This instruction chart illustrates the safe isolation procedure to
be applied when working on electrical systems and equipment.
Isolation means the cutting off of the electrical supply to an electrical installation
for safety reasons.This is carried out by operating devices that have been provided
within the electrical installation for isolation to make the electrical system, or part
of it, DEAD.
Once the electrical supply has been isolated, the means of isolation must then be
secured so that the system/equipment cannot be inadvertently made live.
It is important that all sources of electrical supply are isolated and the system/
equipment proved to be DEAD before work is carried out.
The Electricity at Work Regulations requires the isolation of electrical equipment
and systems to prevent danger. All electrical systems or equipment must be
DEAD before installation or maintenance is carried out. A system is any part of
an electrical installation from the source of supply to the equipment installed.
The regulations also state that no person shall take part in any work activity
unless they possess the necessary technical knowledge and experience in order to
prevent danger, or is under suitable supervision.
An approved voltage indicator or test lamp must comply with the Health and
Safety Executive’s guidance note GS38. The approved voltage indicator or test
lamp must be “proved” using a known live supply or proving unit before and after
use to show it is working correctly.
NOTE: Both the Electricity atWork Regulations and the Health and Safety
Executive’s guidance note GS38 should be referred to with this guidance.
THE RULES OF SAFE ISOLATION ARE:
• 	Obtain permission to start work (a Permit may be required in
some situations)
• 	Identify the source(s) of supply using an approved voltage
indicator or test lamp
• 	Prove that the approved voltage indicator or test lamp is
functioning correctly
• 	Isolate the supply(s)
• 	Secure the isolation
• 	Prove the system/equipment is DEAD using an approved
voltage indicator or test lamp
• 	Prove that the approved voltage indicator or test lamp is
functioning correctly
• 	Put up warning signs to tell other people that the electrical
installation has been isolated
• 	Once the system/equipment is proved DEAD, work can begin

Contenu connexe

Tendances

Electrical Safety Techniques
Electrical Safety TechniquesElectrical Safety Techniques
Electrical Safety Techniques
Living Online
 
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGY
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGYLOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGY
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGY
jasonmorgan
 
Practical Electrical Substation Safety for Engineers and Technicians
Practical Electrical Substation Safety for Engineers and TechniciansPractical Electrical Substation Safety for Engineers and Technicians
Practical Electrical Substation Safety for Engineers and Technicians
Living Online
 
Construction Electrical Safety Training by South Carolina State Association
Construction Electrical Safety Training by South Carolina State AssociationConstruction Electrical Safety Training by South Carolina State Association
Construction Electrical Safety Training by South Carolina State Association
Atlantic Training, LLC.
 

Tendances (20)

Hipot cable-testing
Hipot cable-testingHipot cable-testing
Hipot cable-testing
 
Electrical safety
Electrical safetyElectrical safety
Electrical safety
 
Introduction to Arc Flash/Blast Electrical Hazards
Introduction to Arc Flash/Blast Electrical HazardsIntroduction to Arc Flash/Blast Electrical Hazards
Introduction to Arc Flash/Blast Electrical Hazards
 
Understanding Arc Flash
Understanding Arc FlashUnderstanding Arc Flash
Understanding Arc Flash
 
Electrical Safety Joliet Distribution Center
Electrical Safety Joliet Distribution CenterElectrical Safety Joliet Distribution Center
Electrical Safety Joliet Distribution Center
 
Electrical safety new
Electrical safety newElectrical safety new
Electrical safety new
 
Lockout tagout
Lockout tagoutLockout tagout
Lockout tagout
 
Electrical Safety, Personal Protective Equipment, & Z462 Compliance
Electrical Safety, Personal Protective Equipment, & Z462 ComplianceElectrical Safety, Personal Protective Equipment, & Z462 Compliance
Electrical Safety, Personal Protective Equipment, & Z462 Compliance
 
Electrical Safety Tips
Electrical Safety TipsElectrical Safety Tips
Electrical Safety Tips
 
Arc Flash Training
Arc Flash TrainingArc Flash Training
Arc Flash Training
 
8 steps-to-ensure-proper-lockout-tagout
8 steps-to-ensure-proper-lockout-tagout8 steps-to-ensure-proper-lockout-tagout
8 steps-to-ensure-proper-lockout-tagout
 
Electrical Safety Techniques
Electrical Safety TechniquesElectrical Safety Techniques
Electrical Safety Techniques
 
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGY
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGYLOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGY
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGY
 
testing formats
testing formatstesting formats
testing formats
 
Lockout Tagout by FirstSource
Lockout Tagout by FirstSourceLockout Tagout by FirstSource
Lockout Tagout by FirstSource
 
