SlideShare une entreprise Scribd logo
1  sur  35
Télécharger pour lire hors ligne
Side event
Climate change mitigation and adaptation: approaches and
strategies in the Italian industry
Federica Gasbarro (Scuola Superiore Sant’Anna)
1
tel. +39 051 6450411 | fax +39 051 6450310
info@lifeiris.eu | http://www.lifeiris.eu
UNFCCC COP22 – 9th November 2016 – Marrakech, Morocco
Action A1 - Climate Change Risk Assessment
2
• Assessment of the exposure to climate hazards
• Assessment of sensitivity to climatic variability of the two productive areas
and the brewery supply chain involved in the project
• Assessment of capacity to cope with these impacts and the existing
adaptive measures
Results:
• A climate change risk assessment at productive area level for SIPRO and
CAP, and at supply chain level for Carlsberg Italia
• The maps of climate events at productive area level for SIPRO and CAP,
and at supply chain level for Carlsberg Italia
Involved parners:
SSSUP, CAP, SIPRO, CARLSBERG, ERVET
Actions C1 and C2 - Action plans for the climate
resilience
3
• Definition and implementation of the action plans for improving climate
resilience for both prductive areas and beer supply chain
• Every action of the plans will be appointed by a feasibility study and an
economic viability analysis
Results:
• Climate adaptation plans at productive area level for SIPRO and CAP, and
at supply chain level for Carlsberg Italia including one measure based on
ecosystem approach
• Climate adaptation plans monitoring reports
Involved parners:
SSSUP, CAP, SIPRO, CARLSBERG, ERVET
Action C4 - Web portal for climate resilient industry
4
• The action will develop a web portal aimed to give information
about risks and opportunities related to climate change impacts
to enterprises belonging to the clusters involved in the
demonstration actions
Web Portal:
• Portale web
Involved partners:
• TERRARIA, SSSUP, ERVET
Action C4 - Web portal for climate resilient industry
5
• The action will develop a web portal aimed to give information
about risks and opportunities related to climate change impacts
to enterprises belonging to the clusters involved in the
demonstration actions
Web Portal:
• Portale web
Involved partners:
• TERRARIA, SSSUP, ERVET
Around 1,3 mio HL beer
34 beers
in the portfolio
1° beer company in the world with an
EPD certification (Environmental Product
Declaration)
12 Awards in 2012,
2 in 2013,
3 in 2014
4 in 2015
for innovation, DraughMaster-Drink Different
and products
6 Products wth EPD
Carlsberg Italia
3° Italian market producer
6
Carlsberg Italia S.p.A. Supply chain
7
Carlsberg Italia climate risk assessment map by supply
chain phase
8
Procurement
• Business continuity
• Financial balance
Production
• Asset Integrity
• Business continuity
• Legal liability
• Reputation
• Financial balance
• Staff health & safety
• Infrastractures
Sales
• Business continuity
• Market response
Logistics
• Business continuity
Carlsberg Italia Main climate drivers for supply chain phase
9
Carlsberg Italia raw materials
10
Hop comes mainly from Germany and the USA.
In 2015, Germany has had a very bad season characterized by rainfall which
led to a poor crop yields. While in the US drought negatively impacted crop
yields. Similar productive years impact availability in terms of quantity and
consequent price increases.
The barley comes from France - A study conducted in France on barley crops
from 1950 to 2014 in relation to climatic variables shows that the
temperature above 33 ° C and the increase of rainfall impact barley
production in terms of a reduction of the 0.11% to 0.16% per year.
Risk identification for Carlsberg’s raw
material procurement
11
Risk categories/climatic events
Procurement
Heatwaves
Coldwaves
Tornado
Etremeprecipitations
andconsequents:
a)Floods
b)landslide
Drought
Asset integrity
Business continuity X X X
Legal liability
Reputation
Market response
Financial balance X X X
Staff health and safety
Infrastructures
Carlsberg Italia previous experience with climate
extremes
12
The production plant has already been affected by floods three times,
the last being in July 2009. The flood of 2009 caused damage to the
plant not totally recognized by the insurance and therefore entailing
economic losses.
In March 2010 a collaboration started between the Lombardy
Region, the Basin Authority of the Po River, inter-regional Agency
for the River Po, Induno Olona, Varese Municipality and Carlsberg
Italia. This collaboration aimed to study and search for solutions
such as hydraulic arrangement of the River Olona in part of
Carlsberg property.
Carlsberg has drawn up a preliminary plan for the retention works
in the stretch from Valganna Caves at the confluence of the two
branches of the Olona.
Risk identification for Carlsberg’s plant and
production
13
Risk categories/climatic events
Production
Heatwaves
Coldwaves
Tornado
Etremeprecipitations
andconsequents:
a)Floods
b)landslide
Drought
Asset integrity X X X X
Business continuity X X X X X X X
Legal liability X X X X X
Reputation X X X X X
Market response
Financial balance X X X X X
Staff health and safety X X X X X X
Infrastructures X X X X X X
Carlsberg Italia: climate impact on sales
14
• The beer is sold mainly between April (Easter) and September
with peak when the temperature is between 27 ° and 28 ° C
