SlideShare une entreprise Scribd logo
1  sur  14
GPS Based Bus Management
System
Software Engineering
Project Report
(CSHP - 410)
Submitted by: Under the supervision of
Atul (10545) Dr. Anjali Thukral
Ankit (10423)
Neeraj(10471)
2013
Keshav Mahavidyalaya
University of Delhi
Table of Contents
Problem Statement.................................................................................................................................3
1 INTRODUCTION...............................................................................................................................4
1.1 Purpose ...................................................................................................................................4
1.2 Scope.......................................................................................................................................4
1.3 Definitions...............................................................................................................................4
1.4 Overview.................................................................................................................................4
2 Software Requirement Specification..............................................................................................5
2.1 Data Flow Diagram..................................................................................................................5
2.1.1 DFD Level 0......................................................................................................................5
2.1.2 DFD Level 1......................................................................................................................6
2.1.3 Data Dictionary ...............................................................................................................7
3 Project Management ......................................................................................................................9
3.1 Cost Estimations......................................................................................................................9
3.1.1 Functional Point Estimation............................................................................................9
3.1.2 Efforts............................................................................................................................10
3.2 Schedule................................................................................................................................11
3.3 Risk Table ..............................................................................................................................11
4 Design Engineering........................................................................................................................12
4.1 Architectural Design..............................................................................................................12
4.2 Entity- Relationship Diagram ................................................................................................13
5 Testing...........................................................................................................................................14
Problem Statement
Problem Analysis:-
1. We don’t have system which could inform Passenger about their Bus Timing, Shedule
etc.
2. We only do have record of bus Timings on which bus should start on a route which is
also sometimes not followed by drivers.
3. There is no information provided to passenger about buses.
Method of Solution:-
1. The problem of bus timing and other problem could be solved by Schedule Monitoring
of Buses.
2. Real time Information should be provided to user about their bus this could be done
by using GPS in buses.
1 INTRODUCTION
1.1 Purpose
The GPS Based Bus Management System (GBMS) is used to keep Track of Buses by
Company. Also this facility can be used to give information to Passenger by web and a
Display on Bus Stop.
1.2 Scope
Many cities have found that using GPS tracking systems not only improve the efficiency of
city bus operations, but also encourage more commuters to take advantage of their city bus
systems.
Many city bus systems have discovered that GPS tracking systems which allow passengers to
monitor the location and estimated arrival time of their bus actually increases the number of
people using city buses for routine commuting. For example, if a rushed commuter can
1.3 Definitions
Our System also provides information about Buses to Passenger. Consider the possibility of
implementing GPS tracking systems which allow customers to monitor bus locations via
website, or cell phones. This will likely increase the satisfaction of customers. Also a display
is fixed on every Stop so passenger will know where their bus is and when will it arrive.
1.4 Overview
The purpose of this section is to obtain agreement regarding the objectives the system must
meet. Ultimately this segment defines the boundaries of the effort. The “GPS Based Bus
Management System” helps administrator honor their professional commitments by
following a tailored version of the organization’s standard process. This project aims to
provide helpful information about Bus in a given geographic area. Also it store Tracking
Information in Database. It also keep track of Bus’s speed if it is crossed the authority will
get the information.verify his or her bus is running on time via their cell phone or a website,
they are much more likely to ride the bus rather than take a cab or drive themselves.
2 Software Requirement Specification
2.1 Data Flow Diagram
2.1.1 DFD Level 0
2.1.2 DFD Level 1
2.1.3 Data Dictionary
Table 1: Bus Database
Field Name Type Description
Bus_ID Long Integer Primary Key
Route_no Integer
Emp_no Long Integer
Driver_name Character[20]
Table 2: Route
Field Name Type Description
Route_no Integer Primary Key
Route_Name Character[20]
Start Character[20]
Destination Character[20]
Path Integer Multi valued
Table 3: Stops
Field Name Type Description
Stop_id Integer Primary Key
Stop_name Character[20]
Degree_lat Float
Min_lat Float
Sec_lat Float
Degree_log Float
Min_log Float
Sec_log Float
Table 4: Main
Field Name Type Description
Bus_ID Long Integer
Route_no Integer
Route_Name Character[20]
Time Time Stamp
Loc_lat Degree Float
Min Float
Sec Float
Loc_log Degree Float
Min Float
Sec Float
Next_stop Integer
Last_stop Integer
3 Project Management
3.1 Cost Estimations
3.1.1 Functional Point Estimation
Info Domain Value Opt. Est. Count Weight FP Count
External Inputs 5 4 5 23
External Outputs 6 5 4 23
External Inquires 2 2 5 10
Internal Logical Files 4 3 10 35
External Interface
Files
2 1 7 11
Count Total 102
FP (EST.) = Count Total * Value adjustment factor
FP (EST.) = Count Total * [0.65+0.01* Ʃ (Fi)]
Calculation of Value adjustment factor:-
S No. Factor Values
1 Backup and Recovery 3
2 Data communication 4
3 Distributed processing 2
4 Performance Critical 3
5 Existing operating environment 1
6 Online-line data entry 2
7 Input transaction over multiple screens 2
8 ILFs update online 1
9 Information domain values complex 3
10 Internal processing complex 4
11 Code design for reuse 3
12 Conversion/installation in design 4
13 Multiple installation 1
14 Application design for change 5
Total 38
Ʃ (Fi)] = 38
Value adjustment factor= [0.65+0.01* 38]
=0.65 + 0.38
= 1.03
FP (EST.) = 102 * 1.03
= 105.06
 Our average productivity is 8 FP/month.
 If labour rate is Rs.10000 per month.
 Cost per FP is Rs. 1250.
 Total Cost for Project is Rs. 130,000.
3.1.2 Efforts
Effort= Total Functional Points/Average Productivity
= 105.06/8
=13 pm
 Our estimated Effort is 13 person-month
3.2 Schedule
S.No. Process/Phase Start Date Finish Date
1. Requirement gathering 20/01/13 15/02/13
2. Requirement analysis 16/02/13 27/02/13
3. DFD preparation 28/02/13 10/03/13
4. Data Dictionary preparation 11/03/13 20/03/13
5. Risk Management Plan 21/03/13 30/03/13
6. ERD preparation 31/03/13 10/04/13
7. FPA calculation 11/04/13 16/04/13
3.3 Risk Table
S.No RISK CATEGORY PROBABILIT
Y
IMPACT RMMM PLAN
1 Some team members
leave the project
development in-
between
Technical risk 30% 2  Use backup staffs
which knows what was
going on in the project.
2 Delivery deadline
tightened
Project risk 30% 1  Team may use extra
members to complete
the task on scheduled
time
3 Losing of all the project
data, this may be
caused by a hard disk
being wiped out by a
virus, hard disk failure,
etc.
Project risk 20% 2  Carry out necessary
backup of database
data, source code and
documentation
4 Team dissension/lack of
cohesion
Project risk 10% 3  We could set some
guide-lines and rules
regarding how we deal
with each other .
4 Design Engineering
4.1 Architectural Design
4.2 Entity- Relationship Diagram
5 Testing
 Administrator module :
1. Test case: Login
Input : ID, Password.
Process : Click on the login link. If administrator enters ID and password correct it goes to
the admin services otherwise displays the same page with an error message.
Output : Displays the admin services page.
2. Test case: Add/Delete new Bus
Input: Bus_Id.
Process: A new Bus can be added into the system and admin can update details.
Output: Changes will take place in Database
3. Test case: Add/Delete new Route
Input: Route_id
Process: A new Route can be added/deleted into the system and admin can update details.
Output: Changes will take place in Database
4. Test case: Track a Bus
Input: Bus_Id
Process: All GPS Message coming from this bus ID will be displayed through Map.
Output: Real Time tracking will be shown on Map.

