Project Charter
Project Charter Components: The Power of the One-Page Document
citoolkit.com
Introduction
Once a project opportunity has been identified, it must be translated from
a concept into a well-written project charter.
Project Charter 2
A project charter is a one-page document that
summarizes the fundamental information of a
project before it begins.
The completed project charter is a requirement
for the project kick-off.
citoolkit.com
Introduction
The information in the project charter is critical for obtaining leadership
support and commitment to provide the necessary funding and resources.
Project Charter 3
Once signed, it authorizes the project leader to
formally start the project and use the necessary
resources and funding to complete the project
successfully.
citoolkit.com
Introduction
A Project Charter . . .
Project Charter 4
Addresses the needs of stakeholders
Clarifies project objectives and scope
Defines roles and responsibilities
citoolkit.com
Uses
A project charter is one of the first essential steps in many different types
of projects . . .
• In Lean Six Sigma, a project charter is used to summarize the
findings of the Define phase.
• A project charter as per the PMBOK is a document that
formally authorizes the existence of the project and issued by
the sponsor or the initiator of the project.
Lean Six Sigma
PMI / PMO
Project Charter 5
citoolkit.com
Benefits
A project charter ensures that the project is . . .
Project Charter 6
Business focused
Executed in a timely
manner
Well scoped
Have the necessary
resources & support
citoolkit.com
Benefits
Project Charter 7
Acts as a contract between the
project sponsor, key stakeholders
and the project team
02
Enables everybody to review the
project and commit it
03
Communicates the objectives to
those outside the project team
05
Serves as a reference for future
projects
06
Communicates the summary of
the project to those who are
usually not interested in the
details
04
Establishes a shared
understanding of the project
scope and objectives
01
citoolkit.com
A project charter should provide answers to . . .
What must be done?
Why doing it?
What are the benefits of implementing the project?
When must it be done?
Who does what?
Who will be benefited form the results of the project?
Key Elements
Project Charter 8
citoolkit.com
Key Elements
The project charter requires significant preparation time to include key
elements such as . . .
Project Charter 9
Goal statement
Project team
Project title
Project plan
Problem statement
Project authorization
section
Business case
summary
Scope & boundaries
Project metrics
citoolkit.com
Key Elements
The components of a project charter vary depending on the methodology
used.
In a Six Sigma project for example, it is useful to include the following . . .
Voice of the customer.
Baseline data and COPQ.
Defect definition.
Estimated defect level.
Five major milestones based on the
DMAIC methodology.
Project Charter 10
citoolkit.com
Key Elements – Business Case
A business case analysis should precede any project to justify why the
project is being selected.
Project Charter 11
A business case analysis is a tool used
to evaluate a potential business
decision and help decide whether
some sort of action should be taken.
citoolkit.com
Key Elements – Business Case Summary
The business case summary should describe:
The impact on the business in terms of benefits or savings.
How the project is aligned to the company strategy.
Project Charter 12
vs.
Business
case
A report that describes
why the problem
needs to be solved
Business
case
Summary
A section in the project
charter that summarized
the business case
citoolkit.com
Key Elements – Problem Statement
Identifies what is not working and where the pain point lies.
Project Charter 13
A problem exists when
there is a difference
between where we are and
where we want to be.
REQUIRED STATE
CURRENT STATE
No problem means no improvement
citoolkit.com
Key Elements – Problem Statement
A problem statement . . .
Should be specific and brief.
Should describe when and how often the
problem occurs.
Should be supported with data.
Should not include background information.
Should not discuss causes and solutions.
Project Charter 14
citoolkit.com
Key Elements – Problem Statement
A problem statement is sometimes written in the following format . . .
Project Charter 15
The problem of...
Is affecting...
The impact of which is...
citoolkit.com
Key Elements – Problem Statement
Example of a Problem Statement . . .
Project Charter 16
The manual oil refilling
process using drums in
the forming machines
in line #4 make it
difficult to control oil
losses which may
reach more than 4%
per drum
citoolkit.com
Key Elements – Problem Statement
What is the Problem of this Problem Statement:
Project Charter 17
“The business is not making enough profit”
Not supported with
data
Too general which
you can’t solve at
once
citoolkit.com
Key Elements – Goal Statement
Project Charter 18
Defines the target of the
project
Responds to the problem
statement
citoolkit.com
Key Elements – Goal Statement
Project Charter 19
Should have a
measurable
target
Often starts with
a verb
Should be brief
and specific
SMART Reduce . . .
Increase . . .
Eliminate . . .
citoolkit.com
Key Elements – Goal Statement
Typically written in the following format . . .
Project Charter 20
Improve (primary metric) from
(baseline performance) to
(desired future performance)
by (desired date of completion)
citoolkit.com
Key Elements – Goal Statement
Project Charter 21
Avoid using technical language when writing
a goal statement.
Avoid suggesting or assuming a solutions.
citoolkit.com
Key Elements – Goal Statement
Project Charter 22
Reduce oil losses of the
manual refilling
process of the forming
machines in line #4 to
less than 1% per drum
by the 30th of October
Example of a Goal Statement . . .
Specific
Measurable
Time bound
Defines the scope
Does not refer
to solutions or
causes
citoolkit.com
Key Elements – Project Team
Should be selected along with their expected time contribution to the
project.
Project Charter 23
Composed of . . .
Team members
A dedicated project leader
Directed by a project sponsor
citoolkit.com
Key Elements – Project Team
A project leader . . .
Project Charter 24
Provides the
purpose
Communicates and
facilitates
Establishes a shared
ownership
Monitors and tracks
citoolkit.com
Key Elements – Project Team
The team members are responsible for executing the project activities to
produce the desired deliverables.
Project Charter 25
Knowing how much work team members have to do is important, so they don't get
too stressed or struggle with their contribution.
citoolkit.com
Key Elements – Project Team
A project sponsor has the ultimate accountability for the project and owns
