCE: Emerville General Plan January 2009
35P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
S a n F r a n c i s c o B a y
Pedestrianonly
BERKELEY
EMERYVILLE
OAKLAND
EMERYVILLE
OAKLAND
EMERYVILLE
FRONTAGEROAD
EASTSHOREFREEWAY
INTERSTATE80
LACOSTEST
65TH ST
CHRISTIEAVE
53RD
ST
HOLLISST
HARUFF ST
OVERLANDAVE
54TH ST
55TH ST
BEAUDRYSTPOWELL ST
59TH ST
61ST ST
62ND ST
63RD ST
HOLLISST
DOYLE
ST
VALLEJOST
64TH
ST
VALLEJOST
OCEAN AVE
65TH ST
67TH ST
66TH ST
SHERWIN AVE
HALLECKST
HUBBARDST
HORTONST
HOLDENST
EMERY
ST
WATTSST
HARLANST
HAVENST
45TH ST
PARK AVE
43RD ST
41ST
ST
45TH ST
47TH ST
ESSEXST
SALEMST
SALEM
ST
46TH ST
45TH ST
44TH ST
43RD ST
42ND ST
41ST ST
40TH ST.
YERBA BUENA AVE
39TH ST.
38TH ST
APGAR ST
36TH ST
37TH ST
PERALTA
WATTS
47TH ST
48TH ST
ADELINEST
SANPABLOAVE
HORTONST
POWELL ST
40TH ST
YERBA BUENA AVE
SANPABLOAVE
CHRISTIE
AVE
BEACHST
PEABODY
LN
MANDELAPK
W
Y
SHELLMOUNDST
ASHBY
AVE
W. MACARTHUR BLVD
SHELLMOUNDST
BAYST
INTERSTATE 580
STAN
FO
RD
AVE
CHIRONWAY
WAY
SHELLMOUND
0 600 1200 2400300
FEET
BAY TRAIL
EMERYVILLE GENERAL PLAN
Bay Trail
Spur Trail
Spur Pedestrian Only Trail
Existing Overpass
Approved Overpass
To Bay Bridge To Mandela Parkway
via 32nd St
FIGURE 3-3
Bay Trail
3-10
S a n F r a n c i s c o B a y
Pedestrian and bike
access to Bay Bridge
BERKELEY
EMERYVILLE
OAKLAND
EMERYVILLE
OAKLAND
EMERYVILLE
FRONTAGEROAD
EASTSHOREFREEWAY
INTERSTATE80
LACOSTEST
65TH ST
CHRISTIEAVE
53RD
ST
HOLLISST
HARUFF ST
OVERLANDAVE
54TH ST
55TH ST
BEAUDRYST
POWELL ST
59TH ST
61ST ST
62ND ST
63RD ST
HOLLISST
DOYLE
ST
VALLEJOST
64TH
ST
VALLEJOST
OCEAN AVE
65TH ST
67TH ST
66TH ST
SHERWIN AVE
HALLECKST
HUBBARDST
HORTONST
HOLDENST
EMERY
ST
WATTSST
HARLANST
HAVENST
45TH ST
PARK AVE
43RD ST
41ST
ST
45TH ST
47TH ST
ESSEXST
SALEMST
SALEM
ST
46TH ST
45TH ST
44TH ST
43RD ST
42ND ST
41ST ST
40TH ST.
YERBA BUENA AVE
39TH ST.
38TH ST
APGAR ST
36TH ST
37TH ST
PERALTA
WATTS
47TH ST
48TH ST
ADELINEST
SANPABLOAVE
HORTONST
POWELL ST
40TH ST
YERBA BUENA AVE
SANPABLOAVE
CHRISTIE
AVE
BEACHST
PEABODY
LN
MANDELAPK
W
Y
SHELLMOUNDST
ASHBY
AVE
W. MACARTHUR BLVD
SHELLMOUNDST
BAYST
INTERSTATE 580
STAN
FO
RD
AVE
CHIRONWAY
WAY
SHELLMOUND
0 600 1200 2400300
FEET
BICYCLE SYSTEM
EMERYVILLE GENERAL PLAN FRAMEWORK
To MacArthur
BART
To West Oakland
BART
Existing or Proposed Class I
Existing or Proposed Class II & III
Bike Boulevard
Existing Overpass
Approved Overpass/Underpass
Proposed Overpass/Underpass
Existing Railroad Grade Crossing
Grade-separated crossings
across I-80 (for pedestrians
and bicycles) and the railroad
(for all travel modes) north
of Powell St
FIGURE 3-4
Bicycle System
3-12
S a n F r a n c i s c o B a y
To Bay Bridge
Transit Cent
er
Amtrak
Station
Transit Cent
er
Transit Cent
er
1/4
M
ile
1/4
Mile
BERKELEY
EMERYVILLE
OAKLAND
EMERYVILLE
OAKLAND
EMERYVILLE
Boat
Launching
Ramp
Fishing Pier
Windsurfing
Launch
FRONTAGEROAD
EASTSHOREFREEWAY
INTERSTATE80
LACOSTEST
65TH ST
CHRISTIEAVE
53RD
ST
HOLLISST
HARUFF ST
OVERLANDAVE
54TH ST
55TH ST
BEAUDRYST
POWELL ST
59TH ST
61ST ST
62ND ST
63RD ST
HOLLISST
DOYLE
ST
VALLEJOST
64TH
ST
VALLEJOST
OCEAN AVE
65TH ST
67TH ST
66TH ST
SHERWIN AVE
HALLECKST
HUBBARDST
HORTONST
HOLDENST
EMERY
ST
WATTSST
HARLANST
HAVENST
45TH ST
PARK AVE
43RD ST
41ST
ST
45TH ST
47TH ST
ESSEXST
SALEMST
SALEM
ST
46TH ST
45TH ST
44TH ST
43RD ST
42ND ST
41ST ST
40TH ST.
YERBA BUENA AVE
39TH ST.
38TH ST
APGAR ST
36TH ST
37TH ST
PERALTA
WATTS
47TH ST
48TH ST
ADELINEST
SANPABLOAVE
HORTONST
POWELL ST
40TH ST
YERBA BUENA AVE
SANPABLOAVE
CHRISTIE
AVE
BEACHST
PEABODY
LN
MANDELAPK
W
Y
SHELLMOUNDST
ASHBY
AVE
W. MACARTHUR BLVD
SHELLMOUNDST
BAYST
INTERSTATE 580
STAN
FO
RD
AVE
CHIRONWAY
WAY
SHELLMOUND
0 600 1200 2400300
FEET
CIRCULATION
EMERYVILLE GENERAL PLAN
To MacArthur
BART
To West Oakland
BART
Transit Street
Connector Street
Local Street
Auto Dominated Highway
Regional Rail
Bikeways
Existing or Proposed Class I
Existing or Proposed Class II & III
Bike Boulevard
Pedestrian-only Trail
Pedestrian Priority Zone
Existing Overpass
Approved Overpass/Underpass
(Pedestrian Only)
Proposed Overpass/Underpass
Existing Railroad Grade Crossing
Major Transit Hub
Grade-separated crossings
across I-80 (for pedestrians
and bicycles) and the railroad
(for all travel modes) north
of Powell St
FIGURE 3-1
Circulation
3-6
S a n F r a n c i s c o B a y
Transit Center
Amtrak
Station
Transit Cente
r
1/4
M
ile
1/4
Mile
BERKELEY
EMERYVILLE
OAKLAND
EMERYVILLE
OAKLAND
EMERYVILLE
FRONTAGEROAD
EASTSHOREFREEWAY
INTERSTATE80
LACOSTEST
65TH ST
CHRISTIEAVE
53RD
ST
HOLLISST
HARUFF ST
OVERLANDAVE
54TH ST
55TH ST
BEAUDRYST
POWELL ST
59TH ST
61ST ST
62ND ST
63RD ST
HOLLISST
DOYLE
ST
VALLEJOST
64TH
ST
VALLEJOST
OCEAN AVE
65TH ST
67TH ST
66TH ST
SHERWIN AVE
HALLECKST
HUBBARDST
HORTONST
HOLDENST
EMERY
ST
WATTSST
HARLANST
HAVENST
45TH ST
PARK AVE
43RD ST
41ST
ST
45TH ST
47TH ST
ESSEXST
SALEMST
SALEM
ST
46TH ST
45TH ST
44TH ST
43RD ST
42ND ST
41ST ST
40TH ST.
YERBA BUENA AVE
39TH ST.
38TH ST
APGAR ST
36TH ST
37TH ST
PERALTA
WATTS
47TH ST
48TH ST
ADELINEST
SANPABLOAVE
HORTONST
POWELL ST
40TH ST
YERBA BUENA AVE
SANPABLOAVE
CHRISTIE
AVE
BEACHST
PEABODY
LN
MANDELAPK
W
Y
SHELLMOUNDST
ASHBY
AVE
W. MACARTHUR BLVD
SHELLMOUNDST
BAYST
INTERSTATE 580
STAN
FO
RD
AVE
CHIRONWAY
WAY
SHELLMOUND
0 600 1200 2400300
FEET
TRANSIT SYSTEM
EMERYVILLE GENERAL PLAN
To MacArthur
BART
To West Oakland
BART
Transit Streets
Regional Rail
Existing Crossing (at grade)
Major Transit Hub
Future grade-separated
crossing of the railroad
between Powell St and
Ashby Ave at location
to be determined
FIGURE 3-5
Transit System
3-13
SUPPLEMENTAL INFORMATION
GENERAL PLAN DIAGRAMS
SOURCE: Emerville General Plan January 2009
Wallace Roberts & Todd, LLC.

