PRESENTED BY:
Rincy Joseph
Surbhi Gupta
Sugandha Vidge
Parana Vijay
Dulguun Turbat

(69)
(71)
(80)
(110)
Necessity of Materials Planning Material Planning is
necessary
• To avoid over ordering on under-ordering of materials.
• To reduce unwanted expenses due to last minute
ordering.
• To reduce capital locked up in excess.
• Independent Demand:
Demand for final products.
• Dependent Demand:

Demand fort items that are sub assemblies or
component parts to be used in production of finished
goods.
• It is a production planning process that starts from the
demand for finished products and plans the production
step by step of subassemblies and parts.
• Materials Requirements Planning (MRP) is a set of
techniques that takes the Master Production Schedule and
other information from inventory records and product
structure records as inputs to determine the requirements
and schedule of timing for each item.
• This inventory management system is appropriate for items that
have a dependent demand .
• MRP is applicable for industries that offer a variety of finished

products where the customer is allowed to choose among many
different options.
• MRP is most appropriate when the manufacturing environment
is complex and uncertain.
Control inventory levels

Assign operating priorities

Plan capacity to load the
production system
• Master Production Schedule (MPS)
• Bills of materials (BOM)
• Inventory status file
• Lead time
• Primary reports
1. Work orders
2. Purchase orders
3. Action notices or rescheduling notices
• Secondary reports
1. Exception reports

2. Planning reports
3. Performance Control reports
• Inventory transaction
• A listing of all of the raw materials, parts, subassemblies, and
assemblies needed to produce one unit of a product .
• BOM Shows way a finished product or parent item is put together
from individual components.
• Parent item shown at highest level or level zero , Parts that go into
parent item are called level 1 components and so on.
• Production planners explode BOM to determine the number, due
dates, and order dates of subcomponents.
• Based on actual customer orders and predicted demand.
• Indicates when each ordered item will be produced in coming
weeks, and in how much quantity.

• It is a plan specifying timing and quantity of production for
each end item.
• MPS inputs come from sales and marketing .
• MPS covers about 1-3 months into the future.
• Detailed information regarding the quantity of each item,
available in hand, on order to be released, for use in various
time periods.

• MRP system using inventory master file is used to determine the
quantity of material available for use in a given period.
• If sufficient items not available , the system includes the item on
the planned order release report .
• Also known as Inventory Master File
• Primary reports
1. Work orders / Planned orders - schedule indicating the
amount and timing of future orders.

2. Order Release - Authorization for the execution of planned
orders.
3. Action Notices or Rescheduling Notices - which orders are
to be released, revised and canceled during the current time
period.
• Secondary Reports
1. Performance control Reports – evaluate system operations . They
aid in measuring deviations from plans, and also provide information
to assess cost performance.
2. Planning Reports – are useful to forecast future inventory
requirements.
3. Exception Reports – these help to find the major discrepancies
such as late and overdue orders, excessive scrap rates, reporting
errors, etc.
• Exploding and Offsetting
• Gross and Net Requirements
• Releasing Orders
• Low level Coding and Netting
• Lead time – it is the time needed to perform the process . It
includes order preparation, queuing, processing moving receiving
and inspecting time as well as any expected delays.

• Exploding the requirements – it is the process of multiplying the
requirements by usage quantity of each item and recording the
appropriate requirements throughout the product tree.
• Offsetting – it is a process of placing the exploded requirements
in their proper periods based on lead time.
• Gross Requirement - Total expected demand of the product.
• Net Requirements - Actual amount needed in each time period.
Net Requirements = Gross Requirement – available inventory
• Planned on hand - Expected inventory on hand at the beginning of
each time period.
• Planned-order receipts - Quantity expected to received at the
beginning of the period
• Planned-order releases - Planned amount to order in each time
period
• Releasing an order – means authorization is given to buy the
necessary material or to manufacturing of required component.
• Scheduled Receipts – are orders placed on manufacturing or

on a vendor and represent a commitment to make or buy.
• Now, considering Scheduled Receipts,
Net Requirement = Gross Requirement – Scheduled Receipts –
available inventory
• Netting – is a process in which any stock on hand is subtracted from
the gross requirement determined through explosion, giving the
quantity of each item needed to manufacture the required finished
products.

