112/09/2016 – Az. 05065-14 © BECKER BÜTTNERHELD
Rechtsanwälte Wirtschaftsprüfer Steuerberater · PartGmbB
Dr. Dörte Fouquet
Brussels, 12.09.2016
Model Contracts
Presentation and discussion of Contract Guidance
212/09/2016 – Az. 05065-14 © BECKER BÜTTNERHELD
Rechtsanwälte Wirtschaftsprüfer Steuerberater · PartGmbB
About us
Becker Büttner Held has been operating since 1991. At BBH,
lawyers, auditors and tax advisors work hand in hand with the
engineers, consultants and other experts of our BBH
ConsultingAG.We provide advice to more than 3,000 clients
and are the leading law firm for the energy and infrastructure
industry.
BBH is known as “the” law firm of public utilities. But we are
far more than that – in Germany and also in Europe.The
decentralised utilities, the industry, transport companies,
investors as well as political bodies, like the European
Commission, the Federal Government, the Federal States and
public corporations appreciate BBH’s work.
 Accredited professionals: ca. 250; total staff: ca. 550
 Offices in Berlin, Munich, Cologne, Hamburg,
Stuttgart and Brussels
312/09/2016 – Az. 05065-14 © BECKER BÜTTNERHELD
Rechtsanwälte Wirtschaftsprüfer Steuerberater · PartGmbB
Dr. Dörte Fouquet
Dr. Dörte Fouquet is specialized in EU law and interna-
tional legal relations, with focus on competition, infra-
structure, energy and environment. She is legal advisor
to companies, finance institutions, associations, go-
vernmental agencies in Germany and other EU Member
States, EU institutions and on international level.
 Studies of Law at the Universities of Marburg and Hamburg
 1982 Research assistant, University of Hamburg
 1988 Ministry for the Environment and Energy, Hamburg
 1991 Liaison office of Hamburg and Schleswig-Holstein to
the EuropeanCommission in Brussels
 1993 Partner at law firm Kuhbier, Brussels
 Since 2011 Partner at BBH Brussels
Rechtsanwältin / Lawyer · Partner
1000 Brussels, Belgium · Avenue Marnix 28 · Phone +32 (0)2 204 44-11 · doerte.fouquet@bbh-online.be
412/09/2016 – Az. 05065-14 © BECKER BÜTTNERHELD
Rechtsanwälte Wirtschaftsprüfer Steuerberater · PartGmbB
Agenda
1. Objective
2. Approach
3. Presentation of the ContractGuidances
4. Outlook
512/09/2016 – Az. 05065-14 © BECKER BÜTTNERHELD
Rechtsanwälte Wirtschaftsprüfer Steuerberater · PartGmbB
Objective
 Facilitating cooperation betweenVRE and FID
 Show what is possible, and what is not
 Pre-defined Business Models as „inspiration“
 Create „instruments“ to allow for easier implementation
 „Check-lists“ of what needs to be considered
 Provide a basis for discussion
 Concrete „Contract Outlines “ perceived as more helpful
 Point to Member State specifics
 As different legal systems may necessitate different contractual settings
 Give guidance to project developers in the Member States
 „Contract Guidance“ targeted to Member State specifics
612/09/2016 – Az. 05065-14 © BECKER BÜTTNERHELD
Rechtsanwälte Wirtschaftsprüfer Steuerberater · PartGmbB
Approach
Contract Outlines under German Law
Drafting ContractOutlines underGerman Law has been the
starting point
 See what is possible and what is not
 E.g. because certain settings would have unwanted consequences
 See what is in practice chosen and what is not
 E.g. because certain settings are not profitable in Germany
 Draft ContractOutlines
 Leave out technical etc. specificities and keep in general
 Note where there are different options for parties to choose
 Keep the language clear and simple
 …
712/09/2016 – Az. 05065-14 © BECKER BÜTTNERHELD
Rechtsanwälte Wirtschaftsprüfer Steuerberater · PartGmbB
Approach
Assumptions for all Business Models
Drafting ContractOutlines underGerman Law showed the
need for further clarification of the Business Models
 Certain assumptions had to be made
 E.g. regarding the location or the grid connection of theVRE
 Some Business Models needed more differentiation
 E.g. Business Model A2.3 was split into three scenarios
 BUT: No assumptions onVRE plant and FID technical
specificities
 To keep the considerations sufficiently general in order to fit different
projects
812/09/2016 – Az. 05065-14 © BECKER BÜTTNERHELD
Rechtsanwälte Wirtschaftsprüfer Steuerberater · PartGmbB
Approach
Check-lists
Based on the assumptions made, check-lists for contracts under
the Business Models could be made
 Which contracts are needed?
 If more than one, maybe a framework contract makes sense?
 What should be dealt with in those contracts?
 Electricity supply?
 Construction and/or operation of theVRE?
 Financing arrangements?
 Sharing of risks and liability?
 …
912/09/2016 – Az. 05065-14 © BECKER BÜTTNERHELD
Rechtsanwälte Wirtschaftsprüfer Steuerberater · PartGmbB
Approach
Member State specific considerations
As Member States differ, some specificities may need to be
taken into account
 E.g. German law on property ownership differs from UK law
 Important e.g. for ownership of theVRE plant on FID territory
 Some contractual arrangements may not make sense in
certain Member States
 E.g. German rules on self-consumption rather strict regarding VRE
owned and/or operated by third parties
 Other specificities of a Member State may suggest other
Business Models
 …
1012/09/2016 – Az. 05065-14 © BECKER BÜTTNERHELD
Rechtsanwälte Wirtschaftsprüfer Steuerberater · PartGmbB
Approach
Contract Guidance for each Member State
Translating the Member State specifics identified into contract
skeleton
 „Skeleton“ structure with respective paragraphs
 Each paragraph identifies what parties should lay down there
 BUT:Options are mentioned and references are made to the Report on
Member State specific considerations
 Translation into the Member States languages
 As easy reference tool
 Together with Check-lists, Report and the fully formulated
contract outlines = tool kit for the parties
1112/09/2016 – Az. 05065-14 © BECKER BÜTTNERHELD
Rechtsanwälte Wirtschaftsprüfer Steuerberater · PartGmbB
Presentation of the Contract Guidances
 Two ContractGuidances
 Electricity Supply from Off-siteVRE
 Electricity bill reduction with On-siteVRE
 Prepared for each Member State
 Note: in the following presentation, the country-specific traits have
been left out
 Normally marked in footnotes
1212/09/2016 – Az. 05065-14 © BECKER BÜTTNERHELD
Rechtsanwälte Wirtschaftsprüfer Steuerberater · PartGmbB
Contract Guidance “Electricity supply
with Off-site VRE”
§ 1 Objective
(1) Supply IEC with electricity from a variable renewable energy plant
owned and operated byVRE
1. (…where relevant to the Parties, indicate specifics of the plant, attach
Annex with details)
2. …
(2) Adaptation of IEC’s electricity demand through shifting production
processes to times of high generation from VRE’s variable renewable
power plant
(3) Any other objectives
§ 2 Conduct of the Parties towards each other
Due diligence and good faith
1312/09/2016 – Az. 05065-14 © BECKER BÜTTNERHELD
Rechtsanwälte Wirtschaftsprüfer Steuerberater · PartGmbB
Contract Guidance “Electricity supply
with Off-site VRE”
§ 3 Electricity supply
(1) Clauses on amount of electricity to be delivered and arrangements to regulate possible
interruptions or reductions of the supplied amount: VRE shall supply electricity to VRE
from the variable renewable energy plant(s) identified; supply without reserve or
balancing electricity and net ofVRE own demand
(2) Clauses on terms and conditions on the supply: Obligation for IEC to primarily use the
electricity from the VRE plant(s) (take or pay); Clause allowing IEC to contract a third
party supplier, where electricity from the VRE plant is insufficient; possibly identify the
supplier
(3) Obligation for VRE to operate the plant(s) at least a certain number of hours per year;
explanation that surplus electricity exceeding IEC demand will not be bought from IEC
(4) Possibly obligation for IEC to adapt production processes/demand to generation
forecast fromVRE (in particular where price signal is deemed insufficient)
(5) Obligation on VRE to provide IEC with forecast; possibly attach Annex with template
for such forecast
1412/09/2016 – Az. 05065-14 © BECKER BÜTTNERHELD
Rechtsanwälte Wirtschaftsprüfer Steuerberater · PartGmbB
Contract Guidance “Electricity supply
with Off-site VRE”
§4 Price of the electricity
(1) Possibly agreement on minimum prices for the VRE electricity to give VRE some
investment security
(2) Clause on prices, i.e. variable prices in order to set incentives for IEC to shift demand;
reference to Price Sheet/Terms and Conditions of VRE in Annex; explanation that net
prices, not including taxes and surcharges; clause explaining that in particular
surcharges which come attached to grid use are not included (e.g. grid
surcharge/federale bijdrag)
(3) Clause on invoicing and payment
(4) Adaptations to the prices – when set out in price sheet – to be communicated in
advance; possibly vest a termination right for IEC
§5 Renewable electricity and guarantees of origin
(1) VRE to prove renewable quality of the electricity through guarantees of origin
(2) No extra price for guarantees of origin
1512/09/2016 – Az. 05065-14 © BECKER BÜTTNERHELD
Rechtsanwälte Wirtschaftsprüfer Steuerberater · PartGmbB
Contract Guidance “Electricity supply
with Off-site VRE”
§6 Grid use and metering
(1) IEC to have grid use contract with grid operator
(2) VRE to have grid use contract
(3) Definition of the grid access point through which the electricity is
going to be supplied to IEC where this is not done elsewhere
(4) Definition of the grid operator in charge for metering; likely the ones
to whom IEC/VRE are connected
§7 General Terms and Conditions
Reference to the applicable General Terms and Conditions (VRE’s
General Terms and Conditions), in Annex
1612/09/2016 – Az. 05065-14 © BECKER BÜTTNERHELD
Rechtsanwälte Wirtschaftsprüfer Steuerberater · PartGmbB
Contract Guidance “Electricity supply
with Off-site VRE”
§8 Duration of the contract
(1) Entry into force
(2) Duration of the contract: possibly several years and/or with annual
