SlideShare une entreprise Scribd logo
1  sur  25
Erbil Polytechnic University
Erbil Technical Engineering College
Civil Engineering Techniques
Designing pile caps according to ACI 318-19
Supervisors
1. Prof. Dr. Mereen Hasan Fahmi
2. Mr. Deedar Hussein
Prepared by (G6)
1. Paywand Shakir 2. Ziyad Asaad
3. Mohammed Jalal
4. Rasan Nuradin 5. Ismail Mukhlis
6. Ahmed Karim
(2023-2024)
【 Concrete Foundation Structures 】
Contents
Introduction 1
Pile Cap Plan Dimensions 4
•Two-Way Shear at the Column 5
•One-Way Shear at the Column 7
•Two-Way Shear at Corner Pile 9
•One-Way Shear at Corner Pile 9
•Two-Way Shear at Interior Piles 10
•Pile Cap Overall Depth Requirements 11
Pile Cap Shear Strength and Thickness 5
•Factored Moments 12
•Required Flexural Reinforcement12
Pile Cap Flexural Strength and Reinforcement 11
Reinforcement Bar Development Length 14
•Flexure16
•Shear 16
Design Results Comparison and Conclusions 16
Discussion 17
2024/04/14 Concrete Foundation Structures 2
Introduction
Based on a geotechnical study, a pile supported foundation is required to
support a heavily loaded building column. Design the pile cap shown in
the following figure with 12 in. diameter piles and a service load capacity
of 50 tons each. The pile cap has normal-weight concrete with a
compressive strength of 5800 psi and Grade 60 reinforcement. And the
piles are embedded 4 in. into the pile cap. The axial loads on the column
are due to dead and live loads and are equal to 425 and 250 kips,
respectively. This report explains how we'll figure out and design pile
caps by hand, following the rules in ACI 318-19. We're making sure
everything meets safety standards for strong, stable structures. We'll use
this hand solution to compare it with the reference result.
2024/04/14 Concrete Foundation Structures 3
2024/04/14 Concrete Foundation Structures 4
Code
Building Code Requirements for Structural Concrete (ACI 318-19) and Commentary (ACI 318R-19)
Design Data
fc’ = 5,800 psi normal weight concrete
fy = 60,000 psi
Dead load, D = 425 kips
Live load, L = 250 kips
Pile Diameter, dp = 12 in.
Piles are embedded 4 in. into the pile cap
2024/04/14 Concrete Foundation Structures 5
Pile Cap Plan Dimensions
The plan dimensions of a pile cap depend on the number of piles that are needed to support the load. Number
and arrangement of piles were determined from unfactored forces and moments transmitted to piles and
permissible pile capacity selected through geotechnical
engineering principles. These calculations are not part of the
scope of this example. ACI 318-19 (13.4.1.1)
Pile spacing is generally a function of pile type and capacity.
The following figure shows the piles configuration selected
by the reference for this example with the associated pile cap
plan dimensions.
2024/04/14 Concrete Foundation Structures 6
Pile Cap Shear Strength and Thickness
The thickness of the pile cap is initially determined based on the following key parameters:
1) Two-way shear requirements around the column,
1) One-way shear requirements at the column, and
1) One-way and two-way shear requirements around the piles
1) Pile cap overall depth minimum requirements
Both one-way and two-way shear are investigated at the critical sections around the vertical elements (columns)
supported by the pile cap with the requirements of ACI 318-19 (13.4.6). Factored loads are used to compute the shear
forces at the critical sections around columns as well as piles. Like footings, it is common practice not to use shear
reinforcement in pile caps. One-way shear checks are shown for illustration as two-way shear normally governs the
design. The overall depth of pile cap shall also be selected such that the effective depth of bottom reinforcement is at
least 12 inches.
2024/04/14 Concrete Foundation Structures 7
Two-Way Shear at the Column
The total factored axial load on the column:
Pu = 1.2´ PD +1.6´ PL = 1.2´ 425 +1.6´ 250 = 910 kips
Consider a uniform distribution of column load to the provided piles. Because of the rigidity of the pile cap
Pu per pile =
910
8
= 114 kips
Assuming that the centers of the two piles closest to the column are located dp/2 = 6 in. or more inside the perimeter of
the critical section for two-way shear, their contribution to the total shear can then be neglected. This assumption will be
verified later. ACI 318-19 (13.4.6.5(b))
Therefore, the factored shear force at the critical section is calculated based on six of the eight piles only:
Vu = 12/2 ´114 = 684 kips
The design shear strength for the interior column:
ϕV=ϕ 4 λs λ 𝑓′𝑐 bo d
ϕv= 0.75 x 4 x 0.95 x 1 x 5800 4x(22+d) d ACI 318-19 (22.6.5.2(a))
2024/04/14 Concrete Foundation Structures 8
Where ϕ = 0.75, λs =
2
1
+
𝑑
10
≤ 1 λs=0.95 ACI 318-19 (Table 21.2.1)
The minimum required d for the pile cap foundation can be calculated by setting Vu = ϕVc as follows:
ϕVc = Vu
684,000 = 0.75 x 4 x 0.95 x 1 x 5800 4x(22+d) d
d = 19.15 in. ➞ 21 in.
By using d = 21 in., the center of the two piles closest to the column is located (43/2) - 18 = 3.5 in. inside the critical
section which less than dp/2 = 6 in. (see the following figure). Thus, the initial assumption is not valid. That is part of the
reactions from these two piles must be considered in the shear force at the critical section, or a bigger d must be selected.