• Low Level Code – is the lowest level on which a part resides in all
bills of material.
Low level codes are determined by starting at lowest level of bill of

material and working up, recording the level against the part. If part
exists on higher level, its existence on the lower level is already
recorded.
• Time buckets - The column in an inventory record that
represents a unit of time. It may be in days or weeks.

• Action bucket - The current time period.
• Action notices - Output from the MRP system identifying the
need for an action, to avoid future problem.
• Planning Horizon – is the total number of periods in a record.
• Keep inventory levels to a cost-effective minimum.
• Keeps track of inventory that is used.
• Tracks the amount of material that is required .

• Set safety stock levels for emergencies.
• Determine the best lot sizes to fulfill orders.
• Set up production times among the separate manufacturing
stages.
• Plan for future needs of raw
• Inaccurate information can result in mis-planning , overstock,
under-stock, or lack of appropriate resources.
• The inaccurate master schedule will provide wrong lengths of

time for production . Hence affecting planning.
• MRP systems can be costly and time-consuming to set up.
Manufacturing resource planning (MRPII) is defined as a method
for the effective planning of all resources of a manufacturing
company. Ideally, it addresses operational planning in units and

financial planning .
This is not exclusively a software function, but a combination of
people skills, dedication to data base accuracy, and computer
resources. It is a total company management concept for using
human resources which is used more productively.
• Business Planning
• Purchasing

• Distribution Requirement

Scheduling

• Forecasting

• Service Requirement Planning

• Inventory Control

• Capacity Requirement Planning

• Order Entry And

• Accounting

Management
• Shop Floor Control
• Faster Production Scheduling
• More efficient use of resources
Reduced inventories
Less idle time

Fewer bottlenecks
• Better priority planning
Quicker production starts
Schedule flexibility
• Improved customer service
Meet delivery dates

Improved quality
Lower price possibility
• Improved employee moral
• Better management information
• Error Due To Poor Information
• Use of averages
MRP I and MRP II

More Related Content

What's hot

MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL Junaid Hassan
 
Material Requirement Planning (mrp)
Material Requirement Planning (mrp)Material Requirement Planning (mrp)
Material Requirement Planning (mrp)Snehav Sharma
 
Material resource planning
Material resource planningMaterial resource planning
Material resource planningNishant Agrawal
 
Production planning, routing, scheduling, Activating, Monitoring
Production planning, routing, scheduling, Activating, MonitoringProduction planning, routing, scheduling, Activating, Monitoring
Production planning, routing, scheduling, Activating, MonitoringDarshan Shah
 
Production Planning and Control (Operations Management)
Production Planning and Control (Operations Management)Production Planning and Control (Operations Management)
Production Planning and Control (Operations Management)Manu Alias
 
Production Planning & Control
Production Planning & ControlProduction Planning & Control
Production Planning & ControlKunalJagtap5
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and Controlshrinivas kulkarni
 
Production planning & control(ppc)
Production planning & control(ppc)Production planning & control(ppc)
Production planning & control(ppc)Abu Bashar
 
Operation scheduling
Operation schedulingOperation scheduling
Operation schedulingsai precious
 
Production planning control ppt
Production planning control pptProduction planning control ppt
Production planning control pptsudhir pawar
 
small and effective ppt on master production schedule
small and effective ppt on master production schedulesmall and effective ppt on master production schedule
small and effective ppt on master production scheduleyashbhhardwaj260
 
Material Requirement Planning
Material Requirement PlanningMaterial Requirement Planning
Material Requirement PlanningPritesh Mogane
 
Introduction to production and operation management
Introduction to production and operation managementIntroduction to production and operation management
Introduction to production and operation managementPROF.JITENDRA PATEL
 

What's hot (20)

MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
 
Material Requirement Planning (mrp)
Material Requirement Planning (mrp)Material Requirement Planning (mrp)
Material Requirement Planning (mrp)
 
Material resource planning
Material resource planningMaterial resource planning
Material resource planning
 
Production planning, routing, scheduling, Activating, Monitoring
Production planning, routing, scheduling, Activating, MonitoringProduction planning, routing, scheduling, Activating, Monitoring
Production planning, routing, scheduling, Activating, Monitoring
 
