SlideShare une entreprise Scribd logo
1  sur  104
Télécharger pour lire hors ligne
GROWING GREEN INFRASTRUCTURE:
    how to create high-performance
      landscapes and healthy cities




    Nate Cormier, ASLA, LEED AP
    Senior Landscape Architect
    SvR Design Company
GI layers and elements




1. WHAT IS GREEN INFRASTRUCTURE?
Introduction




what is green infrastructure?
Introduction




                                +




nature provides valuable ecological services for urban environments
Introduction
                                                      King County Greenprint




Open Space Seattle 2100




  green infrastructure is a tapestry of open space in and around a city
Minneapolis’s Grand Rounds


                            Introduction




Boston’s Emerald Necklace

                    green infrastructure is not a new idea
Introduction


Mercer Slough Wetlands,
Bellevue, Washington




                                                                    Mt. Si,
                                                   North Bend, Washington




      protected and connected natural habitats are its foundation
Introduction


Jamison Square, Portland, Oregon




                                                            Beaver Lake Park,
                                                       Sammamish, Washington




traditional parks, gardens, and trails link communities to this nature matrix
Introduction




green infrastructure can also address urban challenges
Forms are patterns




  “the forms we conceive are really patterns, and patterns are the
configuration of relationships between natural systems…” –David Miller
GI layers and elements




2. ELEMENTS OF GREEN INFRASTRUCTURE
layers


     High Point housing
redevelopment, Seattle




                     Looking at any community…
layers




we can map its green infrastructure.
layers
          mobility




            water




       community




           habitat




Peeling apart a series of green infrastructure systems like layers
           and looking at their constituent parts...
Table of Elements




reveals a table of green infrastructure elements.
Table of Elements




green infrastructure elements: habitat
Mercer Slough Wetland,

           Element: urban wild
  Bellevue, Washington
Olympic Sculpture Park

                   Element: shoreline
Shoreline Restoration,
Seattle, Washington
Table of Elements




green infrastructure elements: community
Element: community garden




                           Oxbow Park,
                   Seattle, Washington
Element: streetside garden




            2716 39th Ave. SW,
          Seattle, Washington
Table of Elements




green infrastructure elements: water
Rain garden
Glencoe Elementary School, Portland, Oregon
Glencoe Elementary School, Portland, Oregon
Oxbow Park, Seattle, Washington
Maple Valley Library, Maple Valley, Washington
Denny Park Apartments, Seattle, Washington
Denny Park Apartments, Seattle, Washington
Liberty Center Parking Garage, Portland, Oregon
New Seasons Market, Portland, Oregon
SW 12th Avenue, Portland, Oregon
SW 12th Avenue, Portland, Oregon
Element: Bioswale
New Seasons Market, Portland, Oregon
Oregon Museum of Science and Industry (OMSI), Portland, Oregon
East Esplanade Park, Portland, Oregon
High Point, Seattle, Washington
High Point, Seattle, Washington
High Point, Seattle, Washington
High Point, Seattle, Washington
3


                         2

                             Cascading
                  1          Channel
Rain Garden




        Kitsap Administration Building, Bremerton, Washington
Kitsap Administration Building, Bremerton, Washington
Thornton Creek Water Quality Channel, Seattle, Washington
“Swale on Yale,” Seattle, Washington
Meadowbrook Pond, Seattle, Washington
Meadowbrook Pond, Seattle, Washington
Meadowbrook Pond, Seattle, Washington
Waterworks Gardens, Renton, Washington
Waterworks Gardens, Renton, Washington
Waterworks Gardens, Renton, Washington
High Point, Seattle, Washington
Multnomah County Building, Portland. Oregon
Multnomah County Building, Portland. Oregon
Seattle Municipal Courthouse and City Hall, Seattle, Washington
Colman Center, Seattle, Washington
Colman Center, Seattle, Washington
Oxbow Park, Seattle, Washington
Element: cistern
Growing Vine Street, Seattle, Washington
Growing Vine Street, Seattle, Washington
Cascade Community Center, Seattle, Washington
Table of Elements




green infrastructure elements: mobility
Chief Sealth Trail, Seattle, Washington
Element: complete street




               assorted complete streets
Yale Avenue Campus, Seattle, Washington
layers




integrated systems form of a green infrastructure network
GI APPS




3. CREATING A GREEN INFRASTRUCTURE PLAN
1) educate the public




              Mark Childs, Designing Compelling Public Places

         Mike Houck, Creating Livable Cities with Urban Green Space

Robert Garcia, The City Project: New Open Spaces for Social Justice in Los Angeles
       Patrick Condon, Green Urban Infrastructure for the 21st Century

     OSS2100 included many public lectures, articles, and events
           LFP Legacy had a Green Infrastructure Festival
1) educate the public




                                  from the Cascade Agenda by the
                                  Cascade Land Conservancy




                          Olmsted Brothers plan


 OSS2100 linked the effort to Seattle’s history and current imperatives
           around growth, public health, and global warming
2) choose your units




                what will be your planning unit?
2) choose your units




                       what is the scale?
2) choose your units




                  corridors can have units too
3) discover the anatomy of the landscape

OSS2100 Technical Panels: Development, Biodiversity, Waters of Puget Sound,
  Future Scenarios, Seattle Parks, Climate Change, Transportation Futures




        what are your existing green infrastructure elements?
        what is missing? what would make the system whole?
4) develop a long-term vision




