SlideShare une entreprise Scribd logo
1  sur  18
My Turning pointMy Turning point
傑克飛傑克飛
轉變
我人
生的
一部
電影
...
 Around Taiwan land
 Visit a foreign country
 Hold my birthday party
 Take a picture with my three idols
 Be an international volunteer
 Find a perfect girl and marry her
 Publish a book
 Being in zero gravity
 Visit Tibet Egypt and Venice
 Become the idol of my son and daughter
 Become National Cheng Kung University
Outstanding Alumni
 Make “jackfir” become a brand or company
 Become an influential person
 live my life without regret
 ...
1. 探索世界
3. 勇於行動
2. 關懷生命
New Product Introduction
Pilot run request Product phase inPD head approve
C1 C2 C3 C4
PD head approve
愛情 NPI 流程
求婚籌備試驗 婚禮籌備試驗雙方價值觀測試
C1 C2 C3 C4
雙方親友相容性試驗
Monthly Review Meeting
…工作後,最常點的技能…工作後,最常點的技能
勉強自己,往往可以得到貨真價實的快樂勉強自己,往往可以得到貨真價實的快樂
……
My turning point

Contenu connexe

En vedette

September 19 (101)
September 19 (101)September 19 (101)
September 19 (101)MelissaJLong
 
Apj Abdul kalam 'Turning points"
Apj Abdul kalam 'Turning points"Apj Abdul kalam 'Turning points"
Apj Abdul kalam 'Turning points"Sumit Singh
 
Turning Points_ By A.P.J Abdul Kalam
Turning Points_ By A.P.J Abdul Kalam Turning Points_ By A.P.J Abdul Kalam
Turning Points_ By A.P.J Abdul Kalam Ashwin Jai
 
ANZAC Commemorative Memorial
ANZAC Commemorative MemorialANZAC Commemorative Memorial
ANZAC Commemorative MemorialAntony Rogers
 

En vedette (7)

September 19 (101)
September 19 (101)September 19 (101)
September 19 (101)
 
Basic concept
Basic conceptBasic concept
Basic concept
 
Field Tested and Ready
Field Tested and ReadyField Tested and Ready
Field Tested and Ready
 
Apj Abdul kalam 'Turning points"
Apj Abdul kalam 'Turning points"Apj Abdul kalam 'Turning points"
Apj Abdul kalam 'Turning points"
 
Turning Points_ By A.P.J Abdul Kalam
Turning Points_ By A.P.J Abdul Kalam Turning Points_ By A.P.J Abdul Kalam
Turning Points_ By A.P.J Abdul Kalam
 
ANZAC Commemorative Memorial
ANZAC Commemorative MemorialANZAC Commemorative Memorial
ANZAC Commemorative Memorial
 
Agama Hindu
Agama HinduAgama Hindu
Agama Hindu
 

My turning point

Notes de l'éditeur

  1. 開始思考如果我真的要跟這個世界say goodbye,人生跑馬燈
  2. 人生的蝴蝶效應,當時我喜歡的三個模範,教會我的事情, 我開始想辦法實踐這些概念,因此今天的分享,就從這三大部分開始 探索世界,Janet說,世界就是我的遊樂園,世界也像一本書,不旅行的人只翻了一頁 嚴長壽跟我說,希望年輕人都能走出台灣,並思考如何作自己與別人生命中的天使 九把刀跟我說,實踐才是檢驗真理的標準,人生就是不停的戰鬥
  3. There are 5 phases and 4 check points in NPI process From concept&planning->EVT->DVT->PVT->MP Between two phases have a check point, The new product should pass all the test , then could pass to the next phase. All process will record in PLM system This part represent which department take care the process. For example, The RD and DQA department are responsible for EVT process. ========== (2)進入下一流程需經過以下幾個測試並以PLM系統管制 (3)下面則是負責的單位 ex:RD Next, let me point out Advantech’s NPI process. There are 5 phases and 4 check points in this process. Planning: Feasibility review and test plan Technical feasibility study: New technology platform, SW, HW, FirmW, Mechanical, Thermal or special environmental spec requirement Financial analysis: Target profit margin Supply Chain feasibility study: Evaluation suitable Manufacturing site, Key components evaluation, Lead time analysis and Service model EVT: Mockup sample, Mould making and debug DVT: QA lab for certification and EMI, DQA, small modification PVT: after design freeze, technical transfer and small qty pilot run for MFG validation MP: weekly and monthly review ------- How to say: Please highlight “simultaneous同步的 engineering” in NPI process. ------------------------------------------------------------------------------------- Next, let me point out Advantech’s NPI process. There are 5 phases and 4 check points in this process. It also shows what engineer involves in both design and factory site. --------------------------------------------------------------------------------------- New Product Introduction is a process used at Advantech where a series of tasks need to be completed before the product can be introduced into the market. NPI is divided into 5 stages: Planning, Engineering, Design, Production Validation and finally Mass Production. Each stage is closely guarded by responsible parties ensuring all documentation is in place before the product can move on to the next stage. A group of R&D, lab and quality engineers are involved during NPI to ensure Advantech’s standard is always met.
  4. There are 5 phases and 4 check points in NPI process From concept&planning->EVT->DVT->PVT->MP Between two phases have a check point, The new product should pass all the test , then could pass to the next phase. All process will record in PLM system This part represent which department take care the process. For example, The RD and DQA department are responsible for EVT process. ========== (2)進入下一流程需經過以下幾個測試並以PLM系統管制 (3)下面則是負責的單位 ex:RD Next, let me point out Advantech’s NPI process. There are 5 phases and 4 check points in this process. Planning: Feasibility review and test plan Technical feasibility study: New technology platform, SW, HW, FirmW, Mechanical, Thermal or special environmental spec requirement Financial analysis: Target profit margin Supply Chain feasibility study: Evaluation suitable Manufacturing site, Key components evaluation, Lead time analysis and Service model EVT: Mockup sample, Mould making and debug DVT: QA lab for certification and EMI, DQA, small modification PVT: after design freeze, technical transfer and small qty pilot run for MFG validation MP: weekly and monthly review ------- How to say: Please highlight “simultaneous同步的 engineering” in NPI process. ------------------------------------------------------------------------------------- Next, let me point out Advantech’s NPI process. There are 5 phases and 4 check points in this process. It also shows what engineer involves in both design and factory site. --------------------------------------------------------------------------------------- New Product Introduction is a process used at Advantech where a series of tasks need to be completed before the product can be introduced into the market. NPI is divided into 5 stages: Planning, Engineering, Design, Production Validation and finally Mass Production. Each stage is closely guarded by responsible parties ensuring all documentation is in place before the product can move on to the next stage. A group of R&D, lab and quality engineers are involved during NPI to ensure Advantech’s standard is always met.