SlideShare une entreprise Scribd logo
1  sur  38
1
2
Under supervision of
Dr . Mohamed Nabil
This report has been prepared by :
 Mohamed Mohsen Mohamed Hussein
 Mohamed Nabil Ali Kamel
 Mohamed Youssef Mahmoud Youssef
 Ahmed Hamdy Mohamed Hassan
Hollow block & Ribbed slabs
Outlines
■ Introduction.
■ Comparison between different codes.
■ Solved example by different codes.
■ One & two way slab solved example.
■ Effect of cross ribs on deflection.
■ Modeling.
■ Case study.
3
Introduction
 Hollow block and Ribbed slabs are formed by placing blocks on the slab
and concrete ribs.
 In case of hollow block slab voided blocks are placed to reduce the total
weight of the slab .
 In case of ribbed slab the blocks are not permanent.
 The blocks are considered as non-structural element as they do not
contribute to strength of the slab.
 Blocks may be made concrete with lightweight aggregate or other material
as polystyrene ( foam ).
 Types hollow block slab are one way and two way slabs .
4
Introduction
The advantages of Ribbed and Hollow block slabs are as follows:
■ They provide an economical, versatile lightweight monolithic slab system and
this its main advantage reduction of weight by removing the part of the concrete
below the neutral axis.
■ Components are relatively light and no mechanical handling is necessary there
is ease of construction.
 Economic for spans more than 5m with light or moderate live loads, such as
hospitals, office or residential buildings.
5
ACI 318 ECP 203
BS 8110 Euro code 2
Comparison between different codes
6
7
■ Net distance between ribs "e"
shall not exceed 700 mm.
■ Web width "b" shall not be less
than 100 mm or one the third of
depth "t", whichever is greater.
■ Compression slab thickness "ts"
shall not be less than 50 mm or
one Tenth 1/10 of distance "e",
whichever is greater.
Comparison between different codes
Egyptian code (ECP 203)
 Limitations of Hollow block slabs :
8
■ The minimum value of rib width (b) isn't less than 1/4 slab thickness
(t) or 100 mm whichever greater, with taking into account
requirements of concrete cover, distance between bars and fire
requirements
Egyptian code (ECP 203)
■ Distance between ribs axes can be increased up to 1.5 m .
■ Thickness of upper slab is determined by a value not less than e/12 or
50 mm whichever greater.
 Limitations of Ribbed slabs:
9
Comparison between different codes
British code (BS 8110)
 Limitations of Hollow block slabs :
■ Clear distance between ribs (e) not more than 500 mm , jointed
in cement : sand mortar ts is 25 mm.
■ Clear distance between ribs (e) not more than 500 mm not
jointed in cement : sand mortar ts is 30 mm.
■ All other slabs with permanent blocks ts is 40 or one-tenth
1/10 of clear distance between ribs, whichever is great
 Limitations of Ribbed slabs:
Clear distance between ribs not more than 1.5 m ts is 50 mm or one-
tenth of clear distance between ribs, whichever is greater.
t b
e
b
t
b ≤ t/4
Euro code (En2)
■ The rib spacing does not exceed 1500 mm.
■ The depth of the rib below the flange does
not exceed 4 times its width.
■ The depth of the flange is at least 1/10 of
the clear distance between ribs or 50 mm,
whichever is the greater.
■ Transverse ribs are provided at a clear
spacing not exceeding 10 times the overall
depth of the slab.
10
Comparison between different codes
 Limitations of Hollow block slabs :
 Limitations of Ribbed slabs:
■ One limitation will change from ribbed slab The minimum flange
thickness of 50 mm may be reduced to 40 mm.
11
American Concrete Institute (ACI)
■ When permanent filling material
having a unit compressive strength at
least equal to fc′ in the joists are used ts
shall be not less than 1/12 the clear
distance between ribs, nor less than 40
mm.
■ Otherwise ts is not to be less than 1/12
the clear distance between ribs, nor less
than 5.0 cm
■ Ribs are not to be less than 10 cm in
width, and a depth of not more than 3.5
times the minimum web width.
■ Clear spacing between ribs is not to
exceed 75.0 cm
Comparison between different codes
 Limitations of Hollow block slabs & Ribbed slab:
12
Simply sup. L/20 L/20
-----------
L/16
1 end cont. L/25 L/20.8 L/18.5
2 end cont. L/28 ----- L/21
cantilever L/8 L/5.6 L/8
e ≤ 700 mm e ≤ 1500 mm e ≤ 1500 mm e ≤ 750 mm
b ≤ t/4 b ≤ t/4 b ≥ 100 mm
L.L ≤ 3
KN/m2 , Ls>
5
L.L > 3
KN/m2
, Ls→(4:7)
L.L >
7m.
------- If L ≥ 10th.b -------
One X rib One X rib 3 X ribs
Comparison between different codes
13
14
Fcu= 25 N/mm2
Fy= 360 N/mm2
F.C= 1.5 KN/m2
L.L= 3.0 KN/m2
Solved examples by different codes
15
th.b 250 mm 250 mm 250 mm 300
tS 50 mm 50 mm 50 mm 50 mm
h 200 200 200 250
Mu (Kn.m/rib)
19.187 19.187 17.75 23.5
AS 293.30 mm2 255.72 mm2 322.005 mm2 226.67 mm2
Main ribs dim. 100 × 200 mm 100 × 200 mm 100 × 200 mm 100 × 250 mm
Cross ribs No cross ribs No cross ribs One cross rib No cross ribs
Solid part
Short dir. long dir. Short dir. long dir. Short dir. long dir. Short dir. long dir.
0.3 m. 0.3 m. 0.3 m. 0.3 m. 0.25 m. 0.3 m. 0.3 m. 0.3 m.
Conc.
Quantities
2.806 m3 2.806 m3 2.934 m3 3.07 m3
Solved examples by different codes
16
One & two way slab Solved examples
One way
slab
Two way
slab
Fcu= 25 N/mm2
Fy= 360 N/mm2
F.C= 1.5 KN/m2
L.L= 3.0 KN/m2
17
th.b. 320 mm 250 mm
h 250 mm 200 mm
ts 70 mm 50 mm
Mu (KN.m/rib) 45.64
α dir. β dir.
15.68 15.68
As 529.255 mm2/ rib
239.68 mm2/ rib. For α dir.
And 251.09 mm2/ rib. for β dir.
Ribs dim. 0.12 * 0.25 m 0.1 * 0.2 m
NO. of main ribs 11 12
No. of cross ribs 1 12
Conc. quantities 5.6854 m3 5.234 m3
RFT 1017.79 mm2 /m 981.54 mm2/m
One & two way slab Solved examples
It is obvious that the RFT and concrete quantities in the two way hollow
block slab is more economic however the execution of the two way hollow
block slab is harder than the one way hollow block slab.
Effect of cross ribs on deflection
 In The previous example the effect of cross ribs on deflection will be
discussed on sap program.
 At first one cross rib is put in the mid span of the slab.
 Then two cross ribs are put at 1/3 of the span from each side.
18
19
■ Case of one cross rib:
Effect of cross ribs
20
■ Case of two cross rib:
Effect of cross ribs
The two cases have the same deflection value so it is more economic to use one
cross rib at mid span
Modeling