      OSS2100 Green Futures Charrette: 350 people x 3 days
4) develop a long-term vision




           watershed by watershed, system by system
4) develop a long-term vision




               Seattle’s Green Infrastructure Plan
4) develop a long-term vision




           Lake Forest Park’s Green Infrastructure Plan
4) develop a long-term vision




           Lake Forest Park’s Green Infrastructure Plan
5) identify catalytic projects




    LFP Legacy projects to be integrated into comp plan and CIP
5) identify catalytic projects




                 online voting for priority projects
5) identify catalytic projects




                 online voting for priority projects
PROJECT LOCATION:
A2. Town Center                       main hub @ intersection of main Creekways and Arterial Green
                                                                                             Streets
                                                           VISIBILITY: high
                                                           CHALLENGE: high




POSSIBLE PROJECT ELEMENTS:
Habitat                                          Water
• create a wider riparian buffer and remove      • use bioswales, green roofs, and other LID
   fish blockages at 522 and under Town             features to manage parking lot run-off
   Center                                        Mobility
• daylight Lyon Creek through the parking lot    • improve sidewalks and crosswalks to connect
Community                                           neighbors to Town Center
• create high-density, mixed-use, transit-       • create trail along Lyon Creekway (start of
   oriented development                             connection between BG and Interurban)
• create a central civic space for community     • park & ride facility
PROJECT LOCATION:
A4. Tolt Pipeline Trail                gateway on the northeast end of Bothell Way Arterial Green
                                                                         Street and the Lakeway
                                                        VISIBILITY: low
                                                        CHALLENGE: low




POSSIBLE PROJECT ELEMENTS:
Habitat                                        Water
• restore maintenance-appropriate native       • use bioswales, rain gardens, and other LID
   habitat in pipeline right-of-way               features to manage trail run-off
Community                                      Mobility
                                               • build multi-use trail for bikes and pedestrians
PROJECT LOCATION:
B2. West Fork Confluence                 hublet at intersection of Lyon Creekway and Ballinger
                                                                       Way Arterial Green Street
                                                      VISIBILITY: high
                                                      CHALLENGE: medium




POSSIBLE PROJECT ELEMENTS:
Habitat                                    Water
• improve riparian and wetland habitat     • use bioswales, rain gardens, and other LID
   around creek confluence                    features to manage run-off from Ballinger Way
Community                                  Mobility
• incentive a market or coffee shop        • build part of the trail on the mainstem Lyon
   destination along Ballinger Way            Creekway
                                           • redevelop a segment of Ballinger Way as a
                                              complete street for bicycles, transit, and
                                              pedestrians
PROJECT LOCATION:
C1. Orchard Park                                new park on   35th   Ave. NE in the Lyon Creekway
                                                     VISIBILITY: low
                                                     CHALLENGE: low




POSSIBLE PROJECT ELEMENTS:
Habitat                                      Water
• improve Lyon Creek riparian habitat        • use rain gardens, bioswales, and other LID
                                                features to manage run-off from park and
Community
                                                street
• acquire land for park
                                             Mobility
• create orchard-themed passive open space
                                             • build portion of Lyon Creekway trail
   amenities
                                             • improve sidewalks and crosswalks near park
PROJECT LOCATION:
D1. Greening Perkins Way                           McAleer Creekway trail on Perkins from Whisper
                                                                   Confluence to 178th intersection
                                                        VISIBILITY: high
                                                        CHALLENGE: medium




POSSIBLE PROJECT ELEMENTS:
Habitat                                         Water
• improve riparian and instream habitat along   • use rain gardens, bioswales, and other LID
   McAleer Creekway                                features to manage run-off from trail and
                                                   street
Community
                                                Mobility
• build benches and overlooks for watching
   and learning the creek                       • redevelop Perkins as one way with a separate
                                                   trail (on creek side) for bikes and peds;
• build trailhead onto Creekway trail
PROJECT LOCATION:
D2. 178th Street Gateway                                gateway on   178th   Street Arterial Green Street
                                                           VISIBILITY: high
                                                           CHALLENGE: low




POSSIBLE PROJECT ELEMENTS:
Habitat                                           Water
• improve wetland habitat in the Hillside Creek   • use rain gardens, bioswales, and other LID
   headwaters                                        features to manage run-off from street
Community                                         Mobility
• build creative gateway elements on 178th        • redevelop a segment of the 178th Street
   Street Arterial Green Street                      Arterial Green Street as a complete street for
                                                     bicycles, transit, and pedestrians
PROJECT LOCATION:
E1. Greening 158th Street                       pilot Residential Green Street between 33rd and 35th in the
                                                                             Sheridan Heights neighborhood
                                                                  VISIBILITY: medium
                                                                  CHALLENGE: medium




POSSIBLE PROJECT ELEMENTS:
Habitat                                               Water
• plant native plants for wildlife habitat in LID     • use rain gardens, bioswales, and other LID
   features                                              features to manage run-off from street
Community                                             Mobility
• use grouped mailboxes to create mini-               • meander street to slow traffic
   gathering places                                   • create trail-like sidewalk
PROJECT LOCATION:
E3. Greening Brookside School                           schoolyard hublet at the confluence of the
                                                                   Brookside and Hillside Creekways
                                                          VISIBILITY: high
                                                          CHALLENGE: low