prolongation in case none of the Parties terminates it
(3) Rules on termination
(4) Possibly clause on early termination (contractual damages clause)
§9 Confidentiality
(Standard) clause on confidentiality
1712/09/2016 – Az. 05065-14 © BECKER BÜTTNERHELD
Rechtsanwälte Wirtschaftsprüfer Steuerberater · PartGmbB
Contract Guidance “Electricity supply
with Off-site VRE”
§ 10 Liability
(1) No liability for VRE in case of disturbances in supply through
disruption in grid operation or connection, provided not caused by
non-authorized measures ofVRE
(2) Obligation on VRE – where this can be reasonably expected – to
inform IEC about grid-related disturbances
(3) Liability clause (liability limited to intent only or intent and gross
negligence of VRE and agents, as in accordance with the terms of the
Law)
(4) Possibly: Clause on contractual damages
1812/09/2016 – Az. 05065-14 © BECKER BÜTTNERHELD
Rechtsanwälte Wirtschaftsprüfer Steuerberater · PartGmbB
Contract Guidance “Electricity supply
with Off-site VRE”
§ 10 Liability
(1) No liability for VRE in case of disturbances in supply through disruption in
grid operation or connection, provided not caused by non-authorized
measures ofVRE
(2) Obligation on VRE – where this can be reasonably expected – to inform IEC
about grid-related disturbances
(3) Liability clause (liability limited to intent only or intent and gross negligence
ofVRE and agents, as in accordance with the terms of the Law)
(4) Possibly: Clause on contractual damages
§11 Force Majeure
Parties freed from obligations in case of Force Majeure, where not
otherwise provided for in contract; possibly reference to the terms of
the Law
1912/09/2016 – Az. 05065-14 © BECKER BÜTTNERHELD
Rechtsanwälte Wirtschaftsprüfer Steuerberater · PartGmbB
Contract Guidance “Electricity supply
with Off-site VRE”
§12 Transferral of rights
Clause on whether the Parties can transfer their rights and under which
conditions
§13 Derogatory clause
Example: In the event that one of the clauses of this contract should be or
become either invalid or impossible to perform, the other clauses of this contract
will not be affected. The Parties will replace the respective provision by a valid
provision which is valid and can be performed, but which comes as close as
possible to the result of the provision replaced.
§14 Amendments and additions
(1) All amendments in writing, including amendments to this clause
(2) Clause stating whether oral side agreements have been made/other relations
between parties in place.
2012/09/2016 – Az. 05065-14 © BECKER BÜTTNERHELD
Rechtsanwälte Wirtschaftsprüfer Steuerberater · PartGmbB
Contract Guidance “Electricity bill
reduction with On-site VRE”
§1 Objective
(1) Supply of renewable electricity to IEC by VRE, from variable
renewable energy power plant on IEC’s property
(2) IEC to adapt demand to production patterns of the variable
renewable energy power plant; optimization of supply and demand
(3) Any other objectives)
§2 Conduct of the Parties towards each other
Due diligence and good faith
2112/09/2016 – Az. 05065-14 © BECKER BÜTTNERHELD
Rechtsanwälte Wirtschaftsprüfer Steuerberater · PartGmbB
Contract Guidance “Electricity bill
reduction with On-site VRE”
§3 Electricity Supply Contract
(1) Contract to be concluded between the Parties, under which VRE shall supply electricity to VRE from
the variable renewable energy plant(s) identified; supply without reserve or balancing electricity
and net ofVRE own demand
(2) Obligation for IEC to primarily use the electricity from the VRE plant(s) (take or pay); Clause
allowing IEC to contract a third party supplier, where electricity from the VRE plant is insufficient;
possibly identify the supplier
(3) Possibly right for IEC to market surplus electricity freely; alternative: explanation that IEC does not
take on surplus electricity and right forVRE to market the electricity
(4) Obligation forVRE to operate the plant(s) at least a certain number of hours per year
(5) Possibly obligation for IEC to adapt production processes/demand to generation forecast from VRE
(in particular where price signal is deemed insufficient)
(6) Obligation on VRE to provide IEC with forecast; possibly attach Annex with template for such
forecast
(7) Provisions on the price of the electricity: possibly minimum prices (for VRE to have some financial
security, however, noting that green certifiates may still be issued), variable prices (to give
incentive for IEC to adapt consumption patterns), agreement on price adaptations
2212/09/2016 – Az. 05065-14 © BECKER BÜTTNERHELD
Rechtsanwälte Wirtschaftsprüfer Steuerberater · PartGmbB
Contract Guidance “Electricity bill
reduction with On-site VRE”
§4 Liability under the Electricity Supply Contract
(1) Possibly agreement that VRE not liable for delays in delayed start of
the electricity supply, except for intent or gross negligence, and/or
exclusion of financial penalties
(2) Exclusion of liability for disturbances in the supply due to faults in the
infrastructure (owned and operated by IEC)
(3) Possibly (where such risk shall be taken from VRE) exclusion of
liability for VRE for deviations from the forecast, i.e. more or less
production and the potential need for IEC to buy/sell on the market
2312/09/2016 – Az. 05065-14 © BECKER BÜTTNERHELD
Rechtsanwälte Wirtschaftsprüfer Steuerberater · PartGmbB
Contract Guidance “Electricity bill
reduction with On-site VRE”
§5 Technical specifications relating to the construction of the
variable renewable energy power plant
(1) Definition of the variable renewable energy power plant (source, size, etc),reference
to annex for specifications
(2) List of minimum “non-negotiable” points (i.e. source, size, location…) where such exist
(3) Definition of location of the variable renewable energy power plant, reference to map
in annex
(4) Clause on how to deal with changes to the original plans (i.e. different equipment etc
to be used), possibly negotiations in good faith
§6 Specifications relating to the operation of the variable
renewable energy power plant
(1) Obligation on VRE to mainatain the variable renewable energy power plant
operational and ensure proper functioning
(2) Possibly define authority of IEC in operation of the variable renewable energy power
plant, where such authority is agreed between the Parties
2412/09/2016 – Az. 05065-14 © BECKER BÜTTNERHELD
Rechtsanwälte Wirtschaftsprüfer Steuerberater · PartGmbB
Contract Guidance “Electricity bill
reduction with On-site VRE”
§7 Contract on access and use of IEC’s infrastructure
(1) Contract to be concluded that IEC has to build and operate
infrastructure connecting the variable renewable energy power plant
to the connection point at IEC’s property to which electricity is to be
supplied
(2) Infrastructure to include certain minimum facilities, in particular
metering
1. …
(3) IEC to grant VRE the right to access and use such infrastructure for
the purposes of delivering electricity to IEC; possibly explanation that
this is not an exclusive (i.e. discriminatory) right
(4) IEC not to charge any costs for access and use of infrastructure;
neither costs for balancing or reserve will be passed on toVRE
(5) Possibly (where IEC is responsible for marketing surplus production)
possibility for IEC to regulate downVRE
2512/09/2016 – Az. 05065-14 © BECKER BÜTTNERHELD
Rechtsanwälte Wirtschaftsprüfer Steuerberater · PartGmbB
Contract Guidance “Electricity bill
reduction with On-site VRE”
§8 Contract on access and use of IEC’s industrial property
(1) Parties to construct a right for VRE to access and use IEC’s property
for the duration of the contract, possibly through limited personal
servitude
(2) After termination of the contract, VRE to remove any legacy
stemming from the variable renewable energy power plant, if not
agreed otherwise
§9 Time frame for the construction and operation of the
variable renewable energy power plant
(1) Start date of construction
(2) Definition of certain interim steps
(3) Envisioned date for becoming operations
(4) Duration of operation (e.g. 15 years)
(5) Clause determining what happens in case of delays
2612/09/2016 – Az. 05065-14 © BECKER BÜTTNERHELD
Rechtsanwälte Wirtschaftsprüfer Steuerberater · PartGmbB
Contract Guidance „Electricity bill
reduction with On-site VRE“
...
§11 Option to purchase the variable renewable energy power
plant
Possibly, option forVRE to purchase the variable renewable energy
power plant after duration of the contract; if so provisions on agreement
on price (e.g. based on expert opinion), explanation that in such caseVRE
shall not be obliged to remove it
…
§13 General Terms and Conditions
Agreement on applicable General Terms and Conditions
§14 Economic Viability Clause
Possibly, clause that where circumstances arise that affect the economic
viability of the project (for either party), Parties to negotiate in good
faith
2712/09/2016 – Az. 05065-14 © BECKER BÜTTNERHELD
Rechtsanwälte Wirtschaftsprüfer Steuerberater · PartGmbB
Contract Guidance „Electricity bill
reduction with On-site VRE“
 Other clauses resemble the ones from Contract Guidance
„Electricity supply with Off-siteVRE“
2812/09/2016 – Az. 05065-14 © BECKER BÜTTNERHELD
Rechtsanwälte Wirtschaftsprüfer Steuerberater · PartGmbB
Outlook
 Completion and translation of the Contract Guidance for
each Member State
 Taking into account today‘s discussion
 Continued discussion of the Contract Guidance with relevant
stakeholders
 E.g. through renewable energy associations/stakeholder associations
 Last revision of the Report if appropriate
2912/09/2016 – Az. 05065-14 © BECKER BÜTTNERHELD
Rechtsanwälte Wirtschaftsprüfer Steuerberater · PartGmbB
Thank you very much
for your attention.
Dr. Dörte fouquet, BBH Brussels
Tel +32 (0)2 20444-11
Doerte.fouquet@bbh-online.be
www.bbh-online.de
3012/09/2016 – Az. 05065-14 © BECKER BÜTTNERHELD
Rechtsanwälte Wirtschaftsprüfer Steuerberater · PartGmbB
Backup.