Contenu connexe

Tendances

online bus ticket booking system
online bus ticket booking systemonline bus ticket booking system
online bus ticket booking systemUmme habiba
 
TRAIN TICKETING SYSTEM
TRAIN TICKETING SYSTEMTRAIN TICKETING SYSTEM
TRAIN TICKETING SYSTEMNimRaH NaZaR
 
online bus ticket booking system
online bus ticket booking systemonline bus ticket booking system
online bus ticket booking systemUmme habiba
 
Online Bus ticket reservation
Online Bus ticket reservationOnline Bus ticket reservation
Online Bus ticket reservationSmit Patel
 
Bus tracking application in Android
Bus tracking application in AndroidBus tracking application in Android
Bus tracking application in Androidyashonil
 
Train-Ticket_Booking-System-Presentation.pptx
Train-Ticket_Booking-System-Presentation.pptxTrain-Ticket_Booking-System-Presentation.pptx
Train-Ticket_Booking-System-Presentation.pptxShadman Rahman
 
Intelligent Bus Tracking System Using Android
Intelligent Bus Tracking System Using AndroidIntelligent Bus Tracking System Using Android
Intelligent Bus Tracking System Using AndroidAM Publications
 
Airline reservation system 1
Airline reservation system 1Airline reservation system 1
Airline reservation system 1_faisalkhan
 
Online Railway Reservation System
Online Railway Reservation SystemOnline Railway Reservation System
Online Railway Reservation SystemPrince Kumar
 