21
22
Modeling
■ Model 1
The ribs are frame elements with cross section as T-section and connected
together with a virtual slab with very small thickness.
23
The moment on the ribs=19.3675 KN.m
24
Modeling
■ Model 2
The ribs are frame elements with cross section as T-section and connected
together with frame elements with cross section as rectangular section .
The moment on the ribs= 19.1793 KN.m
25
Modeling
■ Model 3
The ribs are converted to a thickness on the whole slab and use virtual slab to
connect between elements with very small thickness.
26
The moment on the ribs= 19.0767 KN.m
27
Modeling
■ Model 4
The ribs are represented as frame elements with rectangle section and the
connecting element is frame element with rectangle section.
The moment on the ribs= 19.1555 KN.m
 This table shows the differences between the models and the manual
solution .
28
Manual4321Model
19.187519.155519.076719.179319.3675M (ultimate)
KN .m
Rectangular
section
Rectangular
section
T-sectionT-sectionCross section
of ribs
FramesVirtual slabFramesVirtual slabConnecting
elements
W (rib)On slabW (rib)On slabLoads
0101Self weight
multiplier
Modeling
Case study
 Introduction:
Different case study for hollow block slabs and ribbed slabs.
■ Case 1
29
Ordinary one way hollow block slab
30
Case study
.
31
Case study
■ Case 2
Cantilever hollow block slabs
32
Case study
■ Case 3
Two way hollow block slabs
Ribbed slabs one way and two way ( waffle ) and how the blocks are
placed .
33
Case study
■ Case 4
34
Case study
35
Case study
■ Case 5
In this case foam blocks are used
Clay blocks are used in this case.
36
Case study
■ Case 6
Questions
37
38