By increasing d to 26 in., the center of the piles is located at dp/2 inside the critical section, and these reactions can be
neglected and the assumption made earlier is validated (see the following figure). These configuration changes are for
illustration only and may not represent optimal design which is left up to the design professional based on project criteria.
2024/04/14 Concrete Foundation Structures 9
2024/04/14 Concrete Foundation Structures 10
The design shear strength for the interior column:
ϕV=ϕ 4 λs λ 𝑓′𝑐 bo d ACI 318-19 (22.6.5.2(a))
ϕVc = 0.75´ 4´0.95´1.0´ 5800 ´(4´(22 + 26))´ 26/1000 = 1083 kips > Vu = 684 kips  o.k.
Thus, Two-way shear requirement around the column is satisfied.
One-Way Shear at the Column
North/South Direction:
The critical section for one-way shear is located at a distance d
from the face of the column as shown in the previous figure.
The center of the three piles is located 5.5 in. inside of the
critical section, which is less than dp/2 (see the previous figure).
In this case, the pile reaction shall be based on a linear
interpolation between full value at dp/2 outside the section and
zero value at dp /2 inside the section. ACI 318-19 (13.4.6.5(c))
2024/04/14 Concrete Foundation Structures 11
d - dp/2 = 26 - 12/2 = 20 in.  the reaction from each pile = 0 kips
d - dp/2 = 26 + 12/2 = 32 in.  the reaction from each pile = 114 kips
By performing interpolation with the center of the three piles is located at 26 – 5.5 = 20.5 in. from the face of the column:
the reaction from each pile=114´(
20.5
32−20
-1.667) = 5 kips Therefore, Vu = 3 x 5 = 15 kips.
ϕVc = ϕ ´8´ λs ´λ´(r)1/3 𝑓′𝑐 L ´ d ACI 318-19 (22.5.5.1(c))
ϕVc = 0.75´ 8´0.95´1.0´(0.0018)1/3 5800 (8.5´12)´ 26 /1000 = 140 kips
Vu < ϕVc  o.k.
East/West Direction:
The critical section for one-way shear is located at a distance d
from the face of the column as shown in the previous figure.
The center of the pile closest to the column is located 19 in.
inside of the critical section, which is greater than dp/2 (see the
previous figure). Thus, the reaction from this pile is not
considered.
2024/04/14 Concrete Foundation Structures 12
The two remaining piles are located 26 - (36 - 11) = 1 in. inside of the critical section, which is less than dp/2. In this
case, the reaction for those piles shall be based on a linear interpolation between full value at dp/2 outside the section
and zero value at dp /2 inside the section. ACI 318-19 (13.4.6.5(c))
d - dp/2 = 26 - 12/2 = 20 in.  the reaction from each pile = 0 kips
d - dp/2 = 26 + 12/2 = 32 in.  the reaction from each pile = 114 kips
By performing interpolation with the center of the three piles is located at 26 – 1 = 25 in. from the face of the column:
the reaction from each pile =114´(
25
32−20
-1.667) = 48 kips
Therefore, Vu = 2 x 48 = 96 kips.
ϕVc = ϕ ´8´ λs ´λ´(r)1/3 𝑓′𝑐 B ´ d ACI 318-19 (22.5.5.1(c))
ϕVc = 0.75´ 8´0.95´1.0´(0.0018)1/3 5800 (7.75´12)´ 26 /1000 = 127 kips
Vu < ϕVc  o.k.
2024/04/14 Concrete Foundation Structures 13
Two-Way Shear at Corner Pile
Vu = Pile reaction = 114 kips
ϕV=ϕ 4 λs λ 𝑓′𝑐 bo d ACI 318-19 (22.6.5.2(a))
Where bo = π (dp + d) normally for an interior circular pile.
For the corner pile however, bo is calculated as shown in the following figure:
ϕVc = 0.75´ 4´0.95´1.0´ 5800 ´(
𝜋
4
´(12 + 26)+(2´15)´ 26/1000 = 337 kips
Vu < ϕVc  o.k.
The calculations above may be simplified using the approximation of
equivalent sections as shown in ACI 8.10.1.3
2024/04/14 Concrete Foundation Structures 14
One-Way Shear at Corner Pile
The one-way shear is checked at a distance d, but no more than 13 in., from the face of a corner pile as stated in the
reference. The critical section occurs at a 45ᴼ angle with respect to the edges of the pile cap.
Vu = the reaction of the pile = 114 kips
ϕVc = ϕ ´8´ λs ´λ´(r)1/3 𝑓′𝑐 b ´ d ACI 318-19 (22.5.5.1(c)
Where b is calculated as shown in the following figure.
ϕVc = 0.75´ 8´0.95´1.0´(0.0018)1/3 5800 (2´40.2)´ 26 /1000 = 115 kips Vu < ϕVc  o.k.
2024/04/14 Concrete Foundation Structures 15
Two-Way Shear at Interior Piles
For interior piles, if two-way shear perimeters overlap, the modified critical shear perimeter should be taken as
that portion of the smallest envelope of individual shear perimeters that will actually resist the critical shear for
group under consideration as shown in the following figure. ACI 318-19 (R13.2.7.2)
Vu = Pile reactions = 2 x 114 = 228 kips
ϕV=ϕ 4 λs λ 𝑓′𝑐 bo d ACI 318-19 (22.6.5.2(a))
Where bo is calculated as shown in the following figure.
ϕVc = 0.75´ 4´0.95´1.0´ 5800 ´[(2π´(
12
2
+
26
2
)+(2´36)]´
26/1000 = 1080kips
Vu < ϕVc  o.k.
2024/04/14 Concrete Foundation Structures 16
Pile Cap Overall Depth Requirements
Overall depth of pile cap shall be selected such that the effective depth of bottom reinforcement is at least 12 in. ACI
318-14 (13.4.2.1)
hmin = 12 in. + cover + embedment = 12 + 3+ 4 = 19 in.
h = 26 + 3 + 4 = 33 in.>hmin
Thus, use a final pile cap thickness of 33 in.
2024/04/14 Concrete Foundation Structures 17
Pile Cap Flexural Strength and Reinforcement
In a pile cap foundation design, flexural moments are evaluated in two orthogonal directions (Mx and My). To simplify
design calculations, an average value of d is used to represent both reinforcement curtains in the x and y directions.
1. Factored Moments