Contenu connexe

Tendances

The completion of the internal market and the way ahead: ACER's view
The completion of the internal market and the way ahead: ACER's viewThe completion of the internal market and the way ahead: ACER's view
The completion of the internal market and the way ahead: ACER's viewFlorence Shool of Regulation
 
Legal challenges in establishing organised electricity markets and market cou...
Legal challenges in establishing organised electricity markets and market cou...Legal challenges in establishing organised electricity markets and market cou...
Legal challenges in establishing organised electricity markets and market cou...Florence Shool of Regulation
 
EU Energy Law as a barrier to Trade and Investment: A view from the Court
EU Energy Law as a barrier to Trade and Investment: A view from the CourtEU Energy Law as a barrier to Trade and Investment: A view from the Court
EU Energy Law as a barrier to Trade and Investment: A view from the CourtFlorence Shool of Regulation
 
New business models for distribution grid stakeholders under high penetration...
New business models for distribution grid stakeholders under high penetration...New business models for distribution grid stakeholders under high penetration...
New business models for distribution grid stakeholders under high penetration...Leonardo ENERGY
 
How far can Member States go to derogate from Third Package obligations and m...
How far can Member States go to derogate from Third Package obligations and m...How far can Member States go to derogate from Third Package obligations and m...
How far can Member States go to derogate from Third Package obligations and m...Florence Shool of Regulation
 
The experience with market liberalisation in the CEE region
The experience with market liberalisation in the CEE regionThe experience with market liberalisation in the CEE region
The experience with market liberalisation in the CEE regionFlorence Shool of Regulation
 
Smart energy innovation may17 (3)
Smart energy innovation   may17 (3)Smart energy innovation   may17 (3)
Smart energy innovation may17 (3)Let's Learn Digital
 
Auctions for RES support - the convincing list of pros
Auctions for RES support - the convincing list of prosAuctions for RES support - the convincing list of pros
Auctions for RES support - the convincing list of prosenergydialog
 
Riku Huttunen Fingrid Current 5.4.2017
Riku Huttunen Fingrid Current 5.4.2017 Riku Huttunen Fingrid Current 5.4.2017
Riku Huttunen Fingrid Current 5.4.2017 Fingrid Oyj
 
Anna Colucci Fingrid Current 5.4.2017
Anna Colucci Fingrid Current 5.4.2017 Anna Colucci Fingrid Current 5.4.2017
Anna Colucci Fingrid Current 5.4.2017 Fingrid Oyj
 
Auctions for energy efficiency and the experience of renewables
 Auctions for energy efficiency and the experience of renewables Auctions for energy efficiency and the experience of renewables
Auctions for energy efficiency and the experience of renewablesLeonardo ENERGY
 
The EU State aid law hot spot in the Energy sector from a German perspective
The EU State aid law hot spot in the Energy sector from a German perspectiveThe EU State aid law hot spot in the Energy sector from a German perspective
The EU State aid law hot spot in the Energy sector from a German perspectiveFlorence Shool of Regulation
 
1 dieter hirdes 2017-01-25 empower symposium barcelona dh
1 dieter hirdes 2017-01-25 empower symposium barcelona dh1 dieter hirdes 2017-01-25 empower symposium barcelona dh
1 dieter hirdes 2017-01-25 empower symposium barcelona dhMonica Aragüés Peñalba
 

Tendances (20)

Towards a Pan-European Security of Supply Regime
Towards a Pan-European Security of Supply RegimeTowards a Pan-European Security of Supply Regime
Towards a Pan-European Security of Supply Regime
 
RES auctions in Poland: a new opening?
RES auctions in Poland: a new opening?RES auctions in Poland: a new opening?
RES auctions in Poland: a new opening?
 
