ACTIVITIES OF THE MAINTENANCE DEPARTMENT
GENERAL PLANNING AND WORKING OF THE
MAINTENANCE DEPARTMENT


• Planning of machinery well in advance as per the style

• Arranging machines for the batch setting well in
  advance

• Providing work aids/folders during setting batch to
  enhance productivity and quality

• Reducing of machine down time to meet timely
  shipment.
UP KEEPING THE MACHINE AND REGULAR
MAINTENANCE TASKS


• Maintain machines in peak condition by carrying out
  scheduled maintenance.

• Use genuine spare parts for longer life and also to
  avoid frequent failures

• Follow up with Planning and IED regarding the future
  styles and start preparing the attachments and planning
  the machines.

• In case of failures maintain sufficient spare and
  machine back up.
DETAILED ACTIVITIES OF THE MAINTENANCE
DEPARTMENT:


• Coordinating with the Planning and the I.E department
  regarding the type of style running in the batches
  (sewing lines). On the basis of the change of the
  product requirement, the new machines required are
  worked out by this section.

• On the basis of the change in the product
  specifications, the machinery requirements are bound
  to change. This section works out the changes to be
  brought in the batches.
DETAILED ACTIVITIES OF THE MAINTENANCE
DEPARTMENT:

• Installation of the new machines whenever required in
  the plant

• Planning the type of machine to be positioned in the
  line on the basis of the line plan provided to them by
  the IE department.

• Verifies the data, check the availability of machines in
  any of other units.

•    Receives the machine to be attended from the
    production floor with details of the problem faced and
    nature of breakdown and record same in breakdown
    register.
DETAILED ACTIVITIES OF THE MAINTENANCE
DEPARTMENT:


• Keeps all the machines in particular bay for easy
  identification

•    Responsible for keeping record of all inward/outward
    and serviced machines

• In case of folders or attachments IED gives the style
  bulletin at least a week in advance.

• The Maintenance store will keep Inventory of machine
  spares with proper record.
DETAILED ACTIVITIES OF THE MAINTENANCE
DEPARTMENT:

• Inventory Management of the spare parts in the stores.

• Receive     information     for    sampling section
  also, regarding the requirements of some machines
  which are not available with the company.

• Allot 1 mechanic for every 2 batches, who has to be
  present throughout the day for the production related
  problems with the machines.

• Arrange for the replacement of the machine in case of
  machine breakdown
BASIC ACTIVITIES REQUIRED TO BE
 DONE FOR THE GENERAL PLANNING
AND WORKING OF THE MAINTENANCE
          DEPARTMENT
S.NO.                        ACTIVITY
        Planning of machinery well in advance as per the
  1.    PPC plan style wise.

        Arranging machines for the batch setting well in
  2.
        advance as per the IED bulletin for the styles,
        indicating the machine requirements for the line.
        Providing work aids/folders during setting batch to
  3.    enhance productivity and quality

        Reducing of machine down time to meet timely
  4.    shipment

     Standardization of spare parts (genuine) to obtain
  5. good quality seam and good performance of m/c
ACTIVITIES REQUIRED FOR THE UPKEEP OF
     THE MACHINES AND REGULAR
         MAINTENANCE TASKS
S.NO.                   ACTIVITY

        Maintain machines in peak condition by carrying
  1.
        out   AM       (Autonomous     Maintenance),   PM
        (Preventive     Maintenance)     and     scheduled
        maintenance.
        Use genuine spare parts for longer life and also to
   2.   avoid frequent failures.

        Follow up with PPC and IED regarding the future
   3.   styles and start preparing the attachments and
        planning the machines.

        In case of failures maintain sufficient spare and
   4.   machine back up.
ACTIVITIES DONE FOR THE CONTINUOUS
IMPROVEMENT OF THE PROCESSES ON THE
             SEWING LINE
S.NO.                       ACTIVITY



        Reducing the batch setting time by proper
 1.
        planning of machines

        Optimize the utility of UBT machines and avoid
 2.
        the usage of manual trimming by avoiding the
        thread wastage and time
        Use only cone thread instead of tube thread to
 3.
        avoid loose stitch, frequent thread exhaustion and
        m/c stoppage for each thread changeover
        Identify the machine running in lesser RPM and
 4.
        synchronize the speed

        Train the mechanics to counter the tasks with out
 5.
        delay in reducing the m/c down time
ACTIVITIES REQUIRED FOR THE
INTERACTION AND TRAINING OF THE
    WORKERS AND ASSOCIATES
S.NO.                       ACTIVITY



        Have one to one interaction with the associates
 1.
        and understand their problem and counsel.

        Take the team for outing after each goal setting
 2.
        and upon achieving the same

        Provide education and training to the associate
 3.
        according to the required skill

        Recognize the work of the each and every
 4.
        associate and if he is found competitive promote
        him
        A token of appreciation should be given for each
 5.
        developmental work or innovations
TOTAL PRODUCTIVE MAINTAINANCE




   “TPM is a plant improvement methodology which
 enables continuous and rapid improvement of the
     manufacturing process through use of employee
 involvement, employee empowerment and closed loop
                measurement of results”
GOALS SET UP BY THE T.P.M. DEPARTMENT


•Reducing batch setting time from existing 8 hrs to 6
hrs.

•Conducting the skill test for all mechanics and
electricians.

•Checking and synchronizing the m/.c speed and
drives.

•Set up machine overhauling team and eliminate extra
working of mechanics.

•Understand the problems of the associates and provide
the solutions
SUB DEPARTMENTS AND DETAILED
    ACTIVITIES OF THE TPM DEPARTMENT

1. CENTRAL MAINTENANCE DEPARTMENT:

• Coordinating with the Central Planning and the
Central I.E department regarding the type of style
running in the batches (sewing lines). On the basis of
the change of the product requirement, the new
machines required are worked out by this section of
the CMD.

• On the basis of the change in the product
specifications, the machinery requirements are bound
to change. This section works out the changes to be
brought in the batches.
• Installation of the new machines whenever required in
the plant

•Planning the type of machine to be positioned in the
line on the basis of the line plan provided to them by the
Central IE department.

