Presented by Goutama Bachtiar
E: goutama@gmail.com | T: @goudotmobi   2008
   Scope Management
   Time Management
   Cost Management
   Quality Management
   Human Resources Management
   Communication Management
   Risk Management
   Contracts & Procurement Management
   Project Integration & Professional Responsibility
 Objectives & Challenges
 Project Selection
 Project Justification
 Project Charter
 Scope Statement
 Scope Management Plan
   Objectives
     Decide criteria to select projects
     Setting up process to select projects
     Authorize the project & project manager to manage via project
      charter

   Challenges
    Project Manager (PM) needs to:
     Ensure a scope statement is created
     Ensure everyone understands main objectives & deliverables
     Ensure everyone understands constraints & assumptions
     Ensure scope is managed in a standard & consistent fashion
   Using Project Selection Matrix
   The matrix based on Project Selection Criteria
   Elements:
       Financial return
       Effect on employees/alignment with corporate culture
       Technical advancement/innovation
       Market value/share
       Public perception
       Alignment/advancement of corporate strategy
   Project Justification Criteria
     Select 5 to 7 main criteria to justify the projects
     Assign a weighting factor to each criterion based on importance
     For each criterion, select the benefit measurement to use
     Create the list of all proposed projects
     A written business case for informing project selection committee
     Put projects in a matrix & rate each project based on method selected
     Multiply weighting factor to each rating received
     Eliminate any projects based on any minimum standards /thresholds
      established prior to ranking
     Rank remaining projects
     Select projects to proceed from ranking
     Make sure document justifications for each project selected (project charter,
      scope statement, business case, or other supporting docs)
   Official written acknowledgment & recognition that
    a project exists.
   Issued by senior management external to the project
   Gives the PM authority to assign resources
   Elements
       Product description & project overview
       Project goals & objectives
       Project deliverables
       Business case/business need
       Resource & cost estimates
       Feasibility study (optional)
   Steps to write
     Interview sponsor, product managers & any leaders to understand
        product & purpose
       Ask sponsor & other stakeholders about main goals & objectives
       Ask sponsor & other stakeholders about tangible deliverables
       Collect business case for the project & attach it to the plan
       Estimate resource needs & costs
       Write the project charter with all gathered info
       Describe needed authority to PM
       Ask sponsor or a senior leader to review & change the charter as
        needed, have it signed & distributed to involved parties
       Have a meeting to ensure concurrence with the charter for all
        executives & identified team members
   Elements
       Project justification (business need)
       Project product
       Requirements/Specifications
       Project deliverables (WBS)
       Project objectives (quantifiable criteria)
       Assumptions
       Cost & time estimates
       Constraints
   Steps to write
       Review project charter for resued any items
       Write a brief general statement about project purpose
       Include a project justification
       Rewrite/use a product/service description
       Create list of major deliverables & high-level WBS to show scope of work
       List the objective(s) or goals
       List assumptions
       List constraints
       Include requirements in scope statement or produce them in another doc
       Include major roles & responsibilities needed
       Write the scope statement doc & deliver it to stakeholders for approval
       Have a meeting to review the scope with team & stakeholders
   Steps to create
       Review scope statement & make informed judgments on stability
       Provide in plan probability of scope changes & frequency
       Describe how scope changes will impact the project
       Document scope change process
        ▪ General info about change (date, brief description & requestor)
        ▪ Business, technical, or other need for the change
        ▪ Describe the resulting analysis of the change
        ▪ Socialize levels of review & approval for the change and communicate change
          to everyone
        ▪ Integrate change into the scope; managed & tracked as part of project plan
     Communicate scope management plan & scope change process to
        team members
   Work Breakdown Structure (WBS)
   Activity Sequencing
   Estimating Activity Duration
   Critical Path Method
   Program Evaluation & Review Technique (PERT)
   Duration Compression
   GANTT Chart
   Controlling Schedule Changes
   A tool and technique to decompose project scope
    components into smaller and more manageable
    components/work packages
   Purposes
     Identify project major deliverables
     Create a common understanding of deliverables
   Composition
     Project name/major task, subcomponents/higher level
     tasks (summary tasks) and work packages (work task)
   Steps to Create
     Determine format for WBS (tree/outline)
     Determine appropriate levels of decomposition
     Determine organization of WBS levels
     Label level one the project name.
     At level two, decompose into a set of deliverables
     For each subsequent level, decompose the level above into smaller
      components
     Create the lowest level of decomposition (work package)
      It should be small enough to easily assign to one person to complete.
     Create a unique numerical identifier for each component on WBS
   Components
     Activity List
      Lowest level of work on WBS
     Dependencies
      Determining dependencies of the work to be done
      ▪ Mandatory dependencies: Inherent in the work to be done
      ▪ Discretionary dependencies: Created by the project team
      ▪ External dependencies: Come from outside of the project
     Diagramming Methods
        Precedence diagramming method (PDM)/Activity on node (AON)
        and Arrow diagramming method (ADM)
   Tools and techniques
       Expert judgment
       Analogous estimating (top-down estimating)
       Quantitatively based durations
       Reserve time (contingency)

