SlideShare une entreprise Scribd logo
1  sur  22
Area       :   538,117 square meters

Location   :   Pasong Kawayan II,
               General Trias,Cavite
Land Owner             :   Province of Cavite
Developer/Contractor   :   R-II Builders, Inc
Buyers’ Financing      : Pag-IBIG

Overall Coordinator    : HUDCC
Pamayanang Maliksi – Cavite Mass Housing Project is a
socialized housing project intended primarily to answer
the housing backlog of the Province.

This 53-hectare property with relatively flat and gently
rolling slopes is clustered into 5 phases wherein duplex
and single attached units will house about 5,000 qualified
families.

Each phase has its own Multipurpose Hall and strip of
commercial spaces.
Distance in                               Distance in
   Economic Centers      Km. Radius         Economic Zones         Km. Radius
Public Market               7.50       EPZA                           8.00
Talipapa                    3.00       First Cavite Industrial
Walter Mart                12.00       Economic Zone                 15.00

McDonalds                   8.00       Gateway                       15.00

Jollibee                    7.50       Trece City Hall                7.50

Elementary/High School      2.00       Provincial Capitol             7.50

College                     7.50       Tanza, Cavite Town Proper      8.00
                                       St. Jude Chapel                7.50
• Concrete paved roads
     Main Road         : 15.0 meters
     Secondary Road : 10.0 meters
     Alleys            : 6.5 meters
• Centralized water distribution system
• Underground drainage system
• Meralco-supplied power facility
• Commercial strip along main road
Provisions for the following amenities:
  • Commercial areas
  • Health Centers
  • Elementary and High School
  • Village Centers
  • Parks and playgrounds
Estate Management          -   R-II Builders, Inc.
Garbage Collection         -   Mun. Gov’t of Gen. Trias
Right of Way                   -       Province of Cavite
Alternative Access Rd      -   Province of Cavite
Livelihood Training        -   Province of Cavite
Funding Support for
 Livelihood training        -   R-II Builders (seed fund)
Public School              -   Province of Cavite
 (Elementary & High school)
Transportation             -   Province of Cavite
  (Multicabs)
Phase 2                Phase 4               Phase 5
Roads              70.0%                  30.0%                  100%
Drainage           75.0%                  90.0%                  100%
Water Line
                   75.0%                  90.0%                  100%
Power         Applied with Meralco   Applied with Meralco   On going erection of
(MERALCO)                                                    MERALCO poles

Amenities
(Clubhouse)     Dec. 2010               June 2011                100%
Single Attached                    Duplex Type
LA: 64sqm FA: 30sqm                LA: 48sqm FA: 22.5sqm
 P470,000/unit                     P350,000/unit
  P2,870.00 monthly                  P2,150.00 monthly
  (for 25 years with Pag-IBIG)       (for 25 years with Pag-IBIG)
 Inclusive of Miscellaneous Fee    Inclusive of Miscellaneous Fee
  (MF) – P70,000.00
                                     (MF) – P50,000.00
 Reservation Fee – P7,000.00
                                    Reservation Fee – P5,000.00
  (non refundable but deductible     (non refundable but deductible
  from the MF)
                                     from the MF)
Single Attached
Model Unit
Net of Tax

6% - 0-20 units      7.5%
6.25 – 21-39 units   8%
6.5% - 40-50 units   8.5%
Option Incentive
   1                  Option Incentive-Quarterly

        SALES VALUE                 # of Units     Cash Incentive
         10,000,000                     25                10,000.00
         15,000,000                    37.5               15,000.00
         20,000,000                     50                20,000.00
         25,000,000                    62.5               25,000.00
         30,000,000                     75                30,000.00
         35,000,000                    87.5               35,000.00
         40,000,000                    100                40,000.00
                                       438                  175,000
                        Average Cost Per Unit                400.00
Option Incentive
                                                           ANNUAL GRAND RAFFLE
                                                                                                         No. of Tickets
                                                                                                                    (AGENTS/
                Unit Type                                     DP terms                             (BROKERS)         SELLER)
                                                             Spot: 90-Day                              5                1
                                                                6 mos                                  4                1
            single attached
                                                                9 mos                                  3                1
                                                               12 mos.                                 2                1
                                                             Spot: 90-Day                              4                1
                                                                6 mos                                  3                1
                  duplex
                                                                9 mos                                  2                1
                                                               12 mos.                                 1                1