•CMD will verify the data, check the availability of
machines in any of other units or at the least on rental
basis and then will confirm the same to IED.

•CMD will receive machine to be attended from the
production floor with details of the problem faced and
nature of breakdown and record same in breakdown
register.
• CMD will consume time for breakdown maintenance
according to the nature of breakdown. If it is minor
technician will take Max. 15 to 20 Minutes. If it is major
technician will take Max. 1 day.

•CMD will receive all the new machines ordered due to
new requirements arising and on arrival of
consignment, the department will call the franchise for
installation and commissioning. After commissioning, it
will obtain ID and Barcode Numbers from B.I (Business
Intelligence).

•CMD will keep all the machines in particular bay for
easy identification.

•CMD is responsible for keeping record of all
inward/outward and serviced machines.
• CMD is having responsible for recruiting trainee
mechanics by giving theoretical and practical test &
decide to locate the recruited mechanic for production
floor after judging his caliber.

• In case of folders or attachments IED gives the
style bulletin at least a week in advance. This applies
even for die sets.

• The Maintenance store will keep Inventory of
machine spares with proper record. This store also
comes under the CMD Head

• Inventory Management of the spare parts in the
stores
• Receive information fro sampling section
also, regarding the requirements of some machines
which are not available with the company.

• Further the machine operators are trained to clean and
check their machines daily under “Autonomous
Maintenance Program.”

• An AM Clock is attached to all the machines. The
activities are
        Initial Cleaning,
        Implement Counter Measures,
        Preparation for Standardization
       [Cleaning, Oiling and Tightening],
        General Inspection,
        Autonomous Inspection,
       Standardization and Autonomous Management
2. BATCH MAINTENANCE DEPARTMENT:

• Coordinating with the CMD in times of style change
over.

•Allot 1 mechanic for every 2 batches, who has to be
present throughout the day for the production related
problems with the machines.

•Carrying out Autonomous Breakdown maintenance
for the machines.

•Send the machine to the Central Maintenance
Department in case the machine breakdown is not
repaired on the floor itself. Side by side, arrange for the
replacement of the machine by preparing an IOM
(Indent of Materials) and sending it to the CMD.
•Training tailors and other operators for the Autonomous
Maintenance and Preventive Maintenance.

•Machine settings changes according to the fabric type
and the style running

•Inspect tools and cord periodically, and if damaged have
it replaced by an authorized service agent.

•Ensure the oil tank cleaning, and check oil level and oil
condition of the machine.

•The Spot Washing Machine is maintained daily by
cleaning, Belt tension checking, and Oil level checked, Air
leakage attended, loose connections rectified, Steam
leakage attended and noise level maintained.
HIEARCHY OF MAINTENANCE
      DEPARTMENT
CONCLUSION


• This department is not just a maintenance department as its
  name suggests.

• The department in fact plans and makes the required machinery
  available on time.

• The company also boasts of its own unique Folders and
  Attachments fabrication unit wherein the required work aids are
  100% fabricated from metal sheets. These attachments are a lot
  economical than those purchased from the specialized suppliers.
CONCLUSION


• Major area of focus for the department are:

       plant improvement methodology
       continuous and rapid improvement
       employee involvement


PLANT IMPROVEMENT METHODOLOGY:

TPM is a method for bringing about change. It is a set of structured
 activities that can lead to improved management of plant assets
        when properly performed by individuals and team
CONCLUSION

• CONTINUOUS AND RAPID IMPROVEMENT:

  A critical aspect of TPM is that improvement should be rapid as
   well as continuous. To attain or maintain a leadership position
  in industry, a company must continuously improve at a rate that
   is faster than that of its competition. Performance targets must
                         be dynamic, not static.

 • EMPLOYEE INVOLVEMENT

  It is necessary part of TPM process. The goal is to tap into the
  expertise and creative capabilities of the entire plant or facility
        through the use of small group activities. They have a
  heightened role in defining their job content, along with work
                      systems and procedures.
Thank you 

Contenu connexe

Tendances

Machine Technology and Maintenance of Textile Machinary
Machine Technology and Maintenance of Textile MachinaryMachine Technology and Maintenance of Textile Machinary
Machine Technology and Maintenance of Textile MachinarySajibul Islam
 
Application of Industrial Engineering in Garments Industry
Application of Industrial Engineering in Garments IndustryApplication of Industrial Engineering in Garments Industry
Application of Industrial Engineering in Garments Industryzaman parvez
 
Maintenance management
Maintenance managementMaintenance management
Maintenance managementRajeev Sharan
 
Computerized cutting machine
Computerized cutting machineComputerized cutting machine
Computerized cutting machineMd. Reajul islam
 
Quality Control in Garment Manufacturing
Quality Control in Garment ManufacturingQuality Control in Garment Manufacturing
Quality Control in Garment ManufacturingAbhishek Raj
 
Increasing the productivity and efficiency of a sewing line in an apparel man...
Increasing the productivity and efficiency of a sewing line in an apparel man...Increasing the productivity and efficiency of a sewing line in an apparel man...
Increasing the productivity and efficiency of a sewing line in an apparel man...Mazedul Islam Soyeb
 
Garment Industries Finishing Department
Garment Industries Finishing DepartmentGarment Industries Finishing Department
Garment Industries Finishing DepartmentsanjeevSingla10
 
Maintenance Strategy and Activites of Textile Industry (Spinning Mill)
Maintenance Strategy and Activites of Textile Industry (Spinning Mill)Maintenance Strategy and Activites of Textile Industry (Spinning Mill)
Maintenance Strategy and Activites of Textile Industry (Spinning Mill)Danial Sohail
 
Analysis of sewing section efficiency by time study technique in apparel indu...
Analysis of sewing section efficiency by time study technique in apparel indu...Analysis of sewing section efficiency by time study technique in apparel indu...
Analysis of sewing section efficiency by time study technique in apparel indu...Khairul Bashar
 