• Beer sales slow down when the temperature exceeds 30 ° C,
because the consumption are turning to other beverages such as
water. As a consequence in case of heat waves or summer storms
and temperature drop, beer consumption is reduced.
• In case of rainy or cool summers such as the summer of 2014, the
beer consumption fell with consequences for the whole chain
• In general, with increasing average temperatures, then warmer
autumn and spring and warmer summer, the sales decrease
during the summer and increase in the spring and autumn
• Special beers are not affected by these impacts
Risk identification for Carlsberg’s sales
15
Risk categories/climatic events
Sales
Heatwaves
Coldwaves
Tornado
Etremeprecipitations
andconsequents:
a)Floods
b)landslide
Drought
Asset integrity
Business continuity
Legal liability
Reputation
Market response X X
Financial balance
Staff health and safety
Infrastructures
Carlsberg Italia main climate risks
16
Main climate events Supply chain phases at risk Potential risks
Asset integrity
Business continuity
Legal liability
Reputation
Raw materials procurement
Production
Carlsberg’s Magnitude assessment
17
Associated Magnitude to each risk per climate events
Heat
wave
Cold wave Tornado Extreme
precipitations
Drought
a) Asset integrity 5,00 5,00 5,00
b) Business continuity 4,00 3,50 4,00 4,60 4,50
c) Legal liability 4,00 4,00 4,00 4,00
d) Reputation 3,00 4,00 4,00 4,00 3,50
e) Market response 4,00 4,00 4,00
f) Financial balance 3,00 3,00 3,67 3,40 3,40
g) Staff health and safety 3,00 3,00 3,00 3,00 3,00
h) Infrastructures 3,00 3,00 3,00 3,00
Carlsberg’s Risk assessment
18
Heat wave Cold wave Tornado Extreme Precipitations Drought
P M R P M R P M R P M R P M R
a) Asset
integrity 1,00 - - 0,65 - - 0,30 5,00 1,50 1,00 5,00 5,00 1,00 5,00 5,00
b) Business
continuity 1,00 4,00 4,00 0,65 3,50 2,28 0,30 4,00 1,20 1,00 4,60 4,60 1,00 4,50 4,50
c) Legal
liability 1,00 - - 0,65 4,00 2,60 0,30 4,00 1,20 1,00 4,00 4,00 1,00 4,00 4,00
d) Reputation
1,00 3,00 3,00 0,65 4,00 2,60 0,30 4,00 1,20 1,00 4,00 4,00 1,00 3,50 3,50
e) Market
response 1,00 4,00 4,00 0,65 4,00 2,60 0,30 - - 1,00 4,00 4,00 1,00 - -
f) Financial
balance 1,00 3,00 3,00 0,65 3,00 1,95 0,30 3,67 1,10 1,00 3,40 3,40 1,00 3,40 3,40
g) Staff health
and safety
1,00 3,00 3,00 0,65 3,00 1,95 0,30 3,00 0,90 1,00 3,00 3,00 1,00 3,00 3,00
h) Infrastructur
es 1,00 - - 0,65 3,00 1,95 0,30 3,00 0,90 1,00 3,00 3,00 1,00 3,00 3,00
Carlsberg’s risk rank per typology
Before the adaptive capacity
assessment
Risk Assessment
a) Asset integrity 2,88
b) Business continuity 2,49
c) Legal liability 2,21
d) Reputation 2,15
e) Market response 2,10
f) Financial balance 1,93
g) Staff health and safety 1,78
h) Infrastructures 2,21
After the adaptive capacity assessment
19
Rischio Valutazione
a) Asset integrity 3,83
b) Business continuity 3,32
c) Legal liability 2,95
d) Reputation 2,86
e) Market response 3,53
f) Financial balance 2,57
g) Staff health and safety 2,37
h) Infrastructures 2,21
Carlsberg Italia climate change adaptation plan
20
The plan includes 5 measures:
• Feasibility study for changing pasteurizer
• Creating working area within the green park on the Induno Olona
beer factory
• Hydrogeological study to understand the future impact of climate
change on the water availability
• Carrying out a study on the impact of climate change on the green
park on the Induno Olona beer factory
• Identification of some adaptation measures for bees conservation
together with honey supplier
Bomporto industrial area
21
• Bomporto Industrial area (Modena)
• 95 hectares
• 70 enterprises, with manufacturing
prevalence (60%)
• 1200 employees
Bomporto previous experience with climate
22
19/01/2014 30/04/2014
Bomporto magnitude assessment
23
HEATWAVES: high event
likelohood but limited
damages
DROUGHT: likelihood and
damages low
EXTREME PRECIPITATIONS:
likelihood and damages very
high
Bomporto climate risk assessment map
24
Bomporto climate change adaptation plan
25
The plan includes 13 measures to be implemented in
10 years:
• Info Point for the companies within the CAP
• Training for the companies
• Climate risk assessment for the companies belonging to the
cluster
• Emergency plan and automatic alert
• Comfort outdoor simulation
• Urban trees
• Drainable floors
• Flowerbed for catching the rain
• Flooding basin
Bomporto climate change adaptation plan timeline
26
Ostellato industrial area
27
• Ostellato industrial area (Ferrara)
• 120 hectares
• 24 enterprises, largely belonging to
manufacturing (70%)
• 650 employees
Ostellato climate risk assessment map
28
Ostellato climate change adaptation plan
29
The plan includes 10 measures:
• Adaptation Helpdesk for the companies
• Training for the companies
• Climate risk assessment for the companies belonging to the
cluster
• Support to the definition of climate change adaptation plans for
the companies belonging to the cluster
• Urban trees within Sipro area (50.000mq)
• Barrier against flood
• Smart irrigation and raining collector
Web tool climate change risk assessment: sites
30
Web tool climate change risk assessment: events
31
Web tool climate change risk assessment: likelihood
32
Web tool climate change risk assessment: risk
evalutation results
33
Web tool climate change risk assessment: risk
assessment results
34
35
Thank you!
www.lifeiris.eu
f. gasbarro@sssup.it