Contenu connexe

Tendances

Steel connections
Steel connectionsSteel connections
Steel connectionsbabunaveen
 
Type of structural joints
Type of structural joints Type of structural joints
Type of structural joints Hanzlahakhlaq
 
Raft foundation ppt by kamal bhatia
Raft foundation ppt by kamal bhatiaRaft foundation ppt by kamal bhatia
Raft foundation ppt by kamal bhatiakamal bhatia
 
Composite Concrete-Steel Construction in Tall Buildings by Dr. Naveed
Composite Concrete-Steel Construction in Tall Buildings by Dr. NaveedComposite Concrete-Steel Construction in Tall Buildings by Dr. Naveed
Composite Concrete-Steel Construction in Tall Buildings by Dr. NaveedAIT Solutions
 
Prefabrication types and Applications explained
Prefabrication types and Applications explainedPrefabrication types and Applications explained
Prefabrication types and Applications explainedEyad Reda
 
RCC Elements column, beam.
RCC Elements  column, beam.RCC Elements  column, beam.
RCC Elements column, beam.Puneet Chhonker
 
Beam and slab design
Beam and slab designBeam and slab design
Beam and slab designIvan Ferrer
 
Pre stressed concrete Bridge
Pre stressed concrete BridgePre stressed concrete Bridge
Pre stressed concrete BridgeShubham Das
 
Presentation on MIVAN -- A versatile aluminum formwork construction technique
Presentation on MIVAN -- A versatile aluminum formwork construction techniquePresentation on MIVAN -- A versatile aluminum formwork construction technique
Presentation on MIVAN -- A versatile aluminum formwork construction techniqueIEI GSC
 

Tendances (20)

Underpinning
UnderpinningUnderpinning
Underpinning
 
Steel connections
Steel connectionsSteel connections
Steel connections
 
Type of structural joints
Type of structural joints Type of structural joints
Type of structural joints
 
slab concrete
slab concreteslab concrete
slab concrete
 
Wind load
Wind  loadWind  load
Wind load
 
Shear walls
Shear wallsShear walls
Shear walls
 
Bracing connections
Bracing connectionsBracing connections
Bracing connections
 
Raft foundation ppt by kamal bhatia
Raft foundation ppt by kamal bhatiaRaft foundation ppt by kamal bhatia
Raft foundation ppt by kamal bhatia
 
Retaining Walls
Retaining WallsRetaining Walls
Retaining Walls
 
Tube structures
Tube structuresTube structures
Tube structures
 
Composite Concrete-Steel Construction in Tall Buildings by Dr. Naveed
Composite Concrete-Steel Construction in Tall Buildings by Dr. NaveedComposite Concrete-Steel Construction in Tall Buildings by Dr. Naveed
Composite Concrete-Steel Construction in Tall Buildings by Dr. Naveed
 
Jump Formwork
Jump FormworkJump Formwork
Jump Formwork
 
Prefabrication types and Applications explained
Prefabrication types and Applications explainedPrefabrication types and Applications explained
Prefabrication types and Applications explained
 
RCC Elements column, beam.
RCC Elements  column, beam.RCC Elements  column, beam.
RCC Elements column, beam.
 
