Rooftop/Ground Mount
Solar
Financial Models
Various Models
S.No Comparison Point CAPEX OPEX Lease
1
Ownership of the
plant
Customer EPCComp. -Till the tenure of the PPA Leasing Partner
2 Investment
Customer invests directly in
the plant and places an EPC
(Engineering, Procurement
and ConstructionOrder on
EPCComp. . O&MOrder can
be placed separately
EPCCompany invests the initial CAPEX
and maintains the plant till the tenure of
the PPA
Financial Institution invests the major
amount in CAPEX and in-turn leases the
plant to Customer. EPC order places by
Financial Institution to EPCCompany.
O&M order can be directly placed by
Customer to EPCComp.
3 AgreementType
Engineering Procurement
and Construction
Power Purchase Agreement LeaseAgreement
4 Cash flow
Initial investment by
Customer only O&M cost to
be born separately after
commissioning of the project
Monthly electricity charge at a pre-fixed
rate till the tenure of the Agreement
Monthly EMI to be paid till the lease
period
5 Feasibility Available in all States
Not available in States like Karnataka and
Gujarat
Depends on location and assessment by
Financial Institution
Various Financial Models
Ownership with
Customer
Own Investment
EPC Agreement with
Vendor
Operation &
Maintenance by
Customer
Lower Electricity
Cost
CAPEX Model
Pros & Cons - CAPEX
S.No Pros Cons
1
Ownership of the plant with customer which
provides flexibility in future expansion and
changes
High initial investment of close INR 46.2 Cr.
2
Accelerated depreciation benefit of 40%
availableYear onYear
Operation and Maintenance of solar plant including
the risk of generation.
3
ROI of just around 3 years. Post which free
electricity from solar plant with minimal
O&MCost of around 1.5% of the project cost
per year
Replacement of components, if required. Mandatory
replacement of Inverters every 10-12 years.
4 Higher overall savings
OPEX Model
Ownership with EPC
Solar Company
Initial Investment by
Solar EPC Company
Power Purchase
Agreement for
10/15/25 years
Operation &
Maintenance by
Solar EPC Company
Solar electricity
cheaper than Grid
electricity
Pros & Cons - OPEX
S.No Pros Cons
1
Hassle free installation and Maintenance as
end to end responsibility of EPCComp.
Low Flexibility ofOperations as long term agreement
signed
2
Entire Operation and Maintenance of plant
including equipment repair/replacement by
EPC Comp. Power for 15 years.
NoAccelerated depreciation available
3 No Initial investment LowerOverall savings over a period of 25 years
4
No risk ofGeneration as O&M taken up by
EPC Comp.
No Link between PPATariff and Grid tariff. Risk of PPA
tariff to be more than Grid tariff
Lease Model – Financial /
Operational
Ownership with
Solar EPC Company
Initial Investment by
Solar EPC Company
LeaseAgreement for
3 to 8 years
Operation &
Maintenance by
Solar EPC Company
Insurance to be
taken by customer
ResidualValue in
case of Operational
Lease
Pros & Cons - LEASE
S.No Pros Cons
1
Hassle free installation and Maintenance as
end to end responsibility of EPC Comp.
Low Flexibility ofOperations as long term agreement
signed
2
Accelerate depreciation benefit given to the
customer
Residual value in case of Operational Lease
3
Minimal initial investment (only 20-25% of
Security deposit)
Generation risk with the Customer
4
Interest benefit of SD transferred to the
customer
LowerOverall savings over a period of 25 years
5
No Link between Lease value and Grid tariff. Risk of
savings to be reduce if grid tariff reduces.
Thank You!

Contenu connexe

Similaire à Solar Financing Models for Solar projects

OE consulting services
OE consulting services OE consulting services
OE consulting services
Bhanu Prakash
 
SunAlphaEnergy_Solar Leasing_6.2015_SLIDESHARE
SunAlphaEnergy_Solar Leasing_6.2015_SLIDESHARESunAlphaEnergy_Solar Leasing_6.2015_SLIDESHARE
SunAlphaEnergy_Solar Leasing_6.2015_SLIDESHARE
raghavmittal
 
Wind Force Newsletter September, Edition, 2012
Wind Force Newsletter   September, Edition, 2012Wind Force Newsletter   September, Edition, 2012
Wind Force Newsletter September, Edition, 2012
rupeshsingh_1
 

Similaire à Solar Financing Models for Solar projects (20)

Rooftop Solar: The eco-friendly way to cut your electricity bill
Rooftop Solar: The eco-friendly way to cut your electricity billRooftop Solar: The eco-friendly way to cut your electricity bill
Rooftop Solar: The eco-friendly way to cut your electricity bill
 