More Related Content

What's hot

1979 Mission | Presentation to 15th Street Neighbors
1979 Mission | Presentation to 15th Street Neighbors1979 Mission | Presentation to 15th Street Neighbors
1979 Mission | Presentation to 15th Street Neighbors1979mission
 
Steeles Avenue Widening and Morningside Avenue Extension - Display Panels, Ju...
Steeles Avenue Widening and Morningside Avenue Extension - Display Panels, Ju...Steeles Avenue Widening and Morningside Avenue Extension - Display Panels, Ju...
Steeles Avenue Widening and Morningside Avenue Extension - Display Panels, Ju...Toronto Public Consultation Unit
 
Alafaya presentation 3 3-11
Alafaya presentation 3 3-11Alafaya presentation 3 3-11
Alafaya presentation 3 3-11JennThomp
 
Emery village pic #1 boards v4 (reduced)
Emery village pic #1 boards v4 (reduced)Emery village pic #1 boards v4 (reduced)
Emery village pic #1 boards v4 (reduced)knelischer
 
Lorton VRE Parking Lot Expansion
Lorton VRE Parking Lot ExpansionLorton VRE Parking Lot Expansion
Lorton VRE Parking Lot ExpansionFairfax County
 
Balboa Avenue Station Presentation
Balboa Avenue Station PresentationBalboa Avenue Station Presentation
Balboa Avenue Station PresentationCirculateSD
 
Demery and assoc madison and yount street community presentation 3 4-14
Demery and assoc madison and yount street community presentation 3 4-14Demery and assoc madison and yount street community presentation 3 4-14
Demery and assoc madison and yount street community presentation 3 4-14kristinemassey
 
Clairemont subcommittee presentation 07.19.17
Clairemont subcommittee presentation  07.19.17Clairemont subcommittee presentation  07.19.17
Clairemont subcommittee presentation 07.19.17CirculateSD
 
1979 Mission | Community Meeting for Neighbors
1979 Mission |  Community Meeting for Neighbors1979 Mission |  Community Meeting for Neighbors
1979 Mission | Community Meeting for Neighbors1979mission
 
Pacific Beach ad hoc subcommittee presentation 11/3/16
Pacific Beach ad hoc subcommittee presentation 11/3/16Pacific Beach ad hoc subcommittee presentation 11/3/16
Pacific Beach ad hoc subcommittee presentation 11/3/16omedina91
 
Reston Parkway at Dulles Toll Road Westbound On-Ramp and Eastbound Off-Ramp
Reston Parkway at Dulles Toll Road Westbound On-Ramp and Eastbound Off-RampReston Parkway at Dulles Toll Road Westbound On-Ramp and Eastbound Off-Ramp
Reston Parkway at Dulles Toll Road Westbound On-Ramp and Eastbound Off-RampFairfax County
 
Clairemont CPG ad hoc subcommittee presentation 1/18/18
Clairemont CPG ad hoc subcommittee presentation 1/18/18Clairemont CPG ad hoc subcommittee presentation 1/18/18
Clairemont CPG ad hoc subcommittee presentation 1/18/18CirculateSD
 
Clairemont ad hoc subcommittee presentation 11/2/16
Clairemont ad hoc subcommittee presentation 11/2/16 Clairemont ad hoc subcommittee presentation 11/2/16
Clairemont ad hoc subcommittee presentation 11/2/16 omedina91
 
Pb Community Planning Group May 24
Pb Community Planning Group May 24Pb Community Planning Group May 24
Pb Community Planning Group May 24CirculateSD
 
Clairemont CPG Ad Hoc Subcommittee Meeting
Clairemont CPG Ad Hoc Subcommittee MeetingClairemont CPG Ad Hoc Subcommittee Meeting
Clairemont CPG Ad Hoc Subcommittee MeetingCirculateSD
 
Burke Road Corridor Community Meeting : June 18, 2018
Burke Road Corridor Community Meeting : June 18, 2018Burke Road Corridor Community Meeting : June 18, 2018
Burke Road Corridor Community Meeting : June 18, 2018Fairfax County
 
1979 Mission | Neighbors From Capp & Adair Streets
1979 Mission | Neighbors From Capp & Adair Streets1979 Mission | Neighbors From Capp & Adair Streets
1979 Mission | Neighbors From Capp & Adair Streets1979mission
 

What's hot (20)

East Don Trail - Design Concepts
East Don Trail - Design ConceptsEast Don Trail - Design Concepts
East Don Trail - Design Concepts
 
1979 Mission | Presentation to 15th Street Neighbors
1979 Mission | Presentation to 15th Street Neighbors1979 Mission | Presentation to 15th Street Neighbors
1979 Mission | Presentation to 15th Street Neighbors
 
Steeles Avenue Widening and Morningside Avenue Extension - Display Panels, Ju...
Steeles Avenue Widening and Morningside Avenue Extension - Display Panels, Ju...Steeles Avenue Widening and Morningside Avenue Extension - Display Panels, Ju...
Steeles Avenue Widening and Morningside Avenue Extension - Display Panels, Ju...
 
Alafaya presentation 3 3-11
Alafaya presentation 3 3-11Alafaya presentation 3 3-11
Alafaya presentation 3 3-11
 
Emery village pic #1 boards v4 (reduced)
Emery village pic #1 boards v4 (reduced)Emery village pic #1 boards v4 (reduced)
Emery village pic #1 boards v4 (reduced)
 
Lorton VRE Parking Lot Expansion
Lorton VRE Parking Lot ExpansionLorton VRE Parking Lot Expansion
Lorton VRE Parking Lot Expansion
 
Flagler street-enhanced-bus-service-presentation-2014-12
Flagler street-enhanced-bus-service-presentation-2014-12Flagler street-enhanced-bus-service-presentation-2014-12
Flagler street-enhanced-bus-service-presentation-2014-12
 
Balboa Avenue Station Presentation
Balboa Avenue Station PresentationBalboa Avenue Station Presentation
Balboa Avenue Station Presentation
 
Demery and assoc madison and yount street community presentation 3 4-14
Demery and assoc madison and yount street community presentation 3 4-14Demery and assoc madison and yount street community presentation 3 4-14
Demery and assoc madison and yount street community presentation 3 4-14
 
Clairemont subcommittee presentation 07.19.17
Clairemont subcommittee presentation  07.19.17Clairemont subcommittee presentation  07.19.17
Clairemont subcommittee presentation 07.19.17
 
Quander Road Walkway
Quander Road WalkwayQuander Road Walkway
Quander Road Walkway
 
1979 Mission | Community Meeting for Neighbors
1979 Mission |  Community Meeting for Neighbors1979 Mission |  Community Meeting for Neighbors
1979 Mission | Community Meeting for Neighbors
 
Pacific Beach ad hoc subcommittee presentation 11/3/16
Pacific Beach ad hoc subcommittee presentation 11/3/16Pacific Beach ad hoc subcommittee presentation 11/3/16
Pacific Beach ad hoc subcommittee presentation 11/3/16
 
Reston Parkway at Dulles Toll Road Westbound On-Ramp and Eastbound Off-Ramp
Reston Parkway at Dulles Toll Road Westbound On-Ramp and Eastbound Off-RampReston Parkway at Dulles Toll Road Westbound On-Ramp and Eastbound Off-Ramp
Reston Parkway at Dulles Toll Road Westbound On-Ramp and Eastbound Off-Ramp
 
Clairemont CPG ad hoc subcommittee presentation 1/18/18
Clairemont CPG ad hoc subcommittee presentation 1/18/18Clairemont CPG ad hoc subcommittee presentation 1/18/18
Clairemont CPG ad hoc subcommittee presentation 1/18/18
 
Clairemont ad hoc subcommittee presentation 11/2/16
Clairemont ad hoc subcommittee presentation 11/2/16 Clairemont ad hoc subcommittee presentation 11/2/16
Clairemont ad hoc subcommittee presentation 11/2/16
 
Pb Community Planning Group May 24
Pb Community Planning Group May 24Pb Community Planning Group May 24
Pb Community Planning Group May 24
 
Clairemont CPG Ad Hoc Subcommittee Meeting
Clairemont CPG Ad Hoc Subcommittee MeetingClairemont CPG Ad Hoc Subcommittee Meeting
Clairemont CPG Ad Hoc Subcommittee Meeting
 
Burke Road Corridor Community Meeting : June 18, 2018
Burke Road Corridor Community Meeting : June 18, 2018Burke Road Corridor Community Meeting : June 18, 2018
Burke Road Corridor Community Meeting : June 18, 2018
 
1979 Mission | Neighbors From Capp & Adair Streets
1979 Mission | Neighbors From Capp & Adair Streets1979 Mission | Neighbors From Capp & Adair Streets
1979 Mission | Neighbors From Capp & Adair Streets
 

Similar to 2011 04-26 powell-street_urban_design_plan

East West Link Royal Park West Portal Design to be Finalised
East West Link Royal Park West Portal Design to be FinalisedEast West Link Royal Park West Portal Design to be Finalised
East West Link Royal Park West Portal Design to be FinalisedTony Smith
 
Oakville Working Draft Design Guidelines 6.25.15 reduced
Oakville Working Draft Design Guidelines 6.25.15 reducedOakville Working Draft Design Guidelines 6.25.15 reduced
Oakville Working Draft Design Guidelines 6.25.15 reducedC. Juliana Villabona
 
2015 3 25 Presentation Boards
2015 3 25 Presentation Boards2015 3 25 Presentation Boards
2015 3 25 Presentation BoardsTy Bos
 
Urban Forestry as a Means of Fostering Economic Development and Environmental...
Urban Forestry as a Means of Fostering Economic Development and Environmental...Urban Forestry as a Means of Fostering Economic Development and Environmental...
Urban Forestry as a Means of Fostering Economic Development and Environmental...Arbor Day Foundation
 
Sindiong Project Examples
Sindiong Project ExamplesSindiong Project Examples
Sindiong Project ExamplesSteveSindiong
 
Kellen Kyger Portfolio with Revit 013117
Kellen Kyger Portfolio with Revit 013117Kellen Kyger Portfolio with Revit 013117
Kellen Kyger Portfolio with Revit 013117Kellen Kyger
 
02 cta yellow line station evanston cc 04.16.12
02   cta yellow line station evanston cc 04.16.1202   cta yellow line station evanston cc 04.16.12
02 cta yellow line station evanston cc 04.16.12cityofevanston
 
Summit Parkline Presentation to City Council
Summit Parkline Presentation to City CouncilSummit Parkline Presentation to City Council
Summit Parkline Presentation to City CouncilGabriela Kappes
 
El camino real fact sheet
El camino real fact sheet El camino real fact sheet
El camino real fact sheet Adina Levin
 