Beam and slab design
Beam and slab designBeam and slab design
Beam and slab design
 
Pre stressed concrete Bridge
Pre stressed concrete BridgePre stressed concrete Bridge
Pre stressed concrete Bridge
 
Presentation on MIVAN -- A versatile aluminum formwork construction technique
Presentation on MIVAN -- A versatile aluminum formwork construction techniquePresentation on MIVAN -- A versatile aluminum formwork construction technique
Presentation on MIVAN -- A versatile aluminum formwork construction technique
 
Flat slab ppt
Flat slab pptFlat slab ppt
Flat slab ppt
 
Stairs
StairsStairs
Stairs
 
TALL BUILDINGS
TALL BUILDINGSTALL BUILDINGS
TALL BUILDINGS
 

Similaire à Hollow Block & Ribbed Slab Report Analysis

Lec05 Design of Rectangular Beams with Tension Steel only (Reinforced Concret...
Lec05 Design of Rectangular Beams with Tension Steel only (Reinforced Concret...Lec05 Design of Rectangular Beams with Tension Steel only (Reinforced Concret...
Lec05 Design of Rectangular Beams with Tension Steel only (Reinforced Concret...Hossam Shafiq II
 
Design of two way slabs(d.d.m.)
Design of two way slabs(d.d.m.)Design of two way slabs(d.d.m.)
Design of two way slabs(d.d.m.)Malika khalil
 
Lecture-7-Detailing-PHG-A1-Rev-10-2-Nov-16-Print.pptx
Lecture-7-Detailing-PHG-A1-Rev-10-2-Nov-16-Print.pptxLecture-7-Detailing-PHG-A1-Rev-10-2-Nov-16-Print.pptx
Lecture-7-Detailing-PHG-A1-Rev-10-2-Nov-16-Print.pptxAbelMulugeta8
 
Lecture chapter 1u
Lecture chapter 1uLecture chapter 1u
Lecture chapter 1urgo-amo
 
Top civil engineering Interview questions and Answers
Top civil engineering Interview questions and AnswersTop civil engineering Interview questions and Answers
Top civil engineering Interview questions and AnswersRam N
 
Lec10 Bond and Development Length (Reinforced Concrete Design I & Prof. Abdel...
Lec10 Bond and Development Length (Reinforced Concrete Design I & Prof. Abdel...Lec10 Bond and Development Length (Reinforced Concrete Design I & Prof. Abdel...
Lec10 Bond and Development Length (Reinforced Concrete Design I & Prof. Abdel...Hossam Shafiq II
 
design of steel flyover
design of steel flyoverdesign of steel flyover
design of steel flyoverPeer Mohideen
 
Calulation of deflection and crack width according to is 456 2000
Calulation of deflection and crack width according to is 456 2000Calulation of deflection and crack width according to is 456 2000
Calulation of deflection and crack width according to is 456 2000Vikas Mehta
 
Heron, vol 50, no 2 (2005)
Heron, vol 50, no 2 (2005)Heron, vol 50, no 2 (2005)
Heron, vol 50, no 2 (2005)Ab van den Bos
 
Design of Main Girder [Compatibility Mode].pdf
Design of Main Girder [Compatibility Mode].pdfDesign of Main Girder [Compatibility Mode].pdf
Design of Main Girder [Compatibility Mode].pdfmohamed abdo
 

Similaire à Hollow Block & Ribbed Slab Report Analysis (20)

slab-design.ppt
slab-design.pptslab-design.ppt
slab-design.ppt
 
Lec05 Design of Rectangular Beams with Tension Steel only (Reinforced Concret...
Lec05 Design of Rectangular Beams with Tension Steel only (Reinforced Concret...Lec05 Design of Rectangular Beams with Tension Steel only (Reinforced Concret...
Lec05 Design of Rectangular Beams with Tension Steel only (Reinforced Concret...
 
Design of two way slabs(d.d.m.)
Design of two way slabs(d.d.m.)Design of two way slabs(d.d.m.)
Design of two way slabs(d.d.m.)
 