Contenu connexe

En vedette

Financial Infographic
Financial InfographicFinancial Infographic
Financial Infographic
Elena Venieri
 
Rapporto sull'economia circolare dell'Osservatorio Bocconi sulla Green Economy
Rapporto sull'economia circolare dell'Osservatorio Bocconi sulla Green EconomyRapporto sull'economia circolare dell'Osservatorio Bocconi sulla Green Economy
Rapporto sull'economia circolare dell'Osservatorio Bocconi sulla Green Economy
Fabio Iraldo
 

En vedette (9)

Financial Infographic
Financial InfographicFinancial Infographic
Financial Infographic
 
Il Futuro è di Chi Organizza - WebUpdate 2015
Il Futuro è di Chi Organizza - WebUpdate 2015Il Futuro è di Chi Organizza - WebUpdate 2015
Il Futuro è di Chi Organizza - WebUpdate 2015
 
Turning Data into Infographics: An Interactive Workshop for Problem Solvers
Turning Data into Infographics: An Interactive Workshop for Problem SolversTurning Data into Infographics: An Interactive Workshop for Problem Solvers
Turning Data into Infographics: An Interactive Workshop for Problem Solvers
 
Marketing e sostenibilità ambientale nel settore automotive
Marketing e sostenibilità ambientale nel settore automotiveMarketing e sostenibilità ambientale nel settore automotive
Marketing e sostenibilità ambientale nel settore automotive
 
Stima del Customer Lifetime Value
Stima del Customer Lifetime Value Stima del Customer Lifetime Value
Stima del Customer Lifetime Value
 
Digitalizzazione, Industria 4.0 ed Economia Circolare
Digitalizzazione, Industria 4.0 ed Economia CircolareDigitalizzazione, Industria 4.0 ed Economia Circolare
Digitalizzazione, Industria 4.0 ed Economia Circolare
 
Libera la tua forza interiore - Leadership personale
Libera la tua forza interiore - Leadership personaleLibera la tua forza interiore - Leadership personale
Libera la tua forza interiore - Leadership personale
 
Automotive’s Latest Model: Redefining Competitiveness Through The Circular Ec...
Automotive’s Latest Model: Redefining Competitiveness Through The Circular Ec...Automotive’s Latest Model: Redefining Competitiveness Through The Circular Ec...
Automotive’s Latest Model: Redefining Competitiveness Through The Circular Ec...
 