Nfpa 70 E
Nfpa 70 ENfpa 70 E
Nfpa 70 E
 
Lockout tagout
Lockout tagoutLockout tagout
Lockout tagout
 
Electrical safety
Electrical safetyElectrical safety
Electrical safety
 
Practical Electrical Substation Safety for Engineers and Technicians
Practical Electrical Substation Safety for Engineers and TechniciansPractical Electrical Substation Safety for Engineers and Technicians
Practical Electrical Substation Safety for Engineers and Technicians
 
Construction Electrical Safety Training by South Carolina State Association
Construction Electrical Safety Training by South Carolina State AssociationConstruction Electrical Safety Training by South Carolina State Association
Construction Electrical Safety Training by South Carolina State Association
 

Similaire à Isolation procedures for safe working on electrical systems and equipment by the jib

Unit 103 power_point_6_safe_isolation
Unit 103 power_point_6_safe_isolationUnit 103 power_point_6_safe_isolation
Unit 103 power_point_6_safe_isolation
wirethehouse
 
Electrical Safety1
Electrical Safety1Electrical Safety1
Electrical Safety1
jboullemet
 
Lockout Tag Out
Lockout Tag OutLockout Tag Out
Lockout Tag Out
sspuent
 
Construction Electrical Safety
Construction Electrical SafetyConstruction Electrical Safety
Construction Electrical Safety
DjCurrie
 
Lockout Tagout
Lockout TagoutLockout Tagout
Lockout Tagout
vtsiri
 

Similaire à Isolation procedures for safe working on electrical systems and equipment by the jib (20)

Lockout Tagout by Snohomish County
Lockout Tagout by Snohomish CountyLockout Tagout by Snohomish County
Lockout Tagout by Snohomish County
 
lockout-tagout-training.ppt
lockout-tagout-training.pptlockout-tagout-training.ppt
lockout-tagout-training.ppt
 
shock_arc_flash
shock_arc_flashshock_arc_flash
shock_arc_flash
 
Unit 103 power_point_6_safe_isolation
Unit 103 power_point_6_safe_isolationUnit 103 power_point_6_safe_isolation
Unit 103 power_point_6_safe_isolation
 
5980 dual column floor frames system support
5980 dual column floor frames system support5980 dual column floor frames system support
5980 dual column floor frames system support
 
Electrical Safety1
Electrical Safety1Electrical Safety1
Electrical Safety1
 
Sistema de monitorització de mesures elèctriques
Sistema de monitorització de mesures elèctriques Sistema de monitorització de mesures elèctriques
Sistema de monitorització de mesures elèctriques
 
Lockout Tagout.ppt
Lockout Tagout.pptLockout Tagout.ppt
Lockout Tagout.ppt
 
SAFETY PRESENTATION 2.pptx
SAFETY PRESENTATION 2.pptxSAFETY PRESENTATION 2.pptx
SAFETY PRESENTATION 2.pptx
 
Electrical by osha
Electrical by oshaElectrical by osha
Electrical by osha
 
The complete procedure of Logout & tagout
The complete procedure of Logout & tagoutThe complete procedure of Logout & tagout
The complete procedure of Logout & tagout
 
Lockout Tag Out
Lockout Tag OutLockout Tag Out
Lockout Tag Out
 
Lock Out Tag Out
Lock Out Tag OutLock Out Tag Out
Lock Out Tag Out
 
Lockout-Tagout 2023.ppt
Lockout-Tagout 2023.pptLockout-Tagout 2023.ppt
Lockout-Tagout 2023.ppt
 
LOTO.pptx
LOTO.pptxLOTO.pptx
LOTO.pptx
 
Live wire testing lock out tag out safe work procedure
Live wire testing lock out tag out safe work procedureLive wire testing lock out tag out safe work procedure
Live wire testing lock out tag out safe work procedure
 
Electrical Safety in healthcare.
Electrical Safety in healthcare.Electrical Safety in healthcare.
Electrical Safety in healthcare.
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentation
 
Construction Electrical Safety
Construction Electrical SafetyConstruction Electrical Safety
Construction Electrical Safety
 
Lockout Tagout
Lockout TagoutLockout Tagout
Lockout Tagout
 

Plus de Thorne & Derrick International

Plus de Thorne & Derrick International (20)

THORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical Eqpt
THORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical EqptTHORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical Eqpt
THORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical Eqpt
 
The Children North East Annual Golf Day Wednesday 9th May 2018
The Children North East Annual Golf Day Wednesday 9th May 2018The Children North East Annual Golf Day Wednesday 9th May 2018
The Children North East Annual Golf Day Wednesday 9th May 2018
 
3M Electrical Products Stocked By Thorne & Derrick International
3M Electrical Products Stocked By Thorne & Derrick International3M Electrical Products Stocked By Thorne & Derrick International
3M Electrical Products Stocked By Thorne & Derrick International
 
CATU Electrical Safety Catalogue
CATU Electrical Safety CatalogueCATU Electrical Safety Catalogue
CATU Electrical Safety Catalogue
 
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
 
THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...
THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...
THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...
 
Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...
Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...
Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...
 
Roxtec Cable Transit - B Frame Dimensional Drawing
Roxtec Cable Transit - B Frame Dimensional DrawingRoxtec Cable Transit - B Frame Dimensional Drawing
Roxtec Cable Transit - B Frame Dimensional Drawing
 
Pepperl & Fuchs SIL Training Certificate - T&D Adam Rowe
Pepperl & Fuchs SIL Training Certificate - T&D Adam RowePepperl & Fuchs SIL Training Certificate - T&D Adam Rowe
Pepperl & Fuchs SIL Training Certificate - T&D Adam Rowe
 
T&D Experts In Equipment For Explosive Atmospheres
T&D Experts In Equipment For Explosive AtmospheresT&D Experts In Equipment For Explosive Atmospheres
T&D Experts In Equipment For Explosive Atmospheres
 
Ultrasonic Flow Meters - Customer Specification Demand
Ultrasonic Flow Meters - Customer Specification DemandUltrasonic Flow Meters - Customer Specification Demand
Ultrasonic Flow Meters - Customer Specification Demand
 
Emtelle Fibre Optic Cables - Product Catalogue 2016
Emtelle Fibre Optic Cables - Product Catalogue 2016Emtelle Fibre Optic Cables - Product Catalogue 2016
Emtelle Fibre Optic Cables - Product Catalogue 2016
 
Thorne & Derrick Process Heating Brochure 2016
Thorne & Derrick Process Heating Brochure 2016Thorne & Derrick Process Heating Brochure 2016
Thorne & Derrick Process Heating Brochure 2016
 
SIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282D
SIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282DSIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282D
SIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282D
 
Ripley Utility Tool Cable Preparation Tools
Ripley Utility Tool Cable Preparation ToolsRipley Utility Tool Cable Preparation Tools
Ripley Utility Tool Cable Preparation Tools
 
RIDGID micro CD100 Combustible Gas Detector
RIDGID micro CD100 Combustible Gas DetectorRIDGID micro CD100 Combustible Gas Detector
RIDGID micro CD100 Combustible Gas Detector
 
Itron Fact Sheet
Itron Fact SheetItron Fact Sheet
Itron Fact Sheet
 
United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...
United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...
United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...
 
Filoform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec Sheet
Filoform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec SheetFiloform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec Sheet
Filoform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec Sheet
 
Eltherm Self-Regulating Trace Heating Cables
Eltherm Self-Regulating Trace Heating CablesEltherm Self-Regulating Trace Heating Cables
Eltherm Self-Regulating Trace Heating Cables
 

Dernier

Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
dharasingh5698
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
amitlee9823
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 

Dernier (20)

University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 

Isolation procedures for safe working on electrical systems and equipment by the jib

  • 1. Isolation Procedures for Safe Working on Electrical Systems and Equipment This instruction chart illustrates the safe isolation procedure to be applied when working on electrical systems and equipment. Isolation means the cutting off of the electrical supply to an electrical installation for safety reasons.This is carried out by operating devices that have been provided within the electrical installation for isolation to make the electrical system, or part of it, DEAD. Once the electrical supply has been isolated, the means of isolation must then be secured so that the system/equipment cannot be inadvertently made live. It is important that all sources of electrical supply are isolated and the system/ equipment proved to be DEAD before work is carried out. The Electricity at Work Regulations requires the isolation of electrical equipment and systems to prevent danger. All electrical systems or equipment must be DEAD before installation or maintenance is carried out. A system is any part of an electrical installation from the source of supply to the equipment installed. The regulations also state that no person shall take part in any work activity unless they possess the necessary technical knowledge and experience in order to prevent danger, or is under suitable supervision. An approved voltage indicator or test lamp must comply with the Health and Safety Executive’s guidance note GS38. The approved voltage indicator or test lamp must be “proved” using a known live supply or proving unit before and after use to show it is working correctly. NOTE: Both the Electricity atWork Regulations and the Health and Safety Executive’s guidance note GS38 should be referred to with this guidance. THE RULES OF SAFE ISOLATION ARE: • Obtain permission to start work (a Permit may be required in some situations) • Identify the source(s) of supply using an approved voltage indicator or test lamp • Prove that the approved voltage indicator or test lamp is functioning correctly • Isolate the supply(s) • Secure the isolation • Prove the system/equipment is DEAD using an approved voltage indicator or test lamp • Prove that the approved voltage indicator or test lamp is functioning correctly • Put up warning signs to tell other people that the electrical installation has been isolated • Once the system/equipment is proved DEAD, work can begin