the project charter.
Project Charter 26
He or she should have the authority to
afford the necessary resources and
provide support as needed.
citoolkit.com
Key Elements – Project Scope
Defines what is involved in the project and what is not.
Project Charter 27
Consider using SIPOC mapping
Departments Products
Customers
Locations Processes
Services
It is important to identify . . .
citoolkit.com
Key Elements – Project Scope
Avoid the temptation of expanding the scope of
the project . . .
You will not be able to complete the project
within the allocated time.
More resources will be required.
The action and control plans will be too
detailed.
Project Charter 28
citoolkit.com
Key Elements – Voice of the Customer (VOC)
Customers are the elements that identify the need for executing the
project.
Project Charter 29
It is important to take the VOC
(or the Voice of the business)
into account during the project
definition phase
citoolkit.com
Key Elements – Voice of the Customer (VOC)
A customer representative may be needed to evaluate
the outcomes of the project definition process and
provide feedback as necessary.
Remember that a customer may be and internal or external.
Project Charter 30
citoolkit.com
Key Elements – Project Metrics
Project Charter 31
Allows project managers
to take corrective actions
promptly
Keeps the team focused
to achieve the project
goals
Tracks progress and
brings attention to the
future progress and
results
Establishes
accountability among
team members and
stakeholders
citoolkit.com
Key Elements – Project Metrics
The success of any project is measured by each or both of . . .
Project Charter 32
Primary
metrics
Financial
metrics
&
Tracking these metrics is important not only during the project period but also several years
after the project completion.
citoolkit.com
Key Elements – Project Time Frame
Project duration must be determined so that a project could be managed
in terms of schedule, cost and resources.
Often represented by the start and expected completion dates.
Project Charter 33
It is possible to assign an approximate
completion date, however, you need to revise it
as the project progresses.
citoolkit.com
Key Elements – Project Authorization Section
Obtain approval by letting key stakeholders view and sign the project
charter.
Project Charter 34
Signing on the project charter . . .
Serves as a formal approval of the project.
Empowers the project leader to proceed with
the project.
Who should sign?
citoolkit.com
Key Elements – Project Authorization Section
A signature from a financial representative provides credibility and support
to the proposed financial gains.
Project Charter 35
In is important that companies considers
financial approval as a requirement for any
project to be qualified.
citoolkit.com
A Project Charter May Contain
Project Charter 36
Goal statement
Project team
Project title
Project plan
Problem statement
Project authorization
section
Business case
summary
Scope & boundaries
Project metrics
citoolkit.com
A Project Charter May Contain
A list of key stakeholders affected by the project, and their expectations and
concerns.
Project Charter 37
We need to get their support in order for the project to be successful.
citoolkit.com
A Project Charter May Contain
Key milestones which could be simply the completion of each project stage.
Project Charter 38
Highlight
important dates
Help you stay on
schedule
Provide regular
opportunities to review
progress
citoolkit.com
A Project Charter May Contain
Project Charter 39
Project approach or
project implementation
methodology
Project Approach
The deliverables at
every stage
If a deliverable is significant,
it may be a milestone
Deliverables
A communication plan
summary to communicate
the man messages to the
key stakeholders
Communication Plan
A go/no go decision to decide whether to move forward with the project as defined or to stop.
citoolkit.com
A Project Charter Template
Example of a project charter template . . .
Project Charter 40
Project Team:
Leader:
Team member1:
Team member2:
Team member3:
Project Information:
Project start:
Project end:
Project scope:
Problem Statement: Goal Statement:
PROJECT CHARTER
PROJECT TITLE: ______________________________________________
VOC:
Key Metrics:
SIGNATURES: _______________ _______________ _______________ _______________
Resources:
•
•
•
•
MILESTONES: _______________________________________________
citoolkit.com
How to Prepare an Effective Project Charter?
A project charter . . .
Should be customer focused and addresses their
specific needs and expectations.
Should be clear and concise (preferably one page).
Should contain realistic and achievable objectives
(use the SMART checklist).
Should be developed as a collaborative effort.
Should be dealt with as a live document during the
project lifetime.
Should be updated as the project progresses.
Project Charter 41
citoolkit.com
Further Information
Project charters can be created by the project team, the
project sponsor, or by an expert external to the project
team.
Project Charter 42
Although project charters are short and brief, they
often refer to more detailed documents.
A project charter may be created for each phase for multiple-phased large projects.
citoolkit.com
Further Information
Sometimes, the project should be stopped at the beginning when:
Project Charter 43
Where else?
The potential benefits
are insufficient
The availability of
resources might be an
issue
citoolkit.com
Further Information
A good problem statement concisely communicates the problem in terms
of who, what, when, where, and how many.
Who is affected by the problem?
What does the problem appear to be?
When does the problem occur?
Where does the problem occur?
How many times has the problem occurred
over the defined period?
Project Charter 44
citoolkit.com
Further Information
A good goal statement describes . . .
What do we want to do?
By when?
What is the level of performance we want to reach?
Project Charter 45
Goal Statement
citoolkit.com
Further Information
Are we following the right goal?
Use the SMART checklist . . .
Project Charter 46
S - Specific
M - Measurable
A - Achievable
R - Realistic
T - Time bound
P - Positively stated
U - Understood
R - Relevant
E – Ethical
C - Challenging
L - Legal
E - Environmental
A - Agreed
R - Recorded
Always check whether your goals correlates with the 14 requirements.
citoolkit.com
Further Information
In Six Sigma projects, the project charter must be filled in and agreed by
the Champion before the kick-off.
Adjustments to the project charter are possible with the approval of the
Champion.
Project Charter 47
© Copyright Citoolkit.com. All Rights Reserved.
CITOOLKIT
Made with by
The Continuous Improvement Toolkit
www.citoolkit.com