Rapporto sull'economia circolare dell'Osservatorio Bocconi sulla Green Economy
Rapporto sull'economia circolare dell'Osservatorio Bocconi sulla Green EconomyRapporto sull'economia circolare dell'Osservatorio Bocconi sulla Green Economy
Rapporto sull'economia circolare dell'Osservatorio Bocconi sulla Green Economy
 

Similaire à Presentazione delle esperienze aziendali del progetto Life Iris alla cop22

Sustainability Report 2011
Sustainability Report 2011Sustainability Report 2011
Sustainability Report 2011
Petrobras
 
B_Bilancio-Sostenibilità_M_30-0_GB
B_Bilancio-Sostenibilità_M_30-0_GBB_Bilancio-Sostenibilità_M_30-0_GB
B_Bilancio-Sostenibilità_M_30-0_GB
Cristina Stefani
 
B_Bilancio-Sostenibilità_M_30-0_GB
B_Bilancio-Sostenibilità_M_30-0_GBB_Bilancio-Sostenibilità_M_30-0_GB
B_Bilancio-Sostenibilità_M_30-0_GB
Simonetta Dusi
 
Telling the Norwegian CCS Story | PART I: CCS: the path to sustainable and em...
Telling the Norwegian CCS Story | PART I: CCS: the path to sustainable and em...Telling the Norwegian CCS Story | PART I: CCS: the path to sustainable and em...
Telling the Norwegian CCS Story | PART I: CCS: the path to sustainable and em...
Global CCS Institute
 
Janos Mate - Greenpeace International - LAVORARE SENZA HFC
Janos Mate - Greenpeace International - LAVORARE SENZA HFCJanos Mate - Greenpeace International - LAVORARE SENZA HFC
Janos Mate - Greenpeace International - LAVORARE SENZA HFC
Centro Studi Galileo
 

Similaire à Presentazione delle esperienze aziendali del progetto Life Iris alla cop22 (20)

6.5 Adaptation forum part 2
6.5 Adaptation forum part 26.5 Adaptation forum part 2
6.5 Adaptation forum part 2
 
Yara-Sluiskil-presentatie-2021-ext..pdf
Yara-Sluiskil-presentatie-2021-ext..pdfYara-Sluiskil-presentatie-2021-ext..pdf
Yara-Sluiskil-presentatie-2021-ext..pdf
 
BASF_Report_2020.pdf
BASF_Report_2020.pdfBASF_Report_2020.pdf
BASF_Report_2020.pdf
 
WKE2019 Conference - Session 1 - Carmine Marzano: EC, DG RTD
WKE2019 Conference - Session 1 - Carmine Marzano: EC, DG RTDWKE2019 Conference - Session 1 - Carmine Marzano: EC, DG RTD
WKE2019 Conference - Session 1 - Carmine Marzano: EC, DG RTD
 
Introduction to climate change - 2019
Introduction to climate change - 2019Introduction to climate change - 2019
Introduction to climate change - 2019
 
Full cycle tanneries: the LCA between now and the future
Full cycle tanneries: the LCA between now and the future Full cycle tanneries: the LCA between now and the future
Full cycle tanneries: the LCA between now and the future
 
EIT Climate KIC Sustainable Production Systems
EIT Climate KIC Sustainable Production SystemsEIT Climate KIC Sustainable Production Systems
EIT Climate KIC Sustainable Production Systems
 
Sustainability Report 2011
Sustainability Report 2011Sustainability Report 2011
Sustainability Report 2011
 
B_Bilancio-Sostenibilità_M_30-0_GB
B_Bilancio-Sostenibilità_M_30-0_GBB_Bilancio-Sostenibilità_M_30-0_GB
B_Bilancio-Sostenibilità_M_30-0_GB
 
B_Bilancio-Sostenibilità_M_30-0_GB
B_Bilancio-Sostenibilità_M_30-0_GBB_Bilancio-Sostenibilità_M_30-0_GB
B_Bilancio-Sostenibilità_M_30-0_GB
 
Sequestro del carbonio in ambito forestale e nature-based-solutions
Sequestro del carbonio in ambito forestale e nature-based-solutionsSequestro del carbonio in ambito forestale e nature-based-solutions
Sequestro del carbonio in ambito forestale e nature-based-solutions
 
Telling the Norwegian CCS Story | PART I: CCS: the path to sustainable and em...
Telling the Norwegian CCS Story | PART I: CCS: the path to sustainable and em...Telling the Norwegian CCS Story | PART I: CCS: the path to sustainable and em...
Telling the Norwegian CCS Story | PART I: CCS: the path to sustainable and em...
 