Completing the Internal Energy Market
Completing the Internal Energy Market Completing the Internal Energy Market
Completing the Internal Energy Market
 
The completion of the internal market and the way ahead: ACER's view
The completion of the internal market and the way ahead: ACER's viewThe completion of the internal market and the way ahead: ACER's view
The completion of the internal market and the way ahead: ACER's view
 
Legal challenges in establishing organised electricity markets and market cou...
Legal challenges in establishing organised electricity markets and market cou...Legal challenges in establishing organised electricity markets and market cou...
Legal challenges in establishing organised electricity markets and market cou...
 
EU Energy Law as a barrier to Trade and Investment: A view from the Court
EU Energy Law as a barrier to Trade and Investment: A view from the CourtEU Energy Law as a barrier to Trade and Investment: A view from the Court
EU Energy Law as a barrier to Trade and Investment: A view from the Court
 
New business models for distribution grid stakeholders under high penetration...
New business models for distribution grid stakeholders under high penetration...New business models for distribution grid stakeholders under high penetration...
New business models for distribution grid stakeholders under high penetration...
 
How far can Member States go to derogate from Third Package obligations and m...
How far can Member States go to derogate from Third Package obligations and m...How far can Member States go to derogate from Third Package obligations and m...
How far can Member States go to derogate from Third Package obligations and m...
 
The experience with market liberalisation in the CEE region
The experience with market liberalisation in the CEE regionThe experience with market liberalisation in the CEE region
The experience with market liberalisation in the CEE region
 
An electricity market design at last?
An electricity market design at last?An electricity market design at last?
An electricity market design at last?
 
Smart energy innovation may17 (3)
Smart energy innovation   may17 (3)Smart energy innovation   may17 (3)
Smart energy innovation may17 (3)
 
Auctions for RES support - the convincing list of pros
Auctions for RES support - the convincing list of prosAuctions for RES support - the convincing list of pros
Auctions for RES support - the convincing list of pros
 
Security of Gas Supply in the Energy Community
Security of Gas Supply in the Energy CommunitySecurity of Gas Supply in the Energy Community
Security of Gas Supply in the Energy Community
 
Riku Huttunen Fingrid Current 5.4.2017
Riku Huttunen Fingrid Current 5.4.2017 Riku Huttunen Fingrid Current 5.4.2017
Riku Huttunen Fingrid Current 5.4.2017
 
Designing Network Codes
Designing Network CodesDesigning Network Codes
Designing Network Codes
 
Anna Colucci Fingrid Current 5.4.2017
Anna Colucci Fingrid Current 5.4.2017 Anna Colucci Fingrid Current 5.4.2017
Anna Colucci Fingrid Current 5.4.2017
 
Auctions for energy efficiency and the experience of renewables
 Auctions for energy efficiency and the experience of renewables Auctions for energy efficiency and the experience of renewables
Auctions for energy efficiency and the experience of renewables
 
The EU State aid law hot spot in the Energy sector from a German perspective
The EU State aid law hot spot in the Energy sector from a German perspectiveThe EU State aid law hot spot in the Energy sector from a German perspective
The EU State aid law hot spot in the Energy sector from a German perspective
 
1 dieter hirdes 2017-01-25 empower symposium barcelona dh
1 dieter hirdes 2017-01-25 empower symposium barcelona dh1 dieter hirdes 2017-01-25 empower symposium barcelona dh
1 dieter hirdes 2017-01-25 empower symposium barcelona dh
 
4 bernt market design - barcelona 26012017
4 bernt market design - barcelona 260120174 bernt market design - barcelona 26012017
4 bernt market design - barcelona 26012017
 

Similaire à 2016 IndustRE Workshop - 2 Model Contracts

Current arbitration cases under the Energy Charter Treaty
Current arbitration cases under the Energy Charter TreatyCurrent arbitration cases under the Energy Charter Treaty
Current arbitration cases under the Energy Charter TreatyFlorence Shool of Regulation
 
Jan Ole Voß "Civil society analyze of Directives requirements on public info...
 Jan Ole Voß "Civil society analyze of Directives requirements on public info... Jan Ole Voß "Civil society analyze of Directives requirements on public info...
Jan Ole Voß "Civil society analyze of Directives requirements on public info...Nuclear-Transparency-Watch
 
VIETNAM – MOIT PROPOSES NEW FIT RATE FOR WIND POWER PROJECTS
VIETNAM – MOIT PROPOSES NEW FIT RATE FOR WIND POWER PROJECTSVIETNAM – MOIT PROPOSES NEW FIT RATE FOR WIND POWER PROJECTS
VIETNAM – MOIT PROPOSES NEW FIT RATE FOR WIND POWER PROJECTSDr. Oliver Massmann
 
The Contracts for Difference – Strike Back (with a cameo appearance by...Ener...
The Contracts for Difference – Strike Back (with a cameo appearance by...Ener...The Contracts for Difference – Strike Back (with a cameo appearance by...Ener...
The Contracts for Difference – Strike Back (with a cameo appearance by...Ener...Bhalindra Bath - projects & M&A law
 
Recent developments in the field of VAT: a view from the European Commission
Recent developments in the field of VAT: a view from the European CommissionRecent developments in the field of VAT: a view from the European Commission
Recent developments in the field of VAT: a view from the European CommissionDLA Piper Nederland N.V.
 
VIETNAM – NEW PRICING FRAMEWORK FOR SOLAR AND WIND POWER PROJECTS
VIETNAM – NEW PRICING FRAMEWORK FOR SOLAR  AND WIND POWER PROJECTSVIETNAM – NEW PRICING FRAMEWORK FOR SOLAR  AND WIND POWER PROJECTS
VIETNAM – NEW PRICING FRAMEWORK FOR SOLAR AND WIND POWER PROJECTSDr. Oliver Massmann
 
Na Presentation Legal And Policy Framework Energy En
Na Presentation Legal And Policy Framework Energy EnNa Presentation Legal And Policy Framework Energy En
Na Presentation Legal And Policy Framework Energy EnDr. Oliver Massmann
 
BDO German Tax and legal news 01-2014
BDO German Tax and legal news 01-2014BDO German Tax and legal news 01-2014
BDO German Tax and legal news 01-2014BDO Tax
 
LAWYER IN VIETNAM DR. OLIVER MASSMANN KEY COMMENTS ON DRAFT PUBLIC PRIVATE PA...
LAWYER IN VIETNAM DR. OLIVER MASSMANN KEY COMMENTS ON DRAFT PUBLIC PRIVATE PA...LAWYER IN VIETNAM DR. OLIVER MASSMANN KEY COMMENTS ON DRAFT PUBLIC PRIVATE PA...
LAWYER IN VIETNAM DR. OLIVER MASSMANN KEY COMMENTS ON DRAFT PUBLIC PRIVATE PA...Dr. Oliver Massmann
 
Irish Public Works Contract - Clause 10.6 - Practical Application
Irish Public Works Contract - Clause 10.6 - Practical ApplicationIrish Public Works Contract - Clause 10.6 - Practical Application
Irish Public Works Contract - Clause 10.6 - Practical ApplicationMark Wearen
 

Similaire à 2016 IndustRE Workshop - 2 Model Contracts (20)

Current arbitration cases under the Energy Charter Treaty
Current arbitration cases under the Energy Charter TreatyCurrent arbitration cases under the Energy Charter Treaty
Current arbitration cases under the Energy Charter Treaty
 
Epc contracts-in-the-power-sector
Epc contracts-in-the-power-sectorEpc contracts-in-the-power-sector
Epc contracts-in-the-power-sector
 
Jan Ole Voß "Civil society analyze of Directives requirements on public info...
 Jan Ole Voß "Civil society analyze of Directives requirements on public info... Jan Ole Voß "Civil society analyze of Directives requirements on public info...
Jan Ole Voß "Civil society analyze of Directives requirements on public info...
 