WS 2D Goldilocks & Streets: What's Just Right for You
WS 2D   Goldilocks & Streets: What's Just Right for YouWS 2D   Goldilocks & Streets: What's Just Right for You
WS 2D Goldilocks & Streets: What's Just Right for YouTheOpenStreetsProject
 
J.christopher ray portfolio 2014
J.christopher ray portfolio 2014 J.christopher ray portfolio 2014
J.christopher ray portfolio 2014 jchrisray
 
Sunrise Valley Dr. Sidewalk Improvements -River Birch Rd. to Legacy Circle
Sunrise Valley Dr. Sidewalk Improvements -River Birch Rd. to Legacy CircleSunrise Valley Dr. Sidewalk Improvements -River Birch Rd. to Legacy Circle
Sunrise Valley Dr. Sidewalk Improvements -River Birch Rd. to Legacy CircleFairfax County
 
Orange Avenue Overlay Final Report
Orange Avenue Overlay Final ReportOrange Avenue Overlay Final Report
Orange Avenue Overlay Final ReportBrendan O'Connor
 
REimagining Yonge Street - Public Open House 1 Display Panels [may 25-16]
REimagining Yonge Street - Public Open House 1 Display Panels [may 25-16]REimagining Yonge Street - Public Open House 1 Display Panels [may 25-16]
REimagining Yonge Street - Public Open House 1 Display Panels [may 25-16]knelischer
 
Cedarvale station open house for website final2
Cedarvale station open house for website final2Cedarvale station open house for website final2
Cedarvale station open house for website final2Crosstown TO
 

Similar to 2011 04-26 powell-street_urban_design_plan (20)

East West Link Royal Park West Portal Design to be Finalised
East West Link Royal Park West Portal Design to be FinalisedEast West Link Royal Park West Portal Design to be Finalised
East West Link Royal Park West Portal Design to be Finalised
 
Wilton Walking Audit
Wilton Walking AuditWilton Walking Audit
Wilton Walking Audit
 
Miller J Portfolio
Miller J PortfolioMiller J Portfolio
Miller J Portfolio
 
Oakville Working Draft Design Guidelines 6.25.15 reduced
Oakville Working Draft Design Guidelines 6.25.15 reducedOakville Working Draft Design Guidelines 6.25.15 reduced
Oakville Working Draft Design Guidelines 6.25.15 reduced
 
2015 3 25 Presentation Boards
2015 3 25 Presentation Boards2015 3 25 Presentation Boards
2015 3 25 Presentation Boards
 
Urban Forestry as a Means of Fostering Economic Development and Environmental...
Urban Forestry as a Means of Fostering Economic Development and Environmental...Urban Forestry as a Means of Fostering Economic Development and Environmental...
Urban Forestry as a Means of Fostering Economic Development and Environmental...
 
Sindiong Project Examples
Sindiong Project ExamplesSindiong Project Examples
Sindiong Project Examples
 
Kellen Kyger Portfolio with Revit 013117
Kellen Kyger Portfolio with Revit 013117Kellen Kyger Portfolio with Revit 013117
Kellen Kyger Portfolio with Revit 013117
 
02 cta yellow line station evanston cc 04.16.12
02   cta yellow line station evanston cc 04.16.1202   cta yellow line station evanston cc 04.16.12
02 cta yellow line station evanston cc 04.16.12
 
Summit Parkline Presentation to City Council
Summit Parkline Presentation to City CouncilSummit Parkline Presentation to City Council
Summit Parkline Presentation to City Council
 
Somerville Broadway Streetscape Project, CAPS comments to MassDOT, March 2011
Somerville Broadway Streetscape Project, CAPS comments to MassDOT, March 2011 Somerville Broadway Streetscape Project, CAPS comments to MassDOT, March 2011
Somerville Broadway Streetscape Project, CAPS comments to MassDOT, March 2011
 
How the West was One Gold Rush Survival Kit
How the West was One Gold Rush Survival KitHow the West was One Gold Rush Survival Kit
How the West was One Gold Rush Survival Kit
 
130423 pubmtgppt2
130423 pubmtgppt2130423 pubmtgppt2
130423 pubmtgppt2
 
El camino real fact sheet
El camino real fact sheet El camino real fact sheet
El camino real fact sheet
 
WS 2D Goldilocks & Streets: What's Just Right for You
WS 2D   Goldilocks & Streets: What's Just Right for YouWS 2D   Goldilocks & Streets: What's Just Right for You
WS 2D Goldilocks & Streets: What's Just Right for You
 
J.christopher ray portfolio 2014
J.christopher ray portfolio 2014 J.christopher ray portfolio 2014
J.christopher ray portfolio 2014
 
Sunrise Valley Dr. Sidewalk Improvements -River Birch Rd. to Legacy Circle
Sunrise Valley Dr. Sidewalk Improvements -River Birch Rd. to Legacy CircleSunrise Valley Dr. Sidewalk Improvements -River Birch Rd. to Legacy Circle
Sunrise Valley Dr. Sidewalk Improvements -River Birch Rd. to Legacy Circle
 
Orange Avenue Overlay Final Report
Orange Avenue Overlay Final ReportOrange Avenue Overlay Final Report
Orange Avenue Overlay Final Report
 
REimagining Yonge Street - Public Open House 1 Display Panels [may 25-16]
REimagining Yonge Street - Public Open House 1 Display Panels [may 25-16]REimagining Yonge Street - Public Open House 1 Display Panels [may 25-16]
REimagining Yonge Street - Public Open House 1 Display Panels [may 25-16]
 
Cedarvale station open house for website final2
Cedarvale station open house for website final2Cedarvale station open house for website final2
Cedarvale station open house for website final2
 

More from E'ville Eye

legal-Complaint-emery-unified-assault.pdf
legal-Complaint-emery-unified-assault.pdflegal-Complaint-emery-unified-assault.pdf
legal-Complaint-emery-unified-assault.pdfE'ville Eye
 
EUSD Superintendent Goals 2021-2023.pdf
EUSD Superintendent Goals 2021-2023.pdfEUSD Superintendent Goals 2021-2023.pdf
EUSD Superintendent Goals 2021-2023.pdfE'ville Eye
 
SeaWallsMap-UPDATE.pdf
SeaWallsMap-UPDATE.pdfSeaWallsMap-UPDATE.pdf
SeaWallsMap-UPDATE.pdfE'ville Eye
 
EGR-WOAK_BART_Preso_1024.pdf
EGR-WOAK_BART_Preso_1024.pdfEGR-WOAK_BART_Preso_1024.pdf
EGR-WOAK_BART_Preso_1024.pdfE'ville Eye
 
City of Emeryville 2023-2031 Housing Element [Public Draft]
City of Emeryville 2023-2031 Housing Element [Public Draft]City of Emeryville 2023-2031 Housing Element [Public Draft]
City of Emeryville 2023-2031 Housing Element [Public Draft]E'ville Eye
 
Wood Street Engagement Sessions FAQ.pdf
Wood Street Engagement Sessions FAQ.pdfWood Street Engagement Sessions FAQ.pdf
Wood Street Engagement Sessions FAQ.pdfE'ville Eye
 
Item 9.2 bay street emeryville grocery store staff report
Item 9.2 bay street emeryville grocery store staff reportItem 9.2 bay street emeryville grocery store staff report
Item 9.2 bay street emeryville grocery store staff reportE'ville Eye
 
2021 Emeryville Special Election Petition
2021 Emeryville Special Election Petition2021 Emeryville Special Election Petition
2021 Emeryville Special Election PetitionE'ville Eye
 
Wdwg press packet
Wdwg press packetWdwg press packet
Wdwg press packetE'ville Eye
 
8 6 updated_reopeningschoolsdata_0
8 6 updated_reopeningschoolsdata_08 6 updated_reopeningschoolsdata_0
8 6 updated_reopeningschoolsdata_0E'ville Eye
 
History and Innovation in Emeryville
History and Innovation in EmeryvilleHistory and Innovation in Emeryville
History and Innovation in EmeryvilleE'ville Eye
 
Onni deemed withdrawn letter 07 22-20
Onni deemed withdrawn letter 07 22-20Onni deemed withdrawn letter 07 22-20
Onni deemed withdrawn letter 07 22-20E'ville Eye
 
Item 7.1 art center study session
Item 7.1   art center study sessionItem 7.1   art center study session
Item 7.1 art center study sessionE'ville Eye
 
Lpas rcs-3600-san-pablo
Lpas rcs-3600-san-pabloLpas rcs-3600-san-pablo
Lpas rcs-3600-san-pabloE'ville Eye
 
Tejada retirement notice
Tejada retirement noticeTejada retirement notice
Tejada retirement noticeE'ville Eye
 
Fy 2019 21 mid-cycle budget review 5-14-2020
Fy 2019 21 mid-cycle budget review 5-14-2020Fy 2019 21 mid-cycle budget review 5-14-2020
Fy 2019 21 mid-cycle budget review 5-14-2020E'ville Eye
 
Biomed realty-emeryville-center-innovation
Biomed realty-emeryville-center-innovationBiomed realty-emeryville-center-innovation
Biomed realty-emeryville-center-innovationE'ville Eye
 
2020.03.19 covid-19 emergency rental assistance program
2020.03.19   covid-19 emergency rental assistance program2020.03.19   covid-19 emergency rental assistance program
2020.03.19 covid-19 emergency rental assistance programE'ville Eye
 
Dec 3 2019 cc meeting proposed sales tax measure
Dec 3 2019 cc meeting   proposed sales tax measureDec 3 2019 cc meeting   proposed sales tax measure
Dec 3 2019 cc meeting proposed sales tax measureE'ville Eye
 
Ac fr ogdxe1o77gyvrw6rruvtw7lusdahpeh-u_k0fz0g0qzdx80n9wtveg4_p2c17d1b-r2m4zv...
Ac fr ogdxe1o77gyvrw6rruvtw7lusdahpeh-u_k0fz0g0qzdx80n9wtveg4_p2c17d1b-r2m4zv...Ac fr ogdxe1o77gyvrw6rruvtw7lusdahpeh-u_k0fz0g0qzdx80n9wtveg4_p2c17d1b-r2m4zv...
Ac fr ogdxe1o77gyvrw6rruvtw7lusdahpeh-u_k0fz0g0qzdx80n9wtveg4_p2c17d1b-r2m4zv...E'ville Eye
 