Contenu connexe

Similaire à Project Charter Components: The Power of the One-Page Document

Basics in Project Management
Basics in Project ManagementBasics in Project Management
Basics in Project Managementchaitanyakrsk
 
Module 2 - IDP.pptx
Module 2 - IDP.pptxModule 2 - IDP.pptx
Module 2 - IDP.pptxRAJESH S
 
Article-How to Write a Project Charter
Article-How to Write a Project CharterArticle-How to Write a Project Charter
Article-How to Write a Project Charterjaydeep chaurasia
 
Assignment 1 ITECH 2250 IT Project Management Techniques.docx
Assignment 1 ITECH 2250 IT Project Management Techniques.docxAssignment 1 ITECH 2250 IT Project Management Techniques.docx
Assignment 1 ITECH 2250 IT Project Management Techniques.docxsherni1
 
Project Management Presentation Template.pdf
Project Management Presentation Template.pdfProject Management Presentation Template.pdf
Project Management Presentation Template.pdfapoorvaguptaspn27
 
Project Manager Primer
Project Manager PrimerProject Manager Primer
Project Manager PrimerTom Cremins
 
PMP Training - Project Integration Management - Part 1
PMP Training - Project Integration Management - Part 1PMP Training - Project Integration Management - Part 1
PMP Training - Project Integration Management - Part 1Skillogic Solutions
 
PMP - Project Initiation Template for Professionals
PMP - Project Initiation Template for ProfessionalsPMP - Project Initiation Template for Professionals
PMP - Project Initiation Template for ProfessionalsDaniel_Mccrea
 
ChapterPM_1.pptx for the course project management
ChapterPM_1.pptx for the course project managementChapterPM_1.pptx for the course project management
ChapterPM_1.pptx for the course project managementDerbewBirhanu2
 
romi-pm-03-process-april2013.pptx
romi-pm-03-process-april2013.pptxromi-pm-03-process-april2013.pptx
romi-pm-03-process-april2013.pptxummi1206
 
Project Management Msc. 7Pjmn009W Project Management Project.
Project Management Msc. 7Pjmn009W Project Management Project.Project Management Msc. 7Pjmn009W Project Management Project.
Project Management Msc. 7Pjmn009W Project Management Project.Renee Jones
 
