PRESEN TED BY:
PAWA N K U M A R ( 1 6 M 1 4 5 )
A D I T YA U PA D H AYAY ( 1 6 M 1 5 0 )
A M I T K U M A R ( 1 6 M 1 5 5 )
SAFETY AUDIT PROCESS FOR RURAL ROADS
GUIDED BY:
DR. SUNIL SHARMA,
Associate Prof. civil engg.
DEPARTMENT OF CIVIL ENGINEERING,
NIT HAMIRPUR 2016
ROAD SAFETY AUDIT
• A Road Safety Audit (RSA) is a formal procedure for
assessing safety performance examination of an existing
or future road or intersection by an independent audit
team.
• Road safety audits can be used in any phase of project
development from planning and preliminary engineering,
design and construction.
• RSAs can also be used on any sized project from minor
rural roads to inter-state National Highways. RSAs can be
viewed as a proactive low-cost approach to improve
safety.
OBJECTIVE OF RSA
• Objective of the RSA is to assess projects for potential
accident elimination / reduction on the basis of road user
knowledge, attributes and skills, day/night, wet/dry road
conditions.
• Since our roads are designed and constructed by striking
a socio-economic balance between safety, accessibility,
environment, economy and locally available material and
skill, RSA may determine the shortfall in safety, but may
not be able to correct the deficiencies in pavement
design, drainage, and appropriate space standard etc.
BENEFITS OF RSA
• The likelihood of accidents on the road network can
be reduced,
• The severity of accidents can be reduced,
• Road safety is given greater prominence in the
minds of road designers and traffic engineers,
• The need for costly remedial work is reduced
• The total cost of a project to the community, including
accidents, disruption and trauma, is minimized.
• The cost of road safety audit and the consequent cost
of changing a design are significantly less
ROAD SAFETY SITUATION IN INDIA
ACCIDENTAL SURVEY
• India accounts for 10% or total world’s
fatalities.
• In 2014 there were 450898 case of
accidents(as per MORT&H).
• Socio-economic cost of accidents was reported
at 3% of GDP.
ROAD ACCIDENT DEATHS BY
URBAN-RURAL SPLIT (2014)
URBAN
POPULATIO
N
RURAL
POPULATIO
N
ALL INDIA
Population 37.7 cr. 83.3 cr. 121 cr.
Population share 31% 69% 100%
Road accident deaths 54,565 86,961 1,41,526
Road accident deaths per 1 lakh pop. 14.5 10.4 11.7
Share of road accident deaths 39% 61% 100%
Data Source: National Crimes & Records Bureau (NCRN)
RURAL ROADS
Rural roads are generally:
• Single lane
RURAL ROADS (CONTINUE…)
• Low design speed
• Low traffic volume(both motorised and non motorised)
RURAL ROADS (CONTINUE…)
• May be paved or unpaved
INVOLVEMENT
• RSA is based on the principle of an independent review.
• In the process of RSA their is involvement of Client, Designer,
Auditor and the Road User.
• The client normally appoints the designer and the auditor who
are two separate consultants.
METHODOLOGY
1. Safety Audit can be applied to
a) New Roads
b) Existing / constructed Roads
2. On new roads, the audit will lead to identification of
accident prone situations in rural roads .eg railway
crossing , defective geometry , illegal encroachment
3. On existing or already constructed roads, the audit will
suggest appropriate mitigation measures to reduce the
possibility of accidents
METHODOLOGY (CONTINUE…)
Audit team
• The safety audit team should comprise two members.
1. One member should have adequate traffic engineering
and traffic management experience
2. The other should be an engineer with experience in road
design and construction techniques.
AUDIT PROCESS
STAGES OF AUDIT FOR RURAL ROADS
Road Safety Audit (RSA) basically comprises of three
Stages:
• Stage 1 - Audit during design and planning
• Stage 2 - Audit during Construction
• Stage 3 - Audit after the completion of the project
STAGE 1 - AUDIT DURING DESIGN AND PLANNING
• Examining safety issues
1. Specific geometric design features,
2. Traffic control devices,
3. Delineators,
4. Roadside clear zones,
5. Detailed design of intersections,
6. Interchanges,
7. Grade separators,
8. Glare concerns and lighting,
SAFETY ISSUES RELATED TO LANDSCAPING
Provision for special road users like
1. School children
2. Persons with disabilities
3. Buses
4. Equestrian
5. Rail roads
6. Heavy trucks
STAGE 2 - AUDIT DURING CONSTRUCTION
• Final check prior to opening the facility to ensure that
the safety concerns of all road users have been
addressed and that there are no apparent hazardous
conditions.
• The Audit team needs to actually travel both during the
day and the night in a car, on two wheeler and also in a
non-motorised transport.
STAGE 2 - AUDIT DURING CONSTRUCTION
(CONTINUE…)
• The Audit team needs to
1. Include day / night checks
2. Evaluation considering dry / wet weather
3. Driving / riding and walking
STAGE 3 - AUDIT AFTER THE COMPLETION
OF THE PROJECT
• An audit of existing roadway to determine……
1. If the safety needs of all road users are currently being served.
It recognizes that a roadway may change over time. Changes may have
resulted from
• Changing road use .
• Encroachments.
• Design inconsistency .
• Ageing infrastructure .
• Inadequate maintenance of road and traffic control devices and other
measures.
STAGE 3 - AUDIT AFTER THE COMPLETION OF THE
PROJECT
Points to be emphasized are adequacy of roadway….
1. Roadside and intersections
2. Interchanges
3. Grade separators
4. location of bus stops
5. Truck lay-byes
6. Needs of VRU(vulnerable road users)
7. Access management
THANK YOU

