PRODUCTION MANAGEMENT
LECTURE –III & IV
• The Production Function
• Types of production system
• Elementary knowledge of manufacturing processes
• Plant Layouts
• Material Handling
• Location Problems
• Inventory management
• Scheduling
• Network Analysis
• Break Even Point Analysis
• Reliability maintenance & plant services
• Quality control
• Emerging Trends
• Concept of Productivity
Syllabus
• Plant Layouts :
• Objectives
• Symptoms Of Poor Layout
• Types Of Layout
• Functional Layout
• Line Layout
• Static Product Layout
• Group Layout
• Factors Influencing Layouts
• Plant Layout Tools & Techniques
CHAPTER -III
PRODUCTION SYSTEM
CONVERSION
PROCESSINPUT OUTPUT
CONTROL
DECISION MAKER
IN OUT
Definitions of plant layout :
A method of organizing the elements of a production process, in
which similar processes and functions are grouped together
Plant Layout is the physical arrangement of equipment and facilities
within a Plant
Plant layout is the organization of physical facilities like machinery ,
equipment & the allocation of space for the various activities of the
plant & personnel working in the plant
PLAN LAYOUT
To improve productivity, safety and quality of Products
Unnecessary efforts of materials handling can be avoided when the
Plant Layout is optimized
This is valid for :
- Distances Material has to move
- Distances Equipment has to move
- Distances Operators have to move
- Types of Handling Equipment needed
- Energy required to move items against resistance (i.e. gravity)
Optimizing the Layout of a Plant
Provide space for machine / materials / storage / etc
•Flexible for future changes in capacity / Design / Process etc
( Cellular design)
• Accommodate future expansion
•Comply with government rules & regulations ( Municipal corporation /
Labor law & rules
• Safety of employees / visitors / vendors is prime concern
• Achieve economy in operation
Plant Layout Characteristics :
Building & Structure :
Depend on type of production system ( Intermittent / Continuous)
Intermittent System : Building & Shades are constructed & layouts done in
shades with best possible options & then machinery will be brought
inside
Continuous System : Arrange machines first then construction around . It
should withstand & offer support to cranes / hoists / trolleys etc.
The floor should be designed considering the load it should carry ( Tons /
Sq m)
Men :
• Number of people
• Unskilled ( More space ) / Skilled ( Less space i.e. Computer operator)
• Physic of workers ( ex. height )
Receiving Grin-
Mills ders
Raw matl. Large number
of
storage Assem- low volume
bly products
Drills
Planers
Finished
Inspec- goods
Lathes Automatics tion storage
Part A
Part B
Intermittent System
Stage 1 Stage 2
Machine
X
Machine Y Machine Z
Raw
Material
Finished
Product
Continuous System
: Type of machine :
• General purpose machines : Compact in size & requires less
space
• Special Purpose machines (SPM) : Large in size ,
complicated , high level of automation
• Number of machines :
• Level of automation ( Semi / fully automated)
• Higher complexity wider space
• Level & frequency of maintenance
Machine
• Nature of material ( Flammable / inflammable / Hazardous & Non
Hazardous , Corrosive , Methalene , mercury , oils , fuels)
• Form of material ( Solid / Liquid / Powder etc)
• Quantity of material to be handled
• Cycle Time : Consumption of material
• Availability of material
•
Materials :
Movement :
• Movement of people / machines / cranes ( length & frequency)
• Purpose of movement ( With load / without load / Quantity of load)
Waiting Time :
• Cycle time for completeting each activity
• Intermittent –
•Uncertain & High
• More storage places between machines & facilities
• Continuous –
•Defined & low
• Purpose of waiting
• Process ( low space)
• Idling (More space)
Changes :
• Production Volume
• Product type & design
• Process type
• Varieties
• Frequency of change ( Ex 5 years)
Services
• Electrical supply
• Pneumatic supply ( Air supply)
• Water supply
• Chilling process – Cooling Tower
• Air ventilation –Ducting
• Fire extinguishers – Water sprinklers
•Plant layout begins with plant location and continues through 3 further
levels,
1. Layout of department within site
2. Layout of items within the department
3. Layout of individual work places
•
Plant Layout
Symptoms Of Poor Layout
A good layout results in
• Comfort,
• Convenience,
• Safety,
• Efficiency,
• Compactness And
• Finally In Profits To The Organization
A poor layout results in
• Congestion,
• Wastes,
• Frustration,
• Inefficiency And
• Finally A Lower Profit Or A Loss To An Organization
Types Of Layout
Functional Layout ( Process Layout
Line Layout ( Product Layout)
Static Product Layout ( Fixed Position)
Group Layout ( Cellular Layout)
Combination layout ( Hybrid Layout)
Functional Layout ( Process Layout)
• Also called as process layout
• Its best suited for intermittent type of operation
• Machines on layout are called as general purpose machines
• It involves a grouping together of like machines in one section / dept
Example :
• Machines performing grinding operation are installed in grinding dept
• Machines performing drilling operation are installed in drilling dept
• Heat Treatment / Painting etc
Receiving Grin-
Mills ders
Raw matl. Large number
of
storage Assem- low volume
bly products
Drills
Planers
Finished
Inspec- goods
Lathes Automatics tion storage
Part A
Part B
Machine shop Functional Layout ( Process Layout)
Functional Layout ( Process Layout)
Advantages :
• Greater flexibility in production
• Easy to handle M/c breakdown by transfer of to another machine
• Greater Scope for expansion
• Investment on equipment will be comparatively low
• Full utilization of equipment
• Greater incentive to operators to improve performance
Disadvantages :
• Accumulation of work in progress
• Requires more floor space
• Difficulty in movement of material
• Production control is difficult
• High production time as WIP has to travel from place to place
• It involves the arrangement of machines in one line , depending on operation
sequence
• Raw material will be fed in first machine & final product will come out of last machine
• Output of one machine becomes input to next machine
Example :
• Sugar refineries / Paper mills / Cement plants / Rolling mills / paper mills
Line Layout ( Product Layout)
Stage 1 Stage 2
Machine X Machine Y Machine Z
Raw
Material
Finished
Product
Advantages :