  Prizes at stake                                                                                              Budget
  a.       Cellular Phone                                                                                          6,000.00
  b.       DVD Player                                                                                              2,500.00
  c.       24” Flat Colored Television                                                                            10,000.00
  d.       Microwave Oven                                                                                          4,500.00
  e.       Turbo Broiler                                                                                           5,000.00
  f.        Gas Range                                                                                              5,000.00
  g.       Magic Sing                                                                                             15,000.00
  h.       Personal Refrigerator                                                                                  15,000.00
  i.         Trip for 2 to Boracay (Airfare & Hotel Accommodation) plus Php2, 000.00 cash allowance.              20,000.00
  j.         Trip for 2 to Bohol (Airfare & Hotel Accommodation) plus Php2, 000.00 cash allowance.                20,000.00
  k.       Trip for 2 to HongKong (Airfare & Hotel Accommodation) (3days 2 nights)                                50,000.00

                                                                                                       TOTAL     153,000.00
Quarterly Cumulative Take Out
 3                         QUARTERLY CUMULATIVE TAKE OUT

      Accumulated Paid-up Value           # of Units            Cash Incentive
             20,000,000                       50                       20,000.00
             10,000,000                       25                       10,000.00
              5,000,000                      12.5                       5,000.00
                                              88                       35,000.00
     Average                                           400.00
Annual Cumulative Take Out
 4                           ANNUAL CUMULATIVE TAKE OUT

               SALES VALUE               Cash Incentive            # of Units
                20,000,000                 30,000.00                   50
                25,000,000                 37,500.00                  62.5
                30,000,000                 45,000.00                   75
                35,000,000                 52,500.00                  87.5
                40,000,000                 60,000.00                  100
                                            225,000                        375.00
     Average                                              600.00

Contenu connexe

Tendances

Presentation by GWP Chair Dr Letitia A Obeng at the conference "Water Securit...
Presentation by GWP Chair Dr Letitia A Obeng at the conference "Water Securit...Presentation by GWP Chair Dr Letitia A Obeng at the conference "Water Securit...
Presentation by GWP Chair Dr Letitia A Obeng at the conference "Water Securit...Global Water Partnership
 
GFN Investor Presentation12-12-11
GFN Investor Presentation12-12-11GFN Investor Presentation12-12-11
GFN Investor Presentation12-12-11Pac-Van, Inc.
 
Musgrove mwmg07022013final
Musgrove mwmg07022013finalMusgrove mwmg07022013final
Musgrove mwmg07022013finalGrant Musgrove
 
IDP Statistics for KP and FATA (2012 December, UNHCR)
IDP Statistics for KP and FATA (2012 December, UNHCR)IDP Statistics for KP and FATA (2012 December, UNHCR)
IDP Statistics for KP and FATA (2012 December, UNHCR)fatanews
 
Creuna_Frukostseminarie_15_02_2011
Creuna_Frukostseminarie_15_02_2011Creuna_Frukostseminarie_15_02_2011
Creuna_Frukostseminarie_15_02_2011Martin Deinoff
 

Tendances (7)

Presentation by GWP Chair Dr Letitia A Obeng at the conference "Water Securit...
Presentation by GWP Chair Dr Letitia A Obeng at the conference "Water Securit...Presentation by GWP Chair Dr Letitia A Obeng at the conference "Water Securit...
Presentation by GWP Chair Dr Letitia A Obeng at the conference "Water Securit...
 