Contenu connexe

Tendances

Accident Black Spot Identification | KJEI Campus to Chandni Chowk
Accident Black Spot Identification | KJEI Campus to Chandni ChowkAccident Black Spot Identification | KJEI Campus to Chandni Chowk
Accident Black Spot Identification | KJEI Campus to Chandni ChowkShadaab Sayyed
 
GEOMETRIC DESIGN OF HIGHWAY
GEOMETRIC DESIGN OF HIGHWAYGEOMETRIC DESIGN OF HIGHWAY
GEOMETRIC DESIGN OF HIGHWAYreemajadwani
 
Introduction to highway engineering
Introduction to highway engineeringIntroduction to highway engineering
Introduction to highway engineeringAavani Thampi
 
Urban transportation system - methods of route assignment
Urban transportation system - methods of route assignmentUrban transportation system - methods of route assignment
Urban transportation system - methods of route assignmentStudent
 
Spot speed study, transport planning
Spot speed study, transport planningSpot speed study, transport planning
Spot speed study, transport planningPratyush Kumar
 
Road safety audit presentation with special application to pedestrian issues
Road safety audit presentation with special application to pedestrian issuesRoad safety audit presentation with special application to pedestrian issues
Road safety audit presentation with special application to pedestrian issuesnickfortey
 
O and d study
O and d studyO and d study
O and d studymeetmksvs
 
Road safety audit case study
Road safety audit case studyRoad safety audit case study
Road safety audit case studyHardik Dhaduk
 
Origin and destination survey
Origin and destination surveyOrigin and destination survey
Origin and destination surveyraj balar
 
Traffic studies volume study
Traffic studies volume studyTraffic studies volume study
Traffic studies volume studyAglaia Connect
 
Chapter 2 traffic studies
Chapter 2 traffic studiesChapter 2 traffic studies
Chapter 2 traffic studiesAnkit Patel
 
Introduction of vissim software
Introduction of vissim softwareIntroduction of vissim software
Introduction of vissim softwareashahit
 
Ce2026 traffic engineering and management notes
Ce2026 traffic engineering and management notesCe2026 traffic engineering and management notes
Ce2026 traffic engineering and management notesNayana 54321
 
Design Of Flexible Pavements
Design Of Flexible PavementsDesign Of Flexible Pavements
Design Of Flexible Pavementswhutton1
 

Tendances (20)

Geometric design
Geometric designGeometric design
Geometric design
 
Road construction ppt
Road construction pptRoad construction ppt
Road construction ppt
 