• Smooth & regular flow of finished goods
• Shorter processing time due to less travel , storage & inspection frequency
• Reduced material handling
• Low cost labors & lesser training requirement
•Use of special purpose machines (SPM) ,automatic or semi automatic
• Less floor are with high productivity
• Easy production control
Disadvantages :
• Heavy capital investment
• Non flexible layout
• Risk of total production line shutdown
• Supervision is more difficult
Line Layout ( Product Layout)
Static Layout ( Fixed Position Layout)
This type of layout involves the movement of men & machines to the product
Which remains stationary
1. Aircraft Assembly
2. Flyover Bridge
3. Water Dam
Raw Material
Machine &
equipment
Labors
Finished
Product
Advantages :
• Men & machine can be used for wide variety of operations producing different products
• The investment on layout is very small
• The high cost of & difficulty in transporting a bulky product are avoided
Disadvantages :
• High cost of operation
• Very high duration of project
• Rework will be very costly
Static Layout ( Fixed Position Layout)
In cellular manufacturing layout the arrangement of a facility so that
equipment Used to make similar parts or families of parts is grouped
together
The group of equipment is called “ cell “
The arrangement of cells is called a “ cellular Layout “
1
5
2
4
3
1
Cell 1
211 3 Cell 3
Cell 2 Cell 4
Group Layout ( Cellular Layout)
It is a combination of product & process layout with an emphasis on either
In industries plants are never laid out in either pure form
It is possible to have both types of layouts in an efficient combine form if the
products are somewhat similar & not complex
Fabrication of parts ----Process Layout
Assembly of parts ----Product layout
Ex : Soap Manufacturing Machines ---- Product line
Process Layout ---------- Functional basis---Ancillary services ---- Heating / Manu
of glycerin / power house / water treatment plant
Combined Layout ( Hybrid Layout)
F.P
F.P
G.C
G.C
G.C
H.T
H.T
G.G
G.G
Process
Layout
Product Layout
Raw
material
Raw
material
Finished
Products
(Gears)
F.P : Forging Press G.C : Gear Cutting H.T : Heat Treatment
G.G : Gear Grinding Machine
Line Balancing
Line balancing is the phase of assembly line study that
equally divides the work to be done among the workers so
that the total number of employees Required on assembly
line are minimized & no employee of equipment will remain
idle.
Factors Influencing Layouts
1.Factory Building : The nature & size of building determines the floor space available
for layout
While designing the special requirements i.e. Air conditioning , dust control , Humidity
control ,Noise proofing etc must be kept in mind
2. Nature of product : Product layout is suitable for uniform products
Process layout is suitable for custom made products
3. Production process : In assembly line industries product layout is better.
In job order or intermittent manufacturing process layout is desirable
4.Types of machinery : General purpose machines are arranged as per process layout ,
Special purpose machines are arranged as per product layout
5. Repairs & Maintenance : Machines / Equipments must be arranged keeping in mind
the movement of operators & maintenance tools
6. Human Needs : Adequate arrangement should be made for Wash rooms, drinking
water / Canteen & other employee facilities
7.Plant Environment : Heat / Noise / Light / Ventilation & other aspects should be duly
considered e.g. Paint shop / Fabrication / Plating section should be located separately to
protect employees from harmful fumes etc. Adequate safety arrangement should be
made
• The plant layout should be conducive to health & safety of
employees
• It should ensure free & efficient flow of employees & materials
• Future expansion & diversification may also be considered while
planning factory layout
To conclude
Factors Influencing Layouts
Plant Layout Tools & Techniques
1. Process Chart
i. Operations process chart
ii. Flow process chart
2. Process Flow Diagrams
3. Machine Data cards
4. Visualization of layout
i. Two dimensional plan or template
ii. Three dimensional plan or machine models
Process Chart : It is a classification & graphic representation of production activities in
a plant
Very useful for systematic analysis of various operations & material movements in
production process & there effectiveness
Study helps to identify operations that can be eliminated / rearranged / or simplified to
achieve economy in production
Operation Process Chart :
Flow Process Chart :
It is graphic representation of all the activities occurring on the floor of the plant
This chart accumulates & classifies the complete information necessary for the analysis
& improvement of plant operations .
Plant Layout Tools & Techniques
Plant Layout Tools & Techniques
2. Process Flow Diagram : It helps to visualize the movement of material on
an existing floor layout
Helps in identifying excessive movement of materials & helps in relocations
of plant activities to reduce travel distance
3.Machine Data Cards : This is an effective method to provide necessary
information for placement Or layout of the equipment
The cards indicates machines capacity / space & power requirements , handling
needs & corresponding dimensions
4.Visualisation of Layout :Most common method of planning a layout by making
replicas of machines ,racks , benches , & equipment & then arranging these on a
2d /3d plan of the floor space
i) Two Dimensional Plan (Template)
ii) Three Dimensional plan ( Miniature models )
SUMMARY
Decisions about layout are made only periodically. As they have long term
consequences ,they must be made with careful planning .The layout design
affects the cost of producing goods & delivering services for many years in
future. Here we have discussed three “Traditional “ Basic layouts: 1) Process 2)
Product 3) Fixed Position.
Process Layout arrange work centers according to function.
Product Layouts ( Assembly layout) arrange work centers & equipments in line
to perform specialized sequence of tasks.
In Fixed position Layout ,the product remains in one location & resources are
brought to it.
In process & product layouts , the design begin with a statement of goals of
facility. The layouts are designed to meet these goals.
After initial designs have been developed , improved designs are sought which
will be cumbersome ,hence to take care of it quantitative & computer based
models are used.