Bus Ticket Management System Documentation
Bus Ticket Management System DocumentationBus Ticket Management System Documentation
Bus Ticket Management System Documentationmuzammil siddiq
 
Railways reservation system using socket programming
Railways reservation system using socket programmingRailways reservation system using socket programming
Railways reservation system using socket programmingUtkarsh Sharma
 
SCHOOL BUS ROUTING MANAGEMENT SYSTEM [FINAL]
SCHOOL BUS ROUTING MANAGEMENT SYSTEM [FINAL]SCHOOL BUS ROUTING MANAGEMENT SYSTEM [FINAL]
SCHOOL BUS ROUTING MANAGEMENT SYSTEM [FINAL]ayushi goyal
 
Srs on-railway-reservation-system
Srs on-railway-reservation-systemSrs on-railway-reservation-system
Srs on-railway-reservation-systemRajesh Salla
 
M Suburban Train Ticket System
M Suburban Train Ticket SystemM Suburban Train Ticket System
M Suburban Train Ticket Systemkalpesh1908
 
Online Railway Reservation System
Online Railway Reservation SystemOnline Railway Reservation System
Online Railway Reservation SystemSanjay Saluth
 
Bus Booking Management System
Bus Booking Management SystemBus Booking Management System
Bus Booking Management SystemMike Marshall
 
Railway reservation system
Railway reservation systemRailway reservation system
Railway reservation systemKOYELMAJUMDAR1
 

Tendances (20)

online bus ticket booking system
online bus ticket booking systemonline bus ticket booking system
online bus ticket booking system
 
TRAIN TICKETING SYSTEM
TRAIN TICKETING SYSTEMTRAIN TICKETING SYSTEM
TRAIN TICKETING SYSTEM
 
Railway Reservation system
Railway Reservation systemRailway Reservation system
Railway Reservation system
 
online bus ticket booking system
online bus ticket booking systemonline bus ticket booking system
online bus ticket booking system
 
Airline reservation system
Airline reservation system Airline reservation system
Airline reservation system
 
Online Bus ticket reservation
Online Bus ticket reservationOnline Bus ticket reservation
Online Bus ticket reservation
 
Bus tracking application in Android
Bus tracking application in AndroidBus tracking application in Android
Bus tracking application in Android
 
Train-Ticket_Booking-System-Presentation.pptx
Train-Ticket_Booking-System-Presentation.pptxTrain-Ticket_Booking-System-Presentation.pptx
Train-Ticket_Booking-System-Presentation.pptx
 
Intelligent Bus Tracking System Using Android
Intelligent Bus Tracking System Using AndroidIntelligent Bus Tracking System Using Android
Intelligent Bus Tracking System Using Android
 
Airline reservation system 1
Airline reservation system 1Airline reservation system 1
Airline reservation system 1
 
Online Railway Reservation System
Online Railway Reservation SystemOnline Railway Reservation System
Online Railway Reservation System
 
ONLINE BUS BOOKING SYSTEM
ONLINE BUS BOOKING SYSTEMONLINE BUS BOOKING SYSTEM
ONLINE BUS BOOKING SYSTEM
 
Bus Ticket Management System Documentation
Bus Ticket Management System DocumentationBus Ticket Management System Documentation
Bus Ticket Management System Documentation
 
Railways reservation system using socket programming
Railways reservation system using socket programmingRailways reservation system using socket programming
Railways reservation system using socket programming
 
SCHOOL BUS ROUTING MANAGEMENT SYSTEM [FINAL]
SCHOOL BUS ROUTING MANAGEMENT SYSTEM [FINAL]SCHOOL BUS ROUTING MANAGEMENT SYSTEM [FINAL]
SCHOOL BUS ROUTING MANAGEMENT SYSTEM [FINAL]
 
Srs on-railway-reservation-system
Srs on-railway-reservation-systemSrs on-railway-reservation-system
Srs on-railway-reservation-system
 
M Suburban Train Ticket System
M Suburban Train Ticket SystemM Suburban Train Ticket System
M Suburban Train Ticket System
 
Online Railway Reservation System
Online Railway Reservation SystemOnline Railway Reservation System
Online Railway Reservation System
 
Bus Booking Management System
Bus Booking Management SystemBus Booking Management System
Bus Booking Management System
 
Railway reservation system
Railway reservation systemRailway reservation system
Railway reservation system
 

Similaire à GPS based Bus management system

Daewoo reservation and transport system database
Daewoo reservation and transport system databaseDaewoo reservation and transport system database
Daewoo reservation and transport system databaseEfrah Shakir
 
Asu bus management project (autosaved)
Asu bus management project (autosaved)Asu bus management project (autosaved)
Asu bus management project (autosaved)Birhanu Dagnew
 