Unit2 Project phases.pptx
Unit2 Project phases.pptxUnit2 Project phases.pptx
Unit2 Project phases.pptxAtulBhagwat6
 
Chapter 3: The Project Management Process Groups: A Case Study
Chapter 3:The Project Management Process Groups: A Case StudyChapter 3:The Project Management Process Groups: A Case Study
Chapter 3: The Project Management Process Groups: A Case StudyShahid Riaz
 
NCET Biz Bite | Project Management Tips and Tools | January 2018
NCET Biz Bite | Project Management Tips and Tools | January 2018NCET Biz Bite | Project Management Tips and Tools | January 2018
NCET Biz Bite | Project Management Tips and Tools | January 2018Archersan
 
Lecture Presentation on Project Proposal
Lecture Presentation on Project ProposalLecture Presentation on Project Proposal
Lecture Presentation on Project ProposalJo Balucanag - Bitonio
 
Introduction to Business Analysis
Introduction to Business AnalysisIntroduction to Business Analysis
Introduction to Business AnalysisVeneet-BA
 
IT Project Management
IT Project ManagementIT Project Management
IT Project ManagementSravan Banka
 
About this research note Technology Insight notes descr.docx
About this research note Technology Insight notes descr.docxAbout this research note Technology Insight notes descr.docx
About this research note Technology Insight notes descr.docxransayo
 
Step by Step Guide to Project Management
Step by Step Guide to Project ManagementStep by Step Guide to Project Management
Step by Step Guide to Project ManagementBrendon Yip
 

Similaire à Project Charter Components: The Power of the One-Page Document (20)

Basics in Project Management
Basics in Project ManagementBasics in Project Management
Basics in Project Management
 
Module 2 - IDP.pptx
Module 2 - IDP.pptxModule 2 - IDP.pptx
Module 2 - IDP.pptx
 
Article-How to Write a Project Charter
Article-How to Write a Project CharterArticle-How to Write a Project Charter
Article-How to Write a Project Charter
 
Assignment 1 ITECH 2250 IT Project Management Techniques.docx
Assignment 1 ITECH 2250 IT Project Management Techniques.docxAssignment 1 ITECH 2250 IT Project Management Techniques.docx
Assignment 1 ITECH 2250 IT Project Management Techniques.docx
 
Project Management Presentation Template.pdf
Project Management Presentation Template.pdfProject Management Presentation Template.pdf
Project Management Presentation Template.pdf
 
Project Manager Primer
Project Manager PrimerProject Manager Primer
Project Manager Primer
 
PMP Training - Project Integration Management - Part 1
PMP Training - Project Integration Management - Part 1PMP Training - Project Integration Management - Part 1
PMP Training - Project Integration Management - Part 1
 
Session 2 gdas pmp study group presentation
Session 2   gdas pmp study group presentationSession 2   gdas pmp study group presentation
Session 2 gdas pmp study group presentation
 
PMP - Project Initiation Template for Professionals
PMP - Project Initiation Template for ProfessionalsPMP - Project Initiation Template for Professionals
PMP - Project Initiation Template for Professionals
 
ChapterPM_1.pptx for the course project management
ChapterPM_1.pptx for the course project managementChapterPM_1.pptx for the course project management
ChapterPM_1.pptx for the course project management
 
romi-pm-03-process-april2013.pptx
romi-pm-03-process-april2013.pptxromi-pm-03-process-april2013.pptx
romi-pm-03-process-april2013.pptx
 
Project Management Msc. 7Pjmn009W Project Management Project.
Project Management Msc. 7Pjmn009W Project Management Project.Project Management Msc. 7Pjmn009W Project Management Project.
Project Management Msc. 7Pjmn009W Project Management Project.
 
Unit2 Project phases.pptx
Unit2 Project phases.pptxUnit2 Project phases.pptx
Unit2 Project phases.pptx
 
Chapter 3: The Project Management Process Groups: A Case Study
Chapter 3:The Project Management Process Groups: A Case StudyChapter 3:The Project Management Process Groups: A Case Study
Chapter 3: The Project Management Process Groups: A Case Study
 
NCET Biz Bite | Project Management Tips and Tools | January 2018
NCET Biz Bite | Project Management Tips and Tools | January 2018NCET Biz Bite | Project Management Tips and Tools | January 2018
NCET Biz Bite | Project Management Tips and Tools | January 2018
 
Lecture Presentation on Project Proposal
Lecture Presentation on Project ProposalLecture Presentation on Project Proposal
Lecture Presentation on Project Proposal
 