Contenu connexe

Tendances

Plant layout and its types
Plant layout and its typesPlant layout and its types
Plant layout and its typesHammaduddin
 
Computer aided quality control
Computer aided quality controlComputer aided quality control
Computer aided quality controlAhmad Bajwa
 
Process design layout ppt bec doms
Process design layout ppt bec domsProcess design layout ppt bec doms
Process design layout ppt bec domsBabasab Patil
 
Total productive maintenance (tpm)
Total productive maintenance (tpm)Total productive maintenance (tpm)
Total productive maintenance (tpm)ranviry49
 
Plant layout and its types
Plant layout and its typesPlant layout and its types
Plant layout and its typesKritika Garg
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and controlNikitaGidde
 
COMPONENTS OF CIM
COMPONENTS OF CIM COMPONENTS OF CIM
COMPONENTS OF CIM manimaran m
 
Work Study- Methods Study
Work Study- Methods StudyWork Study- Methods Study
Work Study- Methods StudyJoseph Konnully
 
Material requirement planning, MRP.
Material requirement planning, MRP. Material requirement planning, MRP.
Material requirement planning, MRP. shoaibzaheer1
 
world-class-manufacturing
world-class-manufacturingworld-class-manufacturing
world-class-manufacturingPrasad Bidwai
 
Product, process, fixed and group layouts
Product, process, fixed and group layoutsProduct, process, fixed and group layouts
Product, process, fixed and group layoutsAjith Antony
 
