Daily KPI Report Forest Products Client
1. Power & Recovery Daily Operating Report
Week beginning dat
Key: * = Winter Targets (Oct 1 - April 1)
KPIs - Safety & Environmental UOM Accountable Base Target
5 Plan
Accidents # Superintendant N/A 0
Actual
7 Plan
Near Misses # Superintendant N/A 0
Actual
9 Plan
Spills # Superintendant N/A 0
Actual
13 Plan
So2 at Church >.5PPM Mins Superintendant N/A 0
Actual
15 BoilersSo2 Emissions > Plan
# Process Engineer N/A 0
400PPM > 20 Mins
Actual
Number of times Acid
17 Condensate Conductivity Evaporator Plan
# N/A 0
stayed >5,000USCM >15 Supervisor
Actual
Mins
19 South Sewer Ph (out of range Plan
Mins Process Engineer N/A 0
of 6.0 to 9.5 Ph)
Actual
Steam Plant KPIs UOM Accountable Base Target
25 Plan
Natural Gas Consumption* M3 Superintendent N/A 52,000
Actual
27 Assistant Plan
Gas Steam Vented M3
Superintendent
N/A 7,500
Actual
29 Plan
Natural Gas Used Complex* M3 Superintendent N/A 70,000
Actual
31 Mill Lost Production (Spec Cell Plan
Tons Superintendent N/A 17
all reasons)
Actual
2. 33 Assistant Plan
HL Steam Produced (Blr #2) Tons
Superintendent
N/A 600
Actual
35 Assistant Plan
HL Steam Produced (Blr #3) Tons
Superintendent
N/A 600
Actual
37 Assistant Plan
HL Steam Produced (Blr #9) Tons
Superintendent
N/A 2,150
Actual
39 Assistant Plan
HL Burnt BDT
Superintendent
N/A 450
Actual
67 Assistant Plan
Sludge Dryness %
Superintendent
N/A 28%
Actual
41 Assistant Plan
Bark Steam (Blr #4) Tons
Superintendent
N/A 2,200
Actual
69 Assistant Plan
Bark Trucks Dumped #
Superintendent
N/A 24
Actual
43 Assistant Plan
Temcell Steam Production Tons
Superintendent
N/A 40
Actual
45 Assistant Plan
Church Inventory %
Superintendent
50% > 25%
Actual
47 Main Line Low Pressure <750 Assistant Plan
Mins N/A 20
KPA Superintendent
Actual
Evaporators KPIs UOM Accountable Base Target
49 Evaporator Power to Guide Evaporator Plan
% N/A 40%
Vane Ratio Supervisor (R/G)
Actual
51 Evaporator Plan
Spec Cell Liquor Production BDT
Supervisor
N/A 650
Actual
53 Evaporator Plan
Digesters Produced #
Supervisor
N/A 30
Actual
55 Evaporator Plan
HL Production BDT
Supervisor
N/A 600
Actual
3. 57 HW Liquor Evoprated since Evaporator Plan
BDT N/A 7,000
Cleaning Supervisor
Actual
59 Evaporator Plan
Hardwood Liquor Inventory BDT
Supervisor
N/A 900
Actual
61 Evaporator Plan
Soft Wood Liquor Inventory BDT
Supervisor
N/A 450
Actual
Operating Costs UOM Accountable Base Target
63 Plan
Natural Gas Cost $ Superintendent N/A 19,000
Actual
65 Evaporator Plan
Defoamer Cost $
Supervisor
N/A 550
Actual