GFN Investor Presentation12-12-11
GFN Investor Presentation12-12-11GFN Investor Presentation12-12-11
GFN Investor Presentation12-12-11
 
Musgrove mwmg07022013final
Musgrove mwmg07022013finalMusgrove mwmg07022013final
Musgrove mwmg07022013final
 
MSc Thesis
MSc ThesisMSc Thesis
MSc Thesis
 
IDP Statistics for KP and FATA (2012 December, UNHCR)
IDP Statistics for KP and FATA (2012 December, UNHCR)IDP Statistics for KP and FATA (2012 December, UNHCR)
IDP Statistics for KP and FATA (2012 December, UNHCR)
 
Nisqually Thin Project
Nisqually Thin ProjectNisqually Thin Project
Nisqually Thin Project
 
Creuna_Frukostseminarie_15_02_2011
Creuna_Frukostseminarie_15_02_2011Creuna_Frukostseminarie_15_02_2011
Creuna_Frukostseminarie_15_02_2011
 

Similaire à Pm presentation 001

Earnings release 3 q09 presentation
Earnings release 3 q09 presentationEarnings release 3 q09 presentation
Earnings release 3 q09 presentationBrasilEcodiesel
 
Case study - improving marketing ROI at Universal Music through Artificial In...
Case study - improving marketing ROI at Universal Music through Artificial In...Case study - improving marketing ROI at Universal Music through Artificial In...
Case study - improving marketing ROI at Universal Music through Artificial In...Robert Shaw
 
Stormwater Financing Mechanisms- Charlotte Katzenmoyer
Stormwater Financing Mechanisms- Charlotte KatzenmoyerStormwater Financing Mechanisms- Charlotte Katzenmoyer
Stormwater Financing Mechanisms- Charlotte KatzenmoyerCleanH2O
 
Weaving Dreams
Weaving DreamsWeaving Dreams
Weaving Dreamsrogel84
 
Edgar's power point
Edgar's power pointEdgar's power point
Edgar's power pointEdgar_Rios
 
Lesson 8 charts presentation
Lesson 8 charts presentationLesson 8 charts presentation
Lesson 8 charts presentationMonica-Gomez
 
4 eco tourism development2012
4 eco tourism development20124 eco tourism development2012
4 eco tourism development2012Samuel Hernandez
 
Legends sun presentation (final) 8-7-08
Legends sun presentation (final)   8-7-08Legends sun presentation (final)   8-7-08
Legends sun presentation (final) 8-7-08krgc
 
3. Seastar 6.5ha Construction Cost Data
3. Seastar 6.5ha   Construction Cost Data3. Seastar 6.5ha   Construction Cost Data
3. Seastar 6.5ha Construction Cost Dataericbali
 
Apresentacao aes eletropaulo_1_t12_sem discurso_eng_final
Apresentacao aes eletropaulo_1_t12_sem discurso_eng_finalApresentacao aes eletropaulo_1_t12_sem discurso_eng_final
Apresentacao aes eletropaulo_1_t12_sem discurso_eng_finalAES Eletropaulo
 
Calpine2Q08_Earnings_Presentation_vFINAL
Calpine2Q08_Earnings_Presentation_vFINALCalpine2Q08_Earnings_Presentation_vFINAL
Calpine2Q08_Earnings_Presentation_vFINALfinance29
 
Calpine2Q08_Earnings_Presentation_vFINAL
Calpine2Q08_Earnings_Presentation_vFINALCalpine2Q08_Earnings_Presentation_vFINAL
Calpine2Q08_Earnings_Presentation_vFINALfinance29
 

Similaire à Pm presentation 001 (20)

Pamayanang Maliksi
Pamayanang Maliksi Pamayanang Maliksi
Pamayanang Maliksi
 
Earnings release 3 q09 presentation
Earnings release 3 q09 presentationEarnings release 3 q09 presentation
Earnings release 3 q09 presentation
 
Case study - improving marketing ROI at Universal Music through Artificial In...
Case study - improving marketing ROI at Universal Music through Artificial In...Case study - improving marketing ROI at Universal Music through Artificial In...
Case study - improving marketing ROI at Universal Music through Artificial In...
 