Example flow process charts
Example flow process chartsExample flow process charts
Example flow process chartsrahulmeshram14
 
cycle time, normal time and standard allowance
cycle time, normal time and standard allowancecycle time, normal time and standard allowance
cycle time, normal time and standard allowancePratibha Khemchandani
 

Tendances (20)

Plant layout and its types
Plant layout and its typesPlant layout and its types
Plant layout and its types
 
Line balancing
Line balancingLine balancing
Line balancing
 
Computer aided quality control
Computer aided quality controlComputer aided quality control
Computer aided quality control
 
Plant layout
Plant layout Plant layout
Plant layout
 
Process design layout ppt bec doms
Process design layout ppt bec domsProcess design layout ppt bec doms
Process design layout ppt bec doms
 
Total productive maintenance (tpm)
Total productive maintenance (tpm)Total productive maintenance (tpm)
Total productive maintenance (tpm)
 
Manufacturing systems
Manufacturing systems Manufacturing systems
Manufacturing systems
 
Process selection
Process selectionProcess selection
Process selection
 
Plant layout and its types
Plant layout and its typesPlant layout and its types
Plant layout and its types
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and control
 
Line balancing
Line balancingLine balancing
Line balancing
 
COMPONENTS OF CIM
COMPONENTS OF CIM COMPONENTS OF CIM
COMPONENTS OF CIM
 
Work Study- Methods Study
Work Study- Methods StudyWork Study- Methods Study
Work Study- Methods Study
 
Material requirement planning, MRP.
Material requirement planning, MRP. Material requirement planning, MRP.
Material requirement planning, MRP.
 
world-class-manufacturing
world-class-manufacturingworld-class-manufacturing
world-class-manufacturing
 
Work measurement
Work measurementWork measurement
Work measurement
 
Product, process, fixed and group layouts
Product, process, fixed and group layoutsProduct, process, fixed and group layouts
Product, process, fixed and group layouts
 
Example flow process charts
Example flow process chartsExample flow process charts
Example flow process charts
 
cycle time, normal time and standard allowance
cycle time, normal time and standard allowancecycle time, normal time and standard allowance
cycle time, normal time and standard allowance
 
Group Technology
Group TechnologyGroup Technology
Group Technology
 

Similaire à Lecture on Production management- Plant layout

plant layout.pptx
plant layout.pptxplant layout.pptx
plant layout.pptxsuryapatelq
 
plant layout.pptx
plant layout.pptxplant layout.pptx
plant layout.pptxsuryapatelq
 
chapter 5.pdf
chapter 5.pdfchapter 5.pdf
chapter 5.pdfhinal10
 
main.pptxjdjdjdjejrjrheheheheheuueueueurh
main.pptxjdjdjdjejrjrheheheheheuueueueurhmain.pptxjdjdjdjejrjrheheheheheuueueueurh
main.pptxjdjdjdjejrjrheheheheheuueueueurhsuryapatelq
 
Mba ii pmom_unit-1.4 process design, analysis & selection a
Mba ii pmom_unit-1.4 process design, analysis & selection aMba ii pmom_unit-1.4 process design, analysis & selection a
Mba ii pmom_unit-1.4 process design, analysis & selection aRai University
 
Plantlayout
PlantlayoutPlantlayout
Plantlayoutgiyana
 
Process design layout
Process design layoutProcess design layout
Process design layoutAL Kindi
 
Textile plant layout.pptx
Textile plant layout.pptxTextile plant layout.pptx
Textile plant layout.pptxBewuket Teshome
 
Om lect 04_a(r0-aug08)_facility location & layout_mms_sies
Om lect 04_a(r0-aug08)_facility location & layout_mms_siesOm lect 04_a(r0-aug08)_facility location & layout_mms_sies
Om lect 04_a(r0-aug08)_facility location & layout_mms_siesvideoaakash15
 
Plant layout by tamanna kumari.pptx
Plant layout by tamanna kumari.pptxPlant layout by tamanna kumari.pptx
Plant layout by tamanna kumari.pptxTamannaKumari8
 