Digital Intelligence, a walkway to Chirology
Digital Intelligence, a walkway to ChirologyDigital Intelligence, a walkway to Chirology
Digital Intelligence, a walkway to Chirologyjgd2121
 
Deployment of Debug and Trace for features in RISC-V Core
Deployment of Debug and Trace for features in RISC-V CoreDeployment of Debug and Trace for features in RISC-V Core
Deployment of Debug and Trace for features in RISC-V CoreIRJET Journal
 
Investigating Geographic Information System Technologies A Global Positioning...
Investigating Geographic Information System Technologies A Global Positioning...Investigating Geographic Information System Technologies A Global Positioning...
Investigating Geographic Information System Technologies A Global Positioning...Simon Sweeney
 
srs for railway reservation system
 srs for railway reservation system srs for railway reservation system
srs for railway reservation systemkhushi kalaria
 
DHSSTTSL11192.HSI Process (1)
DHSSTTSL11192.HSI Process (1)DHSSTTSL11192.HSI Process (1)
DHSSTTSL11192.HSI Process (1)John Chin
 
EO notes Lecture 27 Project Management 2.ppt
EO notes Lecture 27 Project Management 2.pptEO notes Lecture 27 Project Management 2.ppt
EO notes Lecture 27 Project Management 2.pptyashchotaliyael21
 
Smart Traffic Monitoring System Report
Smart Traffic Monitoring System ReportSmart Traffic Monitoring System Report
Smart Traffic Monitoring System ReportALi Baker
 
Hospital management system
Hospital management systemHospital management system
Hospital management systemMehul Ranavasiya
 
Passport Automation System
Passport Automation SystemPassport Automation System
Passport Automation SystemMegha Sahu
 
Hostel management system (5)
Hostel management system (5)Hostel management system (5)
Hostel management system (5)PRIYANKMZN
 
Airline ticket reservation system
Airline ticket reservation systemAirline ticket reservation system
Airline ticket reservation systemSH Rajøn
 
School management System
School management SystemSchool management System
School management SystemHATIM Bhagat
 
Pretext Knowledge Grids on Unstructured Data for Facilitating Online Education
Pretext Knowledge Grids on Unstructured Data for Facilitating  Online EducationPretext Knowledge Grids on Unstructured Data for Facilitating  Online Education
Pretext Knowledge Grids on Unstructured Data for Facilitating Online EducationIOSR Journals
 
Project for Student Result System
Project for Student Result SystemProject for Student Result System
Project for Student Result SystemKuMaR AnAnD
 
Online vehicle renting website
Online vehicle renting websiteOnline vehicle renting website
Online vehicle renting websiteSomendra Singh
 

Similaire à GPS based Bus management system (20)

Daewoo reservation and transport system database
Daewoo reservation and transport system databaseDaewoo reservation and transport system database
Daewoo reservation and transport system database
 
combinepdf
combinepdfcombinepdf
combinepdf
 
Asu bus management project (autosaved)
Asu bus management project (autosaved)Asu bus management project (autosaved)
Asu bus management project (autosaved)
 
Dacota sunflower
Dacota sunflowerDacota sunflower
Dacota sunflower
 
Digital Intelligence, a walkway to Chirology
Digital Intelligence, a walkway to ChirologyDigital Intelligence, a walkway to Chirology
Digital Intelligence, a walkway to Chirology
 
Deployment of Debug and Trace for features in RISC-V Core
Deployment of Debug and Trace for features in RISC-V CoreDeployment of Debug and Trace for features in RISC-V Core
Deployment of Debug and Trace for features in RISC-V Core
 
Investigating Geographic Information System Technologies A Global Positioning...
Investigating Geographic Information System Technologies A Global Positioning...Investigating Geographic Information System Technologies A Global Positioning...
Investigating Geographic Information System Technologies A Global Positioning...
 
srs for railway reservation system
 srs for railway reservation system srs for railway reservation system
srs for railway reservation system
 
DHSSTTSL11192.HSI Process (1)
DHSSTTSL11192.HSI Process (1)DHSSTTSL11192.HSI Process (1)
DHSSTTSL11192.HSI Process (1)
 
EO notes Lecture 27 Project Management 2.ppt
EO notes Lecture 27 Project Management 2.pptEO notes Lecture 27 Project Management 2.ppt
EO notes Lecture 27 Project Management 2.ppt
 
Srs
SrsSrs
Srs
 
Smart Traffic Monitoring System Report
Smart Traffic Monitoring System ReportSmart Traffic Monitoring System Report
Smart Traffic Monitoring System Report
 
Hospital management system
Hospital management systemHospital management system
Hospital management system
 