Garments Inspection
Garments InspectionGarments Inspection
Garments InspectionTakbir Ahmed
 
Maintenance of SNLS Machine
Maintenance of SNLS Machine Maintenance of SNLS Machine
Maintenance of SNLS Machine SaurabhSumanyu
 
Lean manufacturing tools for garment industry
Lean manufacturing tools for garment industryLean manufacturing tools for garment industry
Lean manufacturing tools for garment industryAzmir Latif Beg
 
Real time data in garment production
Real time data in garment productionReal time data in garment production
Real time data in garment productionkibrom G
 

Tendances (20)

Machine Technology and Maintenance of Textile Machinary
Machine Technology and Maintenance of Textile MachinaryMachine Technology and Maintenance of Textile Machinary
Machine Technology and Maintenance of Textile Machinary
 
Cutting department
Cutting departmentCutting department
Cutting department
 
Application of Industrial Engineering in Garments Industry
Application of Industrial Engineering in Garments IndustryApplication of Industrial Engineering in Garments Industry
Application of Industrial Engineering in Garments Industry
 
GSD cords
GSD cordsGSD cords
GSD cords
 
Maintenance management
Maintenance managementMaintenance management
Maintenance management
 
Computerized cutting machine
Computerized cutting machineComputerized cutting machine
Computerized cutting machine
 
Quality Control in Garment Manufacturing
Quality Control in Garment ManufacturingQuality Control in Garment Manufacturing
Quality Control in Garment Manufacturing
 
Increasing the productivity and efficiency of a sewing line in an apparel man...
Increasing the productivity and efficiency of a sewing line in an apparel man...Increasing the productivity and efficiency of a sewing line in an apparel man...
Increasing the productivity and efficiency of a sewing line in an apparel man...
 
Garment Industries Finishing Department
Garment Industries Finishing DepartmentGarment Industries Finishing Department
Garment Industries Finishing Department
 
Quality management in garments
Quality management in garmentsQuality management in garments
Quality management in garments
 
Maintenance Strategy and Activites of Textile Industry (Spinning Mill)
Maintenance Strategy and Activites of Textile Industry (Spinning Mill)Maintenance Strategy and Activites of Textile Industry (Spinning Mill)
Maintenance Strategy and Activites of Textile Industry (Spinning Mill)
 
Analysis of sewing section efficiency by time study technique in apparel indu...
Analysis of sewing section efficiency by time study technique in apparel indu...Analysis of sewing section efficiency by time study technique in apparel indu...
Analysis of sewing section efficiency by time study technique in apparel indu...
 
Garments Inspection
Garments InspectionGarments Inspection
Garments Inspection
 
Introduction to SAM
Introduction to SAMIntroduction to SAM
Introduction to SAM
 
Maintenance in wet processing Machine
Maintenance in wet processing MachineMaintenance in wet processing Machine
Maintenance in wet processing Machine
 
Maintenance of SNLS Machine
Maintenance of SNLS Machine Maintenance of SNLS Machine
Maintenance of SNLS Machine
 
Lean manufacturing tools for garment industry
Lean manufacturing tools for garment industryLean manufacturing tools for garment industry
Lean manufacturing tools for garment industry
 
Maintenance of dyeing machine
Maintenance of dyeing machineMaintenance of dyeing machine
Maintenance of dyeing machine
 
Real time data in garment production
Real time data in garment productionReal time data in garment production
Real time data in garment production
 
Traffic light system
Traffic light systemTraffic light system
Traffic light system
 

En vedette

Maintenance management
Maintenance managementMaintenance management
Maintenance managementRajeev Sharan
 
Maintenance Management
Maintenance ManagementMaintenance Management
Maintenance ManagementBisina Keshara
 
Facility engineering and Maintenance
Facility engineering and MaintenanceFacility engineering and Maintenance
Facility engineering and MaintenancePat Cabangis
 
Maintenance Scorecard
Maintenance ScorecardMaintenance Scorecard
Maintenance Scorecardyoan_ariesta
 
Maintenance Manager Balanced Scorecard
Maintenance Manager Balanced ScorecardMaintenance Manager Balanced Scorecard
Maintenance Manager Balanced ScorecardRicky Smith CMRP, CMRT
 
Mechanical Maintenance Department-Balance of Power, Adani Power
Mechanical Maintenance Department-Balance of Power, Adani PowerMechanical Maintenance Department-Balance of Power, Adani Power
Mechanical Maintenance Department-Balance of Power, Adani PowerNemish Kanwar
 
Condition-Based Maintenance: 10 Steps Towards Continuous Improvement
Condition-Based Maintenance: 10 Steps Towards Continuous ImprovementCondition-Based Maintenance: 10 Steps Towards Continuous Improvement
Condition-Based Maintenance: 10 Steps Towards Continuous ImprovementOSIsoft, LLC
 
PM Outsource Vs. Inhouse Final 2.14.11
PM Outsource Vs. Inhouse Final 2.14.11PM Outsource Vs. Inhouse Final 2.14.11
PM Outsource Vs. Inhouse Final 2.14.11kkosin
 
Condition Monitoring (PdM) Maturity Matrix - Know Best Practices
Condition Monitoring (PdM) Maturity Matrix - Know Best PracticesCondition Monitoring (PdM) Maturity Matrix - Know Best Practices
Condition Monitoring (PdM) Maturity Matrix - Know Best PracticesRicky Smith CMRP, CMRT
 
Comparing In-House vs Outsourced IT Services
Comparing In-House vs Outsourced IT ServicesComparing In-House vs Outsourced IT Services
Comparing In-House vs Outsourced IT ServicesSolution Systems, Inc.
 