Stormwater Financing Mechanisms- Charlotte Katzenmoyer
Stormwater Financing Mechanisms- Charlotte KatzenmoyerStormwater Financing Mechanisms- Charlotte Katzenmoyer
Stormwater Financing Mechanisms- Charlotte Katzenmoyer
 
Weaving Dreams
Weaving DreamsWeaving Dreams
Weaving Dreams
 
Edgar's power point
Edgar's power pointEdgar's power point
Edgar's power point
 
Lesson 8 charts presentation
Lesson 8 charts presentationLesson 8 charts presentation
Lesson 8 charts presentation
 
Lac timesheet 03 15-11
Lac timesheet 03 15-11Lac timesheet 03 15-11
Lac timesheet 03 15-11
 
Lac timesheet 04 15-11
Lac timesheet 04 15-11Lac timesheet 04 15-11
Lac timesheet 04 15-11
 
Win presentation
Win presentationWin presentation
Win presentation
 
Lac timesheet 02 15-11
Lac timesheet 02 15-11Lac timesheet 02 15-11
Lac timesheet 02 15-11
 
Lac timesheet 03 31-11
Lac timesheet 03 31-11Lac timesheet 03 31-11
Lac timesheet 03 31-11
 
4 eco tourism development2012
4 eco tourism development20124 eco tourism development2012
4 eco tourism development2012
 
Excel charts
Excel chartsExcel charts
Excel charts
 
Legends sun presentation (final) 8-7-08
Legends sun presentation (final)   8-7-08Legends sun presentation (final)   8-7-08
Legends sun presentation (final) 8-7-08
 
2 q11
2 q112 q11
2 q11
 
3. Seastar 6.5ha Construction Cost Data
3. Seastar 6.5ha   Construction Cost Data3. Seastar 6.5ha   Construction Cost Data
3. Seastar 6.5ha Construction Cost Data
 
Apresentacao aes eletropaulo_1_t12_sem discurso_eng_final
Apresentacao aes eletropaulo_1_t12_sem discurso_eng_finalApresentacao aes eletropaulo_1_t12_sem discurso_eng_final
Apresentacao aes eletropaulo_1_t12_sem discurso_eng_final
 
Calpine2Q08_Earnings_Presentation_vFINAL
Calpine2Q08_Earnings_Presentation_vFINALCalpine2Q08_Earnings_Presentation_vFINAL
Calpine2Q08_Earnings_Presentation_vFINAL
 
Calpine2Q08_Earnings_Presentation_vFINAL
Calpine2Q08_Earnings_Presentation_vFINALCalpine2Q08_Earnings_Presentation_vFINAL
Calpine2Q08_Earnings_Presentation_vFINAL
 

Dernier

LCAR RE Practice - The Power of Your Database
LCAR RE Practice - The Power of Your DatabaseLCAR RE Practice - The Power of Your Database
LCAR RE Practice - The Power of Your DatabaseTom Blefko
 
Seller Seminar Presentation With A Realtor
Seller Seminar  Presentation With A RealtorSeller Seminar  Presentation With A Realtor
Seller Seminar Presentation With A Realtorcarlsbadheather
 
Triaa Housing Lohegaon Pune E-Brochure.pdf
Triaa Housing Lohegaon Pune  E-Brochure.pdfTriaa Housing Lohegaon Pune  E-Brochure.pdf
Triaa Housing Lohegaon Pune E-Brochure.pdfManishSaxena95
 
LCAR Unit 19 - Financing the Real Estate Transaction - 14th Edition Revised
LCAR Unit 19 - Financing the Real Estate Transaction - 14th Edition RevisedLCAR Unit 19 - Financing the Real Estate Transaction - 14th Edition Revised
LCAR Unit 19 - Financing the Real Estate Transaction - 14th Edition RevisedTom Blefko
 
Purva BlueBelle Magadi Road Bangalore.pdf.pdf
Purva BlueBelle Magadi Road Bangalore.pdf.pdfPurva BlueBelle Magadi Road Bangalore.pdf.pdf
Purva BlueBelle Magadi Road Bangalore.pdf.pdfkratirudram
 