POSSIBLE PROJECT ELEMENTS:
Habitat                                          Water
• improve riparian and wetland habitat at        • use green roofs, rain gardens, and other LID
   confluence                                       features to manage run-off from school
Community                                        Mobility
• increase environmental and green building      • improve safe school walking routes from
   education                                        neighborhood and from 178th Street Arterial
                                                    Green Street
• build environmental art with kids to inspire
   stewardship                                   • increase public health and physical activity
                                                    education
PROJECT LOCATION:
F4. McAleer Creek Delta                    @ intersection of the McAleer Creekway and the Lakeway
                                                          VISIBILITY: medium
                                                          CHALLENGE: high




POSSIBLE PROJECT ELEMENTS:
Habitat                                          Water
• restore and enhance Lake Washington            • use bioswales, rain gardens, and other LID
   shoreline                                        features to manage run-off from adjacent
                                                    roads and residences
• create more distributary channels in McAleer
   Creek                                         Mobility
Community                                        • build trail spur between Bothell Way, Burke
                                                    Gilman trail, and the shoreline
• acquire lakeside parcels to increase public
   access to the shoreline
• build park amenities such as picnic shelters
   and restrooms for shoreline visitors
5) identify catalytic projects




          OSS2100 projects...provocative and inspirational
GI OPPS




4. TOWARDS AN AESTHETIC OF PERFORMANCE
towards an aesthetic of performance




            “form follows function.” –Louis Sullivan
towards an aesthetic of performance




                    Stephen Epler Dormitory, Portland, Oregon
towards an aesthetic of performance
towards an aesthetic of performance




                                 New Seasons Market
                                 Portland, OR

                     Portland Convention Center, Portland, OR
GI OPPS




5. ESTABLISHING THE NEW NORMAL
establishing the new normal




                   Seattle’s Green Factor
establishing the new normal




               Portland’s Green Streets Program
contact: natec@SvRdesign.com




 join the movement: www.greeninfrastructurewiki.com

Contenu connexe

Tendances

Vivek Sarma: Portfolio
Vivek Sarma: PortfolioVivek Sarma: Portfolio
Vivek Sarma: PortfolioVivek Sarma
 
IRJET- A Sustainable Approach for Urban Riverfront Development
IRJET-  	  A Sustainable Approach for Urban Riverfront DevelopmentIRJET-  	  A Sustainable Approach for Urban Riverfront Development
IRJET- A Sustainable Approach for Urban Riverfront DevelopmentIRJET Journal
 
Spring Lake - A Case Study for Green Infrastructure & LID (part 1)
Spring Lake - A Case Study for Green Infrastructure & LID (part 1)Spring Lake - A Case Study for Green Infrastructure & LID (part 1)
Spring Lake - A Case Study for Green Infrastructure & LID (part 1)Katie Pekarek
 
Urban Brownfield Redevelopment - Case Descriptions
Urban Brownfield Redevelopment - Case DescriptionsUrban Brownfield Redevelopment - Case Descriptions
Urban Brownfield Redevelopment - Case DescriptionsJohnny Browaeys - 庄博闻
 
Spring Lake - A Case Study for Green Infrastructure & LID (part 2)
Spring Lake - A Case Study for Green Infrastructure & LID (part 2)Spring Lake - A Case Study for Green Infrastructure & LID (part 2)
Spring Lake - A Case Study for Green Infrastructure & LID (part 2)Katie Pekarek
 
Walking Mountains Science Center - LEED Platinum in a Small Mountain Town
Walking Mountains Science Center - LEED Platinum in a Small Mountain TownWalking Mountains Science Center - LEED Platinum in a Small Mountain Town
Walking Mountains Science Center - LEED Platinum in a Small Mountain TownBrian Sipes
 
Stormwater Management Using State Revolving Funds
Stormwater Management Using State Revolving FundsStormwater Management Using State Revolving Funds
Stormwater Management Using State Revolving FundsOHM Advisors
 
River-Front Revitalisation
River-Front RevitalisationRiver-Front Revitalisation
River-Front RevitalisationVitastaRaina
 
Turning the Tide: Reviving the Estuary: Science, Politics, and Education
Turning the Tide: Reviving the Estuary: Science, Politics, and EducationTurning the Tide: Reviving the Estuary: Science, Politics, and Education
Turning the Tide: Reviving the Estuary: Science, Politics, and EducationCUNY Sustainable Cities
 
Maintaining Rain Gardens
Maintaining Rain GardensMaintaining Rain Gardens
Maintaining Rain GardensSotirakou964
 
Trial for online
Trial for onlineTrial for online
Trial for onlineelogilvie
 
Singapore Managing Stormwater For Water Resource And Flood Control 水资源介绍
Singapore Managing   Stormwater For Water Resource And Flood Control  水资源介绍Singapore Managing   Stormwater For Water Resource And Flood Control  水资源介绍
Singapore Managing Stormwater For Water Resource And Flood Control 水资源介绍dreamsion
 
Walk on Wall
Walk on Wall Walk on Wall
Walk on Wall kvon15
 
Broyhill McLean Estates BMP Neighborhood Improvement Project
Broyhill McLean Estates BMP Neighborhood Improvement ProjectBroyhill McLean Estates BMP Neighborhood Improvement Project
Broyhill McLean Estates BMP Neighborhood Improvement ProjectFairfax County
 

Tendances (19)

Vivek Sarma: Portfolio
Vivek Sarma: PortfolioVivek Sarma: Portfolio
Vivek Sarma: Portfolio
 
IRJET- A Sustainable Approach for Urban Riverfront Development
IRJET-  	  A Sustainable Approach for Urban Riverfront DevelopmentIRJET-  	  A Sustainable Approach for Urban Riverfront Development
IRJET- A Sustainable Approach for Urban Riverfront Development
 