Short Direction
The factored moment at the critical section is obtained by multiplying the reactions from three piles by the distance
from the center of the piles to the critical section (at the face of the column) as follows:
Mu x = (3´114) (
7.75
2
− 1.25 −
22
2×12
) = 584.3 kips-ft
Long Direction
The factored moment at the critical section is obtained by multiplying the reactions from three piles by the distance
from the center of the piles to the critical section (at the face of the column) as follows:
Mu y = 114´(1.5 −
22
2×12
) + (2 × 114) × (3 −
22
2×12
) = 541.5 kips-ft
2024/04/14 Concrete Foundation Structures 18
Required Flexural Reinforcement
Short Direction
Mux = 584.3 kips-ft
d = 26 in.
To determine the area of steel, assumptions have to be made whether the section is tension or compression controlled,
and regarding the distance between the resultant compression and tension forces along the footing section (jd). In this
example, tension-controlled section will be assumed so the reduction factor ϕ is equal to 0.9, and jd will be taken
equal to 0.983d. The assumptions will be verified once the reinforcement area is finalized.
Assume jd = 0.983´ d = 25.56 in.
As =
𝑀𝑢
∅ 𝑓𝑦 𝑗𝑑
=
584.3×12000
0.9×60000×25.56
= 5.08 𝑖𝑛.2
𝜀 =
0.003
𝑐
𝑑𝑡 − 0.003 =
0.003
1.03
26 − 0.003 = 0.073 > 0.05
Therefore, the assumption that section is tension-controlled is valid.
2024/04/14 Concrete Foundation Structures 19
ACI 318-19 (7.6.1.1)
Providing 11#7 bars with As = 6.60 in.2 satisfies strength requirements.
For rectangular foundation, a portion of the total reinforcement (γsAs) in the short direction shall be distributed
uniformly over a band width equal to the length of short side of footing, centered on centerline of column.
Remainder of reinforcement required in the short direction ((1-γs) As) shall be distributed uniformly outside the
center band width of footing. ACI 318-19 (13.3.3.3)
2024/04/14 Concrete Foundation Structures 20
This requirement is also helpful to address the effects resulting from load concentration near the column and
two-way behavior in foundation structures. This is a similar effect to what is required in elevated slab supported
by columns.
ACI 318-19 (Eq. 13.3.3.3)
Provide 10#7 bars at 9 in. on centers (≤ smax) in the center band, and add one additional bar outside of the center
band. Thus, provide 12#7 in the short direction.
Long Direction
Mux = 541.5 kips-ft
d = 26 in.
To determine the area of steel, assumptions have to be made whether the section is tension or compression
controlled, and regarding the distance between the resultant compression and tension forces along the footing
section (jd). In this example, tension-controlled section will be assumed so the reduction factor ϕ is equal to 0.9, and
jd will be taken equal to 0.983d. The assumptions will be verified once the reinforcement area is finalized.
2024/04/14 Concrete Foundation Structures 21
Therefore, the assumption that section is tension-controlled is valid.
Provide 10#7 in the long direction. These bars are spaced
uniformly over the width of the pile cap.
2024/04/14 Concrete Foundation Structures 22
Reinforcement Bar Development Length
Flexural reinforcement must be properly developed in a concrete foundation in order for the foundation to perform as
intended in accordance with the strength design method. The concept of the development length is stated as follows:
minimum lengths of reinforcement must be provided beyond the locations of peak stress (critical sections) in the
reinforcement in order to fully develop the bars.
The development length for the pile cap is calculated as follows:
ACI 318-19 (Eq. 25.4.2.4a)
2024/04/14 Concrete Foundation Structures 23
The provided bar length is equal to:
Because the available development length is greater in the long direction, the bars in that direction can be fully developed.
2024/04/14 Concrete Foundation Structures 24
Design Results
1. Flexure
Table 1 – Pile Cap Analysis and Design Results (Flexural)
Solution Short Direction Long Direction
Mdesign (kips-ft) As,required (in.2) Mdesign (kips-ft) As,required (in.2)
Hand 584.3 6.06 541.5 5.52
2. Shear
Table 2 – Pile Cap Analysis and Design Results (Two-Way Shear)
Solution Around Column Around Interior Piles Around Corner Piles
vu, psi ϕvc, psi vu, psi ϕvc, psi vu, psi ϕvc, psi
Hand 684 1083 228 1080 114 337
2024/04/14 Concrete Foundation Structures 25
Discussion
In our report, we looked closely at how strong and stable our pile caps are in two main ways: flexure (bending)
and shear (sideways force).
When we checked flexure, we found that in the short direction, our pile caps could handle up to 584.3 kips-ft of
force, needing about 6.06 square inches of reinforcement. In the long direction, they could handle up to 541.5
kips-ft, needing about 5.52 square inches of reinforcement.
Then, we studied shear. We looked at how much force the pile caps could take around the column, near the
center piles, and at the corners. In these situations, our pile caps could resist forces like 684 psi, 228 psi, and 114
psi, respectively. This means they can handle a lot of pressure from different directions.
These findings show that our pile caps are well-designed to handle bending and sideways forces, ensuring
they're strong enough to support whatever's built on top of them.