Mrp ii
Mrp iiMrp ii
Mrp ii
 
Production Planning and Control (Operations Management)
Production Planning and Control (Operations Management)Production Planning and Control (Operations Management)
Production Planning and Control (Operations Management)
 
(Mrp 1) Prsntation Slides
(Mrp 1) Prsntation Slides(Mrp 1) Prsntation Slides
(Mrp 1) Prsntation Slides
 
Production Planning & Control
Production Planning & ControlProduction Planning & Control
Production Planning & Control
 
Production Planning & Control
Production Planning & ControlProduction Planning & Control
Production Planning & Control
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and Control
 
Mrp ii
Mrp iiMrp ii
Mrp ii
 
Production planning & control(ppc)
Production planning & control(ppc)Production planning & control(ppc)
Production planning & control(ppc)
 
Operation scheduling
Operation schedulingOperation scheduling
Operation scheduling
 
UNIT 4 - PRODUCTION SCHEDULING
UNIT 4 - PRODUCTION SCHEDULINGUNIT 4 - PRODUCTION SCHEDULING
UNIT 4 - PRODUCTION SCHEDULING
 
Production planning control ppt
Production planning control pptProduction planning control ppt
Production planning control ppt
 
small and effective ppt on master production schedule
small and effective ppt on master production schedulesmall and effective ppt on master production schedule
small and effective ppt on master production schedule
 
Mrp structure
Mrp structureMrp structure
Mrp structure
 
Material Requirement Planning
Material Requirement PlanningMaterial Requirement Planning
Material Requirement Planning
 
Facility Layout
Facility LayoutFacility Layout
Facility Layout
 
Introduction to production and operation management
Introduction to production and operation managementIntroduction to production and operation management
Introduction to production and operation management
 

Viewers also liked

Logistics Strategy
Logistics StrategyLogistics Strategy
Logistics Strategyhanson han
 
MRP II - Manufacturing Resource Planning ( Planejamento de Recursos de Produção)
MRP II - Manufacturing Resource Planning ( Planejamento de Recursos de Produção)MRP II - Manufacturing Resource Planning ( Planejamento de Recursos de Produção)
MRP II - Manufacturing Resource Planning ( Planejamento de Recursos de Produção)Sidnei Reis
 
58262864 09-administracao-financeira-do-estoque
58262864 09-administracao-financeira-do-estoque58262864 09-administracao-financeira-do-estoque
58262864 09-administracao-financeira-do-estoqueTeodosio Junior
 
MRP1 vs MRP2
MRP1 vs MRP2MRP1 vs MRP2
MRP1 vs MRP2Ari Limpo
 
Material requirement planning presentation
Material requirement planning presentationMaterial requirement planning presentation
Material requirement planning presentationjhanakshah
 
Mrp MRPII Erp Implementation
Mrp MRPII Erp ImplementationMrp MRPII Erp Implementation
Mrp MRPII Erp ImplementationAnand Subramaniam
 

Viewers also liked (14)

Logistics Strategy
Logistics StrategyLogistics Strategy
Logistics Strategy
 
Facility location
Facility locationFacility location
Facility location
 
MRP II
MRP II MRP II
MRP II
 
MRP II - Manufacturing Resource Planning ( Planejamento de Recursos de Produção)
MRP II - Manufacturing Resource Planning ( Planejamento de Recursos de Produção)MRP II - Manufacturing Resource Planning ( Planejamento de Recursos de Produção)
MRP II - Manufacturing Resource Planning ( Planejamento de Recursos de Produção)
 
58262864 09-administracao-financeira-do-estoque
58262864 09-administracao-financeira-do-estoque58262864 09-administracao-financeira-do-estoque
58262864 09-administracao-financeira-do-estoque
 
QUALITY & COST
QUALITY & COSTQUALITY & COST
QUALITY & COST
 
Aula de mrp
Aula de mrpAula de mrp
Aula de mrp
 
MRP1 vs MRP2
MRP1 vs MRP2MRP1 vs MRP2
MRP1 vs MRP2
 
Aula mrp
Aula  mrpAula  mrp
Aula mrp
 
Logistics ppt
Logistics pptLogistics ppt
Logistics ppt
 
Plant layout
Plant layoutPlant layout
Plant layout
 
Ergonomics
ErgonomicsErgonomics
Ergonomics
 
Material requirement planning presentation
Material requirement planning presentationMaterial requirement planning presentation
Material requirement planning presentation
 