Save the Rain Presentation - NYSAC 2012
Save the Rain Presentation - NYSAC 2012Save the Rain Presentation - NYSAC 2012
Save the Rain Presentation - NYSAC 2012
 
Spring Lake - A Case Study for Green Infrastructure & LID (part 1)
Spring Lake - A Case Study for Green Infrastructure & LID (part 1)Spring Lake - A Case Study for Green Infrastructure & LID (part 1)
Spring Lake - A Case Study for Green Infrastructure & LID (part 1)
 
Portfolio
PortfolioPortfolio
Portfolio
 
Urban Brownfield Redevelopment - Case Descriptions
Urban Brownfield Redevelopment - Case DescriptionsUrban Brownfield Redevelopment - Case Descriptions
Urban Brownfield Redevelopment - Case Descriptions
 
Spring Lake - A Case Study for Green Infrastructure & LID (part 2)
Spring Lake - A Case Study for Green Infrastructure & LID (part 2)Spring Lake - A Case Study for Green Infrastructure & LID (part 2)
Spring Lake - A Case Study for Green Infrastructure & LID (part 2)
 
Walking Mountains Science Center - LEED Platinum in a Small Mountain Town
Walking Mountains Science Center - LEED Platinum in a Small Mountain TownWalking Mountains Science Center - LEED Platinum in a Small Mountain Town
Walking Mountains Science Center - LEED Platinum in a Small Mountain Town
 
Stormwater Management Using State Revolving Funds
Stormwater Management Using State Revolving FundsStormwater Management Using State Revolving Funds
Stormwater Management Using State Revolving Funds
 
River-Front Revitalisation
River-Front RevitalisationRiver-Front Revitalisation
River-Front Revitalisation
 
Turning the Tide: Reviving the Estuary: Science, Politics, and Education
Turning the Tide: Reviving the Estuary: Science, Politics, and EducationTurning the Tide: Reviving the Estuary: Science, Politics, and Education
Turning the Tide: Reviving the Estuary: Science, Politics, and Education
 
Maintaining Rain Gardens
Maintaining Rain GardensMaintaining Rain Gardens
Maintaining Rain Gardens
 
RBF Summer 2010
RBF Summer 2010RBF Summer 2010
RBF Summer 2010
 
Trial for online
Trial for onlineTrial for online
Trial for online
 
Portfolio
PortfolioPortfolio
Portfolio
 
Singapore Managing Stormwater For Water Resource And Flood Control 水资源介绍
Singapore Managing   Stormwater For Water Resource And Flood Control  水资源介绍Singapore Managing   Stormwater For Water Resource And Flood Control  水资源介绍
Singapore Managing Stormwater For Water Resource And Flood Control 水资源介绍
 
Claire Robinson
Claire RobinsonClaire Robinson
Claire Robinson
 
Walk on Wall
Walk on Wall Walk on Wall
Walk on Wall
 
Broyhill McLean Estates BMP Neighborhood Improvement Project
Broyhill McLean Estates BMP Neighborhood Improvement ProjectBroyhill McLean Estates BMP Neighborhood Improvement Project
Broyhill McLean Estates BMP Neighborhood Improvement Project
 

En vedette

SvR High Point presentation
SvR High Point presentationSvR High Point presentation
SvR High Point presentationncormier
 
Lessons learned from green infrastructure project experience in developing co...
Lessons learned from green infrastructure project experience in developing co...Lessons learned from green infrastructure project experience in developing co...
Lessons learned from green infrastructure project experience in developing co...U.S. Water Alliance
 
Rohit Gupta Resume
Rohit Gupta ResumeRohit Gupta Resume
Rohit Gupta ResumeROHIT GUPTA
 
Green Infrastructure Basic Principles & Tools
Green Infrastructure Basic Principles & Tools Green Infrastructure Basic Principles & Tools
Green Infrastructure Basic Principles & Tools nado-web
 
5. Flood-risk assessment in urban environment by
5. Flood-risk assessment in urban environment by5. Flood-risk assessment in urban environment by
5. Flood-risk assessment in urban environment byDr. Ravinder Jangra
 
RV 2015: If You Build It, Will it Flood? Climate Change Vulnerabilities and S...
RV 2015: If You Build It, Will it Flood? Climate Change Vulnerabilities and S...RV 2015: If You Build It, Will it Flood? Climate Change Vulnerabilities and S...
RV 2015: If You Build It, Will it Flood? Climate Change Vulnerabilities and S...Rail~Volution
 

En vedette (11)

SvR High Point presentation
SvR High Point presentationSvR High Point presentation
SvR High Point presentation
 
Green Infrastructure Enhancements for AUC
Green Infrastructure Enhancements for AUCGreen Infrastructure Enhancements for AUC
Green Infrastructure Enhancements for AUC
 
Catchment 1 Green Infrastructure Conceptual Plan
Catchment 1 Green Infrastructure Conceptual PlanCatchment 1 Green Infrastructure Conceptual Plan
Catchment 1 Green Infrastructure Conceptual Plan
 
Catchment 4 Green Infrastructure Conceptual Plan
Catchment 4 Green Infrastructure Conceptual PlanCatchment 4 Green Infrastructure Conceptual Plan
Catchment 4 Green Infrastructure Conceptual Plan
 
Lessons learned from green infrastructure project experience in developing co...
Lessons learned from green infrastructure project experience in developing co...Lessons learned from green infrastructure project experience in developing co...
Lessons learned from green infrastructure project experience in developing co...
 
