PIC Action Plan
©Productivity Improvement Cell,BGMEA
Developed by :
Saad Bin A.Rashid
Productivity Improvement Cell,
BGMEA
Outline
•PRODUCTIVITY Scenario.
•Improvement Strategy.
•PIC team training condition & further
improvement plan.
•Working strategy.
©Productivity Improvement Cell,BGMEA
Productivity Scenario
©Productivity Improvement Cell,BGMEA
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Bangladesh
India
Vietnam
Pakistan
Cambodia
Bangladesh India Vietnam Pakistan Cambodia
Productivity 77% 92% 90% 88% 68%
©Productivity Improvement Cell,BGMEA
Low productivity
 Less labor efficiency.
 Less skill mid level management
 No Productivity team( IE, Work study)
 Top management lack of awareness about productivity
 Low Supply Chain Efficiency – increase lead time
©Productivity Improvement Cell,BGMEA
Productivity Improvement Strategy
©Productivity Improvement Cell,BGMEA
Productivity
Improvement
phase plan
• GSD based
training
• Zero defect
operator
training
• SOP
development
Worker eff. training
• Production
management
Training
• PL
development
Mid mgt PL program
Capacity plan
development
Factory Setup support
Direct factory
consultation
Implement
©Productivity Improvement Cell,BGMEA
PIC cell Action planFactorysetupstage
Capacity
calculation,
production
layout design,
ROI analysis,
Item knowledge
Productionstage
Direct factory
consultation by
their training &
practical
improvement
Shortcourseonskill
development
Short course
offered to
develop Mid
management
officer for
factory.
Topmanagement&buyer
attachmentseminar
Short seminar
about
productivity
improvement to
ensure smooth
business & better
growth for RMG
Sector
©Productivity Improvement Cell,BGMEA
Production Leader (PL) development Program
Floor level
position
(OJT)
• Supervisor & line chief, Floor in charge people can have very specific
idea about efficient production system by On job Training (OJT)
• They are very related to floor , so they should learn to train up
multiskilling operator
Mid level
management
• Mid level management(production management, Industrial
Engineering, quality) may be trained by module to have efficient
production system.
• This program can be further institutionalized by collaboration with
training center & Garmenting institution.
Top
management
• Top management might be keep in touch to know how about
modern production Technology.
• we can promote our activity by short seminar /fair/ gathering
©Productivity Improvement Cell,BGMEA
Production Leader (PL) development Program
OJT
Time study
Capacity
calculation
Efficiency
calculation
Production
planning&
design
Line
balanceWIP
reduction
Method
improvement
Motion study
Quality
improvement
Inventory
Control
©Productivity Improvement Cell,BGMEA
70-80%Efficiency
level
Work Measurement Technique ( NPT , SAM, Time study,
skill matrix)
Motion & Method Engineering (micro motion,
method improvement, human factor engineering)
Efficient Production system design(Production layout,
capacity , target, WIP reduction, Waste reduction)
Quality control Engineering
Kaizen, 5s tools
Cutting Fabric optimization Technique
Phase -1( standard)
©Productivity Improvement Cell,BGMEA
90-100%efficiencylevel
LEAN Manufacturing ( VSM , TQM, TPM, Pull production
System, SMED, OEE, ANDON, Kanban )
Flexible Manufacturing System(Cellular manufacturing,
Group technology)
RFID & BARCODE based production
SIX Sigma Approach
KPI Benchmarking for Factory (benchmark