Contenu connexe

Tendances

UNIT 2 PREFABRICATION COMPONENTS | CE8022 PREFABRICATED STRUCTURES
UNIT 2 PREFABRICATION COMPONENTS | CE8022 PREFABRICATED STRUCTURESUNIT 2 PREFABRICATION COMPONENTS | CE8022 PREFABRICATED STRUCTURES
UNIT 2 PREFABRICATION COMPONENTS | CE8022 PREFABRICATED STRUCTURESVenkateswaran S
 
Prefabricated components
Prefabricated componentsPrefabricated components
Prefabricated componentsSofia Rajesh
 
Precast concrete structures
Precast concrete structuresPrecast concrete structures
Precast concrete structuresAglaia Connect
 
Design of two way slab
Design of two way slabDesign of two way slab
Design of two way slabsarani_reza
 
High-rise structural systems
High-rise structural systemsHigh-rise structural systems
High-rise structural systemsAkshay Revekar
 
PRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEMPRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEMSagar Shah
 
MIVAN_An Aluminum Formwork Construction Technique
MIVAN_An Aluminum Formwork Construction TechniqueMIVAN_An Aluminum Formwork Construction Technique
MIVAN_An Aluminum Formwork Construction TechniqueSandeep Jain
 
Design of Multi-storey car parking
Design of Multi-storey car parkingDesign of Multi-storey car parking
Design of Multi-storey car parkingManoj Navneeth
 
Long span structures in Concrete and Steel
Long span structures in Concrete and SteelLong span structures in Concrete and Steel
Long span structures in Concrete and SteelRithika Ravishankar
 
Pre engineered building ppt rit
Pre engineered building ppt ritPre engineered building ppt rit
Pre engineered building ppt ritShubham Parab
 
PREFABRICATION BUILDING
PREFABRICATION BUILDINGPREFABRICATION BUILDING
PREFABRICATION BUILDINGsathish sak
 
Diagrid Systems : Future of Tall buildings, Technical Paper by Jagmohan Garg ...
Diagrid Systems : Future of Tall buildings, Technical Paper by Jagmohan Garg ...Diagrid Systems : Future of Tall buildings, Technical Paper by Jagmohan Garg ...
Diagrid Systems : Future of Tall buildings, Technical Paper by Jagmohan Garg ...Jagmohan Garg
 
DESIGN OF HOSTEL BUILDING G+5
DESIGN OF HOSTEL BUILDING G+5DESIGN OF HOSTEL BUILDING G+5
DESIGN OF HOSTEL BUILDING G+5anvesh reddy
 
ADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGS
ADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGSADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGS
ADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGSASHOK KUMAR TIWARY
 

Tendances (20)

UNIT 2 PREFABRICATION COMPONENTS | CE8022 PREFABRICATED STRUCTURES
UNIT 2 PREFABRICATION COMPONENTS | CE8022 PREFABRICATED STRUCTURESUNIT 2 PREFABRICATION COMPONENTS | CE8022 PREFABRICATED STRUCTURES
UNIT 2 PREFABRICATION COMPONENTS | CE8022 PREFABRICATED STRUCTURES
 
Prefabricated components
Prefabricated componentsPrefabricated components
Prefabricated components
 
Precast concrete structures
Precast concrete structuresPrecast concrete structures
Precast concrete structures
 
GRIDSHELL Structures
GRIDSHELL StructuresGRIDSHELL Structures
GRIDSHELL Structures
 
Rigid frame systems
Rigid frame systemsRigid frame systems
Rigid frame systems
 
Design of two way slab
Design of two way slabDesign of two way slab
Design of two way slab
 
High-rise structural systems
High-rise structural systemsHigh-rise structural systems
High-rise structural systems
 
Prefabricated structures
Prefabricated structuresPrefabricated structures
Prefabricated structures
 
LIFT SLAB .pdf
LIFT SLAB .pdfLIFT SLAB .pdf
LIFT SLAB .pdf
 
PRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEMPRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEM
 
MIVAN_An Aluminum Formwork Construction Technique
MIVAN_An Aluminum Formwork Construction TechniqueMIVAN_An Aluminum Formwork Construction Technique
MIVAN_An Aluminum Formwork Construction Technique
 
Design of Multi-storey car parking
Design of Multi-storey car parkingDesign of Multi-storey car parking
Design of Multi-storey car parking
 
Long span structures in Concrete and Steel
Long span structures in Concrete and SteelLong span structures in Concrete and Steel
Long span structures in Concrete and Steel
 
Pre engineered building ppt rit
Pre engineered building ppt ritPre engineered building ppt rit
Pre engineered building ppt rit
 
PREFABRICATION BUILDING
PREFABRICATION BUILDINGPREFABRICATION BUILDING
PREFABRICATION BUILDING
 
Diagrid Systems : Future of Tall buildings, Technical Paper by Jagmohan Garg ...
Diagrid Systems : Future of Tall buildings, Technical Paper by Jagmohan Garg ...Diagrid Systems : Future of Tall buildings, Technical Paper by Jagmohan Garg ...
Diagrid Systems : Future of Tall buildings, Technical Paper by Jagmohan Garg ...
 