Rohit Gupta Resume
Rohit Gupta ResumeRohit Gupta Resume
Rohit Gupta Resume
 
Green Infrastructure Basic Principles & Tools
Green Infrastructure Basic Principles & Tools Green Infrastructure Basic Principles & Tools
Green Infrastructure Basic Principles & Tools
 
5. Flood-risk assessment in urban environment by
5. Flood-risk assessment in urban environment by5. Flood-risk assessment in urban environment by
5. Flood-risk assessment in urban environment by
 
RV 2015: If You Build It, Will it Flood? Climate Change Vulnerabilities and S...
RV 2015: If You Build It, Will it Flood? Climate Change Vulnerabilities and S...RV 2015: If You Build It, Will it Flood? Climate Change Vulnerabilities and S...
RV 2015: If You Build It, Will it Flood? Climate Change Vulnerabilities and S...
 
Greenways as Green Infrastructure
Greenways as Green InfrastructureGreenways as Green Infrastructure
Greenways as Green Infrastructure
 
The permitting advantages and challenges of green infrastructure
The permitting advantages and challenges of green infrastructureThe permitting advantages and challenges of green infrastructure
The permitting advantages and challenges of green infrastructure
 

Similaire à Green Infrastructure Guide

Daylighting sd 051513_cisc__extended
Daylighting sd 051513_cisc__extendedDaylighting sd 051513_cisc__extended
Daylighting sd 051513_cisc__extendedSteve Duncan
 
Land, Water, People: New Parks in Practice
Land, Water, People: New Parks in PracticeLand, Water, People: New Parks in Practice
Land, Water, People: New Parks in PracticeRiverFirst Initiative
 
Green infrastructure on the fair
Green infrastructure on the fairGreen infrastructure on the fair
Green infrastructure on the fairaslfadmin
 
NY: A Green Infrastructure Approach - Onondaga Creek Water Quality
NY: A Green Infrastructure Approach - Onondaga Creek Water QualityNY: A Green Infrastructure Approach - Onondaga Creek Water Quality
NY: A Green Infrastructure Approach - Onondaga Creek Water QualitySotirakou964
 
Vinh_Le_Work_Samples
Vinh_Le_Work_SamplesVinh_Le_Work_Samples
Vinh_Le_Work_SamplesVinh Le
 
Urban Stormwater Conditions and the Multiple Benefits of Green Infrastructure...
Urban Stormwater Conditions and the Multiple Benefits of Green Infrastructure...Urban Stormwater Conditions and the Multiple Benefits of Green Infrastructure...
Urban Stormwater Conditions and the Multiple Benefits of Green Infrastructure...RI_FMA
 
Dj pow work samples
Dj pow work samplesDj pow work samples
Dj pow work samplesDanielJPow
 
MNTR△ Design Portfolio
MNTR△ Design PortfolioMNTR△ Design Portfolio
MNTR△ Design PortfolioMarisaNaughton2
 
Improve kpmb+big booklet
Improve kpmb+big bookletImprove kpmb+big booklet
Improve kpmb+big bookletGardinerEast
 
Rooftops to Rivers
Rooftops to RiversRooftops to Rivers
Rooftops to RiversD6Z
 
Green Strategies for Controlling Stormwater and Sewer Overflow
Green Strategies for Controlling Stormwater and Sewer OverflowGreen Strategies for Controlling Stormwater and Sewer Overflow
Green Strategies for Controlling Stormwater and Sewer OverflowSotirakou964
 
Nicholas DiFrank - Professional Portfolio 2015
Nicholas DiFrank - Professional Portfolio 2015Nicholas DiFrank - Professional Portfolio 2015
Nicholas DiFrank - Professional Portfolio 2015Nicholas DiFrank
 
Safe Harbors Green Design and Construction Process
Safe Harbors Green Design and Construction ProcessSafe Harbors Green Design and Construction Process
Safe Harbors Green Design and Construction ProcessBryan Quinn
 
Green Connection Lid 3 12 09
Green Connection Lid 3 12 09Green Connection Lid 3 12 09
Green Connection Lid 3 12 09Michael Clark
 

Similaire à Green Infrastructure Guide (20)

Bath, Maine Design And Resiliency Team (DART) Project
Bath, Maine Design And Resiliency Team (DART) ProjectBath, Maine Design And Resiliency Team (DART) Project
Bath, Maine Design And Resiliency Team (DART) Project
 
Daylighting sd 051513_cisc__extended
Daylighting sd 051513_cisc__extendedDaylighting sd 051513_cisc__extended
Daylighting sd 051513_cisc__extended
 
LIUDD by Maria Ignatieva
LIUDD by Maria IgnatievaLIUDD by Maria Ignatieva
LIUDD by Maria Ignatieva
 
Portfolio_2_05
Portfolio_2_05Portfolio_2_05
Portfolio_2_05
 
Land, Water, People: New Parks in Practice
Land, Water, People: New Parks in PracticeLand, Water, People: New Parks in Practice
Land, Water, People: New Parks in Practice
 
Green infrastructure on the fair
Green infrastructure on the fairGreen infrastructure on the fair
Green infrastructure on the fair
 
NY: A Green Infrastructure Approach - Onondaga Creek Water Quality
NY: A Green Infrastructure Approach - Onondaga Creek Water QualityNY: A Green Infrastructure Approach - Onondaga Creek Water Quality
NY: A Green Infrastructure Approach - Onondaga Creek Water Quality
 
Portfolio_4-5
Portfolio_4-5Portfolio_4-5
Portfolio_4-5
 
Vinh_Le_Work_Samples
Vinh_Le_Work_SamplesVinh_Le_Work_Samples
Vinh_Le_Work_Samples
 
Urban Stormwater Conditions and the Multiple Benefits of Green Infrastructure...
Urban Stormwater Conditions and the Multiple Benefits of Green Infrastructure...Urban Stormwater Conditions and the Multiple Benefits of Green Infrastructure...
Urban Stormwater Conditions and the Multiple Benefits of Green Infrastructure...
 