Introduction to Business Analysis
Introduction to Business AnalysisIntroduction to Business Analysis
Introduction to Business Analysis
 
IT Project Management
IT Project ManagementIT Project Management
IT Project Management
 
About this research note Technology Insight notes descr.docx
About this research note Technology Insight notes descr.docxAbout this research note Technology Insight notes descr.docx
About this research note Technology Insight notes descr.docx
 
Step by Step Guide to Project Management
Step by Step Guide to Project ManagementStep by Step Guide to Project Management
Step by Step Guide to Project Management
 

Plus de CIToolkit

Continuous Improvement Infographics for Learning
Continuous Improvement Infographics for LearningContinuous Improvement Infographics for Learning
Continuous Improvement Infographics for LearningCIToolkit
 
Continuous Improvement Posters for Learning
Continuous Improvement Posters for LearningContinuous Improvement Posters for Learning
Continuous Improvement Posters for LearningCIToolkit
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingCIToolkit
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixCIToolkit
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsCIToolkit
 
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramBeyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramCIToolkit
 
How-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionHow-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionCIToolkit
 
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsFrom Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsCIToolkit
 
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...CIToolkit
 
From Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light AssessmentFrom Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light AssessmentCIToolkit
 
Mind Mapping: A Visual Approach to Organize Ideas and Thoughts
Mind Mapping: A Visual Approach to Organize Ideas and ThoughtsMind Mapping: A Visual Approach to Organize Ideas and Thoughts
Mind Mapping: A Visual Approach to Organize Ideas and ThoughtsCIToolkit
 
Adapting to Change: Using PEST Analysis for Better Decision-Making
Adapting to Change: Using PEST Analysis for Better Decision-MakingAdapting to Change: Using PEST Analysis for Better Decision-Making
Adapting to Change: Using PEST Analysis for Better Decision-MakingCIToolkit
 
The Role of Box Plots in Comparing Multiple Data Sets
The Role of Box Plots in Comparing Multiple Data SetsThe Role of Box Plots in Comparing Multiple Data Sets
The Role of Box Plots in Comparing Multiple Data SetsCIToolkit
 
Exploring Variable Relationships with Scatter Diagram Analysis
Exploring Variable Relationships with Scatter Diagram AnalysisExploring Variable Relationships with Scatter Diagram Analysis
Exploring Variable Relationships with Scatter Diagram AnalysisCIToolkit
 
The Role of Histograms in Exploring Data Insights
The Role of Histograms in Exploring Data InsightsThe Role of Histograms in Exploring Data Insights
The Role of Histograms in Exploring Data InsightsCIToolkit
 
Leveraging Gap Analysis for Continuous Improvement
Leveraging Gap Analysis for Continuous ImprovementLeveraging Gap Analysis for Continuous Improvement
Leveraging Gap Analysis for Continuous ImprovementCIToolkit
 
Flowcharting: The Three Common Types of Flowcharts
Flowcharting: The Three Common Types of FlowchartsFlowcharting: The Three Common Types of Flowcharts
Flowcharting: The Three Common Types of FlowchartsCIToolkit
 
Yokoten: Enhancing Performance through Best Practice Sharing
Yokoten: Enhancing Performance through Best Practice SharingYokoten: Enhancing Performance through Best Practice Sharing
Yokoten: Enhancing Performance through Best Practice SharingCIToolkit
 
Value Analysis: How Lean Thinking Defines Value
Value Analysis: How Lean Thinking Defines ValueValue Analysis: How Lean Thinking Defines Value
Value Analysis: How Lean Thinking Defines ValueCIToolkit
 
The Main Components of an Effective Visual Management System
The Main Components of an Effective Visual Management SystemThe Main Components of an Effective Visual Management System
The Main Components of an Effective Visual Management SystemCIToolkit
 

Plus de CIToolkit (20)

Continuous Improvement Infographics for Learning
Continuous Improvement Infographics for LearningContinuous Improvement Infographics for Learning
Continuous Improvement Infographics for Learning
 
Continuous Improvement Posters for Learning
Continuous Improvement Posters for LearningContinuous Improvement Posters for Learning
Continuous Improvement Posters for Learning
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield Metrics
 
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramBeyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
 
How-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionHow-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem Resolution
 
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsFrom Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
 
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
 
From Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light AssessmentFrom Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light Assessment
 
Mind Mapping: A Visual Approach to Organize Ideas and Thoughts
Mind Mapping: A Visual Approach to Organize Ideas and ThoughtsMind Mapping: A Visual Approach to Organize Ideas and Thoughts
Mind Mapping: A Visual Approach to Organize Ideas and Thoughts
 