   Steps to Create
       Determine if WBS needs to be decomposed into smaller activities
       Understand resource requirements for each activity
       Determine whether best tools & techniques
       Determine proper duration estimate for each activity
       Analyze each activity for schedule risk
       Determine type of reserve time (work unit/percentage)
       Add reserve time to each activity where appropriate
   The longest path through the project and has no float
    (slack time)
   Should be managed
   If a task on critical path slips, end date slips
   Use a mathematical analysis tool & technique of the
    schedule development process called Critical Path Method
    (CPM)
   CPM types
     Forward pass: Calculates early start & early finish for each task
     Backward pass: Calculates late start & late finish for each task
     Float: Subtracts early start from late start or subtracting early
      finish from late finish
   Another mathematical analysis tool and technique of the
    schedule development process
   Focuses on determining project’s duration
   Uses expected values/weighted averages
   Relies heavily on mathematics of probability & statistical bell
    curves
   Provide more confidence to duration estimates
   Applied to every task, to certain risky tasks, or to critical path.
   To Calculate PERT
     Optimistic: If everything goes well, how long the task will take
     Pessimistic: If everything goes poorly, how long the task will take
     Most likely: Original estimate provided(best guess)
   As schedule development tool & technique
   First is crashing, second is fast tracking
   Crashing
     An analysis method looks at trade-offs between schedule
      & cost.
     Analyze critical path & determine to shorten it.
     May fail or success; affect the budget
   Fast Tracking
     An analysis method to reduce duration of projects
     To have tasks worked in parallel than sequentially
     Look for opportunities on the critical path
 Known as a bar chart
 Graphic display of schedule related information
 Depicts the project elements down left side of chart
  (Y axis) & a time scale across top or bottom of chart
  (X axis).
 Tasks with a duration are shown as date-placed
  horizontal bars
 Most project managers use a project management
  software system for creating this chart
 To create: determine time scale to display the info;
  determine level of tasks to display; draw chart &
  place tasks
   Steps to Control
     Plan for change
      ▪   Who can request, approve and review the change
      ▪   Impact to the schedule
      ▪   Specific form for request
      ▪   Reason for the change
      ▪   Advantages/disadvantages for allowing the change
      ▪   If it is approved or denied, how to update the schedule, how to notify team & requestor
      ▪   How to log & track change
     Determine if schedule has changed
      ▪ Planned on doing
      ▪ Status of existing process
      ▪ Variance between the two
     Manage actual changes on the project
      ▪ Analysis, decisions, and corrective actions regarding changes and variances will help
        manage to a successful completion
   Foundation for creating and controlling the costs
    of a project
   Steps to Manage
     Resource Planning
     Types of Cost Estimates
     Estimating Costs
     Creating a Budget & Baseline
     Controlling Changes
   Resource Planning
     A planning process done to establish the costs of a
      project
     Determine what resources needed on project
     Determine how many of each type of needed resource
     Three commonly known types of resources:
      people, equipment, and materials
   Order of Magnitude Estimates
      ▪ Done at the very beginning
      ▪ Derived from information for similar or previous projects
      ▪ Magnitude estimate fall between–25% and +75% of project actual cost
   Budget Estimates
      ▪ Created during the Cost Budgeting process
      ▪ Cover all of the costs of a project (personnel, equipment, materials)
      ▪ More precise, falling in the range of –10% to +25% of project actual cost
   Definitive Estimates
      ▪ The most detailed & most precise
      ▪ Derived from an expert /project team looking at a specific task and the
        duration
      ▪ Falling in the range of –5% to +10% of project actual cost
   Methods
      ▪ Analogous estimating
        ▪ Uses expert judgment and information from previous projects
        ▪ Top-down estimating to create an order of magnitude estimate
        ▪ Very subjective, not very accurate
      ▪ Parametric modeling
        ▪ Determine what elements should be placed in a mathematical model
        ▪ Can be used to create any of the three types of estimates
      ▪ Bottom-up Estimating
        ▪ Most precise method
        ▪ Estimating each individual task separately
        ▪ Look at the effort required to complete a task, not the duration
        ▪ To create definitive estimates
     Determine the unit of measure
     Create the estimates
   Inputs
     Cost estimates (analogous, parametric modeling, bottom-up)
        May be very general/specific
     WBS
        Determine which tasks will have costs associated with them
     Project schedule
        Created in the Schedule Development process
        Provides element of time to your budget
   Determining Budget
     Cost Estimating techniques (resource costs, material, equipment)
     Prepare managerial reserves (unpredict situation)
     Generate total project budget
   Creating a Cost Baseline
     A copy of the budget prior to work beginning on the project
     Kept for comparison, analysis & future forecasts (planned value (PV))
     Does not include the managerial reserve
   The Cost Control process is very similar to the Schedule Control process
   Differentiation is an output called estimate at completion (EAC)
   EAC is a calculation done at any point that forecasts likely final costs of project
   To calculate estimate
     EAC = AC + ETC
       Determine the estimate to completion (ETC).
        ETC is the amount of money needed to complete the project
       Actual cost (AC) to determine the estimate at completion
     EAC = (AC + BAC) – EV
       Total budget for the project (BAC) and add it to the actual cost (AC)
       Subtract the work accomplished and the authorized budget for the work (EV)
     EAC = (AC + (BAC – EV) ÷ CPI)
       Take work accomplished & authorized budget for work (EV)
       Subtract them by the total budgets for project (BAC)
       Add that figure to the actual monies spent to date (AC)
       Divide that figure by the cost performance index (CPI)
   Quality Planning Tools
   Calculating the Cost of Quality
   Quality Assurance
   Quality Control
   Inputs
     Quality policy
      A statement regarding company’s beliefs around quality
      A guiding light for people working on project
     Scope statement
      To verify project deliverables
     Product description
      Information about the desired level of quality that assist in quality
      management planning
     Standards and regulations
   Outputs
       Quality management plan.
       Created by project manager & project team
       Detail all quality planning activities & who will perform.
       Essence: quality will be ensured & how to follow the quality policy
   Cost of quality is the total amount of money required to ensure quality
   3 different types of costs
     Prevention costs
      Cover all activities to keep errors out of process in creating the product
      Including all quality planning, product validation and process validation activities
     Appraisal costs
       Cover all activities to keep errors out of customer’s hands
      Including quality audits, evaluations, calibration, inspections & field testing
     Failure costs
      Including all costs incurred due to product failure (internal & external)
      Internal failures : rework costs, product repairs, scrap & additional purchase for
      inventory External failures : happened after product leaves organization
      Including warranties, complaint handling, product recalls, legal suits, and harm done
      to reputation
   Computing cost of quality: adding the work effort estimate for each activity
    that is preventative or appraisal in nature to the costs incurred because of any
    type of failure (internal or external)
   Process focuses on making certain planned
    quality will be met
   2 sets of tools & techniques
     Quality planning tools: benchmarking, cost benefit
      analysis, flowcharting, design of experiments, & cost
      of quality
     Quality audit: A review of the quality management
      activities; In-depth review will produce findings to
      identify lessons learned for improvement
   Components of Quality Audit
      ▪ Determine the auditor (Internal vs External)
      ▪ Time frames to audit
         Initial assessment
                   Conducted at the end of planning process & before project execution
                   Evaluate planned quality assurance work
                   Creates a quality baseline for project planning
         Quality progress review
                   Planned at regular intervals/key milestones during project execution
                   Evaluating if the outlined quality activities performed
                   Inspect project quality processes & determine if they are sound
         Quality completion review
                   Done at the end of the project & should recap the quality assurance
                   effectiveness in light of final project results
      ▪ Quality audit process
           Include a review log that identifies points that will be reviewed during the audit
           The reviewer should receive relevant materials (product description, quality policy, project
           schedule, status reports)
           Outcome: suggested actions for enhancement
   A technical process on product quality
   Tools and techniques
     Inspection
       Review/verify product quality; Done on a single component/part/entire product
     Control chart
       Graphic display shows measurements of a specific process over time
       Shows an upper control limit, a lower control & middle line
     Statistical sampling
       Gathering a subset of the total set of units
       Randomly selecting items to be inspected or reviewed
     Flowcharting
        Determine how problems occur
     Trend analysis
       A set of mathematical computations to determine future outcome
     Pareto diagram/Histogram
       Rank order problems from larger to smallest
       Majority of defects caused by a few problems (the 80/20 rule)
   Staffing management
    plan
   Inputs for a staffing
    management plan
   Contents of a staffing
    management plan
   Document project team how to assign human
    resources, what to work on, and when to depart
    from the project
   Foundation to manage human resources during
    the project
   General vs very detailed
   Project interfaces
    Organizational: coordinating project work across multiple vendors,
    departments, or both
    Technical: The way work of project must be done
    Interpersonal: Relationships among all personnel
   Staffing requirements
    Types of resources used on project tasks
    A subset of created resource plans
    Describes types of required competencies for each resource type
   Constraints
    Factors that limit team’s ability to use resources
    Can be an organizational rules, team preferences, organizational
    structures, union agreements
 Organization charts
  Graphical depiction of project team hierarchy
  To depict reporting relationships of team members w/ PM
  Resource assignment matrix (RAM)
  A diagram merges an organization breakdown structure & WBS
 How assignments are made
  A section on assignments includes methodology for assigning
  team members to specific tasks
 Roles and responsibilities
  A roles and responsibilities matrix would include each team
  member or resource grouping & a list of their responsibilities
 Attrition management
  Cover how key personnel & team members are replaced
  How all project personnel will be reassigned at end of project
   Understanding Your Stakeholders
     Stakeholder is anyone positively or negatively impacted by the project; individuals
      and organizations
     Including project manager, sponsor, team members, customers, organization
      performing the work, functional managers providing team members, operations, and
      others
   Communicating with the Team
     Effectively communicate with the team
     Need to understand complexity of communication
     Need to resolve differences using conflict resolution methods.
   Deciding on Information Distribution
     Decide on what to distribute and how to distribute
   Creating a Communications Plan
     Describe types & method to distribute communication
     Describe strategy & tactics to communicate the plan
     Create a communication matrix
   Performance Reporting
     Communicate status and progress
     Provide the executives objective measurements
     Measure progress based on cost, schedule, and quality
      (performance)
     Tools: Performance reviews, Variance analysis, Trend
      analysis, Earned value analysis
   Project Closing
     Closing a phase/project, not just closing the project
     down
   A project management process that helps fend
    off potential damaging events and identify
    opportunities for the project
   Steps
     Identifying Risks
     Analysis Methods
     Types of Risk Responses
     Creating a Risk Response Plan
   Major Risks
     Technical, quality, or performance
      Major technical complexity/new technology
     Project management
      Undeveloped project management methodology,
      inexperienced project manager, or lack of training
     Organizational
      Frequent changes in management, culture that does not
      support the project, downsizing, or a project that does not fit
      into the overall strategy can cause many risks
     External
      Legal changes, government regulations, market changes,
      changes in political influences
   Qualitative
    Process to determine risk probability & impact
   Quantitative
    More detailed & objective than Qualitative
    Tools are Interviewing (PERT & probability
    distributions), Sensitivity analysis, Simulation
    Decision tree analysis & expected value
 Avoidance
  Overcome risk event by trying to stray away from or
  eliminate it altogether
 Transference
  Transfer risk responsibility to someone else
 Mitigation
  Reduce risk probability/impact to project/objectives
 Acceptance
  Take consequences if risk is occurred
 Contingency planning
  A plan of action if risk event occurs
  Might have decided to accept risk
  Plan to deal when happens
   Need to set up a documented and living plan for
    dealing with the risks
   Possible items included
       Risks & their categories
       Owner
       Response types
       Actual response steps to take & response budget
       Contingency plan & possible contingency actions
       New risks identified based on risk response plans
 A project management process to perform only if
  procuring services or goods from someone outside of
  your organization
 First decide on the type of contract wanted for
  project
 Have a plan for procuring and managing contracts
 Create a statement of work (SOW)
 Document evaluation criteria to objectively select
  vendors
 Create contract to manage status and change and
  handle disputes
   Basic contract types
     Fixed price/lump sum
      Predetermined fee for goods/services agreed on
     Cost reimbursable
      Set incentives/penalties in addition to fixed price
      Floating price contract based on costs the contractor
      incurs
   Creating a Procurement Management Plan
   Creating a Statement of Work
   Evaluating and Selecting the Vendor
   Creating the Contract
 A plan on how to manage processes and standards
  for contracts & vendors
 How to manage vendor solicitations (documents &
  evaluation criteria)
 How to obtain contract vendors
 How to evaluate proposals & make final vendor
  selection
 How to negotiate contracts
 How to manage & administer project’s contracts
 How to manage procurement management items
   Written to understand expectations of requested
    work
   Patterns
       Objectives
       Product/Service Description
       Required Deliverables
       Requirements/Specifications
       Assumption & constraints
       Time estimate
   Elements
       Roles and responsibilities
       Security
       Location of work
       Milestones/deliverables
       Quantities
       Vendor payments
       Progress reporting
       Testing
       Quality
   Does vendor demonstrate the best value, lowest price, or other price
    comparison advantage?
   Make sure distinguish what is more important, and evaluate this for the
    overall life cycle of the project
   Does vendor demonstrate an understanding of expectations of product
    & service, as well as how to expect vendor to work during the project?
   Does vendor clearly demonstrate ability to carry out
    technical/operational processes needed to perform the work? Judge this
    on references, previous performance, skill sets of employees within
    organization assigned to project, and any awards/technical
    achievements vendor can demonstrate.
   Will project team be able to work with the vendor management team?
   Can vendor fulfill obligations of performing work based on the vendor’s
    financial capabilities?
   Start by using templates of organization’s contracts
    /previous contracts as a basis
   Collecting requirements to include in the contract,
   Working with lawyers and procurement department
    to put contract together
   Include following details
     Definitions
      Define all technical & others terms particular to the
      contract
     Scope/statement of work
      Expected work description/work product from vendor
 Roles and responsibilities
    Description of who does, approves work, administers contract & manages processes
   Technical specifications and deliverables
    Provides specific measurements, specifications & other technical requirements
   Interpretation of requirements
    Gives order of precedence for project requirements
   Schedule
    States milestones or deliverables expected from vendor
   Quality assurance/control
    Describes inspections/audits expected
   Warranty/guarantee
    How long product is expected to last
    Include express warranties for equipment, workmanship, performance/process &
    design
   Contract administration
    Describes processes, time frames, escalations for contract
    administration
   Price and terms of payment
    Price information & a schedule of invoicing & payments
   Laws, regulations, and taxes
    Any legal regulations specific to state/project
   Provisions
    General and special terms and conditions negotiated with the
    vendor
   Provisions for early termination
    How to dissolve contract & distribute payments
   Liabilities and insurance
    Liability if the project or product is disrupted, is delayed, or fails
   Confidentiality, privacy, and security
    Describes confidentiality requirements
   Employee recruiting
    Provisions protecting raiding each other’s employees for certain
    period of time
   Disputes
    Escalations, arbitration & other ways to settle disputes
   Contract completion
    Cover several SOWs, or may be extended for new work
    Closure should also center on formal acceptance of all
    deliverables /contract
   Overarching processes & concepts in project
    management
   Project plan
       Development takes all info in previous planning processes
       Integrates it into one comprehensive document
       Serve as a guide during project execution and control.
       Has the formal approval of the project stakeholders
   8 knowledge areas: scope planning, schedule
    development, cost budgeting, quality planning, staff
    acquisition, communications & risk management &
    procurement planning
   Components
     Project charter
      The formal authorization to start a project
     Scope statement
      Work to be done to deliver product of the project
     Work breakdown structure
      A tool and technique to decompose project scope
      components into smaller and more manageable
      components
     Project schedule
      Include all of the major milestones and deliverables
 Resource assignments
  Resource assignments need to be included in the project
  plan
 Project costs
  Including magnitude estimates, budget estimates, and
  work estimates
 Risks
  Will be updated as new risks are identified, quantified, and
  risk responses are created
 Other management plans
  Including Scope management plan and quality
  management plan
   Project Execution
   Project Change Control
   Project Organizational Structure
 Definition
  Part of integration management knowledge area
 Tools & techniques
     General management skills
        Communication, managing, and team development skills
       Product skills and knowledge
        Monitor level of expertise, train & retrain team accordingly
       Work authorization system (WAS)
        System to control sequence of tasks
       Status review meetings
        Meeting conducted to examine project progress
       Project management information systems (PMIS)
        Manual/Mechanized tool to helps PM collect, analyze, & integrate project
        info
   How to Control:
       How to request & can request a change
       How to document
       System to record and archive changes
       How to analyze & review change
       How to make & prioritize change
       How & Who to approve the request
       Manage change within team & configuration control board
       How to implement if approved
       How to communicate changes
       How to monitor project
 Projectized organizations
  Organized around project management
  Provide complete authority to PM and provide
  administrative support
  Full-Time Personnel
 Functional organizations
  Established to perform certain functions (sales, marketing,
  or accounting)
 Matrix Organizations
  Use functional & projectized organizations
  3 levels of progression: weak matrix, balanced matrix, and
  strong matrix
 Work ethically, with regard for customer fairness, and with the
  latest project management knowledge
 Code of conduct
       Adherence (supporting it and sharing it with others, acting ethically)
       Disclosing conflict of interest/impropriety to customers
       Advertising qualifications truthfully
       Complying with applicable laws
       Respecting intellectual property
       Providing accurate cost & service estimates & expected results
       Sticking to & satisfying scope of objectives
       Protecting confidential information
       Refraining from taking gifts or payments for personal gain
   A Guide to the Project Management Body of
    Knowledge, Third Edition (PMBOK Guides) by
    Project Management Institute, USA, 2004, 140p
   Information Technology Project Management,
    Reprint (with Microsoft Project 2007) by Kathy
    Schwalbe, Thomson Learning, Canada, 2000,
    469p
   Integrated Project Management by K.C. Chan,
    Peter Ong, R. Eko Indrajit, Andi Publisher,
    Indonesia, 212p
 LinkedIn:
  www.linkedin.com/in/goutama
 Email: goutama@gmail.com
 Google+: www.gplus.to/goudotmobi
 Skype: goudotinfo
 Twitter: @goudotmobi
Q&A
THANK YOU!