Passport Automation System
Passport Automation SystemPassport Automation System
Passport Automation System
 
Hostel management system (5)
Hostel management system (5)Hostel management system (5)
Hostel management system (5)
 
Airline ticket reservation system
Airline ticket reservation systemAirline ticket reservation system
Airline ticket reservation system
 
School management System
School management SystemSchool management System
School management System
 
Pretext Knowledge Grids on Unstructured Data for Facilitating Online Education
Pretext Knowledge Grids on Unstructured Data for Facilitating  Online EducationPretext Knowledge Grids on Unstructured Data for Facilitating  Online Education
Pretext Knowledge Grids on Unstructured Data for Facilitating Online Education
 
Project for Student Result System
Project for Student Result SystemProject for Student Result System
Project for Student Result System
 
Online vehicle renting website
Online vehicle renting websiteOnline vehicle renting website
Online vehicle renting website
 

Dernier

From idea to production in a day – Leveraging Azure ML and Streamlit to build...
From idea to production in a day – Leveraging Azure ML and Streamlit to build...From idea to production in a day – Leveraging Azure ML and Streamlit to build...
From idea to production in a day – Leveraging Azure ML and Streamlit to build...Florian Roscheck
 
How we prevented account sharing with MFA
How we prevented account sharing with MFAHow we prevented account sharing with MFA
How we prevented account sharing with MFAAndrei Kaleshka
 
2006_GasProcessing_HB (1).pdf HYDROCARBON PROCESSING
2006_GasProcessing_HB (1).pdf HYDROCARBON PROCESSING2006_GasProcessing_HB (1).pdf HYDROCARBON PROCESSING
2006_GasProcessing_HB (1).pdf HYDROCARBON PROCESSINGmarianagonzalez07
 
Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...
Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...
Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...dajasot375
 
Student Profile Sample report on improving academic performance by uniting gr...
Student Profile Sample report on improving academic performance by uniting gr...Student Profile Sample report on improving academic performance by uniting gr...
Student Profile Sample report on improving academic performance by uniting gr...Seán Kennedy
 
RABBIT: A CLI tool for identifying bots based on their GitHub events.
RABBIT: A CLI tool for identifying bots based on their GitHub events.RABBIT: A CLI tool for identifying bots based on their GitHub events.
RABBIT: A CLI tool for identifying bots based on their GitHub events.natarajan8993
 
Biometric Authentication: The Evolution, Applications, Benefits and Challenge...
Biometric Authentication: The Evolution, Applications, Benefits and Challenge...Biometric Authentication: The Evolution, Applications, Benefits and Challenge...
Biometric Authentication: The Evolution, Applications, Benefits and Challenge...GQ Research
 
Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...
Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...
Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...Jack DiGiovanna
 
Effects of Smartphone Addiction on the Academic Performances of Grades 9 to 1...
Effects of Smartphone Addiction on the Academic Performances of Grades 9 to 1...Effects of Smartphone Addiction on the Academic Performances of Grades 9 to 1...
Effects of Smartphone Addiction on the Academic Performances of Grades 9 to 1...limedy534
 
RadioAdProWritingCinderellabyButleri.pdf
RadioAdProWritingCinderellabyButleri.pdfRadioAdProWritingCinderellabyButleri.pdf
RadioAdProWritingCinderellabyButleri.pdfgstagge
 
Multiple time frame trading analysis -brianshannon.pdf
Multiple time frame trading analysis -brianshannon.pdfMultiple time frame trading analysis -brianshannon.pdf
Multiple time frame trading analysis -brianshannon.pdfchwongval
 
20240419 - Measurecamp Amsterdam - SAM.pdf
20240419 - Measurecamp Amsterdam - SAM.pdf20240419 - Measurecamp Amsterdam - SAM.pdf
20240419 - Measurecamp Amsterdam - SAM.pdfHuman37
 
Identifying Appropriate Test Statistics Involving Population Mean
Identifying Appropriate Test Statistics Involving Population MeanIdentifying Appropriate Test Statistics Involving Population Mean
Identifying Appropriate Test Statistics Involving Population MeanMYRABACSAFRA2
 
NLP Project PPT: Flipkart Product Reviews through NLP Data Science.pptx
NLP Project PPT: Flipkart Product Reviews through NLP Data Science.pptxNLP Project PPT: Flipkart Product Reviews through NLP Data Science.pptx
NLP Project PPT: Flipkart Product Reviews through NLP Data Science.pptxBoston Institute of Analytics
 
Call Us ➥97111√47426🤳Call Girls in Aerocity (Delhi NCR)
Call Us ➥97111√47426🤳Call Girls in Aerocity (Delhi NCR)Call Us ➥97111√47426🤳Call Girls in Aerocity (Delhi NCR)
Call Us ➥97111√47426🤳Call Girls in Aerocity (Delhi NCR)jennyeacort
 