More from E'ville Eye (20)

legal-Complaint-emery-unified-assault.pdf
legal-Complaint-emery-unified-assault.pdflegal-Complaint-emery-unified-assault.pdf
legal-Complaint-emery-unified-assault.pdf
 
EUSD Superintendent Goals 2021-2023.pdf
EUSD Superintendent Goals 2021-2023.pdfEUSD Superintendent Goals 2021-2023.pdf
EUSD Superintendent Goals 2021-2023.pdf
 
SeaWallsMap-UPDATE.pdf
SeaWallsMap-UPDATE.pdfSeaWallsMap-UPDATE.pdf
SeaWallsMap-UPDATE.pdf
 
EGR-WOAK_BART_Preso_1024.pdf
EGR-WOAK_BART_Preso_1024.pdfEGR-WOAK_BART_Preso_1024.pdf
EGR-WOAK_BART_Preso_1024.pdf
 
City of Emeryville 2023-2031 Housing Element [Public Draft]
City of Emeryville 2023-2031 Housing Element [Public Draft]City of Emeryville 2023-2031 Housing Element [Public Draft]
City of Emeryville 2023-2031 Housing Element [Public Draft]
 
Wood Street Engagement Sessions FAQ.pdf
Wood Street Engagement Sessions FAQ.pdfWood Street Engagement Sessions FAQ.pdf
Wood Street Engagement Sessions FAQ.pdf
 
Item 9.2 bay street emeryville grocery store staff report
Item 9.2 bay street emeryville grocery store staff reportItem 9.2 bay street emeryville grocery store staff report
Item 9.2 bay street emeryville grocery store staff report
 
2021 Emeryville Special Election Petition
2021 Emeryville Special Election Petition2021 Emeryville Special Election Petition
2021 Emeryville Special Election Petition
 
Wdwg press packet
Wdwg press packetWdwg press packet
Wdwg press packet
 
8 6 updated_reopeningschoolsdata_0
8 6 updated_reopeningschoolsdata_08 6 updated_reopeningschoolsdata_0
8 6 updated_reopeningschoolsdata_0
 
History and Innovation in Emeryville
History and Innovation in EmeryvilleHistory and Innovation in Emeryville
History and Innovation in Emeryville
 
Onni deemed withdrawn letter 07 22-20
Onni deemed withdrawn letter 07 22-20Onni deemed withdrawn letter 07 22-20
Onni deemed withdrawn letter 07 22-20
 
Item 7.1 art center study session
Item 7.1   art center study sessionItem 7.1   art center study session
Item 7.1 art center study session
 
Lpas rcs-3600-san-pablo
Lpas rcs-3600-san-pabloLpas rcs-3600-san-pablo
Lpas rcs-3600-san-pablo
 
Tejada retirement notice
Tejada retirement noticeTejada retirement notice
Tejada retirement notice
 
Fy 2019 21 mid-cycle budget review 5-14-2020
Fy 2019 21 mid-cycle budget review 5-14-2020Fy 2019 21 mid-cycle budget review 5-14-2020
Fy 2019 21 mid-cycle budget review 5-14-2020
 
Biomed realty-emeryville-center-innovation
Biomed realty-emeryville-center-innovationBiomed realty-emeryville-center-innovation
Biomed realty-emeryville-center-innovation
 
2020.03.19 covid-19 emergency rental assistance program
2020.03.19   covid-19 emergency rental assistance program2020.03.19   covid-19 emergency rental assistance program
2020.03.19 covid-19 emergency rental assistance program
 
Dec 3 2019 cc meeting proposed sales tax measure
Dec 3 2019 cc meeting   proposed sales tax measureDec 3 2019 cc meeting   proposed sales tax measure
Dec 3 2019 cc meeting proposed sales tax measure
 
Ac fr ogdxe1o77gyvrw6rruvtw7lusdahpeh-u_k0fz0g0qzdx80n9wtveg4_p2c17d1b-r2m4zv...
Ac fr ogdxe1o77gyvrw6rruvtw7lusdahpeh-u_k0fz0g0qzdx80n9wtveg4_p2c17d1b-r2m4zv...Ac fr ogdxe1o77gyvrw6rruvtw7lusdahpeh-u_k0fz0g0qzdx80n9wtveg4_p2c17d1b-r2m4zv...
Ac fr ogdxe1o77gyvrw6rruvtw7lusdahpeh-u_k0fz0g0qzdx80n9wtveg4_p2c17d1b-r2m4zv...
 

Recently uploaded

2024: The FAR, Federal Acquisition Regulations - Part 25
2024: The FAR, Federal Acquisition Regulations - Part 252024: The FAR, Federal Acquisition Regulations - Part 25
2024: The FAR, Federal Acquisition Regulations - Part 25JSchaus & Associates
 
Disciplines-and-Ideas-in-the-Applied-Social-Sciences-DLP-.pdf
Disciplines-and-Ideas-in-the-Applied-Social-Sciences-DLP-.pdfDisciplines-and-Ideas-in-the-Applied-Social-Sciences-DLP-.pdf
Disciplines-and-Ideas-in-the-Applied-Social-Sciences-DLP-.pdfDeLeon9
 
history of 1935 philippine constitution.pptx
history of 1935 philippine constitution.pptxhistory of 1935 philippine constitution.pptx
history of 1935 philippine constitution.pptxhellokittymaearciaga
 
Call Girls Near Surya International Hotel New Delhi 9873777170
Call Girls Near Surya International Hotel New Delhi 9873777170Call Girls Near Surya International Hotel New Delhi 9873777170
Call Girls Near Surya International Hotel New Delhi 9873777170Sonam Pathan
 
No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...
No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...
No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...narwatsonia7
 
call girls in Vasant Kunj DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vasant Kunj DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Vasant Kunj DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vasant Kunj DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️saminamagar
 
High-Level Thematic Event on Tourism - SUSTAINABILITY WEEK 2024- United Natio...
High-Level Thematic Event on Tourism - SUSTAINABILITY WEEK 2024- United Natio...High-Level Thematic Event on Tourism - SUSTAINABILITY WEEK 2024- United Natio...
High-Level Thematic Event on Tourism - SUSTAINABILITY WEEK 2024- United Natio...Christina Parmionova
 
call girls in DLF Phase 1 gurgaon 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
call girls in DLF Phase 1  gurgaon  🔝 >༒9540349809 🔝 genuine Escort Service 🔝...call girls in DLF Phase 1  gurgaon  🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
call girls in DLF Phase 1 gurgaon 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...saminamagar
 
Angels_EDProgrammes & Services 2024.pptx
Angels_EDProgrammes & Services 2024.pptxAngels_EDProgrammes & Services 2024.pptx
Angels_EDProgrammes & Services 2024.pptxLizelle Coombs
 
call girls in Mukherjee Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
call girls in Mukherjee Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...call girls in Mukherjee Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
call girls in Mukherjee Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...saminamagar
 
call girls in Tilak Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Tilak Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Tilak Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Tilak Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️saminamagar
 
Yellow is My Favorite Color By Annabelle.pdf
Yellow is My Favorite Color By Annabelle.pdfYellow is My Favorite Color By Annabelle.pdf
Yellow is My Favorite Color By Annabelle.pdfAmir Saranga
 
Start Donating your Old Clothes to Poor People
Start Donating your Old Clothes to Poor PeopleStart Donating your Old Clothes to Poor People
Start Donating your Old Clothes to Poor PeopleSERUDS INDIA
 
High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...
High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...
High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...narwatsonia7
 
call girls in Punjabi Bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Punjabi Bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Punjabi Bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Punjabi Bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️saminamagar
 
Action Toolkit - Earth Day 2024 - April 22nd.
Action Toolkit - Earth Day 2024 - April 22nd.Action Toolkit - Earth Day 2024 - April 22nd.
Action Toolkit - Earth Day 2024 - April 22nd.Christina Parmionova
 
办理约克大学毕业证成绩单|购买加拿大文凭证书
办理约克大学毕业证成绩单|购买加拿大文凭证书办理约克大学毕业证成绩单|购买加拿大文凭证书
办理约克大学毕业证成绩单|购买加拿大文凭证书zdzoqco
 
(多少钱)Dal毕业证国外本科学位证
(多少钱)Dal毕业证国外本科学位证(多少钱)Dal毕业证国外本科学位证
(多少钱)Dal毕业证国外本科学位证mbetknu
 
call girls in Laxmi Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Laxmi Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Laxmi Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Laxmi Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️saminamagar
 

Recently uploaded (20)

2024: The FAR, Federal Acquisition Regulations - Part 25
2024: The FAR, Federal Acquisition Regulations - Part 252024: The FAR, Federal Acquisition Regulations - Part 25
2024: The FAR, Federal Acquisition Regulations - Part 25
 
Disciplines-and-Ideas-in-the-Applied-Social-Sciences-DLP-.pdf
Disciplines-and-Ideas-in-the-Applied-Social-Sciences-DLP-.pdfDisciplines-and-Ideas-in-the-Applied-Social-Sciences-DLP-.pdf
Disciplines-and-Ideas-in-the-Applied-Social-Sciences-DLP-.pdf
 
history of 1935 philippine constitution.pptx
history of 1935 philippine constitution.pptxhistory of 1935 philippine constitution.pptx
history of 1935 philippine constitution.pptx
 
Call Girls Near Surya International Hotel New Delhi 9873777170
Call Girls Near Surya International Hotel New Delhi 9873777170Call Girls Near Surya International Hotel New Delhi 9873777170
Call Girls Near Surya International Hotel New Delhi 9873777170
 
No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...
No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...
No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...
 
call girls in Vasant Kunj DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vasant Kunj DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Vasant Kunj DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vasant Kunj DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
 
High-Level Thematic Event on Tourism - SUSTAINABILITY WEEK 2024- United Natio...
High-Level Thematic Event on Tourism - SUSTAINABILITY WEEK 2024- United Natio...High-Level Thematic Event on Tourism - SUSTAINABILITY WEEK 2024- United Natio...
High-Level Thematic Event on Tourism - SUSTAINABILITY WEEK 2024- United Natio...
 