Accident Black Spot Identification | KJEI Campus to Chandni Chowk
Accident Black Spot Identification | KJEI Campus to Chandni ChowkAccident Black Spot Identification | KJEI Campus to Chandni Chowk
Accident Black Spot Identification | KJEI Campus to Chandni Chowk
 
GEOMETRIC DESIGN OF HIGHWAY
GEOMETRIC DESIGN OF HIGHWAYGEOMETRIC DESIGN OF HIGHWAY
GEOMETRIC DESIGN OF HIGHWAY
 
Introduction to highway engineering
Introduction to highway engineeringIntroduction to highway engineering
Introduction to highway engineering
 
Urban transportation system - methods of route assignment
Urban transportation system - methods of route assignmentUrban transportation system - methods of route assignment
Urban transportation system - methods of route assignment
 
Spot speed study, transport planning
Spot speed study, transport planningSpot speed study, transport planning
Spot speed study, transport planning
 
Road safety audit presentation with special application to pedestrian issues
Road safety audit presentation with special application to pedestrian issuesRoad safety audit presentation with special application to pedestrian issues
Road safety audit presentation with special application to pedestrian issues
 
Accident study
Accident studyAccident study
Accident study
 
O and d study
O and d studyO and d study
O and d study
 
Vissim
VissimVissim
Vissim
 
Road safety audit case study
Road safety audit case studyRoad safety audit case study
Road safety audit case study
 
Origin and destination survey
Origin and destination surveyOrigin and destination survey
Origin and destination survey
 
Traffic studies volume study
Traffic studies volume studyTraffic studies volume study
Traffic studies volume study
 
O & d survey
O & d survey O & d survey
O & d survey
 
Chapter 2 traffic studies
Chapter 2 traffic studiesChapter 2 traffic studies
Chapter 2 traffic studies
 
Introduction of vissim software
Introduction of vissim softwareIntroduction of vissim software
Introduction of vissim software
 
Ce2026 traffic engineering and management notes
Ce2026 traffic engineering and management notesCe2026 traffic engineering and management notes
Ce2026 traffic engineering and management notes
 
Road Safety Auditing
Road Safety AuditingRoad Safety Auditing
Road Safety Auditing
 
Design Of Flexible Pavements
Design Of Flexible PavementsDesign Of Flexible Pavements
Design Of Flexible Pavements
 

Similaire à Rural Road Safety Audit Process

Road safety tools for authorities
Road safety tools for authorities  Road safety tools for authorities
Road safety tools for authorities Tristan Wiggill
 
Road Safety Audit of Chamarajanagar to Haradanahalli District Forest - NH 948
Road Safety Audit of Chamarajanagar to Haradanahalli District Forest - NH 948Road Safety Audit of Chamarajanagar to Haradanahalli District Forest - NH 948
Road Safety Audit of Chamarajanagar to Haradanahalli District Forest - NH 948IRJET Journal
 
IRJET- Traffic Management Studies in Avadi
IRJET- Traffic Management Studies in AvadiIRJET- Traffic Management Studies in Avadi
IRJET- Traffic Management Studies in AvadiIRJET Journal
 
Safety Orientation on Indian Highways-Delhi Gurgaon Expressway: A case study
Safety Orientation on Indian Highways-Delhi Gurgaon Expressway: A case studySafety Orientation on Indian Highways-Delhi Gurgaon Expressway: A case study
Safety Orientation on Indian Highways-Delhi Gurgaon Expressway: A case studyManoj Aggarwal
 
project synopsis.pptx
project synopsis.pptxproject synopsis.pptx
project synopsis.pptxPrasannaPn1
 
Road Safety Auditing of Koratty Intersection
Road Safety Auditing of Koratty IntersectionRoad Safety Auditing of Koratty Intersection
Road Safety Auditing of Koratty IntersectionIRJET Journal
 
Current status of road safety audits
Current status of road safety auditsCurrent status of road safety audits
Current status of road safety auditsTristan Wiggill
 