Similaire à Lecture on Production management- Plant layout (20)

plant layout.pptx
plant layout.pptxplant layout.pptx
plant layout.pptx
 
plant layout.pptx
plant layout.pptxplant layout.pptx
plant layout.pptx
 
Plant layout
Plant layoutPlant layout
Plant layout
 
Plant layout
Plant layoutPlant layout
Plant layout
 
Facility Layout,PPT.pptx
Facility Layout,PPT.pptxFacility Layout,PPT.pptx
Facility Layout,PPT.pptx
 
chapter 5.pdf
chapter 5.pdfchapter 5.pdf
chapter 5.pdf
 
plant layout
plant layoutplant layout
plant layout
 
Plant layouts(presentation)
Plant layouts(presentation)Plant layouts(presentation)
Plant layouts(presentation)
 
POM- PLANT LAYOUT.pptx
POM- PLANT LAYOUT.pptxPOM- PLANT LAYOUT.pptx
POM- PLANT LAYOUT.pptx
 
main.pptxjdjdjdjejrjrheheheheheuueueueurh
main.pptxjdjdjdjejrjrheheheheheuueueueurhmain.pptxjdjdjdjejrjrheheheheheuueueueurh
main.pptxjdjdjdjejrjrheheheheheuueueueurh
 
Plant layout
Plant layoutPlant layout
Plant layout
 
Layout
LayoutLayout
Layout
 
layout.ppt
layout.pptlayout.ppt
layout.ppt
 
Mba ii pmom_unit-1.4 process design, analysis & selection a
Mba ii pmom_unit-1.4 process design, analysis & selection aMba ii pmom_unit-1.4 process design, analysis & selection a
Mba ii pmom_unit-1.4 process design, analysis & selection a
 
Plant layout
Plant layoutPlant layout
Plant layout
 
Plantlayout
PlantlayoutPlantlayout
Plantlayout
 
Process design layout
Process design layoutProcess design layout
Process design layout
 
Textile plant layout.pptx
Textile plant layout.pptxTextile plant layout.pptx
Textile plant layout.pptx
 
Om lect 04_a(r0-aug08)_facility location & layout_mms_sies
Om lect 04_a(r0-aug08)_facility location & layout_mms_siesOm lect 04_a(r0-aug08)_facility location & layout_mms_sies
Om lect 04_a(r0-aug08)_facility location & layout_mms_sies
 
Plant layout by tamanna kumari.pptx
Plant layout by tamanna kumari.pptxPlant layout by tamanna kumari.pptx
Plant layout by tamanna kumari.pptx
 

Plus de Sujeet TAMBE

Job shop scheduling
Job shop schedulingJob shop scheduling
Job shop schedulingSujeet TAMBE
 
A Special Study of Emerging Global Trends in Advanced Manufacturing
A Special Study of Emerging Global Trends in Advanced ManufacturingA Special Study of Emerging Global Trends in Advanced Manufacturing
A Special Study of Emerging Global Trends in Advanced ManufacturingSujeet TAMBE
 
New strategies and trends used in manufacturing (operation management)
New strategies and trends used in manufacturing (operation management)New strategies and trends used in manufacturing (operation management)
New strategies and trends used in manufacturing (operation management)Sujeet TAMBE
 
EVOLUTION OF MARKETING CONCEPT
EVOLUTION OF MARKETING CONCEPTEVOLUTION OF MARKETING CONCEPT
EVOLUTION OF MARKETING CONCEPTSujeet TAMBE
 
ERP (ENTERPRISE RESOURCE PLANNING)
ERP (ENTERPRISE RESOURCE PLANNING)ERP (ENTERPRISE RESOURCE PLANNING)
ERP (ENTERPRISE RESOURCE PLANNING)Sujeet TAMBE
 
Introduction to multicomponent distillation
Introduction to multicomponent distillationIntroduction to multicomponent distillation
Introduction to multicomponent distillationSujeet TAMBE
 

Plus de Sujeet TAMBE (13)

Research Aptitude
Research AptitudeResearch Aptitude
Research Aptitude
 
Job shop scheduling
Job shop schedulingJob shop scheduling
Job shop scheduling
 
A Special Study of Emerging Global Trends in Advanced Manufacturing
A Special Study of Emerging Global Trends in Advanced ManufacturingA Special Study of Emerging Global Trends in Advanced Manufacturing
A Special Study of Emerging Global Trends in Advanced Manufacturing
 
OZONE DEPLECTION
OZONE DEPLECTIONOZONE DEPLECTION
OZONE DEPLECTION
 
New strategies and trends used in manufacturing (operation management)
New strategies and trends used in manufacturing (operation management)New strategies and trends used in manufacturing (operation management)
New strategies and trends used in manufacturing (operation management)
 