call girls in DLF Phase 1 gurgaon 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
call girls in DLF Phase 1  gurgaon  🔝 >༒9540349809 🔝 genuine Escort Service 🔝...call girls in DLF Phase 1  gurgaon  🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
call girls in DLF Phase 1 gurgaon 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
 
Angels_EDProgrammes & Services 2024.pptx
Angels_EDProgrammes & Services 2024.pptxAngels_EDProgrammes & Services 2024.pptx
Angels_EDProgrammes & Services 2024.pptx
 
call girls in Mukherjee Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
call girls in Mukherjee Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...call girls in Mukherjee Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
call girls in Mukherjee Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
 
call girls in Tilak Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Tilak Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Tilak Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Tilak Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
 
Yellow is My Favorite Color By Annabelle.pdf
Yellow is My Favorite Color By Annabelle.pdfYellow is My Favorite Color By Annabelle.pdf
Yellow is My Favorite Color By Annabelle.pdf
 
Start Donating your Old Clothes to Poor People
Start Donating your Old Clothes to Poor PeopleStart Donating your Old Clothes to Poor People
Start Donating your Old Clothes to Poor People
 
High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...
High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...
High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...
 
call girls in Punjabi Bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Punjabi Bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Punjabi Bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Punjabi Bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
 
Action Toolkit - Earth Day 2024 - April 22nd.
Action Toolkit - Earth Day 2024 - April 22nd.Action Toolkit - Earth Day 2024 - April 22nd.
Action Toolkit - Earth Day 2024 - April 22nd.
 
办理约克大学毕业证成绩单|购买加拿大文凭证书
办理约克大学毕业证成绩单|购买加拿大文凭证书办理约克大学毕业证成绩单|购买加拿大文凭证书
办理约克大学毕业证成绩单|购买加拿大文凭证书
 
(多少钱)Dal毕业证国外本科学位证
(多少钱)Dal毕业证国外本科学位证(多少钱)Dal毕业证国外本科学位证
(多少钱)Dal毕业证国外本科学位证
 
call girls in Laxmi Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Laxmi Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Laxmi Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Laxmi Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
 
Hot Sexy call girls in Palam Vihar🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Palam Vihar🔝 9953056974 🔝 escort ServiceHot Sexy call girls in Palam Vihar🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Palam Vihar🔝 9953056974 🔝 escort Service
 