Presentation tedx final
Presentation tedx finalPresentation tedx final
Presentation tedx final
 
Presentation mrs. andrea junemann chile
Presentation mrs. andrea junemann chilePresentation mrs. andrea junemann chile
Presentation mrs. andrea junemann chile
 
greenLIFE and the World Water Day 2017
greenLIFE and the World Water Day 2017greenLIFE and the World Water Day 2017
greenLIFE and the World Water Day 2017
 
Vattenfall Annual and Sustainability Report 2016
Vattenfall Annual and Sustainability Report 2016Vattenfall Annual and Sustainability Report 2016
Vattenfall Annual and Sustainability Report 2016
 
DSD-INT 2019 Coastal climate change adaptation a consultancy perspective on p...
DSD-INT 2019 Coastal climate change adaptation a consultancy perspective on p...DSD-INT 2019 Coastal climate change adaptation a consultancy perspective on p...
DSD-INT 2019 Coastal climate change adaptation a consultancy perspective on p...
 
SEC (cosmetic brand)-1.pptx
SEC (cosmetic brand)-1.pptxSEC (cosmetic brand)-1.pptx
SEC (cosmetic brand)-1.pptx
 
Janos Mate - Greenpeace International - LAVORARE SENZA HFC
Janos Mate - Greenpeace International - LAVORARE SENZA HFCJanos Mate - Greenpeace International - LAVORARE SENZA HFC
Janos Mate - Greenpeace International - LAVORARE SENZA HFC
 
Pitch 1
Pitch 1Pitch 1
Pitch 1
 

Plus de Fabio Iraldo

Plus de Fabio Iraldo (20)

New catalogue of the seasonal schools
New catalogue of the seasonal schoolsNew catalogue of the seasonal schools
New catalogue of the seasonal schools
 
Bando "Smart 2"
Bando "Smart 2" Bando "Smart 2"
Bando "Smart 2"
 
I NUOVI CONSUMATORI "CIRCOLARI"
I NUOVI CONSUMATORI "CIRCOLARI"I NUOVI CONSUMATORI "CIRCOLARI"
I NUOVI CONSUMATORI "CIRCOLARI"
 
Presentazione plastica o non plastica
Presentazione plastica o non plasticaPresentazione plastica o non plastica
Presentazione plastica o non plastica
 
Ecolabel day - conference in Berlin
Ecolabel day - conference in BerlinEcolabel day - conference in Berlin
Ecolabel day - conference in Berlin
 
Climate Change - Mitigation and adaptation efforts by the Italian Industrial ...
Climate Change - Mitigation and adaptation efforts by the Italian Industrial ...Climate Change - Mitigation and adaptation efforts by the Italian Industrial ...
Climate Change - Mitigation and adaptation efforts by the Italian Industrial ...
 
Relazione convegno finale bg circular
Relazione convegno finale bg circularRelazione convegno finale bg circular
Relazione convegno finale bg circular
 
Geo 20giu2018 reg made green in italy iraldo
Geo 20giu2018 reg made green in italy iraldoGeo 20giu2018 reg made green in italy iraldo
Geo 20giu2018 reg made green in italy iraldo
 
Call for articles, special issue on: "The Future of Ecolabels"
Call for articles, special issue on: "The Future of Ecolabels"Call for articles, special issue on: "The Future of Ecolabels"
Call for articles, special issue on: "The Future of Ecolabels"
 
REFIT: the future of EMAS and Ecolabel
REFIT: the future of EMAS and EcolabelREFIT: the future of EMAS and Ecolabel
REFIT: the future of EMAS and Ecolabel
 
Economia circolare: il position paper dell'osservatorio GEO - Green Economy O...
Economia circolare: il position paper dell'osservatorio GEO - Green Economy O...Economia circolare: il position paper dell'osservatorio GEO - Green Economy O...
Economia circolare: il position paper dell'osservatorio GEO - Green Economy O...
 
Call for papers circular economy epee
Call for papers circular economy epeeCall for papers circular economy epee
Call for papers circular economy epee
 
Kickoff of the Braver project
Kickoff of the Braver project Kickoff of the Braver project
Kickoff of the Braver project
 
Calendario geo
Calendario geoCalendario geo
Calendario geo
 
20 years of EMAS (the Eco Management and Audit Scheme)
20 years of EMAS (the Eco Management and Audit Scheme)20 years of EMAS (the Eco Management and Audit Scheme)
20 years of EMAS (the Eco Management and Audit Scheme)
 
Programma convegno prefer 29 ottobre
Programma convegno prefer 29 ottobre Programma convegno prefer 29 ottobre
Programma convegno prefer 29 ottobre
 
Presentazione green public procurement 2015
Presentazione green public procurement 2015Presentazione green public procurement 2015
Presentazione green public procurement 2015
 
Presentazione Iraldo al Convegno Green Act, un anno di Ossservatorio GEO
Presentazione Iraldo al Convegno Green Act, un anno di Ossservatorio GEOPresentazione Iraldo al Convegno Green Act, un anno di Ossservatorio GEO
Presentazione Iraldo al Convegno Green Act, un anno di Ossservatorio GEO
 
Amarcord EMAS... su per giu' vent'anni fa!
Amarcord EMAS... su per giu' vent'anni fa!Amarcord EMAS... su per giu' vent'anni fa!
Amarcord EMAS... su per giu' vent'anni fa!
 