EVOLUTION OF MARKETING CONCEPT
EVOLUTION OF MARKETING CONCEPTEVOLUTION OF MARKETING CONCEPT
EVOLUTION OF MARKETING CONCEPT
 
ERP (ENTERPRISE RESOURCE PLANNING)
ERP (ENTERPRISE RESOURCE PLANNING)ERP (ENTERPRISE RESOURCE PLANNING)
ERP (ENTERPRISE RESOURCE PLANNING)
 
Introduction to multicomponent distillation
Introduction to multicomponent distillationIntroduction to multicomponent distillation
Introduction to multicomponent distillation
 
Air compressor
Air compressorAir compressor
Air compressor
 
Distillation
DistillationDistillation
Distillation
 
Cooling tower
Cooling towerCooling tower
Cooling tower
 
Refrigeration
RefrigerationRefrigeration
Refrigeration
 
Ozone deplection
Ozone deplectionOzone deplection
Ozone deplection
 

Dernier

complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
Industrial Safety Unit-I SAFETY TERMINOLOGIES
Industrial Safety Unit-I SAFETY TERMINOLOGIESIndustrial Safety Unit-I SAFETY TERMINOLOGIES
Industrial Safety Unit-I SAFETY TERMINOLOGIESNarmatha D
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgsaravananr517913
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
National Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfNational Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfRajuKanojiya4
 
Internet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxInternet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxVelmuruganTECE
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...
NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...
NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...Amil Baba Dawood bangali
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptJasonTagapanGulla
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxsiddharthjain2303
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncssuser2ae721
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 

Dernier (20)

complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
Industrial Safety Unit-I SAFETY TERMINOLOGIES
Industrial Safety Unit-I SAFETY TERMINOLOGIESIndustrial Safety Unit-I SAFETY TERMINOLOGIES
Industrial Safety Unit-I SAFETY TERMINOLOGIES
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
National Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfNational Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdf
 
Internet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxInternet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptx
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...
NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...
NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.ppt
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptx
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 