Lake2Bay
Lake2Bay Lake2Bay
Lake2Bay
 
Dj pow work samples
Dj pow work samplesDj pow work samples
Dj pow work samples
 
Maverick park presentation
Maverick park presentationMaverick park presentation
Maverick park presentation
 
MNTR△ Design Portfolio
MNTR△ Design PortfolioMNTR△ Design Portfolio
MNTR△ Design Portfolio
 
Improve kpmb+big booklet
Improve kpmb+big bookletImprove kpmb+big booklet
Improve kpmb+big booklet
 
Rooftops to Rivers
Rooftops to RiversRooftops to Rivers
Rooftops to Rivers
 
Green Strategies for Controlling Stormwater and Sewer Overflow
Green Strategies for Controlling Stormwater and Sewer OverflowGreen Strategies for Controlling Stormwater and Sewer Overflow
Green Strategies for Controlling Stormwater and Sewer Overflow
 
Nicholas DiFrank - Professional Portfolio 2015
Nicholas DiFrank - Professional Portfolio 2015Nicholas DiFrank - Professional Portfolio 2015
Nicholas DiFrank - Professional Portfolio 2015
 
Safe Harbors Green Design and Construction Process
Safe Harbors Green Design and Construction ProcessSafe Harbors Green Design and Construction Process
Safe Harbors Green Design and Construction Process
 
Green Connection Lid 3 12 09
Green Connection Lid 3 12 09Green Connection Lid 3 12 09
Green Connection Lid 3 12 09
 

Dernier

trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdftrending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdfMintel Group
 
Driving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerDriving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerAggregage
 
Excvation Safety for safety officers reference
Excvation Safety for safety officers referenceExcvation Safety for safety officers reference
Excvation Safety for safety officers referencessuser2c065e
 
14680-51-4.pdf Good quality CAS Good quality CAS
14680-51-4.pdf  Good  quality CAS Good  quality CAS14680-51-4.pdf  Good  quality CAS Good  quality CAS
14680-51-4.pdf Good quality CAS Good quality CAScathy664059
 
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...ssuserf63bd7
 
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxGo for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxRakhi Bazaar
 
Interoperability and ecosystems: Assembling the industrial metaverse
Interoperability and ecosystems:  Assembling the industrial metaverseInteroperability and ecosystems:  Assembling the industrial metaverse
Interoperability and ecosystems: Assembling the industrial metaverseSiemens
 
business environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxbusiness environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxShruti Mittal
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFChandresh Chudasama
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Americas Got Grants
 
Welding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsWelding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsIndiaMART InterMESH Limited
 
20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdfChris Skinner
 
Planetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifePlanetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifeBhavana Pujan Kendra
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
EUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersEUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersPeter Horsten
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Peter Ward
 
Healthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare NewsletterHealthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare NewsletterJamesConcepcion7
 
Technical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamTechnical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamArik Fletcher
 

Dernier (20)

trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdftrending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
 
Driving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerDriving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon Harmer
 
Excvation Safety for safety officers reference
Excvation Safety for safety officers referenceExcvation Safety for safety officers reference
Excvation Safety for safety officers reference
 
14680-51-4.pdf Good quality CAS Good quality CAS
14680-51-4.pdf  Good  quality CAS Good  quality CAS14680-51-4.pdf  Good  quality CAS Good  quality CAS
14680-51-4.pdf Good quality CAS Good quality CAS
 
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
 
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxGo for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
 
Interoperability and ecosystems: Assembling the industrial metaverse
Interoperability and ecosystems:  Assembling the industrial metaverseInteroperability and ecosystems:  Assembling the industrial metaverse
Interoperability and ecosystems: Assembling the industrial metaverse
 
business environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxbusiness environment micro environment macro environment.pptx
business environment micro environment macro environment.pptx
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDF
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...
 
Welding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsWelding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan Dynamics
 
20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf
 
Planetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifePlanetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in Life
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
EUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersEUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exporters
 
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptxThe Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...
 
Healthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare NewsletterHealthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare Newsletter
 
Technical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamTechnical Leaders - Working with the Management Team
Technical Leaders - Working with the Management Team
 