_Purva Blubelle Magadi Road E-Brochure.pdf
_Purva Blubelle Magadi Road E-Brochure.pdf_Purva Blubelle Magadi Road E-Brochure.pdf
_Purva Blubelle Magadi Road E-Brochure.pdffaheemali990101
 
Listing Turkey - Resim Modern Catalog Istanbul
Listing Turkey - Resim Modern Catalog IstanbulListing Turkey - Resim Modern Catalog Istanbul
Listing Turkey - Resim Modern Catalog IstanbulListing Turkey
 
Lancaster Market Expenses and Company Worksheet
Lancaster Market Expenses and Company WorksheetLancaster Market Expenses and Company Worksheet
Lancaster Market Expenses and Company WorksheetTom Blefko
 
Managing Uncertainty: Newman George Leech's Real Estate Finance Strategy
Managing Uncertainty: Newman George Leech's Real Estate Finance StrategyManaging Uncertainty: Newman George Leech's Real Estate Finance Strategy
Managing Uncertainty: Newman George Leech's Real Estate Finance StrategyNewman George Leech
 
Saheel ITREND Futura At Baner Annexe Pune - PDF.pdf
Saheel ITREND Futura At Baner Annexe Pune - PDF.pdfSaheel ITREND Futura At Baner Annexe Pune - PDF.pdf
Saheel ITREND Futura At Baner Annexe Pune - PDF.pdfmonikasharma630
 
Listing Turkey Green life Istanbul Eyup Catalog
Listing Turkey Green life Istanbul Eyup CatalogListing Turkey Green life Istanbul Eyup Catalog
Listing Turkey Green life Istanbul Eyup CatalogListing Turkey
 
Kohinoor Hinjewadi Phase 2 In Pune - PDF.pdf
Kohinoor Hinjewadi Phase 2 In Pune - PDF.pdfKohinoor Hinjewadi Phase 2 In Pune - PDF.pdf
Kohinoor Hinjewadi Phase 2 In Pune - PDF.pdfmonikasharma630
 
Experion Elements Phase 1 Noida E-Brochure
Experion Elements Phase 1 Noida E-BrochureExperion Elements Phase 1 Noida E-Brochure
Experion Elements Phase 1 Noida E-BrochureRealEstate Info
 
What is Affordable Housing? Bristol Civic Society April 2024
What is Affordable Housing? Bristol Civic Society April 2024What is Affordable Housing? Bristol Civic Society April 2024
What is Affordable Housing? Bristol Civic Society April 2024Paul Smith
 
Ganga Fusion 85 Gurugram - PDF Download.pdf
Ganga Fusion 85 Gurugram - PDF Download.pdfGanga Fusion 85 Gurugram - PDF Download.pdf
Ganga Fusion 85 Gurugram - PDF Download.pdfanjalisaini334541
 
It’s Time to Fight Back Against the Media Narrative Regarding Real Estate Com...
It’s Time to Fight Back Against the Media Narrative Regarding Real Estate Com...It’s Time to Fight Back Against the Media Narrative Regarding Real Estate Com...
It’s Time to Fight Back Against the Media Narrative Regarding Real Estate Com...Tom Blefko
 
Shapoorji Pallonji Parkwest Sequoia Tower Binnypet, Central Bangalore E - Bro...
Shapoorji Pallonji Parkwest Sequoia Tower Binnypet, Central Bangalore E - Bro...Shapoorji Pallonji Parkwest Sequoia Tower Binnypet, Central Bangalore E - Bro...
Shapoorji Pallonji Parkwest Sequoia Tower Binnypet, Central Bangalore E - Bro...faheemali990101
 
JP Codename Lottery Thane - Virtual Tour, Pricing, Pros&Cons.
JP Codename Lottery Thane - Virtual Tour, Pricing, Pros&Cons.JP Codename Lottery Thane - Virtual Tour, Pricing, Pros&Cons.
JP Codename Lottery Thane - Virtual Tour, Pricing, Pros&Cons.Housiey
 