Notts Sport Multi-use Games Area reference sites
Notts Sport Multi-use Games Area reference sitesNotts Sport Multi-use Games Area reference sites
Notts Sport Multi-use Games Area reference sitesNotts Sport
 
Automation of Mobile Fuel Bowsers - Brief Introduction
Automation of Mobile Fuel Bowsers - Brief IntroductionAutomation of Mobile Fuel Bowsers - Brief Introduction
Automation of Mobile Fuel Bowsers - Brief IntroductionFuelTrack
 
Spec'ing Your Truck for Fuel Efficiency
Spec'ing Your Truck for Fuel EfficiencySpec'ing Your Truck for Fuel Efficiency
Spec'ing Your Truck for Fuel EfficiencyHeather Dunn
 
Maintenance Craft Skill Maturity Matrix
Maintenance Craft Skill Maturity MatrixMaintenance Craft Skill Maturity Matrix
Maintenance Craft Skill Maturity MatrixRicky Smith CMRP, CMRT
 
Preventive Maintenance Maturity Matrix 2013 version
Preventive Maintenance Maturity Matrix   2013 versionPreventive Maintenance Maturity Matrix   2013 version
Preventive Maintenance Maturity Matrix 2013 versionRicky Smith CMRP, CMRT
 
Trends in Operation and Maintenance Spending by the Department of Defense
Trends in Operation and Maintenance Spending by the Department of DefenseTrends in Operation and Maintenance Spending by the Department of Defense
Trends in Operation and Maintenance Spending by the Department of DefenseCongressional Budget Office
 
Fabrication Shop Ergonomics
Fabrication Shop ErgonomicsFabrication Shop Ergonomics
Fabrication Shop ErgonomicsTeresa Long
 
Maintenance management
Maintenance managementMaintenance management
Maintenance managementTripti Mittal
 

En vedette (20)

Maintenance management
Maintenance managementMaintenance management
Maintenance management
 
Maintenance Management
Maintenance ManagementMaintenance Management
Maintenance Management
 
TPM (en)
TPM (en)TPM (en)
TPM (en)
 
Facility engineering and Maintenance
Facility engineering and MaintenanceFacility engineering and Maintenance
Facility engineering and Maintenance
 
Maintenence management
Maintenence managementMaintenence management
Maintenence management
 
Maintenance Scorecard
Maintenance ScorecardMaintenance Scorecard
Maintenance Scorecard
 
Maintenance Manager Balanced Scorecard
Maintenance Manager Balanced ScorecardMaintenance Manager Balanced Scorecard
Maintenance Manager Balanced Scorecard
 
Mechanical Maintenance Department-Balance of Power, Adani Power
Mechanical Maintenance Department-Balance of Power, Adani PowerMechanical Maintenance Department-Balance of Power, Adani Power
Mechanical Maintenance Department-Balance of Power, Adani Power
 
Condition-Based Maintenance: 10 Steps Towards Continuous Improvement
Condition-Based Maintenance: 10 Steps Towards Continuous ImprovementCondition-Based Maintenance: 10 Steps Towards Continuous Improvement
Condition-Based Maintenance: 10 Steps Towards Continuous Improvement
 
PM Outsource Vs. Inhouse Final 2.14.11
PM Outsource Vs. Inhouse Final 2.14.11PM Outsource Vs. Inhouse Final 2.14.11
PM Outsource Vs. Inhouse Final 2.14.11
 
Condition Monitoring (PdM) Maturity Matrix - Know Best Practices
Condition Monitoring (PdM) Maturity Matrix - Know Best PracticesCondition Monitoring (PdM) Maturity Matrix - Know Best Practices
Condition Monitoring (PdM) Maturity Matrix - Know Best Practices
 
Comparing In-House vs Outsourced IT Services
Comparing In-House vs Outsourced IT ServicesComparing In-House vs Outsourced IT Services
Comparing In-House vs Outsourced IT Services
 
Notts Sport Multi-use Games Area reference sites
Notts Sport Multi-use Games Area reference sitesNotts Sport Multi-use Games Area reference sites
Notts Sport Multi-use Games Area reference sites
 
Automation of Mobile Fuel Bowsers - Brief Introduction
Automation of Mobile Fuel Bowsers - Brief IntroductionAutomation of Mobile Fuel Bowsers - Brief Introduction
Automation of Mobile Fuel Bowsers - Brief Introduction
 
Spec'ing Your Truck for Fuel Efficiency
Spec'ing Your Truck for Fuel EfficiencySpec'ing Your Truck for Fuel Efficiency
Spec'ing Your Truck for Fuel Efficiency
 
Maintenance Craft Skill Maturity Matrix
Maintenance Craft Skill Maturity MatrixMaintenance Craft Skill Maturity Matrix
Maintenance Craft Skill Maturity Matrix
 
Preventive Maintenance Maturity Matrix 2013 version
Preventive Maintenance Maturity Matrix   2013 versionPreventive Maintenance Maturity Matrix   2013 version
Preventive Maintenance Maturity Matrix 2013 version
 
Trends in Operation and Maintenance Spending by the Department of Defense
Trends in Operation and Maintenance Spending by the Department of DefenseTrends in Operation and Maintenance Spending by the Department of Defense
Trends in Operation and Maintenance Spending by the Department of Defense
 
Fabrication Shop Ergonomics
Fabrication Shop ErgonomicsFabrication Shop Ergonomics
Fabrication Shop Ergonomics
 
Maintenance management
Maintenance managementMaintenance management
Maintenance management
 

Similaire à Maintaining Optimal Production With TPM

Unit 8 maintainance management pptx
Unit 8 maintainance management pptxUnit 8 maintainance management pptx
Unit 8 maintainance management pptxRASHMIPANWAR10
 
A throughput bulletin for Texport Syndicate, post vsm
A throughput bulletin for Texport Syndicate, post vsmA throughput bulletin for Texport Syndicate, post vsm
A throughput bulletin for Texport Syndicate, post vsmSourav Kumar
 
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCE
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCEMAINTENANCE POLICIES – PREVENTIVE MAINTENANCE
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCElaxtwinsme
 
Production and operation Unit_3.pptx
Production and operation Unit_3.pptxProduction and operation Unit_3.pptx
Production and operation Unit_3.pptxMargi Shah
 
Maintenance Department of Hotels
Maintenance Department of HotelsMaintenance Department of Hotels
Maintenance Department of HotelsNishisarin
 
Maintenance Management
Maintenance ManagementMaintenance Management
Maintenance ManagementVijay325
 