1.Safety Evaluation of a Highway using IRAP 1 (2).pdf
1.Safety Evaluation of a Highway using IRAP 1 (2).pdf1.Safety Evaluation of a Highway using IRAP 1 (2).pdf
1.Safety Evaluation of a Highway using IRAP 1 (2).pdfpushraj5
 
AMTID International Conference: Road Safety Audit of Palm Beach Road, Navi Mu...
AMTID International Conference: Road Safety Audit of Palm Beach Road, Navi Mu...AMTID International Conference: Road Safety Audit of Palm Beach Road, Navi Mu...
AMTID International Conference: Road Safety Audit of Palm Beach Road, Navi Mu...Jatin Solanki
 
Traffic engg_.pdf
Traffic engg_.pdfTraffic engg_.pdf
Traffic engg_.pdfReigerRoyal
 
IRJET- Identification and Analysis of Accident Blackspots using GIS
IRJET- Identification and Analysis of Accident Blackspots using GISIRJET- Identification and Analysis of Accident Blackspots using GIS
IRJET- Identification and Analysis of Accident Blackspots using GISIRJET Journal
 
Road User Safety
Road User Safety Road User Safety
Road User Safety JumpingJaq
 
Transport demand survey
Transport demand surveyTransport demand survey
Transport demand surveyBhishma Bhatti
 
PROPOSED KAJANG URBAN TRAFFIC MANAGEMENT SYSTEM PRESENTATION
PROPOSED KAJANG URBAN TRAFFIC MANAGEMENT SYSTEM PRESENTATIONPROPOSED KAJANG URBAN TRAFFIC MANAGEMENT SYSTEM PRESENTATION
PROPOSED KAJANG URBAN TRAFFIC MANAGEMENT SYSTEM PRESENTATIONWael Alawsey
 
Jp Research, Pune sres ppt
Jp Research, Pune sres pptJp Research, Pune sres ppt
Jp Research, Pune sres pptSuraj Puri
 
JP RESEARCH INDIA, PVT. LTD
JP RESEARCH INDIA, PVT. LTD JP RESEARCH INDIA, PVT. LTD
JP RESEARCH INDIA, PVT. LTD Suraj Puri
 
Roadway condition survey full report(BUET)
Roadway condition survey full report(BUET)Roadway condition survey full report(BUET)
Roadway condition survey full report(BUET)Ahmed Ferdous Ankon
 

Similaire à Rural Road Safety Audit Process (20)

Road safety tools for authorities
Road safety tools for authorities  Road safety tools for authorities
Road safety tools for authorities
 
Design of expressway
Design of expresswayDesign of expressway
Design of expressway
 
Road Safety Audit of Chamarajanagar to Haradanahalli District Forest - NH 948
Road Safety Audit of Chamarajanagar to Haradanahalli District Forest - NH 948Road Safety Audit of Chamarajanagar to Haradanahalli District Forest - NH 948
Road Safety Audit of Chamarajanagar to Haradanahalli District Forest - NH 948
 
IRJET- Traffic Management Studies in Avadi
IRJET- Traffic Management Studies in AvadiIRJET- Traffic Management Studies in Avadi
IRJET- Traffic Management Studies in Avadi
 
Safety Orientation on Indian Highways-Delhi Gurgaon Expressway: A case study
Safety Orientation on Indian Highways-Delhi Gurgaon Expressway: A case studySafety Orientation on Indian Highways-Delhi Gurgaon Expressway: A case study
Safety Orientation on Indian Highways-Delhi Gurgaon Expressway: A case study
 
project synopsis.pptx
project synopsis.pptxproject synopsis.pptx
project synopsis.pptx
 
Road Safety Auditing of Koratty Intersection
Road Safety Auditing of Koratty IntersectionRoad Safety Auditing of Koratty Intersection
Road Safety Auditing of Koratty Intersection
 
Current status of road safety audits
Current status of road safety auditsCurrent status of road safety audits
Current status of road safety audits
 
1.Safety Evaluation of a Highway using IRAP 1 (2).pdf
1.Safety Evaluation of a Highway using IRAP 1 (2).pdf1.Safety Evaluation of a Highway using IRAP 1 (2).pdf
1.Safety Evaluation of a Highway using IRAP 1 (2).pdf
 
AMTID International Conference: Road Safety Audit of Palm Beach Road, Navi Mu...
AMTID International Conference: Road Safety Audit of Palm Beach Road, Navi Mu...AMTID International Conference: Road Safety Audit of Palm Beach Road, Navi Mu...
AMTID International Conference: Road Safety Audit of Palm Beach Road, Navi Mu...
 