Steel trusses
Steel trussesSteel trusses
Steel trusses
 
DESIGN OF HOSTEL BUILDING G+5
DESIGN OF HOSTEL BUILDING G+5DESIGN OF HOSTEL BUILDING G+5
DESIGN OF HOSTEL BUILDING G+5
 
Structural System
Structural SystemStructural System
Structural System
 
ADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGS
ADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGSADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGS
ADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGS
 

Similaire à Designing pile caps according to ACI 318-19.pptx

CEE598_Gummaraj_Bharath_Final_Project
CEE598_Gummaraj_Bharath_Final_ProjectCEE598_Gummaraj_Bharath_Final_Project
CEE598_Gummaraj_Bharath_Final_ProjectBharath Gummaraj
 
Reinforced concrete Course assignments, 2019
Reinforced concrete Course assignments, 2019Reinforced concrete Course assignments, 2019
Reinforced concrete Course assignments, 2019JanneHanka
 
Worked example extract_flat_slabs
Worked example extract_flat_slabsWorked example extract_flat_slabs
Worked example extract_flat_slabsLuan Truong Van
 
Design of Flat Slab and Bridges
Design of Flat Slab and BridgesDesign of Flat Slab and Bridges
Design of Flat Slab and BridgesAnanthakumar75
 
Fire Resistance of Materials & Structures - Analysing the Steel Structure
Fire Resistance of Materials & Structures - Analysing the Steel StructureFire Resistance of Materials & Structures - Analysing the Steel Structure
Fire Resistance of Materials & Structures - Analysing the Steel StructureArshia Mousavi
 
Passive Cooling Design Feature for Energy Efficient in PERI Auditorium
Passive Cooling Design Feature for Energy Efficient in PERI AuditoriumPassive Cooling Design Feature for Energy Efficient in PERI Auditorium
Passive Cooling Design Feature for Energy Efficient in PERI AuditoriumIRJET Journal
 
Worked example extract_flat_slabs
Worked example extract_flat_slabsWorked example extract_flat_slabs
Worked example extract_flat_slabsluantvconst
 
finalprojectreportg2-141218075116-conversion-gate01 (1).pdf
finalprojectreportg2-141218075116-conversion-gate01 (1).pdffinalprojectreportg2-141218075116-conversion-gate01 (1).pdf
finalprojectreportg2-141218075116-conversion-gate01 (1).pdfAbdurRazzak187410
 
140204-5-PTI EDC-130-Continuous Members-41.pdf
140204-5-PTI EDC-130-Continuous Members-41.pdf140204-5-PTI EDC-130-Continuous Members-41.pdf
140204-5-PTI EDC-130-Continuous Members-41.pdfephrem53
 
Design of transformer
Design of transformerDesign of transformer
Design of transformerSubrata Dey
 
Design of concrete structure 2 project-Loay Qabaha &Basel Salame
Design of concrete structure 2 project-Loay Qabaha &Basel SalameDesign of concrete structure 2 project-Loay Qabaha &Basel Salame
Design of concrete structure 2 project-Loay Qabaha &Basel SalameLoay Qabaha
 
Chapter 6 column
Chapter 6   columnChapter 6   column
Chapter 6 columnSimon Foo
 
Tranformer Design
Tranformer DesignTranformer Design
Tranformer DesignArnab Nandi
 
Design of Structures Chapter2.pdf
Design of Structures Chapter2.pdfDesign of Structures Chapter2.pdf
Design of Structures Chapter2.pdfUmarSaba1
 

Similaire à Designing pile caps according to ACI 318-19.pptx (20)

CEE598_Gummaraj_Bharath_Final_Project
CEE598_Gummaraj_Bharath_Final_ProjectCEE598_Gummaraj_Bharath_Final_Project
CEE598_Gummaraj_Bharath_Final_Project
 
Reinforced concrete Course assignments, 2019
Reinforced concrete Course assignments, 2019Reinforced concrete Course assignments, 2019
Reinforced concrete Course assignments, 2019
 
Reinfored beam
Reinfored beamReinfored beam
Reinfored beam
 
presentation1_28.pptx
presentation1_28.pptxpresentation1_28.pptx
presentation1_28.pptx
 
Worked example extract_flat_slabs
Worked example extract_flat_slabsWorked example extract_flat_slabs
Worked example extract_flat_slabs
 
Design of Flat Slab and Bridges
Design of Flat Slab and BridgesDesign of Flat Slab and Bridges
Design of Flat Slab and Bridges
 
Fire Resistance of Materials & Structures - Analysing the Steel Structure
Fire Resistance of Materials & Structures - Analysing the Steel StructureFire Resistance of Materials & Structures - Analysing the Steel Structure
Fire Resistance of Materials & Structures - Analysing the Steel Structure
 
Passive Cooling Design Feature for Energy Efficient in PERI Auditorium
Passive Cooling Design Feature for Energy Efficient in PERI AuditoriumPassive Cooling Design Feature for Energy Efficient in PERI Auditorium
Passive Cooling Design Feature for Energy Efficient in PERI Auditorium
 
Design and analasys of a g+2 residential building
Design and analasys of a g+2 residential building Design and analasys of a g+2 residential building
Design and analasys of a g+2 residential building
 
Worked example extract_flat_slabs
Worked example extract_flat_slabsWorked example extract_flat_slabs
Worked example extract_flat_slabs
 
Presentation
PresentationPresentation
Presentation
 
finalprojectreportg2-141218075116-conversion-gate01 (1).pdf
finalprojectreportg2-141218075116-conversion-gate01 (1).pdffinalprojectreportg2-141218075116-conversion-gate01 (1).pdf
finalprojectreportg2-141218075116-conversion-gate01 (1).pdf
 
Crack Width
Crack WidthCrack Width
Crack Width
 
140204-5-PTI EDC-130-Continuous Members-41.pdf
140204-5-PTI EDC-130-Continuous Members-41.pdf140204-5-PTI EDC-130-Continuous Members-41.pdf
140204-5-PTI EDC-130-Continuous Members-41.pdf
 
Design of transformer
Design of transformerDesign of transformer
Design of transformer
 
Design of concrete structure 2 project-Loay Qabaha &Basel Salame
Design of concrete structure 2 project-Loay Qabaha &Basel SalameDesign of concrete structure 2 project-Loay Qabaha &Basel Salame
Design of concrete structure 2 project-Loay Qabaha &Basel Salame
 