2011 04-26 powell-street_urban_design_plan

  • 1. POWELL STREET URBAN DESIGN PLAN F R O N TA G E R O A D T O C H R I S T I E AV E N U E City of Emeryville Wallace Roberts & Todd, LLC.
  • 2.
  • 3. 3P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E City of Emeryville Wallace Roberts & Todd, LLC. Acknowledgements City of Emeryville 1333 Park Avenue Emeryville, CA 94608-3517 Office of the City Manager/Emeryville Redevelopment Agency Patrick D. O’Keeffe, City Manager/Agency Executive Director Planning and Building Department Charles S. Bryant (AICP), Director Public Works Department Maurice Kaufman, Public Works Director Department of Economic Development and Housing Helen Bean, Director Michelle De Guzman, Community Economic Development Coordinator Wallace Roberts & Todd, LLC – San Francisco James K. Stickley, ASLA, Principal John R. Gibbs, ASLA, Project Manager / Landscape Architect Julie Peng, Landscape Architect Dan Affleck, Landscape Designer Adopted April 5th, 2011, by vote of the Emeryville City Council
  • 4. 4P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E City of Emeryville Wallace Roberts & Todd, LLC. Table of Contents Project Approach.........................................................................................................5 Existing Conditions.....................................................................................................6 Site Photos.........................................................................................................6 Aerial Photo and Survey...................................................................................8 ProjectOverview..........................................................................................................7 Phase 1: Multi-Modal Improvements.......................................................................12 Phase 2: Civic Identity................................................................................................16 Phase3: TransitIdentity...............................................................................................23 Supplemental Information........................................................................................26 StreetSections.................................................................................................26 Project Concept Precedents...........................................................................28 Art Elements...................................................................................................29 Bicycle and Pedestrian Safety.........................................................................30 Gateway Parcel Massing Study......................................................................31 AC Transit Route Map....................................................................................32 Transit Network Summary..............................................................................33 General Plan Diagrams...................................................................................34 Powell Street as it currently exists- a vast auto-oriented corridor leading into the city.
  • 5. 5P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E City of Emeryville Wallace Roberts & Todd, LLC. Market Place Expansion Transit Center BRE Development Area South Bayfront Site B Market Place Expansion Powell Street Urban Design Project Study Area Shellmound Design Guidelines Study Powell Street Urban Design Project Study Area BAY TRAIL BAYTRAIL East Shore State Park PROJECT APPROACH Conceptual Design Narrative Project Guiding Principles The General Plan offers street designations and level of service criteria that• balance -if not favor- pedestrian, bicycle, and transit mobility. The Plan further articulates a vision for connectivity, revitalization, and sustainability. The corridor has been extensively studied. Project designers should incorporate• the recommendations of previous authors including the UC Berkeley Traffic Safety Study. The design should embody the objectives of a “complete street.” The corridor serves as a significant point of welcome to the City for residents,• freeway passerbyes, and regional shoppers. As a gateway, it should effectively announce and characterize Emeryville’s quality of life. In order to provide optimal pedestrian/bicycle/transit circulation and civic• beautification without reducing vehicle travel lanes, the corridor can be widened into the adjacent parcels when redesign of those uses is appropriate. The number of travel lanes on Powell will not change. Regional and City residents should gain improved pedestrian and bicycle access• to waterfront open space resources via the Bay Trail and other conenctions. The project should promote the revitalization of private properties and stimulate• reinvestment/redevelopment. The Powell / Shellmound District is an emerging, mixed-use urban• neighborhood. A finer grain mix of green space, neighborhood serving retail, and pedestrian access is increasingly appropriate. Overall Design Objectives Identify clear project phases that address near term multi-modal improvements (0-5 years) and a long term vision (8-• 15 years). Each phase should maximize improvement to pedestrian, bicycle, and transit functions. Create a distinctive sense of place that makes legible the design principles and builds a positive civic gateway.• Connect the City’s inland neighborhoods to the Bay and extensive waterfront open space via substantial sidewalk/• multi-use path connectors. Prescribe a street geometry where curbs, gutters, and crosswalks each contribute to a clear and regularized• aesthetic. Compress vehicle-oriented layout such as curb radii, lane width, and speed to acceptable minimums to maintain function while improving pedestrian safety and access. Add crosswalks and configure with center median pedestrian refuges.• Treat stormwater runoff to remove pollutants before discharge to Bay.• Configure new building edges and massing to best address issues of height, transparency, street animation, and• entry. Promote safe sidewalk conditions through the use of paving and signage which clearly delineates access zones for• cyclist and pedestrians. Provide a connection point from Powell Street to East Shore State Park.• Project area and nearby development projects
  • 6. 6P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E City of Emeryville Wallace Roberts & Todd, LLC. EXISTING CONDITIONS PHOTOS Sequential walk on the SOUTH side of Powell St, from Frontage Rd. walking east towards Shellmound St. Sequential walk on the NORTH side of Powell Street, from Frontage Rd. walking east towards Christie Ave. 1. 6. 2. 7. 3. 8. 4. 9. 5. 10. 1. 6. 2. 7. 3. 8. 4. 9. 5. 10.
  • 7. 7P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E City of Emeryville Wallace Roberts & Todd, LLC. EXISTING CONDITIONS PHOTOS View of Powell St. and Christie Ave. looking west View of historic map describing irregular and unique pattern of the city grid that formed over time. Ground level view of Powell St. Emeryville Crescent at Powell St. and Frontage Rd.
  • 8. 8P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E City of Emeryville Wallace Roberts & Todd, LLC. EXISTING CONDITIONS AERIAL AND SURVEY 0 40’ 80’ 160’
  • 9. 9P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E City of Emeryville Wallace Roberts & Todd, LLC. PROJECT OVERVIEW Phase 1: Multi-Modal Improvements Reconfigure south side Powell Bay Trail/sidewalk and landscape to• improve pedestrian/bicycle access from Shellmound to Frontage Road. Greenway is public in character and beautifies the private retail frontage. Provide new Transbay bus stops for San Francisco/Emeryville• communting, also available for use by Emery-Go-Round. Provide various pedestrian and bicycle improvements including those• identified by UC Berkeley Traffic Safety Study. Phase 2: Civic Identity Create an enhanced pedestrian and bicycle path and landscape cor-• ridor on the north side of Powell connecting Christie to the Frontage Road. Provide a center median of a sufficient size to include large trees,• mounded soil above the water table, and other design features that create a positive civic gateway feature. Provide new crosswalk at Powell and Christie intersection.• Create overlook to Emeryville Crescent and gateway to Eastshore• State Park. Phase 3: Transit Vision Provide dedicated transit access from the freeway off ramp through• the Powell Christie intersection (remove stops at ramp locations). Provide new crosswalk at Powell and freeway ramp intersection.• Configure Powell Frontage intersection to allow bus only left turn• access to bridge. Prevent illegal vehicle access through use of hydraulic bollard, signage, and raised, mountable curb. Create an enhanced pedestrian and bicycle path and landscape• corridor on the south side of Powell to mirror the north side.
  • 10. 10P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E City of Emeryville Wallace Roberts & Todd, LLC. LANE ADDED BRIDGE WIDENED BAY TRAIL EXISTING CONDITIONS PHASE 1 BAY TRAIL BAY TRAIL BAY TRAIL DENNY’S POWELL ST. PLAZA HOTEL I-80 OVERPASS GAS STATION LA-Z- BOY POWELL ST. CHRISTIEAVE. FRONTAGERD. DENNY’S POWELL ST. PLAZA HOTEL I-80 OVERPASS GAS STATION LA-Z- BOY POWELL ST. CHRISTIEAVE. FRONTAGERD. New Pedestrian Signal EXISTING AND PHASE 1 DIAGRAM I-80 OVERPASS New Crosswalk Tighten RadiusArt Opportunity Zone Art Opportunity Zone New Bus Sop Extend Median into Crosswalk to Provide Pedestrian Refuge Straighten Crosswalk Straighten SidewalkNew Bus Stop
  • 11. 11P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E City of Emeryville Wallace Roberts & Todd, LLC. PHASE 1 SUMMARY OF CHANGES Phase 1: Multi-Modal Improvements Pedestrian and Bicycle Transit Vehicle Image and Atmosphere Straighten Class I path on south side• at Powell Plaza and I-80 underpass from Frontage Rd. to Shellmound Ave. Improve visibility of Bay Trail on south• side as important connection to the waterfront. Improve visibility and crossing safety• at ramp crossings on south side (I-80 eastbound and westbound). Improve safety at I-80 on ramp near• Denny’s by tightening radius and planting the area. Improve pedestrian crossing of• Frontage Rd. on north side by installing pedestrian signal phase on right turn lanes. Improve Bay Trail connection to• Shellmound Ave. at Hotel parking lot. Extend median into crosswalk to• provide pedestrian refuge. Provide striping, special paving and• signage to clearly seperate bike and pedestrian traffic appropriate to path width. Provide interim stops for AC Transit• Transbay busses. Inbound bus stop is at off ramp location. Bus would pull out of traffic per Caltrans. Outbound is off Frontage Rd. Highlight shelters with• contemporary design, lighting, and proximity to sidewalk connection. Consider sponsorship of interim• shelters by businesses and arts groups. Powell St.-Frontage Rd: Add new approach (one-way• northbound, left and thru) for traffic from eastbound I-80 off ramp left-turns. Add new phase to signal timing• at intersection. Powell-I-80 off ramps: Signal operation/phasing to• remain the same, but adjust timings parameters. Powell-Christie: Change existing westbound• bridge approach by adding left- turn lane. Modify eastbound bridge to• accommodate Bay Street garage entry. Adjust timings parameters of• signal operation/phasing. Create new landscape treatment• for south side Powell St. that compliments both civic and retail improvement goals. Provide lighting and/or art• features to convey Bay Trail connection from Christie Ave. to Frontage Rd. on south side. Indicates Project Recommended by UC Berkeley Pedestrian and Bicycle Safety Evalua- tion for the the City of Emeryville at Four Intersections. These Projects are the Current Subject of The Bike and Pedestrian Safety Improvement Project by the City of Emeryville Department of Public Works.