Green Infrastructure Guide

  • 1. GROWING GREEN INFRASTRUCTURE: how to create high-performance landscapes and healthy cities Nate Cormier, ASLA, LEED AP Senior Landscape Architect SvR Design Company
  • 2. GI layers and elements 1. WHAT IS GREEN INFRASTRUCTURE?
  • 3. Introduction what is green infrastructure?
  • 4. Introduction + nature provides valuable ecological services for urban environments
  • 5. Introduction King County Greenprint Open Space Seattle 2100 green infrastructure is a tapestry of open space in and around a city
  • 6. Minneapolis’s Grand Rounds Introduction Boston’s Emerald Necklace green infrastructure is not a new idea
  • 7. Introduction Mercer Slough Wetlands, Bellevue, Washington Mt. Si, North Bend, Washington protected and connected natural habitats are its foundation
  • 8. Introduction Jamison Square, Portland, Oregon Beaver Lake Park, Sammamish, Washington traditional parks, gardens, and trails link communities to this nature matrix
  • 9. Introduction green infrastructure can also address urban challenges
  • 10. Forms are patterns “the forms we conceive are really patterns, and patterns are the configuration of relationships between natural systems…” –David Miller
  • 11. GI layers and elements 2. ELEMENTS OF GREEN INFRASTRUCTURE
  • 12. layers High Point housing redevelopment, Seattle Looking at any community…
  • 13. layers we can map its green infrastructure.
  • 14. layers mobility water community habitat Peeling apart a series of green infrastructure systems like layers and looking at their constituent parts...
  • 15. Table of Elements reveals a table of green infrastructure elements.
  • 16. Table of Elements green infrastructure elements: habitat
  • 17. Mercer Slough Wetland, Element: urban wild Bellevue, Washington
  • 18. Olympic Sculpture Park Element: shoreline Shoreline Restoration, Seattle, Washington
  • 19. Table of Elements green infrastructure elements: community
  • 20. Element: community garden Oxbow Park, Seattle, Washington
  • 21. Element: streetside garden 2716 39th Ave. SW, Seattle, Washington
  • 22. Table of Elements green infrastructure elements: water
  • 24. Glencoe Elementary School, Portland, Oregon
  • 25. Glencoe Elementary School, Portland, Oregon
  • 26. Oxbow Park, Seattle, Washington
  • 27. Maple Valley Library, Maple Valley, Washington
  • 28.
  • 29. Denny Park Apartments, Seattle, Washington
  • 30. Denny Park Apartments, Seattle, Washington
  • 31. Liberty Center Parking Garage, Portland, Oregon
  • 32. New Seasons Market, Portland, Oregon
  • 33. SW 12th Avenue, Portland, Oregon
  • 34. SW 12th Avenue, Portland, Oregon
  • 36. New Seasons Market, Portland, Oregon
  • 37. Oregon Museum of Science and Industry (OMSI), Portland, Oregon
  • 38. East Esplanade Park, Portland, Oregon
  • 39. High Point, Seattle, Washington
  • 40. High Point, Seattle, Washington
  • 41. High Point, Seattle, Washington
  • 42. High Point, Seattle, Washington
  • 43. 3 2 Cascading 1 Channel Rain Garden Kitsap Administration Building, Bremerton, Washington
  • 44. Kitsap Administration Building, Bremerton, Washington
  • 45. Thornton Creek Water Quality Channel, Seattle, Washington
  • 46. “Swale on Yale,” Seattle, Washington
  • 47.
  • 54. High Point, Seattle, Washington
  • 55.
  • 56. Multnomah County Building, Portland. Oregon
  • 57. Multnomah County Building, Portland. Oregon
  • 58. Seattle Municipal Courthouse and City Hall, Seattle, Washington
  • 61. Oxbow Park, Seattle, Washington
  • 63. Growing Vine Street, Seattle, Washington
  • 64. Growing Vine Street, Seattle, Washington
  • 65. Cascade Community Center, Seattle, Washington
  • 66. Table of Elements green infrastructure elements: mobility
  • 67. Chief Sealth Trail, Seattle, Washington
  • 68. Element: complete street assorted complete streets
  • 69. Yale Avenue Campus, Seattle, Washington
  • 70. layers integrated systems form of a green infrastructure network
  • 71. GI APPS 3. CREATING A GREEN INFRASTRUCTURE PLAN
  • 72. 1) educate the public Mark Childs, Designing Compelling Public Places Mike Houck, Creating Livable Cities with Urban Green Space Robert Garcia, The City Project: New Open Spaces for Social Justice in Los Angeles Patrick Condon, Green Urban Infrastructure for the 21st Century OSS2100 included many public lectures, articles, and events LFP Legacy had a Green Infrastructure Festival
  • 73. 1) educate the public from the Cascade Agenda by the Cascade Land Conservancy Olmsted Brothers plan OSS2100 linked the effort to Seattle’s history and current imperatives around growth, public health, and global warming
  • 74. 2) choose your units what will be your planning unit?
  • 75. 2) choose your units what is the scale?
  • 76. 2) choose your units corridors can have units too
  • 77. 3) discover the anatomy of the landscape OSS2100 Technical Panels: Development, Biodiversity, Waters of Puget Sound, Future Scenarios, Seattle Parks, Climate Change, Transportation Futures what are your existing green infrastructure elements? what is missing? what would make the system whole?
  • 78. 4) develop a long-term vision OSS2100 Green Futures Charrette: 350 people x 3 days
  • 79. 4) develop a long-term vision watershed by watershed, system by system
  • 80. 4) develop a long-term vision Seattle’s Green Infrastructure Plan
  • 81. 4) develop a long-term vision Lake Forest Park’s Green Infrastructure Plan
  • 82. 4) develop a long-term vision Lake Forest Park’s Green Infrastructure Plan
  • 83. 5) identify catalytic projects LFP Legacy projects to be integrated into comp plan and CIP
  • 84. 5) identify catalytic projects online voting for priority projects
  • 85. 5) identify catalytic projects online voting for priority projects