More Related Content

What's hot

Information Technology Project Management - part 12
Information Technology Project Management - part 12Information Technology Project Management - part 12
Information Technology Project Management - part 12Rizwan Khurram
 
Project scope management
Project scope managementProject scope management
Project scope managementAnit Roy
 
Information Technology Project Management - part 10
Information Technology Project Management - part 10Information Technology Project Management - part 10
Information Technology Project Management - part 10Rizwan Khurram
 
Chap03 the project management process groups
Chap03 the project management process groupsChap03 the project management process groups
Chap03 the project management process groupsDhani Ahmad
 
Project management process groups case study
Project management process groups case studyProject management process groups case study
Project management process groups case studyDhani Ahmad
 
Chapter 3: The Project Management Process Groups: A Case Study
Chapter 3:The Project Management Process Groups: A Case StudyChapter 3:The Project Management Process Groups: A Case Study
Chapter 3: The Project Management Process Groups: A Case StudyShahid Riaz
 
06. Project Management Process Groups
06. Project Management Process Groups06. Project Management Process Groups
06. Project Management Process GroupsBhuWan Khadka
 
Introduction to project management
Introduction to project managementIntroduction to project management
Introduction to project managementDhani Ahmad
 
Introduction to project management
Introduction to project managementIntroduction to project management
Introduction to project managementBarun_agnihotri
 
The project management and information technology context
The project management and information technology contextThe project management and information technology context
The project management and information technology contextAfdalArifAmandaPutra
 
Chapter 3 The Project Management Process Groups A Case Study.ppt
Chapter 3 The Project Management Process Groups A Case Study.pptChapter 3 The Project Management Process Groups A Case Study.ppt
Chapter 3 The Project Management Process Groups A Case Study.pptAhmadTawfigAlRadaide
 
The project management process groups a case study
The project management process groups a case studyThe project management process groups a case study
The project management process groups a case studyAfdalArifAmandaPutra
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Managementcgautam
 
PMP Lecture 1: Introduction to Project Management
PMP Lecture 1: Introduction to Project ManagementPMP Lecture 1: Introduction to Project Management
PMP Lecture 1: Introduction to Project ManagementMohamed Loey
 
Software Project Management( lecture 1)
Software Project Management( lecture 1)Software Project Management( lecture 1)
Software Project Management( lecture 1)Syed Muhammad Hammad
 
Setting up a Project Management Office (PMO)
Setting up a Project Management Office (PMO)Setting up a Project Management Office (PMO)
Setting up a Project Management Office (PMO)Hussain Bandukwala
 
Project management and information technology context
Project management and information technology contextProject management and information technology context
Project management and information technology contextDhani Ahmad
 

What's hot (20)

Information Technology Project Management - part 12
Information Technology Project Management - part 12Information Technology Project Management - part 12
Information Technology Project Management - part 12
 
Project scope management
Project scope managementProject scope management
Project scope management
 
Information Technology Project Management - part 10
Information Technology Project Management - part 10Information Technology Project Management - part 10
Information Technology Project Management - part 10
 
Chap03 the project management process groups
Chap03 the project management process groupsChap03 the project management process groups
Chap03 the project management process groups
 
Project management process groups case study
Project management process groups case studyProject management process groups case study
Project management process groups case study
 
Chapter 3: The Project Management Process Groups: A Case Study
Chapter 3:The Project Management Process Groups: A Case StudyChapter 3:The Project Management Process Groups: A Case Study
Chapter 3: The Project Management Process Groups: A Case Study
 
06. Project Management Process Groups
06. Project Management Process Groups06. Project Management Process Groups
06. Project Management Process Groups
 
Introduction to project management
Introduction to project managementIntroduction to project management
Introduction to project management
 
Introduction to project management
Introduction to project managementIntroduction to project management
Introduction to project management
 
The project management and information technology context
The project management and information technology contextThe project management and information technology context
The project management and information technology context
 
Chapter 3 The Project Management Process Groups A Case Study.ppt
Chapter 3 The Project Management Process Groups A Case Study.pptChapter 3 The Project Management Process Groups A Case Study.ppt
Chapter 3 The Project Management Process Groups A Case Study.ppt
 
The project management process groups a case study
The project management process groups a case studyThe project management process groups a case study
The project management process groups a case study
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 
project management concepts
project management conceptsproject management concepts
project management concepts
 
Unit 2 spm
Unit 2 spmUnit 2 spm
Unit 2 spm
 
PMP Lecture 1: Introduction to Project Management
PMP Lecture 1: Introduction to Project ManagementPMP Lecture 1: Introduction to Project Management
PMP Lecture 1: Introduction to Project Management
 