  • 12. 12P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E City of Emeryville Wallace Roberts & Todd, LLC. PHASE 1: MULTI-MODAL IMPROVEMENTS Southeast corner of Powell St. and Christie Ave. existing condition Southeast corner of Powell St. and Christie Ave. Phase 1 condition View of lighted path under Interstate 80
  • 13. 13P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E City of Emeryville Wallace Roberts & Todd, LLC. PHASE 1: MULTI-MODAL IMPROVEMENTS
  • 14. 14P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E City of Emeryville Wallace Roberts & Todd, LLC. PHASE 1: MULTI-MODAL IMPROVEMENTS View of proposed bus stop at corner of Powell St. and I-80 off ramp
  • 15. 15P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E City of Emeryville Wallace Roberts & Todd, LLC. PHASE 1: MULTI-MODAL IMPROVEMENTS DENNY’S I-80 OVERPASS POWELL ST. PLAZA POWELL ST. GAS STATION LA-Z- BOY CHRISTIEAVE. FRONTAGERD
  • 16. 16P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E City of Emeryville Wallace Roberts & Todd, LLC. NEW RAMP CONNECTOR NEW CENTRAL BUS SHELTER BUS ONLY LEFT TURN PHASE 2 PHASE 3 BAY TRAIL BAY TRAIL BAY TRAIL BAY TRAIL POWELL ST. PLAZA HOTELI-80 OVERPASS LA-Z- BOY POWELL ST. CHRISTIEAVE. FRONTAGERD. HOTEL I-80 OVERPASS LA-Z- BOY POWELL ST. CHRISTIEAVE. FRONTAGERD. PHASE 2 AND 3 DIAGRAM Straighten North Sidewalk Straighten South Sidewalk Add Crosswalk Add Crosswalk Re-align Crosswalk I-80 OVERPASS I-80 OVERPASS Art Opportunity Zone
  • 17. 17P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E City of Emeryville Wallace Roberts & Todd, LLC. Pedestrian and Bicycle Transit Vehicle Image and Atmosphere Create new multi-use path and• Class I bicycle facility on north side of Powell St. Create new center median with• pedestrian refuge to improve crossing of Powell St. at Christie Ave. Add new crosswalk on Powell• St. at I-80 off ramps. Modify curb and radius on• northeast corner to provide new crosswalk at Powell St/ Christie Ave. intersection. Provide striping, special paving• and signage to clearly seperate bicycle and pedestrian traffic appropriate to path width. Provide on-going improvement• to existing operations. Improve eastbound I-80• off ramp and Powell St. intersection. Redirect left turn traffic away under overpass and to Powell St.- Frontage Rd.intersection. Restripe westbound lanes on• Powell St. from Christie Ave. to Frontage Rd. Create major new civic• identity from landscape treatments on north side and center median. Add new decorative light• fixtures to north and south side of Powell St. Create opportunities for• more public art on new paths to celebrate and interpret the unique culture of Emeryville. Create overlook at• Emeryville Crescent to reconnect city to Bay and serve as gateway to Eastshore Park. Pedestrian and Bicycle Transit Vehicle Image and Atmosphere Create new Bay Trail/multi-• use path on newly-landscaped south side of Powell connecting Shellmound St. to Bay. Create new center median with• pedestrian refuge to improve crossing of Powell St. at Christie Ave. Provide striping, special paving• and signage to clearly seperate bicycle and pedestrian traffic appropriate to path width. Provide dedicated transit• only lanes and center median station as civic marker and signature gateway feature. Modify signal timing at• Powell St. and Christie Ave. to prioritize bus movements over private vehicles. Provide bus only lane for• westbound I-80 on ramp from Powell St. Restripe eastbound lanes on• Powell from Frontage Road to Christie Ave. Prevent illegal westbound• I-80 onramp access with flexible posts and a hydraulic bollard. Integrate public art into• new transit shelter design through dynamic graphic media, lighting, color, and or form. Complete civic identity• through landscape treatments on south side to match north. Reinstall decorative lights from Phase 2. PHASE 2 AND 3 SUMMARY OF CHANGES Phase 2: Civic Identity Phase 3: Transit Vision
  • 18. 18P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E City of Emeryville Wallace Roberts & Todd, LLC. PHASE 2: CIVIC IDENTITY Existing condition Southeast corner of Powell St. and Christie Ave. Phase 2 condition View illustrating the landforms proposed for the Phase 2 median Southeast corner of Powell St. and Christie Ave. Phase 1 condition
  • 19. 19P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E City of Emeryville Wallace Roberts & Todd, LLC. PHASE 2: CIVIC IDENTITY
  • 20. 20P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E City of Emeryville Wallace Roberts & Todd, LLC. PHASE 2: CIVIC IDENTITY View of proposed Bay Trail Overlook At Emeryville Crescent (Powell St. and Frontage Rd.) View of existing location
  • 21. 21P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E City of Emeryville Wallace Roberts & Todd, LLC. PHASE 2: CIVIC IDENTITY I-80 OVERPASS POWELL ST. PLAZA NEW DEVELOPMENT PARCEL POWELL ST. LA-Z- BOY CHRISTIEAVE. FRONTAGERD
  • 22. 22P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E City of Emeryville Wallace Roberts & Todd, LLC. Existing condition Southeast corner of Powell St. and Christie Ave. Phase 2 condition Southeast corner of Powell St. and Christie Ave. Phase 3 condition Northeast corner of Powell St. and Christie Ave. Phase 3 condition PHASE 2: CIVIC IDENTITY
  • 23. 23P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E City of Emeryville Wallace Roberts & Todd, LLC. PHASE 3: TRANSIT IDENTITY
  • 24. 24P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E City of Emeryville Wallace Roberts & Todd, LLC. PHASE 3: TRANSIT IDENTITY View of reconfigured Bay Trail connection to crescent overlook and special bus only ramp access
  • 25. 25P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E City of Emeryville Wallace Roberts & Todd, LLC. PHASE 3: TRANSIT IDENTITY I-80 OVERPASS NEW DEVELOPMENT PARCEL NEW DEVELOPMENT PARCEL POWELL ST. LA-Z- BOY CHRISTIEAVE. FRONTAGERD.
  • 26. 26P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E City of Emeryville Wallace Roberts & Todd, LLC. Median SidewalkSidewalk 10.5’ 10’10.5’ 10’ 10’ 12’ 6’10’10.5’10.5’10’.510’7’ 13’ Existing Condition Powell St. Section Phase 1 Powell St. Section Median SidewalkSidewalk 10’ 10’10’ 10’ 10’ 12’ 6’10’10’10’10’10’7’ 13’ POWELL STREET CROSS SECTIONS LOOKING WEST TOWARDS FREEWAY
  • 27. 27P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E City of Emeryville Wallace Roberts & Todd, LLC. POWELL STREET CROSS SECTIONS P H A S E 2 P O W E L L S T S E C T I O N Phase 3 Powell St. Section Phase 2 Powell St. Section Bus Shelter SidewalkSidewalk 11’56’ 11’ 11’ 11’ 8’11’11’ 11’ 11’ 11’8’ 15’15’ 20’20’ P H A S E 2 P O W E LLL LLLLLLL S T S ES C T I O N 30’ Median SidewalkSidewalk 11’10.5’10’.510.5’10.5’10.5’10’7’ 13’ 11’ 11’ 11’ 8’ 15’ 20’ LOOKING WEST TOWARDS FREEWAY
  • 28. 28P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E City of Emeryville Wallace Roberts & Todd, LLC. SUPPLEMENTAL INFORMATION PROJECT CONCEPT PRECEDENTS Station canopy- Lyon, France Transit boulevard- San Francisco, CA BRT station- Eugene, OregonGrand civic boulevard, Champs Elysees- Paris, France Civic station design- Liege, Belgium
  • 29. 29P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E City of Emeryville Wallace Roberts & Todd, LLC. SUPPLEMENTAL INFORMATION ART ELEMENTS The Powell Street corridor provides opportunities for art installations and lighting elements that can function as a gateway to the city and an expression of the unique character of Emeryville. This page shows interesting examples from other cities.
  • 30. 30P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E City of Emeryville Wallace Roberts & Todd, LLC.SUPPLEMENTAL INFORMATION BICYCLE AND PEDESTRIAN SAFETY Signage and striping can clearly direct the flow of traffic and prevent conflict between cylists and pedestrians, as seen in these examples.
  • 31. 31P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E City of Emeryville Wallace Roberts & Todd, LLC. Massing and Form Description Building Form/Edges: Flexible frontage massing with potential• entries and varying degrees of transparency. (i.e. de Young Museum) FAR shown above 3.5 - 5.0• Massing and Form Description Building Form/Edges: Consistent frontage massing and• architecture with entry positioned at corner and Christie. Towers are symmetrical to the North and South of Powell St. FAR shown above 3.5-5.0• Massing and Form Description Building Form/Edges: Two separate masses are appropriate on• Powell, shown as a tower and 5-story building, with a plaza between and accessed from Powell Street and the site interior. Each building should engage the street with high transparency. Event venue type uses would contribute to the theme of commerce. Scheme shows a second tower to test mass and FAR• FAR shown above 4.5-6.0• SUPPLEMENTAL INFORMATION GATEWAY PARCEL MASSING STUDY ChristieAve Powell St Powell St Powell St ChristieAve ChristieAve Potential Programming Mixed-use with residential, office/commercial, cultural venue• Ground floor retail facing Christie Ave.• Assumes realigned Christie Way• Potential Programming Mixed-use with residential, office/commercial• Ground floor retail facing Christie Ave• Assumes realigned Christie Way• Potential Programming Mixed-use with residential, office/commercial, cultural/event venue• Exhibition space, conference center may be appropriate• Ground floor retail facing Christie Ave• Assumes realigned Christie Way•
  • 32. 32P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E City of Emeryville Wallace Roberts & Todd, LLC. SUPPLEMENTAL INFORMATION AC TRANSIT ROUTE MAP SOURCE: www.actransit.org
  • 33. 33P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E City of Emeryville Wallace Roberts & Todd, LLC. C J Z F 57 EM J C Z F 57 EM Emery-Go-Round (local service) Bus Line Designations Transbay Service Late Night (last trip midnight) Commute Hour Service (no midday or night service) Commute Hour Service (no midday or night service) Transbay Service SUPPLEMENTAL INFORMATION TRANSIT NETWORK SUMMARY