  • 86. PROJECT LOCATION: A2. Town Center main hub @ intersection of main Creekways and Arterial Green Streets VISIBILITY: high CHALLENGE: high POSSIBLE PROJECT ELEMENTS: Habitat Water • create a wider riparian buffer and remove • use bioswales, green roofs, and other LID fish blockages at 522 and under Town features to manage parking lot run-off Center Mobility • daylight Lyon Creek through the parking lot • improve sidewalks and crosswalks to connect Community neighbors to Town Center • create high-density, mixed-use, transit- • create trail along Lyon Creekway (start of oriented development connection between BG and Interurban) • create a central civic space for community • park & ride facility
  • 87. PROJECT LOCATION: A4. Tolt Pipeline Trail gateway on the northeast end of Bothell Way Arterial Green Street and the Lakeway VISIBILITY: low CHALLENGE: low POSSIBLE PROJECT ELEMENTS: Habitat Water • restore maintenance-appropriate native • use bioswales, rain gardens, and other LID habitat in pipeline right-of-way features to manage trail run-off Community Mobility • build multi-use trail for bikes and pedestrians
  • 88. PROJECT LOCATION: B2. West Fork Confluence hublet at intersection of Lyon Creekway and Ballinger Way Arterial Green Street VISIBILITY: high CHALLENGE: medium POSSIBLE PROJECT ELEMENTS: Habitat Water • improve riparian and wetland habitat • use bioswales, rain gardens, and other LID around creek confluence features to manage run-off from Ballinger Way Community Mobility • incentive a market or coffee shop • build part of the trail on the mainstem Lyon destination along Ballinger Way Creekway • redevelop a segment of Ballinger Way as a complete street for bicycles, transit, and pedestrians
  • 89. PROJECT LOCATION: C1. Orchard Park new park on 35th Ave. NE in the Lyon Creekway VISIBILITY: low CHALLENGE: low POSSIBLE PROJECT ELEMENTS: Habitat Water • improve Lyon Creek riparian habitat • use rain gardens, bioswales, and other LID features to manage run-off from park and Community street • acquire land for park Mobility • create orchard-themed passive open space • build portion of Lyon Creekway trail amenities • improve sidewalks and crosswalks near park
  • 90. PROJECT LOCATION: D1. Greening Perkins Way McAleer Creekway trail on Perkins from Whisper Confluence to 178th intersection VISIBILITY: high CHALLENGE: medium POSSIBLE PROJECT ELEMENTS: Habitat Water • improve riparian and instream habitat along • use rain gardens, bioswales, and other LID McAleer Creekway features to manage run-off from trail and street Community Mobility • build benches and overlooks for watching and learning the creek • redevelop Perkins as one way with a separate trail (on creek side) for bikes and peds; • build trailhead onto Creekway trail
  • 91. PROJECT LOCATION: D2. 178th Street Gateway gateway on 178th Street Arterial Green Street VISIBILITY: high CHALLENGE: low POSSIBLE PROJECT ELEMENTS: Habitat Water • improve wetland habitat in the Hillside Creek • use rain gardens, bioswales, and other LID headwaters features to manage run-off from street Community Mobility • build creative gateway elements on 178th • redevelop a segment of the 178th Street Street Arterial Green Street Arterial Green Street as a complete street for bicycles, transit, and pedestrians
  • 92. PROJECT LOCATION: E1. Greening 158th Street pilot Residential Green Street between 33rd and 35th in the Sheridan Heights neighborhood VISIBILITY: medium CHALLENGE: medium POSSIBLE PROJECT ELEMENTS: Habitat Water • plant native plants for wildlife habitat in LID • use rain gardens, bioswales, and other LID features features to manage run-off from street Community Mobility • use grouped mailboxes to create mini- • meander street to slow traffic gathering places • create trail-like sidewalk
  • 93. PROJECT LOCATION: E3. Greening Brookside School schoolyard hublet at the confluence of the Brookside and Hillside Creekways VISIBILITY: high CHALLENGE: low POSSIBLE PROJECT ELEMENTS: Habitat Water • improve riparian and wetland habitat at • use green roofs, rain gardens, and other LID confluence features to manage run-off from school Community Mobility • increase environmental and green building • improve safe school walking routes from education neighborhood and from 178th Street Arterial Green Street • build environmental art with kids to inspire stewardship • increase public health and physical activity education
  • 94. PROJECT LOCATION: F4. McAleer Creek Delta @ intersection of the McAleer Creekway and the Lakeway VISIBILITY: medium CHALLENGE: high POSSIBLE PROJECT ELEMENTS: Habitat Water • restore and enhance Lake Washington • use bioswales, rain gardens, and other LID shoreline features to manage run-off from adjacent roads and residences • create more distributary channels in McAleer Creek Mobility Community • build trail spur between Bothell Way, Burke Gilman trail, and the shoreline • acquire lakeside parcels to increase public access to the shoreline • build park amenities such as picnic shelters and restrooms for shoreline visitors
  • 95. 5) identify catalytic projects OSS2100 projects...provocative and inspirational
  • 96. GI OPPS 4. TOWARDS AN AESTHETIC OF PERFORMANCE
  • 97. towards an aesthetic of performance “form follows function.” –Louis Sullivan
  • 98. towards an aesthetic of performance Stephen Epler Dormitory, Portland, Oregon
  • 99. towards an aesthetic of performance
  • 100. towards an aesthetic of performance New Seasons Market Portland, OR Portland Convention Center, Portland, OR
  • 101. GI OPPS 5. ESTABLISHING THE NEW NORMAL
  • 102. establishing the new normal Seattle’s Green Factor
  • 103. establishing the new normal Portland’s Green Streets Program
  • 104. contact: natec@SvRdesign.com join the movement: www.greeninfrastructurewiki.com