Spm unit 4
Spm unit 4Spm unit 4
Spm unit 4
 
Software Project Management( lecture 1)
Software Project Management( lecture 1)Software Project Management( lecture 1)
Software Project Management( lecture 1)
 
Setting up a Project Management Office (PMO)
Setting up a Project Management Office (PMO)Setting up a Project Management Office (PMO)
Setting up a Project Management Office (PMO)
 
Project management and information technology context
Project management and information technology contextProject management and information technology context
Project management and information technology context
 

Viewers also liked

SUST Innovation Lab Seminar on 9th January 2013
SUST Innovation Lab Seminar on 9th January 2013SUST Innovation Lab Seminar on 9th January 2013
SUST Innovation Lab Seminar on 9th January 2013Gada Kadoda
 
Building an Excellent Team in Modern Times
Building an Excellent Team in Modern TimesBuilding an Excellent Team in Modern Times
Building an Excellent Team in Modern Timesvivek2008
 
Presentation Learning Tree
Presentation Learning TreePresentation Learning Tree
Presentation Learning TreeKarl Kapp
 
Windows Internal - Ch9 memory management
Windows Internal - Ch9 memory managementWindows Internal - Ch9 memory management
Windows Internal - Ch9 memory managementKent Huang
 
Clean Code: Chapter 3 Function
Clean Code: Chapter 3 FunctionClean Code: Chapter 3 Function
Clean Code: Chapter 3 FunctionKent Huang
 
Reverse eningeering
Reverse eningeeringReverse eningeering
Reverse eningeeringKent Huang
 
Windows internals Essentials
Windows internals EssentialsWindows internals Essentials
Windows internals EssentialsJohn Ombagi
 
Total quality management in education
Total quality management  in educationTotal quality management  in education
Total quality management in educationSam Luke
 

Viewers also liked (9)

SUST Innovation Lab Seminar on 9th January 2013
SUST Innovation Lab Seminar on 9th January 2013SUST Innovation Lab Seminar on 9th January 2013
SUST Innovation Lab Seminar on 9th January 2013
 
Building an Excellent Team in Modern Times
Building an Excellent Team in Modern TimesBuilding an Excellent Team in Modern Times
Building an Excellent Team in Modern Times
 
Presentation Learning Tree
Presentation Learning TreePresentation Learning Tree
Presentation Learning Tree
 
Get ready for Marketing 2020
Get ready for Marketing 2020Get ready for Marketing 2020
Get ready for Marketing 2020
 
Windows Internal - Ch9 memory management
Windows Internal - Ch9 memory managementWindows Internal - Ch9 memory management
Windows Internal - Ch9 memory management
 
Clean Code: Chapter 3 Function
Clean Code: Chapter 3 FunctionClean Code: Chapter 3 Function
Clean Code: Chapter 3 Function
 
Reverse eningeering
Reverse eningeeringReverse eningeering
Reverse eningeering
 
Windows internals Essentials
Windows internals EssentialsWindows internals Essentials
Windows internals Essentials
 
Total quality management in education
Total quality management  in educationTotal quality management  in education
Total quality management in education
 

Similar to Information Technology Project Management

Mmi entrepreneurship 6
Mmi entrepreneurship 6Mmi entrepreneurship 6
Mmi entrepreneurship 6gatecomro
 
Project Management Toolkit - Presentation
Project Management Toolkit - PresentationProject Management Toolkit - Presentation
Project Management Toolkit - PresentationHassan Rizwan
 
The project plan
The project planThe project plan
The project planVatsalaPG
 
Schedule Development
Schedule DevelopmentSchedule Development
Schedule DevelopmentChris Carson
 
Gonzales.matthew
Gonzales.matthewGonzales.matthew
Gonzales.matthewNASAPMC
 
Project Management Tools and Techniques.pdf
Project Management Tools and Techniques.pdfProject Management Tools and Techniques.pdf
Project Management Tools and Techniques.pdfAzadHussain44
 
PM Session 4
PM Session 4PM Session 4
PM Session 4dmdk12
 
PMP Exam Flashcards common definitions 7th edition original v2.0
PMP Exam Flashcards common definitions 7th edition original v2.0PMP Exam Flashcards common definitions 7th edition original v2.0
PMP Exam Flashcards common definitions 7th edition original v2.0Vinod Kumar, PMP®
 
Sce vasg os_project_managementprocess_scw2010_05
Sce vasg os_project_managementprocess_scw2010_05Sce vasg os_project_managementprocess_scw2010_05
Sce vasg os_project_managementprocess_scw2010_05xtiandlr
 
2005.04.04.cpp.project.management.adb
2005.04.04.cpp.project.management.adb2005.04.04.cpp.project.management.adb
2005.04.04.cpp.project.management.adbngocjos
 
Cassidy.jim
Cassidy.jimCassidy.jim
Cassidy.jimNASAPMC
 
Introduction To Project Management
Introduction To Project ManagementIntroduction To Project Management
Introduction To Project ManagementUW Madison
 
Scope and Time Management
Scope and Time ManagementScope and Time Management
Scope and Time ManagementSabrinaScott22
 

Similar to Information Technology Project Management (20)

Mmi entrepreneurship 6
Mmi entrepreneurship 6Mmi entrepreneurship 6
Mmi entrepreneurship 6
 
MIS Project management
MIS Project managementMIS Project management
MIS Project management
 
Project Management Toolkit - Presentation
Project Management Toolkit - PresentationProject Management Toolkit - Presentation
Project Management Toolkit - Presentation
 
6396901
63969016396901
6396901
 
The project plan
The project planThe project plan
The project plan
 
Project scheduling
Project schedulingProject scheduling
Project scheduling
 
Schedule Development
Schedule DevelopmentSchedule Development
Schedule Development
 
Project Management
Project ManagementProject Management
Project Management
 
Gonzales.matthew
Gonzales.matthewGonzales.matthew
Gonzales.matthew
 
Project Management Tools and Techniques.pdf
Project Management Tools and Techniques.pdfProject Management Tools and Techniques.pdf
Project Management Tools and Techniques.pdf
 
PM Session 4
PM Session 4PM Session 4
PM Session 4
 
PMP Exam Flashcards common definitions 7th edition original v2.0
PMP Exam Flashcards common definitions 7th edition original v2.0PMP Exam Flashcards common definitions 7th edition original v2.0
PMP Exam Flashcards common definitions 7th edition original v2.0
 
Sce vasg os_project_managementprocess_scw2010_05
Sce vasg os_project_managementprocess_scw2010_05Sce vasg os_project_managementprocess_scw2010_05
Sce vasg os_project_managementprocess_scw2010_05
 
Leon Tisdale Show
Leon Tisdale ShowLeon Tisdale Show
Leon Tisdale Show
 
2005.04.04.cpp.project.management.adb
2005.04.04.cpp.project.management.adb2005.04.04.cpp.project.management.adb
2005.04.04.cpp.project.management.adb
 
Cassidy.jim
Cassidy.jimCassidy.jim
Cassidy.jim
 
Chap005
Chap005Chap005
Chap005
 
AnAr project management overview
AnAr project management overviewAnAr project management overview
AnAr project management overview
 
Introduction To Project Management
Introduction To Project ManagementIntroduction To Project Management
Introduction To Project Management
 
Scope and Time Management
Scope and Time ManagementScope and Time Management
Scope and Time Management
 

More from Goutama Bachtiar

Crypto Currency, Bitcoin and Blockchain
Crypto Currency, Bitcoin and BlockchainCrypto Currency, Bitcoin and Blockchain
Crypto Currency, Bitcoin and BlockchainGoutama Bachtiar
 
Information Security Management System with ISO/IEC 27000:2018
Information Security Management System with ISO/IEC 27000:2018Information Security Management System with ISO/IEC 27000:2018
Information Security Management System with ISO/IEC 27000:2018Goutama Bachtiar
 
Blockchain Essentials - Harnessing the Technology for Banking Industry
Blockchain Essentials - Harnessing the Technology for Banking IndustryBlockchain Essentials - Harnessing the Technology for Banking Industry
Blockchain Essentials - Harnessing the Technology for Banking IndustryGoutama Bachtiar
 
Leveraging Agile Project Management with Scrum
Leveraging Agile Project Management with ScrumLeveraging Agile Project Management with Scrum
Leveraging Agile Project Management with ScrumGoutama Bachtiar
 
Library of Information Technology Icons
Library of Information Technology IconsLibrary of Information Technology Icons
Library of Information Technology IconsGoutama Bachtiar
 
Dealing with Fraud in E-Banking Sphere
Dealing with Fraud in E-Banking SphereDealing with Fraud in E-Banking Sphere
Dealing with Fraud in E-Banking SphereGoutama Bachtiar
 
IS and IT Auditor Roles in Today's New Economy
IS and IT Auditor Roles in Today's New EconomyIS and IT Auditor Roles in Today's New Economy
IS and IT Auditor Roles in Today's New EconomyGoutama Bachtiar
 
Conducting Digital Forensics against Crime and Fraud
Conducting Digital Forensics against Crime and FraudConducting Digital Forensics against Crime and Fraud
Conducting Digital Forensics against Crime and FraudGoutama Bachtiar
 
Utilizing Internet for Fraud Examination and Investigation
Utilizing Internet for Fraud Examination and InvestigationUtilizing Internet for Fraud Examination and Investigation
Utilizing Internet for Fraud Examination and InvestigationGoutama Bachtiar
 