  • 34. 34P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E City of Emeryville Wallace Roberts & Todd, LLC. High Density Residential Medium-High Density Residential Medium Density Residential Mixed Use with Residential Mixed Use with Non-Residential Office/Technology Industrial Public Marina Park/Open Space Other Park Opportunity Regional Retail Overlay Neighborhood Retail Overlay Neighborhood Center Major Hub Transit Center TransitCent er 1/4 M ile 1/4 Mile FRONTAGEROAD EASTSHOREFREEWAY INTERSTATE80 LACOSTEST 65TH ST CHRISTIEAVE 53RD ST HOLLISST HARUFF ST OVERLANDAVE 54TH ST 55TH ST BEAUDRYST POWELL ST 59TH ST 61ST ST 62ND ST 63RD ST HOLLISST DOYLE ST VALLEJOST 64TH ST VALLEJOST OCEAN AVE 65TH ST 67TH ST 66TH ST SHERWIN AVE HALLECKST HUBBARDST HORTONST HOLDENST EMERY ST WATTSST HARLANST HAVENST 45TH ST PARK AVE 43RD ST 41ST ST 45TH ST 47TH ST ESSEXST SALEMST SALEM ST 46TH ST 45TH ST 44TH ST 43RD ST 42ND ST 41ST ST 40TH ST. YERBA BUENA AVE 39TH ST. 38TH ST APGAR ST 36TH ST 37TH ST PERALTA WATTS 47TH ST 48TH ST ADELINEST SANPABLOAVE HORTONST POWELL ST 40TH ST YERBA BUENA AVE SANPABLOAVE CHRISTIE AVE BEACHST PEABODY LN MANDELAPK W Y SHELLMOUNDST ASHBY AVE W. MACARTHUR BLVD SHELLMOUNDST BAYST INTERSTATE 580 STAN FO RD AVE CHIRONWAY WAY SHELLMOUND 0 600 1200 2400300 FEET FIGURE 2-2 Land Use Diagram 2-11 S a n F r a n c i s c o B a y BERKELEY EMERYVILLE OAKLAND EMERYVILLE OAKLAND EMERYVILLE Boat Launching Ramp Fishing Pier Windsurfing Launch FRONTAGEROAD EASTSHOREFREEWAY INTERSTATE80 LACOSTEST 65TH ST CHRISTIEAVE 53RD ST HOLLISST HARUFF ST OVERLANDAVE 54TH ST 55TH ST BEAUDRYST POWELL ST 59TH ST 61ST ST 62ND ST 63RD ST HOLLISST DOYLE ST VALLEJOST 64TH ST VALLEJOST OCEAN AVE 65TH ST 67TH ST 66TH ST SHERWIN AVE HALLECKST HUBBARDST HORTONST HOLDENST EMERY ST WATTSST HARLANST HAVENST 45TH ST PARK AVE 43RD ST 41ST ST 45TH ST 47TH ST ESSEXST SALEMST SALEM ST 46TH ST 45TH ST 44TH ST 43RD ST 42ND ST 41ST ST 40TH ST. YERBA BUENA AVE 39TH ST. 38TH ST APGAR ST 36TH ST 37TH ST PERALTA WATTS 47TH ST 48TH ST ADELINEST SANPABLOAVE HORTONST POWELL ST 40TH ST YERBA BUENA AVE SANPABLOAVE CHRISTIE AVE BEACHST PEABODY LN MANDELAPK W Y SHELLMOUNDST ASHBY AVE W. MACARTHUR BLVD SHELLMOUNDST BAYST INTERSTATE 580 STAN FO RD AVE CHIRONWAY WAY SHELLMOUND 0 600 1200 2400300 FEET MAXIMUM FLOOR AREA RATIOS EMERYVILLE GENERAL PLAN Notes: Maximum FAR may not be attainable on all sites given development standards in the Zoning Ordinance. Bonus FAR is discretionary and will be awarded only after developers demonstrate that projects meet community goals. * FARs are established by Planned Unit Developments (PUDs) and do not include parking in the calculations. Floor Area Ratio (FAR) Base/with Bonus 3.0/ 4.0 3.0/ 4.0 4.0/ 5.5 4.0/ 5.5 1.5/ 2.0 0.75/ 1.25 0.75/ 1.25 1.5/ 2.0 5.5/ 8.0 4.0/ 5.5 5.5/ 8.0 0.75/ 1.25 3.0/ 4.0 4.0/ 5.5 2.3* 0.75/ 1.25 1.0/ 1.5 1.4* 0.75/ 1.25 1.5/ 2.0 3.0/ 4.0 4.0/ 5.54.0/ 5.5 1.5/ 2.0 1.5/ 2.0 3.0/ 4.0 0.75/ 1.25 1.5/2.0 3.0/ 4.0 1.5/ 2.0 FIGURE 2-3 Maximum Floor Area Ratios 2-14 S a n F r a n c i s c o B a y BERKELEY EMERYVILLE OAKLAND EMERYVILLE OAKLAND EMERYVILLE FRONTAGEROAD EASTSHOREFREEWAY INTERSTATE80 LACOSTEST 65TH ST CHRISTIEAVE 53RD ST HOLLISST HARUFF ST OVERLANDAVE 54TH ST 55TH ST BEAUDRYST POWELL ST 59TH ST 61ST ST 62ND ST 63RD ST HOLLISST DOYLE ST VALLEJOST 64TH ST VALLEJOST OCEAN AVE 65TH ST 67TH ST 66TH ST SHERWIN AVE HALLECKST HUBBARDST HORTONST HOLDENST EMERY ST WATTSST HARLANST HAVENST 45TH ST PARK AVE 43RD ST 41ST ST 45TH ST 47TH ST ESSEXST SALEMST SALEM ST 46TH ST 45TH ST 44TH ST 43RD ST 42ND ST 41ST ST 40TH ST. YERBA BUENA AVE 39TH ST. 38TH ST APGAR ST 36TH ST 37TH ST PERALTA WATTS 47TH ST 48TH ST ADELINEST SANPABLOAVE HORTONST POWELL ST 40TH ST YERBA BUENA AVE SANPABLOAVE CHRISTIE AVE BEACHST PEABODY LN MANDELAPK W Y SHELLMOUNDST ASHBY AVE W. MACARTHUR BLVD SHELLMOUNDST BAYST INTERSTATE 580 STAN FO RD AVE CHIRONWAY WAY SHELLMOUND 0 600 1200 2400300 FEET AREAS OF CHANGE AND STABILITY EMERYVILLE GENERAL PLAN Areas of Potential Change Master Plan Areas Areas of Stability To Bay Bridge 2-5 FIGURE 2-1 Areas of Change and Stability– 2009 S a n F r a n c i s c o B a y Transit Center Transit Center BERKELEY EMERYVILLE OAKLAND EMERYVILLE OAKLAND EMERYVILLE Boat Launching Ramp Fishing Pier Windsurfing Launch 0 600 1200 2400300 FEET Amtrak Station Emery Secondary School Emeryville Marketplace Approved Civic Center Anna Yates Elementary School Center for Community Life (proposed) TransitCen ter FRONTAGEROAD EASTSHOREFREEWAY SHELLMOUND ST INTERSTATE80 LACOSTEST 65TH ST CHRISTIEAVE 53RD ST HOLLIS ST HARUFF ST OVERLANDAVE 54TH ST 55TH ST BEAUDRY ST DOYLE ST POWELL ST 59TH ST 61ST ST 62ND ST 63RD ST HOLLIS ST DOYLE ST VALLEJO ST 64TH ST VALLEJO ST OCEAN AVE 65TH ST 67TH ST 66TH ST SHERWIN ST HALLECK ST HUBBARD ST ST HOLDEN EMERY ST WATTSST HARLANST HAVENST ST 45TH PARK AVE 43RD ST 45TH ST 47TH ST SALEMST. 46TH ST. 45TH ST. 44TH ST. 43RD ST. 42ND ST. 41ST ST. 40TH ST. YERBA BUENA AVE 39TH ST. 38TH ST. APGAR ST. 36TH ST. 37TH ST. PERALTA ST. MAGNOLIA ST. 47TH ST 48TH ST ADELINE ST SANPABLO AVE HORTON ST POWELL ST 40TH ST YERBA BUENA AVE. CHRISTIEA VE CHIRON WAY PEABODY RD MANDELAPKW Y SHELLMOUNDST SANPABLO AVE 64TH ST INTERSTATE 80 ASH BY AVE W.MACARTHUR BLVD Neighborhood Center Activity Nodes Neighborhood Retail Overlay Regional Retail Residential Mixed Use Industrial Major Street Large Park Greenway Existing Bike/Ped. Crossing Potential Bike/Ped. Crossing Freeway Gateway Core CITY STRUCTURE EMERYVILLE GENERAL PLAN FIGURE 5-1 City Structure 5-4 SUPPLEMENTAL INFORMATION GENERAL PLAN DIAGRAMS SOURCE: Emerville General Plan January 2009
  • 35. 35P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E City of Emeryville Wallace Roberts & Todd, LLC. S a n F r a n c i s c o B a y Pedestrianonly BERKELEY EMERYVILLE OAKLAND EMERYVILLE OAKLAND EMERYVILLE FRONTAGEROAD EASTSHOREFREEWAY INTERSTATE80 LACOSTEST 65TH ST CHRISTIEAVE 53RD ST HOLLISST HARUFF ST OVERLANDAVE 54TH ST 55TH ST BEAUDRYSTPOWELL ST 59TH ST 61ST ST 62ND ST 63RD ST HOLLISST DOYLE ST VALLEJOST 64TH ST VALLEJOST OCEAN AVE 65TH ST 67TH ST 66TH ST SHERWIN AVE HALLECKST HUBBARDST HORTONST HOLDENST EMERY ST WATTSST HARLANST HAVENST 45TH ST PARK AVE 43RD ST 41ST ST 45TH ST 47TH ST ESSEXST SALEMST SALEM ST 46TH ST 45TH ST 44TH ST 43RD ST 42ND ST 41ST ST 40TH ST. YERBA BUENA AVE 39TH ST. 38TH ST APGAR ST 36TH ST 37TH ST PERALTA WATTS 47TH ST 48TH ST ADELINEST SANPABLOAVE HORTONST POWELL ST 40TH ST YERBA BUENA AVE SANPABLOAVE CHRISTIE AVE BEACHST PEABODY LN MANDELAPK W Y SHELLMOUNDST ASHBY AVE W. MACARTHUR BLVD SHELLMOUNDST BAYST INTERSTATE 580 STAN FO RD AVE CHIRONWAY WAY SHELLMOUND 0 600 1200 2400300 FEET BAY TRAIL EMERYVILLE GENERAL PLAN Bay Trail Spur Trail Spur Pedestrian Only Trail Existing Overpass Approved Overpass To Bay Bridge To Mandela Parkway via 32nd St FIGURE 3-3 Bay Trail 3-10 S a n F r a n c i s c o B a y Pedestrian and bike access to Bay Bridge BERKELEY EMERYVILLE OAKLAND EMERYVILLE OAKLAND EMERYVILLE FRONTAGEROAD EASTSHOREFREEWAY INTERSTATE80 LACOSTEST 65TH ST CHRISTIEAVE 53RD ST HOLLISST HARUFF ST OVERLANDAVE 54TH ST 55TH ST BEAUDRYST POWELL ST 59TH ST 61ST ST 62ND ST 63RD ST HOLLISST DOYLE ST VALLEJOST 64TH ST VALLEJOST OCEAN AVE 65TH ST 67TH ST 66TH ST SHERWIN AVE HALLECKST HUBBARDST HORTONST HOLDENST EMERY ST WATTSST HARLANST HAVENST 45TH ST PARK AVE 43RD ST 41ST ST 45TH ST 47TH ST ESSEXST SALEMST SALEM ST 46TH ST 45TH ST 44TH ST 43RD ST 42ND ST 41ST ST 40TH ST. YERBA BUENA AVE 39TH ST. 38TH ST APGAR ST 36TH ST 37TH ST PERALTA WATTS 47TH ST 48TH ST ADELINEST SANPABLOAVE HORTONST POWELL ST 40TH ST YERBA BUENA AVE SANPABLOAVE CHRISTIE AVE BEACHST PEABODY LN MANDELAPK W Y SHELLMOUNDST ASHBY AVE W. MACARTHUR BLVD SHELLMOUNDST BAYST INTERSTATE 580 STAN FO RD AVE CHIRONWAY WAY SHELLMOUND 0 600 1200 2400300 FEET BICYCLE SYSTEM EMERYVILLE GENERAL PLAN FRAMEWORK To MacArthur BART To West Oakland BART Existing or Proposed Class I Existing or Proposed Class II & III Bike Boulevard Existing Overpass Approved Overpass/Underpass Proposed Overpass/Underpass Existing Railroad Grade Crossing Grade-separated crossings across I-80 (for pedestrians and bicycles) and the railroad (for all travel modes) north of Powell St FIGURE 3-4 Bicycle System 3-12 S a n F r a n c i s c o B a y To Bay Bridge Transit Cent er Amtrak Station Transit Cent er Transit Cent er 1/4 M ile 1/4 Mile BERKELEY EMERYVILLE OAKLAND EMERYVILLE OAKLAND EMERYVILLE Boat Launching Ramp Fishing Pier Windsurfing Launch FRONTAGEROAD EASTSHOREFREEWAY INTERSTATE80 LACOSTEST 65TH ST CHRISTIEAVE 53RD ST HOLLISST HARUFF ST OVERLANDAVE 54TH ST 55TH ST BEAUDRYST POWELL ST 59TH ST 61ST ST 62ND ST 63RD ST HOLLISST DOYLE ST VALLEJOST 64TH ST VALLEJOST OCEAN AVE 65TH ST 67TH ST 66TH ST SHERWIN AVE HALLECKST HUBBARDST HORTONST HOLDENST EMERY ST WATTSST HARLANST HAVENST 45TH ST PARK AVE 43RD ST 41ST ST 45TH ST 47TH ST ESSEXST SALEMST SALEM ST 46TH ST 45TH ST 44TH ST 43RD ST 42ND ST 41ST ST 40TH ST. YERBA BUENA AVE 39TH ST. 38TH ST APGAR ST 36TH ST 37TH ST PERALTA WATTS 47TH ST 48TH ST ADELINEST SANPABLOAVE HORTONST POWELL ST 40TH ST YERBA BUENA AVE SANPABLOAVE CHRISTIE AVE BEACHST PEABODY LN MANDELAPK W Y SHELLMOUNDST ASHBY AVE W. MACARTHUR BLVD SHELLMOUNDST BAYST INTERSTATE 580 STAN FO RD AVE CHIRONWAY WAY SHELLMOUND 0 600 1200 2400300 FEET CIRCULATION EMERYVILLE GENERAL PLAN To MacArthur BART To West Oakland BART Transit Street Connector Street Local Street Auto Dominated Highway Regional Rail Bikeways Existing or Proposed Class I Existing or Proposed Class II & III Bike Boulevard Pedestrian-only Trail Pedestrian Priority Zone Existing Overpass Approved Overpass/Underpass (Pedestrian Only) Proposed Overpass/Underpass Existing Railroad Grade Crossing Major Transit Hub Grade-separated crossings across I-80 (for pedestrians and bicycles) and the railroad (for all travel modes) north of Powell St FIGURE 3-1 Circulation 3-6 S a n F r a n c i s c o B a y Transit Center Amtrak Station Transit Cente r 1/4 M ile 1/4 Mile BERKELEY EMERYVILLE OAKLAND EMERYVILLE OAKLAND EMERYVILLE FRONTAGEROAD EASTSHOREFREEWAY INTERSTATE80 LACOSTEST 65TH ST CHRISTIEAVE 53RD ST HOLLISST HARUFF ST OVERLANDAVE 54TH ST 55TH ST BEAUDRYST POWELL ST 59TH ST 61ST ST 62ND ST 63RD ST HOLLISST DOYLE ST VALLEJOST 64TH ST VALLEJOST OCEAN AVE 65TH ST 67TH ST 66TH ST SHERWIN AVE HALLECKST HUBBARDST HORTONST HOLDENST EMERY ST WATTSST HARLANST HAVENST 45TH ST PARK AVE 43RD ST 41ST ST 45TH ST 47TH ST ESSEXST SALEMST SALEM ST 46TH ST 45TH ST 44TH ST 43RD ST 42ND ST 41ST ST 40TH ST. YERBA BUENA AVE 39TH ST. 38TH ST APGAR ST 36TH ST 37TH ST PERALTA WATTS 47TH ST 48TH ST ADELINEST SANPABLOAVE HORTONST POWELL ST 40TH ST YERBA BUENA AVE SANPABLOAVE CHRISTIE AVE BEACHST PEABODY LN MANDELAPK W Y SHELLMOUNDST ASHBY AVE W. MACARTHUR BLVD SHELLMOUNDST BAYST INTERSTATE 580 STAN FO RD AVE CHIRONWAY WAY SHELLMOUND 0 600 1200 2400300 FEET TRANSIT SYSTEM EMERYVILLE GENERAL PLAN To MacArthur BART To West Oakland BART Transit Streets Regional Rail Existing Crossing (at grade) Major Transit Hub Future grade-separated crossing of the railroad between Powell St and Ashby Ave at location to be determined FIGURE 3-5 Transit System 3-13 SUPPLEMENTAL INFORMATION GENERAL PLAN DIAGRAMS SOURCE: Emerville General Plan January 2009
  • 36. Wallace Roberts & Todd, LLC.