Lecture-7-Detailing-PHG-A1-Rev-10-2-Nov-16-Print.pptx
Lecture-7-Detailing-PHG-A1-Rev-10-2-Nov-16-Print.pptxLecture-7-Detailing-PHG-A1-Rev-10-2-Nov-16-Print.pptx
Lecture-7-Detailing-PHG-A1-Rev-10-2-Nov-16-Print.pptx
 
0 ne way slab
0 ne way slab0 ne way slab
0 ne way slab
 
Lecture chapter 1u
Lecture chapter 1uLecture chapter 1u
Lecture chapter 1u
 
Composite slab
Composite slabComposite slab
Composite slab
 
gov.bd.bnbc.2012.06.08.pdf
gov.bd.bnbc.2012.06.08.pdfgov.bd.bnbc.2012.06.08.pdf
gov.bd.bnbc.2012.06.08.pdf
 
Top civil engineering Interview questions and Answers
Top civil engineering Interview questions and AnswersTop civil engineering Interview questions and Answers
Top civil engineering Interview questions and Answers
 
Lec10 Bond and Development Length (Reinforced Concrete Design I & Prof. Abdel...
Lec10 Bond and Development Length (Reinforced Concrete Design I & Prof. Abdel...Lec10 Bond and Development Length (Reinforced Concrete Design I & Prof. Abdel...
Lec10 Bond and Development Length (Reinforced Concrete Design I & Prof. Abdel...
 
9793339.ppt
9793339.ppt9793339.ppt
9793339.ppt
 
design of steel flyover
design of steel flyoverdesign of steel flyover
design of steel flyover
 
Rectangular tank
Rectangular tankRectangular tank
Rectangular tank
 
Calulation of deflection and crack width according to is 456 2000
Calulation of deflection and crack width according to is 456 2000Calulation of deflection and crack width according to is 456 2000
Calulation of deflection and crack width according to is 456 2000
 
Design of concrete structure.
Design of concrete structure.Design of concrete structure.
Design of concrete structure.
 
Formwork
FormworkFormwork
Formwork
 
Heron, vol 50, no 2 (2005)
Heron, vol 50, no 2 (2005)Heron, vol 50, no 2 (2005)
Heron, vol 50, no 2 (2005)
 
Design of Main Girder [Compatibility Mode].pdf
Design of Main Girder [Compatibility Mode].pdfDesign of Main Girder [Compatibility Mode].pdf
Design of Main Girder [Compatibility Mode].pdf
 
Unit 5.1 Riveted joints
Unit 5.1 Riveted jointsUnit 5.1 Riveted joints
Unit 5.1 Riveted joints
 
Design and Manufacturing Homework Help
Design and Manufacturing Homework HelpDesign and Manufacturing Homework Help
Design and Manufacturing Homework Help
 

Dernier

The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxLoriGlavin3
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024Stephanie Beckett
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxLoriGlavin3
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenHervé Boutemy
 
Advanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionAdvanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionDilum Bandara
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr BaganFwdays
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyAlfredo García Lavilla
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Mattias Andersson
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfPrecisely
 
What is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfWhat is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfMounikaPolabathina
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsRizwan Syed
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii SoldatenkoFwdays
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsPixlogix Infotech
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxNavinnSomaal
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteDianaGray10
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfAlex Barbosa Coqueiro
 

Dernier (20)

The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptx
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache Maven
 
Advanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionAdvanced Computer Architecture – An Introduction
Advanced Computer Architecture – An Introduction
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easy
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
 
What is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfWhat is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdf
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL Certs
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and Cons
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptx
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test Suite
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdf
 