Corporate Renewable Energy Procurement - Why and How
Corporate Renewable Energy Procurement - Why and HowCorporate Renewable Energy Procurement - Why and How
Corporate Renewable Energy Procurement - Why and How
 
9 incorporating energy storage into pv system design
9   incorporating energy storage into pv system design9   incorporating energy storage into pv system design
9 incorporating energy storage into pv system design
 
Epc Vs Epcm
Epc Vs EpcmEpc Vs Epcm
Epc Vs Epcm
 
Contracts for difference
Contracts for differenceContracts for difference
Contracts for difference
 
Understanding Legal Issues in Solar PPAs
Understanding Legal Issues in Solar PPAsUnderstanding Legal Issues in Solar PPAs
Understanding Legal Issues in Solar PPAs
 
OE consulting services
OE consulting services OE consulting services
OE consulting services
 
SunAlpha Zero-Down Solar PPA
SunAlpha Zero-Down Solar PPASunAlpha Zero-Down Solar PPA
SunAlpha Zero-Down Solar PPA
 
SunAlphaEnergy_Solar Leasing_6.2015_SLIDESHARE
SunAlphaEnergy_Solar Leasing_6.2015_SLIDESHARESunAlphaEnergy_Solar Leasing_6.2015_SLIDESHARE
SunAlphaEnergy_Solar Leasing_6.2015_SLIDESHARE
 
ABC's of Residential Solar - by The Solar Store Tucson, AZ
ABC's of Residential Solar - by The Solar Store Tucson, AZABC's of Residential Solar - by The Solar Store Tucson, AZ
ABC's of Residential Solar - by The Solar Store Tucson, AZ
 
Renewables Infrastructure Projects - Examining US Tax Equity Structures
Renewables Infrastructure Projects - Examining US Tax Equity StructuresRenewables Infrastructure Projects - Examining US Tax Equity Structures
Renewables Infrastructure Projects - Examining US Tax Equity Structures
 
Summary of SECI Tranche III - 1200 MW Hybrid Wind Solar
Summary of SECI Tranche III - 1200 MW Hybrid Wind SolarSummary of SECI Tranche III - 1200 MW Hybrid Wind Solar
Summary of SECI Tranche III - 1200 MW Hybrid Wind Solar
 
Rf s for supply of 5000 mw of round the-clock power - re + thermal power
Rf s for supply of 5000 mw of round the-clock power - re + thermal powerRf s for supply of 5000 mw of round the-clock power - re + thermal power
Rf s for supply of 5000 mw of round the-clock power - re + thermal power
 
COBI Powerpoint
COBI PowerpointCOBI Powerpoint
COBI Powerpoint
 
KDC11- Anand Rohatgi, Synergy Consulting
KDC11- Anand Rohatgi, Synergy ConsultingKDC11- Anand Rohatgi, Synergy Consulting
KDC11- Anand Rohatgi, Synergy Consulting
 
Energy costs reduction through Energy Performance Contracting projects implem...
Energy costs reduction through Energy Performance Contracting projects implem...Energy costs reduction through Energy Performance Contracting projects implem...
Energy costs reduction through Energy Performance Contracting projects implem...
 
Wind Force Newsletter September, Edition, 2012
Wind Force Newsletter   September, Edition, 2012Wind Force Newsletter   September, Edition, 2012
Wind Force Newsletter September, Edition, 2012
 
Climargy Innovative Energy Efficiency Financing through ESCO Project Aggregat...
Climargy Innovative Energy Efficiency Financing through ESCO Project Aggregat...Climargy Innovative Energy Efficiency Financing through ESCO Project Aggregat...
Climargy Innovative Energy Efficiency Financing through ESCO Project Aggregat...
 
Solar PPA Presentation
Solar PPA PresentationSolar PPA Presentation
Solar PPA Presentation
 
Dss For Wind Power Plant
Dss For Wind Power PlantDss For Wind Power Plant
Dss For Wind Power Plant
 

Dernier

#Mtp-Kit Prices » Qatar. Doha (+27737758557) Abortion Pills For Sale In Doha,...
#Mtp-Kit Prices » Qatar. Doha (+27737758557) Abortion Pills For Sale In Doha,...#Mtp-Kit Prices » Qatar. Doha (+27737758557) Abortion Pills For Sale In Doha,...
#Mtp-Kit Prices » Qatar. Doha (+27737758557) Abortion Pills For Sale In Doha,...
drm1699
 
Powerpoint showing results from tik tok metrics
Powerpoint showing results from tik tok metricsPowerpoint showing results from tik tok metrics
Powerpoint showing results from tik tok metrics
CaitlinCummins3
 