Managing IT Risks in Internet Banking
Managing IT Risks in Internet BankingManaging IT Risks in Internet Banking
Managing IT Risks in Internet BankingGoutama Bachtiar
 
Electronic Payment Fundamentals: When Tech Embracing Payment Industry
Electronic Payment Fundamentals: When Tech Embracing Payment IndustryElectronic Payment Fundamentals: When Tech Embracing Payment Industry
Electronic Payment Fundamentals: When Tech Embracing Payment IndustryGoutama Bachtiar
 
State of Cyber Crime in Banking Sector Today: Threats and Solutions
State of Cyber Crime in Banking Sector Today: Threats and SolutionsState of Cyber Crime in Banking Sector Today: Threats and Solutions
State of Cyber Crime in Banking Sector Today: Threats and SolutionsGoutama Bachtiar
 
The State of ERP in Indonesia: Trends, Opportunities and Challenges
The State of ERP in Indonesia: Trends, Opportunities and ChallengesThe State of ERP in Indonesia: Trends, Opportunities and Challenges
The State of ERP in Indonesia: Trends, Opportunities and ChallengesGoutama Bachtiar
 
Developing and Managing Business Continuity Plan (BCP)
Developing and Managing Business Continuity Plan (BCP)Developing and Managing Business Continuity Plan (BCP)
Developing and Managing Business Continuity Plan (BCP)Goutama Bachtiar
 
Implementing BPMN 2.0 with Microsoft Visio
Implementing BPMN 2.0 with Microsoft VisioImplementing BPMN 2.0 with Microsoft Visio
Implementing BPMN 2.0 with Microsoft VisioGoutama Bachtiar
 
Understanding IT Strategy, Sourcing and Vendor Relationships
Understanding IT Strategy, Sourcing and Vendor RelationshipsUnderstanding IT Strategy, Sourcing and Vendor Relationships
Understanding IT Strategy, Sourcing and Vendor RelationshipsGoutama Bachtiar
 
Valuing Information Management and IT Architecture
Valuing Information Management and IT ArchitectureValuing Information Management and IT Architecture
Valuing Information Management and IT ArchitectureGoutama Bachtiar
 
Riding and Capitalizing the Next Wave of Information Technology
Riding and Capitalizing the Next Wave of Information TechnologyRiding and Capitalizing the Next Wave of Information Technology
Riding and Capitalizing the Next Wave of Information TechnologyGoutama Bachtiar
 

More from Goutama Bachtiar (20)

Crypto Currency, Bitcoin and Blockchain
Crypto Currency, Bitcoin and BlockchainCrypto Currency, Bitcoin and Blockchain
Crypto Currency, Bitcoin and Blockchain
 
Information Security Management System with ISO/IEC 27000:2018
Information Security Management System with ISO/IEC 27000:2018Information Security Management System with ISO/IEC 27000:2018
Information Security Management System with ISO/IEC 27000:2018
 
Blockchain Essentials - Harnessing the Technology for Banking Industry
Blockchain Essentials - Harnessing the Technology for Banking IndustryBlockchain Essentials - Harnessing the Technology for Banking Industry
Blockchain Essentials - Harnessing the Technology for Banking Industry
 
Delving into Fintech
Delving into FintechDelving into Fintech
Delving into Fintech
 
Leveraging Agile Project Management with Scrum
Leveraging Agile Project Management with ScrumLeveraging Agile Project Management with Scrum
Leveraging Agile Project Management with Scrum
 
Library of Information Technology Icons
Library of Information Technology IconsLibrary of Information Technology Icons
Library of Information Technology Icons
 
PMBOK 6th vs 5th Edition
PMBOK 6th vs 5th EditionPMBOK 6th vs 5th Edition
PMBOK 6th vs 5th Edition
 
Dealing with Fraud in E-Banking Sphere
Dealing with Fraud in E-Banking SphereDealing with Fraud in E-Banking Sphere
Dealing with Fraud in E-Banking Sphere
 
IS and IT Auditor Roles in Today's New Economy
IS and IT Auditor Roles in Today's New EconomyIS and IT Auditor Roles in Today's New Economy
IS and IT Auditor Roles in Today's New Economy
 
Conducting Digital Forensics against Crime and Fraud
Conducting Digital Forensics against Crime and FraudConducting Digital Forensics against Crime and Fraud
Conducting Digital Forensics against Crime and Fraud
 
Utilizing Internet for Fraud Examination and Investigation
Utilizing Internet for Fraud Examination and InvestigationUtilizing Internet for Fraud Examination and Investigation
Utilizing Internet for Fraud Examination and Investigation
 
Managing IT Risks in Internet Banking
Managing IT Risks in Internet BankingManaging IT Risks in Internet Banking
Managing IT Risks in Internet Banking
 
Electronic Payment Fundamentals: When Tech Embracing Payment Industry
Electronic Payment Fundamentals: When Tech Embracing Payment IndustryElectronic Payment Fundamentals: When Tech Embracing Payment Industry
Electronic Payment Fundamentals: When Tech Embracing Payment Industry
 
State of Cyber Crime in Banking Sector Today: Threats and Solutions
State of Cyber Crime in Banking Sector Today: Threats and SolutionsState of Cyber Crime in Banking Sector Today: Threats and Solutions
State of Cyber Crime in Banking Sector Today: Threats and Solutions
 
The State of ERP in Indonesia: Trends, Opportunities and Challenges
The State of ERP in Indonesia: Trends, Opportunities and ChallengesThe State of ERP in Indonesia: Trends, Opportunities and Challenges
The State of ERP in Indonesia: Trends, Opportunities and Challenges
 
Developing and Managing Business Continuity Plan (BCP)
Developing and Managing Business Continuity Plan (BCP)Developing and Managing Business Continuity Plan (BCP)
Developing and Managing Business Continuity Plan (BCP)
 
Implementing BPMN 2.0 with Microsoft Visio
Implementing BPMN 2.0 with Microsoft VisioImplementing BPMN 2.0 with Microsoft Visio
Implementing BPMN 2.0 with Microsoft Visio
 
Understanding IT Strategy, Sourcing and Vendor Relationships
Understanding IT Strategy, Sourcing and Vendor RelationshipsUnderstanding IT Strategy, Sourcing and Vendor Relationships
Understanding IT Strategy, Sourcing and Vendor Relationships
 
Valuing Information Management and IT Architecture
Valuing Information Management and IT ArchitectureValuing Information Management and IT Architecture
Valuing Information Management and IT Architecture
 
Riding and Capitalizing the Next Wave of Information Technology
Riding and Capitalizing the Next Wave of Information TechnologyRiding and Capitalizing the Next Wave of Information Technology
Riding and Capitalizing the Next Wave of Information Technology
 

Recently uploaded

Bird eye's view on Camunda open source ecosystem
Bird eye's view on Camunda open source ecosystemBird eye's view on Camunda open source ecosystem
Bird eye's view on Camunda open source ecosystemAsko Soukka
 
UiPath Studio Web workshop series - Day 7
UiPath Studio Web workshop series - Day 7UiPath Studio Web workshop series - Day 7
UiPath Studio Web workshop series - Day 7DianaGray10
 
UiPath Platform: The Backend Engine Powering Your Automation - Session 1
UiPath Platform: The Backend Engine Powering Your Automation - Session 1UiPath Platform: The Backend Engine Powering Your Automation - Session 1
UiPath Platform: The Backend Engine Powering Your Automation - Session 1DianaGray10
 
OpenShift Commons Paris - Choose Your Own Observability Adventure
OpenShift Commons Paris - Choose Your Own Observability AdventureOpenShift Commons Paris - Choose Your Own Observability Adventure
OpenShift Commons Paris - Choose Your Own Observability AdventureEric D. Schabell
 
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019IES VE
 
GenAI and AI GCC State of AI_Object Automation Inc
GenAI and AI GCC State of AI_Object Automation IncGenAI and AI GCC State of AI_Object Automation Inc
GenAI and AI GCC State of AI_Object Automation IncObject Automation
 
9 Steps For Building Winning Founding Team
9 Steps For Building Winning Founding Team9 Steps For Building Winning Founding Team
9 Steps For Building Winning Founding TeamAdam Moalla
 
Cloud Revolution: Exploring the New Wave of Serverless Spatial Data
Cloud Revolution: Exploring the New Wave of Serverless Spatial DataCloud Revolution: Exploring the New Wave of Serverless Spatial Data
Cloud Revolution: Exploring the New Wave of Serverless Spatial DataSafe Software
 
Introduction to Matsuo Laboratory (ENG).pptx
Introduction to Matsuo Laboratory (ENG).pptxIntroduction to Matsuo Laboratory (ENG).pptx
Introduction to Matsuo Laboratory (ENG).pptxMatsuo Lab
 
COMPUTER 10 Lesson 8 - Building a Website
COMPUTER 10 Lesson 8 - Building a WebsiteCOMPUTER 10 Lesson 8 - Building a Website
COMPUTER 10 Lesson 8 - Building a Websitedgelyza
 
Machine Learning Model Validation (Aijun Zhang 2024).pdf
Machine Learning Model Validation (Aijun Zhang 2024).pdfMachine Learning Model Validation (Aijun Zhang 2024).pdf
Machine Learning Model Validation (Aijun Zhang 2024).pdfAijun Zhang
 
Do we need a new standard for visualizing the invisible?
Do we need a new standard for visualizing the invisible?Do we need a new standard for visualizing the invisible?
Do we need a new standard for visualizing the invisible?SANGHEE SHIN
 