Heavy Deuty automotive students Ch 5.pdf
Heavy Deuty automotive students Ch 5.pdfHeavy Deuty automotive students Ch 5.pdf
Heavy Deuty automotive students Ch 5.pdfmussietilahungessess
 
Maintenece mgmt. 2
Maintenece mgmt. 2Maintenece mgmt. 2
Maintenece mgmt. 2Ajit Adsul
 
chapter one.pdf 2016.pdf
chapter one.pdf 2016.pdfchapter one.pdf 2016.pdf
chapter one.pdf 2016.pdfgete2
 
Production Planning & Control Book
Production Planning & Control BookProduction Planning & Control Book
Production Planning & Control BookLearn With GeekAlign
 
Conference presentation-farinas-maintenance-2011
Conference presentation-farinas-maintenance-2011Conference presentation-farinas-maintenance-2011
Conference presentation-farinas-maintenance-2011Sushil Anand
 

Similaire à Maintaining Optimal Production With TPM (20)

Unit 8 maintainance management pptx
Unit 8 maintainance management pptxUnit 8 maintainance management pptx
Unit 8 maintainance management pptx
 
A throughput bulletin for Texport Syndicate, post vsm
A throughput bulletin for Texport Syndicate, post vsmA throughput bulletin for Texport Syndicate, post vsm
A throughput bulletin for Texport Syndicate, post vsm
 
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCE
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCEMAINTENANCE POLICIES – PREVENTIVE MAINTENANCE
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCE
 
Production and operation Unit_3.pptx
Production and operation Unit_3.pptxProduction and operation Unit_3.pptx
Production and operation Unit_3.pptx
 
Planned Maintenance
Planned MaintenancePlanned Maintenance
Planned Maintenance
 
Plannedmaintenance
PlannedmaintenancePlannedmaintenance
Plannedmaintenance
 
ketul
ketulketul
ketul
 
MAINTENANCE
MAINTENANCEMAINTENANCE
MAINTENANCE
 
new cv kishor
new cv kishornew cv kishor
new cv kishor
 
Maintenance Department of Hotels
Maintenance Department of HotelsMaintenance Department of Hotels
Maintenance Department of Hotels
 
Maintenance Management
Maintenance ManagementMaintenance Management
Maintenance Management
 
Heavy Deuty automotive students Ch 5.pdf
Heavy Deuty automotive students Ch 5.pdfHeavy Deuty automotive students Ch 5.pdf
Heavy Deuty automotive students Ch 5.pdf
 
ARAGAW-MAINTENANCE LECTURE NOTE-FOR HIBRET.pdf
ARAGAW-MAINTENANCE LECTURE NOTE-FOR HIBRET.pdfARAGAW-MAINTENANCE LECTURE NOTE-FOR HIBRET.pdf
ARAGAW-MAINTENANCE LECTURE NOTE-FOR HIBRET.pdf
 
Maintenece mgmt. 2
Maintenece mgmt. 2Maintenece mgmt. 2
Maintenece mgmt. 2
 
chapter one.pdf 2016.pdf
chapter one.pdf 2016.pdfchapter one.pdf 2016.pdf
chapter one.pdf 2016.pdf
 
Tpm
TpmTpm
Tpm
 
SMED
SMEDSMED
SMED
 
Ahmed Elzafarany.
Ahmed Elzafarany.Ahmed Elzafarany.
Ahmed Elzafarany.
 
Production Planning & Control Book
Production Planning & Control BookProduction Planning & Control Book
Production Planning & Control Book
 
Conference presentation-farinas-maintenance-2011
Conference presentation-farinas-maintenance-2011Conference presentation-farinas-maintenance-2011
Conference presentation-farinas-maintenance-2011
 

Plus de Rajeev Sharan

Graduation Project (SA 8000 & it's frame work for Indian Apparel Manufacturing)
Graduation Project (SA 8000 & it's frame work for Indian Apparel Manufacturing)Graduation Project (SA 8000 & it's frame work for Indian Apparel Manufacturing)
Graduation Project (SA 8000 & it's frame work for Indian Apparel Manufacturing)Rajeev Sharan
 
Supply chain management
Supply chain managementSupply chain management
Supply chain managementRajeev Sharan
 
Production module-ERP
Production module-ERPProduction module-ERP
Production module-ERPRajeev Sharan
 
Supply chain management
Supply chain managementSupply chain management
Supply chain managementRajeev Sharan
 
Inventory management
Inventory managementInventory management
Inventory managementRajeev Sharan
 
RECENT TRENDS OF MAINTENANCE MANAGEMENT
RECENT TRENDS OF MAINTENANCE MANAGEMENTRECENT TRENDS OF MAINTENANCE MANAGEMENT
RECENT TRENDS OF MAINTENANCE MANAGEMENTRajeev Sharan
 
product analysis & development- sourcing
product analysis & development- sourcingproduct analysis & development- sourcing
product analysis & development- sourcingRajeev Sharan
 
Product Analysis & Development
Product Analysis & DevelopmentProduct Analysis & Development
Product Analysis & DevelopmentRajeev Sharan
 
Total service management
Total service managementTotal service management
Total service managementRajeev Sharan
 

Plus de Rajeev Sharan (20)

Graduation Project (SA 8000 & it's frame work for Indian Apparel Manufacturing)
Graduation Project (SA 8000 & it's frame work for Indian Apparel Manufacturing)Graduation Project (SA 8000 & it's frame work for Indian Apparel Manufacturing)
Graduation Project (SA 8000 & it's frame work for Indian Apparel Manufacturing)
 
Supply chain management
Supply chain managementSupply chain management
Supply chain management
 
Final pl doc
Final pl docFinal pl doc
Final pl doc
 
Production module-ERP
Production module-ERPProduction module-ERP
Production module-ERP
 
Supply chain management
Supply chain managementSupply chain management
Supply chain management
 
E smartx.ppt
E smartx.pptE smartx.ppt
E smartx.ppt
 
Inventory management
Inventory managementInventory management
Inventory management
 