Shots fired Budget Presentation.pdf12312
Shots fired Budget Presentation.pdf12312Shots fired Budget Presentation.pdf12312
Shots fired Budget Presentation.pdf12312
LR1709MUSIC
 
Obat Aborsi Pasuruan 0851\7696\3835 Jual Obat Cytotec Di Pasuruan
Obat Aborsi Pasuruan 0851\7696\3835 Jual Obat Cytotec Di PasuruanObat Aborsi Pasuruan 0851\7696\3835 Jual Obat Cytotec Di Pasuruan
Obat Aborsi Pasuruan 0851\7696\3835 Jual Obat Cytotec Di Pasuruan
Obat Aborsi Jakarta Wa 085176963835 Apotek Jual Obat Cytotec Di Jakarta
 
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
daisycvs
 

Dernier (20)

#Mtp-Kit Prices » Qatar. Doha (+27737758557) Abortion Pills For Sale In Doha,...
#Mtp-Kit Prices » Qatar. Doha (+27737758557) Abortion Pills For Sale In Doha,...#Mtp-Kit Prices » Qatar. Doha (+27737758557) Abortion Pills For Sale In Doha,...
#Mtp-Kit Prices » Qatar. Doha (+27737758557) Abortion Pills For Sale In Doha,...
 
Most Visionary Leaders in Cloud Revolution, Shaping Tech’s Next Era - 2024 (2...
Most Visionary Leaders in Cloud Revolution, Shaping Tech’s Next Era - 2024 (2...Most Visionary Leaders in Cloud Revolution, Shaping Tech’s Next Era - 2024 (2...
Most Visionary Leaders in Cloud Revolution, Shaping Tech’s Next Era - 2024 (2...
 
The Vietnam Believer Newsletter_May 13th, 2024_ENVol. 007.pdf
The Vietnam Believer Newsletter_May 13th, 2024_ENVol. 007.pdfThe Vietnam Believer Newsletter_May 13th, 2024_ENVol. 007.pdf
The Vietnam Believer Newsletter_May 13th, 2024_ENVol. 007.pdf
 
Powerpoint showing results from tik tok metrics
Powerpoint showing results from tik tok metricsPowerpoint showing results from tik tok metrics
Powerpoint showing results from tik tok metrics
 
tekAura | Desktop Procedure Template (2016)
tekAura | Desktop Procedure Template (2016)tekAura | Desktop Procedure Template (2016)
tekAura | Desktop Procedure Template (2016)
 
Beyond Numbers A Holistic Approach to Forensic Accounting
Beyond Numbers A Holistic Approach to Forensic AccountingBeyond Numbers A Holistic Approach to Forensic Accounting
Beyond Numbers A Holistic Approach to Forensic Accounting
 
Innomantra Viewpoint - Building Moonshots : May-Jun 2024.pdf
Innomantra Viewpoint - Building Moonshots : May-Jun 2024.pdfInnomantra Viewpoint - Building Moonshots : May-Jun 2024.pdf
Innomantra Viewpoint - Building Moonshots : May-Jun 2024.pdf
 
Exploring-Pipe-Flanges-Applications-Types-and-Benefits.pptx
Exploring-Pipe-Flanges-Applications-Types-and-Benefits.pptxExploring-Pipe-Flanges-Applications-Types-and-Benefits.pptx
Exploring-Pipe-Flanges-Applications-Types-and-Benefits.pptx
 
Shots fired Budget Presentation.pdf12312
Shots fired Budget Presentation.pdf12312Shots fired Budget Presentation.pdf12312
Shots fired Budget Presentation.pdf12312
 
Obat Aborsi Pasuruan 0851\7696\3835 Jual Obat Cytotec Di Pasuruan
Obat Aborsi Pasuruan 0851\7696\3835 Jual Obat Cytotec Di PasuruanObat Aborsi Pasuruan 0851\7696\3835 Jual Obat Cytotec Di Pasuruan
Obat Aborsi Pasuruan 0851\7696\3835 Jual Obat Cytotec Di Pasuruan
 
Global Internal Audit Standards 2024.pdf
Global Internal Audit Standards 2024.pdfGlobal Internal Audit Standards 2024.pdf
Global Internal Audit Standards 2024.pdf
 
Should Law Firms Outsource their Bookkeeping
Should Law Firms Outsource their BookkeepingShould Law Firms Outsource their Bookkeeping
Should Law Firms Outsource their Bookkeeping
 
How to refresh to be fit for the future world
How to refresh to be fit for the future worldHow to refresh to be fit for the future world
How to refresh to be fit for the future world
 
wagamamaLab presentation @MIT 20240509 IRODORI
wagamamaLab presentation @MIT 20240509 IRODORIwagamamaLab presentation @MIT 20240509 IRODORI
wagamamaLab presentation @MIT 20240509 IRODORI
 
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
 
Pay after result spell caster (,$+27834335081)@ bring back lost lover same da...
Pay after result spell caster (,$+27834335081)@ bring back lost lover same da...Pay after result spell caster (,$+27834335081)@ bring back lost lover same da...
Pay after result spell caster (,$+27834335081)@ bring back lost lover same da...
 