Prestige Orchards Plots in Shamshabad, Mamidipalli, Hyderabad pdf.pdf
Prestige Orchards Plots in Shamshabad, Mamidipalli, Hyderabad pdf.pdfPrestige Orchards Plots in Shamshabad, Mamidipalli, Hyderabad pdf.pdf
Prestige Orchards Plots in Shamshabad, Mamidipalli, Hyderabad pdf.pdfAhanundefined
 
SVN Live 4.15.24 Weekly Property Broadcast
SVN Live 4.15.24 Weekly Property BroadcastSVN Live 4.15.24 Weekly Property Broadcast
SVN Live 4.15.24 Weekly Property BroadcastSVN International Corp.
 

Dernier (20)

LCAR RE Practice - The Power of Your Database
LCAR RE Practice - The Power of Your DatabaseLCAR RE Practice - The Power of Your Database
LCAR RE Practice - The Power of Your Database
 
Seller Seminar Presentation With A Realtor
Seller Seminar  Presentation With A RealtorSeller Seminar  Presentation With A Realtor
Seller Seminar Presentation With A Realtor
 
Triaa Housing Lohegaon Pune E-Brochure.pdf
Triaa Housing Lohegaon Pune  E-Brochure.pdfTriaa Housing Lohegaon Pune  E-Brochure.pdf
Triaa Housing Lohegaon Pune E-Brochure.pdf
 
LCAR Unit 19 - Financing the Real Estate Transaction - 14th Edition Revised
LCAR Unit 19 - Financing the Real Estate Transaction - 14th Edition RevisedLCAR Unit 19 - Financing the Real Estate Transaction - 14th Edition Revised
LCAR Unit 19 - Financing the Real Estate Transaction - 14th Edition Revised
 
Purva BlueBelle Magadi Road Bangalore.pdf.pdf
Purva BlueBelle Magadi Road Bangalore.pdf.pdfPurva BlueBelle Magadi Road Bangalore.pdf.pdf
Purva BlueBelle Magadi Road Bangalore.pdf.pdf
 
_Purva Blubelle Magadi Road E-Brochure.pdf
_Purva Blubelle Magadi Road E-Brochure.pdf_Purva Blubelle Magadi Road E-Brochure.pdf
_Purva Blubelle Magadi Road E-Brochure.pdf
 
Listing Turkey - Resim Modern Catalog Istanbul
Listing Turkey - Resim Modern Catalog IstanbulListing Turkey - Resim Modern Catalog Istanbul
Listing Turkey - Resim Modern Catalog Istanbul
 
Lancaster Market Expenses and Company Worksheet
Lancaster Market Expenses and Company WorksheetLancaster Market Expenses and Company Worksheet
Lancaster Market Expenses and Company Worksheet
 
Managing Uncertainty: Newman George Leech's Real Estate Finance Strategy
Managing Uncertainty: Newman George Leech's Real Estate Finance StrategyManaging Uncertainty: Newman George Leech's Real Estate Finance Strategy
Managing Uncertainty: Newman George Leech's Real Estate Finance Strategy
 
Saheel ITREND Futura At Baner Annexe Pune - PDF.pdf
Saheel ITREND Futura At Baner Annexe Pune - PDF.pdfSaheel ITREND Futura At Baner Annexe Pune - PDF.pdf
Saheel ITREND Futura At Baner Annexe Pune - PDF.pdf
 
Listing Turkey Green life Istanbul Eyup Catalog
Listing Turkey Green life Istanbul Eyup CatalogListing Turkey Green life Istanbul Eyup Catalog
Listing Turkey Green life Istanbul Eyup Catalog
 
Kohinoor Hinjewadi Phase 2 In Pune - PDF.pdf
Kohinoor Hinjewadi Phase 2 In Pune - PDF.pdfKohinoor Hinjewadi Phase 2 In Pune - PDF.pdf
Kohinoor Hinjewadi Phase 2 In Pune - PDF.pdf
 