Calculator code
Calculator codeCalculator code
Calculator code
 
RECENT TRENDS OF MAINTENANCE MANAGEMENT
RECENT TRENDS OF MAINTENANCE MANAGEMENTRECENT TRENDS OF MAINTENANCE MANAGEMENT
RECENT TRENDS OF MAINTENANCE MANAGEMENT
 
PAD FINAL DOC
PAD FINAL DOCPAD FINAL DOC
PAD FINAL DOC
 
Shirt spec sheet
Shirt spec sheetShirt spec sheet
Shirt spec sheet
 
product analysis & development- sourcing
product analysis & development- sourcingproduct analysis & development- sourcing
product analysis & development- sourcing
 
Product Analysis & Development
Product Analysis & DevelopmentProduct Analysis & Development
Product Analysis & Development
 
Ergonomics
ErgonomicsErgonomics
Ergonomics
 
Ergonomics
Ergonomics Ergonomics
Ergonomics
 
Total service management
Total service managementTotal service management
Total service management
 
Lean- automobile
Lean- automobileLean- automobile
Lean- automobile
 
Vb (2)
Vb (2)Vb (2)
Vb (2)
 
Vb (1)
Vb (1)Vb (1)
Vb (1)
 
Vb
VbVb
Vb
 

Dernier

BÀI TẬP BỔ TRỢ TIẾNG ANH 11 THEO ĐƠN VỊ BÀI HỌC - CẢ NĂM - CÓ FILE NGHE (GLOB...
BÀI TẬP BỔ TRỢ TIẾNG ANH 11 THEO ĐƠN VỊ BÀI HỌC - CẢ NĂM - CÓ FILE NGHE (GLOB...BÀI TẬP BỔ TRỢ TIẾNG ANH 11 THEO ĐƠN VỊ BÀI HỌC - CẢ NĂM - CÓ FILE NGHE (GLOB...
BÀI TẬP BỔ TRỢ TIẾNG ANH 11 THEO ĐƠN VỊ BÀI HỌC - CẢ NĂM - CÓ FILE NGHE (GLOB...Nguyen Thanh Tu Collection
 
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptxBIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptxSayali Powar
 
Tree View Decoration Attribute in the Odoo 17
Tree View Decoration Attribute in the Odoo 17Tree View Decoration Attribute in the Odoo 17
Tree View Decoration Attribute in the Odoo 17Celine George
 
Narcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfNarcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfPrerana Jadhav
 
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...DhatriParmar
 
How to Manage Buy 3 Get 1 Free in Odoo 17
How to Manage Buy 3 Get 1 Free in Odoo 17How to Manage Buy 3 Get 1 Free in Odoo 17
How to Manage Buy 3 Get 1 Free in Odoo 17Celine George
 
MS4 level being good citizen -imperative- (1) (1).pdf
MS4 level   being good citizen -imperative- (1) (1).pdfMS4 level   being good citizen -imperative- (1) (1).pdf
MS4 level being good citizen -imperative- (1) (1).pdfMr Bounab Samir
 
Scientific Writing :Research Discourse
Scientific  Writing :Research  DiscourseScientific  Writing :Research  Discourse
Scientific Writing :Research DiscourseAnita GoswamiGiri
 
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Association for Project Management
 
Objectives n learning outcoms - MD 20240404.pptx
Objectives n learning outcoms - MD 20240404.pptxObjectives n learning outcoms - MD 20240404.pptx
Objectives n learning outcoms - MD 20240404.pptxMadhavi Dharankar
 
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...Nguyen Thanh Tu Collection
 
ICS 2208 Lecture Slide Notes for Topic 6
ICS 2208 Lecture Slide Notes for Topic 6ICS 2208 Lecture Slide Notes for Topic 6
ICS 2208 Lecture Slide Notes for Topic 6Vanessa Camilleri
 
4.9.24 Social Capital and Social Exclusion.pptx
4.9.24 Social Capital and Social Exclusion.pptx4.9.24 Social Capital and Social Exclusion.pptx
4.9.24 Social Capital and Social Exclusion.pptxmary850239
 
4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptx4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptxmary850239
 
How to Uninstall a Module in Odoo 17 Using Command Line
How to Uninstall a Module in Odoo 17 Using Command LineHow to Uninstall a Module in Odoo 17 Using Command Line
How to Uninstall a Module in Odoo 17 Using Command LineCeline George
 
DiskStorage_BasicFileStructuresandHashing.pdf
DiskStorage_BasicFileStructuresandHashing.pdfDiskStorage_BasicFileStructuresandHashing.pdf
DiskStorage_BasicFileStructuresandHashing.pdfChristalin Nelson
 

Dernier (20)

BÀI TẬP BỔ TRỢ TIẾNG ANH 11 THEO ĐƠN VỊ BÀI HỌC - CẢ NĂM - CÓ FILE NGHE (GLOB...
BÀI TẬP BỔ TRỢ TIẾNG ANH 11 THEO ĐƠN VỊ BÀI HỌC - CẢ NĂM - CÓ FILE NGHE (GLOB...BÀI TẬP BỔ TRỢ TIẾNG ANH 11 THEO ĐƠN VỊ BÀI HỌC - CẢ NĂM - CÓ FILE NGHE (GLOB...
BÀI TẬP BỔ TRỢ TIẾNG ANH 11 THEO ĐƠN VỊ BÀI HỌC - CẢ NĂM - CÓ FILE NGHE (GLOB...
 