Chapter 6 column
Chapter 6   columnChapter 6   column
Chapter 6 column
 
Tranformer Design
Tranformer DesignTranformer Design
Tranformer Design
 
Design of Structures Chapter2.pdf
Design of Structures Chapter2.pdfDesign of Structures Chapter2.pdf
Design of Structures Chapter2.pdf
 
Shi20396 ch18
Shi20396 ch18Shi20396 ch18
Shi20396 ch18
 

Dernier

Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 

Dernier (20)

Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 

Designing pile caps according to ACI 318-19.pptx

  • 1. Erbil Polytechnic University Erbil Technical Engineering College Civil Engineering Techniques Designing pile caps according to ACI 318-19 Supervisors 1. Prof. Dr. Mereen Hasan Fahmi 2. Mr. Deedar Hussein Prepared by (G6) 1. Paywand Shakir 2. Ziyad Asaad 3. Mohammed Jalal 4. Rasan Nuradin 5. Ismail Mukhlis 6. Ahmed Karim (2023-2024) 【 Concrete Foundation Structures 】
  • 2. Contents Introduction 1 Pile Cap Plan Dimensions 4 •Two-Way Shear at the Column 5 •One-Way Shear at the Column 7 •Two-Way Shear at Corner Pile 9 •One-Way Shear at Corner Pile 9 •Two-Way Shear at Interior Piles 10 •Pile Cap Overall Depth Requirements 11 Pile Cap Shear Strength and Thickness 5 •Factored Moments 12 •Required Flexural Reinforcement12 Pile Cap Flexural Strength and Reinforcement 11 Reinforcement Bar Development Length 14 •Flexure16 •Shear 16 Design Results Comparison and Conclusions 16 Discussion 17 2024/04/14 Concrete Foundation Structures 2
  • 3. Introduction Based on a geotechnical study, a pile supported foundation is required to support a heavily loaded building column. Design the pile cap shown in the following figure with 12 in. diameter piles and a service load capacity of 50 tons each. The pile cap has normal-weight concrete with a compressive strength of 5800 psi and Grade 60 reinforcement. And the piles are embedded 4 in. into the pile cap. The axial loads on the column are due to dead and live loads and are equal to 425 and 250 kips, respectively. This report explains how we'll figure out and design pile caps by hand, following the rules in ACI 318-19. We're making sure everything meets safety standards for strong, stable structures. We'll use this hand solution to compare it with the reference result. 2024/04/14 Concrete Foundation Structures 3
  • 4. 2024/04/14 Concrete Foundation Structures 4 Code Building Code Requirements for Structural Concrete (ACI 318-19) and Commentary (ACI 318R-19) Design Data fc’ = 5,800 psi normal weight concrete fy = 60,000 psi Dead load, D = 425 kips Live load, L = 250 kips Pile Diameter, dp = 12 in. Piles are embedded 4 in. into the pile cap
  • 5. 2024/04/14 Concrete Foundation Structures 5 Pile Cap Plan Dimensions The plan dimensions of a pile cap depend on the number of piles that are needed to support the load. Number and arrangement of piles were determined from unfactored forces and moments transmitted to piles and permissible pile capacity selected through geotechnical engineering principles. These calculations are not part of the scope of this example. ACI 318-19 (13.4.1.1) Pile spacing is generally a function of pile type and capacity. The following figure shows the piles configuration selected by the reference for this example with the associated pile cap plan dimensions.
  • 6. 2024/04/14 Concrete Foundation Structures 6 Pile Cap Shear Strength and Thickness The thickness of the pile cap is initially determined based on the following key parameters: 1) Two-way shear requirements around the column, 1) One-way shear requirements at the column, and 1) One-way and two-way shear requirements around the piles 1) Pile cap overall depth minimum requirements Both one-way and two-way shear are investigated at the critical sections around the vertical elements (columns) supported by the pile cap with the requirements of ACI 318-19 (13.4.6). Factored loads are used to compute the shear forces at the critical sections around columns as well as piles. Like footings, it is common practice not to use shear reinforcement in pile caps. One-way shear checks are shown for illustration as two-way shear normally governs the design. The overall depth of pile cap shall also be selected such that the effective depth of bottom reinforcement is at least 12 inches.
  • 7. 2024/04/14 Concrete Foundation Structures 7 Two-Way Shear at the Column The total factored axial load on the column: Pu = 1.2´ PD +1.6´ PL = 1.2´ 425 +1.6´ 250 = 910 kips Consider a uniform distribution of column load to the provided piles. Because of the rigidity of the pile cap Pu per pile = 910 8 = 114 kips Assuming that the centers of the two piles closest to the column are located dp/2 = 6 in. or more inside the perimeter of the critical section for two-way shear, their contribution to the total shear can then be neglected. This assumption will be verified later. ACI 318-19 (13.4.6.5(b)) Therefore, the factored shear force at the critical section is calculated based on six of the eight piles only: Vu = 12/2 ´114 = 684 kips The design shear strength for the interior column: ϕV=ϕ 4 λs λ 𝑓′𝑐 bo d ϕv= 0.75 x 4 x 0.95 x 1 x 5800 4x(22+d) d ACI 318-19 (22.6.5.2(a))