performance indicator for all department)
Phase -2( Global Standard)
©Productivity Improvement Cell,BGMEA
PIC Team continuing project
•In total 6 months project with almost 24 factories.
•It covers Productivity module 1,2,3 followed by HR module, fire & safety.
•PIC team to have practical work during each module break
•PIC team need to develop own module within the short term of training for factory training.
BBW
•This program mostly related to practical implementation.
•We need to develop our basic module before attending the program.
•PIC team need to mix up experience to implement it successfully & make success story.PSES
•We need special TOT for PIC team , follow by intense practical session by them
•Training material needs to be provided to PIC ( video, presentation soft copy ) for further
implementation.
•PIC team have to develop own module based on that training for factory implementation
UNIDO
©Productivity Improvement Cell,BGMEA
PIC Team Standing
PHASE -1
1. Work Measurement
2. Method Engineering
3. Motion analysis
4. Production system design
5. Quality control
6. Cutting fabric optimization
7. Inventory planning
PHASE-2
8. LEAN Manufacturing
9. Flexible Manufacturing
system
10. RFID & Barcode based
production
11. Six sigma approach
12. KPI benchmarking
Professional training
• ERP Software training ( Fast
react or similar software)
• GSD training
• Marker software( Lectra,
Garber)
• Professional Excel training(
VBA, Macro)
• Cost benefit analysis
AfterPSES&BBWprogram
©Productivity Improvement Cell,BGMEA
TOT training team
Consultant
Full project
PIC team
Out source
trainer
LEAN Transformation project
©Productivity Improvement Cell,BGMEA
PIC Cell Factory consultation
Set
Assessment
Diagnose
improvement
scope
Develop factory
PL team
OJT-1
for PL
Action
plan
Factory
implementation(
PIC team with PL
)
OJT-2
Set pilot line
& global
change
Follow up
1 day 3 day 7 day 4 day 15 day 3 month
In house mini
workshop-1
In house mini
workshop-2
In house mini
workshop-3
4 days 1 month
6 month development plan for each factory
Cost benefit
analysis
©Productivity Improvement Cell,BGMEA
Systematic approach of Implementation
Floor Data
collection
Analysis the
data
Standardize
the data
PMTS format
development
Optimize
layout design
WIP analysis Bottleneck Balance line
Set standard
production
system
Productivity
Improvement Cell,
BGMEA
©Productivity Improvement Cell,BGMEA
Factory setup stage
Capacity
& layout
planning
Labor
planning
Item
knowledge
ROI
Analysis
©Productivity Improvement Cell,BGMEA
©Productivity Improvement Cell,BGMEA
• Competitive cost
• High Quality
• Smooth production run
• Right delivery time
• Flexibility
• CSR, safety &
compliance
• Profit
• Sustainable business
growth
• repeat business
Buyer
FactoryOwner
PIP
productivity improvement program
Cost optimization system
development
Factory productivity system
development
©Productivity Improvement Cell,BGMEA
Awareness
seminar
with owner &
buyer
Pre Setup
Engineered
planning
Short
training
program
with
factory side
Short term strategy
©Productivity Improvement Cell,BGMEA
PIP strategy
Collaboration
with
International
buyer
Collaboration
with Donor
agencies
Collaboration
with Top
management by
means of short
seminar
©Productivity Improvement Cell,BGMEA
Branding strategy
©Productivity Improvement Cell,BGMEA
Suggestion for further
Improvement
©Productivity Improvement Cell,BGMEA
Towards Competitive RMG
Sector
©Productivity Improvement Cell,BGMEA