Experion Elements Phase 1 Noida E-Brochure
Experion Elements Phase 1 Noida E-BrochureExperion Elements Phase 1 Noida E-Brochure
Experion Elements Phase 1 Noida E-Brochure
 
What is Affordable Housing? Bristol Civic Society April 2024
What is Affordable Housing? Bristol Civic Society April 2024What is Affordable Housing? Bristol Civic Society April 2024
What is Affordable Housing? Bristol Civic Society April 2024
 
Ganga Fusion 85 Gurugram - PDF Download.pdf
Ganga Fusion 85 Gurugram - PDF Download.pdfGanga Fusion 85 Gurugram - PDF Download.pdf
Ganga Fusion 85 Gurugram - PDF Download.pdf
 
It’s Time to Fight Back Against the Media Narrative Regarding Real Estate Com...
It’s Time to Fight Back Against the Media Narrative Regarding Real Estate Com...It’s Time to Fight Back Against the Media Narrative Regarding Real Estate Com...
It’s Time to Fight Back Against the Media Narrative Regarding Real Estate Com...
 
Shapoorji Pallonji Parkwest Sequoia Tower Binnypet, Central Bangalore E - Bro...
Shapoorji Pallonji Parkwest Sequoia Tower Binnypet, Central Bangalore E - Bro...Shapoorji Pallonji Parkwest Sequoia Tower Binnypet, Central Bangalore E - Bro...
Shapoorji Pallonji Parkwest Sequoia Tower Binnypet, Central Bangalore E - Bro...
 
JP Codename Lottery Thane - Virtual Tour, Pricing, Pros&Cons.
JP Codename Lottery Thane - Virtual Tour, Pricing, Pros&Cons.JP Codename Lottery Thane - Virtual Tour, Pricing, Pros&Cons.
JP Codename Lottery Thane - Virtual Tour, Pricing, Pros&Cons.
 
Prestige Orchards Plots in Shamshabad, Mamidipalli, Hyderabad pdf.pdf
Prestige Orchards Plots in Shamshabad, Mamidipalli, Hyderabad pdf.pdfPrestige Orchards Plots in Shamshabad, Mamidipalli, Hyderabad pdf.pdf
Prestige Orchards Plots in Shamshabad, Mamidipalli, Hyderabad pdf.pdf
 
SVN Live 4.15.24 Weekly Property Broadcast
SVN Live 4.15.24 Weekly Property BroadcastSVN Live 4.15.24 Weekly Property Broadcast
SVN Live 4.15.24 Weekly Property Broadcast
 