Layman's report of the BRAVE Project - Better Regulation Aimed at Valorising ...
Layman's report of the BRAVE Project - Better Regulation Aimed at Valorising ...Layman's report of the BRAVE Project - Better Regulation Aimed at Valorising ...
Layman's report of the BRAVE Project - Better Regulation Aimed at Valorising ...
 

Dernier

Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Anamikakaur10
 
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Environmental Science - Nuclear Hazards and Us.pptx
Environmental Science - Nuclear Hazards and Us.pptxEnvironmental Science - Nuclear Hazards and Us.pptx
Environmental Science - Nuclear Hazards and Us.pptx
hossanmdjobayer103
 

Dernier (20)

Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
 
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
 
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
 
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
 
Kondhwa ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Kondhwa ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Kondhwa ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Kondhwa ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
 
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024
 
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
 
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
 
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
 
Enhancing forest data transparency for climate action
Enhancing forest data transparency for climate actionEnhancing forest data transparency for climate action
Enhancing forest data transparency for climate action
 
Verified Trusted Kalyani Nagar Call Girls 8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
Verified Trusted Kalyani Nagar Call Girls  8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...Verified Trusted Kalyani Nagar Call Girls  8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
Verified Trusted Kalyani Nagar Call Girls 8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
 
CSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -ENCSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -EN
 
(INDIRA) Call Girl Katra Call Now 8617697112 Katra Escorts 24x7
(INDIRA) Call Girl Katra Call Now 8617697112 Katra Escorts 24x7(INDIRA) Call Girl Katra Call Now 8617697112 Katra Escorts 24x7
(INDIRA) Call Girl Katra Call Now 8617697112 Katra Escorts 24x7
 
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
 
Deforestation
DeforestationDeforestation
Deforestation
 
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
 
Cheap Call Girls in Dubai %(+971524965298 )# Dubai Call Girl Service By Rus...
Cheap Call Girls  in Dubai %(+971524965298 )#  Dubai Call Girl Service By Rus...Cheap Call Girls  in Dubai %(+971524965298 )#  Dubai Call Girl Service By Rus...
Cheap Call Girls in Dubai %(+971524965298 )# Dubai Call Girl Service By Rus...
 
Environmental Science - Nuclear Hazards and Us.pptx
Environmental Science - Nuclear Hazards and Us.pptxEnvironmental Science - Nuclear Hazards and Us.pptx
Environmental Science - Nuclear Hazards and Us.pptx
 