Contenu connexe

Tendances

Tendances (20)

Bottleneck Analysis Theory Of Constraints (TOC)
Bottleneck Analysis Theory Of Constraints (TOC)Bottleneck Analysis Theory Of Constraints (TOC)
Bottleneck Analysis Theory Of Constraints (TOC)
 
Numbers simulation - less is more!
Numbers simulation - less is more!Numbers simulation - less is more!
Numbers simulation - less is more!
 
Hoshin Kanri Strategy Deployment by Operational Excellence Consulting
Hoshin Kanri Strategy Deployment by Operational Excellence ConsultingHoshin Kanri Strategy Deployment by Operational Excellence Consulting
Hoshin Kanri Strategy Deployment by Operational Excellence Consulting
 
Lean Tools
Lean ToolsLean Tools
Lean Tools
 
Dwm ppt
Dwm pptDwm ppt
Dwm ppt
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Kanban
KanbanKanban
Kanban
 
Just in time
Just in timeJust in time
Just in time
 
How to Introduce Operational Excellence in your Organisation?
How to Introduce Operational Excellence in your Organisation?How to Introduce Operational Excellence in your Organisation?
How to Introduce Operational Excellence in your Organisation?
 
Lean manufacturing ppt
Lean manufacturing pptLean manufacturing ppt
Lean manufacturing ppt
 
The toyota way
The toyota wayThe toyota way
The toyota way
 
Kaizen Events Blitz & Lean Projects
Kaizen Events   Blitz  & Lean ProjectsKaizen Events   Blitz  & Lean Projects
Kaizen Events Blitz & Lean Projects
 
Kanban
KanbanKanban
Kanban
 
Lean Manufacturing - An Overview
Lean Manufacturing - An OverviewLean Manufacturing - An Overview
Lean Manufacturing - An Overview
 
LeanKaizenTraining
LeanKaizenTrainingLeanKaizenTraining
LeanKaizenTraining
 
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 
Basic Elements of Lean
Basic Elements of LeanBasic Elements of Lean
Basic Elements of Lean
 
5 S Work Place Organizer
5 S Work Place Organizer5 S Work Place Organizer
5 S Work Place Organizer
 
Productivity improvement slide share
Productivity improvement slide shareProductivity improvement slide share
Productivity improvement slide share
 
Daily Management
Daily ManagementDaily Management
Daily Management
 

Similaire à Productivity action plan

Vegam 4i, Making factories smarter
Vegam 4i, Making factories smarterVegam 4i, Making factories smarter
Vegam 4i, Making factories smarterVegam Solutions
 
CITGO: Fueling Time Savings and Ensuring Quality with Automation
CITGO: Fueling Time Savings and Ensuring Quality with AutomationCITGO: Fueling Time Savings and Ensuring Quality with Automation
CITGO: Fueling Time Savings and Ensuring Quality with AutomationWorksoft
 
Italy MAG Wire Business case _Scada system Jan 2016 english version
Italy MAG Wire Business case _Scada system Jan 2016 english versionItaly MAG Wire Business case _Scada system Jan 2016 english version
Italy MAG Wire Business case _Scada system Jan 2016 english versionLuizclaudiomatto
 
CITGO Fueling Time Savings and Ensuring Quality with Automation – TechEd 2015
CITGO Fueling Time Savings and Ensuring Quality with Automation – TechEd 2015CITGO Fueling Time Savings and Ensuring Quality with Automation – TechEd 2015
CITGO Fueling Time Savings and Ensuring Quality with Automation – TechEd 2015Worksoft
 
Six sigma in automobile Industry
Six sigma in automobile IndustrySix sigma in automobile Industry
Six sigma in automobile IndustryVishnu Rajoriya
 
AIPMM Phase Review Process for Product Management
AIPMM Phase Review Process for Product ManagementAIPMM Phase Review Process for Product Management
AIPMM Phase Review Process for Product ManagementAIPMM Administration
 
20080115 03 - Qualimétrie et CMMi dans les applications temps réel embarquées
20080115 03 - Qualimétrie et CMMi dans les applications temps réel embarquées20080115 03 - Qualimétrie et CMMi dans les applications temps réel embarquées
20080115 03 - Qualimétrie et CMMi dans les applications temps réel embarquéesLeClubQualiteLogicielle
 

Similaire à Productivity action plan (20)

Vegam 4i, Making factories smarter
Vegam 4i, Making factories smarterVegam 4i, Making factories smarter
Vegam 4i, Making factories smarter
 
CITGO: Fueling Time Savings and Ensuring Quality with Automation
CITGO: Fueling Time Savings and Ensuring Quality with AutomationCITGO: Fueling Time Savings and Ensuring Quality with Automation
CITGO: Fueling Time Savings and Ensuring Quality with Automation
 
CV_Vineet_BTech_ECE
CV_Vineet_BTech_ECECV_Vineet_BTech_ECE
CV_Vineet_BTech_ECE
 
Italy MAG Wire Business case _Scada system Jan 2016 english version
Italy MAG Wire Business case _Scada system Jan 2016 english versionItaly MAG Wire Business case _Scada system Jan 2016 english version
Italy MAG Wire Business case _Scada system Jan 2016 english version
 
Resume -UD
Resume -UDResume -UD
Resume -UD
 
CURRICULUM VITA ANTH
CURRICULUM VITA ANTHCURRICULUM VITA ANTH
CURRICULUM VITA ANTH
 
CITGO Fueling Time Savings and Ensuring Quality with Automation – TechEd 2015
CITGO Fueling Time Savings and Ensuring Quality with Automation – TechEd 2015CITGO Fueling Time Savings and Ensuring Quality with Automation – TechEd 2015
CITGO Fueling Time Savings and Ensuring Quality with Automation – TechEd 2015
 