  • 8. 2024/04/14 Concrete Foundation Structures 8 Where ϕ = 0.75, λs = 2 1 + 𝑑 10 ≤ 1 λs=0.95 ACI 318-19 (Table 21.2.1) The minimum required d for the pile cap foundation can be calculated by setting Vu = ϕVc as follows: ϕVc = Vu 684,000 = 0.75 x 4 x 0.95 x 1 x 5800 4x(22+d) d d = 19.15 in. ➞ 21 in. By using d = 21 in., the center of the two piles closest to the column is located (43/2) - 18 = 3.5 in. inside the critical section which less than dp/2 = 6 in. (see the following figure). Thus, the initial assumption is not valid. That is part of the reactions from these two piles must be considered in the shear force at the critical section, or a bigger d must be selected. By increasing d to 26 in., the center of the piles is located at dp/2 inside the critical section, and these reactions can be neglected and the assumption made earlier is validated (see the following figure). These configuration changes are for illustration only and may not represent optimal design which is left up to the design professional based on project criteria.
  • 10. 2024/04/14 Concrete Foundation Structures 10 The design shear strength for the interior column: ϕV=ϕ 4 λs λ 𝑓′𝑐 bo d ACI 318-19 (22.6.5.2(a)) ϕVc = 0.75´ 4´0.95´1.0´ 5800 ´(4´(22 + 26))´ 26/1000 = 1083 kips > Vu = 684 kips  o.k. Thus, Two-way shear requirement around the column is satisfied. One-Way Shear at the Column North/South Direction: The critical section for one-way shear is located at a distance d from the face of the column as shown in the previous figure. The center of the three piles is located 5.5 in. inside of the critical section, which is less than dp/2 (see the previous figure). In this case, the pile reaction shall be based on a linear interpolation between full value at dp/2 outside the section and zero value at dp /2 inside the section. ACI 318-19 (13.4.6.5(c))
  • 11. 2024/04/14 Concrete Foundation Structures 11 d - dp/2 = 26 - 12/2 = 20 in.  the reaction from each pile = 0 kips d - dp/2 = 26 + 12/2 = 32 in.  the reaction from each pile = 114 kips By performing interpolation with the center of the three piles is located at 26 – 5.5 = 20.5 in. from the face of the column: the reaction from each pile=114´( 20.5 32−20 -1.667) = 5 kips Therefore, Vu = 3 x 5 = 15 kips. ϕVc = ϕ ´8´ λs ´λ´(r)1/3 𝑓′𝑐 L ´ d ACI 318-19 (22.5.5.1(c)) ϕVc = 0.75´ 8´0.95´1.0´(0.0018)1/3 5800 (8.5´12)´ 26 /1000 = 140 kips Vu < ϕVc  o.k. East/West Direction: The critical section for one-way shear is located at a distance d from the face of the column as shown in the previous figure. The center of the pile closest to the column is located 19 in. inside of the critical section, which is greater than dp/2 (see the previous figure). Thus, the reaction from this pile is not considered.
  • 12. 2024/04/14 Concrete Foundation Structures 12 The two remaining piles are located 26 - (36 - 11) = 1 in. inside of the critical section, which is less than dp/2. In this case, the reaction for those piles shall be based on a linear interpolation between full value at dp/2 outside the section and zero value at dp /2 inside the section. ACI 318-19 (13.4.6.5(c)) d - dp/2 = 26 - 12/2 = 20 in.  the reaction from each pile = 0 kips d - dp/2 = 26 + 12/2 = 32 in.  the reaction from each pile = 114 kips By performing interpolation with the center of the three piles is located at 26 – 1 = 25 in. from the face of the column: the reaction from each pile =114´( 25 32−20 -1.667) = 48 kips Therefore, Vu = 2 x 48 = 96 kips. ϕVc = ϕ ´8´ λs ´λ´(r)1/3 𝑓′𝑐 B ´ d ACI 318-19 (22.5.5.1(c)) ϕVc = 0.75´ 8´0.95´1.0´(0.0018)1/3 5800 (7.75´12)´ 26 /1000 = 127 kips Vu < ϕVc  o.k.
  • 13. 2024/04/14 Concrete Foundation Structures 13 Two-Way Shear at Corner Pile Vu = Pile reaction = 114 kips ϕV=ϕ 4 λs λ 𝑓′𝑐 bo d ACI 318-19 (22.6.5.2(a)) Where bo = π (dp + d) normally for an interior circular pile. For the corner pile however, bo is calculated as shown in the following figure: ϕVc = 0.75´ 4´0.95´1.0´ 5800 ´( 𝜋 4 ´(12 + 26)+(2´15)´ 26/1000 = 337 kips Vu < ϕVc  o.k. The calculations above may be simplified using the approximation of equivalent sections as shown in ACI 8.10.1.3
  • 14. 2024/04/14 Concrete Foundation Structures 14 One-Way Shear at Corner Pile The one-way shear is checked at a distance d, but no more than 13 in., from the face of a corner pile as stated in the reference. The critical section occurs at a 45ᴼ angle with respect to the edges of the pile cap. Vu = the reaction of the pile = 114 kips ϕVc = ϕ ´8´ λs ´λ´(r)1/3 𝑓′𝑐 b ´ d ACI 318-19 (22.5.5.1(c) Where b is calculated as shown in the following figure. ϕVc = 0.75´ 8´0.95´1.0´(0.0018)1/3 5800 (2´40.2)´ 26 /1000 = 115 kips Vu < ϕVc  o.k.
  • 15. 2024/04/14 Concrete Foundation Structures 15 Two-Way Shear at Interior Piles For interior piles, if two-way shear perimeters overlap, the modified critical shear perimeter should be taken as that portion of the smallest envelope of individual shear perimeters that will actually resist the critical shear for group under consideration as shown in the following figure. ACI 318-19 (R13.2.7.2) Vu = Pile reactions = 2 x 114 = 228 kips ϕV=ϕ 4 λs λ 𝑓′𝑐 bo d ACI 318-19 (22.6.5.2(a)) Where bo is calculated as shown in the following figure. ϕVc = 0.75´ 4´0.95´1.0´ 5800 ´[(2π´( 12 2 + 26 2 )+(2´36)]´ 26/1000 = 1080kips Vu < ϕVc  o.k.
  • 16. 2024/04/14 Concrete Foundation Structures 16 Pile Cap Overall Depth Requirements Overall depth of pile cap shall be selected such that the effective depth of bottom reinforcement is at least 12 in. ACI 318-14 (13.4.2.1) hmin = 12 in. + cover + embedment = 12 + 3+ 4 = 19 in. h = 26 + 3 + 4 = 33 in.>hmin Thus, use a final pile cap thickness of 33 in.