NLP Data Science Project Presentation:Predicting Heart Disease with NLP Data ...
NLP Data Science Project Presentation:Predicting Heart Disease with NLP Data ...NLP Data Science Project Presentation:Predicting Heart Disease with NLP Data ...
NLP Data Science Project Presentation:Predicting Heart Disease with NLP Data ...Boston Institute of Analytics
 
科罗拉多大学波尔得分校毕业证学位证成绩单-可办理
科罗拉多大学波尔得分校毕业证学位证成绩单-可办理科罗拉多大学波尔得分校毕业证学位证成绩单-可办理
科罗拉多大学波尔得分校毕业证学位证成绩单-可办理e4aez8ss
 
Generative AI for Social Good at Open Data Science East 2024
Generative AI for Social Good at Open Data Science East 2024Generative AI for Social Good at Open Data Science East 2024
Generative AI for Social Good at Open Data Science East 2024Colleen Farrelly
 
DBA Basics: Getting Started with Performance Tuning.pdf
DBA Basics: Getting Started with Performance Tuning.pdfDBA Basics: Getting Started with Performance Tuning.pdf
DBA Basics: Getting Started with Performance Tuning.pdfJohn Sterrett
 

Dernier (20)

From idea to production in a day – Leveraging Azure ML and Streamlit to build...
From idea to production in a day – Leveraging Azure ML and Streamlit to build...From idea to production in a day – Leveraging Azure ML and Streamlit to build...
From idea to production in a day – Leveraging Azure ML and Streamlit to build...
 
How we prevented account sharing with MFA
How we prevented account sharing with MFAHow we prevented account sharing with MFA
How we prevented account sharing with MFA
 
2006_GasProcessing_HB (1).pdf HYDROCARBON PROCESSING
2006_GasProcessing_HB (1).pdf HYDROCARBON PROCESSING2006_GasProcessing_HB (1).pdf HYDROCARBON PROCESSING
2006_GasProcessing_HB (1).pdf HYDROCARBON PROCESSING
 
Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...
Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...
Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...
 
Student Profile Sample report on improving academic performance by uniting gr...
Student Profile Sample report on improving academic performance by uniting gr...Student Profile Sample report on improving academic performance by uniting gr...
Student Profile Sample report on improving academic performance by uniting gr...
 
RABBIT: A CLI tool for identifying bots based on their GitHub events.
RABBIT: A CLI tool for identifying bots based on their GitHub events.RABBIT: A CLI tool for identifying bots based on their GitHub events.
RABBIT: A CLI tool for identifying bots based on their GitHub events.
 
Biometric Authentication: The Evolution, Applications, Benefits and Challenge...
Biometric Authentication: The Evolution, Applications, Benefits and Challenge...Biometric Authentication: The Evolution, Applications, Benefits and Challenge...
Biometric Authentication: The Evolution, Applications, Benefits and Challenge...
 
Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...
Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...
Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...
 
Effects of Smartphone Addiction on the Academic Performances of Grades 9 to 1...
Effects of Smartphone Addiction on the Academic Performances of Grades 9 to 1...Effects of Smartphone Addiction on the Academic Performances of Grades 9 to 1...
Effects of Smartphone Addiction on the Academic Performances of Grades 9 to 1...
 
RadioAdProWritingCinderellabyButleri.pdf
RadioAdProWritingCinderellabyButleri.pdfRadioAdProWritingCinderellabyButleri.pdf
RadioAdProWritingCinderellabyButleri.pdf
 
Multiple time frame trading analysis -brianshannon.pdf
Multiple time frame trading analysis -brianshannon.pdfMultiple time frame trading analysis -brianshannon.pdf
Multiple time frame trading analysis -brianshannon.pdf
 
20240419 - Measurecamp Amsterdam - SAM.pdf
20240419 - Measurecamp Amsterdam - SAM.pdf20240419 - Measurecamp Amsterdam - SAM.pdf
20240419 - Measurecamp Amsterdam - SAM.pdf
 
Identifying Appropriate Test Statistics Involving Population Mean
Identifying Appropriate Test Statistics Involving Population MeanIdentifying Appropriate Test Statistics Involving Population Mean
Identifying Appropriate Test Statistics Involving Population Mean
 
NLP Project PPT: Flipkart Product Reviews through NLP Data Science.pptx
NLP Project PPT: Flipkart Product Reviews through NLP Data Science.pptxNLP Project PPT: Flipkart Product Reviews through NLP Data Science.pptx
NLP Project PPT: Flipkart Product Reviews through NLP Data Science.pptx
 