Lecture on Production management- Plant layout

  • 2. • The Production Function • Types of production system • Elementary knowledge of manufacturing processes • Plant Layouts • Material Handling • Location Problems • Inventory management • Scheduling • Network Analysis • Break Even Point Analysis • Reliability maintenance & plant services • Quality control • Emerging Trends • Concept of Productivity Syllabus
  • 3. • Plant Layouts : • Objectives • Symptoms Of Poor Layout • Types Of Layout • Functional Layout • Line Layout • Static Product Layout • Group Layout • Factors Influencing Layouts • Plant Layout Tools & Techniques CHAPTER -III
  • 5. Definitions of plant layout : A method of organizing the elements of a production process, in which similar processes and functions are grouped together Plant Layout is the physical arrangement of equipment and facilities within a Plant Plant layout is the organization of physical facilities like machinery , equipment & the allocation of space for the various activities of the plant & personnel working in the plant PLAN LAYOUT
  • 6.
  • 7. To improve productivity, safety and quality of Products Unnecessary efforts of materials handling can be avoided when the Plant Layout is optimized This is valid for : - Distances Material has to move - Distances Equipment has to move - Distances Operators have to move - Types of Handling Equipment needed - Energy required to move items against resistance (i.e. gravity) Optimizing the Layout of a Plant
  • 8. Provide space for machine / materials / storage / etc •Flexible for future changes in capacity / Design / Process etc ( Cellular design) • Accommodate future expansion •Comply with government rules & regulations ( Municipal corporation / Labor law & rules • Safety of employees / visitors / vendors is prime concern • Achieve economy in operation Plant Layout Characteristics :
  • 9.
  • 10. Building & Structure : Depend on type of production system ( Intermittent / Continuous) Intermittent System : Building & Shades are constructed & layouts done in shades with best possible options & then machinery will be brought inside Continuous System : Arrange machines first then construction around . It should withstand & offer support to cranes / hoists / trolleys etc. The floor should be designed considering the load it should carry ( Tons / Sq m) Men : • Number of people • Unskilled ( More space ) / Skilled ( Less space i.e. Computer operator) • Physic of workers ( ex. height )
  • 11. Receiving Grin- Mills ders Raw matl. Large number of storage Assem- low volume bly products Drills Planers Finished Inspec- goods Lathes Automatics tion storage Part A Part B Intermittent System
  • 12. Stage 1 Stage 2 Machine X Machine Y Machine Z Raw Material Finished Product Continuous System
  • 13. : Type of machine : • General purpose machines : Compact in size & requires less space • Special Purpose machines (SPM) : Large in size , complicated , high level of automation • Number of machines : • Level of automation ( Semi / fully automated) • Higher complexity wider space • Level & frequency of maintenance Machine
  • 14. • Nature of material ( Flammable / inflammable / Hazardous & Non Hazardous , Corrosive , Methalene , mercury , oils , fuels) • Form of material ( Solid / Liquid / Powder etc) • Quantity of material to be handled • Cycle Time : Consumption of material • Availability of material • Materials :
  • 15. Movement : • Movement of people / machines / cranes ( length & frequency) • Purpose of movement ( With load / without load / Quantity of load) Waiting Time : • Cycle time for completeting each activity • Intermittent – •Uncertain & High • More storage places between machines & facilities • Continuous – •Defined & low • Purpose of waiting • Process ( low space) • Idling (More space)
  • 16. Changes : • Production Volume • Product type & design • Process type • Varieties • Frequency of change ( Ex 5 years) Services • Electrical supply • Pneumatic supply ( Air supply) • Water supply • Chilling process – Cooling Tower • Air ventilation –Ducting • Fire extinguishers – Water sprinklers
  • 17. •Plant layout begins with plant location and continues through 3 further levels, 1. Layout of department within site 2. Layout of items within the department 3. Layout of individual work places • Plant Layout
  • 18. Symptoms Of Poor Layout A good layout results in • Comfort, • Convenience, • Safety, • Efficiency, • Compactness And • Finally In Profits To The Organization A poor layout results in • Congestion, • Wastes, • Frustration, • Inefficiency And • Finally A Lower Profit Or A Loss To An Organization
  • 19. Types Of Layout Functional Layout ( Process Layout Line Layout ( Product Layout) Static Product Layout ( Fixed Position) Group Layout ( Cellular Layout) Combination layout ( Hybrid Layout)
  • 20. Functional Layout ( Process Layout) • Also called as process layout • Its best suited for intermittent type of operation • Machines on layout are called as general purpose machines • It involves a grouping together of like machines in one section / dept Example : • Machines performing grinding operation are installed in grinding dept • Machines performing drilling operation are installed in drilling dept • Heat Treatment / Painting etc
  • 21. Receiving Grin- Mills ders Raw matl. Large number of storage Assem- low volume bly products Drills Planers Finished Inspec- goods Lathes Automatics tion storage Part A Part B Machine shop Functional Layout ( Process Layout)
  • 22. Functional Layout ( Process Layout) Advantages : • Greater flexibility in production • Easy to handle M/c breakdown by transfer of to another machine • Greater Scope for expansion • Investment on equipment will be comparatively low • Full utilization of equipment • Greater incentive to operators to improve performance Disadvantages : • Accumulation of work in progress • Requires more floor space • Difficulty in movement of material • Production control is difficult • High production time as WIP has to travel from place to place
  • 23. • It involves the arrangement of machines in one line , depending on operation sequence • Raw material will be fed in first machine & final product will come out of last machine • Output of one machine becomes input to next machine Example : • Sugar refineries / Paper mills / Cement plants / Rolling mills / paper mills Line Layout ( Product Layout) Stage 1 Stage 2 Machine X Machine Y Machine Z Raw Material Finished Product