Artificial Intelligence & SEO Trends for 2024
Artificial Intelligence & SEO Trends for 2024Artificial Intelligence & SEO Trends for 2024
Artificial Intelligence & SEO Trends for 2024D Cloud Solutions
 
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdf
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdfUiPath Solutions Management Preview - Northern CA Chapter - March 22.pdf
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdfDianaGray10
 
NIST Cybersecurity Framework (CSF) 2.0 Workshop
NIST Cybersecurity Framework (CSF) 2.0 WorkshopNIST Cybersecurity Framework (CSF) 2.0 Workshop
NIST Cybersecurity Framework (CSF) 2.0 WorkshopBachir Benyammi
 
Salesforce Miami User Group Event - 1st Quarter 2024
Salesforce Miami User Group Event - 1st Quarter 2024Salesforce Miami User Group Event - 1st Quarter 2024
Salesforce Miami User Group Event - 1st Quarter 2024SkyPlanner
 
Meet the new FSP 3000 M-Flex800™
Meet the new FSP 3000 M-Flex800™Meet the new FSP 3000 M-Flex800™
Meet the new FSP 3000 M-Flex800™Adtran
 
Using IESVE for Loads, Sizing and Heat Pump Modeling to Achieve Decarbonization
Using IESVE for Loads, Sizing and Heat Pump Modeling to Achieve DecarbonizationUsing IESVE for Loads, Sizing and Heat Pump Modeling to Achieve Decarbonization
Using IESVE for Loads, Sizing and Heat Pump Modeling to Achieve DecarbonizationIES VE
 
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyesHow to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyesThousandEyes
 
Secure your environment with UiPath and CyberArk technologies - Session 1
Secure your environment with UiPath and CyberArk technologies - Session 1Secure your environment with UiPath and CyberArk technologies - Session 1
Secure your environment with UiPath and CyberArk technologies - Session 1DianaGray10
 

Recently uploaded (20)

Bird eye's view on Camunda open source ecosystem
Bird eye's view on Camunda open source ecosystemBird eye's view on Camunda open source ecosystem
Bird eye's view on Camunda open source ecosystem
 
UiPath Studio Web workshop series - Day 7
UiPath Studio Web workshop series - Day 7UiPath Studio Web workshop series - Day 7
UiPath Studio Web workshop series - Day 7
 
UiPath Platform: The Backend Engine Powering Your Automation - Session 1
UiPath Platform: The Backend Engine Powering Your Automation - Session 1UiPath Platform: The Backend Engine Powering Your Automation - Session 1
UiPath Platform: The Backend Engine Powering Your Automation - Session 1
 
OpenShift Commons Paris - Choose Your Own Observability Adventure
OpenShift Commons Paris - Choose Your Own Observability AdventureOpenShift Commons Paris - Choose Your Own Observability Adventure
OpenShift Commons Paris - Choose Your Own Observability Adventure
 
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019
 
GenAI and AI GCC State of AI_Object Automation Inc
GenAI and AI GCC State of AI_Object Automation IncGenAI and AI GCC State of AI_Object Automation Inc
GenAI and AI GCC State of AI_Object Automation Inc
 
9 Steps For Building Winning Founding Team
9 Steps For Building Winning Founding Team9 Steps For Building Winning Founding Team
9 Steps For Building Winning Founding Team
 
Cloud Revolution: Exploring the New Wave of Serverless Spatial Data
Cloud Revolution: Exploring the New Wave of Serverless Spatial DataCloud Revolution: Exploring the New Wave of Serverless Spatial Data
Cloud Revolution: Exploring the New Wave of Serverless Spatial Data
 
Introduction to Matsuo Laboratory (ENG).pptx
Introduction to Matsuo Laboratory (ENG).pptxIntroduction to Matsuo Laboratory (ENG).pptx
Introduction to Matsuo Laboratory (ENG).pptx
 
COMPUTER 10 Lesson 8 - Building a Website
COMPUTER 10 Lesson 8 - Building a WebsiteCOMPUTER 10 Lesson 8 - Building a Website
COMPUTER 10 Lesson 8 - Building a Website
 
Machine Learning Model Validation (Aijun Zhang 2024).pdf
Machine Learning Model Validation (Aijun Zhang 2024).pdfMachine Learning Model Validation (Aijun Zhang 2024).pdf
Machine Learning Model Validation (Aijun Zhang 2024).pdf
 
Do we need a new standard for visualizing the invisible?
Do we need a new standard for visualizing the invisible?Do we need a new standard for visualizing the invisible?
Do we need a new standard for visualizing the invisible?
 
Artificial Intelligence & SEO Trends for 2024
Artificial Intelligence & SEO Trends for 2024Artificial Intelligence & SEO Trends for 2024
Artificial Intelligence & SEO Trends for 2024
 
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdf
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdfUiPath Solutions Management Preview - Northern CA Chapter - March 22.pdf
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdf
 
NIST Cybersecurity Framework (CSF) 2.0 Workshop
NIST Cybersecurity Framework (CSF) 2.0 WorkshopNIST Cybersecurity Framework (CSF) 2.0 Workshop
NIST Cybersecurity Framework (CSF) 2.0 Workshop
 
Salesforce Miami User Group Event - 1st Quarter 2024
Salesforce Miami User Group Event - 1st Quarter 2024Salesforce Miami User Group Event - 1st Quarter 2024
Salesforce Miami User Group Event - 1st Quarter 2024
 
Meet the new FSP 3000 M-Flex800™
Meet the new FSP 3000 M-Flex800™Meet the new FSP 3000 M-Flex800™
Meet the new FSP 3000 M-Flex800™
 
Using IESVE for Loads, Sizing and Heat Pump Modeling to Achieve Decarbonization
Using IESVE for Loads, Sizing and Heat Pump Modeling to Achieve DecarbonizationUsing IESVE for Loads, Sizing and Heat Pump Modeling to Achieve Decarbonization
Using IESVE for Loads, Sizing and Heat Pump Modeling to Achieve Decarbonization
 
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyesHow to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
 
Secure your environment with UiPath and CyberArk technologies - Session 1
Secure your environment with UiPath and CyberArk technologies - Session 1Secure your environment with UiPath and CyberArk technologies - Session 1
Secure your environment with UiPath and CyberArk technologies - Session 1
 