Call Us ➥97111√47426🤳Call Girls in Aerocity (Delhi NCR)
Call Us ➥97111√47426🤳Call Girls in Aerocity (Delhi NCR)Call Us ➥97111√47426🤳Call Girls in Aerocity (Delhi NCR)
Call Us ➥97111√47426🤳Call Girls in Aerocity (Delhi NCR)
 
NLP Data Science Project Presentation:Predicting Heart Disease with NLP Data ...
NLP Data Science Project Presentation:Predicting Heart Disease with NLP Data ...NLP Data Science Project Presentation:Predicting Heart Disease with NLP Data ...
NLP Data Science Project Presentation:Predicting Heart Disease with NLP Data ...
 
Call Girls in Saket 99530🔝 56974 Escort Service
Call Girls in Saket 99530🔝 56974 Escort ServiceCall Girls in Saket 99530🔝 56974 Escort Service
Call Girls in Saket 99530🔝 56974 Escort Service
 
科罗拉多大学波尔得分校毕业证学位证成绩单-可办理
科罗拉多大学波尔得分校毕业证学位证成绩单-可办理科罗拉多大学波尔得分校毕业证学位证成绩单-可办理
科罗拉多大学波尔得分校毕业证学位证成绩单-可办理
 
Generative AI for Social Good at Open Data Science East 2024
Generative AI for Social Good at Open Data Science East 2024Generative AI for Social Good at Open Data Science East 2024
Generative AI for Social Good at Open Data Science East 2024
 
DBA Basics: Getting Started with Performance Tuning.pdf
DBA Basics: Getting Started with Performance Tuning.pdfDBA Basics: Getting Started with Performance Tuning.pdf
DBA Basics: Getting Started with Performance Tuning.pdf
 