Presentazione delle esperienze aziendali del progetto Life Iris alla cop22

  • 1. Side event Climate change mitigation and adaptation: approaches and strategies in the Italian industry Federica Gasbarro (Scuola Superiore Sant’Anna) 1 tel. +39 051 6450411 | fax +39 051 6450310 info@lifeiris.eu | http://www.lifeiris.eu UNFCCC COP22 – 9th November 2016 – Marrakech, Morocco
  • 2. Action A1 - Climate Change Risk Assessment 2 • Assessment of the exposure to climate hazards • Assessment of sensitivity to climatic variability of the two productive areas and the brewery supply chain involved in the project • Assessment of capacity to cope with these impacts and the existing adaptive measures Results: • A climate change risk assessment at productive area level for SIPRO and CAP, and at supply chain level for Carlsberg Italia • The maps of climate events at productive area level for SIPRO and CAP, and at supply chain level for Carlsberg Italia Involved parners: SSSUP, CAP, SIPRO, CARLSBERG, ERVET
  • 3. Actions C1 and C2 - Action plans for the climate resilience 3 • Definition and implementation of the action plans for improving climate resilience for both prductive areas and beer supply chain • Every action of the plans will be appointed by a feasibility study and an economic viability analysis Results: • Climate adaptation plans at productive area level for SIPRO and CAP, and at supply chain level for Carlsberg Italia including one measure based on ecosystem approach • Climate adaptation plans monitoring reports Involved parners: SSSUP, CAP, SIPRO, CARLSBERG, ERVET
  • 4. Action C4 - Web portal for climate resilient industry 4 • The action will develop a web portal aimed to give information about risks and opportunities related to climate change impacts to enterprises belonging to the clusters involved in the demonstration actions Web Portal: • Portale web Involved partners: • TERRARIA, SSSUP, ERVET
  • 5. Action C4 - Web portal for climate resilient industry 5 • The action will develop a web portal aimed to give information about risks and opportunities related to climate change impacts to enterprises belonging to the clusters involved in the demonstration actions Web Portal: • Portale web Involved partners: • TERRARIA, SSSUP, ERVET
  • 6. Around 1,3 mio HL beer 34 beers in the portfolio 1° beer company in the world with an EPD certification (Environmental Product Declaration) 12 Awards in 2012, 2 in 2013, 3 in 2014 4 in 2015 for innovation, DraughMaster-Drink Different and products 6 Products wth EPD Carlsberg Italia 3° Italian market producer 6
  • 7. Carlsberg Italia S.p.A. Supply chain 7
  • 8. Carlsberg Italia climate risk assessment map by supply chain phase 8 Procurement • Business continuity • Financial balance Production • Asset Integrity • Business continuity • Legal liability • Reputation • Financial balance • Staff health & safety • Infrastractures Sales • Business continuity • Market response Logistics • Business continuity
  • 9. Carlsberg Italia Main climate drivers for supply chain phase 9
  • 10. Carlsberg Italia raw materials 10 Hop comes mainly from Germany and the USA. In 2015, Germany has had a very bad season characterized by rainfall which led to a poor crop yields. While in the US drought negatively impacted crop yields. Similar productive years impact availability in terms of quantity and consequent price increases. The barley comes from France - A study conducted in France on barley crops from 1950 to 2014 in relation to climatic variables shows that the temperature above 33 ° C and the increase of rainfall impact barley production in terms of a reduction of the 0.11% to 0.16% per year.
  • 11. Risk identification for Carlsberg’s raw material procurement 11 Risk categories/climatic events Procurement Heatwaves Coldwaves Tornado Etremeprecipitations andconsequents: a)Floods b)landslide Drought Asset integrity Business continuity X X X Legal liability Reputation Market response Financial balance X X X Staff health and safety Infrastructures
  • 12. Carlsberg Italia previous experience with climate extremes 12 The production plant has already been affected by floods three times, the last being in July 2009. The flood of 2009 caused damage to the plant not totally recognized by the insurance and therefore entailing economic losses. In March 2010 a collaboration started between the Lombardy Region, the Basin Authority of the Po River, inter-regional Agency for the River Po, Induno Olona, Varese Municipality and Carlsberg Italia. This collaboration aimed to study and search for solutions such as hydraulic arrangement of the River Olona in part of Carlsberg property. Carlsberg has drawn up a preliminary plan for the retention works in the stretch from Valganna Caves at the confluence of the two branches of the Olona.
  • 13. Risk identification for Carlsberg’s plant and production 13 Risk categories/climatic events Production Heatwaves Coldwaves Tornado Etremeprecipitations andconsequents: a)Floods b)landslide Drought Asset integrity X X X X Business continuity X X X X X X X Legal liability X X X X X Reputation X X X X X Market response Financial balance X X X X X Staff health and safety X X X X X X Infrastructures X X X X X X