Traffic engg_.pdf
Traffic engg_.pdfTraffic engg_.pdf
Traffic engg_.pdf
 
IRJET- Identification and Analysis of Accident Blackspots using GIS
IRJET- Identification and Analysis of Accident Blackspots using GISIRJET- Identification and Analysis of Accident Blackspots using GIS
IRJET- Identification and Analysis of Accident Blackspots using GIS
 
Road User Safety
Road User Safety Road User Safety
Road User Safety
 
Transport demand survey
Transport demand surveyTransport demand survey
Transport demand survey
 
ITS presentation final
ITS presentation final ITS presentation final
ITS presentation final
 
PROPOSED KAJANG URBAN TRAFFIC MANAGEMENT SYSTEM PRESENTATION
PROPOSED KAJANG URBAN TRAFFIC MANAGEMENT SYSTEM PRESENTATIONPROPOSED KAJANG URBAN TRAFFIC MANAGEMENT SYSTEM PRESENTATION
PROPOSED KAJANG URBAN TRAFFIC MANAGEMENT SYSTEM PRESENTATION
 
PROPOSED KAJANG URBAN TRAFFIC MANAGEMENT SYSTEM.
PROPOSED KAJANG URBAN TRAFFIC MANAGEMENT SYSTEM.PROPOSED KAJANG URBAN TRAFFIC MANAGEMENT SYSTEM.
PROPOSED KAJANG URBAN TRAFFIC MANAGEMENT SYSTEM.
 
Jp Research, Pune sres ppt
Jp Research, Pune sres pptJp Research, Pune sres ppt
Jp Research, Pune sres ppt
 
JP RESEARCH INDIA, PVT. LTD
JP RESEARCH INDIA, PVT. LTD JP RESEARCH INDIA, PVT. LTD
JP RESEARCH INDIA, PVT. LTD
 
Roadway condition survey full report(BUET)
Roadway condition survey full report(BUET)Roadway condition survey full report(BUET)
Roadway condition survey full report(BUET)
 

Dernier

THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONjhunlian
 
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESCME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESkarthi keyan
 
Javier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptxJavier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptxJavier Fernández Muñoz
 
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfComprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfalene1
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdfHafizMudaserAhmad
 
priority interrupt computer organization
priority interrupt computer organizationpriority interrupt computer organization
priority interrupt computer organizationchnrketan
 
Novel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsNovel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsResearcher Researcher
 
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Erbil Polytechnic University
 
STATE TRANSITION DIAGRAM in psoc subject
STATE TRANSITION DIAGRAM in psoc subjectSTATE TRANSITION DIAGRAM in psoc subject
STATE TRANSITION DIAGRAM in psoc subjectGayathriM270621
 
Triangulation survey (Basic Mine Surveying)_MI10412MI.pptx
Triangulation survey (Basic Mine Surveying)_MI10412MI.pptxTriangulation survey (Basic Mine Surveying)_MI10412MI.pptx
Triangulation survey (Basic Mine Surveying)_MI10412MI.pptxRomil Mishra
 
Forming section troubleshooting checklist for improving wire life (1).ppt
Forming section troubleshooting checklist for improving wire life (1).pptForming section troubleshooting checklist for improving wire life (1).ppt
Forming section troubleshooting checklist for improving wire life (1).pptNoman khan
 
Secure Key Crypto - Tech Paper JET Tech Labs
Secure Key Crypto - Tech Paper JET Tech LabsSecure Key Crypto - Tech Paper JET Tech Labs
Secure Key Crypto - Tech Paper JET Tech Labsamber724300
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communicationpanditadesh123
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosVictor Morales
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Coursebim.edu.pl
 