GPS based Bus management system

  • 1. GPS Based Bus Management System Software Engineering Project Report (CSHP - 410) Submitted by: Under the supervision of Atul (10545) Dr. Anjali Thukral Ankit (10423) Neeraj(10471) 2013 Keshav Mahavidyalaya University of Delhi
  • 2. Table of Contents Problem Statement.................................................................................................................................3 1 INTRODUCTION...............................................................................................................................4 1.1 Purpose ...................................................................................................................................4 1.2 Scope.......................................................................................................................................4 1.3 Definitions...............................................................................................................................4 1.4 Overview.................................................................................................................................4 2 Software Requirement Specification..............................................................................................5 2.1 Data Flow Diagram..................................................................................................................5 2.1.1 DFD Level 0......................................................................................................................5 2.1.2 DFD Level 1......................................................................................................................6 2.1.3 Data Dictionary ...............................................................................................................7 3 Project Management ......................................................................................................................9 3.1 Cost Estimations......................................................................................................................9 3.1.1 Functional Point Estimation............................................................................................9 3.1.2 Efforts............................................................................................................................10 3.2 Schedule................................................................................................................................11 3.3 Risk Table ..............................................................................................................................11 4 Design Engineering........................................................................................................................12 4.1 Architectural Design..............................................................................................................12 4.2 Entity- Relationship Diagram ................................................................................................13 5 Testing...........................................................................................................................................14
  • 3. Problem Statement Problem Analysis:- 1. We don’t have system which could inform Passenger about their Bus Timing, Shedule etc. 2. We only do have record of bus Timings on which bus should start on a route which is also sometimes not followed by drivers. 3. There is no information provided to passenger about buses. Method of Solution:- 1. The problem of bus timing and other problem could be solved by Schedule Monitoring of Buses. 2. Real time Information should be provided to user about their bus this could be done by using GPS in buses.
  • 4. 1 INTRODUCTION 1.1 Purpose The GPS Based Bus Management System (GBMS) is used to keep Track of Buses by Company. Also this facility can be used to give information to Passenger by web and a Display on Bus Stop. 1.2 Scope Many cities have found that using GPS tracking systems not only improve the efficiency of city bus operations, but also encourage more commuters to take advantage of their city bus systems. Many city bus systems have discovered that GPS tracking systems which allow passengers to monitor the location and estimated arrival time of their bus actually increases the number of people using city buses for routine commuting. For example, if a rushed commuter can 1.3 Definitions Our System also provides information about Buses to Passenger. Consider the possibility of implementing GPS tracking systems which allow customers to monitor bus locations via website, or cell phones. This will likely increase the satisfaction of customers. Also a display is fixed on every Stop so passenger will know where their bus is and when will it arrive. 1.4 Overview The purpose of this section is to obtain agreement regarding the objectives the system must meet. Ultimately this segment defines the boundaries of the effort. The “GPS Based Bus Management System” helps administrator honor their professional commitments by following a tailored version of the organization’s standard process. This project aims to provide helpful information about Bus in a given geographic area. Also it store Tracking Information in Database. It also keep track of Bus’s speed if it is crossed the authority will get the information.verify his or her bus is running on time via their cell phone or a website, they are much more likely to ride the bus rather than take a cab or drive themselves.
  • 5. 2 Software Requirement Specification 2.1 Data Flow Diagram 2.1.1 DFD Level 0
  • 7. 2.1.3 Data Dictionary Table 1: Bus Database Field Name Type Description Bus_ID Long Integer Primary Key Route_no Integer Emp_no Long Integer Driver_name Character[20] Table 2: Route Field Name Type Description Route_no Integer Primary Key Route_Name Character[20] Start Character[20] Destination Character[20] Path Integer Multi valued
  • 8. Table 3: Stops Field Name Type Description Stop_id Integer Primary Key Stop_name Character[20] Degree_lat Float Min_lat Float Sec_lat Float Degree_log Float Min_log Float Sec_log Float Table 4: Main Field Name Type Description Bus_ID Long Integer Route_no Integer Route_Name Character[20] Time Time Stamp Loc_lat Degree Float Min Float Sec Float Loc_log Degree Float Min Float Sec Float Next_stop Integer Last_stop Integer
  • 9. 3 Project Management 3.1 Cost Estimations 3.1.1 Functional Point Estimation Info Domain Value Opt. Est. Count Weight FP Count External Inputs 5 4 5 23 External Outputs 6 5 4 23 External Inquires 2 2 5 10 Internal Logical Files 4 3 10 35 External Interface Files 2 1 7 11 Count Total 102 FP (EST.) = Count Total * Value adjustment factor FP (EST.) = Count Total * [0.65+0.01* Ʃ (Fi)] Calculation of Value adjustment factor:- S No. Factor Values 1 Backup and Recovery 3 2 Data communication 4 3 Distributed processing 2 4 Performance Critical 3 5 Existing operating environment 1 6 Online-line data entry 2
  • 10. 7 Input transaction over multiple screens 2 8 ILFs update online 1 9 Information domain values complex 3 10 Internal processing complex 4 11 Code design for reuse 3 12 Conversion/installation in design 4 13 Multiple installation 1 14 Application design for change 5 Total 38 Ʃ (Fi)] = 38 Value adjustment factor= [0.65+0.01* 38] =0.65 + 0.38 = 1.03 FP (EST.) = 102 * 1.03 = 105.06  Our average productivity is 8 FP/month.  If labour rate is Rs.10000 per month.  Cost per FP is Rs. 1250.  Total Cost for Project is Rs. 130,000. 3.1.2 Efforts Effort= Total Functional Points/Average Productivity = 105.06/8 =13 pm  Our estimated Effort is 13 person-month
  • 11. 3.2 Schedule S.No. Process/Phase Start Date Finish Date 1. Requirement gathering 20/01/13 15/02/13 2. Requirement analysis 16/02/13 27/02/13 3. DFD preparation 28/02/13 10/03/13 4. Data Dictionary preparation 11/03/13 20/03/13 5. Risk Management Plan 21/03/13 30/03/13 6. ERD preparation 31/03/13 10/04/13 7. FPA calculation 11/04/13 16/04/13 3.3 Risk Table S.No RISK CATEGORY PROBABILIT Y IMPACT RMMM PLAN 1 Some team members leave the project development in- between Technical risk 30% 2  Use backup staffs which knows what was going on in the project. 2 Delivery deadline tightened Project risk 30% 1  Team may use extra members to complete the task on scheduled time 3 Losing of all the project data, this may be caused by a hard disk being wiped out by a virus, hard disk failure, etc. Project risk 20% 2  Carry out necessary backup of database data, source code and documentation 4 Team dissension/lack of cohesion Project risk 10% 3  We could set some guide-lines and rules regarding how we deal with each other .
  • 12. 4 Design Engineering 4.1 Architectural Design
  • 14. 5 Testing  Administrator module : 1. Test case: Login Input : ID, Password. Process : Click on the login link. If administrator enters ID and password correct it goes to the admin services otherwise displays the same page with an error message. Output : Displays the admin services page. 2. Test case: Add/Delete new Bus Input: Bus_Id. Process: A new Bus can be added into the system and admin can update details. Output: Changes will take place in Database 3. Test case: Add/Delete new Route Input: Route_id Process: A new Route can be added/deleted into the system and admin can update details. Output: Changes will take place in Database 4. Test case: Track a Bus Input: Bus_Id Process: All GPS Message coming from this bus ID will be displayed through Map. Output: Real Time tracking will be shown on Map.