Transfer pricing case law in Europe
Transfer pricing case law in EuropeTransfer pricing case law in Europe
Transfer pricing case law in Europe
 
Recent Developments in Energy Arbitration
Recent Developments in Energy ArbitrationRecent Developments in Energy Arbitration
Recent Developments in Energy Arbitration
 
VIETNAM – MOIT PROPOSES NEW FIT RATE FOR WIND POWER PROJECTS
VIETNAM – MOIT PROPOSES NEW FIT RATE FOR WIND POWER PROJECTSVIETNAM – MOIT PROPOSES NEW FIT RATE FOR WIND POWER PROJECTS
VIETNAM – MOIT PROPOSES NEW FIT RATE FOR WIND POWER PROJECTS
 
Vind byen
Vind byenVind byen
Vind byen
 
The Contracts for Difference – Strike Back (with a cameo appearance by...Ener...
The Contracts for Difference – Strike Back (with a cameo appearance by...Ener...The Contracts for Difference – Strike Back (with a cameo appearance by...Ener...
The Contracts for Difference – Strike Back (with a cameo appearance by...Ener...
 
Recent developments in the field of VAT: a view from the European Commission
Recent developments in the field of VAT: a view from the European CommissionRecent developments in the field of VAT: a view from the European Commission
Recent developments in the field of VAT: a view from the European Commission
 
12953021.ppt
12953021.ppt12953021.ppt
12953021.ppt
 
VIETNAM – NEW PRICING FRAMEWORK FOR SOLAR AND WIND POWER PROJECTS
VIETNAM – NEW PRICING FRAMEWORK FOR SOLAR  AND WIND POWER PROJECTSVIETNAM – NEW PRICING FRAMEWORK FOR SOLAR  AND WIND POWER PROJECTS
VIETNAM – NEW PRICING FRAMEWORK FOR SOLAR AND WIND POWER PROJECTS
 
Na Presentation Legal And Policy Framework Energy En
Na Presentation Legal And Policy Framework Energy EnNa Presentation Legal And Policy Framework Energy En
Na Presentation Legal And Policy Framework Energy En
 
BDO German Tax and legal news 01-2014
BDO German Tax and legal news 01-2014BDO German Tax and legal news 01-2014
BDO German Tax and legal news 01-2014
 
UK Adjudicators November 2020 Newsletter
UK Adjudicators November 2020 NewsletterUK Adjudicators November 2020 Newsletter
UK Adjudicators November 2020 Newsletter
 
17 10 16
17 10 1617 10 16
17 10 16
 
Germany’s experience with renovation financing | Knut Höller
Germany’s experience with renovation financing | Knut HöllerGermany’s experience with renovation financing | Knut Höller
Germany’s experience with renovation financing | Knut Höller
 
Renewable energy
Renewable energyRenewable energy
Renewable energy
 
LAWYER IN VIETNAM DR. OLIVER MASSMANN KEY COMMENTS ON DRAFT PUBLIC PRIVATE PA...
LAWYER IN VIETNAM DR. OLIVER MASSMANN KEY COMMENTS ON DRAFT PUBLIC PRIVATE PA...LAWYER IN VIETNAM DR. OLIVER MASSMANN KEY COMMENTS ON DRAFT PUBLIC PRIVATE PA...
LAWYER IN VIETNAM DR. OLIVER MASSMANN KEY COMMENTS ON DRAFT PUBLIC PRIVATE PA...
 
Irish Public Works Contract - Clause 10.6 - Practical Application
Irish Public Works Contract - Clause 10.6 - Practical ApplicationIrish Public Works Contract - Clause 10.6 - Practical Application
Irish Public Works Contract - Clause 10.6 - Practical Application
 
Fidic db-yellow-book
Fidic db-yellow-bookFidic db-yellow-book
Fidic db-yellow-book
 

Plus de Leonardo ENERGY

A new generation of instruments and tools to monitor buildings performance
A new generation of instruments and tools to monitor buildings performanceA new generation of instruments and tools to monitor buildings performance
A new generation of instruments and tools to monitor buildings performanceLeonardo ENERGY
 
Addressing the Energy Efficiency First Principle in a National Energy and Cli...
Addressing the Energy Efficiency First Principle in a National Energy and Cli...Addressing the Energy Efficiency First Principle in a National Energy and Cli...
Addressing the Energy Efficiency First Principle in a National Energy and Cli...Leonardo ENERGY
 
Energy efficiency first – retrofitting the building stock final
Energy efficiency first – retrofitting the building stock finalEnergy efficiency first – retrofitting the building stock final
Energy efficiency first – retrofitting the building stock finalLeonardo ENERGY
 
How auction design affects the financing of renewable energy projects
How auction design affects the financing of renewable energy projects How auction design affects the financing of renewable energy projects
How auction design affects the financing of renewable energy projects Leonardo ENERGY
 
Energy Efficiency Funds in Europe (updated)
Energy Efficiency Funds in Europe (updated)Energy Efficiency Funds in Europe (updated)
Energy Efficiency Funds in Europe (updated)Leonardo ENERGY
 
Energy Efficiency Funds in Europe
Energy Efficiency Funds in EuropeEnergy Efficiency Funds in Europe
Energy Efficiency Funds in EuropeLeonardo ENERGY
 
Five actions fit for 55: streamlining energy savings calculations
Five actions fit for 55: streamlining energy savings calculationsFive actions fit for 55: streamlining energy savings calculations
Five actions fit for 55: streamlining energy savings calculationsLeonardo ENERGY
 
Recent energy efficiency trends in the EU
Recent energy efficiency trends in the EURecent energy efficiency trends in the EU
Recent energy efficiency trends in the EULeonardo ENERGY
 
Energy and mobility poverty: Will the Social Climate Fund be enough to delive...
Energy and mobility poverty: Will the Social Climate Fund be enough to delive...Energy and mobility poverty: Will the Social Climate Fund be enough to delive...
Energy and mobility poverty: Will the Social Climate Fund be enough to delive...Leonardo ENERGY
 
Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?
Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?
Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?Leonardo ENERGY
 
Energy efficiency, structural change and energy savings in the manufacturing ...
Energy efficiency, structural change and energy savings in the manufacturing ...Energy efficiency, structural change and energy savings in the manufacturing ...
Energy efficiency, structural change and energy savings in the manufacturing ...Leonardo ENERGY
 
Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)
Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)
Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)Leonardo ENERGY
 
The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...
The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...
The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...Leonardo ENERGY
 
Modelling and optimisation of electric motors with hairpin windings
Modelling and optimisation of electric motors with hairpin windingsModelling and optimisation of electric motors with hairpin windings
Modelling and optimisation of electric motors with hairpin windingsLeonardo ENERGY
 
Casting zero porosity rotors
Casting zero porosity rotorsCasting zero porosity rotors
Casting zero porosity rotorsLeonardo ENERGY
 
Direct coil cooling through hollow wire
Direct coil cooling through hollow wireDirect coil cooling through hollow wire
Direct coil cooling through hollow wireLeonardo ENERGY
 
Motor renovation - Potential savings and views from various EU Member States
Motor renovation - Potential savings and views from various EU Member StatesMotor renovation - Potential savings and views from various EU Member States
Motor renovation - Potential savings and views from various EU Member StatesLeonardo ENERGY
 
The need for an updated European Motor Study - key findings from the 2021 US...
The need for  an updated European Motor Study - key findings from the 2021 US...The need for  an updated European Motor Study - key findings from the 2021 US...
The need for an updated European Motor Study - key findings from the 2021 US...Leonardo ENERGY
 
Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...
Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...
Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...Leonardo ENERGY
 
Product sustainability - tomorrow's market and regulatory requirements, by Je...
Product sustainability - tomorrow's market and regulatory requirements, by Je...Product sustainability - tomorrow's market and regulatory requirements, by Je...
Product sustainability - tomorrow's market and regulatory requirements, by Je...Leonardo ENERGY
 

Plus de Leonardo ENERGY (20)

A new generation of instruments and tools to monitor buildings performance
A new generation of instruments and tools to monitor buildings performanceA new generation of instruments and tools to monitor buildings performance
A new generation of instruments and tools to monitor buildings performance
 
Addressing the Energy Efficiency First Principle in a National Energy and Cli...
Addressing the Energy Efficiency First Principle in a National Energy and Cli...Addressing the Energy Efficiency First Principle in a National Energy and Cli...
Addressing the Energy Efficiency First Principle in a National Energy and Cli...
 