  • 14. Carlsberg Italia: climate impact on sales 14 • The beer is sold mainly between April (Easter) and September with peak when the temperature is between 27 ° and 28 ° C • Beer sales slow down when the temperature exceeds 30 ° C, because the consumption are turning to other beverages such as water. As a consequence in case of heat waves or summer storms and temperature drop, beer consumption is reduced. • In case of rainy or cool summers such as the summer of 2014, the beer consumption fell with consequences for the whole chain • In general, with increasing average temperatures, then warmer autumn and spring and warmer summer, the sales decrease during the summer and increase in the spring and autumn • Special beers are not affected by these impacts
  • 15. Risk identification for Carlsberg’s sales 15 Risk categories/climatic events Sales Heatwaves Coldwaves Tornado Etremeprecipitations andconsequents: a)Floods b)landslide Drought Asset integrity Business continuity Legal liability Reputation Market response X X Financial balance Staff health and safety Infrastructures
  • 16. Carlsberg Italia main climate risks 16 Main climate events Supply chain phases at risk Potential risks Asset integrity Business continuity Legal liability Reputation Raw materials procurement Production
  • 17. Carlsberg’s Magnitude assessment 17 Associated Magnitude to each risk per climate events Heat wave Cold wave Tornado Extreme precipitations Drought a) Asset integrity 5,00 5,00 5,00 b) Business continuity 4,00 3,50 4,00 4,60 4,50 c) Legal liability 4,00 4,00 4,00 4,00 d) Reputation 3,00 4,00 4,00 4,00 3,50 e) Market response 4,00 4,00 4,00 f) Financial balance 3,00 3,00 3,67 3,40 3,40 g) Staff health and safety 3,00 3,00 3,00 3,00 3,00 h) Infrastructures 3,00 3,00 3,00 3,00
  • 18. Carlsberg’s Risk assessment 18 Heat wave Cold wave Tornado Extreme Precipitations Drought P M R P M R P M R P M R P M R a) Asset integrity 1,00 - - 0,65 - - 0,30 5,00 1,50 1,00 5,00 5,00 1,00 5,00 5,00 b) Business continuity 1,00 4,00 4,00 0,65 3,50 2,28 0,30 4,00 1,20 1,00 4,60 4,60 1,00 4,50 4,50 c) Legal liability 1,00 - - 0,65 4,00 2,60 0,30 4,00 1,20 1,00 4,00 4,00 1,00 4,00 4,00 d) Reputation 1,00 3,00 3,00 0,65 4,00 2,60 0,30 4,00 1,20 1,00 4,00 4,00 1,00 3,50 3,50 e) Market response 1,00 4,00 4,00 0,65 4,00 2,60 0,30 - - 1,00 4,00 4,00 1,00 - - f) Financial balance 1,00 3,00 3,00 0,65 3,00 1,95 0,30 3,67 1,10 1,00 3,40 3,40 1,00 3,40 3,40 g) Staff health and safety 1,00 3,00 3,00 0,65 3,00 1,95 0,30 3,00 0,90 1,00 3,00 3,00 1,00 3,00 3,00 h) Infrastructur es 1,00 - - 0,65 3,00 1,95 0,30 3,00 0,90 1,00 3,00 3,00 1,00 3,00 3,00
  • 19. Carlsberg’s risk rank per typology Before the adaptive capacity assessment Risk Assessment a) Asset integrity 2,88 b) Business continuity 2,49 c) Legal liability 2,21 d) Reputation 2,15 e) Market response 2,10 f) Financial balance 1,93 g) Staff health and safety 1,78 h) Infrastructures 2,21 After the adaptive capacity assessment 19 Rischio Valutazione a) Asset integrity 3,83 b) Business continuity 3,32 c) Legal liability 2,95 d) Reputation 2,86 e) Market response 3,53 f) Financial balance 2,57 g) Staff health and safety 2,37 h) Infrastructures 2,21
  • 20. Carlsberg Italia climate change adaptation plan 20 The plan includes 5 measures: • Feasibility study for changing pasteurizer • Creating working area within the green park on the Induno Olona beer factory • Hydrogeological study to understand the future impact of climate change on the water availability • Carrying out a study on the impact of climate change on the green park on the Induno Olona beer factory • Identification of some adaptation measures for bees conservation together with honey supplier
  • 21. Bomporto industrial area 21 • Bomporto Industrial area (Modena) • 95 hectares • 70 enterprises, with manufacturing prevalence (60%) • 1200 employees
  • 22. Bomporto previous experience with climate 22 19/01/2014 30/04/2014
  • 23. Bomporto magnitude assessment 23 HEATWAVES: high event likelohood but limited damages DROUGHT: likelihood and damages low EXTREME PRECIPITATIONS: likelihood and damages very high
  • 24. Bomporto climate risk assessment map 24
  • 25. Bomporto climate change adaptation plan 25 The plan includes 13 measures to be implemented in 10 years: • Info Point for the companies within the CAP • Training for the companies • Climate risk assessment for the companies belonging to the cluster • Emergency plan and automatic alert • Comfort outdoor simulation • Urban trees • Drainable floors • Flowerbed for catching the rain • Flooding basin
  • 26. Bomporto climate change adaptation plan timeline 26
  • 27. Ostellato industrial area 27 • Ostellato industrial area (Ferrara) • 120 hectares • 24 enterprises, largely belonging to manufacturing (70%) • 650 employees
  • 28. Ostellato climate risk assessment map 28
  • 29. Ostellato climate change adaptation plan 29 The plan includes 10 measures: • Adaptation Helpdesk for the companies • Training for the companies • Climate risk assessment for the companies belonging to the cluster • Support to the definition of climate change adaptation plans for the companies belonging to the cluster • Urban trees within Sipro area (50.000mq) • Barrier against flood • Smart irrigation and raining collector
  • 30. Web tool climate change risk assessment: sites 30
  • 31. Web tool climate change risk assessment: events 31
  • 32. Web tool climate change risk assessment: likelihood 32
  • 33. Web tool climate change risk assessment: risk evalutation results 33
  • 34. Web tool climate change risk assessment: risk assessment results 34