Theory of Machine Notes / Lecture Material .pdf
Theory of Machine Notes / Lecture Material .pdfTheory of Machine Notes / Lecture Material .pdf
Theory of Machine Notes / Lecture Material .pdfShreyas Pandit
 
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHTEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHSneha Padhiar
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxsiddharthjain2303
 
Python Programming for basic beginners.pptx
Python Programming for basic beginners.pptxPython Programming for basic beginners.pptx
Python Programming for basic beginners.pptxmohitesoham12
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxRomil Mishra
 

Dernier (20)

THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
 
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESCME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
 
Javier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptxJavier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptx
 
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfComprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf
 
priority interrupt computer organization
priority interrupt computer organizationpriority interrupt computer organization
priority interrupt computer organization
 
Novel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsNovel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending Actuators
 
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
 
STATE TRANSITION DIAGRAM in psoc subject
STATE TRANSITION DIAGRAM in psoc subjectSTATE TRANSITION DIAGRAM in psoc subject
STATE TRANSITION DIAGRAM in psoc subject
 
Triangulation survey (Basic Mine Surveying)_MI10412MI.pptx
Triangulation survey (Basic Mine Surveying)_MI10412MI.pptxTriangulation survey (Basic Mine Surveying)_MI10412MI.pptx
Triangulation survey (Basic Mine Surveying)_MI10412MI.pptx
 
Forming section troubleshooting checklist for improving wire life (1).ppt
Forming section troubleshooting checklist for improving wire life (1).pptForming section troubleshooting checklist for improving wire life (1).ppt
Forming section troubleshooting checklist for improving wire life (1).ppt
 
Secure Key Crypto - Tech Paper JET Tech Labs
Secure Key Crypto - Tech Paper JET Tech LabsSecure Key Crypto - Tech Paper JET Tech Labs
Secure Key Crypto - Tech Paper JET Tech Labs
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communication
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitos
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Course
 
Theory of Machine Notes / Lecture Material .pdf
Theory of Machine Notes / Lecture Material .pdfTheory of Machine Notes / Lecture Material .pdf
Theory of Machine Notes / Lecture Material .pdf
 
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHTEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptx
 
Python Programming for basic beginners.pptx
Python Programming for basic beginners.pptxPython Programming for basic beginners.pptx
Python Programming for basic beginners.pptx
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptx
 