Information Technology Project Management

  • 1. Presented by Goutama Bachtiar E: goutama@gmail.com | T: @goudotmobi 2008
  • 2. Scope Management  Time Management  Cost Management  Quality Management  Human Resources Management  Communication Management  Risk Management  Contracts & Procurement Management  Project Integration & Professional Responsibility
  • 3.  Objectives & Challenges  Project Selection  Project Justification  Project Charter  Scope Statement  Scope Management Plan
  • 4. Objectives  Decide criteria to select projects  Setting up process to select projects  Authorize the project & project manager to manage via project charter  Challenges Project Manager (PM) needs to:  Ensure a scope statement is created  Ensure everyone understands main objectives & deliverables  Ensure everyone understands constraints & assumptions  Ensure scope is managed in a standard & consistent fashion
  • 5. Using Project Selection Matrix  The matrix based on Project Selection Criteria  Elements:  Financial return  Effect on employees/alignment with corporate culture  Technical advancement/innovation  Market value/share  Public perception  Alignment/advancement of corporate strategy
  • 6. Project Justification Criteria  Select 5 to 7 main criteria to justify the projects  Assign a weighting factor to each criterion based on importance  For each criterion, select the benefit measurement to use  Create the list of all proposed projects  A written business case for informing project selection committee  Put projects in a matrix & rate each project based on method selected  Multiply weighting factor to each rating received  Eliminate any projects based on any minimum standards /thresholds established prior to ranking  Rank remaining projects  Select projects to proceed from ranking  Make sure document justifications for each project selected (project charter, scope statement, business case, or other supporting docs)
  • 7. Official written acknowledgment & recognition that a project exists.  Issued by senior management external to the project  Gives the PM authority to assign resources  Elements  Product description & project overview  Project goals & objectives  Project deliverables  Business case/business need  Resource & cost estimates  Feasibility study (optional)
  • 8. Steps to write  Interview sponsor, product managers & any leaders to understand product & purpose  Ask sponsor & other stakeholders about main goals & objectives  Ask sponsor & other stakeholders about tangible deliverables  Collect business case for the project & attach it to the plan  Estimate resource needs & costs  Write the project charter with all gathered info  Describe needed authority to PM  Ask sponsor or a senior leader to review & change the charter as needed, have it signed & distributed to involved parties  Have a meeting to ensure concurrence with the charter for all executives & identified team members
  • 9. Elements  Project justification (business need)  Project product  Requirements/Specifications  Project deliverables (WBS)  Project objectives (quantifiable criteria)  Assumptions  Cost & time estimates  Constraints
  • 10. Steps to write  Review project charter for resued any items  Write a brief general statement about project purpose  Include a project justification  Rewrite/use a product/service description  Create list of major deliverables & high-level WBS to show scope of work  List the objective(s) or goals  List assumptions  List constraints  Include requirements in scope statement or produce them in another doc  Include major roles & responsibilities needed  Write the scope statement doc & deliver it to stakeholders for approval  Have a meeting to review the scope with team & stakeholders
  • 11. Steps to create  Review scope statement & make informed judgments on stability  Provide in plan probability of scope changes & frequency  Describe how scope changes will impact the project  Document scope change process ▪ General info about change (date, brief description & requestor) ▪ Business, technical, or other need for the change ▪ Describe the resulting analysis of the change ▪ Socialize levels of review & approval for the change and communicate change to everyone ▪ Integrate change into the scope; managed & tracked as part of project plan  Communicate scope management plan & scope change process to team members
  • 12. Work Breakdown Structure (WBS)  Activity Sequencing  Estimating Activity Duration  Critical Path Method  Program Evaluation & Review Technique (PERT)  Duration Compression  GANTT Chart  Controlling Schedule Changes
  • 13. A tool and technique to decompose project scope components into smaller and more manageable components/work packages  Purposes  Identify project major deliverables  Create a common understanding of deliverables  Composition  Project name/major task, subcomponents/higher level tasks (summary tasks) and work packages (work task)
  • 14. Steps to Create  Determine format for WBS (tree/outline)  Determine appropriate levels of decomposition  Determine organization of WBS levels  Label level one the project name.  At level two, decompose into a set of deliverables  For each subsequent level, decompose the level above into smaller components  Create the lowest level of decomposition (work package) It should be small enough to easily assign to one person to complete.  Create a unique numerical identifier for each component on WBS
  • 15. Components  Activity List Lowest level of work on WBS  Dependencies Determining dependencies of the work to be done ▪ Mandatory dependencies: Inherent in the work to be done ▪ Discretionary dependencies: Created by the project team ▪ External dependencies: Come from outside of the project  Diagramming Methods Precedence diagramming method (PDM)/Activity on node (AON) and Arrow diagramming method (ADM)
  • 16. Tools and techniques  Expert judgment  Analogous estimating (top-down estimating)  Quantitatively based durations  Reserve time (contingency)  Steps to Create  Determine if WBS needs to be decomposed into smaller activities  Understand resource requirements for each activity  Determine whether best tools & techniques  Determine proper duration estimate for each activity  Analyze each activity for schedule risk  Determine type of reserve time (work unit/percentage)  Add reserve time to each activity where appropriate
  • 17. The longest path through the project and has no float (slack time)  Should be managed  If a task on critical path slips, end date slips  Use a mathematical analysis tool & technique of the schedule development process called Critical Path Method (CPM)  CPM types  Forward pass: Calculates early start & early finish for each task  Backward pass: Calculates late start & late finish for each task  Float: Subtracts early start from late start or subtracting early finish from late finish
  • 18. Another mathematical analysis tool and technique of the schedule development process  Focuses on determining project’s duration  Uses expected values/weighted averages  Relies heavily on mathematics of probability & statistical bell curves  Provide more confidence to duration estimates  Applied to every task, to certain risky tasks, or to critical path.  To Calculate PERT  Optimistic: If everything goes well, how long the task will take  Pessimistic: If everything goes poorly, how long the task will take  Most likely: Original estimate provided(best guess)
  • 19. As schedule development tool & technique  First is crashing, second is fast tracking  Crashing  An analysis method looks at trade-offs between schedule & cost.  Analyze critical path & determine to shorten it.  May fail or success; affect the budget  Fast Tracking  An analysis method to reduce duration of projects  To have tasks worked in parallel than sequentially  Look for opportunities on the critical path
  • 20.  Known as a bar chart  Graphic display of schedule related information  Depicts the project elements down left side of chart (Y axis) & a time scale across top or bottom of chart (X axis).  Tasks with a duration are shown as date-placed horizontal bars  Most project managers use a project management software system for creating this chart  To create: determine time scale to display the info; determine level of tasks to display; draw chart & place tasks
  • 21. Steps to Control  Plan for change ▪ Who can request, approve and review the change ▪ Impact to the schedule ▪ Specific form for request ▪ Reason for the change ▪ Advantages/disadvantages for allowing the change ▪ If it is approved or denied, how to update the schedule, how to notify team & requestor ▪ How to log & track change  Determine if schedule has changed ▪ Planned on doing ▪ Status of existing process ▪ Variance between the two  Manage actual changes on the project ▪ Analysis, decisions, and corrective actions regarding changes and variances will help manage to a successful completion
  • 22. Foundation for creating and controlling the costs of a project  Steps to Manage  Resource Planning  Types of Cost Estimates  Estimating Costs  Creating a Budget & Baseline  Controlling Changes
  • 23. Resource Planning  A planning process done to establish the costs of a project  Determine what resources needed on project  Determine how many of each type of needed resource  Three commonly known types of resources: people, equipment, and materials
  • 24. Order of Magnitude Estimates ▪ Done at the very beginning ▪ Derived from information for similar or previous projects ▪ Magnitude estimate fall between–25% and +75% of project actual cost  Budget Estimates ▪ Created during the Cost Budgeting process ▪ Cover all of the costs of a project (personnel, equipment, materials) ▪ More precise, falling in the range of –10% to +25% of project actual cost  Definitive Estimates ▪ The most detailed & most precise ▪ Derived from an expert /project team looking at a specific task and the duration ▪ Falling in the range of –5% to +10% of project actual cost
  • 25. Methods ▪ Analogous estimating ▪ Uses expert judgment and information from previous projects ▪ Top-down estimating to create an order of magnitude estimate ▪ Very subjective, not very accurate ▪ Parametric modeling ▪ Determine what elements should be placed in a mathematical model ▪ Can be used to create any of the three types of estimates ▪ Bottom-up Estimating ▪ Most precise method ▪ Estimating each individual task separately ▪ Look at the effort required to complete a task, not the duration ▪ To create definitive estimates  Determine the unit of measure  Create the estimates
  • 26. Inputs  Cost estimates (analogous, parametric modeling, bottom-up) May be very general/specific  WBS Determine which tasks will have costs associated with them  Project schedule Created in the Schedule Development process Provides element of time to your budget  Determining Budget  Cost Estimating techniques (resource costs, material, equipment)  Prepare managerial reserves (unpredict situation)  Generate total project budget  Creating a Cost Baseline  A copy of the budget prior to work beginning on the project  Kept for comparison, analysis & future forecasts (planned value (PV))  Does not include the managerial reserve
  • 27. The Cost Control process is very similar to the Schedule Control process  Differentiation is an output called estimate at completion (EAC)  EAC is a calculation done at any point that forecasts likely final costs of project  To calculate estimate  EAC = AC + ETC Determine the estimate to completion (ETC). ETC is the amount of money needed to complete the project Actual cost (AC) to determine the estimate at completion  EAC = (AC + BAC) – EV Total budget for the project (BAC) and add it to the actual cost (AC) Subtract the work accomplished and the authorized budget for the work (EV)  EAC = (AC + (BAC – EV) ÷ CPI) Take work accomplished & authorized budget for work (EV) Subtract them by the total budgets for project (BAC) Add that figure to the actual monies spent to date (AC) Divide that figure by the cost performance index (CPI)
  • 28. Quality Planning Tools  Calculating the Cost of Quality  Quality Assurance  Quality Control
  • 29. Inputs  Quality policy A statement regarding company’s beliefs around quality A guiding light for people working on project  Scope statement To verify project deliverables  Product description Information about the desired level of quality that assist in quality management planning  Standards and regulations  Outputs  Quality management plan.  Created by project manager & project team  Detail all quality planning activities & who will perform.  Essence: quality will be ensured & how to follow the quality policy
  • 30. Cost of quality is the total amount of money required to ensure quality  3 different types of costs  Prevention costs Cover all activities to keep errors out of process in creating the product Including all quality planning, product validation and process validation activities  Appraisal costs Cover all activities to keep errors out of customer’s hands Including quality audits, evaluations, calibration, inspections & field testing  Failure costs Including all costs incurred due to product failure (internal & external) Internal failures : rework costs, product repairs, scrap & additional purchase for inventory External failures : happened after product leaves organization Including warranties, complaint handling, product recalls, legal suits, and harm done to reputation  Computing cost of quality: adding the work effort estimate for each activity that is preventative or appraisal in nature to the costs incurred because of any type of failure (internal or external)