Pm presentation 001

  • 1.
  • 2. Area : 538,117 square meters Location : Pasong Kawayan II, General Trias,Cavite
  • 3. Land Owner : Province of Cavite Developer/Contractor : R-II Builders, Inc Buyers’ Financing : Pag-IBIG Overall Coordinator : HUDCC
  • 4. Pamayanang Maliksi – Cavite Mass Housing Project is a socialized housing project intended primarily to answer the housing backlog of the Province. This 53-hectare property with relatively flat and gently rolling slopes is clustered into 5 phases wherein duplex and single attached units will house about 5,000 qualified families. Each phase has its own Multipurpose Hall and strip of commercial spaces.
  • 5.
  • 6. Distance in Distance in Economic Centers Km. Radius Economic Zones Km. Radius Public Market 7.50 EPZA 8.00 Talipapa 3.00 First Cavite Industrial Walter Mart 12.00 Economic Zone 15.00 McDonalds 8.00 Gateway 15.00 Jollibee 7.50 Trece City Hall 7.50 Elementary/High School 2.00 Provincial Capitol 7.50 College 7.50 Tanza, Cavite Town Proper 8.00 St. Jude Chapel 7.50
  • 7.
  • 8. • Concrete paved roads Main Road : 15.0 meters Secondary Road : 10.0 meters Alleys : 6.5 meters • Centralized water distribution system • Underground drainage system • Meralco-supplied power facility • Commercial strip along main road
  • 9. Provisions for the following amenities: • Commercial areas • Health Centers • Elementary and High School • Village Centers • Parks and playgrounds
  • 10. Estate Management - R-II Builders, Inc. Garbage Collection - Mun. Gov’t of Gen. Trias Right of Way - Province of Cavite Alternative Access Rd - Province of Cavite Livelihood Training - Province of Cavite Funding Support for Livelihood training - R-II Builders (seed fund) Public School - Province of Cavite (Elementary & High school) Transportation - Province of Cavite (Multicabs)
  • 11. Phase 2 Phase 4 Phase 5 Roads 70.0% 30.0% 100% Drainage 75.0% 90.0% 100% Water Line 75.0% 90.0% 100% Power Applied with Meralco Applied with Meralco On going erection of (MERALCO) MERALCO poles Amenities (Clubhouse) Dec. 2010 June 2011 100%
  • 12. Single Attached Duplex Type LA: 64sqm FA: 30sqm LA: 48sqm FA: 22.5sqm  P470,000/unit  P350,000/unit P2,870.00 monthly P2,150.00 monthly (for 25 years with Pag-IBIG) (for 25 years with Pag-IBIG)  Inclusive of Miscellaneous Fee  Inclusive of Miscellaneous Fee (MF) – P70,000.00 (MF) – P50,000.00  Reservation Fee – P7,000.00  Reservation Fee – P5,000.00 (non refundable but deductible (non refundable but deductible from the MF) from the MF)
  • 13.
  • 15.
  • 16.
  • 17.
  • 18. Net of Tax 6% - 0-20 units 7.5% 6.25 – 21-39 units 8% 6.5% - 40-50 units 8.5%
  • 19. Option Incentive 1 Option Incentive-Quarterly SALES VALUE # of Units Cash Incentive 10,000,000 25 10,000.00 15,000,000 37.5 15,000.00 20,000,000 50 20,000.00 25,000,000 62.5 25,000.00 30,000,000 75 30,000.00 35,000,000 87.5 35,000.00 40,000,000 100 40,000.00 438 175,000 Average Cost Per Unit 400.00
  • 20. Option Incentive ANNUAL GRAND RAFFLE No. of Tickets (AGENTS/ Unit Type DP terms (BROKERS) SELLER) Spot: 90-Day 5 1 6 mos 4 1 single attached 9 mos 3 1 12 mos. 2 1 Spot: 90-Day 4 1 6 mos 3 1 duplex 9 mos 2 1 12 mos. 1 1 Prizes at stake Budget a.       Cellular Phone 6,000.00 b.       DVD Player 2,500.00 c.       24” Flat Colored Television 10,000.00 d.       Microwave Oven 4,500.00 e.       Turbo Broiler 5,000.00 f.        Gas Range 5,000.00 g.       Magic Sing 15,000.00 h.       Personal Refrigerator 15,000.00 i.         Trip for 2 to Boracay (Airfare & Hotel Accommodation) plus Php2, 000.00 cash allowance. 20,000.00 j.         Trip for 2 to Bohol (Airfare & Hotel Accommodation) plus Php2, 000.00 cash allowance. 20,000.00 k.       Trip for 2 to HongKong (Airfare & Hotel Accommodation) (3days 2 nights) 50,000.00 TOTAL 153,000.00
  • 21. Quarterly Cumulative Take Out 3 QUARTERLY CUMULATIVE TAKE OUT Accumulated Paid-up Value # of Units Cash Incentive 20,000,000 50 20,000.00 10,000,000 25 10,000.00 5,000,000 12.5 5,000.00 88 35,000.00 Average 400.00
  • 22. Annual Cumulative Take Out 4 ANNUAL CUMULATIVE TAKE OUT SALES VALUE Cash Incentive # of Units 20,000,000 30,000.00 50 25,000,000 37,500.00 62.5 30,000,000 45,000.00 75 35,000,000 52,500.00 87.5 40,000,000 60,000.00 100 225,000 375.00 Average 600.00