SAP QM by Direct trainer
SAP QM by Direct trainerSAP QM by Direct trainer
SAP QM by Direct trainer
 
Resumepmlatest
ResumepmlatestResumepmlatest
Resumepmlatest
 
Six sigma in automobile Industry
Six sigma in automobile IndustrySix sigma in automobile Industry
Six sigma in automobile Industry
 
arun
arunarun
arun
 
AIPMM Phase Review Process for Product Management
AIPMM Phase Review Process for Product ManagementAIPMM Phase Review Process for Product Management
AIPMM Phase Review Process for Product Management
 
vinayaktiwari (1)
vinayaktiwari (1)vinayaktiwari (1)
vinayaktiwari (1)
 
CV CS
CV CSCV CS
CV CS
 
Krishnan_Resume
Krishnan_ResumeKrishnan_Resume
Krishnan_Resume
 
Aghil Jith
Aghil JithAghil Jith
Aghil Jith
 
Renni Consultancy - Introduction
Renni Consultancy - IntroductionRenni Consultancy - Introduction
Renni Consultancy - Introduction
 
20080115 03 - Qualimétrie et CMMi dans les applications temps réel embarquées
20080115 03 - Qualimétrie et CMMi dans les applications temps réel embarquées20080115 03 - Qualimétrie et CMMi dans les applications temps réel embarquées
20080115 03 - Qualimétrie et CMMi dans les applications temps réel embarquées
 
Resume
ResumeResume
Resume
 
Resume_Balachandru
Resume_BalachandruResume_Balachandru
Resume_Balachandru
 

Dernier

Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
An introduction to Semiconductor and its types.pptx
An introduction to Semiconductor and its types.pptxAn introduction to Semiconductor and its types.pptx
An introduction to Semiconductor and its types.pptxPurva Nikam
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 

Dernier (20)

Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
An introduction to Semiconductor and its types.pptx
An introduction to Semiconductor and its types.pptxAn introduction to Semiconductor and its types.pptx
An introduction to Semiconductor and its types.pptx
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 