  • 17. 2024/04/14 Concrete Foundation Structures 17 Pile Cap Flexural Strength and Reinforcement In a pile cap foundation design, flexural moments are evaluated in two orthogonal directions (Mx and My). To simplify design calculations, an average value of d is used to represent both reinforcement curtains in the x and y directions. 1. Factored Moments Short Direction The factored moment at the critical section is obtained by multiplying the reactions from three piles by the distance from the center of the piles to the critical section (at the face of the column) as follows: Mu x = (3´114) ( 7.75 2 − 1.25 − 22 2×12 ) = 584.3 kips-ft Long Direction The factored moment at the critical section is obtained by multiplying the reactions from three piles by the distance from the center of the piles to the critical section (at the face of the column) as follows: Mu y = 114´(1.5 − 22 2×12 ) + (2 × 114) × (3 − 22 2×12 ) = 541.5 kips-ft
  • 18. 2024/04/14 Concrete Foundation Structures 18 Required Flexural Reinforcement Short Direction Mux = 584.3 kips-ft d = 26 in. To determine the area of steel, assumptions have to be made whether the section is tension or compression controlled, and regarding the distance between the resultant compression and tension forces along the footing section (jd). In this example, tension-controlled section will be assumed so the reduction factor ϕ is equal to 0.9, and jd will be taken equal to 0.983d. The assumptions will be verified once the reinforcement area is finalized. Assume jd = 0.983´ d = 25.56 in. As = 𝑀𝑢 ∅ 𝑓𝑦 𝑗𝑑 = 584.3×12000 0.9×60000×25.56 = 5.08 𝑖𝑛.2 𝜀 = 0.003 𝑐 𝑑𝑡 − 0.003 = 0.003 1.03 26 − 0.003 = 0.073 > 0.05 Therefore, the assumption that section is tension-controlled is valid.
  • 19. 2024/04/14 Concrete Foundation Structures 19 ACI 318-19 (7.6.1.1) Providing 11#7 bars with As = 6.60 in.2 satisfies strength requirements. For rectangular foundation, a portion of the total reinforcement (γsAs) in the short direction shall be distributed uniformly over a band width equal to the length of short side of footing, centered on centerline of column. Remainder of reinforcement required in the short direction ((1-γs) As) shall be distributed uniformly outside the center band width of footing. ACI 318-19 (13.3.3.3)
  • 20. 2024/04/14 Concrete Foundation Structures 20 This requirement is also helpful to address the effects resulting from load concentration near the column and two-way behavior in foundation structures. This is a similar effect to what is required in elevated slab supported by columns. ACI 318-19 (Eq. 13.3.3.3) Provide 10#7 bars at 9 in. on centers (≤ smax) in the center band, and add one additional bar outside of the center band. Thus, provide 12#7 in the short direction. Long Direction Mux = 541.5 kips-ft d = 26 in. To determine the area of steel, assumptions have to be made whether the section is tension or compression controlled, and regarding the distance between the resultant compression and tension forces along the footing section (jd). In this example, tension-controlled section will be assumed so the reduction factor ϕ is equal to 0.9, and jd will be taken equal to 0.983d. The assumptions will be verified once the reinforcement area is finalized.
  • 21. 2024/04/14 Concrete Foundation Structures 21 Therefore, the assumption that section is tension-controlled is valid. Provide 10#7 in the long direction. These bars are spaced uniformly over the width of the pile cap.
  • 22. 2024/04/14 Concrete Foundation Structures 22 Reinforcement Bar Development Length Flexural reinforcement must be properly developed in a concrete foundation in order for the foundation to perform as intended in accordance with the strength design method. The concept of the development length is stated as follows: minimum lengths of reinforcement must be provided beyond the locations of peak stress (critical sections) in the reinforcement in order to fully develop the bars. The development length for the pile cap is calculated as follows: ACI 318-19 (Eq. 25.4.2.4a)
  • 23. 2024/04/14 Concrete Foundation Structures 23 The provided bar length is equal to: Because the available development length is greater in the long direction, the bars in that direction can be fully developed.
  • 24. 2024/04/14 Concrete Foundation Structures 24 Design Results 1. Flexure Table 1 – Pile Cap Analysis and Design Results (Flexural) Solution Short Direction Long Direction Mdesign (kips-ft) As,required (in.2) Mdesign (kips-ft) As,required (in.2) Hand 584.3 6.06 541.5 5.52 2. Shear Table 2 – Pile Cap Analysis and Design Results (Two-Way Shear) Solution Around Column Around Interior Piles Around Corner Piles vu, psi ϕvc, psi vu, psi ϕvc, psi vu, psi ϕvc, psi Hand 684 1083 228 1080 114 337
  • 25. 2024/04/14 Concrete Foundation Structures 25 Discussion In our report, we looked closely at how strong and stable our pile caps are in two main ways: flexure (bending) and shear (sideways force). When we checked flexure, we found that in the short direction, our pile caps could handle up to 584.3 kips-ft of force, needing about 6.06 square inches of reinforcement. In the long direction, they could handle up to 541.5 kips-ft, needing about 5.52 square inches of reinforcement. Then, we studied shear. We looked at how much force the pile caps could take around the column, near the center piles, and at the corners. In these situations, our pile caps could resist forces like 684 psi, 228 psi, and 114 psi, respectively. This means they can handle a lot of pressure from different directions. These findings show that our pile caps are well-designed to handle bending and sideways forces, ensuring they're strong enough to support whatever's built on top of them.