Hollow Block & Ribbed Slab Report Analysis

  • 1. 1
  • 2. 2 Under supervision of Dr . Mohamed Nabil This report has been prepared by :  Mohamed Mohsen Mohamed Hussein  Mohamed Nabil Ali Kamel  Mohamed Youssef Mahmoud Youssef  Ahmed Hamdy Mohamed Hassan Hollow block & Ribbed slabs
  • 3. Outlines ■ Introduction. ■ Comparison between different codes. ■ Solved example by different codes. ■ One & two way slab solved example. ■ Effect of cross ribs on deflection. ■ Modeling. ■ Case study. 3
  • 4. Introduction  Hollow block and Ribbed slabs are formed by placing blocks on the slab and concrete ribs.  In case of hollow block slab voided blocks are placed to reduce the total weight of the slab .  In case of ribbed slab the blocks are not permanent.  The blocks are considered as non-structural element as they do not contribute to strength of the slab.  Blocks may be made concrete with lightweight aggregate or other material as polystyrene ( foam ).  Types hollow block slab are one way and two way slabs . 4
  • 5. Introduction The advantages of Ribbed and Hollow block slabs are as follows: ■ They provide an economical, versatile lightweight monolithic slab system and this its main advantage reduction of weight by removing the part of the concrete below the neutral axis. ■ Components are relatively light and no mechanical handling is necessary there is ease of construction.  Economic for spans more than 5m with light or moderate live loads, such as hospitals, office or residential buildings. 5
  • 6. ACI 318 ECP 203 BS 8110 Euro code 2 Comparison between different codes 6
  • 7. 7 ■ Net distance between ribs "e" shall not exceed 700 mm. ■ Web width "b" shall not be less than 100 mm or one the third of depth "t", whichever is greater. ■ Compression slab thickness "ts" shall not be less than 50 mm or one Tenth 1/10 of distance "e", whichever is greater. Comparison between different codes Egyptian code (ECP 203)  Limitations of Hollow block slabs :
  • 8. 8 ■ The minimum value of rib width (b) isn't less than 1/4 slab thickness (t) or 100 mm whichever greater, with taking into account requirements of concrete cover, distance between bars and fire requirements Egyptian code (ECP 203) ■ Distance between ribs axes can be increased up to 1.5 m . ■ Thickness of upper slab is determined by a value not less than e/12 or 50 mm whichever greater.  Limitations of Ribbed slabs:
  • 9. 9 Comparison between different codes British code (BS 8110)  Limitations of Hollow block slabs : ■ Clear distance between ribs (e) not more than 500 mm , jointed in cement : sand mortar ts is 25 mm. ■ Clear distance between ribs (e) not more than 500 mm not jointed in cement : sand mortar ts is 30 mm. ■ All other slabs with permanent blocks ts is 40 or one-tenth 1/10 of clear distance between ribs, whichever is great  Limitations of Ribbed slabs: Clear distance between ribs not more than 1.5 m ts is 50 mm or one- tenth of clear distance between ribs, whichever is greater. t b e b t b ≤ t/4
  • 10. Euro code (En2) ■ The rib spacing does not exceed 1500 mm. ■ The depth of the rib below the flange does not exceed 4 times its width. ■ The depth of the flange is at least 1/10 of the clear distance between ribs or 50 mm, whichever is the greater. ■ Transverse ribs are provided at a clear spacing not exceeding 10 times the overall depth of the slab. 10 Comparison between different codes  Limitations of Hollow block slabs :  Limitations of Ribbed slabs: ■ One limitation will change from ribbed slab The minimum flange thickness of 50 mm may be reduced to 40 mm.
  • 11. 11 American Concrete Institute (ACI) ■ When permanent filling material having a unit compressive strength at least equal to fc′ in the joists are used ts shall be not less than 1/12 the clear distance between ribs, nor less than 40 mm. ■ Otherwise ts is not to be less than 1/12 the clear distance between ribs, nor less than 5.0 cm ■ Ribs are not to be less than 10 cm in width, and a depth of not more than 3.5 times the minimum web width. ■ Clear spacing between ribs is not to exceed 75.0 cm Comparison between different codes  Limitations of Hollow block slabs & Ribbed slab:
  • 12. 12 Simply sup. L/20 L/20 ----------- L/16 1 end cont. L/25 L/20.8 L/18.5 2 end cont. L/28 ----- L/21 cantilever L/8 L/5.6 L/8 e ≤ 700 mm e ≤ 1500 mm e ≤ 1500 mm e ≤ 750 mm b ≤ t/4 b ≤ t/4 b ≥ 100 mm L.L ≤ 3 KN/m2 , Ls> 5 L.L > 3 KN/m2 , Ls→(4:7) L.L > 7m. ------- If L ≥ 10th.b ------- One X rib One X rib 3 X ribs Comparison between different codes
  • 13. 13
  • 14. 14 Fcu= 25 N/mm2 Fy= 360 N/mm2 F.C= 1.5 KN/m2 L.L= 3.0 KN/m2 Solved examples by different codes
  • 15. 15 th.b 250 mm 250 mm 250 mm 300 tS 50 mm 50 mm 50 mm 50 mm h 200 200 200 250 Mu (Kn.m/rib) 19.187 19.187 17.75 23.5 AS 293.30 mm2 255.72 mm2 322.005 mm2 226.67 mm2 Main ribs dim. 100 × 200 mm 100 × 200 mm 100 × 200 mm 100 × 250 mm Cross ribs No cross ribs No cross ribs One cross rib No cross ribs Solid part Short dir. long dir. Short dir. long dir. Short dir. long dir. Short dir. long dir. 0.3 m. 0.3 m. 0.3 m. 0.3 m. 0.25 m. 0.3 m. 0.3 m. 0.3 m. Conc. Quantities 2.806 m3 2.806 m3 2.934 m3 3.07 m3 Solved examples by different codes
  • 16. 16 One & two way slab Solved examples One way slab Two way slab Fcu= 25 N/mm2 Fy= 360 N/mm2 F.C= 1.5 KN/m2 L.L= 3.0 KN/m2
  • 17. 17 th.b. 320 mm 250 mm h 250 mm 200 mm ts 70 mm 50 mm Mu (KN.m/rib) 45.64 α dir. β dir. 15.68 15.68 As 529.255 mm2/ rib 239.68 mm2/ rib. For α dir. And 251.09 mm2/ rib. for β dir. Ribs dim. 0.12 * 0.25 m 0.1 * 0.2 m NO. of main ribs 11 12 No. of cross ribs 1 12 Conc. quantities 5.6854 m3 5.234 m3 RFT 1017.79 mm2 /m 981.54 mm2/m One & two way slab Solved examples It is obvious that the RFT and concrete quantities in the two way hollow block slab is more economic however the execution of the two way hollow block slab is harder than the one way hollow block slab.
  • 18. Effect of cross ribs on deflection  In The previous example the effect of cross ribs on deflection will be discussed on sap program.  At first one cross rib is put in the mid span of the slab.  Then two cross ribs are put at 1/3 of the span from each side. 18
  • 19. 19 ■ Case of one cross rib: Effect of cross ribs
  • 20. 20 ■ Case of two cross rib: Effect of cross ribs The two cases have the same deflection value so it is more economic to use one cross rib at mid span
  • 22. 22 Modeling ■ Model 1 The ribs are frame elements with cross section as T-section and connected together with a virtual slab with very small thickness.
  • 23. 23 The moment on the ribs=19.3675 KN.m
  • 24. 24 Modeling ■ Model 2 The ribs are frame elements with cross section as T-section and connected together with frame elements with cross section as rectangular section . The moment on the ribs= 19.1793 KN.m
  • 25. 25 Modeling ■ Model 3 The ribs are converted to a thickness on the whole slab and use virtual slab to connect between elements with very small thickness.
  • 26. 26 The moment on the ribs= 19.0767 KN.m
  • 27. 27 Modeling ■ Model 4 The ribs are represented as frame elements with rectangle section and the connecting element is frame element with rectangle section. The moment on the ribs= 19.1555 KN.m
  • 28.  This table shows the differences between the models and the manual solution . 28 Manual4321Model 19.187519.155519.076719.179319.3675M (ultimate) KN .m Rectangular section Rectangular section T-sectionT-sectionCross section of ribs FramesVirtual slabFramesVirtual slabConnecting elements W (rib)On slabW (rib)On slabLoads 0101Self weight multiplier Modeling
  • 29. Case study  Introduction: Different case study for hollow block slabs and ribbed slabs. ■ Case 1 29 Ordinary one way hollow block slab
  • 31. . 31 Case study ■ Case 2 Cantilever hollow block slabs
  • 32. 32 Case study ■ Case 3 Two way hollow block slabs
  • 33. Ribbed slabs one way and two way ( waffle ) and how the blocks are placed . 33 Case study ■ Case 4
  • 35. 35 Case study ■ Case 5 In this case foam blocks are used
  • 36. Clay blocks are used in this case. 36 Case study ■ Case 6
  • 38. 38