  • 24. Advantages : • Smooth & regular flow of finished goods • Shorter processing time due to less travel , storage & inspection frequency • Reduced material handling • Low cost labors & lesser training requirement •Use of special purpose machines (SPM) ,automatic or semi automatic • Less floor are with high productivity • Easy production control Disadvantages : • Heavy capital investment • Non flexible layout • Risk of total production line shutdown • Supervision is more difficult Line Layout ( Product Layout)
  • 25. Static Layout ( Fixed Position Layout) This type of layout involves the movement of men & machines to the product Which remains stationary 1. Aircraft Assembly 2. Flyover Bridge 3. Water Dam Raw Material Machine & equipment Labors Finished Product
  • 26. Advantages : • Men & machine can be used for wide variety of operations producing different products • The investment on layout is very small • The high cost of & difficulty in transporting a bulky product are avoided Disadvantages : • High cost of operation • Very high duration of project • Rework will be very costly Static Layout ( Fixed Position Layout)
  • 27. In cellular manufacturing layout the arrangement of a facility so that equipment Used to make similar parts or families of parts is grouped together The group of equipment is called “ cell “ The arrangement of cells is called a “ cellular Layout “ 1 5 2 4 3 1 Cell 1 211 3 Cell 3 Cell 2 Cell 4 Group Layout ( Cellular Layout)
  • 28. It is a combination of product & process layout with an emphasis on either In industries plants are never laid out in either pure form It is possible to have both types of layouts in an efficient combine form if the products are somewhat similar & not complex Fabrication of parts ----Process Layout Assembly of parts ----Product layout Ex : Soap Manufacturing Machines ---- Product line Process Layout ---------- Functional basis---Ancillary services ---- Heating / Manu of glycerin / power house / water treatment plant Combined Layout ( Hybrid Layout)
  • 29. F.P F.P G.C G.C G.C H.T H.T G.G G.G Process Layout Product Layout Raw material Raw material Finished Products (Gears) F.P : Forging Press G.C : Gear Cutting H.T : Heat Treatment G.G : Gear Grinding Machine
  • 30. Line Balancing Line balancing is the phase of assembly line study that equally divides the work to be done among the workers so that the total number of employees Required on assembly line are minimized & no employee of equipment will remain idle.
  • 31. Factors Influencing Layouts 1.Factory Building : The nature & size of building determines the floor space available for layout While designing the special requirements i.e. Air conditioning , dust control , Humidity control ,Noise proofing etc must be kept in mind 2. Nature of product : Product layout is suitable for uniform products Process layout is suitable for custom made products 3. Production process : In assembly line industries product layout is better. In job order or intermittent manufacturing process layout is desirable 4.Types of machinery : General purpose machines are arranged as per process layout , Special purpose machines are arranged as per product layout 5. Repairs & Maintenance : Machines / Equipments must be arranged keeping in mind the movement of operators & maintenance tools 6. Human Needs : Adequate arrangement should be made for Wash rooms, drinking water / Canteen & other employee facilities 7.Plant Environment : Heat / Noise / Light / Ventilation & other aspects should be duly considered e.g. Paint shop / Fabrication / Plating section should be located separately to protect employees from harmful fumes etc. Adequate safety arrangement should be made
  • 32. • The plant layout should be conducive to health & safety of employees • It should ensure free & efficient flow of employees & materials • Future expansion & diversification may also be considered while planning factory layout To conclude Factors Influencing Layouts
  • 33. Plant Layout Tools & Techniques 1. Process Chart i. Operations process chart ii. Flow process chart 2. Process Flow Diagrams 3. Machine Data cards 4. Visualization of layout i. Two dimensional plan or template ii. Three dimensional plan or machine models
  • 34. Process Chart : It is a classification & graphic representation of production activities in a plant Very useful for systematic analysis of various operations & material movements in production process & there effectiveness Study helps to identify operations that can be eliminated / rearranged / or simplified to achieve economy in production Operation Process Chart : Flow Process Chart : It is graphic representation of all the activities occurring on the floor of the plant This chart accumulates & classifies the complete information necessary for the analysis & improvement of plant operations . Plant Layout Tools & Techniques
  • 35.
  • 36. Plant Layout Tools & Techniques 2. Process Flow Diagram : It helps to visualize the movement of material on an existing floor layout Helps in identifying excessive movement of materials & helps in relocations of plant activities to reduce travel distance 3.Machine Data Cards : This is an effective method to provide necessary information for placement Or layout of the equipment The cards indicates machines capacity / space & power requirements , handling needs & corresponding dimensions 4.Visualisation of Layout :Most common method of planning a layout by making replicas of machines ,racks , benches , & equipment & then arranging these on a 2d /3d plan of the floor space i) Two Dimensional Plan (Template) ii) Three Dimensional plan ( Miniature models )
  • 37. SUMMARY Decisions about layout are made only periodically. As they have long term consequences ,they must be made with careful planning .The layout design affects the cost of producing goods & delivering services for many years in future. Here we have discussed three “Traditional “ Basic layouts: 1) Process 2) Product 3) Fixed Position. Process Layout arrange work centers according to function. Product Layouts ( Assembly layout) arrange work centers & equipments in line to perform specialized sequence of tasks. In Fixed position Layout ,the product remains in one location & resources are brought to it. In process & product layouts , the design begin with a statement of goals of facility. The layouts are designed to meet these goals. After initial designs have been developed , improved designs are sought which will be cumbersome ,hence to take care of it quantitative & computer based models are used.