Productivity action plan

  • 1. PIC Action Plan ©Productivity Improvement Cell,BGMEA Developed by : Saad Bin A.Rashid Productivity Improvement Cell, BGMEA
  • 2. Outline •PRODUCTIVITY Scenario. •Improvement Strategy. •PIC team training condition & further improvement plan. •Working strategy. ©Productivity Improvement Cell,BGMEA
  • 3. Productivity Scenario ©Productivity Improvement Cell,BGMEA 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Bangladesh India Vietnam Pakistan Cambodia Bangladesh India Vietnam Pakistan Cambodia Productivity 77% 92% 90% 88% 68%
  • 5. Low productivity  Less labor efficiency.  Less skill mid level management  No Productivity team( IE, Work study)  Top management lack of awareness about productivity  Low Supply Chain Efficiency – increase lead time ©Productivity Improvement Cell,BGMEA
  • 7. Productivity Improvement phase plan • GSD based training • Zero defect operator training • SOP development Worker eff. training • Production management Training • PL development Mid mgt PL program Capacity plan development Factory Setup support Direct factory consultation Implement ©Productivity Improvement Cell,BGMEA
  • 8. PIC cell Action planFactorysetupstage Capacity calculation, production layout design, ROI analysis, Item knowledge Productionstage Direct factory consultation by their training & practical improvement Shortcourseonskill development Short course offered to develop Mid management officer for factory. Topmanagement&buyer attachmentseminar Short seminar about productivity improvement to ensure smooth business & better growth for RMG Sector ©Productivity Improvement Cell,BGMEA
  • 9. Production Leader (PL) development Program Floor level position (OJT) • Supervisor & line chief, Floor in charge people can have very specific idea about efficient production system by On job Training (OJT) • They are very related to floor , so they should learn to train up multiskilling operator Mid level management • Mid level management(production management, Industrial Engineering, quality) may be trained by module to have efficient production system. • This program can be further institutionalized by collaboration with training center & Garmenting institution. Top management • Top management might be keep in touch to know how about modern production Technology. • we can promote our activity by short seminar /fair/ gathering ©Productivity Improvement Cell,BGMEA
  • 10. Production Leader (PL) development Program OJT Time study Capacity calculation Efficiency calculation Production planning& design Line balanceWIP reduction Method improvement Motion study Quality improvement Inventory Control ©Productivity Improvement Cell,BGMEA
  • 11. 70-80%Efficiency level Work Measurement Technique ( NPT , SAM, Time study, skill matrix) Motion & Method Engineering (micro motion, method improvement, human factor engineering) Efficient Production system design(Production layout, capacity , target, WIP reduction, Waste reduction) Quality control Engineering Kaizen, 5s tools Cutting Fabric optimization Technique Phase -1( standard) ©Productivity Improvement Cell,BGMEA
  • 12. 90-100%efficiencylevel LEAN Manufacturing ( VSM , TQM, TPM, Pull production System, SMED, OEE, ANDON, Kanban ) Flexible Manufacturing System(Cellular manufacturing, Group technology) RFID & BARCODE based production SIX Sigma Approach KPI Benchmarking for Factory (benchmark performance indicator for all department) Phase -2( Global Standard) ©Productivity Improvement Cell,BGMEA
  • 13. PIC Team continuing project •In total 6 months project with almost 24 factories. •It covers Productivity module 1,2,3 followed by HR module, fire & safety. •PIC team to have practical work during each module break •PIC team need to develop own module within the short term of training for factory training. BBW •This program mostly related to practical implementation. •We need to develop our basic module before attending the program. •PIC team need to mix up experience to implement it successfully & make success story.PSES •We need special TOT for PIC team , follow by intense practical session by them •Training material needs to be provided to PIC ( video, presentation soft copy ) for further implementation. •PIC team have to develop own module based on that training for factory implementation UNIDO ©Productivity Improvement Cell,BGMEA
  • 14. PIC Team Standing PHASE -1 1. Work Measurement 2. Method Engineering 3. Motion analysis 4. Production system design 5. Quality control 6. Cutting fabric optimization 7. Inventory planning PHASE-2 8. LEAN Manufacturing 9. Flexible Manufacturing system 10. RFID & Barcode based production 11. Six sigma approach 12. KPI benchmarking Professional training • ERP Software training ( Fast react or similar software) • GSD training • Marker software( Lectra, Garber) • Professional Excel training( VBA, Macro) • Cost benefit analysis AfterPSES&BBWprogram ©Productivity Improvement Cell,BGMEA
  • 15. TOT training team Consultant Full project PIC team Out source trainer LEAN Transformation project ©Productivity Improvement Cell,BGMEA
  • 16. PIC Cell Factory consultation Set Assessment Diagnose improvement scope Develop factory PL team OJT-1 for PL Action plan Factory implementation( PIC team with PL ) OJT-2 Set pilot line & global change Follow up 1 day 3 day 7 day 4 day 15 day 3 month In house mini workshop-1 In house mini workshop-2 In house mini workshop-3 4 days 1 month 6 month development plan for each factory Cost benefit analysis ©Productivity Improvement Cell,BGMEA
  • 17. Systematic approach of Implementation Floor Data collection Analysis the data Standardize the data PMTS format development Optimize layout design WIP analysis Bottleneck Balance line Set standard production system Productivity Improvement Cell, BGMEA ©Productivity Improvement Cell,BGMEA
  • 18. Factory setup stage Capacity & layout planning Labor planning Item knowledge ROI Analysis ©Productivity Improvement Cell,BGMEA
  • 20. • Competitive cost • High Quality • Smooth production run • Right delivery time • Flexibility • CSR, safety & compliance • Profit • Sustainable business growth • repeat business Buyer FactoryOwner PIP productivity improvement program Cost optimization system development Factory productivity system development ©Productivity Improvement Cell,BGMEA
  • 21. Awareness seminar with owner & buyer Pre Setup Engineered planning Short training program with factory side Short term strategy ©Productivity Improvement Cell,BGMEA
  • 22. PIP strategy Collaboration with International buyer Collaboration with Donor agencies Collaboration with Top management by means of short seminar ©Productivity Improvement Cell,BGMEA