Energy efficiency first – retrofitting the building stock final
Energy efficiency first – retrofitting the building stock finalEnergy efficiency first – retrofitting the building stock final
Energy efficiency first – retrofitting the building stock final
 
How auction design affects the financing of renewable energy projects
How auction design affects the financing of renewable energy projects How auction design affects the financing of renewable energy projects
How auction design affects the financing of renewable energy projects
 
Energy Efficiency Funds in Europe (updated)
Energy Efficiency Funds in Europe (updated)Energy Efficiency Funds in Europe (updated)
Energy Efficiency Funds in Europe (updated)
 
Energy Efficiency Funds in Europe
Energy Efficiency Funds in EuropeEnergy Efficiency Funds in Europe
Energy Efficiency Funds in Europe
 
Five actions fit for 55: streamlining energy savings calculations
Five actions fit for 55: streamlining energy savings calculationsFive actions fit for 55: streamlining energy savings calculations
Five actions fit for 55: streamlining energy savings calculations
 
Recent energy efficiency trends in the EU
Recent energy efficiency trends in the EURecent energy efficiency trends in the EU
Recent energy efficiency trends in the EU
 
Energy and mobility poverty: Will the Social Climate Fund be enough to delive...
Energy and mobility poverty: Will the Social Climate Fund be enough to delive...Energy and mobility poverty: Will the Social Climate Fund be enough to delive...
Energy and mobility poverty: Will the Social Climate Fund be enough to delive...
 
Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?
Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?
Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?
 
Energy efficiency, structural change and energy savings in the manufacturing ...
Energy efficiency, structural change and energy savings in the manufacturing ...Energy efficiency, structural change and energy savings in the manufacturing ...
Energy efficiency, structural change and energy savings in the manufacturing ...
 
Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)
Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)
Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)
 
The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...
The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...
The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...
 
Modelling and optimisation of electric motors with hairpin windings
Modelling and optimisation of electric motors with hairpin windingsModelling and optimisation of electric motors with hairpin windings
Modelling and optimisation of electric motors with hairpin windings
 
Casting zero porosity rotors
Casting zero porosity rotorsCasting zero porosity rotors
Casting zero porosity rotors
 
Direct coil cooling through hollow wire
Direct coil cooling through hollow wireDirect coil cooling through hollow wire
Direct coil cooling through hollow wire
 
Motor renovation - Potential savings and views from various EU Member States
Motor renovation - Potential savings and views from various EU Member StatesMotor renovation - Potential savings and views from various EU Member States
Motor renovation - Potential savings and views from various EU Member States
 
The need for an updated European Motor Study - key findings from the 2021 US...
The need for  an updated European Motor Study - key findings from the 2021 US...The need for  an updated European Motor Study - key findings from the 2021 US...
The need for an updated European Motor Study - key findings from the 2021 US...
 
Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...
Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...
Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...
 
Product sustainability - tomorrow's market and regulatory requirements, by Je...
Product sustainability - tomorrow's market and regulatory requirements, by Je...Product sustainability - tomorrow's market and regulatory requirements, by Je...
Product sustainability - tomorrow's market and regulatory requirements, by Je...
 

Dernier

DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebUiPathCommunity
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostZilliz
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piececharlottematthew16
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr LapshynFwdays
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024Lorenzo Miniero
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...Fwdays
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
Vector Databases 101 - An introduction to the world of Vector Databases
Vector Databases 101 - An introduction to the world of Vector DatabasesVector Databases 101 - An introduction to the world of Vector Databases
Vector Databases 101 - An introduction to the world of Vector DatabasesZilliz
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyAlfredo García Lavilla
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machinePadma Pradeep
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clashcharlottematthew16
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsRizwan Syed
 

Dernier (20)

DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio Web
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piece
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
Vector Databases 101 - An introduction to the world of Vector Databases
Vector Databases 101 - An introduction to the world of Vector DatabasesVector Databases 101 - An introduction to the world of Vector Databases
Vector Databases 101 - An introduction to the world of Vector Databases
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easy
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machine
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clash
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL Certs
 