Mrp MRPII Erp Implementation
Mrp MRPII Erp ImplementationMrp MRPII Erp Implementation
Mrp MRPII Erp Implementation
 

Similar to MRP I and MRP II

Presentation2 mrp
Presentation2 mrpPresentation2 mrp
Presentation2 mrpgsuicmez
 
Module 3 - Aggregate Planning Tacticts2.pptx
Module 3 - Aggregate Planning Tacticts2.pptxModule 3 - Aggregate Planning Tacticts2.pptx
Module 3 - Aggregate Planning Tacticts2.pptxShivakumar Malagihal
 
Session 6-7-8 MRP.pptx PPC MBA Sem IV IB
Session 6-7-8 MRP.pptx PPC MBA Sem IV IBSession 6-7-8 MRP.pptx PPC MBA Sem IV IB
Session 6-7-8 MRP.pptx PPC MBA Sem IV IBDrDeeptiSharma12
 
Mrp systems & scheduling
Mrp systems & schedulingMrp systems & scheduling
Mrp systems & schedulingvarun0610
 
Material Requirements Planning (MRP).pptx
Material Requirements Planning (MRP).pptxMaterial Requirements Planning (MRP).pptx
Material Requirements Planning (MRP).pptxIrelynJasmin
 
Material requirement planning (mrp)
Material requirement planning (mrp)Material requirement planning (mrp)
Material requirement planning (mrp)Somashekar S.M
 
Planning Process and CBP V1.1.ppt
Planning Process and CBP V1.1.pptPlanning Process and CBP V1.1.ppt
Planning Process and CBP V1.1.pptSwayamTiwari12
 
Manish 13 mrp2
Manish 13 mrp2Manish 13 mrp2
Manish 13 mrp2samjune
 
SAP MM PP Material requirement planning
SAP MM PP Material requirement planning SAP MM PP Material requirement planning
SAP MM PP Material requirement planning Lokesh Modem
 
Inventory management
Inventory managementInventory management
Inventory managementRajThakuri
 
material requirements planning
material requirements planningmaterial requirements planning
material requirements planningAmalia Syafitri
 
Material Requirements planning system 01Page to 04 Page
Material Requirements planning system                      01Page to 04 PageMaterial Requirements planning system                      01Page to 04 Page
Material Requirements planning system 01Page to 04 PageHasibul Islam
 
CAPP, MRP, CRP, CAQC (model 2)
CAPP, MRP, CRP, CAQC (model 2) CAPP, MRP, CRP, CAQC (model 2)
CAPP, MRP, CRP, CAQC (model 2) Deepika V S
 
Sap mrp materials requirements planning
Sap mrp   materials requirements planningSap mrp   materials requirements planning
Sap mrp materials requirements planningmadhu jetty
 
SCM 304 Supply Chain Management Material Requirements .docx
SCM 304 Supply Chain Management Material Requirements .docxSCM 304 Supply Chain Management Material Requirements .docx
SCM 304 Supply Chain Management Material Requirements .docxbagotjesusa
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and controlLaxmikant Deshmukh
 

Similar to MRP I and MRP II (20)

Presentation2 mrp
Presentation2 mrpPresentation2 mrp
Presentation2 mrp
 
Module 3 - Aggregate Planning Tacticts2.pptx
Module 3 - Aggregate Planning Tacticts2.pptxModule 3 - Aggregate Planning Tacticts2.pptx
Module 3 - Aggregate Planning Tacticts2.pptx
 
MRP & ERP.pdf
MRP & ERP.pdfMRP & ERP.pdf
MRP & ERP.pdf
 
Session 6-7-8 MRP.pptx PPC MBA Sem IV IB
Session 6-7-8 MRP.pptx PPC MBA Sem IV IBSession 6-7-8 MRP.pptx PPC MBA Sem IV IB
Session 6-7-8 MRP.pptx PPC MBA Sem IV IB
 
Mrp systems & scheduling
Mrp systems & schedulingMrp systems & scheduling
Mrp systems & scheduling
 