Adapting to Change: Using PEST Analysis for Better Decision-Making
Adapting to Change: Using PEST Analysis for Better Decision-MakingAdapting to Change: Using PEST Analysis for Better Decision-Making
Adapting to Change: Using PEST Analysis for Better Decision-Making
 
The Role of Box Plots in Comparing Multiple Data Sets
The Role of Box Plots in Comparing Multiple Data SetsThe Role of Box Plots in Comparing Multiple Data Sets
The Role of Box Plots in Comparing Multiple Data Sets
 
Exploring Variable Relationships with Scatter Diagram Analysis
Exploring Variable Relationships with Scatter Diagram AnalysisExploring Variable Relationships with Scatter Diagram Analysis
Exploring Variable Relationships with Scatter Diagram Analysis
 
The Role of Histograms in Exploring Data Insights
The Role of Histograms in Exploring Data InsightsThe Role of Histograms in Exploring Data Insights
The Role of Histograms in Exploring Data Insights
 
Leveraging Gap Analysis for Continuous Improvement
Leveraging Gap Analysis for Continuous ImprovementLeveraging Gap Analysis for Continuous Improvement
Leveraging Gap Analysis for Continuous Improvement
 
Flowcharting: The Three Common Types of Flowcharts
Flowcharting: The Three Common Types of FlowchartsFlowcharting: The Three Common Types of Flowcharts
Flowcharting: The Three Common Types of Flowcharts
 
Yokoten: Enhancing Performance through Best Practice Sharing
Yokoten: Enhancing Performance through Best Practice SharingYokoten: Enhancing Performance through Best Practice Sharing
Yokoten: Enhancing Performance through Best Practice Sharing
 
Value Analysis: How Lean Thinking Defines Value
Value Analysis: How Lean Thinking Defines ValueValue Analysis: How Lean Thinking Defines Value
Value Analysis: How Lean Thinking Defines Value
 
The Main Components of an Effective Visual Management System
The Main Components of an Effective Visual Management SystemThe Main Components of an Effective Visual Management System
The Main Components of an Effective Visual Management System
 

Dernier

Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineeringthomas851723
 
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...AgileNetwork
 
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Nehwal
 
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Roomdivyansh0kumar0
 
Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentationcraig524401
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Reviewthomas851723
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insightWayne Abrahams
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sectorthomas851723
 
Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentationmintusiprd
 

Dernier (11)

Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineering
 
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SERVICE
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SERVICECall Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SERVICE
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SERVICE
 
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
 
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Servicesauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
 
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
 
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
 
Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentation
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Review
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insight
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sector
 
Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentation
 

Project Charter Components: The Power of the One-Page Document

  • 1. CITOOLKIT Project Charter Project Charter Components: The Power of the One-Page Document
  • 2. citoolkit.com Introduction Once a project opportunity has been identified, it must be translated from a concept into a well-written project charter. Project Charter 2 A project charter is a one-page document that summarizes the fundamental information of a project before it begins. The completed project charter is a requirement for the project kick-off.
  • 3. citoolkit.com Introduction The information in the project charter is critical for obtaining leadership support and commitment to provide the necessary funding and resources. Project Charter 3 Once signed, it authorizes the project leader to formally start the project and use the necessary resources and funding to complete the project successfully.
  • 4. citoolkit.com Introduction A Project Charter . . . Project Charter 4 Addresses the needs of stakeholders Clarifies project objectives and scope Defines roles and responsibilities
  • 5. citoolkit.com Uses A project charter is one of the first essential steps in many different types of projects . . . • In Lean Six Sigma, a project charter is used to summarize the findings of the Define phase. • A project charter as per the PMBOK is a document that formally authorizes the existence of the project and issued by the sponsor or the initiator of the project. Lean Six Sigma PMI / PMO Project Charter 5
  • 6. citoolkit.com Benefits A project charter ensures that the project is . . . Project Charter 6 Business focused Executed in a timely manner Well scoped Have the necessary resources & support
  • 7. citoolkit.com Benefits Project Charter 7 Acts as a contract between the project sponsor, key stakeholders and the project team 02 Enables everybody to review the project and commit it 03 Communicates the objectives to those outside the project team 05 Serves as a reference for future projects 06 Communicates the summary of the project to those who are usually not interested in the details 04 Establishes a shared understanding of the project scope and objectives 01
  • 8. citoolkit.com A project charter should provide answers to . . . What must be done? Why doing it? What are the benefits of implementing the project? When must it be done? Who does what? Who will be benefited form the results of the project? Key Elements Project Charter 8
  • 9. citoolkit.com Key Elements The project charter requires significant preparation time to include key elements such as . . . Project Charter 9 Goal statement Project team Project title Project plan Problem statement Project authorization section Business case summary Scope & boundaries Project metrics
  • 10. citoolkit.com Key Elements The components of a project charter vary depending on the methodology used. In a Six Sigma project for example, it is useful to include the following . . . Voice of the customer. Baseline data and COPQ. Defect definition. Estimated defect level. Five major milestones based on the DMAIC methodology. Project Charter 10
  • 11. citoolkit.com Key Elements – Business Case A business case analysis should precede any project to justify why the project is being selected. Project Charter 11 A business case analysis is a tool used to evaluate a potential business decision and help decide whether some sort of action should be taken.
  • 12. citoolkit.com Key Elements – Business Case Summary The business case summary should describe: The impact on the business in terms of benefits or savings. How the project is aligned to the company strategy. Project Charter 12 vs. Business case A report that describes why the problem needs to be solved Business case Summary A section in the project charter that summarized the business case
  • 13. citoolkit.com Key Elements – Problem Statement Identifies what is not working and where the pain point lies. Project Charter 13 A problem exists when there is a difference between where we are and where we want to be. REQUIRED STATE CURRENT STATE No problem means no improvement
  • 14. citoolkit.com Key Elements – Problem Statement A problem statement . . . Should be specific and brief. Should describe when and how often the problem occurs. Should be supported with data. Should not include background information. Should not discuss causes and solutions. Project Charter 14
  • 15. citoolkit.com Key Elements – Problem Statement A problem statement is sometimes written in the following format . . . Project Charter 15 The problem of... Is affecting... The impact of which is...
  • 16. citoolkit.com Key Elements – Problem Statement Example of a Problem Statement . . . Project Charter 16 The manual oil refilling process using drums in the forming machines in line #4 make it difficult to control oil losses which may reach more than 4% per drum
  • 17. citoolkit.com Key Elements – Problem Statement What is the Problem of this Problem Statement: Project Charter 17 “The business is not making enough profit” Not supported with data Too general which you can’t solve at once
  • 18. citoolkit.com Key Elements – Goal Statement Project Charter 18 Defines the target of the project Responds to the problem statement
  • 19. citoolkit.com Key Elements – Goal Statement Project Charter 19 Should have a measurable target Often starts with a verb Should be brief and specific SMART Reduce . . . Increase . . . Eliminate . . .
  • 20. citoolkit.com Key Elements – Goal Statement Typically written in the following format . . . Project Charter 20 Improve (primary metric) from (baseline performance) to (desired future performance) by (desired date of completion)
  • 21. citoolkit.com Key Elements – Goal Statement Project Charter 21 Avoid using technical language when writing a goal statement. Avoid suggesting or assuming a solutions.
  • 22. citoolkit.com Key Elements – Goal Statement Project Charter 22 Reduce oil losses of the manual refilling process of the forming machines in line #4 to less than 1% per drum by the 30th of October Example of a Goal Statement . . . Specific Measurable Time bound Defines the scope Does not refer to solutions or causes
  • 23. citoolkit.com Key Elements – Project Team Should be selected along with their expected time contribution to the project. Project Charter 23 Composed of . . . Team members A dedicated project leader Directed by a project sponsor
  • 24. citoolkit.com Key Elements – Project Team A project leader . . . Project Charter 24 Provides the purpose Communicates and facilitates Establishes a shared ownership Monitors and tracks
  • 25. citoolkit.com Key Elements – Project Team The team members are responsible for executing the project activities to produce the desired deliverables. Project Charter 25 Knowing how much work team members have to do is important, so they don't get too stressed or struggle with their contribution.