2016 IndustRE Workshop - 2 Model Contracts

  • 1. 112/09/2016 – Az. 05065-14 © BECKER BÜTTNERHELD Rechtsanwälte Wirtschaftsprüfer Steuerberater · PartGmbB Dr. Dörte Fouquet Brussels, 12.09.2016 Model Contracts Presentation and discussion of Contract Guidance
  • 2. 212/09/2016 – Az. 05065-14 © BECKER BÜTTNERHELD Rechtsanwälte Wirtschaftsprüfer Steuerberater · PartGmbB About us Becker Büttner Held has been operating since 1991. At BBH, lawyers, auditors and tax advisors work hand in hand with the engineers, consultants and other experts of our BBH ConsultingAG.We provide advice to more than 3,000 clients and are the leading law firm for the energy and infrastructure industry. BBH is known as “the” law firm of public utilities. But we are far more than that – in Germany and also in Europe.The decentralised utilities, the industry, transport companies, investors as well as political bodies, like the European Commission, the Federal Government, the Federal States and public corporations appreciate BBH’s work.  Accredited professionals: ca. 250; total staff: ca. 550  Offices in Berlin, Munich, Cologne, Hamburg, Stuttgart and Brussels
  • 3. 312/09/2016 – Az. 05065-14 © BECKER BÜTTNERHELD Rechtsanwälte Wirtschaftsprüfer Steuerberater · PartGmbB Dr. Dörte Fouquet Dr. Dörte Fouquet is specialized in EU law and interna- tional legal relations, with focus on competition, infra- structure, energy and environment. She is legal advisor to companies, finance institutions, associations, go- vernmental agencies in Germany and other EU Member States, EU institutions and on international level.  Studies of Law at the Universities of Marburg and Hamburg  1982 Research assistant, University of Hamburg  1988 Ministry for the Environment and Energy, Hamburg  1991 Liaison office of Hamburg and Schleswig-Holstein to the EuropeanCommission in Brussels  1993 Partner at law firm Kuhbier, Brussels  Since 2011 Partner at BBH Brussels Rechtsanwältin / Lawyer · Partner 1000 Brussels, Belgium · Avenue Marnix 28 · Phone +32 (0)2 204 44-11 · doerte.fouquet@bbh-online.be
  • 4. 412/09/2016 – Az. 05065-14 © BECKER BÜTTNERHELD Rechtsanwälte Wirtschaftsprüfer Steuerberater · PartGmbB Agenda 1. Objective 2. Approach 3. Presentation of the ContractGuidances 4. Outlook
  • 5. 512/09/2016 – Az. 05065-14 © BECKER BÜTTNERHELD Rechtsanwälte Wirtschaftsprüfer Steuerberater · PartGmbB Objective  Facilitating cooperation betweenVRE and FID  Show what is possible, and what is not  Pre-defined Business Models as „inspiration“  Create „instruments“ to allow for easier implementation  „Check-lists“ of what needs to be considered  Provide a basis for discussion  Concrete „Contract Outlines “ perceived as more helpful  Point to Member State specifics  As different legal systems may necessitate different contractual settings  Give guidance to project developers in the Member States  „Contract Guidance“ targeted to Member State specifics
  • 6. 612/09/2016 – Az. 05065-14 © BECKER BÜTTNERHELD Rechtsanwälte Wirtschaftsprüfer Steuerberater · PartGmbB Approach Contract Outlines under German Law Drafting ContractOutlines underGerman Law has been the starting point  See what is possible and what is not  E.g. because certain settings would have unwanted consequences  See what is in practice chosen and what is not  E.g. because certain settings are not profitable in Germany  Draft ContractOutlines  Leave out technical etc. specificities and keep in general  Note where there are different options for parties to choose  Keep the language clear and simple  …
  • 7. 712/09/2016 – Az. 05065-14 © BECKER BÜTTNERHELD Rechtsanwälte Wirtschaftsprüfer Steuerberater · PartGmbB Approach Assumptions for all Business Models Drafting ContractOutlines underGerman Law showed the need for further clarification of the Business Models  Certain assumptions had to be made  E.g. regarding the location or the grid connection of theVRE  Some Business Models needed more differentiation  E.g. Business Model A2.3 was split into three scenarios  BUT: No assumptions onVRE plant and FID technical specificities  To keep the considerations sufficiently general in order to fit different projects
  • 8. 812/09/2016 – Az. 05065-14 © BECKER BÜTTNERHELD Rechtsanwälte Wirtschaftsprüfer Steuerberater · PartGmbB Approach Check-lists Based on the assumptions made, check-lists for contracts under the Business Models could be made  Which contracts are needed?  If more than one, maybe a framework contract makes sense?  What should be dealt with in those contracts?  Electricity supply?  Construction and/or operation of theVRE?  Financing arrangements?  Sharing of risks and liability?  …
  • 9. 912/09/2016 – Az. 05065-14 © BECKER BÜTTNERHELD Rechtsanwälte Wirtschaftsprüfer Steuerberater · PartGmbB Approach Member State specific considerations As Member States differ, some specificities may need to be taken into account  E.g. German law on property ownership differs from UK law  Important e.g. for ownership of theVRE plant on FID territory  Some contractual arrangements may not make sense in certain Member States  E.g. German rules on self-consumption rather strict regarding VRE owned and/or operated by third parties  Other specificities of a Member State may suggest other Business Models  …
  • 10. 1012/09/2016 – Az. 05065-14 © BECKER BÜTTNERHELD Rechtsanwälte Wirtschaftsprüfer Steuerberater · PartGmbB Approach Contract Guidance for each Member State Translating the Member State specifics identified into contract skeleton  „Skeleton“ structure with respective paragraphs  Each paragraph identifies what parties should lay down there  BUT:Options are mentioned and references are made to the Report on Member State specific considerations  Translation into the Member States languages  As easy reference tool  Together with Check-lists, Report and the fully formulated contract outlines = tool kit for the parties
  • 11. 1112/09/2016 – Az. 05065-14 © BECKER BÜTTNERHELD Rechtsanwälte Wirtschaftsprüfer Steuerberater · PartGmbB Presentation of the Contract Guidances  Two ContractGuidances  Electricity Supply from Off-siteVRE  Electricity bill reduction with On-siteVRE  Prepared for each Member State  Note: in the following presentation, the country-specific traits have been left out  Normally marked in footnotes
  • 12. 1212/09/2016 – Az. 05065-14 © BECKER BÜTTNERHELD Rechtsanwälte Wirtschaftsprüfer Steuerberater · PartGmbB Contract Guidance “Electricity supply with Off-site VRE” § 1 Objective (1) Supply IEC with electricity from a variable renewable energy plant owned and operated byVRE 1. (…where relevant to the Parties, indicate specifics of the plant, attach Annex with details) 2. … (2) Adaptation of IEC’s electricity demand through shifting production processes to times of high generation from VRE’s variable renewable power plant (3) Any other objectives § 2 Conduct of the Parties towards each other Due diligence and good faith
  • 13. 1312/09/2016 – Az. 05065-14 © BECKER BÜTTNERHELD Rechtsanwälte Wirtschaftsprüfer Steuerberater · PartGmbB Contract Guidance “Electricity supply with Off-site VRE” § 3 Electricity supply (1) Clauses on amount of electricity to be delivered and arrangements to regulate possible interruptions or reductions of the supplied amount: VRE shall supply electricity to VRE from the variable renewable energy plant(s) identified; supply without reserve or balancing electricity and net ofVRE own demand (2) Clauses on terms and conditions on the supply: Obligation for IEC to primarily use the electricity from the VRE plant(s) (take or pay); Clause allowing IEC to contract a third party supplier, where electricity from the VRE plant is insufficient; possibly identify the supplier (3) Obligation for VRE to operate the plant(s) at least a certain number of hours per year; explanation that surplus electricity exceeding IEC demand will not be bought from IEC (4) Possibly obligation for IEC to adapt production processes/demand to generation forecast fromVRE (in particular where price signal is deemed insufficient) (5) Obligation on VRE to provide IEC with forecast; possibly attach Annex with template for such forecast
  • 14. 1412/09/2016 – Az. 05065-14 © BECKER BÜTTNERHELD Rechtsanwälte Wirtschaftsprüfer Steuerberater · PartGmbB Contract Guidance “Electricity supply with Off-site VRE” §4 Price of the electricity (1) Possibly agreement on minimum prices for the VRE electricity to give VRE some investment security (2) Clause on prices, i.e. variable prices in order to set incentives for IEC to shift demand; reference to Price Sheet/Terms and Conditions of VRE in Annex; explanation that net prices, not including taxes and surcharges; clause explaining that in particular surcharges which come attached to grid use are not included (e.g. grid surcharge/federale bijdrag) (3) Clause on invoicing and payment (4) Adaptations to the prices – when set out in price sheet – to be communicated in advance; possibly vest a termination right for IEC §5 Renewable electricity and guarantees of origin (1) VRE to prove renewable quality of the electricity through guarantees of origin (2) No extra price for guarantees of origin
  • 15. 1512/09/2016 – Az. 05065-14 © BECKER BÜTTNERHELD Rechtsanwälte Wirtschaftsprüfer Steuerberater · PartGmbB Contract Guidance “Electricity supply with Off-site VRE” §6 Grid use and metering (1) IEC to have grid use contract with grid operator (2) VRE to have grid use contract (3) Definition of the grid access point through which the electricity is going to be supplied to IEC where this is not done elsewhere (4) Definition of the grid operator in charge for metering; likely the ones to whom IEC/VRE are connected §7 General Terms and Conditions Reference to the applicable General Terms and Conditions (VRE’s General Terms and Conditions), in Annex