WAM Corporate Presentation May 2024_w.pdf
WAM Corporate Presentation May 2024_w.pdfWAM Corporate Presentation May 2024_w.pdf
WAM Corporate Presentation May 2024_w.pdf
 
Toyota Kata Coaching for Agile Teams & Transformations
Toyota Kata Coaching for Agile Teams & TransformationsToyota Kata Coaching for Agile Teams & Transformations
Toyota Kata Coaching for Agile Teams & Transformations
 
Blinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptx
Blinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptxBlinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptx
Blinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptx
 
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deck
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deckPitch Deck Teardown: Goodcarbon's $5.5m Seed deck
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deck
 

Solar Financing Models for Solar projects

  • 2. Various Models S.No Comparison Point CAPEX OPEX Lease 1 Ownership of the plant Customer EPCComp. -Till the tenure of the PPA Leasing Partner 2 Investment Customer invests directly in the plant and places an EPC (Engineering, Procurement and ConstructionOrder on EPCComp. . O&MOrder can be placed separately EPCCompany invests the initial CAPEX and maintains the plant till the tenure of the PPA Financial Institution invests the major amount in CAPEX and in-turn leases the plant to Customer. EPC order places by Financial Institution to EPCCompany. O&M order can be directly placed by Customer to EPCComp. 3 AgreementType Engineering Procurement and Construction Power Purchase Agreement LeaseAgreement 4 Cash flow Initial investment by Customer only O&M cost to be born separately after commissioning of the project Monthly electricity charge at a pre-fixed rate till the tenure of the Agreement Monthly EMI to be paid till the lease period 5 Feasibility Available in all States Not available in States like Karnataka and Gujarat Depends on location and assessment by Financial Institution Various Financial Models
  • 3. Ownership with Customer Own Investment EPC Agreement with Vendor Operation & Maintenance by Customer Lower Electricity Cost CAPEX Model
  • 4. Pros & Cons - CAPEX S.No Pros Cons 1 Ownership of the plant with customer which provides flexibility in future expansion and changes High initial investment of close INR 46.2 Cr. 2 Accelerated depreciation benefit of 40% availableYear onYear Operation and Maintenance of solar plant including the risk of generation. 3 ROI of just around 3 years. Post which free electricity from solar plant with minimal O&MCost of around 1.5% of the project cost per year Replacement of components, if required. Mandatory replacement of Inverters every 10-12 years. 4 Higher overall savings
  • 5. OPEX Model Ownership with EPC Solar Company Initial Investment by Solar EPC Company Power Purchase Agreement for 10/15/25 years Operation & Maintenance by Solar EPC Company Solar electricity cheaper than Grid electricity
  • 6. Pros & Cons - OPEX S.No Pros Cons 1 Hassle free installation and Maintenance as end to end responsibility of EPCComp. Low Flexibility ofOperations as long term agreement signed 2 Entire Operation and Maintenance of plant including equipment repair/replacement by EPC Comp. Power for 15 years. NoAccelerated depreciation available 3 No Initial investment LowerOverall savings over a period of 25 years 4 No risk ofGeneration as O&M taken up by EPC Comp. No Link between PPATariff and Grid tariff. Risk of PPA tariff to be more than Grid tariff
  • 7. Lease Model – Financial / Operational Ownership with Solar EPC Company Initial Investment by Solar EPC Company LeaseAgreement for 3 to 8 years Operation & Maintenance by Solar EPC Company Insurance to be taken by customer ResidualValue in case of Operational Lease
  • 8. Pros & Cons - LEASE S.No Pros Cons 1 Hassle free installation and Maintenance as end to end responsibility of EPC Comp. Low Flexibility ofOperations as long term agreement signed 2 Accelerate depreciation benefit given to the customer Residual value in case of Operational Lease 3 Minimal initial investment (only 20-25% of Security deposit) Generation risk with the Customer 4 Interest benefit of SD transferred to the customer LowerOverall savings over a period of 25 years 5 No Link between Lease value and Grid tariff. Risk of savings to be reduce if grid tariff reduces.