CARNAVAL COM MAGIA E EUFORIA _
CARNAVAL COM MAGIA E EUFORIA            _CARNAVAL COM MAGIA E EUFORIA            _
CARNAVAL COM MAGIA E EUFORIA _
 
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptxBIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
 
Spearman's correlation,Formula,Advantages,
Spearman's correlation,Formula,Advantages,Spearman's correlation,Formula,Advantages,
Spearman's correlation,Formula,Advantages,
 
Tree View Decoration Attribute in the Odoo 17
Tree View Decoration Attribute in the Odoo 17Tree View Decoration Attribute in the Odoo 17
Tree View Decoration Attribute in the Odoo 17
 
Narcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfNarcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdf
 
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
 
prashanth updated resume 2024 for Teaching Profession
prashanth updated resume 2024 for Teaching Professionprashanth updated resume 2024 for Teaching Profession
prashanth updated resume 2024 for Teaching Profession
 
How to Manage Buy 3 Get 1 Free in Odoo 17
How to Manage Buy 3 Get 1 Free in Odoo 17How to Manage Buy 3 Get 1 Free in Odoo 17
How to Manage Buy 3 Get 1 Free in Odoo 17
 
MS4 level being good citizen -imperative- (1) (1).pdf
MS4 level   being good citizen -imperative- (1) (1).pdfMS4 level   being good citizen -imperative- (1) (1).pdf
MS4 level being good citizen -imperative- (1) (1).pdf
 
Scientific Writing :Research Discourse
Scientific  Writing :Research  DiscourseScientific  Writing :Research  Discourse
Scientific Writing :Research Discourse
 
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
 
Plagiarism,forms,understand about plagiarism,avoid plagiarism,key significanc...
Plagiarism,forms,understand about plagiarism,avoid plagiarism,key significanc...Plagiarism,forms,understand about plagiarism,avoid plagiarism,key significanc...
Plagiarism,forms,understand about plagiarism,avoid plagiarism,key significanc...
 
Objectives n learning outcoms - MD 20240404.pptx
Objectives n learning outcoms - MD 20240404.pptxObjectives n learning outcoms - MD 20240404.pptx
Objectives n learning outcoms - MD 20240404.pptx
 
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
 
ICS 2208 Lecture Slide Notes for Topic 6
ICS 2208 Lecture Slide Notes for Topic 6ICS 2208 Lecture Slide Notes for Topic 6
ICS 2208 Lecture Slide Notes for Topic 6
 
4.9.24 Social Capital and Social Exclusion.pptx
4.9.24 Social Capital and Social Exclusion.pptx4.9.24 Social Capital and Social Exclusion.pptx
4.9.24 Social Capital and Social Exclusion.pptx
 
4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptx4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptx
 
How to Uninstall a Module in Odoo 17 Using Command Line
How to Uninstall a Module in Odoo 17 Using Command LineHow to Uninstall a Module in Odoo 17 Using Command Line
How to Uninstall a Module in Odoo 17 Using Command Line
 
DiskStorage_BasicFileStructuresandHashing.pdf
DiskStorage_BasicFileStructuresandHashing.pdfDiskStorage_BasicFileStructuresandHashing.pdf
DiskStorage_BasicFileStructuresandHashing.pdf
 