Erp chapter 3
Erp chapter 3Erp chapter 3
Erp chapter 3
 
Material Requirements Planning (MRP).pptx
Material Requirements Planning (MRP).pptxMaterial Requirements Planning (MRP).pptx
Material Requirements Planning (MRP).pptx
 
Material requirement planning (mrp)
Material requirement planning (mrp)Material requirement planning (mrp)
Material requirement planning (mrp)
 
Planning Process and CBP V1.1.ppt
Planning Process and CBP V1.1.pptPlanning Process and CBP V1.1.ppt
Planning Process and CBP V1.1.ppt
 
Manish 13 mrp2
Manish 13 mrp2Manish 13 mrp2
Manish 13 mrp2
 
SAP MM PP Material requirement planning
SAP MM PP Material requirement planning SAP MM PP Material requirement planning
SAP MM PP Material requirement planning
 
Inventory management
Inventory managementInventory management
Inventory management
 
material requirements planning
material requirements planningmaterial requirements planning
material requirements planning
 
Material Requirements planning system 01Page to 04 Page
Material Requirements planning system                      01Page to 04 PageMaterial Requirements planning system                      01Page to 04 Page
Material Requirements planning system 01Page to 04 Page
 
CAPP, MRP, CRP, CAQC (model 2)
CAPP, MRP, CRP, CAQC (model 2) CAPP, MRP, CRP, CAQC (model 2)
CAPP, MRP, CRP, CAQC (model 2)
 
Sap mrp materials requirements planning
Sap mrp   materials requirements planningSap mrp   materials requirements planning
Sap mrp materials requirements planning
 
SCM 304 Supply Chain Management Material Requirements .docx
SCM 304 Supply Chain Management Material Requirements .docxSCM 304 Supply Chain Management Material Requirements .docx
SCM 304 Supply Chain Management Material Requirements .docx
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and control
 
MRP
MRPMRP
MRP
 
Sap mrp
Sap mrpSap mrp
Sap mrp
 

Recently uploaded

Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...lizamodels9
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1kcpayne
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfAmzadHosen3
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876dlhescort
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...amitlee9823
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableSeo
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture conceptP&CO
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Sheetaleventcompany
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 

Recently uploaded (20)

Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 

MRP I and MRP II

  • 1. PRESENTED BY: Rincy Joseph Surbhi Gupta Sugandha Vidge Parana Vijay Dulguun Turbat (69) (71) (80) (110)
  • 2. Necessity of Materials Planning Material Planning is necessary • To avoid over ordering on under-ordering of materials. • To reduce unwanted expenses due to last minute ordering. • To reduce capital locked up in excess.
  • 3. • Independent Demand: Demand for final products. • Dependent Demand: Demand fort items that are sub assemblies or component parts to be used in production of finished goods.
  • 4. • It is a production planning process that starts from the demand for finished products and plans the production step by step of subassemblies and parts. • Materials Requirements Planning (MRP) is a set of techniques that takes the Master Production Schedule and other information from inventory records and product structure records as inputs to determine the requirements and schedule of timing for each item.
  • 5. • This inventory management system is appropriate for items that have a dependent demand . • MRP is applicable for industries that offer a variety of finished products where the customer is allowed to choose among many different options. • MRP is most appropriate when the manufacturing environment is complex and uncertain.
  • 6. Control inventory levels Assign operating priorities Plan capacity to load the production system
  • 7. • Master Production Schedule (MPS) • Bills of materials (BOM) • Inventory status file • Lead time
  • 8. • Primary reports 1. Work orders 2. Purchase orders 3. Action notices or rescheduling notices • Secondary reports 1. Exception reports 2. Planning reports 3. Performance Control reports • Inventory transaction
  • 9. • A listing of all of the raw materials, parts, subassemblies, and assemblies needed to produce one unit of a product . • BOM Shows way a finished product or parent item is put together from individual components. • Parent item shown at highest level or level zero , Parts that go into parent item are called level 1 components and so on. • Production planners explode BOM to determine the number, due dates, and order dates of subcomponents.
  • 10. • Based on actual customer orders and predicted demand. • Indicates when each ordered item will be produced in coming weeks, and in how much quantity. • It is a plan specifying timing and quantity of production for each end item. • MPS inputs come from sales and marketing . • MPS covers about 1-3 months into the future.
  • 11. • Detailed information regarding the quantity of each item, available in hand, on order to be released, for use in various time periods. • MRP system using inventory master file is used to determine the quantity of material available for use in a given period. • If sufficient items not available , the system includes the item on the planned order release report . • Also known as Inventory Master File
  • 12. • Primary reports 1. Work orders / Planned orders - schedule indicating the amount and timing of future orders. 2. Order Release - Authorization for the execution of planned orders. 3. Action Notices or Rescheduling Notices - which orders are to be released, revised and canceled during the current time period.
  • 13. • Secondary Reports 1. Performance control Reports – evaluate system operations . They aid in measuring deviations from plans, and also provide information to assess cost performance. 2. Planning Reports – are useful to forecast future inventory requirements. 3. Exception Reports – these help to find the major discrepancies such as late and overdue orders, excessive scrap rates, reporting errors, etc.
  • 14. • Exploding and Offsetting • Gross and Net Requirements • Releasing Orders • Low level Coding and Netting
  • 15. • Lead time – it is the time needed to perform the process . It includes order preparation, queuing, processing moving receiving and inspecting time as well as any expected delays. • Exploding the requirements – it is the process of multiplying the requirements by usage quantity of each item and recording the appropriate requirements throughout the product tree. • Offsetting – it is a process of placing the exploded requirements in their proper periods based on lead time.
  • 16. • Gross Requirement - Total expected demand of the product. • Net Requirements - Actual amount needed in each time period. Net Requirements = Gross Requirement – available inventory • Planned on hand - Expected inventory on hand at the beginning of each time period. • Planned-order receipts - Quantity expected to received at the beginning of the period • Planned-order releases - Planned amount to order in each time period
  • 17. • Releasing an order – means authorization is given to buy the necessary material or to manufacturing of required component. • Scheduled Receipts – are orders placed on manufacturing or on a vendor and represent a commitment to make or buy. • Now, considering Scheduled Receipts, Net Requirement = Gross Requirement – Scheduled Receipts – available inventory
  • 18. • Netting – is a process in which any stock on hand is subtracted from the gross requirement determined through explosion, giving the quantity of each item needed to manufacture the required finished products. • Low Level Code – is the lowest level on which a part resides in all bills of material. Low level codes are determined by starting at lowest level of bill of material and working up, recording the level against the part. If part exists on higher level, its existence on the lower level is already recorded.
  • 19. • Time buckets - The column in an inventory record that represents a unit of time. It may be in days or weeks. • Action bucket - The current time period. • Action notices - Output from the MRP system identifying the need for an action, to avoid future problem. • Planning Horizon – is the total number of periods in a record.
  • 20. • Keep inventory levels to a cost-effective minimum. • Keeps track of inventory that is used. • Tracks the amount of material that is required . • Set safety stock levels for emergencies. • Determine the best lot sizes to fulfill orders. • Set up production times among the separate manufacturing stages. • Plan for future needs of raw
  • 21. • Inaccurate information can result in mis-planning , overstock, under-stock, or lack of appropriate resources. • The inaccurate master schedule will provide wrong lengths of time for production . Hence affecting planning. • MRP systems can be costly and time-consuming to set up.
  • 22.
  • 23. Manufacturing resource planning (MRPII) is defined as a method for the effective planning of all resources of a manufacturing company. Ideally, it addresses operational planning in units and financial planning . This is not exclusively a software function, but a combination of people skills, dedication to data base accuracy, and computer resources. It is a total company management concept for using human resources which is used more productively.
  • 24.
  • 25. • Business Planning • Purchasing • Distribution Requirement Scheduling • Forecasting • Service Requirement Planning • Inventory Control • Capacity Requirement Planning • Order Entry And • Accounting Management • Shop Floor Control • Faster Production Scheduling
  • 26. • More efficient use of resources Reduced inventories Less idle time Fewer bottlenecks • Better priority planning Quicker production starts Schedule flexibility
  • 27. • Improved customer service Meet delivery dates Improved quality Lower price possibility • Improved employee moral • Better management information
  • 28. • Error Due To Poor Information • Use of averages