  • 31. Process focuses on making certain planned quality will be met  2 sets of tools & techniques  Quality planning tools: benchmarking, cost benefit analysis, flowcharting, design of experiments, & cost of quality  Quality audit: A review of the quality management activities; In-depth review will produce findings to identify lessons learned for improvement
  • 32. Components of Quality Audit ▪ Determine the auditor (Internal vs External) ▪ Time frames to audit  Initial assessment Conducted at the end of planning process & before project execution Evaluate planned quality assurance work Creates a quality baseline for project planning  Quality progress review Planned at regular intervals/key milestones during project execution Evaluating if the outlined quality activities performed Inspect project quality processes & determine if they are sound  Quality completion review Done at the end of the project & should recap the quality assurance effectiveness in light of final project results ▪ Quality audit process Include a review log that identifies points that will be reviewed during the audit The reviewer should receive relevant materials (product description, quality policy, project schedule, status reports) Outcome: suggested actions for enhancement
  • 33. A technical process on product quality  Tools and techniques  Inspection Review/verify product quality; Done on a single component/part/entire product  Control chart Graphic display shows measurements of a specific process over time Shows an upper control limit, a lower control & middle line  Statistical sampling Gathering a subset of the total set of units Randomly selecting items to be inspected or reviewed  Flowcharting Determine how problems occur  Trend analysis A set of mathematical computations to determine future outcome  Pareto diagram/Histogram Rank order problems from larger to smallest Majority of defects caused by a few problems (the 80/20 rule)
  • 34. Staffing management plan  Inputs for a staffing management plan  Contents of a staffing management plan
  • 35. Document project team how to assign human resources, what to work on, and when to depart from the project  Foundation to manage human resources during the project  General vs very detailed
  • 36. Project interfaces Organizational: coordinating project work across multiple vendors, departments, or both Technical: The way work of project must be done Interpersonal: Relationships among all personnel  Staffing requirements Types of resources used on project tasks A subset of created resource plans Describes types of required competencies for each resource type  Constraints Factors that limit team’s ability to use resources Can be an organizational rules, team preferences, organizational structures, union agreements
  • 37.  Organization charts Graphical depiction of project team hierarchy To depict reporting relationships of team members w/ PM Resource assignment matrix (RAM) A diagram merges an organization breakdown structure & WBS  How assignments are made A section on assignments includes methodology for assigning team members to specific tasks  Roles and responsibilities A roles and responsibilities matrix would include each team member or resource grouping & a list of their responsibilities  Attrition management Cover how key personnel & team members are replaced How all project personnel will be reassigned at end of project
  • 38. Understanding Your Stakeholders  Stakeholder is anyone positively or negatively impacted by the project; individuals and organizations  Including project manager, sponsor, team members, customers, organization performing the work, functional managers providing team members, operations, and others  Communicating with the Team  Effectively communicate with the team  Need to understand complexity of communication  Need to resolve differences using conflict resolution methods.  Deciding on Information Distribution  Decide on what to distribute and how to distribute  Creating a Communications Plan  Describe types & method to distribute communication  Describe strategy & tactics to communicate the plan  Create a communication matrix
  • 39. Performance Reporting  Communicate status and progress  Provide the executives objective measurements  Measure progress based on cost, schedule, and quality (performance)  Tools: Performance reviews, Variance analysis, Trend analysis, Earned value analysis  Project Closing  Closing a phase/project, not just closing the project down
  • 40. A project management process that helps fend off potential damaging events and identify opportunities for the project  Steps  Identifying Risks  Analysis Methods  Types of Risk Responses  Creating a Risk Response Plan
  • 41. Major Risks  Technical, quality, or performance Major technical complexity/new technology  Project management Undeveloped project management methodology, inexperienced project manager, or lack of training  Organizational Frequent changes in management, culture that does not support the project, downsizing, or a project that does not fit into the overall strategy can cause many risks  External Legal changes, government regulations, market changes, changes in political influences
  • 42. Qualitative Process to determine risk probability & impact  Quantitative More detailed & objective than Qualitative Tools are Interviewing (PERT & probability distributions), Sensitivity analysis, Simulation Decision tree analysis & expected value
  • 43.  Avoidance Overcome risk event by trying to stray away from or eliminate it altogether  Transference Transfer risk responsibility to someone else  Mitigation Reduce risk probability/impact to project/objectives  Acceptance Take consequences if risk is occurred  Contingency planning A plan of action if risk event occurs Might have decided to accept risk Plan to deal when happens
  • 44. Need to set up a documented and living plan for dealing with the risks  Possible items included  Risks & their categories  Owner  Response types  Actual response steps to take & response budget  Contingency plan & possible contingency actions  New risks identified based on risk response plans
  • 45.  A project management process to perform only if procuring services or goods from someone outside of your organization  First decide on the type of contract wanted for project  Have a plan for procuring and managing contracts  Create a statement of work (SOW)  Document evaluation criteria to objectively select vendors  Create contract to manage status and change and handle disputes
  • 46. Basic contract types  Fixed price/lump sum Predetermined fee for goods/services agreed on  Cost reimbursable Set incentives/penalties in addition to fixed price Floating price contract based on costs the contractor incurs
  • 47. Creating a Procurement Management Plan  Creating a Statement of Work  Evaluating and Selecting the Vendor  Creating the Contract
  • 48.  A plan on how to manage processes and standards for contracts & vendors  How to manage vendor solicitations (documents & evaluation criteria)  How to obtain contract vendors  How to evaluate proposals & make final vendor selection  How to negotiate contracts  How to manage & administer project’s contracts  How to manage procurement management items
  • 49. Written to understand expectations of requested work  Patterns  Objectives  Product/Service Description  Required Deliverables  Requirements/Specifications  Assumption & constraints  Time estimate
  • 50. Elements  Roles and responsibilities  Security  Location of work  Milestones/deliverables  Quantities  Vendor payments  Progress reporting  Testing  Quality
  • 51. Does vendor demonstrate the best value, lowest price, or other price comparison advantage?  Make sure distinguish what is more important, and evaluate this for the overall life cycle of the project  Does vendor demonstrate an understanding of expectations of product & service, as well as how to expect vendor to work during the project?  Does vendor clearly demonstrate ability to carry out technical/operational processes needed to perform the work? Judge this on references, previous performance, skill sets of employees within organization assigned to project, and any awards/technical achievements vendor can demonstrate.  Will project team be able to work with the vendor management team?  Can vendor fulfill obligations of performing work based on the vendor’s financial capabilities?
  • 52. Start by using templates of organization’s contracts /previous contracts as a basis  Collecting requirements to include in the contract,  Working with lawyers and procurement department to put contract together  Include following details  Definitions Define all technical & others terms particular to the contract  Scope/statement of work Expected work description/work product from vendor
  • 53.  Roles and responsibilities Description of who does, approves work, administers contract & manages processes  Technical specifications and deliverables Provides specific measurements, specifications & other technical requirements  Interpretation of requirements Gives order of precedence for project requirements  Schedule States milestones or deliverables expected from vendor  Quality assurance/control Describes inspections/audits expected  Warranty/guarantee How long product is expected to last Include express warranties for equipment, workmanship, performance/process & design
  • 54. Contract administration Describes processes, time frames, escalations for contract administration  Price and terms of payment Price information & a schedule of invoicing & payments  Laws, regulations, and taxes Any legal regulations specific to state/project  Provisions General and special terms and conditions negotiated with the vendor  Provisions for early termination How to dissolve contract & distribute payments
  • 55. Liabilities and insurance Liability if the project or product is disrupted, is delayed, or fails  Confidentiality, privacy, and security Describes confidentiality requirements  Employee recruiting Provisions protecting raiding each other’s employees for certain period of time  Disputes Escalations, arbitration & other ways to settle disputes  Contract completion Cover several SOWs, or may be extended for new work Closure should also center on formal acceptance of all deliverables /contract
  • 56. Overarching processes & concepts in project management  Project plan  Development takes all info in previous planning processes  Integrates it into one comprehensive document  Serve as a guide during project execution and control.  Has the formal approval of the project stakeholders  8 knowledge areas: scope planning, schedule development, cost budgeting, quality planning, staff acquisition, communications & risk management & procurement planning
  • 57. Components  Project charter The formal authorization to start a project  Scope statement Work to be done to deliver product of the project  Work breakdown structure A tool and technique to decompose project scope components into smaller and more manageable components  Project schedule Include all of the major milestones and deliverables
  • 58.  Resource assignments Resource assignments need to be included in the project plan  Project costs Including magnitude estimates, budget estimates, and work estimates  Risks Will be updated as new risks are identified, quantified, and risk responses are created  Other management plans Including Scope management plan and quality management plan
  • 59. Project Execution  Project Change Control  Project Organizational Structure
  • 60.  Definition Part of integration management knowledge area  Tools & techniques  General management skills Communication, managing, and team development skills  Product skills and knowledge Monitor level of expertise, train & retrain team accordingly  Work authorization system (WAS) System to control sequence of tasks  Status review meetings Meeting conducted to examine project progress  Project management information systems (PMIS) Manual/Mechanized tool to helps PM collect, analyze, & integrate project info
  • 61. How to Control:  How to request & can request a change  How to document  System to record and archive changes  How to analyze & review change  How to make & prioritize change  How & Who to approve the request  Manage change within team & configuration control board  How to implement if approved  How to communicate changes  How to monitor project
  • 62.  Projectized organizations Organized around project management Provide complete authority to PM and provide administrative support Full-Time Personnel  Functional organizations Established to perform certain functions (sales, marketing, or accounting)  Matrix Organizations Use functional & projectized organizations 3 levels of progression: weak matrix, balanced matrix, and strong matrix
  • 63.  Work ethically, with regard for customer fairness, and with the latest project management knowledge  Code of conduct  Adherence (supporting it and sharing it with others, acting ethically)  Disclosing conflict of interest/impropriety to customers  Advertising qualifications truthfully  Complying with applicable laws  Respecting intellectual property  Providing accurate cost & service estimates & expected results  Sticking to & satisfying scope of objectives  Protecting confidential information  Refraining from taking gifts or payments for personal gain
  • 64. A Guide to the Project Management Body of Knowledge, Third Edition (PMBOK Guides) by Project Management Institute, USA, 2004, 140p  Information Technology Project Management, Reprint (with Microsoft Project 2007) by Kathy Schwalbe, Thomson Learning, Canada, 2000, 469p  Integrated Project Management by K.C. Chan, Peter Ong, R. Eko Indrajit, Andi Publisher, Indonesia, 212p
  • 65.  LinkedIn: www.linkedin.com/in/goutama  Email: goutama@gmail.com  Google+: www.gplus.to/goudotmobi  Skype: goudotinfo  Twitter: @goudotmobi
  • 66. Q&A