Maintaining Optimal Production With TPM

  • 2. ACTIVITIES OF THE MAINTENANCE DEPARTMENT
  • 3. GENERAL PLANNING AND WORKING OF THE MAINTENANCE DEPARTMENT • Planning of machinery well in advance as per the style • Arranging machines for the batch setting well in advance • Providing work aids/folders during setting batch to enhance productivity and quality • Reducing of machine down time to meet timely shipment.
  • 4. UP KEEPING THE MACHINE AND REGULAR MAINTENANCE TASKS • Maintain machines in peak condition by carrying out scheduled maintenance. • Use genuine spare parts for longer life and also to avoid frequent failures • Follow up with Planning and IED regarding the future styles and start preparing the attachments and planning the machines. • In case of failures maintain sufficient spare and machine back up.
  • 5. DETAILED ACTIVITIES OF THE MAINTENANCE DEPARTMENT: • Coordinating with the Planning and the I.E department regarding the type of style running in the batches (sewing lines). On the basis of the change of the product requirement, the new machines required are worked out by this section. • On the basis of the change in the product specifications, the machinery requirements are bound to change. This section works out the changes to be brought in the batches.
  • 6. DETAILED ACTIVITIES OF THE MAINTENANCE DEPARTMENT: • Installation of the new machines whenever required in the plant • Planning the type of machine to be positioned in the line on the basis of the line plan provided to them by the IE department. • Verifies the data, check the availability of machines in any of other units. • Receives the machine to be attended from the production floor with details of the problem faced and nature of breakdown and record same in breakdown register.
  • 7. DETAILED ACTIVITIES OF THE MAINTENANCE DEPARTMENT: • Keeps all the machines in particular bay for easy identification • Responsible for keeping record of all inward/outward and serviced machines • In case of folders or attachments IED gives the style bulletin at least a week in advance. • The Maintenance store will keep Inventory of machine spares with proper record.
  • 8. DETAILED ACTIVITIES OF THE MAINTENANCE DEPARTMENT: • Inventory Management of the spare parts in the stores. • Receive information for sampling section also, regarding the requirements of some machines which are not available with the company. • Allot 1 mechanic for every 2 batches, who has to be present throughout the day for the production related problems with the machines. • Arrange for the replacement of the machine in case of machine breakdown
  • 9. BASIC ACTIVITIES REQUIRED TO BE DONE FOR THE GENERAL PLANNING AND WORKING OF THE MAINTENANCE DEPARTMENT
  • 10. S.NO. ACTIVITY Planning of machinery well in advance as per the 1. PPC plan style wise. Arranging machines for the batch setting well in 2. advance as per the IED bulletin for the styles, indicating the machine requirements for the line. Providing work aids/folders during setting batch to 3. enhance productivity and quality Reducing of machine down time to meet timely 4. shipment Standardization of spare parts (genuine) to obtain 5. good quality seam and good performance of m/c
  • 11. ACTIVITIES REQUIRED FOR THE UPKEEP OF THE MACHINES AND REGULAR MAINTENANCE TASKS
  • 12. S.NO. ACTIVITY Maintain machines in peak condition by carrying 1. out AM (Autonomous Maintenance), PM (Preventive Maintenance) and scheduled maintenance. Use genuine spare parts for longer life and also to 2. avoid frequent failures. Follow up with PPC and IED regarding the future 3. styles and start preparing the attachments and planning the machines. In case of failures maintain sufficient spare and 4. machine back up.
  • 13. ACTIVITIES DONE FOR THE CONTINUOUS IMPROVEMENT OF THE PROCESSES ON THE SEWING LINE
  • 14. S.NO. ACTIVITY Reducing the batch setting time by proper 1. planning of machines Optimize the utility of UBT machines and avoid 2. the usage of manual trimming by avoiding the thread wastage and time Use only cone thread instead of tube thread to 3. avoid loose stitch, frequent thread exhaustion and m/c stoppage for each thread changeover Identify the machine running in lesser RPM and 4. synchronize the speed Train the mechanics to counter the tasks with out 5. delay in reducing the m/c down time
  • 15. ACTIVITIES REQUIRED FOR THE INTERACTION AND TRAINING OF THE WORKERS AND ASSOCIATES
  • 16. S.NO. ACTIVITY Have one to one interaction with the associates 1. and understand their problem and counsel. Take the team for outing after each goal setting 2. and upon achieving the same Provide education and training to the associate 3. according to the required skill Recognize the work of the each and every 4. associate and if he is found competitive promote him A token of appreciation should be given for each 5. developmental work or innovations
  • 17. TOTAL PRODUCTIVE MAINTAINANCE “TPM is a plant improvement methodology which enables continuous and rapid improvement of the manufacturing process through use of employee involvement, employee empowerment and closed loop measurement of results”
  • 18. GOALS SET UP BY THE T.P.M. DEPARTMENT •Reducing batch setting time from existing 8 hrs to 6 hrs. •Conducting the skill test for all mechanics and electricians. •Checking and synchronizing the m/.c speed and drives. •Set up machine overhauling team and eliminate extra working of mechanics. •Understand the problems of the associates and provide the solutions
  • 19. SUB DEPARTMENTS AND DETAILED ACTIVITIES OF THE TPM DEPARTMENT 1. CENTRAL MAINTENANCE DEPARTMENT: • Coordinating with the Central Planning and the Central I.E department regarding the type of style running in the batches (sewing lines). On the basis of the change of the product requirement, the new machines required are worked out by this section of the CMD. • On the basis of the change in the product specifications, the machinery requirements are bound to change. This section works out the changes to be brought in the batches.
  • 20. • Installation of the new machines whenever required in the plant •Planning the type of machine to be positioned in the line on the basis of the line plan provided to them by the Central IE department. •CMD will verify the data, check the availability of machines in any of other units or at the least on rental basis and then will confirm the same to IED. •CMD will receive machine to be attended from the production floor with details of the problem faced and nature of breakdown and record same in breakdown register.
  • 21. • CMD will consume time for breakdown maintenance according to the nature of breakdown. If it is minor technician will take Max. 15 to 20 Minutes. If it is major technician will take Max. 1 day. •CMD will receive all the new machines ordered due to new requirements arising and on arrival of consignment, the department will call the franchise for installation and commissioning. After commissioning, it will obtain ID and Barcode Numbers from B.I (Business Intelligence). •CMD will keep all the machines in particular bay for easy identification. •CMD is responsible for keeping record of all inward/outward and serviced machines.
  • 22. • CMD is having responsible for recruiting trainee mechanics by giving theoretical and practical test & decide to locate the recruited mechanic for production floor after judging his caliber. • In case of folders or attachments IED gives the style bulletin at least a week in advance. This applies even for die sets. • The Maintenance store will keep Inventory of machine spares with proper record. This store also comes under the CMD Head • Inventory Management of the spare parts in the stores
  • 23. • Receive information fro sampling section also, regarding the requirements of some machines which are not available with the company. • Further the machine operators are trained to clean and check their machines daily under “Autonomous Maintenance Program.” • An AM Clock is attached to all the machines. The activities are  Initial Cleaning,  Implement Counter Measures,  Preparation for Standardization [Cleaning, Oiling and Tightening],  General Inspection,  Autonomous Inspection, Standardization and Autonomous Management
  • 24. 2. BATCH MAINTENANCE DEPARTMENT: • Coordinating with the CMD in times of style change over. •Allot 1 mechanic for every 2 batches, who has to be present throughout the day for the production related problems with the machines. •Carrying out Autonomous Breakdown maintenance for the machines. •Send the machine to the Central Maintenance Department in case the machine breakdown is not repaired on the floor itself. Side by side, arrange for the replacement of the machine by preparing an IOM (Indent of Materials) and sending it to the CMD.
  • 25. •Training tailors and other operators for the Autonomous Maintenance and Preventive Maintenance. •Machine settings changes according to the fabric type and the style running •Inspect tools and cord periodically, and if damaged have it replaced by an authorized service agent. •Ensure the oil tank cleaning, and check oil level and oil condition of the machine. •The Spot Washing Machine is maintained daily by cleaning, Belt tension checking, and Oil level checked, Air leakage attended, loose connections rectified, Steam leakage attended and noise level maintained.
  • 27.
  • 28. CONCLUSION • This department is not just a maintenance department as its name suggests. • The department in fact plans and makes the required machinery available on time. • The company also boasts of its own unique Folders and Attachments fabrication unit wherein the required work aids are 100% fabricated from metal sheets. These attachments are a lot economical than those purchased from the specialized suppliers.
  • 29. CONCLUSION • Major area of focus for the department are: plant improvement methodology continuous and rapid improvement employee involvement PLANT IMPROVEMENT METHODOLOGY: TPM is a method for bringing about change. It is a set of structured activities that can lead to improved management of plant assets when properly performed by individuals and team
  • 30. CONCLUSION • CONTINUOUS AND RAPID IMPROVEMENT: A critical aspect of TPM is that improvement should be rapid as well as continuous. To attain or maintain a leadership position in industry, a company must continuously improve at a rate that is faster than that of its competition. Performance targets must be dynamic, not static. • EMPLOYEE INVOLVEMENT It is necessary part of TPM process. The goal is to tap into the expertise and creative capabilities of the entire plant or facility through the use of small group activities. They have a heightened role in defining their job content, along with work systems and procedures.