Rural Road Safety Audit Process

  • 1. PRESEN TED BY: PAWA N K U M A R ( 1 6 M 1 4 5 ) A D I T YA U PA D H AYAY ( 1 6 M 1 5 0 ) A M I T K U M A R ( 1 6 M 1 5 5 ) SAFETY AUDIT PROCESS FOR RURAL ROADS GUIDED BY: DR. SUNIL SHARMA, Associate Prof. civil engg. DEPARTMENT OF CIVIL ENGINEERING, NIT HAMIRPUR 2016
  • 2. ROAD SAFETY AUDIT • A Road Safety Audit (RSA) is a formal procedure for assessing safety performance examination of an existing or future road or intersection by an independent audit team. • Road safety audits can be used in any phase of project development from planning and preliminary engineering, design and construction. • RSAs can also be used on any sized project from minor rural roads to inter-state National Highways. RSAs can be viewed as a proactive low-cost approach to improve safety.
  • 3. OBJECTIVE OF RSA • Objective of the RSA is to assess projects for potential accident elimination / reduction on the basis of road user knowledge, attributes and skills, day/night, wet/dry road conditions. • Since our roads are designed and constructed by striking a socio-economic balance between safety, accessibility, environment, economy and locally available material and skill, RSA may determine the shortfall in safety, but may not be able to correct the deficiencies in pavement design, drainage, and appropriate space standard etc.
  • 4. BENEFITS OF RSA • The likelihood of accidents on the road network can be reduced, • The severity of accidents can be reduced, • Road safety is given greater prominence in the minds of road designers and traffic engineers, • The need for costly remedial work is reduced • The total cost of a project to the community, including accidents, disruption and trauma, is minimized. • The cost of road safety audit and the consequent cost of changing a design are significantly less
  • 6. ACCIDENTAL SURVEY • India accounts for 10% or total world’s fatalities. • In 2014 there were 450898 case of accidents(as per MORT&H). • Socio-economic cost of accidents was reported at 3% of GDP.
  • 7. ROAD ACCIDENT DEATHS BY URBAN-RURAL SPLIT (2014) URBAN POPULATIO N RURAL POPULATIO N ALL INDIA Population 37.7 cr. 83.3 cr. 121 cr. Population share 31% 69% 100% Road accident deaths 54,565 86,961 1,41,526 Road accident deaths per 1 lakh pop. 14.5 10.4 11.7 Share of road accident deaths 39% 61% 100% Data Source: National Crimes & Records Bureau (NCRN)
  • 8. RURAL ROADS Rural roads are generally: • Single lane
  • 9. RURAL ROADS (CONTINUE…) • Low design speed • Low traffic volume(both motorised and non motorised)
  • 10. RURAL ROADS (CONTINUE…) • May be paved or unpaved
  • 11. INVOLVEMENT • RSA is based on the principle of an independent review. • In the process of RSA their is involvement of Client, Designer, Auditor and the Road User. • The client normally appoints the designer and the auditor who are two separate consultants.
  • 12. METHODOLOGY 1. Safety Audit can be applied to a) New Roads b) Existing / constructed Roads 2. On new roads, the audit will lead to identification of accident prone situations in rural roads .eg railway crossing , defective geometry , illegal encroachment 3. On existing or already constructed roads, the audit will suggest appropriate mitigation measures to reduce the possibility of accidents
  • 13. METHODOLOGY (CONTINUE…) Audit team • The safety audit team should comprise two members. 1. One member should have adequate traffic engineering and traffic management experience 2. The other should be an engineer with experience in road design and construction techniques.
  • 15. STAGES OF AUDIT FOR RURAL ROADS Road Safety Audit (RSA) basically comprises of three Stages: • Stage 1 - Audit during design and planning • Stage 2 - Audit during Construction • Stage 3 - Audit after the completion of the project
  • 16. STAGE 1 - AUDIT DURING DESIGN AND PLANNING • Examining safety issues 1. Specific geometric design features, 2. Traffic control devices, 3. Delineators, 4. Roadside clear zones, 5. Detailed design of intersections, 6. Interchanges, 7. Grade separators, 8. Glare concerns and lighting,
  • 17. SAFETY ISSUES RELATED TO LANDSCAPING Provision for special road users like 1. School children 2. Persons with disabilities 3. Buses 4. Equestrian 5. Rail roads 6. Heavy trucks
  • 18. STAGE 2 - AUDIT DURING CONSTRUCTION • Final check prior to opening the facility to ensure that the safety concerns of all road users have been addressed and that there are no apparent hazardous conditions. • The Audit team needs to actually travel both during the day and the night in a car, on two wheeler and also in a non-motorised transport.
  • 19. STAGE 2 - AUDIT DURING CONSTRUCTION (CONTINUE…) • The Audit team needs to 1. Include day / night checks 2. Evaluation considering dry / wet weather 3. Driving / riding and walking
  • 20. STAGE 3 - AUDIT AFTER THE COMPLETION OF THE PROJECT • An audit of existing roadway to determine…… 1. If the safety needs of all road users are currently being served. It recognizes that a roadway may change over time. Changes may have resulted from • Changing road use . • Encroachments. • Design inconsistency . • Ageing infrastructure . • Inadequate maintenance of road and traffic control devices and other measures.
  • 21. STAGE 3 - AUDIT AFTER THE COMPLETION OF THE PROJECT Points to be emphasized are adequacy of roadway…. 1. Roadside and intersections 2. Interchanges 3. Grade separators 4. location of bus stops 5. Truck lay-byes 6. Needs of VRU(vulnerable road users) 7. Access management

Notes de l'éditeur

  1. Fatality rate in urban areas in Maharashtra is higher than the national average.