  • 16. 1612/09/2016 – Az. 05065-14 © BECKER BÜTTNERHELD Rechtsanwälte Wirtschaftsprüfer Steuerberater · PartGmbB Contract Guidance “Electricity supply with Off-site VRE” §8 Duration of the contract (1) Entry into force (2) Duration of the contract: possibly several years and/or with annual prolongation in case none of the Parties terminates it (3) Rules on termination (4) Possibly clause on early termination (contractual damages clause) §9 Confidentiality (Standard) clause on confidentiality
  • 17. 1712/09/2016 – Az. 05065-14 © BECKER BÜTTNERHELD Rechtsanwälte Wirtschaftsprüfer Steuerberater · PartGmbB Contract Guidance “Electricity supply with Off-site VRE” § 10 Liability (1) No liability for VRE in case of disturbances in supply through disruption in grid operation or connection, provided not caused by non-authorized measures ofVRE (2) Obligation on VRE – where this can be reasonably expected – to inform IEC about grid-related disturbances (3) Liability clause (liability limited to intent only or intent and gross negligence of VRE and agents, as in accordance with the terms of the Law) (4) Possibly: Clause on contractual damages
  • 18. 1812/09/2016 – Az. 05065-14 © BECKER BÜTTNERHELD Rechtsanwälte Wirtschaftsprüfer Steuerberater · PartGmbB Contract Guidance “Electricity supply with Off-site VRE” § 10 Liability (1) No liability for VRE in case of disturbances in supply through disruption in grid operation or connection, provided not caused by non-authorized measures ofVRE (2) Obligation on VRE – where this can be reasonably expected – to inform IEC about grid-related disturbances (3) Liability clause (liability limited to intent only or intent and gross negligence ofVRE and agents, as in accordance with the terms of the Law) (4) Possibly: Clause on contractual damages §11 Force Majeure Parties freed from obligations in case of Force Majeure, where not otherwise provided for in contract; possibly reference to the terms of the Law
  • 19. 1912/09/2016 – Az. 05065-14 © BECKER BÜTTNERHELD Rechtsanwälte Wirtschaftsprüfer Steuerberater · PartGmbB Contract Guidance “Electricity supply with Off-site VRE” §12 Transferral of rights Clause on whether the Parties can transfer their rights and under which conditions §13 Derogatory clause Example: In the event that one of the clauses of this contract should be or become either invalid or impossible to perform, the other clauses of this contract will not be affected. The Parties will replace the respective provision by a valid provision which is valid and can be performed, but which comes as close as possible to the result of the provision replaced. §14 Amendments and additions (1) All amendments in writing, including amendments to this clause (2) Clause stating whether oral side agreements have been made/other relations between parties in place.
  • 20. 2012/09/2016 – Az. 05065-14 © BECKER BÜTTNERHELD Rechtsanwälte Wirtschaftsprüfer Steuerberater · PartGmbB Contract Guidance “Electricity bill reduction with On-site VRE” §1 Objective (1) Supply of renewable electricity to IEC by VRE, from variable renewable energy power plant on IEC’s property (2) IEC to adapt demand to production patterns of the variable renewable energy power plant; optimization of supply and demand (3) Any other objectives) §2 Conduct of the Parties towards each other Due diligence and good faith
  • 21. 2112/09/2016 – Az. 05065-14 © BECKER BÜTTNERHELD Rechtsanwälte Wirtschaftsprüfer Steuerberater · PartGmbB Contract Guidance “Electricity bill reduction with On-site VRE” §3 Electricity Supply Contract (1) Contract to be concluded between the Parties, under which VRE shall supply electricity to VRE from the variable renewable energy plant(s) identified; supply without reserve or balancing electricity and net ofVRE own demand (2) Obligation for IEC to primarily use the electricity from the VRE plant(s) (take or pay); Clause allowing IEC to contract a third party supplier, where electricity from the VRE plant is insufficient; possibly identify the supplier (3) Possibly right for IEC to market surplus electricity freely; alternative: explanation that IEC does not take on surplus electricity and right forVRE to market the electricity (4) Obligation forVRE to operate the plant(s) at least a certain number of hours per year (5) Possibly obligation for IEC to adapt production processes/demand to generation forecast from VRE (in particular where price signal is deemed insufficient) (6) Obligation on VRE to provide IEC with forecast; possibly attach Annex with template for such forecast (7) Provisions on the price of the electricity: possibly minimum prices (for VRE to have some financial security, however, noting that green certifiates may still be issued), variable prices (to give incentive for IEC to adapt consumption patterns), agreement on price adaptations
  • 22. 2212/09/2016 – Az. 05065-14 © BECKER BÜTTNERHELD Rechtsanwälte Wirtschaftsprüfer Steuerberater · PartGmbB Contract Guidance “Electricity bill reduction with On-site VRE” §4 Liability under the Electricity Supply Contract (1) Possibly agreement that VRE not liable for delays in delayed start of the electricity supply, except for intent or gross negligence, and/or exclusion of financial penalties (2) Exclusion of liability for disturbances in the supply due to faults in the infrastructure (owned and operated by IEC) (3) Possibly (where such risk shall be taken from VRE) exclusion of liability for VRE for deviations from the forecast, i.e. more or less production and the potential need for IEC to buy/sell on the market
  • 23. 2312/09/2016 – Az. 05065-14 © BECKER BÜTTNERHELD Rechtsanwälte Wirtschaftsprüfer Steuerberater · PartGmbB Contract Guidance “Electricity bill reduction with On-site VRE” §5 Technical specifications relating to the construction of the variable renewable energy power plant (1) Definition of the variable renewable energy power plant (source, size, etc),reference to annex for specifications (2) List of minimum “non-negotiable” points (i.e. source, size, location…) where such exist (3) Definition of location of the variable renewable energy power plant, reference to map in annex (4) Clause on how to deal with changes to the original plans (i.e. different equipment etc to be used), possibly negotiations in good faith §6 Specifications relating to the operation of the variable renewable energy power plant (1) Obligation on VRE to mainatain the variable renewable energy power plant operational and ensure proper functioning (2) Possibly define authority of IEC in operation of the variable renewable energy power plant, where such authority is agreed between the Parties
  • 24. 2412/09/2016 – Az. 05065-14 © BECKER BÜTTNERHELD Rechtsanwälte Wirtschaftsprüfer Steuerberater · PartGmbB Contract Guidance “Electricity bill reduction with On-site VRE” §7 Contract on access and use of IEC’s infrastructure (1) Contract to be concluded that IEC has to build and operate infrastructure connecting the variable renewable energy power plant to the connection point at IEC’s property to which electricity is to be supplied (2) Infrastructure to include certain minimum facilities, in particular metering 1. … (3) IEC to grant VRE the right to access and use such infrastructure for the purposes of delivering electricity to IEC; possibly explanation that this is not an exclusive (i.e. discriminatory) right (4) IEC not to charge any costs for access and use of infrastructure; neither costs for balancing or reserve will be passed on toVRE (5) Possibly (where IEC is responsible for marketing surplus production) possibility for IEC to regulate downVRE
  • 25. 2512/09/2016 – Az. 05065-14 © BECKER BÜTTNERHELD Rechtsanwälte Wirtschaftsprüfer Steuerberater · PartGmbB Contract Guidance “Electricity bill reduction with On-site VRE” §8 Contract on access and use of IEC’s industrial property (1) Parties to construct a right for VRE to access and use IEC’s property for the duration of the contract, possibly through limited personal servitude (2) After termination of the contract, VRE to remove any legacy stemming from the variable renewable energy power plant, if not agreed otherwise §9 Time frame for the construction and operation of the variable renewable energy power plant (1) Start date of construction (2) Definition of certain interim steps (3) Envisioned date for becoming operations (4) Duration of operation (e.g. 15 years) (5) Clause determining what happens in case of delays
  • 26. 2612/09/2016 – Az. 05065-14 © BECKER BÜTTNERHELD Rechtsanwälte Wirtschaftsprüfer Steuerberater · PartGmbB Contract Guidance „Electricity bill reduction with On-site VRE“ ... §11 Option to purchase the variable renewable energy power plant Possibly, option forVRE to purchase the variable renewable energy power plant after duration of the contract; if so provisions on agreement on price (e.g. based on expert opinion), explanation that in such caseVRE shall not be obliged to remove it … §13 General Terms and Conditions Agreement on applicable General Terms and Conditions §14 Economic Viability Clause Possibly, clause that where circumstances arise that affect the economic viability of the project (for either party), Parties to negotiate in good faith
  • 27. 2712/09/2016 – Az. 05065-14 © BECKER BÜTTNERHELD Rechtsanwälte Wirtschaftsprüfer Steuerberater · PartGmbB Contract Guidance „Electricity bill reduction with On-site VRE“  Other clauses resemble the ones from Contract Guidance „Electricity supply with Off-siteVRE“
  • 28. 2812/09/2016 – Az. 05065-14 © BECKER BÜTTNERHELD Rechtsanwälte Wirtschaftsprüfer Steuerberater · PartGmbB Outlook  Completion and translation of the Contract Guidance for each Member State  Taking into account today‘s discussion  Continued discussion of the Contract Guidance with relevant stakeholders  E.g. through renewable energy associations/stakeholder associations  Last revision of the Report if appropriate
  • 29. 2912/09/2016 – Az. 05065-14 © BECKER BÜTTNERHELD Rechtsanwälte Wirtschaftsprüfer Steuerberater · PartGmbB Thank you very much for your attention. Dr. Dörte fouquet, BBH Brussels Tel +32 (0)2 20444-11 Doerte.fouquet@bbh-online.be www.bbh-online.de
  • 30. 3012/09/2016 – Az. 05065-14 © BECKER BÜTTNERHELD Rechtsanwälte Wirtschaftsprüfer Steuerberater · PartGmbB Backup.