  • 26. citoolkit.com Key Elements – Project Team A project sponsor has the ultimate accountability for the project and owns the project charter. Project Charter 26 He or she should have the authority to afford the necessary resources and provide support as needed.
  • 27. citoolkit.com Key Elements – Project Scope Defines what is involved in the project and what is not. Project Charter 27 Consider using SIPOC mapping Departments Products Customers Locations Processes Services It is important to identify . . .
  • 28. citoolkit.com Key Elements – Project Scope Avoid the temptation of expanding the scope of the project . . . You will not be able to complete the project within the allocated time. More resources will be required. The action and control plans will be too detailed. Project Charter 28
  • 29. citoolkit.com Key Elements – Voice of the Customer (VOC) Customers are the elements that identify the need for executing the project. Project Charter 29 It is important to take the VOC (or the Voice of the business) into account during the project definition phase
  • 30. citoolkit.com Key Elements – Voice of the Customer (VOC) A customer representative may be needed to evaluate the outcomes of the project definition process and provide feedback as necessary. Remember that a customer may be and internal or external. Project Charter 30
  • 31. citoolkit.com Key Elements – Project Metrics Project Charter 31 Allows project managers to take corrective actions promptly Keeps the team focused to achieve the project goals Tracks progress and brings attention to the future progress and results Establishes accountability among team members and stakeholders
  • 32. citoolkit.com Key Elements – Project Metrics The success of any project is measured by each or both of . . . Project Charter 32 Primary metrics Financial metrics & Tracking these metrics is important not only during the project period but also several years after the project completion.
  • 33. citoolkit.com Key Elements – Project Time Frame Project duration must be determined so that a project could be managed in terms of schedule, cost and resources. Often represented by the start and expected completion dates. Project Charter 33 It is possible to assign an approximate completion date, however, you need to revise it as the project progresses.
  • 34. citoolkit.com Key Elements – Project Authorization Section Obtain approval by letting key stakeholders view and sign the project charter. Project Charter 34 Signing on the project charter . . . Serves as a formal approval of the project. Empowers the project leader to proceed with the project. Who should sign?
  • 35. citoolkit.com Key Elements – Project Authorization Section A signature from a financial representative provides credibility and support to the proposed financial gains. Project Charter 35 In is important that companies considers financial approval as a requirement for any project to be qualified.
  • 36. citoolkit.com A Project Charter May Contain Project Charter 36 Goal statement Project team Project title Project plan Problem statement Project authorization section Business case summary Scope & boundaries Project metrics
  • 37. citoolkit.com A Project Charter May Contain A list of key stakeholders affected by the project, and their expectations and concerns. Project Charter 37 We need to get their support in order for the project to be successful.
  • 38. citoolkit.com A Project Charter May Contain Key milestones which could be simply the completion of each project stage. Project Charter 38 Highlight important dates Help you stay on schedule Provide regular opportunities to review progress
  • 39. citoolkit.com A Project Charter May Contain Project Charter 39 Project approach or project implementation methodology Project Approach The deliverables at every stage If a deliverable is significant, it may be a milestone Deliverables A communication plan summary to communicate the man messages to the key stakeholders Communication Plan A go/no go decision to decide whether to move forward with the project as defined or to stop.
  • 40. citoolkit.com A Project Charter Template Example of a project charter template . . . Project Charter 40 Project Team: Leader: Team member1: Team member2: Team member3: Project Information: Project start: Project end: Project scope: Problem Statement: Goal Statement: PROJECT CHARTER PROJECT TITLE: ______________________________________________ VOC: Key Metrics: SIGNATURES: _______________ _______________ _______________ _______________ Resources: • • • • MILESTONES: _______________________________________________
  • 41. citoolkit.com How to Prepare an Effective Project Charter? A project charter . . . Should be customer focused and addresses their specific needs and expectations. Should be clear and concise (preferably one page). Should contain realistic and achievable objectives (use the SMART checklist). Should be developed as a collaborative effort. Should be dealt with as a live document during the project lifetime. Should be updated as the project progresses. Project Charter 41
  • 42. citoolkit.com Further Information Project charters can be created by the project team, the project sponsor, or by an expert external to the project team. Project Charter 42 Although project charters are short and brief, they often refer to more detailed documents. A project charter may be created for each phase for multiple-phased large projects.
  • 43. citoolkit.com Further Information Sometimes, the project should be stopped at the beginning when: Project Charter 43 Where else? The potential benefits are insufficient The availability of resources might be an issue
  • 44. citoolkit.com Further Information A good problem statement concisely communicates the problem in terms of who, what, when, where, and how many. Who is affected by the problem? What does the problem appear to be? When does the problem occur? Where does the problem occur? How many times has the problem occurred over the defined period? Project Charter 44
  • 45. citoolkit.com Further Information A good goal statement describes . . . What do we want to do? By when? What is the level of performance we want to reach? Project Charter 45 Goal Statement
  • 46. citoolkit.com Further Information Are we following the right goal? Use the SMART checklist . . . Project Charter 46 S - Specific M - Measurable A - Achievable R - Realistic T - Time bound P - Positively stated U - Understood R - Relevant E – Ethical C - Challenging L - Legal E - Environmental A - Agreed R - Recorded Always check whether your goals correlates with the 14 requirements.
  • 47. citoolkit.com Further Information In Six Sigma projects, the project charter must be filled in and agreed by the Champion before the kick-off. Adjustments to the project charter are possible with the approval of the Champion. Project Charter 47
  • 48. © Copyright Citoolkit.com. All Rights Reserved. CITOOLKIT Made with by The Continuous Improvement Toolkit www.citoolkit.com